Prior art keywords
pile
earthquake
underground continuous
continuous wall
resistant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000039237A
Other languages
Japanese (ja)
Other versions
JP4502442B2 (en
Inventor
Yoshio Takeuchi
義夫 武内
Akihiro Takeuchi
章博 竹内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nishimatsu Construction Co Ltd
Original Assignee
Nishimatsu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nishimatsu Construction Co Ltd filed Critical Nishimatsu Construction Co Ltd
Priority to JP2000039237A priority Critical patent/JP4502442B2/en
Publication of JP2001226987A publication Critical patent/JP2001226987A/en
Application granted granted Critical
Publication of JP4502442B2 publication Critical patent/JP4502442B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an earthquake resistant footing structure using piles and a diaphragm wall an earthquake resisting structure using the earthquake resistant footing structure and a pile reinforcing method by the diaphragm wall. SOLUTION: The earthquake resistant footing structure constituted of the diaphragm wall 1 embedded shallower than a load bearing layer of the earthquake resistant footing structure and piles 2 embedded up to the load bearing layer 5 combined with the diaphragm wall 1 is used. The earthquake resisting structure equipped with the earthquake resistant footing structure and pile reinforcing method are provided.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、建造物の耐震補強
に関し、より詳細には杭と地中連続壁とを用いた耐震基
礎構造、該耐震基礎構造を用いた耐震建造物及び地中連
続壁による杭補強方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an earthquake-resistant reinforcement of a building, and more particularly, to an earthquake-resistant foundation using a pile and an underground continuous wall, an earthquake-resistant building using the earthquake-resistant foundation, and an underground connection. The present invention relates to a method for reinforcing piles with walls.

【0002】[0002]

【従来の技術】地中連続壁は、これまで耐震壁、合成
壁、二方向版耐側圧壁、壁杭等に多用されており、現在
に至るまで数多くが施工されている。
2. Description of the Related Art Underground continuous walls have been frequently used for earthquake-resistant walls, composite walls, two-way version anti-compression walls, wall piles, etc., and many have been constructed to date.

【0003】図4には、従来の地中連続壁を用いた建造
物を示す。図4(a)は、建造物の縦断面図を示し、図
4(b)は、この建造物の耐震補強等のために用いられ
る地中連続壁の横断面図を示す。図4(a)に示された
建造物は、地上に構築された上部建造物40と、図4
(b)に示されるように地下室41を4方向から構築す
る地中連続壁42とから構成されている。図4(a)に
示されるように、地中連続壁42の天端42aは、上部
建造物40に連結され、この地中連続壁42は、天端4
2aから地盤43を通して鉛直方向へと延ばされて、下
端42bが、支持層44へと根入れされていて、上部建
造物40を補強している。
FIG. 4 shows a conventional building using underground diaphragm walls. FIG. 4A shows a longitudinal sectional view of a building, and FIG. 4B shows a transverse sectional view of an underground continuous wall used for seismic reinforcement of the building. The building shown in FIG. 4A includes an upper building 40 built on the ground and a building shown in FIG.
As shown in (b), the underground room 41 is constructed from underground continuous walls 42 that are constructed from four directions. As shown in FIG. 4A, the top 42 a of the underground continuous wall 42 is connected to the upper building 40, and the underground continuous wall 42 is connected to the top 4
Extending vertically from 2a through the ground 43, the lower end 42b is embedded in the support layer 44 to reinforce the upper building 40.

【0004】図5は、従来の地中連続壁を用いた別の建
造物を示した図である。図4と同様に図5(a)は、建
造物の縦断面図であり、図5(b)は、地中連続壁の横
断面図である。図5(a)に示された建造物は、地上に
構築されたフーチング、耐圧盤や地中梁といった構造体
50と、図5(b)に示される断面形状を有する地中連
続壁51とから構成されている。地中連続壁51の天端
51aは、構造体50に連結され、この地中連続壁51
は、天端51aから地盤52を通して鉛直方向へと延ば
されて、下端51bが、支持層53へと根入れされてい
て、図4で示された建造物と同様に、構造体50やこの
構造体50上に構築される建造物を補強している。
FIG. 5 is a view showing another building using a conventional underground continuous wall. Like FIG. 4, FIG. 5A is a longitudinal sectional view of a building, and FIG. 5B is a transverse sectional view of an underground continuous wall. The building shown in FIG. 5A includes a structure 50 such as a footing, a pressure plate and an underground beam constructed on the ground, and an underground continuous wall 51 having a cross-sectional shape shown in FIG. It is composed of The top end 51a of the underground continuous wall 51 is connected to the structure 50, and the underground continuous wall 51
Is extended vertically from the top end 51a through the ground 52, and the lower end 51b is buried in the support layer 53. Like the building shown in FIG. The building built on the structure 50 is reinforced.

【0005】上述したように、地中連続壁は、上部構造
を支持するための基礎として多く使用されている。しか
しながら、大地震、例えばレベル2の大地震により基礎
構造が被害を受けると、上部建造物の傾斜・倒壊といっ
た被害に直結する。このため、従来の地中連続壁の耐震
性を向上させ、さらに建造物の耐震性を向上させる必要
がある。
As described above, underground diaphragm walls are often used as a basis for supporting superstructures. However, if the foundation structure is damaged by a large earthquake, for example, a large level 2 earthquake, it is directly linked to damage such as inclination and collapse of the upper building. For this reason, it is necessary to improve the seismic resistance of the conventional underground continuous wall and further improve the seismic resistance of the building.

【0006】基礎の地盤側に設けられる耐震構造体の耐
震性を向上させるための試みとして従来では、既製杭、
鋼管杭、場所打ち杭といった各種の杭を用いる補強方法
が知られており、杭自体の耐震補強を行うため杭頭部を
補強した杭が提案されている。このような補強が行われ
た杭を図6に示す。図6(a)は、杭頭部が補強された
SC杭を示す。この耐震補強は、既製杭や、場所打ち杭
60の耐震補強のため、既製杭や場所打ち杭60といっ
た円筒形の耐震構造体の杭頭部61に鋼管を接続し、杭
頭部61と鋼管とを互いに付着させることにより曲げ剛
性及び剪断剛性を向上させており、これらは例えばSC
杭として知られている。このようなSC杭を用いること
により、大地震時に杭頭部へと加えられる曲げ応力及び
剪断力に対する耐力が得られている。また、図6(b)
は、杭頭部61aを拡大させて曲げ応力及び剪断応力に
対抗させた拡頭杭を示す。いずれの杭においても杭頭部
が補強されることにより、杭自体の耐久性の向上を達成
するようにされている。
Conventionally, as an attempt to improve the seismic resistance of an earthquake-resistant structure provided on the ground side of the foundation, a conventional pile,
Reinforcing methods using various types of piles, such as steel pipe piles and cast-in-place piles, are known, and piles with reinforced pile heads have been proposed to perform seismic reinforcement of the piles themselves. FIG. 6 shows a pile with such reinforcement. FIG. 6A shows an SC pile in which the pile head is reinforced. In this seismic reinforcement, a steel pipe is connected to a pile head 61 of a cylindrical seismic structure such as a ready-made pile or a cast-in-place pile 60 for seismic reinforcement of a ready-made pile or a cast-in-place pile 60. Are attached to each other to improve the bending rigidity and the shear rigidity.
Also known as a stake. By using such an SC pile, strength against bending stress and shear force applied to the pile head during a large earthquake is obtained. FIG. 6 (b)
Indicates an enlarged pile in which the pile head 61a is enlarged to resist bending stress and shear stress. In any of the piles, the pile head is reinforced, thereby improving the durability of the pile itself.

【0007】地中連続壁についても大地震時は、地表面
付近において大きな曲げ応力が加えられる。しかしなが
ら、これまでのところ地中連続壁は、特開平9−332
468号公報、特開平11−269895号公報、特開
平11−148143号公報、特開平11−10729
5号公報において開示されているように、杭等によって
耐震補強された構造物の周囲に単独で設置され、地盤変
形抑制領域を形成させるために用いられているのみであ
り、地中連続壁と杭とを組み合わせて一体化させ、直接
建造物の基礎として用いる耐震補強についてはほとんど
検討されていないのが現状である。
[0007] A large bending stress is also applied to the underground continuous wall near the ground surface during a large earthquake. However, so far the underground diaphragm wall has been disclosed in Japanese Unexamined Patent Publication No. 9-332.
468, JP-A-11-269895, JP-A-11-148143, JP-A-11-10729
As disclosed in Japanese Patent Publication No. 5 (1993), it is installed solely around a structure reinforced by seismic reinforcement with a pile or the like, and is used only to form a ground deformation suppression area. At present, there is little study on seismic retrofitting that is integrated with piles and used as the foundation of direct buildings.

【0008】図7には、従来の地中連続壁を用いた耐震
基礎構造と、地震時に地中連続壁に発生する曲げモーメ
ントの概略を示す。図7(a)に示した耐震基礎構造で
は、地中連続壁71は、その天端71aが地表面G.L
にまで延ばされており、その下端71bが、支持層72
へと根入れされて構築されていて、上部構造物73の鉛
直方向荷重を支持している。大地震時に地震により発生
する曲げモーメントや剪断応力は、地表面G.Lに近い
側において大きく、地表面G.Lから深くなるにつれて
小さくなることが知られている。これを概略的に示した
のが図7(b)である。
FIG. 7 schematically shows a conventional earthquake-resistant foundation structure using an underground continuous wall and a bending moment generated on the underground continuous wall during an earthquake. In the earthquake-resistant foundation structure shown in FIG. 7A, the underground continuous wall 71 has a top 71a whose ground surface G. L
And a lower end 71 b thereof is supported by a support layer 72.
And supports the vertical load of the upper structure 73. The bending moment and shear stress generated by an earthquake at the time of a large earthquake are determined by the ground surface G. L near the ground surface G.L. It is known that the depth decreases from L. This is schematically shown in FIG. 7 (b).

【0009】上部建造物73の転倒モーメントに代表さ
れる上部建造物73の破壊につながる、図7(b)に示
す曲げモーメントが発生するような状況における、地表
面G.L付近における補強を杭のみにより行う場合に
は、杭の小さい断面に対して直接地震による水平力が加
えられるため、杭のみでは充分とはいえず、杭頭部付近
において、杭が破壊される場合が多い。このため地表面
G.Lでは、剛性が杭よりも大きい地中連続壁を用いる
ことが、大地震時の転倒モーメント、曲げモーメント、
剪断応力に対抗するためには望ましい。
In a situation where a bending moment shown in FIG. 7B is generated, which leads to the destruction of the upper building 73 typified by the overturning moment of the upper building 73, the ground surface G. When the reinforcement near L is performed only by the pile, the horizontal force due to the earthquake is directly applied to the small section of the pile. Therefore, the pile alone is not sufficient, and the pile is destroyed near the pile head. Often. For this reason, the ground surface G. In L, the use of an underground continuous wall having a greater rigidity than a pile makes it possible to reduce the overturn moment, bending moment,
Desirable to combat shear stress.

【0010】しかしながら、地中連続壁71を地表面
G.Lから支持層72まで根入れするように構築する
と、杭のみで耐震補強を行う場合に比べて掘削量が増え
るため掘削コストがかさみ、さらには掘削土量が増え、
投棄又は処分しなければならない土砂が増加することに
なり、環境的な観点からは掘削土の処分のためのコスト
や、処理場所の確保といった不都合が生じることとなっ
ている。
However, the underground continuous wall 71 is connected to the ground surface G. If it is constructed so as to be embedded from L to the support layer 72, the excavation amount is increased as compared with the case where seismic reinforcement is performed using only the pile, so that the excavation cost is increased, and the excavated soil amount is also increased.
The amount of sediment that must be discarded or disposed of increases, resulting in inconveniences such as costs for disposal of excavated soil and securing of a disposal site from an environmental point of view.

【0011】また、地中連続壁71を支持層72にまで
達するように掘削された掘削孔へと鉄筋挿入やコンクリ
ート打設をする際には、杭を用いて耐震補強する場合に
比較して打設するコンクリートの量及び、鉄筋の量が増
大し、これにしたがって施工コストが増大するという不
都合も生じることとなっている。
Further, when inserting a reinforcing bar or placing concrete into an excavation hole excavated so that the underground continuous wall 71 reaches the support layer 72, compared with the case where seismic reinforcement is carried out using a pile. The amount of concrete to be poured and the amount of rebar are increased, and there is a disadvantage that the construction cost is increased accordingly.

【0012】したがって、これまで杭と、地中連続壁と
を一体化させ、より効果的に耐震補強を行うことを可能
とする耐震基礎構造が必要とされている。
[0012] Therefore, there has been a need for a seismic base structure that integrates the pile and the underground continuous wall and enables more effective seismic reinforcement.

【0013】また、より効果的に耐震補強が行われた耐
震建造物が必要とされている。
There is also a need for a seismic building with more effective seismic reinforcement.

【0014】さらには、新設される杭ばかりではなく、
既設杭についても地中連続壁により効果的に補強を行う
ことを可能とし、効果的に地盤の液状化対策を提供する
ことが可能な杭補強方法が必要とされている。
[0014] Furthermore, not only newly installed piles,
There is a need for a method of reinforcing piles that enables existing piles to be effectively reinforced by underground continuous walls and that can effectively provide countermeasures against liquefaction of the ground.

【0015】さらに、地中連続壁を構築するための掘削
土量やコンクリートといった材料を減少させることがで
き、さらには掘削土量を低減することにより建設残土の
量を低減させ環境的に優れた耐震基礎構造を提供するこ
とが必要とされている。
Furthermore, the amount of excavated soil for constructing the underground continuous wall and materials such as concrete can be reduced, and the amount of excavated soil can be reduced to reduce the amount of construction residual soil, thereby improving the environment. There is a need to provide a seismic foundation.

【0016】[0016]

【発明が解決しようとする課題】したがって、本発明
は、杭と、地中連続壁とを一体化させた耐震基礎構造を
提供することを目的とする。
Accordingly, an object of the present invention is to provide an earthquake-resistant foundation structure in which a pile and an underground continuous wall are integrated.

【0017】また、本発明は、より効果的に耐震補強が
行われた耐震建造物を提供することを目的とする。
Another object of the present invention is to provide a seismic building in which seismic reinforcement is more effectively performed.

【0018】さらには、本発明は、新設される杭ばかり
ではなく、既設杭についても地中連続壁により効果的に
補強を行うことを可能とし、効果的に地盤の液状化対策
を提供することが可能な杭補強方法を提供することを目
的とする。
Further, the present invention makes it possible to effectively reinforce not only new piles but also existing piles by using underground continuous walls, and to provide an effective countermeasure against liquefaction of the ground. It is an object of the present invention to provide a pile reinforcing method capable of performing the above.

【0019】また、本発明は、地中連続壁を構築するた
めの掘削土量やコンクリートといった材料を減少させる
ことができ、さらには掘削土量を低減することにより建
設残土の量を低減させ環境的に優れた耐震基礎構造を提
供することを目的とする。
Further, the present invention can reduce the amount of excavated soil and materials such as concrete for constructing an underground continuous wall, and further reduce the amount of excavated soil to reduce the amount of construction residual soil to reduce environmental impact. The purpose is to provide an excellent seismic foundation structure.

【0020】[0020]

【課題を解決するための手段】本発明の上記目的は、本
発明の耐震基礎構造、耐震建造物、及び杭補強方法を提
供することにより提供される。
The above objects of the present invention are provided by providing an earthquake-resistant foundation structure, an earthquake-resistant building, and a pile reinforcing method according to the present invention.

【0021】本発明の請求項1の発明によれば、支持層
より浅く根入れされた地中連続壁と、該地中連続壁に一
体化され上記支持層にまで根入れされた杭とからなる耐
震基礎構造が提供される。
According to the first aspect of the present invention, there is provided an underground continuous wall which is deeply embedded in the support layer and a pile which is integrated with the underground continuous wall and is deeply embedded in the support layer. An earthquake-resistant foundation structure is provided.

【0022】本発明の請求項2の発明によれば、上記杭
が上記地中連続壁の内部にまで延ばされていることを特
徴とする耐震基礎構造が提供される。
According to the invention of claim 2 of the present invention, there is provided an earthquake-resistant foundation structure, wherein the pile is extended to the inside of the underground continuous wall.

【0023】本発明の請求項3の発明によれば、上記杭
は、既製杭、又は鋼管杭、又は場所打ち杭であることを
特徴とする耐震基礎構造が提供される。
According to the invention of claim 3 of the present invention, there is provided an earthquake-resistant foundation structure characterized in that the pile is a ready-made pile, a steel pipe pile, or a cast-in-place pile.

【0024】本発明の請求項4の発明によれば、支持層
より浅く根入れされた地中連続壁と、該地中連続壁に一
体化され上記支持層にまで根入れされた杭とからなる耐
震基礎構造を有する耐震建造物が提供できる。
According to the invention of claim 4 of the present invention, the underground continuous wall shallower than the support layer and the pile integrated into the underground continuous wall and deep into the support layer An earthquake-resistant building having an earthquake-resistant foundation structure can be provided.

【0025】本発明の請求項5の発明によれば、上記杭
が上記地中連続壁の内部にまで延ばされていることを特
徴とする耐震建造物が提供できる。
According to the invention of claim 5 of the present invention, it is possible to provide an earthquake-resistant building, wherein the pile is extended to the inside of the underground continuous wall.

【0026】本発明の請求項6の発明によれば、上記杭
は、既製杭、又は鋼管杭、又は場所打ち杭であることを
特徴とする耐震建造物が提供できる。
According to the invention of claim 6 of the present invention, it is possible to provide an earthquake-resistant building, wherein the pile is a ready-made pile, a steel pipe pile, or a cast-in-place pile.

【0027】本発明の請求項7の発明によれば、複数の
杭の杭頭部を、該杭頭部と一体化され支持層より浅く根
入れされた地中連続壁により連結すること特徴とする杭
補強方法が提供される。
According to a seventh aspect of the present invention, the pile heads of a plurality of piles are connected to each other by an underground continuous wall integrated with the pile heads and buried shallower than the support layer. Is provided.

【0028】本発明の請求項8の発明によれば、上記杭
が上記地中連続壁の内部にまで延ばされていることを特
徴とする杭補強方法が提供される。
According to the invention of claim 8 of the present invention, there is provided a pile reinforcing method, wherein the pile is extended to the inside of the underground continuous wall.

【0029】本発明の請求項9の発明によれば、上記杭
は、既製杭、又は鋼管杭、又は場所打ち杭であることを
特徴とする杭補強方法が提供される。
According to a ninth aspect of the present invention, there is provided a pile reinforcing method, wherein the pile is a ready-made pile, a steel pipe pile, or a cast-in-place pile.

【発明の実施の形態】以下本発明を図面をもって詳細に
説明する。図1は、本発明の耐震基礎構造の構成を示し
た斜視図である。図1に示した耐震基礎構造は、コンク
リート等で構築された地中連続壁1と、この地中連続壁
1の壁頭部に対して一体化された杭2とから構成されて
いる。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below in detail with reference to the drawings. FIG. 1 is a perspective view showing the configuration of the earthquake-resistant foundation structure of the present invention. The earthquake-resistant foundation structure shown in FIG. 1 includes an underground continuous wall 1 made of concrete or the like and a pile 2 integrated with the wall head of the underground continuous wall 1.

【0030】本発明の耐震基礎構造において用いられる
地中連続壁1は、地表面G.Lから支持層レベルS.L
より浅く根入れされて構築されている。また、地中連続
壁1の上端1aからは、地中連続壁1と一体化された杭
2が深さ方向へと支持層レベルS.Lを超えて支持層ま
で延ばされていて、図示しない上部建造物からの鉛直方
向荷重を支持している。地中連続壁1の根入れ深さは、
本発明においては特に制限はないが、地震により発生す
る曲げモーメント、剪断力が大きい地表面G.L付近に
おいて、地中連続壁1が杭2を補強できるようにするこ
とが好ましい。特に大規模地震の際の曲げモーメントが
地中連続壁1の鉛直方向の長さにわたって地下約10m
程度にまで影響すること、及び掘削土量を低減させて、
建設残土を低減させるという環境的な面、及び掘削コス
トを削減することを考えれば、地中連続壁1は、地表面
G.Lから深さ方向へと約5m〜約10m程度の根入れ
深さとして構築することが望ましい。
The underground diaphragm wall 1 used in the earthquake-resistant foundation structure of the present invention has a ground surface G. L to the support layer level S.L. L
It is built with shallower roots. Also, from the upper end 1a of the underground continuous wall 1, a pile 2 integrated with the underground continuous wall 1 extends in the depth direction at the support layer level S.P. It extends to the support layer beyond L and supports a vertical load from an upper building (not shown). The penetration depth of the underground continuous wall 1 is
Although there is no particular limitation in the present invention, a ground surface having a large bending moment and a large shear force generated by an earthquake. It is preferable that the underground continuous wall 1 can reinforce the pile 2 near L. In particular, the bending moment during a large-scale earthquake is about 10 m underground over the vertical length of the underground continuous wall 1.
Effect to the extent, and reduce the amount of excavated soil,
Considering the environmental aspect of reducing the construction surplus soil and reducing the excavation cost, the underground diaphragm wall 1 has a ground surface G. It is desirable to construct from about L to a depth direction of about 5 m to about 10 m in the depth direction.

【0031】本発明の耐震基礎構造は、種々の工法によ
り構築することができる。例えば、地中連続壁1を構築
する際に、地中連続壁1を構築するための掘削を行い、
この掘削と同時に杭を支持層にまで根入れして構築する
ため別途杭を構築するための掘削を支持層に達するまで
行い、地中連続壁1と杭2とをコンクリートを打設して
同時に構築することもできる。この際、杭2のための掘
削と、地中連続壁1のための掘削との順は、適宜施工性
等を考慮して適宜設定することができる。
The earthquake-resistant foundation structure of the present invention can be constructed by various construction methods. For example, when constructing the underground continuous wall 1, excavation for constructing the underground continuous wall 1 is performed,
Simultaneously with this excavation, excavation for constructing a separate pile is performed until the pile reaches the support layer, and the underground continuous wall 1 and the pile 2 are poured into concrete at the same time. Can also be built. At this time, the order of excavation for the pile 2 and excavation for the underground continuous wall 1 can be appropriately set in consideration of workability and the like.

【0032】この際、杭を構築する際に用いる鉄筋篭を
支持層から地中連続壁1内部に達するまで延長すること
により、地中連続壁1と、杭2との間、特に地中連続壁
1の下端1bにおける地中連続壁1と杭2との間の一体
性をより向上させることができる。このような構成とす
ることにより、地震時に地中連続壁1と杭2との境界部
において応力が集中しても境界部において、地中連続壁
1と杭2とが分断されてしまわないように地中連続壁1
と杭2との一体性をより向上させることができる。ま
た、地中連続壁1と、杭2との境界部へと応力が集中し
てしまうのを防止するため、本発明の耐震基礎構造にお
いては、地中連続壁1と、杭2との境界部を地中連続壁
1の下端1bから杭2の径まで順次減少して行くような
テーパとして形成することも可能である。
At this time, the reinforcing steel cage used for constructing the pile is extended from the support layer to the inside of the underground continuous wall 1, so that the underground continuous wall 1 and the pile 2, particularly the underground continuous The integrity between the underground continuous wall 1 and the pile 2 at the lower end 1b of the wall 1 can be further improved. With such a configuration, even if stress concentrates at the boundary between the underground continuous wall 1 and the pile 2 during an earthquake, the underground continuous wall 1 and the pile 2 are not separated at the boundary. Underground wall 1
And the pile 2 can be further integrated. Further, in order to prevent stress from being concentrated on the boundary between the underground continuous wall 1 and the pile 2, in the earthquake-resistant foundation structure of the present invention, the boundary between the underground continuous wall 1 and the pile 2 is used. It is also possible to form the portion as a taper that gradually decreases from the lower end 1 b of the underground continuous wall 1 to the diameter of the pile 2.

【0033】また、プレキャストコンクリート杭といっ
た既製杭を用いる場合には、地中連続壁1を構築するた
めの掘削を行い、杭を支持層にまで根入れして構築する
ための掘削を行った後、プレキャストコンクリート杭
や、鋼管杭を掘削孔へと埋設し、その後地中連続壁1を
コンクリートを場所打ちして構築することもできる。こ
のプレキャストコンクリート杭や鋼管杭を構築する場合
にも、杭の少なくとも一部が地中連続壁1の内部にまで
延びるように構築されることが、境界部における破壊を
防止する上で好ましい。この場合にも地中連続壁1と、
杭2との境界部へと応力が集中してしまうのを防止する
ため、本発明の耐震基礎構造においては、地中連続壁1
と、杭2との境界部を地中連続壁1の下端1bから杭2
の径まで順次減少して行くようなテーパとして形成して
も良い。
In the case where a ready-made pile such as a precast concrete pile is used, excavation for constructing the underground continuous wall 1 and excavation for constructing the pile up to the support layer are performed. Alternatively, a precast concrete pile or a steel pipe pile may be buried in an excavation hole, and then the underground continuous wall 1 may be constructed by casting concrete in place. When constructing this precast concrete pile or steel pipe pile, it is preferable that at least a part of the pile is constructed so as to extend to the inside of the underground continuous wall 1 in order to prevent breakage at the boundary. Also in this case, the underground diaphragm wall 1
In order to prevent stress from concentrating on the boundary with the pile 2, the underground continuous wall 1
And the boundary between the pile 2 and the lower end 1b of the underground continuous wall 1
May be formed as a taper that gradually decreases to the diameter of.

【0034】さらに、本発明によりすでに地中に構築さ
れた既製杭を補強する場合には、杭2の周囲の地盤を杭
2の一部を埋設させつつ地中連続壁1を構築できるよう
に掘削し、この掘削部へとコンクリートを打設して地中
連続壁1を構築することにより、杭2と、地中連続壁1
とが一体化されることにより補強した本発明の耐震基礎
構造を構築することができる。また、この場合にも地中
連続壁1と、杭2との境界部を地中連続壁1の下端1b
から杭2の径まで順次減少して行くようなテーパとして
形成することができる。
Further, in the case of reinforcing a ready-made pile already built in the ground according to the present invention, the underground continuous wall 1 can be constructed while burying a part of the pile 2 around the ground around the pile 2. The pile 2 and the underground continuous wall 1 are excavated, and concrete is poured into the excavated portion to construct the underground continuous wall 1.
The reinforced base structure of the present invention, which is reinforced by being integrated with, can be constructed. Also in this case, the boundary between the underground continuous wall 1 and the pile 2 is connected to the lower end 1b of the underground continuous wall 1.
To the diameter of the pile 2.

【0035】上述した本発明における地中連続壁1を構
築する際の工法には特に制限はなく、具体的には例えば
地中連続鉄筋コンクリート壁工法、ソイルセメント壁工
法、泥水固化壁工法といった周知の工法を挙げることが
できる。
There is no particular limitation on the method of constructing the underground continuous wall 1 according to the present invention described above, and specific examples thereof include well-known underground continuous reinforced concrete wall construction, soil cement wall construction, and muddy solidification wall construction. The method of construction can be mentioned.

【0036】また、本発明に用いることができる杭とし
ては、プレキャストコンクリート杭、といった既製杭、
鋼管杭、場所打ち杭等を挙げることができ、新設される
杭の他、既設の杭であっても良い。
The piles that can be used in the present invention include precast concrete piles such as precast concrete piles,
Steel pipe piles, cast-in-place piles, and the like may be used. In addition to newly-installed piles, existing piles may be used.

【0037】図2は、図1に示した本発明の耐震基礎構
造を図1の矢線A−Aに沿った断面とした断面図であ
る。図2に示されるように、地表面G.Lには、フーチ
ング基礎、耐圧盤といった上部建造物の基礎3が設けら
れている。また、図示しないものの基礎3としては、地
中梁を用いることもできる。この基礎3の下側の地盤4
中には、本発明の耐震基礎構造が構築されている。この
耐震基礎構造は、支持層5に達しない程度の根入れ深さ
として構築された地中連続壁1の天端1aが基礎3に連
結され、また地中連続壁1の下側端1bからは、杭2が
延びており、この杭2が支持層5にまで根入れされてい
る。
FIG. 2 is a sectional view of the earthquake-resistant foundation structure of the present invention shown in FIG. 1 taken along the line AA in FIG. As shown in FIG. L has a foundation 3 for an upper building such as a footing foundation or a pressure plate. Also, an underground beam can be used as the foundation 3 (not shown). The ground 4 below this foundation 3
Inside, the earthquake-resistant foundation structure of the present invention is constructed. In this earthquake-resistant foundation structure, the top end 1a of the underground continuous wall 1 constructed so as not to reach the support layer 5 is connected to the foundation 3, and from the lower end 1b of the underground continuous wall 1. In the figure, the pile 2 extends, and the pile 2 is rooted in the support layer 5.

【0038】本発明においては、図2に示されるように
地震時に大きな水平力が加えられる部分に対しては、地
中連続壁1の平面構造により水平力を受け止めて杭頭部
に加えられる水平力を分散させるものである。さらに、
上部建造物から加えられる鉛直方向荷重については、地
中連続壁1を介して杭2を支持層にまで根入れすること
により鉛直荷重を支持させるものである。また、杭2
は、地中連続壁1に一体化されていて、地中連続壁1に
より複数の杭の杭頭部を連結させることにより杭頭部の
補強をより確実に行うと共に、地盤の液状化をより効果
的に防止することができるようにしている。
In the present invention, as shown in FIG. 2, for a portion to which a large horizontal force is applied during an earthquake, the horizontal structure is applied to the pile head by receiving the horizontal force by the plane structure of the underground continuous wall 1. Disperse the force. further,
Regarding the vertical load applied from the upper building, the vertical load is supported by piercing the pile 2 through the underground continuous wall 1 to the support layer. In addition, pile 2
Is integrated with the underground continuous wall 1, and the pile heads of a plurality of piles are connected by the underground continuous wall 1 to more reliably reinforce the pile head and to improve the liquefaction of the ground. So that it can be effectively prevented.

【0039】本発明においては、上述したように補強さ
れた基礎3上に図示しない上部建造物を構築して、耐震
性の向上した耐震建造物が構築される。この耐震建造物
は、本発明の耐震基礎構造により補強されているので、
特に地震等の際に地下構造の破壊を効果的に防止できる
ので、上部建造物の破壊や、倒壊といった損傷を防止す
ることができる。また、基礎3や上部構造物は、必ずし
も地表面G.Lよりも上に構築されるのではなく、地下
構造部分を有していても良い。
In the present invention, an upper building (not shown) is constructed on the reinforced foundation 3 as described above, thereby constructing an earthquake-resistant building with improved earthquake resistance. Since this earthquake-resistant building is reinforced by the earthquake-resistant foundation structure of the present invention,
In particular, since the destruction of the underground structure can be effectively prevented in the event of an earthquake or the like, damage such as destruction or collapse of the upper building can be prevented. In addition, the foundation 3 and the upper structure are not necessarily the ground surface G. Instead of being built above L, it may have an underground structure.

【0040】以下図3を用いて本発明の耐震基礎構造の
補強作用について詳細に説明する。図3は、本発明の耐
震基礎構造と、この耐震基礎構造に対してレベル2程度
の大地震により加えられる応力とを概略的に示した図で
ある。本発明の耐震基礎構造は、図3に示されているよ
うに地中連続壁1と、この地中連続壁1に一体化され、
支持層にまで根入れされた杭2とから構成されている。
Hereinafter, the reinforcing effect of the earthquake-resistant foundation structure of the present invention will be described in detail with reference to FIG. FIG. 3 is a diagram schematically showing an earthquake-resistant foundation structure of the present invention and stress applied to the earthquake-resistant foundation structure by a large earthquake of level 2 or so. The earthquake-resistant foundation structure of the present invention is integrated with the underground continuous wall 1 and the underground continuous wall 1 as shown in FIG.
And a pile 2 embedded in the support layer.

【0041】図示しない上部建造物からの慣性力が地震
の際に本発明の基礎構造体に作用すると、図3に示され
るように、壁頭部に最大の曲げモーメントFbend
発生する。この曲げモーメントFbendが杭の強度を
上回る場合には、従来の杭のみの基礎は、破壊され、そ
れに伴って上部建造物が傾斜したり、倒壊する。
When an inertial force from an upper building (not shown) acts on the substructure of the present invention during an earthquake, a maximum bending moment Fbend is generated at the wall head as shown in FIG. If the bending moment F bend exceeds the strength of the pile, the conventional pile-only foundation is destroyed, and the upper structure is tilted or collapsed accordingly.

【0042】地震時に発生する曲げモーメントの地表面
G.Lから支持層までの深さ方向に沿った分布は、図7
(b)に示すように地表面G.L付近で大きく、支持層
に近づくにつれて小さくなり、支持層付近では、ほぼ0
となる。このため、支持層付近では、杭による補強程度
で充分鉛直荷重及び地震により発生する曲げモーメント
に対抗することが可能となる。また、地表付近では、図
3のFhorzで示される地震の水平力を受け止めるこ
とが可能となる。
Ground surface of bending moment generated during earthquake FIG. 7 shows the distribution along the depth direction from L to the support layer.
As shown in FIG. It is large near L, becomes smaller as approaching the support layer, and becomes almost 0 near the support layer.
Becomes For this reason, in the vicinity of the support layer, it is possible to sufficiently counter the vertical load and the bending moment generated by the earthquake with the degree of reinforcement by the pile. Further, near the surface of the ground, it is possible to receive the horizontal force of the earthquake indicated by F horz in FIG.

【0043】このため、杭頭部を地中連続壁1で補強す
ることにより、杭が個々に構築されている場合に比べ、
曲げ剛性が大きくなり、よりいっそう地表面G.L付近
での曲げモーメントや剪断応力に対抗させることができ
る。
For this reason, by reinforcing the pile head with the underground continuous wall 1, compared with the case where the piles are individually constructed,
The flexural rigidity increases, and the ground surface G. It can counter bending moment and shear stress near L.

【0044】地震時には、上部構造の慣性力に起因する
水平加重Fhorzが発生する。この水平加重が基礎構
造に作用した場合、杭頭近傍部分において最大曲げモー
メント及び最大剪断力が発生する。本発明の如く杭頭部
を地中連続壁とした場合、杭頭部の剛性の向上により従
来の杭のみの場合に比して曲げ応力及び剪断力に対する
耐震性能は顕著となる。さらに、本発明の耐震基礎構造
は、地中連続壁1の厚さ及び深さ方向へと地盤4中に突
出し、地中連続壁1の長さ方向へと杭頭部が連結されて
いるので、図6に示す頭部補強された杭に比較し、壁頭
部を大きくする効果に加え、Fbendが加えられても
地中連続壁1が、上下動に対する有効なストッパとして
機能して、地表面G.Lにおける変位を小さくすること
ができ、地震時によりいっそう上部建造物に対する支持
を行うことが可能となる。
During an earthquake, a horizontal load F horz is generated due to the inertial force of the superstructure. When this horizontal load acts on the foundation structure, a maximum bending moment and a maximum shearing force are generated near the pile head. When the pile head is an underground continuous wall as in the present invention, the rigidity of the pile head is improved, so that the seismic performance against bending stress and shearing force becomes remarkable as compared with the conventional pile alone. Furthermore, since the earthquake-resistant foundation structure of the present invention protrudes into the ground 4 in the thickness and depth direction of the underground continuous wall 1, and the pile head is connected in the length direction of the underground continuous wall 1, Compared to the pile with the head reinforced shown in FIG. 6, in addition to the effect of enlarging the wall head, even if F bend is added, the underground continuous wall 1 functions as an effective stopper against vertical movement, Ground surface G. The displacement in L can be reduced, and it becomes possible to further support the upper building during an earthquake.

【0045】これまで本発明を図面に示した実施例を持
って説明してきたが、本発明は、図面に示された実施例
に限定されるものではなく、地中連続壁の工法及び厚
さ、杭の種類、数、寸法、本発明の耐震基礎構造の構築
法については、これまで知られているいかなるものでも
用いることができることはいうまでもないことである。
Although the present invention has been described with reference to the embodiment shown in the drawings, the present invention is not limited to the embodiment shown in the drawings. Needless to say, any kind of piles, types, numbers, dimensions, and methods for constructing the seismic foundation structure of the present invention can be used.

【0046】[0046]

【発明の効果】したがって、本発明によれば、杭と、地
中連続壁とを一体化させ、より効果的に耐震補強を行う
ことを可能とする耐震基礎構造が提供できる。
Therefore, according to the present invention, it is possible to provide a seismic base structure that integrates a pile and an underground continuous wall and enables more effective seismic reinforcement.

【0047】また、本発明によれば、より効果的に耐震
補強が行われた耐震建造物が提供できる。
Further, according to the present invention, it is possible to provide a seismic building with more effective seismic reinforcement.

【0048】さらには、本発明によれば、新設される杭
ばかりではなく、既設杭についても地中連続壁により効
果的に補強を行うことを可能とし、効果的に地盤の液状
化対策を提供することが可能な杭補強方法が提供でき
る。
Further, according to the present invention, not only newly installed piles but also existing piles can be effectively reinforced by underground continuous walls, and an effective countermeasure against liquefaction of the ground is provided. A pile reinforcement method that can be provided can be provided.

【0049】さらに、本発明によれば、地中連続壁を構
築するための掘削土量やコンクリートといった材料を減
少させることができ、さらには掘削土量を低減すること
により建設残土の量を低減させ掘削コストを削減でき、
材料の低減を測ることが可能で環境的に優れた耐震基礎
構造を提供することができる。
Further, according to the present invention, it is possible to reduce the amount of excavated soil and the material such as concrete for constructing the underground continuous wall, and further reduce the amount of excavated soil by reducing the amount of excavated soil. To reduce drilling costs,
It is possible to provide an environmentally superior seismic base structure capable of measuring the reduction of materials and being environmentally superior.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の耐震基礎構造を示した斜視図。FIG. 1 is a perspective view showing an earthquake-resistant foundation structure of the present invention.

【図2】本発明の耐震基礎構造を用いた建造物を示した
図。
FIG. 2 is a diagram showing a building using the earthquake-resistant foundation structure of the present invention.

【図3】本発明の地震時発生応力状況を示した図。FIG. 3 is a diagram showing a state of stress generated during an earthquake according to the present invention.

【図4】従来の地中連続壁を用いた建造物を示した図。FIG. 4 is a view showing a building using a conventional underground continuous wall.

【図5】従来の地中連続壁を用いた建造物を示した図。FIG. 5 is a view showing a building using a conventional underground continuous wall.

【図6】従来の杭頭部が補強された杭を示した図。FIG. 6 is a diagram showing a conventional pile with a pile head reinforced.

【図7】地中連続壁を用いた従来の耐震基礎構造及び地
震時の曲げモーメントの分布を示した図。
FIG. 7 is a diagram showing a conventional seismic foundation structure using underground continuous walls and a distribution of bending moment during an earthquake.

【符号の説明】[Explanation of symbols]

1…地中連続壁 1a…天端 1b…下側端 2…杭 3…基礎 4…地盤 5…支持層 40…上部建造物 41…地下室 42…地中連続壁 43…地盤 44…支持層 50…構造体 51…地中連続壁 52…地盤 53…支持層 60…杭 61…杭頭部 71…地中連続壁 72…支持層 73…上部構造物 G.L…地表面 S.L…支持層レベル DESCRIPTION OF SYMBOLS 1 ... Underground continuous wall 1a ... Top end 1b ... Lower end 2 ... Pile 3 ... Foundation 4 ... Soil 5 ... Support layer 40 ... Upper building 41 ... Basement 42 ... Underground continuous wall 43 ... Soil 44 ... Support layer 50 ... structure 51 ... underground continuous wall 52 ... ground 53 ... support layer 60 ... pile 61 ... pile head 71 ... underground continuous wall 72 ... support layer 73 ... upper structure G. L: ground surface L: Support layer level

Claims (9)

【特許請求の範囲】[Claims] 【請求項1】 支持層より浅く根入れされた地中連続壁
と、該地中連続壁に一体化され前記支持層にまで根入れ
された杭とからなる耐震基礎構造。
1. An earthquake-resistant foundation structure comprising an underground continuous wall which is deeper than a support layer and a pile which is integrated with the underground continuous wall and is deeply embedded in the support layer.
【請求項2】 前記杭が前記地中連続壁の内部にまで延
ばされていることを特徴とする請求項1に記載の耐震基
礎構造。
2. The seismic foundation structure according to claim 1, wherein the pile extends into the underground continuous wall.
【請求項3】 前記杭は、既製杭、又は鋼管杭、又は場
所打ち杭であることを特徴とする請求項1又は2に記載
の耐震基礎構造。
3. The earthquake-resistant foundation according to claim 1, wherein the pile is a ready-made pile, a steel pipe pile, or a cast-in-place pile.
【請求項4】 支持層より浅く根入れされた地中連続壁
と、該地中連続壁に一体化され前記支持層にまで根入れ
された杭とからなる耐震基礎構造を有する耐震建造物。
4. An earthquake-resistant building having an earthquake-resistant foundation structure comprising an underground continuous wall buried shallower than a support layer and a pile integrated with the underground continuous wall and buried into the support layer.
【請求項5】 前記杭が前記地中連続壁の内部にまで延
ばされていることを特徴とする請求項4に記載の耐震建
造物。
5. The seismic building according to claim 4, wherein the pile extends into the underground continuous wall.
【請求項6】 前記杭は、既製杭、又は鋼管杭、又は場
所打ち杭であることを特徴とする請求項4又は5に記載
の耐震建造物。
6. The seismic building according to claim 4, wherein the pile is a ready-made pile, a steel pipe pile, or a cast-in-place pile.
【請求項7】 複数の杭の杭頭部を、該杭頭部と一体化
され支持層より浅く根入れされた地中連続壁により連結
すること特徴とする杭補強方法。
7. A method for reinforcing a pile, wherein pile heads of a plurality of piles are connected by an underground continuous wall integrated with the pile heads and embedded deeper than a support layer.
【請求項8】 前記杭が前記地中連続壁の内部にまで延
ばされていることを特徴とする請求項7に記載の杭補強
方法。
8. The method according to claim 7, wherein the pile is extended into the underground continuous wall.
【請求項9】 前記杭は、既製杭、又は鋼管杭、又は場
所打ち杭であることを特徴とする請求項7又は8に記載
の杭補強方法。
9. The pile reinforcing method according to claim 7, wherein the pile is a ready-made pile, a steel pipe pile, or a cast-in-place pile.
JP2000039237A 2000-02-17 2000-02-17 Seismic foundation, seismic building, and pile reinforcement method Expired - Lifetime JP4502442B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000039237A JP4502442B2 (en) 2000-02-17 2000-02-17 Seismic foundation, seismic building, and pile reinforcement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000039237A JP4502442B2 (en) 2000-02-17 2000-02-17 Seismic foundation, seismic building, and pile reinforcement method

Publications (2)

Publication Number Publication Date
JP2001226987A true JP2001226987A (en) 2001-08-24
JP4502442B2 JP4502442B2 (en) 2010-07-14

Family

ID=18562836

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000039237A Expired - Lifetime JP4502442B2 (en) 2000-02-17 2000-02-17 Seismic foundation, seismic building, and pile reinforcement method

Country Status (1)

Country Link
JP (1) JP4502442B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006214201A (en) * 2005-02-04 2006-08-17 Toda Constr Co Ltd Composite foundation of piles and continuous underground wall
CN105756075A (en) * 2016-02-29 2016-07-13 山东电力工程咨询院有限公司 Horizontal bearing combined foundation based on piles and underground continuous wall and method
CN114837240A (en) * 2022-05-10 2022-08-02 中交一公局集团有限公司 Structure and method for improving bearing capacity of single-chamber closed underground continuous wall foundation by using rear drilled piles

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968265A (en) * 2017-04-28 2017-07-21 山东电力工程咨询院有限公司 A kind of combination foundation and method for bearing horizontal loading

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1077644A (en) * 1996-09-03 1998-03-24 Maeda Corp Earthquake resisting pile foundation construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006214201A (en) * 2005-02-04 2006-08-17 Toda Constr Co Ltd Composite foundation of piles and continuous underground wall
CN105756075A (en) * 2016-02-29 2016-07-13 山东电力工程咨询院有限公司 Horizontal bearing combined foundation based on piles and underground continuous wall and method
CN114837240A (en) * 2022-05-10 2022-08-02 中交一公局集团有限公司 Structure and method for improving bearing capacity of single-chamber closed underground continuous wall foundation by using rear drilled piles

Also Published As

Publication number Publication date
JP4502442B2 (en) 2010-07-14

Similar Documents

Publication Publication Date Title
JP6650257B2 (en) Mountain retaining structure and construction method thereof
JP2000054409A (en) Work execution method of top-down construction stanchion in underground excavated space peripheral part
JP5228862B2 (en) Underground structure, construction method of underground structure
JP3385876B2 (en) Cast-in-place pile construction method just below the existing foundation
JP4502442B2 (en) Seismic foundation, seismic building, and pile reinforcement method
JP3603130B2 (en) Root-wound reinforcement structure for column bases such as steel columns
JP6860895B2 (en) Retaining wall and its construction method
JP3641227B2 (en) Construction method of underground structure
KR102195496B1 (en) Pile for earth self-retaining wall using cast in place concrete pile with double I beam
JP2004027727A (en) Foundation pile and construction method for foundation pile
KR102194381B1 (en) Pile for Earth self-retaining wall using double I beam
JP4236361B2 (en) Wall head reinforcement underground continuous wall, seismic building, and wall head reinforcement method for underground continuous wall
JP3957607B2 (en) Pneumatic caisson and pneumatic caisson method
JP3057466B2 (en) How to build underground structures
JP2001182053A (en) Underground aseismatic reinforcing pile and foundation aseismatic structure
JP2001288758A (en) Footing earthquake resistant construction and footing earthquake resistance reinforcing method
JP3832845B2 (en) Steel sheet pile combined direct foundation and construction method of steel sheet pile combined direct foundation
JP3228199U (en) Construction structure of earth retaining support
JPH03286028A (en) Additionally strengthened structure of existing base
JP4236360B2 (en) Reinforced underground continuous wall, seismic building and method for reinforcing underground continuous wall
JP2001311168A (en) Earth retaining wall
JPH06108476A (en) Construction of stud in steel frame structure
KR100273864B1 (en) An improved top-down method using the retaining wall
JP3678290B2 (en) High earthquake resistance foundation
KR20090098126A (en) Reinforcement

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061115

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20081219

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090105

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090302

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100202

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100325

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100420

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100420

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4502442

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130430

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140430

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term