JP2001032241A - Execution method for concrete structure and concrete placing mold - Google Patents

Execution method for concrete structure and concrete placing mold

Info

Publication number
JP2001032241A
JP2001032241A JP11204584A JP20458499A JP2001032241A JP 2001032241 A JP2001032241 A JP 2001032241A JP 11204584 A JP11204584 A JP 11204584A JP 20458499 A JP20458499 A JP 20458499A JP 2001032241 A JP2001032241 A JP 2001032241A
Authority
JP
Japan
Prior art keywords
concrete
plate
formwork
support
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11204584A
Other languages
Japanese (ja)
Inventor
Shuichi Fujita
修一 藤田
Isamu Nakaoka
勇 中岡
Tsuyoshi Morita
強 森田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kansai Electric Power Co Inc
Kinki Concrete Industry Co Ltd
Original Assignee
Kansai Electric Power Co Inc
Kinki Concrete Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kansai Electric Power Co Inc, Kinki Concrete Industry Co Ltd filed Critical Kansai Electric Power Co Inc
Priority to JP11204584A priority Critical patent/JP2001032241A/en
Publication of JP2001032241A publication Critical patent/JP2001032241A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/02Forming boards or similar elements
    • E04G9/06Forming boards or similar elements the form surface being of metal
    • E04G9/065Forming boards or similar elements the form surface being of metal the form surface being of wire mesh

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To lower a cost by connecting a supporting column to a base pin driven into base concrete, fixing a plate body having an opening part to the supporting column, and arranging a sheet type leakage prevention sheet along one face of the plate body for forming a mold. SOLUTION: Before base concrete 50 is hardened, a base pin 1 is driven into a predetermined position, and a supporting column 2 is vertically installed to the base pin 1, while an expanded metal 3 serving as a plate type body having an opening part 3a is arranged between the adjacent supporting columns 2. In installation of the metal 3, the lower side part of its each strand part 3b is placed on the inside, that is, on the concrete placing side beyond the upper side part, so that the strand part 3b can support the weight of the concrete more easily. Subsequently, a leakage preventing sheet body 4 is arranged on the concrete placing side face in the metal 3, and then, assembly of a mold is finished. The weight of the mold material is reduced because of the use of the plate body 3 having the opening part, so that costs for conveyance and storage can be lowered, while a construction cost can be also lowered as no crane or the like is required.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、主にダムや壁体等
として用いられるコンクリート構造体の施工方法に関す
るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a concrete structure mainly used as a dam or a wall.

【0002】[0002]

【従来の技術】コンクリート構造体を施工する場合に
は、型枠を組み立て、そこにコンクリートを打設する
か、予め製作したプレキャストコンクリートブロックを
組み立てている。
2. Description of the Related Art When constructing a concrete structure, a formwork is assembled and concrete is poured into the formwork, or a precast concrete block manufactured in advance is assembled.

【0003】しかしながら、ダムや堤のような大きなコ
ンクリート構造体を施工しようとすると型枠は大型とな
り、大きな強度も求められる。そして、型枠材料は多量
に必要となり、重量が大きく嵩張るものとなるため、型
枠材料の運搬に要するコストが高くなり、現地には広大
な資材置き場が必要となる。更に重い型枠材料を組み立
てるためにクレーン等の機械が必要となる等、施工コス
トが上昇すると共に施工に時間がかかる。
However, when attempting to construct a large concrete structure such as a dam or a bank, the formwork becomes large and a large strength is required. In addition, a large amount of formwork material is required, and the weight and bulkiness are increased. Therefore, the cost required for transporting the formwork material is increased, and a large material storage area is required on site. Furthermore, the construction cost increases and the construction takes time, for example, a machine such as a crane is required to assemble the heavy formwork material.

【0004】特にダムの監査廊等を施工する場合には重
支保工を伴った内型枠を組み立て、周辺に補強のための
鉄筋を配した後、堤体と同時にダムコンクリートを打設
して施工し、養生期間をへて型枠を外す工法が一般的で
あるが、このような工法では、これらの作業には熟練し
た型枠職人や鉄筋職人による内型枠と鉄筋の組立が必要
とされる。しかもこれらの作業時間とコンクリート打設
サイクルとの調整が難しく、工期の遅延を招きやすいと
いう問題がある。
[0004] In particular, when constructing a dam inspection corridor, etc., an inner formwork with heavy supports is assembled, reinforcing steel is provided around the perimeter, and dam concrete is poured simultaneously with the embankment. It is common to construct and remove the formwork after the curing period.However, such a method requires the assembly of the inner formwork and rebar by a skilled formworker or rebarman. Is done. Moreover, there is a problem that it is difficult to adjust the working time and the concrete placing cycle, and the work period is likely to be delayed.

【0005】近年ではプレキャストコンクリートブロッ
クを積み上げて監査廊を施工する方法が提案され(例え
ば特許第2611905号等)、既に実用化が始まっている。
しかしながら、この方法は工程短縮を図るには適してい
るが、プレキャストコンクリートブロックは工場で製作
して、現地に輸送する必要があるので、製作コストや輸
送コスト、更には現地においてプレキャストコンクリー
トブロックを設置するためのクレーンなどの労務費が多
大となるという問題点がある。
In recent years, a method of constructing an inspection corridor by stacking precast concrete blocks has been proposed (for example, Japanese Patent No. 2611905), and practical use has already begun.
However, although this method is suitable for shortening the process, precast concrete blocks need to be manufactured at the factory and transported to the site. There is a problem that labor costs of a crane or the like for performing the operation are large.

【0006】輸送費用を低減するために現地で、プレキ
ャストコンクリートブロックを製作することも考えられ
るが、そのためには製作ヤード,養生ヤード,資材置き
場等が必要であるので、安価に広い用地を現地に確保で
きない場合は実施することができない。
It is conceivable to manufacture a precast concrete block locally to reduce transportation costs. However, a production yard, a curing yard, a material storage place, and the like are required for that purpose. If it cannot be secured, it cannot be implemented.

【0007】又、従来は定尺の型枠材(例えば90×1
80cmのパネル材)を用いていたので、型枠材がうま
く突き合うように組み立てることが難しく、複数箇所か
ら同時に作業を行うと型枠材相互間に隙間が生じたり、
型枠材が入らなくなることがある。したがって、1カ所
を基準として順々に型枠材を組み立てていく必要があ
り、型枠の組み立て作業に時間がかかる。
Conventionally, a fixed-size frame material (for example, 90 × 1
(Panel material of 80 cm), it is difficult to assemble the form materials so that they abut each other. When working from multiple locations at the same time, gaps may occur between the form materials,
The mold material may not be able to enter. Therefore, it is necessary to assemble the form materials one by one based on one place, and it takes time to assemble the form.

【0008】[0008]

【発明が解決しようとする課題】そこで、短期間で、し
かも安価にコンクリート構造体を施工することのできる
施工手段が求められている。
Therefore, there is a need for construction means capable of constructing a concrete structure in a short period of time and at low cost.

【0009】[0009]

【課題を解決するための手段】本発明の請求項1記載の
コンクリート構造体の施工方法は、ベースコンクリート
(50)に基礎ピン(1)を打ち込み、該基礎ピン(1)に支柱
(2)を接続し、該支柱(2)に開口部を有した板状体(3)を
固定し、該板状体(3)の一方の面に沿って該板状体(3)の
開口部(3a)からコンクリートが漏れるのを防止するため
のシート状の漏れ防止シート体(4)を配して型枠とし、
該型枠の漏れ防止シート体(4)が配された側にコンクリ
ートを打設することを特徴とする。
According to the first aspect of the present invention, there is provided a method for constructing a concrete structure, comprising the steps of:
Driving the base pin (1) into (50) and supporting the base pin (1)
(2) is connected, a plate-like body (3) having an opening is fixed to the support (2), and the plate-like body (3) is formed along one surface of the plate-like body (3). A sheet-shaped leakage prevention sheet body (4) for preventing concrete from leaking from the opening (3a) is provided as a formwork,
Concrete is cast on the side of the form where the leak prevention sheet member (4) is arranged.

【0010】これによれば、開口部を有した板状体(3)
を用いるので、型枠材料が軽量で輸送や保管の費用を軽
減することができる。又、軽量であるため作業に必ずし
もクレーンなどは必要なく、施工に要する費用も軽減で
きる。
According to this, a plate-like body (3) having an opening
Is used, the form material is lightweight, and the transportation and storage costs can be reduced. In addition, since it is lightweight, a crane or the like is not necessarily required for work, and the cost required for construction can be reduced.

【0011】開口部を有した板状体は部分的に重なって
も良いので、型枠材の突き合わせなどが問題とならず、
各所から同時に型枠を組み立てることができるので作業
効率が良くなる。
[0011] Since the plate-like body having the opening may partially overlap, the butting of the form material does not matter,
Work efficiency can be improved because the formwork can be assembled from various places at the same time.

【0012】又、漏れ防止シート体(4)を配しているの
で板状体の開口部から打設したコンクリートが漏れ出す
こともない。
Further, since the leak prevention sheet member (4) is provided, the concrete poured in from the opening of the plate member does not leak.

【0013】打設後は支柱(2)と開口部を有した板状体
(3)を取り外して、型枠材料として繰り返し使用するこ
とができるので経済的である。
After the casting, a plate-like body having a column (2) and an opening
It is economical because (3) can be removed and used repeatedly as a formwork material.

【0014】請求項2記載のコンクリート構造体の施工
方法は、ベースコンクリート(50)に基礎ピン(1)を打ち
込み、該基礎ピン(1)に支柱(2)と開口部を有する板状体
(3)とからなる型枠ユニットを接続し、該板状体の一方
の面に沿って該板状体(3)の開口部(3a)からコンクリー
トが漏れるのを防止するためのシート状の漏れ防止シー
ト体(4)を配して型枠とし、該型枠の漏れ防止シート体
が配された側にコンクリートを打設することを特徴とす
る。
According to a second aspect of the present invention, there is provided a method for constructing a concrete structure, wherein a base pin (1) is driven into a base concrete (50), and the base pin (1) has a column (2) and an opening.
(3) to form a sheet unit for preventing concrete from leaking from the opening (3a) of the plate-shaped body (3) along one surface of the plate-shaped body. A leakage prevention sheet body (4) is arranged to form a mold, and concrete is cast on the side of the molding form on which the leakage prevention sheet body is arranged.

【0015】これによれば、予め支柱と開口部を有する
板状体とが接続された型枠ユニットを基礎ピンに取り付
けることにより請求項1の方法と同様にコンクリート打
設用の型枠を作ることができる。
According to this method, a formwork for concrete casting is manufactured in the same manner as in the first aspect by attaching a formwork unit in which the support columns and the plate-like body having the opening are connected in advance to the foundation pins. be able to.

【0016】請求項3記載のコンクリート構造体の施工
方法は、請求項1又は請求項2の施工方法により施工し
たコンクリート構造体(51)の上方に1層又複数層のコン
クリートを打設するコンクリート構造体の施工方法であ
って、下層のコンクリート(51)の上端部に基礎ピン(1)
を打ち込み、該基礎ピン(1)に支柱(2)を接続し、該支柱
(2)に開口部を有した板状体(3)を固定し、該板状体(3)
の一方の面に沿って該板状体(3)の開口部(3a)からコン
クリートが漏れるのを防止するためのシート状の漏れ防
止シート体(4)を配して型枠とし、該型枠の漏れ防止シ
ート体(4)が配された側にコンクリートを打設すること
を特徴とする。
According to a third aspect of the present invention, there is provided a concrete structure, wherein one or more layers of concrete are poured over the concrete structure (51) constructed by the first or second aspect. A method of constructing a structure, in which a foundation pin (1) is attached to the upper end of a lower layer concrete (51).
And connect the support (2) to the base pin (1),
Fix the plate-like body (3) having an opening in (2), the plate-like body (3)
A sheet-shaped leakage prevention sheet body (4) for preventing concrete from leaking from the opening (3a) of the plate-shaped body (3) along one surface of Concrete is cast on the side of the frame on which the sheet for preventing leakage (4) is arranged.

【0017】これにより、階段状のコンクリート構造体
を施工することができる。
Thus, a step-like concrete structure can be constructed.

【0018】請求項4記載のコンクリート構造体の施工
方法は、請求項1又は請求項2の施工方法により施工し
たコンクリート構造体(51)の上方に1層又複数層のコン
クリートを打設するコンクリート構造体の施工方法であ
って、下層のコンクリート(51)硬化後に、該下層のコン
クリート打設に用いた支柱(2)の上に上層用の支柱(2)を
継ぎ、該上層用の支柱(2)に開口部を有した板状体(3)を
固定し、該板状体(3)の一方の面に沿って該板状体の開
口部からコンクリートが漏れるのを防止するためのシー
ト状の漏れ防止シート体(4)を配して型枠とし、該型枠
の漏れ防止シート体(4)が配された側にコンクリートを
打設することを特徴とする。
According to a fourth aspect of the present invention, there is provided a concrete structure, wherein one or more layers of concrete are poured above the concrete structure (51) constructed according to the first or second aspect. A method for constructing a structure, comprising: after hardening a lower layer concrete (51), joining a column (2) for an upper layer onto a column (2) used for placing the lower layer of concrete, and supporting the column for an upper layer (51). A sheet for fixing a plate-like body (3) having an opening to 2) and preventing concrete from leaking from the opening of the plate-like body along one surface of the plate-like body (3). A leak-proof sheet body (4) is formed to form a formwork, and concrete is cast on the side of the formwork on which the leak-proof sheet body (4) is arranged.

【0019】これにより、上下幅(高さ)が大きく、略
面一な壁面を有したコンクリート構造体を施工すること
ができる。
Thus, a concrete structure having a large vertical width (height) and substantially flush wall surfaces can be constructed.

【0020】請求項5記載のコンクリート構造体の施工
方法は、請求項1又は請求項2記載の施工方法により施
工したコンクリート構造体の上方に1層又は複数層のコ
ンクリートを打設するコンクリート構造体の施工方法で
あって、下層のコンクリート打設時にインサート材(25)
を一端がコンクリートから露出するように埋設し、下層
のコンクリート硬化後に、該インサート材(25)に上層の
型枠用の支柱(30)を直接又は支柱支持金具(24)を介して
係止し、該支柱(30)に開口部を有した板状体(3)を固定
し、該板状体の一方の面に沿って該板状体の開口部から
コンクリートが漏れるのを防止するためのシート状の漏
れ防止シート体を配して型枠とし、該型枠の漏れ防止シ
ート体が配された側にコンクリートを打設することを特
徴とする。
According to a fifth aspect of the present invention, there is provided a concrete structure in which one or more layers of concrete are poured over the concrete structure constructed by the first or second aspect. Construction method, the insert material (25)
Is buried so that one end is exposed from the concrete, and after the lower layer concrete is hardened, a column support (30) for the upper layer formwork is fixed to the insert material (25) directly or via a column support bracket (24). A plate-like body (3) having an opening is fixed to the column (30), and concrete is prevented from leaking from the opening of the plate-like body along one surface of the plate-like body. The present invention is characterized in that a sheet-shaped leakage prevention sheet member is arranged to form a mold, and concrete is cast on a side of the mold frame where the leakage prevention sheet member is arranged.

【0021】これによれば、硬化した下層のコンクリー
トに埋設されているインサート材(25)に支柱を取り付け
ることにより、支柱の取り付け位置を高くすることがで
きるので、下層のコンクリートの上方に上層用の型枠を
形成することができる。
[0021] According to this, by attaching the support to the insert material (25) buried in the hardened lower concrete, the mounting position of the support can be raised. Can be formed.

【0022】請求項6記載のコンクリート構造体の施工
方法は、請求項5の方法において、支柱を補強するため
にベースコンクリート(50)又は下層のコンクリートに設
置された支持アンカー(8)と支柱(21)とを接続する支持
材(9)を用い、コンクリート打設後に該支持材(9)をイン
サート材として利用することを特徴とする。
According to a sixth aspect of the present invention, in the method for constructing a concrete structure according to the fifth aspect, a support anchor (8) installed on a base concrete (50) or a lower layer concrete and a support (8) for reinforcing the support. 21), wherein the support member (9) is used as an insert material after concrete is cast.

【0023】これによれば、支柱を支持するための支持
材(9)をコンクリート硬化後にインサート材として利用
することができ、請求項5の方法を実施するに際して別
途インサート材を埋設する必要がない。
According to this, the support member (9) for supporting the column can be used as an insert material after the concrete is hardened, and it is not necessary to separately bury the insert material when performing the method of claim 5. .

【0024】請求項7記載のコンクリート構造体の施工
方法は、請求項1〜請求項6の施工方法において、基礎
ピン(1)は垂直方向に対して角度を有して打ち込まれ、
支柱(2)は該基礎ピン(1)と同軸上となるように接続され
ることを特徴とする。
According to a seventh aspect of the present invention, in the construction method of the first to sixth aspects, the foundation pin (1) is driven at an angle to a vertical direction.
The support (2) is connected so as to be coaxial with the base pin (1).

【0025】これにより、傾斜面を有するコンクリート
構造体を施工することができる。
Thus, a concrete structure having an inclined surface can be constructed.

【0026】請求項8記載のコンクリート構造体の施工
方法は、請求項3記載,請求項5又は請求項6記載の施
工方法において、下層のコンクリート打設のための型枠
として用いた支柱と開口部を有した板状体を下層のコン
クリート硬化後に取り外し、上層のコンクリート打設の
ための型枠材料として再利用することを特徴とする。
The construction method of the concrete structure according to the eighth aspect is the construction method according to the third, fifth or sixth aspect, wherein the column and the opening used as the formwork for placing the lower layer concrete are provided. The plate-like body having the portion is removed after the lower layer concrete is hardened, and is reused as a mold material for placing the upper layer concrete.

【0027】これにより、支柱(2)と開口部を有した板
状体(3)を繰り返し利用することができ、施工に必要な
型枠材料を少なくすることができるので、型枠の輸送費
を低減することができる。
[0027] This makes it possible to repeatedly use the plate-like body (3) having the column (2) and the opening, and to reduce the amount of formwork material required for construction. Can be reduced.

【0028】請求項9記載のコンクリート構造体の施工
方法は、請求項1〜請求項8の施工方法において、開口
部を有した板状体としてエキスパンドメタル(3)を使用
し、該エキスパンドメタルは各ストランド部(3b)の下辺
部(3d)が上辺部(3a)よりもコンクリート打設側となるよ
うに取り付けられることを特徴とする。
According to a ninth aspect of the present invention, there is provided a method for constructing a concrete structure according to the first to eighth aspects, wherein an expanded metal (3) is used as the plate-like body having an opening, and the expanded metal is Each of the strands (3b) is attached so that the lower side (3d) is closer to the concrete casting side than the upper side (3a).

【0029】エキスパンドメタルは軽量で、支柱への取
り付けも容易であるので、本発明の開口部を有した板状
体として好適であり、エキスパンドメタル(3)は各スト
ランド部の下辺部(3d)が上辺部(3a)よりもコンクリート
打設側となるように取り付けると、コンクリートの重量
をエキスパンドメタル(3)で支えやすくなり、漏れ防止
シート体(4)がやぶれにくくなる。
Since the expanded metal is lightweight and can be easily attached to a support, it is suitable as a plate having an opening according to the present invention, and the expanded metal (3) is a lower side (3d) of each strand. If it is installed so that it is closer to the concrete casting side than the upper side (3a), the weight of the concrete can be easily supported by the expanded metal (3), and the leakage prevention sheet (4) is less likely to break.

【0030】請求項10記載のコンクリート構造体の施
工方法は、請求項9の施工方法において、支柱(2)とエ
キスパンドメタル(3)との固定にクリップ又は合成樹脂
製の結束バンド(5)を使用することを特徴とする。
According to a tenth aspect of the present invention, in the construction method of the ninth aspect, a clip or a binding band (5) made of a synthetic resin is used for fixing the column (2) and the expanded metal (3). It is characterized by being used.

【0031】これにより、支柱(2)とエキスパンドメタ
ル(3)の固定を安価で、しかも容易に行うことができ、
型枠を取り外すさいにも容易に支柱(2)とエキスパンド
メタル(3)との固定を解除することができる。
This makes it possible to fix the column (2) and the expanded metal (3) at low cost and easily.
When the mold is removed, the fixing between the support (2) and the expanded metal (3) can be easily released.

【0032】請求項11記載のコンクリート構造体の施
工方法は、請求項1〜請求項10記載の施工方法におい
て、漏れ防止シート体(4)として樹脂製もしくは金属製
の網又は布を用いることを特徴とする。
The construction method of a concrete structure according to the eleventh aspect is characterized in that, in the construction method according to the first to tenth aspects, a resin or metal net or cloth is used as the leakage prevention sheet member (4). Features.

【0033】透水性を有する布又は樹脂製もしくは金属
製の網を用いると、コンクリートの漏れを防止しつつコ
ンクリート中の水分を型枠外に染み出させることとな
り、コンクリート中の水分を少なくしてコンクリートの
密度を高くすることができる。
When a water-permeable cloth or a resin or metal net is used, the water in the concrete is allowed to seep out of the formwork while preventing the concrete from leaking. Can be increased in density.

【0034】請求項12記載のコンクリート打設用型枠
は、ベースコンクリートに打ち込まれる基礎ピン(1)
と、該基礎ピン(1)に取り付け可能な支柱(2)と、該支柱
(2)に固定するエキスパンドメタル(3)と、該エキスパン
ドメタル(3)の開口部からコンクリートが漏れ出すのを
防止するためのシート状の漏れ防止シート体(4)を備え
たことを特徴とする。
In the concrete casting form according to the twelfth aspect, a foundation pin (1) driven into a base concrete is provided.
A support (2) attachable to the base pin (1), and the support
An expanded metal (3) fixed to (2), and a sheet-shaped leakage prevention sheet (4) for preventing concrete from leaking from an opening of the expanded metal (3). I do.

【0035】これにより、軽量で施工性がよく、再利用
が可能な型枠とすることができる。
As a result, a mold that is lightweight, has good workability, and can be reused can be obtained.

【0036】請求項13記載のコンクリート打設用型枠
は、請求項12の型枠において、漏れ防止シート体(4)
は樹脂製のもしくは金属製の網又は布であることを特徴
とする。
According to a thirteenth aspect of the present invention, there is provided the concrete casting formwork according to the twelfth aspect, wherein the leakage preventing sheet body is provided.
Is a resin or metal net or cloth.

【0037】これにより、打設したコンクリートが型枠
外に漏れ出すのを防止しつつ、コンクリート中の水分を
型枠外に出すことができ、コンクリート中の水分を減ら
すことによりコンクリートの密度を高めることができ
る。
[0037] Thereby, it is possible to prevent the poured concrete from leaking out of the formwork, and to make the water in the concrete out of the formwork, thereby increasing the density of the concrete by reducing the water in the concrete. it can.

【0038】請求項14記載のコンクリート打設用型枠
は、請求項12又は請求項13の型枠において、基礎ピ
ン(1)はベースコンクリートに挿入される挿入部(1a)
と、ベースコンクリート上に露出する露出部(1b)を有
し、支柱(2)は基礎ピン(1)の露出部(1b)に着脱可能に固
定でき、支柱(2)同士は軸方向に着脱可能に継ぐことが
できることを特徴とする。
According to a fourteenth aspect of the present invention, there is provided the concrete casting formwork according to the twelfth or thirteenth aspect, wherein the base pin (1) is inserted into the base concrete (1a).
And the exposed part (1b) exposed on the base concrete, the column (2) can be detachably fixed to the exposed part (1b) of the foundation pin (1), and the columns (2) can be attached and detached in the axial direction. It is characterized in that it can be connected as much as possible.

【0039】これによれば、支柱(2)を上方に継いで、
上方の型枠を組み立てることができる。型枠を分解する
際にも支柱(2)と基礎ピン(1)、または支柱(2)同士は分
離可能であるので、型枠分解作業は容易である。又、支
柱(2)の繰り返し再利用が容易となる。
According to this, the support (2) is connected upward,
The upper formwork can be assembled. When the form is disassembled, the column (2) and the base pin (1) or the column (2) can be separated from each other, so that the form disassembling operation is easy. In addition, the column (2) can be easily reused repeatedly.

【0040】請求項15記載のコンクリート打設用型枠
は、請求項12,請求項13又は請求項14記載の型枠
において、支柱には作業者が載ることのできる足場(31)
が備えられていることを特徴とする。
According to a fifteenth aspect of the present invention, there is provided the concrete casting formwork according to the twelfth aspect, the thirteenth aspect and the fourteenth aspect, wherein a scaffold (31) on which a worker can rest can be placed on the support.
Is provided.

【0041】これによれば、常に支柱の取り付け位置に
足場を確保することができるので、作業がしやすい。
According to this, the scaffold can always be secured at the mounting position of the column, so that the work is easy.

【0042】[0042]

【発明の実施の形態】以下、本発明を好適な実施例を用
いて説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to preferred embodiments.

【0043】[実施例1]本実施例は、ダム用監査廊の
施工の例である。図3は施工中の監査廊を示した図であ
り、図1は施工に用いる型枠の正面図、図2は同じく型
枠の側面図である。
[Embodiment 1] This embodiment is an example of construction of a dam inspection corridor. FIG. 3 is a view showing an inspection corridor during construction, FIG. 1 is a front view of a formwork used for construction, and FIG. 2 is a side view of the formwork.

【0044】まずベースコンクリート(50)を打設し、こ
のベースコンクリート(50)が完全に硬化する前に所定位
置に基礎ピン(1)を打ち込む。本実施例で用いた基礎ピ
ン(1)はベースコンクリート(50)に挿入される挿入部(1
a)と、ベースコンクリート(50)上に露出する露出部(1b)
を有しており、両者の境には鍔部(1d)が設けられてい
る。挿入部(1a)の径は露出部(1b)よりも細く、挿入部(1
a)先端(1c)は打ち込み易いように先細りとなっている。
First, a base concrete (50) is cast, and before the base concrete (50) is completely hardened, a base pin (1) is driven into a predetermined position. The base pin (1) used in the present embodiment has an insertion portion (1) inserted into the base concrete (50).
a) and the exposed part (1b) exposed on the base concrete (50)
And a flange (1d) is provided at the boundary between the two. The diameter of the insertion part (1a) is smaller than that of the exposed part (1b),
a) The tip (1c) is tapered to facilitate driving.

【0045】基礎ピン(1)を打ち込む間隔は支柱(2)の間
隔となるため、打設するコンクリートの重量やコンクリ
ートを支える部材の強度や撓み量を考慮して定める必要
がある。本実施例では1m間隔とした。
Since the interval at which the foundation pins (1) are driven is the distance between the columns (2), it is necessary to determine the interval in consideration of the weight of the concrete to be cast and the strength and the amount of bending of the members supporting the concrete. In this embodiment, the interval is 1 m.

【0046】次いで、基礎ピン(1)に支柱(2)を立てる。
実施例では支柱(2)としては鋼管を使用した。支柱(2)は
後工程で撤去するため、ピンやボルトなどにを用いて基
礎ピンに固定する。実施例では基礎ピン(1)の露出部(1
b)がパイプ状の支柱(2)に内接するようにし、両者をボ
ルトにより固定した。支柱(2)の上端部には支柱同士の
接続等に用いるための支柱ジョイント部(2b)が設けられ
ている。
Next, the column (2) is erected on the base pin (1).
In the example, a steel pipe was used as the column (2). The post (2) is fixed to the base pin using pins and bolts for removal in a later process. In the embodiment, the exposed portion (1
b) was inscribed in the pipe-like column (2), and both were fixed with bolts. A strut joint (2b) is provided at the upper end of the strut (2) for use in connecting the struts to each other.

【0047】その際、支柱(2)が傾かないように注意し
て取り付ける。(2a)は支柱(2)と基礎ピン(1)との固定に
用いるボルト穴であり、実施例では正面に3カ所、側面
に1カ所設けている。このボルト穴(2a)の遊びを利用し
て支柱(2)の傾きを微調整することができる。
At this time, the column (2) is attached with care so as not to tilt. (2a) is a bolt hole used for fixing the column (2) and the base pin (1). In the embodiment, three bolt holes are provided at the front and one at the side. By utilizing the play of the bolt hole (2a), the inclination of the column (2) can be finely adjusted.

【0048】支柱(2)はコンクリートを打設しても自立
状態を維持し、コンクリートの重量によって倒れること
はないが、必要により何らかの支柱支持部材を用いて補
強するようにしてもよい。本実施例のダムの監査廊のよ
うに通路の両側にコンクリート壁面を築く場合には、両
側の壁を同時に打設するようにし、通路の両側に位置す
る支柱(2)相互間に、突っ張るように水平に補強支柱(7)
を配して支柱(2)を補強することができる。この場合に
は、支柱(2)は補強支柱(7)により互いに支え合うことに
なる。
The strut (2) maintains its self-standing state even when the concrete is cast and does not fall down due to the weight of the concrete, but may be reinforced by using a strut supporting member if necessary. When constructing concrete walls on both sides of the passage as in the case of the audit corridor of the dam of the present embodiment, the walls on both sides should be cast at the same time, and the columns (2) located on both sides of the passage should be stretched between them. Reinforcement post horizontally (7)
To reinforce the column (2). In this case, the columns (2) will support each other by the reinforcing columns (7).

【0049】本実施例で用いた補強支柱(7)は支柱と同
径で、両端が直角に曲がった鋼管を用いた。取り付けに
際しては曲がった両端を各支柱(2)の上端に設けられて
いる支柱ジョイント部(2b)内に差し入れることにより行
っている。
The reinforcing column (7) used in this embodiment was a steel pipe having the same diameter as the column and having both ends bent at right angles. At the time of mounting, the bent ends are inserted into a column joint (2b) provided at the upper end of each column (2).

【0050】支柱(2)の固定が完了した後、隣接する支
柱(2)間に開口部を有する板状体としてエキスパンドメ
タル(3)を設置する。型枠として鉄板等を用いることも
考えられるが、重量が大きく運搬や作業がしづらく、支
柱との固定も行いにくいので、エキスパンドメタル(3)
の方が適している。もちろん、十分な強度や剛性が得ら
れれば金網や、パンチングメタル等の開口部を有する板
状体を用いても良い。
After the fixing of the columns (2) is completed, the expanded metal (3) is placed as a plate-like body having an opening between the adjacent columns (2). Although it is conceivable to use an iron plate or the like as the formwork, it is difficult to carry or work, and it is difficult to fix it to the columns, so expanded metal (3)
Is more suitable. Of course, if sufficient strength and rigidity can be obtained, a plate having an opening such as a wire mesh or punched metal may be used.

【0051】図6はエキスパンドメタル(3)の断面図で
ある。エキスパンドメタル(3)の各ストランド部(板状
部)(3b)の断面は傾斜を有するが、エキスパンドメタル
(3)を取り付ける際には各ストランド部(3b)の下辺部(3
d)が上辺部(3c)よりも内側、すなわちコンクリート(51)
打設側となるように取り付けることが好ましい。
FIG. 6 is a sectional view of the expanded metal (3). The cross section of each strand (plate-like part) (3b) of the expanded metal (3) has a slope, but the expanded metal
When attaching (3), set the lower side of each strand (3b) (3
d) is inside the upper part (3c), that is, concrete (51)
It is preferable to attach it so as to be on the casting side.

【0052】これによりストランド部(3b)がコンクリー
ト(51)の重量を支えやすくなり、開口部(3a)にかかる重
量を少なくすることができるので、後述の漏れ防止シー
ト体(4)が破れにくくなる。
This makes it easier for the strand portion (3b) to support the weight of the concrete (51) and to reduce the weight applied to the opening (3a). Become.

【0053】エキスパンドメタル(3)と支柱(2)との固定
はU字ボルト等を用いても良いが、樹脂製の結束バンド
(5)(インシュロックタイ)や、文具のクリップ(例え
ば商標「ガチャック」)等を用いると安価で、着脱作業
が容易である。
For fixing the expanded metal (3) and the support (2), a U-shaped bolt or the like may be used, but a resin binding band is used.
(5) Use of (insulk ties), stationery clips (for example, trademark "Gachuck"), etc., makes it inexpensive and easy to remove.

【0054】エキスパンドメタルは部分的に重ね合わす
こともできるので、施工時の突き合わせがあまり問題と
ならない。したがって、各所から同時に一斉に型枠の組
立作業を行うことができ、順に1枚ずつ施工していた従
来の方法に比べて施工に要する時間を大幅に短縮するこ
とができる。
The expanded metal can be partially overlapped, so that butting at the time of construction does not cause much problem. Therefore, the assembling work of the formwork can be performed simultaneously from all the places, and the time required for the construction can be greatly reduced as compared with the conventional method in which one form is constructed one by one.

【0055】エキスパンドメタル(3)だけではコンクリ
ート打設時にエキスパンドメタル(3)の開口部(3a)から
打設したコンクリートが漏れ出すので、エキスパンドメ
タル(3)のコンクリート打設側面にシート状の漏れ防止
シート体(4)を配する。
With the expanded metal (3) alone, the concrete poured from the opening (3a) of the expanded metal (3) at the time of concrete placement leaks. The prevention sheet body (4) is provided.

【0056】本実施例では漏れ防止シート体(4)として
網戸の防虫網として用いられる樹脂製のメッシュを用い
たが、十分な強度が得られれば他の素材でもよく、例え
ば布や樹脂シート,金属製網等も使用することができ
る。
In this embodiment, a resin mesh used as an insect screen of a screen door is used as the leakage prevention sheet member (4). However, other materials may be used as long as sufficient strength can be obtained. Metal nets and the like can also be used.

【0057】漏れ防止シート体(4)はコンクリート打設
前にエキスパンドメタル(3)の上端部から下方に垂らす
ようにする。漏れ防止シート体(4)の上端部はクリップ
(6)等でエキスパンドメタル(3)の上端に固定した。漏れ
防止シート体(4)の下端部はコンクリート打設時に内側
からコンクリートに押圧されてエキスパンドメタル(3)
に密接するが、予めクリップ等でエキスパンドメタル
(3)に固定しておいても良い。
The sheet for preventing leakage (4) is made to hang down from the upper end of the expanded metal (3) before placing concrete. The upper end of the leakage prevention sheet (4) is clipped
It was fixed to the upper end of the expanded metal (3) by (6) or the like. The lower end of the leak prevention sheet body (4) is pressed from inside by the concrete when casting concrete, and the expanded metal (3)
Close to, but beforehand expanded metal with clips etc.
It may be fixed to (3).

【0058】以上により型枠の組立は終了するので、次
いで型枠内にエキスパンドメタル(3)の上端からあふれ
ない程度の量のコンクリートを打設する。エキスパンド
メタル(3)の開口部(3a)は漏れ防止シート体(4)により目
止めされているので、この部分から漏れ出すことはない
が、漏れ防止シート体(4)としてネットや布のように透
水性を有するものを用いれば、コンクリート中の水分が
漏れ防止シート体(4)を通過して染み出すことにより、
コンクリート中の水分が少なくなり、より強固なコンク
リートになるという効果も発揮する。
After the assembly of the mold is completed, concrete is poured into the mold in such an amount that it does not overflow from the upper end of the expanded metal (3). Since the opening (3a) of the expanded metal (3) is sealed by the leakage prevention sheet (4), it does not leak out of this portion, but as a leakage prevention sheet (4), such as a net or cloth. If a material having water permeability is used, moisture in the concrete leaks out through the leak prevention sheet body (4),
The effect of reducing the moisture in the concrete and making the concrete stronger is also exerted.

【0059】打設後、養生し、打設したコンクリート上
端の強度の小さい部分を取り除くグリーンカットと呼ば
れる作業を行い、硬化したコンクリート構造体の上方に
上層の型枠を組み立てる。
After the casting, curing is performed, and a work called green cut is performed to remove the low strength portion of the upper end of the cast concrete, and an upper formwork is assembled above the hardened concrete structure.

【0060】下層となる一層目のコンクリート(51)の型
枠に用いた支柱(2)の上に、次の支柱を継ぐ。そのため
には支柱に内接又は外接するジョイント部材を用いるよ
うにしたり、支柱の端部同士が螺合できるようにする
等、軸方向に接続しやすい構造としておくことが望まし
い。本実施例では支柱上部に設けた支柱ジョイント部(2
b)に上方の支柱の下端部を挿入してボルト穴(2c)を利用
してボルト固定した。
The next strut is connected to the strut (2) used for the formwork of the lower layer concrete (51). For this purpose, it is desirable to use a joint member that is inscribed or tangent to the column, or that the ends of the column can be screwed into each other, and a structure that is easy to connect in the axial direction is desirable. In the present embodiment, a strut joint (2
The lower end of the upper column was inserted into b) and bolted using the bolt hole (2c).

【0061】尚、下層の打設時に支柱間支持のために支
柱ジョイント部(2b)に差し入れていた補強支柱(7)は、
その前に取り外しておく必要がある。
The reinforcing strut (7) inserted into the strut joint (2b) for supporting the strut at the time of placing the lower layer,
It must be removed before that.

【0062】支柱(2)を継いだ後は下層と同様に支柱間
にエキスパンドメタル(3)を固定し、漏れ防止シート体
(4)を配して上層の型枠を完成させる。
After connecting the strut (2), the expanded metal (3) is fixed between the struts in the same manner as in the lower layer, and a leakage prevention sheet body is provided.
(4) is arranged to complete the upper formwork.

【0063】1層目のコンクリート(51)の上端面を清掃
した後、上層型枠内にコンクリートを打設する。これに
より、1層目のコンクリート(51)の上部に2層目のコン
クリート(52)を有するコンクリート構造体が形成され
る。
After cleaning the upper end surface of the first layer concrete (51), concrete is poured into the upper layer formwork. As a result, a concrete structure having the second layer of concrete (52) above the first layer of concrete (51) is formed.

【0064】3層以上の高いコンクリート構造体を施工
する場合には、同様に型枠組立とコンクリート打設を必
要段数繰り返して行えば良い。図中(53)は3層目のコン
クリートである。
In the case of constructing a high concrete structure having three or more layers, it is only necessary to repeat the form assembling and concrete placing by the required number of steps. (53) in the figure is the third layer of concrete.

【0065】但し、エキスパンドメタルの高さと支柱の
長さは同一である必要はなく、例えばエキスパンドメタ
ルの高さより1.5倍程度長い支柱を用いれば、3層目の
型枠組立時には2層目の支柱は既に3層目のエキスパン
ドメタルを支持するのに十分な長さ突出しているので、
3層目の支柱を継ぐ必要はない。又、エキスパンドメタ
ルの高さより2倍程度長い支柱を用いれば、2層打設毎
に支柱を継げばよい。
However, the height of the expanded metal and the length of the column need not be the same. For example, if a column that is about 1.5 times longer than the height of the expanded metal is used, the column of the second layer is assembled at the time of assembling the third-layer formwork. Already protrudes long enough to support the third layer of expanded metal,
There is no need to connect the third layer of support. In addition, if a support that is about twice as long as the height of the expanded metal is used, the support may be connected every two layers.

【0066】尚、型枠端部の地山と接する箇所はフーチ
ングを別施工してもよいし、型枠端部に位置するエキス
パンドメタル(3)を地山の形状に対応するように加工し
ても良い。
The footing at the end of the form may be separately footed, or the expanded metal (3) located at the end of the form may be processed to correspond to the shape of the ground. May be.

【0067】打設が完了し、コンクリートが硬化した後
に、型枠を取り外すが、作業に際してはまず支柱(2)か
ら取り外す。硬化によりコンクリートは自重を支えるの
で、型枠には力が加わらず、型枠を取り外しても強度上
なんら問題はない。
After the casting has been completed and the concrete has hardened, the formwork is removed, but the work is first removed from the column (2). Since concrete supports its own weight by hardening, no force is applied to the formwork, and there is no problem in strength even if the formwork is removed.

【0068】支柱(2)は取り外す前にエキスパンドメタ
ル(3)との結合を解除する必要があるが、結合に樹脂製
の結束バンド(5)を用いた場合には、結束バンド(5)の一
部をカッターやニッパー等で切断したり、ライター等で
溶断するだけで支柱(2)とエキスパンドメタル(3)との結
合が解除される。
The column (2) needs to be released from the connection with the expanded metal (3) before being removed. However, when a resin band (5) is used for the connection, the band (5) is The connection between the column (2) and the expanded metal (3) is released simply by cutting a part with a cutter or a nipper or melting it with a lighter.

【0069】次ぎに、支柱(2)と基礎ピン(1)とを締結し
ているボルト等を外し、支柱(2)を上方に引き抜くよう
に取り外す。その後、エキスパンドメタル(3)をコンク
リート表面から剥離させるように取り外す。エキスパン
ドメタル(3)とコンクリートとの間には漏れ防止シート
体(4)が配されているため、コンクリートがエキスパン
ドメタル(3)の開口部に深く食い込むことはないので、
エキスパンドメタル(3)の剥離は容易である。
Next, the bolts and the like that fasten the column (2) and the foundation pin (1) are removed, and the column (2) is removed so as to be pulled upward. Thereafter, the expanded metal (3) is removed so as to be peeled off from the concrete surface. Since the leak prevention sheet (4) is arranged between the expanded metal (3) and the concrete, the concrete does not penetrate deeply into the opening of the expanded metal (3),
The peeling of the expanded metal (3) is easy.

【0070】次いで、コンクリート表面に密着している
漏れ防止シート体(4)をコンクリート表面から剥離す
る。
Next, the leakage prevention sheet (4) which is in close contact with the concrete surface is peeled off from the concrete surface.

【0071】本実施例は監査廊であるので、3層目のコ
ンクリート(53)の上に天端プレキャストブロック(60)を
載置した。
Since the present embodiment is an inspection hall, the top precast block (60) is placed on the third layer of concrete (53).

【0072】取り外した支柱(2)やエキスパンドメタル
(3)は再度型枠材料として利用することができるので無
駄がなく、施工費用の低減に寄与することができる。
The removed support (2) and expanded metal
Since (3) can be reused as a formwork material, there is no waste and it can contribute to a reduction in construction costs.

【0073】エキスパンドメタル(3)は、鉄板等に比べ
て軽量であり、更には部分毎に型枠を形成して打設作業
することができるので、一度に必要な型枠材料の量も少
なくて良く、輸送費は少なくすることができ、保管のた
めの用地も少なくてすむ。
The expanded metal (3) is lighter in weight than an iron plate and the like, and can be formed and formed by forming a part, so that the amount of form material required at one time is small. And transportation costs can be reduced, and less land is needed for storage.

【0074】又、型枠材料の突き合わせがほとんど問題
とならないので、各所から同時に型枠を組み立てること
ができ、作業性が良い。
Further, since butting of the mold materials does not substantially matter, it is possible to assemble the molds from various places at the same time, and the workability is good.

【0075】更に、型枠材料は軽量であるので、クレー
ン等の吊り上げ装置を用いなくても人力で型枠を組み立
てることができ、更に、熟練した型枠職人や鉄筋職人は
必要ないので、施工期間の短縮と施工費の低減を図るこ
とができる。
Further, since the formwork material is lightweight, the formwork can be assembled manually without using a lifting device such as a crane or the like. The period can be shortened and the construction cost can be reduced.

【0076】[実施例2]実施例1は垂直方向にコンク
リート壁面を施工したが、本実施例では傾斜を有する壁
面を施工する実施例である。図4は本実施例を説明する
図である。
[Embodiment 2] Although the concrete wall is constructed in the vertical direction in the embodiment 1, in the present embodiment, an inclined wall is constructed. FIG. 4 is a diagram for explaining the present embodiment.

【0077】まず、ベースコンクリート(50)を打設する
が、基礎ピン(1)は傾斜面の角度に合わせて斜めに打ち
込む。支柱(2)は基礎ピン(1)と同軸となるように接続さ
れる。
First, the base concrete (50) is cast, and the base pin (1) is driven obliquely according to the angle of the inclined surface. The support (2) is connected so as to be coaxial with the base pin (1).

【0078】但し、実施例1と異なり片側のみにコンク
リート構造体を施工するので、支柱を支持するために向
かい合う支柱間に補強支柱を配するという手段を用いる
ことができない。そこで、本実施例のように内側(コン
クリートを打設する側)に支持アンカー(8)を打ち込
み、この支持アンカー(8)と支柱との間に金具やワイヤ
ー等の支持材(9)を接続し、支柱(2)を内側から引っ張る
ことにより支えるようにしても良いし、支柱の外側に地
面との間で突っ張る部材を取り付ける等しても良い。
However, unlike the first embodiment, since the concrete structure is constructed on only one side, it is not possible to use means for arranging a reinforcing column between opposing columns to support the column. Therefore, as in the present embodiment, a support anchor (8) is driven into the inside (the side where concrete is cast), and a support member (9) such as a bracket or a wire is connected between the support anchor (8) and the support. Then, the column (2) may be supported by being pulled from the inside, or a member extending between the column and the ground may be attached to the outside of the column.

【0079】その他は実施例1と同様に支柱(2)にエキ
スパンドメタルと、漏れ防止シート体を取り付けて下層
用の型枠を組み立て、1層目のコンクリート(51)を打設
する。
Otherwise, as in the first embodiment, an expanded metal and a leakage prevention sheet member are attached to the column (2), and a lower layer formwork is assembled, and a first layer concrete (51) is poured.

【0080】そして一層目の上方に2層目の型枠を組み
立てて、2層目のコンクリート(52)を打設する。本実施
例では支柱(2)の高さをエキスパンドメタルの高さの2
倍としているので、2層目の型枠組立時には支柱(2)を
継ぎ足す必要はなく、支柱は3層目の型枠組立時に継ぎ
足せば良い。(53)は3層目、(54)は4層目、(55)は5層
目、(56)は6層目のコンクリートである。
Then, a second-layer formwork is assembled above the first layer, and a second-layer concrete (52) is poured. In this embodiment, the height of the support (2) is set to 2 times the height of the expanded metal.
Since it is doubled, it is not necessary to add the column (2) at the time of assembling the second-layer formwork, and the column may be added at the time of assembling the third-layer formwork. (53) is the third layer, (54) is the fourth layer, (55) is the fifth layer, and (56) is the sixth layer concrete.

【0081】コンクリート硬化後に支柱(2)、エキスパ
ンドメタル(3)、漏れ防止シート体を取り外すことがで
きるのは実施例1と同様である。
After the concrete is hardened, the column (2), the expanded metal (3) and the leakage prevention sheet can be removed in the same manner as in the first embodiment.

【0082】尚、図示していないが、図の右側の垂直面
は実施例1と同様に垂直方向に型枠を継いで施工してい
る。
Although not shown, the vertical surface on the right side of the figure is formed by connecting the formwork in the vertical direction as in the first embodiment.

【0083】[実施例3]本実施例も斜め方向に壁面を
設ける実施例であるが、実施例2のように傾斜面とはな
らず、階段状に壁面を設けている。
[Embodiment 3] This embodiment is also an embodiment in which a wall surface is provided in an oblique direction. However, unlike the second embodiment, a wall surface is provided in a stair-like shape instead of an inclined surface.

【0084】実施例1と同様にベースコンクリート(50)
を打設し、基礎ピン(1)を打ち込み、エキスパンドメタ
ル(3)と漏れ防止シート体を取り付けて最下層の型枠を
組み立て、コンクリートを打設し、上端をグリーンカッ
トする。
As in Example 1, base concrete (50)
Then, the foundation pin (1) is driven in, the expanded metal (3) and the leakage prevention sheet are attached, the lowermost formwork is assembled, concrete is poured, and the upper end is green-cut.

【0085】本実施例では1層目の支柱の上に2層目の
支柱を継ぐのではなく、2層目の支柱は、1層目のコン
クリートの上面に取り付ける。すなわち、1層目のコン
クリートの上面に基礎ピン(1)を打ち込み、その基礎ピ
ン(1)に支柱を固定し、型枠を組み立て、2層目のコン
クリートを打設する。
In this embodiment, the second-layer struts are attached to the upper surface of the first-layer concrete, instead of connecting the second-layer struts to the first-layer struts. That is, a base pin (1) is driven into the upper surface of the first layer of concrete, a support is fixed to the base pin (1), a formwork is assembled, and a second layer of concrete is poured.

【0086】このように基礎ピンの位置をずらしつつ順
次上層を打設していくことにより、階段状にコンクリー
トを打設することができる。本実施例では支柱(2)同士
を継ぐ必要はないので、上記各実施例と異なり支柱(2)
には支柱ジョイント部は設けていない。
By sequentially placing the upper layers while shifting the positions of the foundation pins, concrete can be placed stepwise. In this embodiment, since it is not necessary to join the struts (2), the struts (2) are different from the above embodiments.
Does not have a column joint.

【0087】上層の施工時には下層の施工に用いた支柱
(2)やエキスパンドメタル(3)を取り外して再利用するこ
とができるので、施工に必要な支柱(2)やエキスパンド
メタル(3)は少なくてすむ。本実施例では1層目(51)の
型枠として用いた支柱(2)とエキスパンドメタル(3)を3
層目(53)の型枠に再利用し、2層目(52)の型枠として用
いた支柱(2)とエキスパンドメタル(3)を4層目(54)の型
枠に再利用した。
When the upper layer was constructed, the strut used for the lower layer construction
Since (2) and expanded metal (3) can be removed and reused, the number of supporting columns (2) and expanded metal (3) required for construction is reduced. In this embodiment, three columns (2) and expanded metal (3) used as the mold of the first layer (51) are used.
The pillar (2) and the expanded metal (3) used as the mold of the second layer (52) were reused for the mold of the fourth layer (54).

【0088】[実施例4]図7は、本実施例の施工工程
を示した図である。まず図中(a)に示すようにベースコ
ンクリート(50)を打設し、基礎ピン(1)と支持アンカー
(8)を設置する。
[Embodiment 4] FIG. 7 is a view showing a construction process of this embodiment. First, cast the base concrete (50) as shown in (a) in the figure,
(8) is installed.

【0089】次に図中(b)に示すように、基礎ピン(1)に
支柱(21),(22)を取り付ける。支柱は下段支柱(21)と上
段支柱(22)の2本が継がれたものであり、上段支柱(22)
の下端部は下段支柱(21)の上端部に内接するように段部
(22a)が形成され径が細くなっている。
Next, as shown in (b) in the figure, columns (21) and (22) are attached to the base pin (1). The strut consists of the lower strut (21) and the upper strut (22) joined together, and the upper strut (22)
Of the lower column (21) so that it is inscribed in the upper end of the lower column (21).
(22a) is formed and the diameter is reduced.

【0090】支持アンカー(8)と支柱(21)とを支持材(9)
を用いて接続する。支持材(9)の支柱(21)側端には「高
ナット」と呼ばれる軸方向に長いナットが備えられてお
り、支柱(21)を貫通するボルト(23)を前記の高ナットに
螺入することにより支持材(9)と支柱(21)とを接続して
いる。
The supporting anchor (8) and the support (21) are connected to the supporting material (9).
Connect using. An axially long nut called a `` high nut '' is provided at the end of the support (9) on the column (21), and a bolt (23) penetrating the column (21) is screwed into the high nut. By doing so, the support member (9) and the support (21) are connected.

【0091】そして、他の実施例と同様にエキスパンド
メタル(3)と漏れ防止シート体を支柱に取りつけるが、
これらは支柱を基礎ピン(1)に取りつれる前に予め支柱
に取りつけておいても良い。
Then, as in the other embodiments, the expanded metal (3) and the leakage prevention sheet are attached to the support.
These may be attached to the support in advance before the support is attached to the foundation pin (1).

【0092】次に図中(c)に示すように、型枠内に1層
目のコンクリート(51)を打設し、1層目のコンクリート
(51)の上に支持アンカー(8)を設置する。
Next, as shown in (c) of the figure, the first layer of concrete (51) is poured into the formwork, and the first layer of concrete (51) is cast.
Place the support anchor (8) on (51).

【0093】次に図中(d)に示すように1層目のコンク
リート(51)の上の支持アンカー(8)と支柱(22)とを支持
材(9)により接続し、図中(e)に示すように2層目のコン
クリート(52)を打設し、その上に支持アンカー(8)を設
置する。
Next, as shown in (d) in the figure, the supporting anchor (8) on the concrete (51) of the first layer and the support (22) are connected by the supporting material (9). As shown in), a second layer of concrete (52) is cast, and a support anchor (8) is placed thereon.

【0094】2層目のコンクリート(52)が硬化した後
に、図中(f)に示すように支柱(21)と基礎ピン(1)との接
続及び支柱と支持材(9)との接続を外し、型枠を分解
し、支柱は上部(22)と下部(23)に分離させる。
After the second layer of concrete (52) has hardened, the connection between the support (21) and the foundation pin (1) and the connection between the support and the support (9) are made as shown in FIG. Remove and disassemble the formwork and separate the struts into upper (22) and lower (23).

【0095】支持材(9)はコンクリート中に埋め込まれ
た状態となるので、支柱と接続されていた「高ナット」
はインサート材としてコンクリート中に残ることとな
る。
Since the supporting material (9) is embedded in the concrete, the “high nut” connected to the support is used.
Will remain in the concrete as an insert material.

【0096】次に図中(g)に示すようにコンクリートか
ら露出している支持材(9)端部の「高ナット」に支柱支
持金具(24)を取り付ける。
Next, as shown in (g) in the figure, a column supporting bracket (24) is attached to the “high nut” at the end of the supporting member (9) exposed from the concrete.

【0097】支柱支持金具(24)はリング状部(24a)とネ
ジが切られたネジ部(24b)とからなり、リング状部(24a)
の内径は上段支柱(22)の段部(22a)より下方の径の細い
部分よりも径が大きく、上段支柱(22)の段部(22a)より
上方の径の太い部分よりも径が小さくなっている。
The support bracket (24) comprises a ring-shaped part (24a) and a threaded part (24b).
The inner diameter of the upper pillar (22) is smaller than the narrow part below the step (22a) of the upper column (22), and smaller than the thick part above the step (22a) of the upper column (22). Has become.

【0098】取り付けに際しては、支柱支持金具(24)の
ネジ部(24b)を「高ナット」に螺入して、リング状部(24
a)の開口が上下方向となるようにする。
When mounting, the screw portion (24b) of the column support metal fitting (24) is screwed into the "high nut" to form the ring-shaped portion (24).
The opening of a) is to be in the vertical direction.

【0099】次に図中(h)に示すように、支柱支持金具
(24)のリング状部(24a)に上方から上段支柱(22)を差し
入れる。すると、上段支柱(22)は段部(22a)でリング状
部(24a)に係止される。
Next, as shown in FIG.
The upper column (22) is inserted into the ring-shaped portion (24a) of (24) from above. Then, the upper column (22) is locked to the ring-shaped portion (24a) at the step (22a).

【0100】そして、2層目のコンクリート(52)の上に
設けられた支持アンカー(8)と上段支柱(22)とを支持材
(9)により接続し、エキスパンドメタル(3)等を配して3
層目用の型枠を完成させ、図中(i)に示すように型枠内
に3層目のコンクリート(53)を打設する。
Then, the supporting anchor (8) and the upper column (22) provided on the second layer concrete (52) are
Connect by (9) and arrange expanded metal (3) etc.
The formwork for the layer is completed, and a third layer of concrete (53) is poured into the formwork as shown in FIG.

【0101】3層目のコンクリート(53)が硬化すれば3
層目用の型枠を分解し、3層目の支持材(9)端部の「高
ナット」に支柱支持金具(24)を取り付けて、そこに上段
支柱(22)を取りつけて4層目のコンクリートの型枠を作
ることができる。る。このようにして上層のコンクリー
トを打設するに際して下層の型枠として用いた支柱やエ
キスパンドメタルを繰り返し使うことができるので、型
枠材料の量が少なく、型枠の材料費,輸送費,保管費等
を大幅に低減させることができる。
If the third layer of concrete (53) is hardened,
Disassemble the formwork for the fourth layer, attach the column support bracket (24) to the "high nut" at the end of the third layer support material (9), and attach the upper column (22) to the fourth layer. Concrete formwork can be made. You. In this way, the pillars and expanded metal used as the lower layer formwork can be used repeatedly when placing the upper layer concrete, so the amount of formwork material is small, and the material cost, transportation cost, and storage cost of the formwork are small. Etc. can be greatly reduced.

【0102】尚、本実施例では上段支柱(22)下端部に設
けた段部(22a)を支柱支持金具(24)のリング状部(24a)で
係止させたが、支柱を係止できれば別の構造でも良い。
例えば、支柱の下端部を錐状にしてリング状部(24a)に
食い込ませたり、リング状部(24a)の内径を上側より下
側を小さくして支柱下端部食い込ませるようにしてもよ
い。又、ボルト等で固定するようにしてもよい。
In this embodiment, the step (22a) provided at the lower end of the upper column (22) is locked by the ring-shaped portion (24a) of the column support fitting (24). Another structure may be used.
For example, the lower end of the column may be made into a conical shape and bite into the ring-shaped portion (24a), or the inner diameter of the ring-shaped portion (24a) may be made smaller at the lower side than the upper side so as to bite into the lower end of the column. Further, it may be fixed with a bolt or the like.

【0103】[実施例5]本実施例も実施例4と同様に
下層の型枠として用いた支柱やエキスパンドメタルを上
層の型枠として利用できる方法であるが、支持アンカー
や支持材(9)を私用しない点が異なる。
[Embodiment 5] In this embodiment, as in Embodiment 4, a column or expanded metal used as a lower mold is used as an upper mold, but a supporting anchor or a support material (9) The difference is that you do not use privately.

【0104】図8は本実施例の施工工程を示した図であ
り、(30)は支柱であり、上下4カ所にボルト取付穴(26)
が設けられている。(31)は支柱に取り付けられた足場で
ある。
FIG. 8 is a view showing the construction process of this embodiment, in which (30) is a supporting column, and bolt mounting holes (26) are provided at four upper and lower positions.
Is provided. (31) is a scaffold attached to a pillar.

【0105】まず、図中(A)に示したように、ベースコ
ンクリート(50)上の基礎ピン(1)に支柱を取り付ける。
エキスパンドメタル等は支柱(30)を所定位置に立ててか
ら取り付けても良いし、予め複数の支柱とエキスパンド
メタルや漏れ防止シート体が接続された型枠ユニットと
しておき、この型枠ユニットを所定位置にフェンスのよ
うに並べ並べるようにしても良い。
First, as shown in (A) in the figure, a support is attached to a foundation pin (1) on a base concrete (50).
Expanded metal or the like may be attached after the support (30) is set in a predetermined position, or a plurality of supports and a form unit in which expanded metal or a leakage prevention sheet body is connected in advance, and the form unit is placed in a predetermined position. It may be arranged like a fence.

【0106】次に図中(B)に示したように、支柱(30)の
高さの半分程度の高さまで1層目のコンクリート(51)を
打設する。そして、支柱(30)のボルト取付穴(26)の内、
1層目のコンクリート(51)より上方に位置する2つのボ
ルト取付穴(26)にボルト(23)でインサート材(25)をそれ
ぞれ取り付ける。このとき、インサート材(25)がコンク
リート打設側となるようにする。
Next, as shown in (B) in the figure, the first layer of concrete (51) is cast to a height of about half the height of the column (30). And among the bolt mounting holes (26) of the support (30),
Insert materials (25) are respectively attached to the two bolt mounting holes (26) located above the first layer concrete (51) with bolts (23). At this time, the insert material (25) is placed on the concrete placing side.

【0107】次に図中(C)に示したように、2層目のコ
ンクリート(52)を打設する。2層目のコンクリートが硬
化した後、図中(D)に示したようにボルト(23)を外して
支柱(30)を取り外す。このときインサート材(25)は2層
目のコンクリート(52)中に残されることとなる。
Next, as shown in (C) in the figure, a second layer of concrete (52) is cast. After the second layer of concrete has hardened, the bolts (23) are removed and the columns (30) are removed as shown in FIG. At this time, the insert material (25) is left in the second-layer concrete (52).

【0108】次に、図中(E)に示すように1層目及び2
層目の型枠として用いた支柱(30)を上方に1層分ずらし
て2層目のコンクリートに取り付ける。取り付けに際し
ては、支柱(30)の下方2カ所のボルト取付穴(26)を通し
たボルト(23)で2層目のコンクリート(52)に埋め込まれ
たインサート材(25)に固定する。これにより、支柱(30)
の上方2カ所のボルト取付穴(26)は2層目のコンクリー
ト(52)より上方に位置することとなるので、この上方2
カ所のボルト取付穴(26)には(B)に示したと同様にボル
ト(23)とインサート材(25)をそれぞれ取り付ける。この
ときもインサート材(25)がコンクリート打設側となるよ
うにする。支柱(30)に取り付けられている足場(31)は支
柱(30)と共に上方に移動するので、高所に足場を確保す
ることができ、作業がし易くなる。
Next, as shown in FIG.
The column (30) used as the formwork of the layer is shifted upward by one layer and attached to the concrete of the second layer. At the time of attachment, it is fixed to the insert material (25) embedded in the second layer of concrete (52) with bolts (23) passing through two bolt mounting holes (26) below the column (30). This makes the pillar (30)
Since the two bolt mounting holes (26) located above are located above the second layer concrete (52),
The bolts (23) and the inserts (25) are mounted in the bolt mounting holes (26) at the same locations as in (B). Also at this time, the insert material (25) is on the concrete placing side. Since the scaffold (31) attached to the strut (30) moves upward together with the strut (30), the scaffold can be secured at a high place, and the work is facilitated.

【0109】次に図中(F)に示すように、3層目のコン
クリート(53)を打設する。3層目のコンクリート(53)硬
化後に4本のボルト(23)を外し、支柱(30)を1層分上に
ずらし、支柱(30)の下方2カ所のボルト取付穴(26)を通
したボルト(23)を3層目のコンクリート(53)に埋め込ま
れたインサート材(25)に固定する。
Next, a third layer of concrete (53) is cast, as shown in FIG. After hardening the third layer of concrete (53), the four bolts (23) are removed, the column (30) is shifted up by one layer, and passed through the bolt mounting holes (26) at two places below the column (30). The bolt (23) is fixed to the insert (25) embedded in the third layer of concrete (53).

【0110】このようにして、コンクリート打設後に1
層分ずつ支柱の取り付け位置を上方に移動させ、下層で
用いた型枠材料を上層で繰り返し利用することができる
ので、型枠材料が少なくすることができる。
[0110] In this way, after concrete is cast, 1
Since the mounting positions of the columns are moved upward by layers, and the mold material used in the lower layer can be repeatedly used in the upper layer, the form material can be reduced.

【0111】尚、支柱(30)の移動は、型枠を一旦分解し
てから行っても良いし、エキスパンドメタル(3)が取り
付けられたままの型枠ユニットとして上方にスライドさ
せるように移動させても良い。
The support post (30) may be moved after the mold is once disassembled, or may be moved upward as a mold unit with the expanded metal (3) attached. May be.

【0112】[0112]

【発明の効果】以上述べたように本発明により、軽量で
施工性の良い型枠と、短期間で、しかも安価にコンクリ
ート構造体を施工する方法を提供することができた。
As described above, according to the present invention, it is possible to provide a formwork which is lightweight and has good workability, and a method for constructing a concrete structure in a short period of time and at low cost.

【図面の簡単な説明】[Brief description of the drawings]

【図1】型枠の正面図。FIG. 1 is a front view of a mold.

【図2】型枠の側面図。FIG. 2 is a side view of a mold.

【図3】実施例1を示した図。FIG. 3 is a view showing a first embodiment;

【図4】実施例2を示した図。FIG. 4 is a view showing a second embodiment.

【図5】実施例3を示した図。FIG. 5 is a view showing a third embodiment.

【図6】エキスパンドメタルの断面図。FIG. 6 is a cross-sectional view of an expanded metal.

【図7】実施例4を示した図。FIG. 7 is a view showing a fourth embodiment.

【図8】実施例5を示した図。FIG. 8 is a view showing a fifth embodiment.

【符号の説明】[Explanation of symbols]

(1) 基礎ピン (2) 支柱 (3) エキスパンドメタル (4) 漏れ防止シート体 (5) 結束バンド (6) クリップ (8) 支持アンカー (9) 支持材 (50) ベースコンクリート (51) 1層目のコンクリート (52) 2層目のコンクリート (53) 3層目のコンクリート (1) Foundation pin (2) Strut (3) Expanded metal (4) Leak-proof sheet (5) Cable tie (6) Clip (8) Support anchor (9) Support material (50) Base concrete (51) One layer Second layer concrete (52) Second layer concrete (53) Third layer concrete

───────────────────────────────────────────────────── フロントページの続き (72)発明者 中岡 勇 大阪市北区西天満5丁目14番10号 近畿コ ンクリート工業株式会社内 (72)発明者 森田 強 大阪市北区西天満5丁目14番10号 近畿コ ンクリート工業株式会社内 Fターム(参考) 2E177 FA05 FB01  ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Isamu Nakaoka 5-14-10, Nishitenma, Kita-ku, Osaka-shi Kinki Concrete Industry Co., Ltd. (72) Inventor Tsuyoshi Morita 5- 14-10, Nishitenma, Kita-ku, Osaka-shi Kinki Concrete Industry Co., Ltd. F-term (reference) 2E177 FA05 FB01

Claims (15)

【特許請求の範囲】[Claims] 【請求項1】 ベースコンクリートに基礎ピンを打ち込
み、該基礎ピンに支柱を接続し、該支柱に開口部を有し
た板状体を固定し、該板状体の一方の面に沿って該板状
体の開口部からコンクリートが漏れるのを防止するため
のシート状の漏れ防止シート体を配して型枠とし、該型
枠の漏れ防止シート体が配された側にコンクリートを打
設することを特徴とするコンクリート構造体の施工方
法。
1. A base pin is driven into a base concrete, a column is connected to the base pin, a plate having an opening is fixed to the column, and the plate is fixed along one surface of the plate. Forming a sheet-shaped leak-preventing sheet body for preventing concrete from leaking from the opening of the form, forming a mold, and casting concrete on the side of the form where the leak-preventing sheet body is arranged. A method for constructing a concrete structure, characterized by the following.
【請求項2】 ベースコンクリートに基礎ピンを打ち込
み、 該基礎ピンに支柱と開口部を有する板状体とからなる型
枠ユニットを接続し、 該板状体の一方の面に沿って該板状体の開口部からコン
クリートが漏れるのを防止するためのシート状の漏れ防
止シート体を配して型枠とし、 該型枠の漏れ防止シート体が配された側にコンクリート
を打設することを特徴とするコンクリート構造体の施工
方法。
2. A base pin is driven into a base concrete, a form unit comprising a support and a plate having an opening is connected to the base pin, and the plate is formed along one surface of the plate. A sheet-shaped leakage prevention sheet body for preventing concrete from leaking from the opening of the body is provided as a formwork, and concrete is cast on the side of the formwork on which the leakage prevention sheet body is provided. Characteristic concrete structure construction method.
【請求項3】 請求項1又は請求項2記載の施工方法に
より施工したコンクリート構造体の上方に1層又は複数
層のコンクリートを打設するコンクリート構造体の施工
方法であって、 下層のコンクリートの上端部に基礎ピンを打ち込み、該
基礎ピンに支柱を接続し、該支柱に開口部を有した板状
体を固定し、該板状体の一方の面に沿って該板状体の開
口部からコンクリートが漏れるのを防止するためのシー
ト状の漏れ防止シート体を配して型枠とし、該型枠の漏
れ防止シート体が配された側にコンクリートを打設する
ことを特徴とするコンクリート構造体の施工方法。
3. A method for constructing a concrete structure in which one or more layers of concrete are cast above the concrete structure constructed by the method according to claim 1 or 2, wherein A base pin is driven into the upper end, a support is connected to the base pin, a plate having an opening is fixed to the support, and an opening of the plate is formed along one surface of the plate. A sheet-shaped leak-preventing sheet body for preventing concrete from leaking from the mold, forming a formwork, and casting concrete on the side of the formwork on which the leak-proof sheet body is arranged. Construction method of the structure.
【請求項4】 請求項1又は請求項2記載の施工方法に
より施工したコンクリート構造体の上方に1層又は複数
層のコンクリートを打設するコンクリート構造体の施工
方法であって、 下層のコンクリート硬化後に、該下層のコンクリート打
設に用いた支柱の上に上層用の支柱を継ぎ、該上層用の
支柱に開口部を有した板状体を固定し、該板状体の一方
の面に沿って該板状体の開口部からコンクリートが漏れ
るのを防止するためのシート状の漏れ防止シート体を配
して型枠とし、該型枠の漏れ防止シート体が配された側
にコンクリートを打設することを特徴とするコンクリー
ト構造体の施工方法。
4. A concrete structure construction method in which one or more layers of concrete are cast above a concrete structure constructed by the construction method according to claim 1 or 2, wherein the lower layer concrete hardening is performed. Later, an upper strut is spliced onto the lower strut used for casting concrete, a plate having an opening is fixed to the upper strut, and the plate is fixed along one surface of the plate. A sheet-shaped leak-preventing sheet body for preventing concrete from leaking from the opening of the plate-shaped body to form a mold, and concrete is cast on the side of the mold-form where the leak-preventing sheet body is arranged. A method for constructing a concrete structure, comprising:
【請求項5】 請求項1又は請求項2記載の施工方法に
より施工したコンクリート構造体の上方に1層又は複数
層のコンクリートを打設するコンクリート構造体の施工
方法であって、 下層のコンクリート打設時にインサート材を一端がコン
クリートから露出するように埋設し、 下層のコンクリート硬化後に、該インサート材に上層の
型枠用の支柱を直接又は支柱支持金具を介して係止し、
該支柱に開口部を有した板状体を固定し、該板状体の一
方の面に沿って該板状体の開口部からコンクリートが漏
れるのを防止するためのシート状の漏れ防止シート体を
配して型枠とし、該型枠の漏れ防止シート体が配された
側にコンクリートを打設することを特徴とするコンクリ
ート構造体の施工方法。
5. A method for constructing a concrete structure in which one or more layers of concrete are cast above the concrete structure constructed by the method according to claim 1 or 2, At the time of installation, the insert material is embedded so that one end is exposed from the concrete, and after the lower layer concrete is hardened, the support for the upper formwork is locked to the insert material directly or via the support metal fitting,
A sheet-like leak-prevention sheet body for fixing a plate-like body having an opening to the column and preventing concrete from leaking from the opening of the plate-like body along one surface of the plate-like body. And forming a concrete form on the side of the form where the leakage prevention sheet member is arranged, by placing concrete.
【請求項6】 支柱を補強するためにベースコンクリー
ト又は下層のコンクリートに設置された支持アンカーと
支柱とを接続する支持材を用い、コンクリート打設後に
該支持材をインサート材として利用することを特徴とす
る請求項5記載のコンクリート構造体の施工方法。
6. A support for connecting a support anchor and a support installed on a base concrete or a lower layer concrete to reinforce the support, and using the support as an insert material after placing the concrete. The method for constructing a concrete structure according to claim 5, wherein
【請求項7】 基礎ピンは垂直方向に対して角度を有し
て打ち込まれ、支柱は該基礎ピンと同軸上となるように
接続されることを特徴とする請求項1,請求項2,請求
項3,請求項4,請求項5又は請求項6記載のコンクリ
ート構造体の施工方法。
7. The base pin according to claim 1, wherein the base pin is driven at an angle with respect to a vertical direction, and the strut is connected so as to be coaxial with the base pin. The method for constructing a concrete structure according to claim 3, 4, 5, or 6.
【請求項8】 下層のコンクリート打設のための型枠と
して用いた支柱と開口部を有した板状体を下層のコンク
リート硬化後に取り外し、上層のコンクリート打設のた
めの型枠材料として再利用することを特徴とする請求項
3記載,請求項5又は請求項6記載のコンクリート構造
体の施工方法。
8. A plate-like body having a support and an opening used as a formwork for lower-layer concrete casting is removed after the lower-layer concrete hardens, and reused as a formwork material for upper-layer concrete placement. 7. The method for constructing a concrete structure according to claim 3, wherein the concrete structure is formed.
【請求項9】 開口部を有した板状体としてエキスパン
ドメタルを使用し、該エキスパンドメタルは各ストラン
ド部の下辺部が上辺部よりもコンクリート打設側となる
ように取り付けられることを特徴とする請求項1,請求
項2,請求項3,請求項4,請求項5,請求項6,請求
項7又は請求項8記載のコンクリート構造体の施工方
法。
9. An expanded metal is used as a plate having an opening, and the expanded metal is attached such that the lower side of each strand is closer to the concrete casting side than the upper side. The construction method of a concrete structure according to claim 1, claim 2, claim 3, claim 4, claim 4, claim 5, claim 6, claim 7, or claim 8.
【請求項10】 支柱とエキスパンドメタルとの固定に
クリップ又は合成樹脂製の結束バンドを使用することを
特徴とする請求項9記載のコンクリート構造体の施工方
法。
10. The method for constructing a concrete structure according to claim 9, wherein a clip or a binding band made of a synthetic resin is used for fixing the column and the expanded metal.
【請求項11】 漏れ防止シート体として樹脂製もしく
は金属製の網又は布を用いることを特徴とする請求項
1,請求項2,請求項3,請求項4,請求項5,請求項
6,請求項7,請求項8,請求項9又は請求項10記載
のコンクリート構造体の施工方法。
11. The leak-preventing sheet body is made of a net or cloth made of resin or metal. The construction method of a concrete structure according to claim 7, 8, 9, or 10.
【請求項12】 ベースコンクリートに打ち込まれる基
礎ピンと、該基礎ピンに取り付け可能な支柱と、該支柱
に固定するエキスパンドメタルと、該エキスパンドメタ
ルの開口部からコンクリートが漏れ出すのを防止するた
めのシート状の漏れ防止シート体を備えたことを特徴と
するコンクリート打設用型枠。
12. A base pin to be driven into a base concrete, a column mountable to the base pin, an expanded metal fixed to the column, and a sheet for preventing concrete from leaking from an opening of the expanded metal. A concrete casting formwork comprising a leak-proof sheet body having a shape of a letter.
【請求項13】 漏れ防止シート体は樹脂製もしくは金
属製の網又は布であることを特徴とする請求項12記載
のコンクリート打設用型枠。
13. The concrete casting formwork according to claim 12, wherein the leakage prevention sheet is a net or cloth made of resin or metal.
【請求項14】 基礎ピンはベースコンクリートに挿入
される挿入部と、ベースコンクリート上に露出する露出
部を有し、支柱は基礎ピンの露出部に着脱可能に固定で
き、支柱同士は軸方向に着脱可能に継ぐことができるこ
とを特徴とする請求項12又は請求項13記載のコンク
リート打設用型枠。
14. The base pin has an insertion portion inserted into the base concrete, and an exposed portion exposed on the base concrete, the column can be detachably fixed to the exposed portion of the base pin, and the columns are axially connected to each other. The concrete casting formwork according to claim 12 or 13, wherein the formwork can be detachably connected.
【請求項15】 支柱には作業者が載ることのできる足
場が備えられていることを特徴とする請求項12,請求
項13又は請求項14記載のコンクリート打設用型枠。
15. The concrete casting formwork according to claim 12, wherein the support is provided with a scaffold on which an operator can rest.
JP11204584A 1999-07-19 1999-07-19 Execution method for concrete structure and concrete placing mold Pending JP2001032241A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11204584A JP2001032241A (en) 1999-07-19 1999-07-19 Execution method for concrete structure and concrete placing mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11204584A JP2001032241A (en) 1999-07-19 1999-07-19 Execution method for concrete structure and concrete placing mold

Publications (1)

Publication Number Publication Date
JP2001032241A true JP2001032241A (en) 2001-02-06

Family

ID=16492894

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11204584A Pending JP2001032241A (en) 1999-07-19 1999-07-19 Execution method for concrete structure and concrete placing mold

Country Status (1)

Country Link
JP (1) JP2001032241A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002138663A (en) * 2000-08-22 2002-05-17 Okabe Co Ltd Sheathing board for form
JP2007297817A (en) * 2006-04-28 2007-11-15 Dam Gijutsu Center Form for top of slope
JP2008267044A (en) * 2007-04-23 2008-11-06 Takamura Sogyo Kk Method of constructing concrete structure with soil concrete used
JP2008291543A (en) * 2007-05-25 2008-12-04 Takamura Sogyo Kk Method of constructing concrete structure by using soil concrete inside
WO2014148716A1 (en) * 2013-03-21 2014-09-25 Park Hae Young Prefabricated formwork for constructing concrete paved roads
CN113322904A (en) * 2021-06-04 2021-08-31 中国电建集团成都勘测设计研究院有限公司 High-spraying impervious wall for covering layer foundation concrete dam and construction method thereof

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002138663A (en) * 2000-08-22 2002-05-17 Okabe Co Ltd Sheathing board for form
JP2007297817A (en) * 2006-04-28 2007-11-15 Dam Gijutsu Center Form for top of slope
JP4537343B2 (en) * 2006-04-28 2010-09-01 財団法人ダム技術センター Form for shoulder
JP2008267044A (en) * 2007-04-23 2008-11-06 Takamura Sogyo Kk Method of constructing concrete structure with soil concrete used
JP2008291543A (en) * 2007-05-25 2008-12-04 Takamura Sogyo Kk Method of constructing concrete structure by using soil concrete inside
WO2014148716A1 (en) * 2013-03-21 2014-09-25 Park Hae Young Prefabricated formwork for constructing concrete paved roads
EP2905380A4 (en) * 2013-03-21 2015-09-23 Hae Young Park Prefabricated formwork for constructing concrete paved roads
US9243374B2 (en) 2013-03-21 2016-01-26 Hae-Young Park Prefabricated mold for construction of concrete pavement
EA025860B1 (en) * 2013-03-21 2017-02-28 Хае Юнг Парк Prefabricated mold for construction of concrete pavement
CN113322904A (en) * 2021-06-04 2021-08-31 中国电建集团成都勘测设计研究院有限公司 High-spraying impervious wall for covering layer foundation concrete dam and construction method thereof
CN113322904B (en) * 2021-06-04 2022-08-19 中国电建集团成都勘测设计研究院有限公司 High-spraying impervious wall for covering layer foundation concrete dam and construction method thereof

Similar Documents

Publication Publication Date Title
KR100731593B1 (en) A pre-fabricating forms for concrete-structure and the construction method thereof
JP2001295298A (en) Foundation for columnar structure and its work execution method
CN113482007B (en) Waist beam supporting structure and construction method thereof
JP2001032241A (en) Execution method for concrete structure and concrete placing mold
KR100865133B1 (en) A fixing device, a pre-fabricating forms for concrete-structure and the construction method thereof
KR100789319B1 (en) Carbon-glass fiber composite concrete mold and construction method using the same
KR200391986Y1 (en) Carbon-glass fiber composite concrete mold
JP2008014047A (en) Beam-column connection portion structure and method of constructing the same
KR100695491B1 (en) A fixing device, a pre-fabricating forms for concrete-structure and the construction method thereof
KR100612938B1 (en) A construction system of the wall/dome and the the method thereof it
KR20220055709A (en) Precast Concrete Method Using Fixing Unit
JPH0673786A (en) Junction of precast concrete column
JP3889497B2 (en) Molding method for concrete basement
JPH11117333A (en) Construction method of concrete structure and form therefor
JP3586121B2 (en) Mixed structure of reinforced concrete column and steel beam and its construction method
JPH0874271A (en) Method of work execution for foundation
KR101569006B1 (en) A method for constructing a frp-concrete hybrid valve-house
JP2764252B2 (en) Underground concrete structure repair material and repair method
JP3390719B2 (en) Concrete formwork construction method
KR20010079206A (en) Method constructing gutler and struc ture thereof
JP2846937B2 (en) Manufacturing method of composite concrete columns
JP6388419B1 (en) 方法 Installation method and structure
JP2000027438A (en) Method for vertically jointing concrete horizontal member
JPH11117525A (en) Src-beam form and constructing method of src-beam
JP3119117B2 (en) PC version driving formwork and formwork method