EP3842601A1 - Transportanker - Google Patents
Transportanker Download PDFInfo
- Publication number
- EP3842601A1 EP3842601A1 EP19219936.2A EP19219936A EP3842601A1 EP 3842601 A1 EP3842601 A1 EP 3842601A1 EP 19219936 A EP19219936 A EP 19219936A EP 3842601 A1 EP3842601 A1 EP 3842601A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- bar
- arms
- anchor
- transport
- transport anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/142—Means in or on the elements for connecting same to handling apparatus
- E04G21/145—Means in or on the elements for connecting same to handling apparatus specific for hollow plates
Definitions
- the invention relates to a transport anchor for transporting building elements in the form of diaphragm walls with an air gap.
- the industry is constantly looking for an optimal, durable transport anchor which allows for safe transport of increasingly larger and thus heavier building elements in the form of walls to the construction site.
- the patent description DE102016121271 discloses a transport anchor for double-walled concrete elements. It is made from a bracket shaped in such a way that its arms are mutually parallel and is intended for embedding in double-walled elements, characterized by having anchor arms connected by a crossbar having an adaptive clamping element. According to the invention, the clamping element is made as a thermally insulated hollow body.
- a clamping element in the form of a crossbar is attached by its ends to the arms of the transport anchor by welding.
- the clamping element is connected by spot welding. The welding process also locally change and weaken the surrounding material, which decreases stability.
- the transport anchor described in the DE 100 38 249 B4 document also has a clamping element made of steel and welded to the anchor legs. High forces during the transport of double walls to the construction site overload these weak anchor's points, thereby increasing the risk of welds cracking, and subsequently leading to a very likely excessive deformation of the anchor at a later stage.
- the welds may cause the transport anchor to break off from the concrete, which may result in the breakdown of the prefabricated concrete part.
- the object of the invention is to provide a new transport anchor of the said type with even better performance, cheaper in manufacturing while meeting all the technical requirements, and with a structure that does not affect the anchor's load capacity, and therefore making it safe for use on construction sites.
- the subject of the invention is a transport anchor for hollow walls made from a bar with a bent central part, the ends of which are passed through openings made in a crossbar connecting them rigidly forming arms parallel to each other, characterized in that the bar arms are twisted along their axes, while the crossbar is a steel element with a quadrilateral cross-section and has an internal filling in the form of polyurethane foam.
- the bar is twisted along the entire length of the transport anchor arms.
- the bar is twisted over a specific section of the transport anchor arms.
- the transport anchor is made of a steel bar with a quadrilateral cross-section.
- the transport anchor is made of a steel bar with a hexagon cross-section.
- the bar arms are twisted 1.5 to 2.5 times for every 100 mm of their length.
- the advantage of a transport anchor for hollow walls with a structure according to the invention is the complete absence of any mechanical interference into the material (welding) from which it is made, making it possible to eliminate ways of joining elements that might weaken its durability, which is of key importance due to the danger of accidents that may occur during transport of such large building materials.
- the optimal anchoring of the element in the wall slab is ensured by embedding in concrete the anchor arms which are twisted along their axes together with the crossbar that connects them.
- twisting the bar arms from 1.5 to 2.5 times for every 100 mm of their length changes the internal structure of the steel, which results in an increased bar tensile strength, while maintaining the required plasticity, e.g. at a level consistent with the guidelines of the German standard VDI/BV-BS 6205.
- one arm torsion is equivalent to it being twisted 360° along its axis.
- the increased tensile strength and the shape of the arms obtained after twisting allow a more secure fixing of the transport anchor according to the invention in concrete, which in turn leads to an increased load capacity of the anchor. Twisting the bar arms themselves causes the anchor element that protrudes from the concrete to have no effect on the original plasticity of the material, which is a very important element due to the nature work for which this part of the transport anchor is designed.
- twisting the bar arms also allows for better anchoring of the transport anchor according to the invention in concrete.
- twisting the bar protects the anchor's crossbar from changing its position (falling out) without the need to make welded or welded joint. Therefore, the strength of the transport anchor and its load capacity do not get worse.
- Transport anchor for hollow walls in the embodiment is made from a bar having a bent central part 1, the ends of which are passed through openings 4, 5 made in a crossbar 3 that connects them rigidly forming arms 6, 7 parallel to each other.
- the bar arms 6 , 7 are twisted axially along their entire length or, in another version, along a given section, while the crossbar 3 is a steel element with a quadrilateral cross-section and has an internal filling in the form of polyurethane foam having thermal insulation properties.
- the steel bar from which the transport anchor is made has a quadrilateral cross-section or, in another version, a hexagon one.
- Transport anchor for hollow walls in the embodiment is made from a bar having a bent central part 1, the ends of which are passed through openings 4, 5 made in a crossbar 3 that connects them rigidly forming arms 6, 7 parallel to each other.
- the bar arms 6 , 7 are twisted axially along their entire length or, in another version, along a given section.
- the bar arms 6 , 7 are twisted along the entire length, and the bar arms 6, 7 are twisted 1.5 times for every 100 mm of their length (in other embodiments the number of twists equals from 1.5 to 2.5), and one torsion of the arms 6 , 7 is equivalent to them being twisted 360° along their axes.
- Such a number of torsions over the length of 100 mm changes the steel structure, which results in an increased tensile strength of the bar arms, while maintaining the required plasticity.
- Crossbar 3 is a steel element with a quadrilateral cross-section and has an internal filling in the form of polyurethane foam having thermal insulation properties.
- the steel bar from which the transport anchor is made has a quadrilateral cross-section or, in another version, a hexagon one.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
- Reinforcement Elements For Buildings (AREA)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP19219936.2A EP3842601A1 (de) | 2019-12-27 | 2019-12-27 | Transportanker |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP19219936.2A EP3842601A1 (de) | 2019-12-27 | 2019-12-27 | Transportanker |
Publications (1)
Publication Number | Publication Date |
---|---|
EP3842601A1 true EP3842601A1 (de) | 2021-06-30 |
Family
ID=76034371
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP19219936.2A Withdrawn EP3842601A1 (de) | 2019-12-27 | 2019-12-27 | Transportanker |
Country Status (1)
Country | Link |
---|---|
EP (1) | EP3842601A1 (de) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE8207185U1 (de) * | 1982-03-13 | 1982-09-16 | Deha-Baubedarf Gmbh & Co Kg, 6080 Gross-Gerau | Transportanker fuer betonfertigteile |
DE19853712A1 (de) * | 1998-11-20 | 2000-05-31 | Weidner Georg | Transport- und Verlegeanker mit querverstrebten Längsverankerungsschenkeln |
DE10038249B4 (de) | 1999-08-12 | 2006-02-09 | Syspro-Gruppe Betonbauteile E.V. | Transportanker für sogenannte Doppelwände |
DE102006062411A1 (de) * | 2006-12-22 | 2008-06-26 | Weidemann, Christian | Transportanker für ein doppelschaliges Wand- oder/und Deckenbauelement |
DE202013100995U1 (de) * | 2013-03-07 | 2013-05-03 | Friedrich Schroeder Gmbh & Co. Kg | Transportanker für Doppelwände |
DE202014103774U1 (de) * | 2014-08-14 | 2015-11-17 | Philipp Gmbh | Hohlwandanker |
EP3029220A1 (de) | 2014-12-02 | 2016-06-08 | Ikona AG | Transportanker für vorgefertigte stahlbeton doppelwände |
DE102016121271A1 (de) | 2016-11-08 | 2018-05-09 | Betonwerk Oschatz GmbH | Transportanker für Doppelwandbauelemente |
PL427814A1 (pl) * | 2018-11-19 | 2019-05-06 | Szulc Aleksander Przed Produkcyjno Handlowe Alruno | Kotwa transportowa do ścian z pustką |
-
2019
- 2019-12-27 EP EP19219936.2A patent/EP3842601A1/de not_active Withdrawn
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE8207185U1 (de) * | 1982-03-13 | 1982-09-16 | Deha-Baubedarf Gmbh & Co Kg, 6080 Gross-Gerau | Transportanker fuer betonfertigteile |
DE19853712A1 (de) * | 1998-11-20 | 2000-05-31 | Weidner Georg | Transport- und Verlegeanker mit querverstrebten Längsverankerungsschenkeln |
DE10038249B4 (de) | 1999-08-12 | 2006-02-09 | Syspro-Gruppe Betonbauteile E.V. | Transportanker für sogenannte Doppelwände |
DE102006062411A1 (de) * | 2006-12-22 | 2008-06-26 | Weidemann, Christian | Transportanker für ein doppelschaliges Wand- oder/und Deckenbauelement |
DE202013100995U1 (de) * | 2013-03-07 | 2013-05-03 | Friedrich Schroeder Gmbh & Co. Kg | Transportanker für Doppelwände |
DE202014103774U1 (de) * | 2014-08-14 | 2015-11-17 | Philipp Gmbh | Hohlwandanker |
EP3029220A1 (de) | 2014-12-02 | 2016-06-08 | Ikona AG | Transportanker für vorgefertigte stahlbeton doppelwände |
DE102016121271A1 (de) | 2016-11-08 | 2018-05-09 | Betonwerk Oschatz GmbH | Transportanker für Doppelwandbauelemente |
PL427814A1 (pl) * | 2018-11-19 | 2019-05-06 | Szulc Aleksander Przed Produkcyjno Handlowe Alruno | Kotwa transportowa do ścian z pustką |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3183628A (en) | Masonry wall reinforcing means | |
US10017942B2 (en) | Rebar wall set-up bar | |
JP7461700B2 (ja) | プレキャストコンクリート版の接合構造 | |
CA2915344C (en) | Prestressed concrete roof for cylindrical tank | |
EP3842601A1 (de) | Transportanker | |
JP2019116795A (ja) | 梁筋とその配筋方法 | |
CN108951418B (zh) | 预制装配式空心板梁的铰缝构造及其施工方法 | |
EP0854248B1 (de) | Vorgefertigte Bauplatte für zivile oder industrielle Gebäudekonstruktionen | |
US8677720B2 (en) | Precast concrete pile with carbon fiber reinforced grid | |
CN112095920A (zh) | 装配式型钢部分包裹混凝土组合梁及其设计与施工方法 | |
CA3127523C (en) | Transport anchor with fiber-plastic composite material pressure element | |
JP7438727B2 (ja) | 梁筋とその配筋方法 | |
EP3964674A1 (de) | Transportanker für hohlwände | |
CN213390768U (zh) | 一种装配式砼预应力叠合用底板 | |
JP2012026088A (ja) | ループ状継手付きプレキャスト床版の連結方法及び連結構造 | |
JP2003293521A (ja) | 鉄筋コンクリート基礎のダブル配筋構造 | |
JP3616727B2 (ja) | 場所打ち鉄筋コンクリート杭 | |
JP7195793B2 (ja) | 法枠の鉄筋接続構造 | |
KR101118305B1 (ko) | 강합성 교량 및 이를 가설하기 위한 하이브리드 주탑 | |
JP6764645B2 (ja) | 構造部材の接合構造 | |
EP3987123B1 (de) | Tragbalken mit verstärkung | |
JP6749182B2 (ja) | 小梁 | |
JP7506480B2 (ja) | 梁筋とその配筋方法 | |
RU2789683C1 (ru) | Гибридная балка | |
CN218843486U (zh) | 一种快连式变刚度预制楼板及其体系 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20220104 |