FR2528467A1 - PROCESS FOR RETAINING LAND AFTER EXCAVATION OF A SLOPED GROUND, PARTICULARLY FOR CROSSING A PIPE IN A TRENCH - Google Patents
PROCESS FOR RETAINING LAND AFTER EXCAVATION OF A SLOPED GROUND, PARTICULARLY FOR CROSSING A PIPE IN A TRENCH Download PDFInfo
- Publication number
- FR2528467A1 FR2528467A1 FR8210265A FR8210265A FR2528467A1 FR 2528467 A1 FR2528467 A1 FR 2528467A1 FR 8210265 A FR8210265 A FR 8210265A FR 8210265 A FR8210265 A FR 8210265A FR 2528467 A1 FR2528467 A1 FR 2528467A1
- Authority
- FR
- France
- Prior art keywords
- excavation
- trench
- panels
- transverse
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B11/00—Drainage of soil, e.g. for agricultural purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Agronomy & Crop Science (AREA)
- Mechanical Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
LE BUT DE L'INVENTION EST D'EVITER, AUX MOINDRES FRAIS, LES EBOULEMENTS ET GLISSEMENTS DE LA TERRE QUI A SERVI AU REMBLAYAGE DE LA TRANCHEE. LE PROCEDE COMPREND LES ETAPES SUIVANTES: ON REALISE EN PIED DE PENTE UN MASSIF DE BUTEE 6, ON PLACE EN FOND DE FOUILLE 4 DEUX DRAINS LATERAUX, ON REMBLAIE APPROXIMATIVEMENT JUSQU'A LA MOITIE DE LA FOUILLE, ON REPARTIT SUR LA LONGUEUR DE LA FOUILLE DES PANNEAUX TRANSVERSAUX P1, P2, P3, P4, P5 QUI SONT ENCASTRES DANS LES PARTIES SUPERIEURES DES DEUX FLANCS DE FOUILLE, ON MET EN PLACE SUR LA LONGUEUR DE LA FOUILLE UN FILM F CONTINU EN MATIERE PERMEABLE QUI S'APPUIE SUR LE REMBLAI EXISTANT R1 ET QUI PASSE PAR-DESSUS CHAQUE PANNEAU TRANSVERSAL, ON PLACE DANS LES ALVEOLES AINSI FORMEES ENTRE LES PANNEAUX TRANSVERSAUX LE RESTE DU REMBLAI T2, ET ON ASSURE LA RETENUE DU REMBLAI DES ALVEOLES ENTRE PANNEAUX A L'AIDE DE GRILLAGES ANCRES DANS LE SOL PAR DES MOYENS APPROPRIES, PAR EXEMPLE DES BROCHES.THE PURPOSE OF THE INVENTION IS TO AVOID, AT THE LEAST COST, SLIDES AND SLIDES OF THE EARTH WHICH WAS USED FOR FILLING THE TRENCH. THE PROCESS INCLUDES THE FOLLOWING STEPS: A MASSIVE STOP 6 IS MADE AT THE FOOT OF THE SLOPE, 4 TWO SIDE DRAINS ARE PLACED IN THE BOTTOM OF THE EXCAVATION, APPROXIMATELY FILLING UP TO HALF OF THE EXCAVATION, WE DISTRIBUTE OVER THE LENGTH OF THE EXCAVATION OF THE CROSS PANELS P1, P2, P3, P4, P5 WHICH ARE EMBEDDED IN THE UPPER PARTS OF THE TWO EXCAVATION SIDES, A CONTINUOUS FILM F IN PERMEABLE MATERIAL IS PLACED ON THE EXISTING FILLING LENGTH R1 AND WHICH PASSES OVER EACH TRANSVERSAL PANEL, THE REST OF FILL T2 IS PLACED IN THE ALVEOLES FORMED BETWEEN THE TRANSVERSAL PANELS, AND WE ENSURE THE RETENTION OF THE BACKFILL OF THE ALVEOLES BETWEEN PANELS BY MEANS OF MESH ANCHORED IN THE GROUND BY APPROPRIATE MEANS, FOR EXAMPLE SPINDLES.
Description
1 25284671 2528467
La présente invention concerne un procédé pour retenir les terres après excavation d'un sol en Dente, The present invention relates to a method for retaining soil after excavation of a Dente soil,
notamment pour le passage d'une conduite en tranchée. especially for the passage of a trench pipe.
Lorsqu'on doit faire passer des canalimat 4 ons, telles que des conduites d'eau,de gaz ou d'autres fluides dans des terrains accidentés,on creuse une tranchie,on met en ulace When 4-channel canalimat, such as water, gas or other fluids, must be passed through rough terrain, a trench is dug, an ulace is placed
la canalisation sur le fond de cette tranchée,et on effec- the pipe on the bottom of this trench, and we perform
tue ensuite le remblaiement du volume résiduel Lorsque la trace de la tranchée présente une pente appréciable pour then kills the backfill of the residual volume When the trace of the trench presents an appreciable slope for
éviter les éboulements et les affouillements,on ooàre générale- avoid landslides and scouring, we generally offer
ment dans le domaine connu en cloisonnant le remblai nar des empila Res de sacs en matière olastique ou en jute qui sont remnlis de sable, d'argile ou de terre Dans d'autres cas,on réalise un fascinaga à l'aide de fagots de bois, d'éléments métalliques,dé madriers, etc,Cependant, il s'est averé en pratique que de telles solutions ne sont pas parfaitement satisúaisantes,elles entraînent des frais importants et on ment in the known field by partitioning the embankment nar of the Res pilila bags of olastic material or jute which are filled with sand, clay or earth In other cases, a fascaga is made using fagots of wood, metal elements, planks, etc., However, it has been found in practice that such solutions are not perfectly satisfactory, they entail significant costs and
n'arrive pas toujours à éviter les éboulements ou les glisse- can't always avoid landslides or slipping
ments de terres aboutissant au vidage de la tranchée et à la land resulting in the emptying of the trench and the
mise à nu de la canalisation.baring of the pipeline.
L'invention a pour but de remédier aux inconvé- The object of the invention is to remedy the drawbacks
nients des systèmes connus à l'aide d'un procédé de retenue de terres après excavation d'un sol en pente,notamment pour le passage d'une conduite en tranchée,ledit procédé comportant les étapes suivantes: -on réalise en pied de pente un massif de butée, -on place en fond de fouille au moins un drain latéral, -on remblai approximativement jusqu'à la moitié de la fouille. -on répartit sur la longueur de la fouille des panneaux transversaux qui sont encastrés dans les parties supérieures des deux flancs de fouille, -on met en place sur la longueur de la fouille un film continu en matière perméable qui s'appuie sur le remblai existant et qui passe par dessus chaque panneau transversal, et nients of known systems using a method of retaining soil after excavation of sloping ground, in particular for the passage of a trench pipe, said method comprising the following steps: a block of abutments, - at least one lateral drain is placed at the bottom of the excavation, - we backfill approximately up to half of the excavation. -we spread over the length of the excavation transverse panels which are embedded in the upper parts of the two sides of the excavation, -we put in place over the length of the excavation a continuous film of permeable material which rests on the existing embankment and which goes over each cross panel, and
2 25284672 2528467
-on place dans les alvéoles ainsi formées entre les pan- -It is placed in the cells thus formed between the pan-
neaux transversaux le reste du remblai. cross sections the rest of the embankment.
De fréférence on assure la retenue du remblai des alvéoles entre panneaux à l'aide de grillages ancrés dans le sol nar Frequently, the backfill of the cells between the panels is retained using grids anchored in the ground nar
des moyens appropriés,par exem*le des broches. appropriate means, for example * pins.
Selon d'autres Particularités du procédé conforme à l'in- According to other particularities of the process in accordance with the
vention: -on encastre les panneaux transversaux da-s les flancs de la tranchée sur une hauteur comprise anproximativement entre la moitii et le tiers de la hauteur de la t-anchée, -on espace les panneaux transversaux en fonction de la oente de la tranchée,de la nature du sol de l'énaisseur et note: - we embed the transverse panels in the sides of the trench at a height approximately between half and a third of the height of the anchor, - we space the transverse panels according to the edge of the trench , the nature of the soil thickness and
des caractéristiques du film.characteristics of the film.
-Pour faciliter l'écoulement des eaux de pluie,on dispose les panneaux transversaux à peu près verticalement et on les -To facilitate the flow of rainwater, the transverse panels are arranged approximately vertically and are
place en oblique par rapport à la direction de la tranchée. oblique to the direction of the trench.
-Pour rejeter les eaux de pluie en dehors de la zone de la tranchée,il est prévu d'un côté et à la partie supérieure de -To discharge rainwater outside the trench area, it is provided on one side and at the top of
chaque Danneau,un prolongement déflecteur. each Danneau, a deflector extension.
D'autres avantages et caractéristiques de l'invention se- Other advantages and characteristics of the invention are-
ront mis en évidence,dans la suite de la descrintion,donnée à titre d'exemple non limitatif en référence aux dessins annexes dans lesquels: Fig 1 est une vue en coupe d'un terrain en pente montrant will be highlighted, in the following description, given by way of nonlimiting example with reference to the accompanying drawings in which: Fig 1 is a sectional view of a sloping ground showing
l'apnlication du procédé de retenue de terres selon l'inven- the application of the land retention process according to the invention
tion dans le cas d'une tranchée de passage d'une canalisa- tion in the case of a trench passing through a pipe-
tion; Fig 2 est une vue en coupe transversale de la tranchée faite sur la li 2 ne A-A de la giaure 1; et Fig 3 est une vue en plan d'une partie de la tranchée faite dans la direction de la flèche V de la figure l,afin de tion; Fig 2 is a cross-sectional view of the trench made on the li 2 ne A-A of the giaure 1; and Fig 3 is a plan view of part of the trench made in the direction of arrow V in Figure l, in order to
montrer l'aeencement des panneaux transversaux. show the arrangement of the transverse panels.
Sur les figures 1 et 2,on a représenté respectivement en vue en coupe sur la ligne de plus grande pente et en vue en In Figures 1 and 2, there is shown respectively in sectional view on the line of greatest slope and in view
coupe transversale une tranchée 1 de passage d'une canalisa- cross section a trench 1 for passage of a pipe-
tion 4.tion 4.
3 25284673 2528467
Après creusement de la tranches en laissant la matiúre d'excavation sur le c 8 té,on met en place la canalisation 4 en fond de fouille Ensuite,on réalise en pied de pente un massif de butée 6 dans lequel on encastre la canalisation 4 et dont le profil et l'ancrage sont calculés en fonction des After digging the wafers leaving the excavation material on the c 8 tee, we put in place the pipe 4 at the bottom of the excavation Then, we realize at the bottom of the slope a massive stop 6 in which we embed the pipe 4 and whose profile and anchorage are calculated according to
conditions existantes de l'ouvrage.existing conditions of the work.
L'étape suivante consiste à mettre en place en fond de The next step is to set up at the bottom of
fouille de part et d'autre de la canalisation 4 un ou plu- excavation on either side of line 4 one or more
sieurs drains latéraux 5 destinés à l'évacuation des eaux 5 lateral drains intended for water drainage
susceptibles de panétrer dans la tranchée. likely to pan into the trench.
Les drains sortent latéralement de la tranchée à intervalles qui sont fonction de la pente et du débit escomptê,var exemple The drains exit laterally from the trench at intervals which depend on the slope and the expected flow, for example
tous les 50 mètres En outre le ou les derniers drains tra- every 50 meters In addition the last drain (s) travels
versent le massif de butée 6 par un trou ménagé lors de la pour the stopper block 6 through a hole made during the
réalisation de ce dernier.realization of the latter.
Ensuite,on transfère dans la tranchée la moitié des remblais disponibles, comme indiqué en RI sur la figure 1 On effectue simultanément des opérations consistant à creuser dans les parties supérieures des flancs de la tranchée des Then, half of the available fill is transferred to the trench, as shown in RI in Figure 1. Simultaneous operations are carried out by digging the upper sides of the trench sides.
saignées latirales,dési&nges par 9 sur les figures et desti- lateral grooves, designated by 9 in the figures and intended
nies à recevoir les panneaux transversaux PI, P 2, P 3, P 4, PS, etc, qu'on met d'ailleurs en place dès que les saignées 9 sont terminées Ces panneaux transversaux peuvent être formés de matériaux capables de tenir jusqu'à consolidation des terres notamment de bois ou de métal On précisera dans la nie to receive the transverse panels PI, P 2, P 3, P 4, PS, etc, which is also put in place as soon as the grooves 9 are completed These transverse panels can be formed of materials capable of holding up to consolidation of land, in particular wood or metal We will specify in the
suite de la description leur mode d'agencement dans les continuation of the description their mode of arrangement in the
saignées. Ensuite,on met en place sur la longueur de la tranchée un film de matière perméable,par exemple un film formé d'une bled. Then, a film of permeable material is placed over the length of the trench, for example a film formed of a
matière plastique perméablenontissie connue sous la désigna- permeable plastic material known as
tion commerciale "BIDIM" ou l'équivalent,de façon que le film commercial "BIDIM" or equivalent, so that the film
passe par dessus les différents panneaux transversaux Pl, P 2. passes over the various transverse panels Pl, P 2.
P 3 P 4 P 5,comme le montre la fieure 1,et s'appuie, dans des intervalles interm 9 diaires,sur le remblai RI déià mis en place dans la tranchée On obtient ainsi entre les différents P 3 P 4 P 5, as shown in fieure 1, and rests, in intermediate intervals, on the RI embankment already placed in the trench We thus obtain between the different
panneaux des sortes d'alvéoles qui sont maintenant condi- panels of the kinds of cells which are now condi-
tionnees de la fa-on suivante:in the following way:
4 25284674 2528467
On comble le volume résiduel de la tranchée avec le reste du remblai, comme indiqué en R 2 sur les figures 1 et 2 Puis, The residual volume of the trench is filled with the rest of the fill, as indicated in R 2 in Figures 1 and 2 Then,
pour tenir ce remblai R 2 dans les alvéoles précitées,on dispo- to hold this embankment R 2 in the aforementioned cells, it is available
se à sa partie supérieure,un grillagelpar exemple en fer gal- at its upper part, a wire mesh, for example made of gal-
vanisé,dont on assure la tension à l'aide de broches,comme indiqué en 8 sur les figures 2 et 3 Il n'est nas nécessaire que ce grillaze soit très résistant à la décomposition et il suffit qu'il résiste iusqu'a consolidation des terres,bar exemple environ 2 ans en climat tempéré car on estime qu'au vanized, the tension of which is ensured by means of pins, as indicated at 8 in FIGS. 2 and 3 It is not necessary for this grillaze to be very resistant to decomposition and it is sufficient for it to resist consolidation land, bar example about 2 years in temperate climate because it is estimated that at
bout d'une telle période la végétation a suffisamment progres- after such a period the vegetation has progressed sufficiently-
sé Dour assurer ensuite le maintien du remblai R 2. sé Dour then ensure the maintenance of the embankment R 2.
Il reste maintenant à préciser la disposition des panneaux transversaux P 1, P 2 P 3, P 4 et P 5 Comme le montre la figure It now remains to specify the arrangement of the transverse panels P 1, P 2 P 3, P 4 and P 5 As shown in the figure
l,ces panneaux sont disposés dans l'ensemble avec une orienta- l, these panels are generally arranged with an orientation
tion approximativement verticale maispour faciliter l'écoule- approximately vertical but to facilitate the flow-
ment des eaux de pluie et éviter les effets de ravina 2 e et d'érosion,on dispose lesdits panneaux en oblique par rapport à ment of rainwater and avoid the effects of ravine 2 e and erosion, these panels are placed obliquely to
la direction de la tranchée cette obliquité étant habituelle- the direction of the trench this obliquity being usual-
ment matérialisée par l'angle o( sur la figure 3 Cet angle o( peut être compris entre 90 et 75 Si la tranchée ne ment materialized by the angle o (in Figure 3 This angle o (can be between 90 and 75 If the trench does not
suit pas la ligne de plus grande pente du terrainl'orienta- not follow the line of greatest slope of the ground
tion des nanneaux est choisie Dour empêcher un retour des eaux de ruissellement vers la tranchée En outre,l'espacement e tion of the rings is chosen To prevent a return of runoff to the trench In addition, the spacing e
des panneaux est déterminé en fonction des conditions exis- of panels is determined according to the existing conditions
tantes de l'ouvragec'est-à-dire notamment de la pluviométrie, aunts of the work, that is to say in particular of the pluviometry,
de la pente du terrainde la nature du sol,des caractéristi- the slope of the soil, the nature of the soil, the characteristics
ques du film etc La hauteur d'encastrement des panneaux dans les saignées q est comprise approximativement entre le quart et le tiers de la hauteur de la fouille et on tient compte également,pour déterminer cette hauteur d'encastrement des ques du film etc The installation height of the panels in the grooves q is approximately between a quarter and a third of the height of the excavation and we also take into account to determine this installation height of the
conditions de l'ouvrage.conditions of the work.
En outre,pour éviter que les eaux de pluie ne reviennent dans In addition, to prevent rainwater from returning to
la tranchée après avoir quitté le panneau transversal corres- the trench after leaving the corresponding cross panel
uondant,il est prévu sur celui-ci un prolongement déflecteur. uondant, there is provided a deflector extension thereon.
mis en évidence en 11 sur les figures 2 et 3 Ce prolongement peut être constitué par une simple planche qui est fixée en haut du panneau P 2,P 3 et qui est légèrement encastrée dans highlighted in 11 in Figures 2 and 3 This extension can be constituted by a simple board which is fixed at the top of the panel P 2, P 3 and which is slightly embedded in
25284672528467
le terrain avoisinant la fouille,comme indiqué en IIA sur la figure 2 Il est également possible de réunir le panneau et the land surrounding the excavation, as shown in IIA in Figure 2 It is also possible to join the panel and
le prolongement déflecteur sous la forme d'un ensemble mono- the deflector extension in the form of a mono- assembly
bloc. Pour mieux illustrer la mise en pratique du procèdé selon block. To better illustrate the implementation of the process according to
l'invention,on va donner dans la suite,sous forme de tableau. the invention, we will give below, in the form of a table.
les principales caractéristiques d'installation en tranchée de deux conduites ayant des diamètres respectifs de 0,200 m the main characteristics of installation in trenches of two pipes having respective diameters of 0.200 m
et 1,200 m.and 1,200 m.
TABLEAUBOARD
________________________
Canalisations _ Lardeur théorique tranchée 0,55 m Profondeur théorique tranchée 1 03 m Volume total remblais 0,527 m Pente tranchée 45 Volume supplémentaire déblais 0,097 m 3 Panneaux en blanches 30 mm énaisseur Profondeur encastrement 25 à 30 cm Espacement panneaux environ 20 m Débordement déflecteur latéral 30 à 40 cm Pipelines _ Theoretical trench width 0.55 m Theoretical trench depth 1 03 m Total fill volume 0.527 m Trench slope 45 Additional excavation volume 0.097 m 3 White panels 30 mm thick Installation depth 25 to 30 cm Panel spacing about 20 m Side deflector overflow 30 40 cm
0 12000 1200
1,45 m 1,82 m 1,810 m 1,83 m mm à 60 cm environ 20 m à 60 cm 1.45 m 1.82 m 1.810 m 1.83 m mm at 60 cm approx. 20 m at 60 cm
ú 528467ú 528467
Claims (6)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR8210265A FR2528467A1 (en) | 1982-06-11 | 1982-06-11 | PROCESS FOR RETAINING LAND AFTER EXCAVATION OF A SLOPED GROUND, PARTICULARLY FOR CROSSING A PIPE IN A TRENCH |
EP83401200A EP0097098A1 (en) | 1982-06-11 | 1983-06-10 | Method of retaining the earth after excavating sloping soil, among others for the passage of a conduit in a trench |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR8210265A FR2528467A1 (en) | 1982-06-11 | 1982-06-11 | PROCESS FOR RETAINING LAND AFTER EXCAVATION OF A SLOPED GROUND, PARTICULARLY FOR CROSSING A PIPE IN A TRENCH |
Publications (2)
Publication Number | Publication Date |
---|---|
FR2528467A1 true FR2528467A1 (en) | 1983-12-16 |
FR2528467B1 FR2528467B1 (en) | 1985-03-29 |
Family
ID=9274927
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR8210265A Granted FR2528467A1 (en) | 1982-06-11 | 1982-06-11 | PROCESS FOR RETAINING LAND AFTER EXCAVATION OF A SLOPED GROUND, PARTICULARLY FOR CROSSING A PIPE IN A TRENCH |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP0097098A1 (en) |
FR (1) | FR2528467A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111074781A (en) * | 2019-12-31 | 2020-04-28 | 中铁大桥局集团有限公司 | Method for quickly excavating suspension bridge tunnel anchor |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2591064B1 (en) * | 1985-12-10 | 1988-02-12 | Rhone Poulenc Fibres | MEANS AND ITS IMPLEMENTING METHOD FOR FIXING POWDERED SOILS ON SLOPES BY SUSTAINABLE VEGETATION |
GB2338006A (en) * | 1998-06-02 | 1999-12-08 | Isis Innovation | Consolidation of sedimentary beds |
CN111395454A (en) * | 2020-04-24 | 2020-07-10 | 宁波城市职业技术学院 | Soil-retaining and water-collecting construction method and soil-retaining and water-collecting structure |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR456750A (en) * | 1912-04-18 | 1913-09-03 | Giulio Serrazanetti | Elastic and filtering diaphragm to support landslides |
FR2105299A5 (en) * | 1970-07-09 | 1972-04-28 | Bodin Girin & Cie | Thick open weave fabric - used as dye roller cladding |
JPS51133902A (en) * | 1975-05-14 | 1976-11-20 | Nobukuro Nagaoka | Method of reinforcing bedrock |
FR2441685B1 (en) * | 1978-11-14 | 1985-12-13 | Vignon Jean Francois | ALVEOLAR TEXTILE MATERIAL FOR CONSOLIDATING AND SANITIZING FLOORS FOR PUBLIC OR OTHER WORKS |
DE2919961A1 (en) * | 1979-05-17 | 1980-11-20 | Josef Ing Grad Nachtsheim | Waterway anti-erosion system using vegetation - has each plant anchored by arch shaped member with corrugated legs securing roots |
US4288175A (en) * | 1979-10-29 | 1981-09-08 | Henningson, Durham & Richardson, Inc. | Reticulately reinforced earthen dams and method for providing reinforcement |
-
1982
- 1982-06-11 FR FR8210265A patent/FR2528467A1/en active Granted
-
1983
- 1983-06-10 EP EP83401200A patent/EP0097098A1/en not_active Ceased
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111074781A (en) * | 2019-12-31 | 2020-04-28 | 中铁大桥局集团有限公司 | Method for quickly excavating suspension bridge tunnel anchor |
Also Published As
Publication number | Publication date |
---|---|
FR2528467B1 (en) | 1985-03-29 |
EP0097098A1 (en) | 1983-12-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Makarov et al. | Country area territory protection from flooding; construction conditions, problem definition and solution | |
EP0833988B1 (en) | Lightweight embankment | |
EP0607349B1 (en) | Water retaining reservoir structure | |
JP5950629B2 (en) | Drainage structure of slope ground and its construction method | |
FR2528467A1 (en) | PROCESS FOR RETAINING LAND AFTER EXCAVATION OF A SLOPED GROUND, PARTICULARLY FOR CROSSING A PIPE IN A TRENCH | |
EP0028558B1 (en) | Method of improving the sliding resistance of a civil engineering construction and its foundation | |
FR2984376A3 (en) | System for retention of rainwater runoff and revitalization of compacted soil on sloping land, has trench formed in area of compacted soil in slope, where drainage base of cesspool is positioned between side surfaces of trench | |
EP0377541B1 (en) | Process and apparatus for anchoring the shieldings of a reinforced-earth wall | |
FR2461064A1 (en) | HIGH-WEIGHT STRUCTURE HAVING FRICTIONAL BODIES | |
WO2015135601A1 (en) | Buried cabling system preventing the removal of the cable | |
EP0029400A1 (en) | Apparatus for protecting buildings and civil engineering constructions against water and moisture | |
FR2999963A1 (en) | System, useful for drainage of leachate from waste landfills, comprises semi-permeable cover for covering excavating portion in ground, where excavation portion comprises sealing unit at its base as geo membrane | |
EP3411531B1 (en) | Modular device for creating an anchor point in the ground | |
FR3105273A1 (en) | Ready-to-assemble set of parts for barring a torrent to maintain a fixed level ford. | |
FR2882076A1 (en) | Covering for flat or inclined roof of building, has large dimensioned and rigid honey-combed plate, made of injected/extruded polypropylene, whose cells are closed on lower side by geotextile and filled with filling material on upper side | |
KR102420792B1 (en) | A device for eco-friendly construction of debris barrier without pouring concrete | |
EP0185041B1 (en) | Retainer works with structure of thin, double curvature elements | |
FR2703377A1 (en) | Stabilization device for carapace elements of the body of work. | |
FR2937350A1 (en) | Composite compensation wedge for use between post and purlin in building, has sealing plate connected on contact face of body, turned in direction of upper concrete element, where sealing plate partially overlaps contact face of body | |
EP1447604A1 (en) | Method for the burying of tubular elements and mortar composition for carrying out this method | |
EP1705289A1 (en) | Interlocking and draining concrete paving block | |
FR2744148A1 (en) | Fluid channel, e.g. for rainwater taken down road embankment | |
BE876763A (en) | METHOD AND DEVICE FOR SUPPORTING A BUILDING FROM AN UNDERGROUND GALLERY. | |
FR2772230A1 (en) | Ground protection against pests, | |
FR2845702A1 (en) | Barrier for unstable solid materials such as rocks is made at least partly from tyres in random positions in bags or nets |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ST | Notification of lapse |