Improvements in or relating to facings or linings for underground works such as tunnels

Info

Publication number
GB476319A
GB476319A GB15866/36A GB1586636A GB476319A GB 476319 A GB476319 A GB 476319A GB 15866/36 A GB15866/36 A GB 15866/36A GB 1586636 A GB1586636 A GB 1586636A GB 476319 A GB476319 A GB 476319A
Authority
GB
United Kingdom
Prior art keywords
lining
spaced
backing
concrete
ceiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
GB15866/36A
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
THOMAS WHITLEY MORAN
Original Assignee
THOMAS WHITLEY MORAN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by THOMAS WHITLEY MORAN filed Critical THOMAS WHITLEY MORAN
Priority to GB15866/36A priority Critical patent/GB476319A/en
Priority to US145894A priority patent/US2172030A/en
Publication of GB476319A publication Critical patent/GB476319A/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/385Sealing means positioned between adjacent lining members

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

476,319. Underground structures. MORAN, T. W. June 6, 1936, No. 15866. [Class 85] [Also in Group X] Underground structures, such as tunnels, subways, tube railway stations, cellars, magazines, &c., are provided with an interior lining formed of cementitious material and inert aggregate sprayed over reinforcement by a cement gun and spaced from the inner surface of the main tunnel &c. structure to form drainage cavities continuous from the top to the bottom of the lining and provided with outlets at their lower ends. In Figs. 1 and 2, spacer strips 21, which may have inclined grooves for passage of moisture, are nailed to inserts 23 between the transverse flanges of segments 20, and backing 24 is fixed thereto ; reinforcement 26 is spaced from the backing by concrete blocks &c. 13 and tied to strips 21 by wire loops 29, and the lining is then applied. Transverse grooves 27 are formed in the lining to allow expansion, the grooves 27 being sealed by buckled copper strips 28. Preformed abutments 30 for the lining have drainage slots 31 and have extending rods 32 later covered by the lining. Auxiliary abutments 33 or 34 are provided. In inclined tunnels, thrust collars are provided coinciding with expansion joints 41, Fig. 4, and comprising concrete 42, with a step 43, applied to a transverse row of segments 36 before application of the lining and provided with projecting rods 44 for connection to the reinforcement of the lining. In Fig. 5, a flat ceiling 46 is formed before the lining 47, a bitumen strip 52 being placed between the parts which are held by rag-bolts 49. In Fig. 6, a tunnel formed of concrete 54 with transverse steel joists 55 has angle bars 59 or a ledge of concrete for support of the spaced lining 58. In another form, the lining consists of a semicircular ceiling carried by longitudinal abutments on spaced pilasters. Instead of using separate spacers, the backing may be provided with corrugations &c. 78, Fig. 20. In Fig. 12, the lining comprises walls 80 and a ceiling of twin arches 81 abutting against a joist 82 on spaced columns 83, spaced thrust pieces 84 being provided, and the backing of the arches being secured to curved ribs 86 ; drainage holes 87 are provided. The ceiling may be supported from pre-cast concrete beams which may be closely spaced. The backing may consist of reinforced bitumen felt, sheet-metal, or asbestos-cement, and the lining may be formed in one or more layers. The cavity behind the lining may be used as a ventilation duct. A raised floor may be provided, constructed similarly to the lining, to leave a cavity for drainage.
GB15866/36A 1936-06-06 1936-06-06 Improvements in or relating to facings or linings for underground works such as tunnels Expired GB476319A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
GB15866/36A GB476319A (en) 1936-06-06 1936-06-06 Improvements in or relating to facings or linings for underground works such as tunnels
US145894A US2172030A (en) 1936-06-06 1937-06-01 Tunnel lining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB15866/36A GB476319A (en) 1936-06-06 1936-06-06 Improvements in or relating to facings or linings for underground works such as tunnels

Publications (1)

Publication Number Publication Date
GB476319A true GB476319A (en) 1937-12-06

Family

ID=10066939

Family Applications (1)

Application Number Title Priority Date Filing Date
GB15866/36A Expired GB476319A (en) 1936-06-06 1936-06-06 Improvements in or relating to facings or linings for underground works such as tunnels

Country Status (2)

Country Link
US (1) US2172030A (en)
GB (1) GB476319A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352708A (en) * 2013-07-04 2013-10-16 浙江海洋学院 Lining supporting device
CN107387119A (en) * 2017-07-07 2017-11-24 中国铁道科学研究院铁道建筑研究所 Prefabricated assembled tunnel inverted arch, tunnel structure and its construction method
CN116220377A (en) * 2022-12-28 2023-06-06 上海市城市建设设计研究总院(集团)有限公司 Intelligent monitoring and automatic glue injection platform reinforced concrete bar planting structure and construction method

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2895299A (en) * 1955-06-24 1959-07-21 American Marietta Co Method of constructing tunnels
US3415063A (en) * 1964-08-12 1968-12-10 Ishikawajima Harima Heavy Ind Shield segment for covering the inner wall of the tunnel made of composite shell units
BE789916A (en) * 1971-10-13 1973-02-01 Caledonian Mining Co Ltd SUPPORT PROCESS FOR THE ROOF AND WALLS OF AN UNDERGROUND TUNNEL
US9249663B2 (en) * 2009-02-27 2016-02-02 Fci Holdings Delaware, Inc. Impact resistant lagging, method for designing impact resistant lagging, and apparatus for testing impact resistant lagging
US8191572B2 (en) * 2009-04-16 2012-06-05 Tenneco Automotive Operating Company Inc. Snap action valve with bumper pad
CN102003190B (en) * 2010-10-09 2013-06-05 卢桂才 Construction method for pre-laying tunnel waterproof coiled material
CN110831904B (en) * 2017-06-28 2022-07-19 康宁股份有限公司 Melter for glass forming apparatus
CN108756937B (en) * 2018-07-12 2024-04-19 中铁第四勘察设计院集团有限公司 Shield tunnel lining structure and method with ultra-long service life in strong corrosion environment
CN109139049B (en) * 2018-09-10 2020-05-08 中铁一局集团第二工程有限公司 Construction method for secondary lining buckling arch of underground excavation station of subway
CN109488313B (en) * 2018-12-10 2020-07-10 中交一公局桥隧工程有限公司 V-level surrounding rock micro-step excavation construction process
CN110685715B (en) * 2019-09-26 2021-02-19 山西省交通规划勘察设计院有限公司 Automatic change tunnel secondary lining and spray maintenance platform truck
CN112855213B (en) * 2021-01-26 2022-05-27 中建八局轨道交通建设有限公司 Construction method of primary support structure of transfer passage at existing station
CN115434709B (en) * 2021-06-01 2024-06-07 上海宝冶集团有限公司 Construction method for collapse body of through tunnel bedding section
CN113565539B (en) * 2021-07-29 2023-12-15 中铁隧道集团一处有限公司 Construction method for preventing primary support side rebound of tunnel cantilever type cast-in-situ side wall
CN113374503B (en) * 2021-07-29 2024-04-05 中铁隧道集团一处有限公司 Method for embedding and arranging assembled lining monitoring and measuring components

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352708A (en) * 2013-07-04 2013-10-16 浙江海洋学院 Lining supporting device
CN103352708B (en) * 2013-07-04 2015-07-15 浙江海洋学院 Lining supporting device
CN107387119A (en) * 2017-07-07 2017-11-24 中国铁道科学研究院铁道建筑研究所 Prefabricated assembled tunnel inverted arch, tunnel structure and its construction method
CN116220377A (en) * 2022-12-28 2023-06-06 上海市城市建设设计研究总院(集团)有限公司 Intelligent monitoring and automatic glue injection platform reinforced concrete bar planting structure and construction method

Also Published As

Publication number Publication date
US2172030A (en) 1939-09-05

Similar Documents

Publication Publication Date Title
GB476319A (en) Improvements in or relating to facings or linings for underground works such as tunnels
RU2510444C2 (en) Three-arched underground station of column type and its erection methods (yurkevich device and methods)
US2171338A (en) Building member and construction
US947514A (en) Concrete floor construction.
US2270846A (en) Building construction
US1912290A (en) Slab floor or roof construction
US2192182A (en) Concrete slab
US2864251A (en) Building wall construction
US1728265A (en) Floor construction and method of producing the same
US2037007A (en) Concrete construction
US2379636A (en) Method of making reinforced concrete buildings
US2041243A (en) Subterranean structure
US501622A (en) Fireproof partition
US1955584A (en) Plank construction system
US2212906A (en) Building construction
US1717444A (en) Building construction
US2211667A (en) Joists and structural connections thereto
US1971093A (en) Reenforced concrete floor for buildings and the like
US1591443A (en) Building construction
US500208A (en) Floor
GB731972A (en) Improvements in or relating to concrete slabs and the method of construction thereof
US2085146A (en) Building structure
GB536411A (en) Improvements in or relating to a building member and construction
FI61066B (en) SKIVKONSTRUKTION
GB191504951A (en) Improvements in and relating to Floors, Roofs and similar Portions of Building Structures.