EP3404142B1 - Precast slab railway track structural system for vibration mitigation and associated construction method - Google Patents

Precast slab railway track structural system for vibration mitigation and associated construction method Download PDF

Info

Publication number
EP3404142B1
EP3404142B1 EP16884604.6A EP16884604A EP3404142B1 EP 3404142 B1 EP3404142 B1 EP 3404142B1 EP 16884604 A EP16884604 A EP 16884604A EP 3404142 B1 EP3404142 B1 EP 3404142B1
Authority
EP
European Patent Office
Prior art keywords
slab
track
track slab
damping
elastic cushion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP16884604.6A
Other languages
German (de)
French (fr)
Other versions
EP3404142A1 (en
EP3404142A4 (en
Inventor
Xiuren YANG
Henghe XUE
Peng Chen
Cun QU
Jianzhong Wu
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Xingyu Rail Equipment Co Ltd
Beijing Urban Construction Design and Development Group Co Ltd
Original Assignee
Anhui Xingyu Rail Equipment Co Ltd
Beijing Urban Construction Design and Development Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Xingyu Rail Equipment Co Ltd, Beijing Urban Construction Design and Development Group Co Ltd filed Critical Anhui Xingyu Rail Equipment Co Ltd
Publication of EP3404142A1 publication Critical patent/EP3404142A1/en
Publication of EP3404142A4 publication Critical patent/EP3404142A4/en
Application granted granted Critical
Publication of EP3404142B1 publication Critical patent/EP3404142B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • E01B1/004Ballastless track, e.g. concrete slab trackway, or with asphalt layers with prefabricated elements embedded in fresh concrete or asphalt
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/005Making of concrete parts of the track in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/01Elastic layers other than rail-pads, e.g. sleeper-shoes, bituconcrete
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/06Height or lateral adjustment means or positioning means for slabs, sleepers or rails
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/10Making longitudinal or transverse sleepers or slabs in situ or embedding them

Definitions

  • the invention relates to field of damping of rail transit, in particular to a damping (vibration reduction) track structure system with prefabricated slab and a supporting construction method.
  • a traditional damping track structure adopts a construction method of on-site binding steel bar and cast-in-place concrete.
  • construction speed thereof is from 25 m to 50 m per day
  • number of construction workers is 80 to 100.
  • Amount of cast-in-place concrete is large, especially in the shield tunnel, because of the narrow working area and a large number of manual work links, construction precision and work efficiency is low, and safety risk is high, with cost of design, construction and maintenance increased.
  • line diseases in cast-in-place damping track section often occur, e.g., ballast bed is likely cracking, and so on.
  • German patent application DE 29 01 283 A1 discloses methods and systems for personal action plans based on an individual's genomic profile, including assessing the association between an individual's genotype and at least one disease or condition and providing rating systems for an individual's action plan.
  • the European patent EP 1 733 094 B1 discloses a ballastless superstructure for rail-bound traffic.
  • the European patent EP 1 587 987 B1 discloses a method for aligning a prefabricated part in a rigid roadway or track, whereby a measurement instrument is set on a first polygon point and aligned with a target point.
  • An object of the invention is to provide a damping track structure system of prefabricated slab type and with adjustable damping performance for rail transit.
  • the track structure system is suitable for all kinds of rail damping requirements, manufactured by factory and laid with highly automatic dedicated equipment, with characteristics of high construction speed, high track structure precision and good rail line smoothness, and can effectively overcome the problems existing in the existing track structure system (including damping and non-damping track structure).
  • the invention provides a damping track structure system of a prefabricated slab type, as defined in claim 1, and supporting construction method thereof, as defined in claim 6.
  • the damping performance of the damping track structure system of the prefabricated slab type according to the invention is adjustable, suitable for laying by manual or automatic dedicated equipment, supported by adjustable temporary vertical supporting device (supporting leg).
  • the track structure system includes, in turn, a prefabricated high precision track slab, an elastic cushion on surface of the track slab in a special way (which can be compounded in factory or in construction site), a temporary vertical supporting with adjustable support height, a post-cast fixed pile for the track slab, and self-compacting concrete prefabricated on bottom of the track slab or rigid backfill material with good fluidity.
  • Main construction sequence of the new damping track structure system of prefabricated slab type can be as following: producing prefabricated track slab structure in factory or on site ⁇ compounding damping cushion in factory or site ⁇ performing high precision positioning on the track slab by using dedicated planking equipment ⁇ temporarily fixing the track slab by the vertical supporting device ⁇ casting concrete filling layer under the track slab one or more times.
  • the damping track structure system with prefabricated slab and a supporting construction method of the invention can make the track structure system have damping function by adopting the prefabricated track slab and the damping cushion, and can solve the vibration problem caused by rail transit.
  • pre-embedded parts or installation condition for hoisting, slab cushion compound, track slab measurement, filling layer pouring under the track slab, laying and positioning of the slab, fixing of the slab, etc., in the slab, and by using rail laying equipment such as slab carrier, crane and fine adjustment trolley and the like the hoisting, laying and precise positioning of the slab is realized, which solves the problems of rapid and high-precision construction and the replacement of track slab and elastic cushion in later period.
  • the invention has the advantages of simple construction procedure, fast construction speed, high construction precision, good rail smoothness and low labor intensity, etc.
  • the invention relates to a damping track structure system with prefabricated slab, which is of a multi-layer design, comprising a filling layer 1, an elastic cushion 4 and a track slab 6, from the bottom to the top.
  • the filling layer 1 is the lowest layer, and the elastic cushion 4 is laid on the filling layer 1.
  • the filling layer is made of self-compacting concrete, thereby providing good fluidity during pouring and providing good supporting effect.
  • End of the elastic cushion 4 is made of sealing material (polyurethane seaming adhesive and the like) 15 to ensure that dust, sundries, water, and so on will not enter the gap between the elastic cushion 4 and the rail 6 or the elastic cushion 4 and the filled layer 1.
  • the elastic cushion 4 is arranged on the filling layer 1 to provide elastic cushioning to the filling layer 1 to avoid rapid damage thereof.
  • the elastic cushion 4 is made of elastic material such as rubber or polyurethane, which can provide good damping effect.
  • the track slab 6 is arranged on the elastic cushion 4 for damping, and the track slab 6 is provided with two parallel steel rails 7, each of which being respectively fixed on the track slab 6 by a plurality of fasteners 5.
  • the elastic cushion 4 may be of surface supporting (see Fig. 2 ), point supporting (see Fig. 3 ), and strip supporting (see Fig. 4 ).
  • the lower surface of the track slab 6 is laid flat on the entire upper surface of the elastic cushion 4 which is integrally coated on the bottom and side parts on both sides of the track slab 6
  • the elastic cushion 4 includes a plurality of rectangular, cylindrical, circular or ridge-shaped elastic cushion 4 arranged at intervals, the lower surface of the track slab 6 being laid on the plurality of elastic cushions.
  • the elastic cushion 4 includes at least two parallel elastic supporting strips and the lower surface of the track slab 6 is laid on the top surface of the two elastic supporting strips.
  • section of the track slab 6 is a symmetrically set polygon, with a beveled structure on both sides to enhance adaptability to the tunnel section.
  • the upper surface of the track slab 6 is a horizontal plane or with a slope, and can be provided with a convex platform, surface of which is a horizontal plane or a slope.
  • track slab 6 is reserved with four lifting points 11 for hoisting and laying, mark 14 for centering, preserved hole 12 for fixing and adjusting slab, and holes for setting prism can be realized by using nylon pipe for setting fastener or by pre-embedding nylon pipe in the slab particularly.
  • Both sides of the track slab 6 can be provided with longitudinal connection device 10, by which the track slabs 6 can be connected each other, so as to better avoid mutual dislocation between the slabs, wherein, the longitudinal connecting device 10 may comprise a plurality of mounting holes on the track slab 6 and connecting bars secured to the mounting holes by bolts so as to longitudinally connect the two prefabricated slabs.
  • Middle part of the track slab ⁇ is provided with two holes 2, the hole 2 penetrates the track slab 6 and the elastic cushion 4, and after pouring the filling layer through the hole 2, a limit pile of the slab is formed.
  • a sealing sleeve 3 is installed in the hole 2, and is of a cylinder structure made of elastic material, which ensures that when the filling layer is poured from inner of the hole, the filling material is prevented from entering between the slab and the elastic cushion and resulting in damping failure. Also, buffering is formed between the slab and the limit pile.
  • the track slab 6 is of industrialized production, and the elastic cushion and the track slab are integrated in the factory (the elastic cushion can also be laid on the site under special circumstances). After being transported to the site by a slab carrier, the slab can be laid and finely adjusted by the fine adjustment trolley and fixed by the adjusting rod 14, then is poured into the filling layer, and the seamless line is laid.
  • the two sides of the track slab 6 may be provided with a drain 8, and the lower part of the elastic cushion 4 may be provided with a ditch (at this time, the drain 8 is not necessary) or without a ditch.
  • the compounding method of the rail damping structure comprises the following steps:
  • Step 1 track slab prefabrication.
  • Step 2 compounding of slab and cushion.
  • damping cushion which is formed as a whole of the slab end, the slab underside and the slab side to avoid cutting and second connecting.
  • the compounding of damping cushion and track slab adopts a unique compounding method without affecting the performance of the damping cushion.
  • the supporting construction method of the invention mainly comprises the following steps:
  • Step 1 transport of track slabs.
  • the track slab is transported to the working site by a dedicated slab conveyer vehicle, wherein the track slab is hoisted on the slab conveyer vehicle, which is provided with a self-locking device, which automatically fixes the track slab and automatically aligns the center of the track slab with the center of baseboard of the vehicle to control the position of the track slab during transportation.
  • the slab conveyer vehicle runs to the working surface, the track slab is automatically unloaded to the working surface by the associated slab unloading mechanism.
  • the slab conveyer vehicle in the tunnel adopts rail-less transportation mode.
  • the slab conveyer vehicle in the tunnel comprises a vehicle body 16 carrying a plurality of track slabs, a plurality of running parts 18 located at the lower end of the vehicle body.
  • a belt conveyor 17 and a slab automatic unloading mechanism 19 for unloading track slab are set at one end of the transport slab, wherein, the slab conveyer vehicle in the tunnel is also provided with a driver control room at front and rear thereof, and the running mechanism can be adjusted according to the different sections of the tunnel structure to adapt to the running requirements of different structural forms (on plane or curved surface basis).
  • Step 2 Lifting of track slabs.
  • the dedicated crane can hoist the track slab on the working surface and run on the circular shield wall in the tunnel. It can also run on the horizontal plane to adapt to different types of structural planes (that is, on a plane and curved surface basis).
  • the crane has frame structure 20, running mechanism 21 that can walk on curved surface and plane, lifting mechanism 22 that controls the track slab up and down, control system 23, hydraulic system 25, positioning system 24 and so on.
  • Step 3 Fine adjustment of track slab.
  • Fine adjustment mechanism and precise control system are provided in the dedicated crane.
  • Fig. 8 it mainly includes frame structure 20 and front and backward running mechanism 21.
  • the frame structure 20 is provided with a regulating oil cylinder 22, the regulating oil cylinder 22 can comprise two longitudinal adjusting oil cylinders and two transverse regulating oil cylinders, which can adjust the track slab by a adjusting rod connected to the track slab, and can feedback data to control system of the fine adjustment trolley by measure equipment.
  • Slab adjustment vehicle can automatically adjust the elevation, the positioning of the central line and the superelevation of the track slab, to make position of the track slab reach the precision required by fine adjustment.
  • the running mechanism 21 adopts a precision control system 23, feeds back to the hydraulic system 25 through the measurement of the total station, and realizes the accurate positioning of the crane through the measurement positioning system 24 of the total station, and accomplishes the fine adjustment of the track slab.
  • a track slab supporter 13 is installed on the track slab to fix the track slab position, so as to ensure that the position accuracy of the track slab in the following pouring of the lower filling layer 1 always meets the error limits.
  • the track slab can be precisely adjusted and located through the fine adjustment trolley.
  • the fine adjustment trolley mainly comprises a tractor 27, a fine adjustment frame 26, a rotary tray 29, vertical and horizontal guide rails 28 and 30, a height adjustment cylinder 31, and so on.
  • the attitude of the track slab can be adjusted automatically.
  • the axis of the track slab is parallel to the central line of the line by rotating the rotation tray 29 for core rotation, then the degree of freedom of rotation is locked.
  • the position of the tray moving along and perpendicular to the line direction is adjusted by using the longitudinal 28 and the transverse guide rail 30, and the projection position (horizontal position) of the track slab on the moving tray is adjusted in place.
  • the height of the track slab is adjusted by vertical adjustment Jack 31 located above moving mechanism.
  • the position of the track slab reaches the precision required by fine adjustment.
  • the track slab supporter 13 is installed on the track slab to fix position of the track slab, so as to ensure that the position accuracy of the track slab in following pouring of the lower filling layer 1 always meets the error limit.
  • Step 2 concrete pouring.
  • the concrete can be poured after checking the compound condition of the damping cushion and the track slab as well as the sealing condition around the damping cushion.
  • the filling layer in the lower part of the track slab is made of self-compacting concrete.
  • the self-compacting concrete is poured in the field mixing method.
  • the self-compacting concrete should be bagged. After being transported to the site, the concrete should be mixed with mixing equipment. After mixed evenly, the self-compacting concrete should be poured through the filling hole reserved in the track slab (and also as a convex platform for limit).
  • a small vibrator can be inserted to assist vibration and stirring.
  • the filling layer can be poured in place by pouring two times as following: the filling, layer being poured to 50mm above the bottom of the slab for the first time, and then further poured after the concrete is finally set.
  • Step 3 buckle components laying.
  • the assembly of the buckle components on top of the track slab is carried out, wherein the buckle components are transported to the working surface by the track slab transporter, and the order of installation is: rubber pad plate under the slab ⁇ iron plate ⁇ rubber plate under the rail.
  • Step 4 rail laying.
  • the rail is transported to the working surface by the track slab transport vehicle, and the steel rail is discharged to the installation point by the transport vehicle, and the steel rail is manually allocated to the rail groove of the iron plate bearing plate, and the gauge block, connecting bolts and elastic bars are installed and welded together.
  • the supporting construction method of the slab-type rail damping structure machine can be used in the field of rail transit, and not only the damping performance can be designed according to the demand, but also the characteristics of simple construction procedure, fast construction speed, high construction precision, good rail smoothness and low labor intensity can be realized. It accords with the current direction of rail transit environmental protection, high efficiency and disease reduction, and has great social benefit. It can effectively reduce the vibration and secondary structure noise caused by the operation of urban rail transit vehicles.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Railway Tracks (AREA)
  • Vibration Prevention Devices (AREA)
  • Foundations (AREA)

Description

    BACKGROUND
  • The invention relates to field of damping of rail transit, in particular to a damping (vibration reduction) track structure system with prefabricated slab and a supporting construction method.
  • With the large-scale networking development of urban rail transit, construction time limit of the urban rail transit is becoming increasingly tense. Construction process of track structure is more close to operating time, and the pressure of construction period thereof is particularly prominent. In general, the construction period of a subway line in about nine months, which is often compressed to six months or less. Form of traditional track structure has many characteristics, such as more construction links, mainly manual work, difficult to control the construction accuracy and construction progress being slow, and so on. Under the condition that the whole construction period and the rail laying period are compressed, the construction precision and the quality of the laying rail are seriously declined, resulting in poor ride comfort of the line in operation and poor amenity of the running vehicles, frequent occurrence of rail diseases, and increasing environmental vibration and noise.
  • A traditional damping track structure adopts a construction method of on-site binding steel bar and cast-in-place concrete. Generally, construction speed thereof is from 25 m to 50 m per day, number of construction workers is 80 to 100. Amount of cast-in-place concrete is large, especially in the shield tunnel, because of the narrow working area and a large number of manual work links, construction precision and work efficiency is low, and safety risk is high, with cost of design, construction and maintenance increased. In addition, line diseases in cast-in-place damping track section often occur, e.g., ballast bed is likely cracking, and so on.
  • In view of the above defects, by diligent designing and much experiment and study, inventor proposes a damping track structure system with prefabricated slab and a fast construction method and device supporting the structure, to overcome such many defects from current damping track structure system.
  • The German patent application DE 29 01 283 A1 discloses methods and systems for personal action plans based on an individual's genomic profile, including assessing the association between an individual's genotype and at least one disease or condition and providing rating systems for an individual's action plan.
  • The European patent EP 1 733 094 B1 discloses a ballastless superstructure for rail-bound traffic.
  • The European patent EP 1 587 987 B1 discloses a method for aligning a prefabricated part in a rigid roadway or track, whereby a measurement instrument is set on a first polygon point and aligned with a target point.
  • SUMMARY
  • An object of the invention is to provide a damping track structure system of prefabricated slab type and with adjustable damping performance for rail transit. The track structure system is suitable for all kinds of rail damping requirements, manufactured by factory and laid with highly automatic dedicated equipment, with characteristics of high construction speed, high track structure precision and good rail line smoothness, and can effectively overcome the problems existing in the existing track structure system (including damping and non-damping track structure).
  • To overcome above matters, the invention provides a damping track structure system of a prefabricated slab type, as defined in claim 1, and supporting construction method thereof, as defined in claim 6.
  • The damping performance of the damping track structure system of the prefabricated slab type according to the invention is adjustable, suitable for laying by manual or automatic dedicated equipment, supported by adjustable temporary vertical supporting device (supporting leg). The track structure system includes, in turn, a prefabricated high precision track slab, an elastic cushion on surface of the track slab in a special way (which can be compounded in factory or in construction site), a temporary vertical supporting with adjustable support height, a post-cast fixed pile for the track slab, and self-compacting concrete prefabricated on bottom of the track slab or rigid backfill material with good fluidity. Main construction sequence of the new damping track structure system of prefabricated slab type can be as following: producing prefabricated track slab structure in factory or on site → compounding damping cushion in factory or site → performing high precision positioning on the track slab by using dedicated planking equipment → temporarily fixing the track slab by the vertical supporting device → casting concrete filling layer under the track slab one or more times.
    1. 1. The damping track structure system of the fabricated slab type is featured with:
      1. 1) prefabricating high precision reinforced concrete track slabs by high precision molds in factory or on site.
      2. 2) the upper surface of the track slab in the form of horizontal plane or herringbone slope surface; section of track slab being polygonal, and structure of both sides of circular tunnel section being slope surface to enhance the adaptability to tunnel section; track slab section of rectangular and horseshoe tunnel section being possible rectangular section, or same as the circular tunnel section i.e., both sides thereof being of the slope form.
      3. 3) the surface of the track slab provided with a dedicated protruding platform for supporting rail, which is equipped with fasteners for connecting steel rails.
      4. 4) steel bar spacing in the slab arranged according to certain modulus (such as integer times of 25mm or 50mm) and shape, which realizes automatic production of the steel mesh in the slab.
      5. 5) the corresponding holes and embedded parts are reserved on the track slab to meet particular needs of construction and use, which mainly includes the following aspects (which can be selected according to specific needs):
        1. (1) installing embedded parts for steel rail fasteners (nylon sleeves, etc.);
        2. (2) 2 holes arranged in the middle part of the track slab and running through the thickness direction of track slab (for casting of filled layer under the slab, position reservation of fixed pile, observation of casting of filled layer under the slab, etc.);
        3. (3) reservation of installation conditions for installation of temporary positioning vertical supporting devices wherein the vertical supporting device may be installed in a position close to the slab or to the side of the slab.
        4. (4) pre-embedding installation parts for automatic measurement and positioning marks, which can be realized by pre-embedding pipe in the slab or directly using pipe for mounting fastener and so on;
        5. (5) setting centering marks for positioning in laying track slabs;
        6. (6) pre-embedding parts for composite connection of the elastic cushion, wherein the pre-embedded parts for connection can be done by bolt sleeve, fixed end of expansion bolt, simple expansion bolt or even wooden embedded pile, etc, and compounding of prefabricated slab and the elastic cushion can be realized by means of reserved slot or embedded channel, etc;
        7. (7) pre-embedding 3 to 4 dedicated hoisting nails for hoisting;
        8. (8) preserving prefabricated parts for longitudinal connection of track slabs;
        9. (9) pre-embedding parts for the installation of contact rails, etc (if necessary).
    2. 2. the damping cushion is compounded in the bottom and side of the prefabricated track slab in the factory or the construction site to realize the integration of the slab and the cushion, with key points are as following:
      1. 1) die damping cushion being made of elastic materials, including damping film with different structure and form, polyurethane sheet and other materials with similar elastic and damping performance.
      2. 2) in order to meet requirement of different damping levels, three laying methods, such as full laying, strip laying and point laying at the bottom of the track slab can be used to lay the damping cushion. When the elastic cushion is of surface supporting, the lower surface of the track slab is tiled on the whole upper surface of the elastic cushion. When the elastic cushion is of strip supporting, the elastic cushion comprises at least two parallel elastic supporting strips, and the lower surface of the track slab is laid on the top surface of the two elastic support strips. When the elastic cushion is of point supporting, it comprises a plurality of cuboids, cylindrical, circular or ridge-shaped elastic cushion arranged at intervals, and the lower surface of the track slab is laid on the support of the plurality of elastic points;
      3. 3) the connection between the damping cushion and the track slab adopts a special connection method which does not affect the performance of the damping cushion;
      4. 4) in order to prevent elastic loss or even failure of the damping cushion caused by the filling concrete at the bottom into gap of the cushion, a special elastic sealing sleeve with "cap brim" at bottom is set in hole position of the track slab, wherein the "cap brim" at the bottom of the sealing sleeve is effectively and tightly connected with the bottom surface of the damping cushion. The sealed sleeve also has the functions of isolating the track slab from the fixed position pile, avoiding direct hard contact, allowing up and down free deformation of the track slab without constraint from the positioning pile, so as to realize the elastic positioning of the track slab, avoid the stress concentration, and ensure that the elasticity of the track slab will not be lost.
      5. 5) compounding damping cushion at the bottom of the track slab is integrated with the end and sides of the track slab. After integrated forming, the damping cushion is of sleeve shoe(casing) form, and the bottom and the side of the damping cushion are formed as a whole. Main function of the side cushion is to realize elastic isolation between the track slab and the surrounding concrete, in order to avoid concrete pouring into the joint layer between the damping cushion and the track slab during construction and to ensure up and down free deformation of the track slab without constraint, avoid situation of damping "short circuit". Main function of the bottom cushion is to provide the elasticity of the track slab and realize the damping function of the track structure system.
      6. 6) sealing measures may be set in the exposed part of the elastic cushion to prevent dust, dirt or groundwater from entering the compounding layer during construction and operation.
    3. 3. After the damping cushion is compounded on the prefabricated track slab in the factory or the construction site, the slab is transported to the rail laying site, with main construction procedures as follows:
      • 1) slab conveyer vehicle (with function of hoisting and unloading slab) carrying the slabs to the site;
      • 2) placing the track slab on the precision trolley.
      • 3) according to the instruction for adjusting slab, the precision adjustment trolley can adjust the track slab with multiple degrees of freedom (longitudinal, transverse, rotation and elevation, etc.), and finish the fine adjustment and positioning of the track slab, which includes steps of slab adjustment control system directing the total station to automatically measure the marks placed on the track slab; according to measurement results, deviations of position and space attitude from the design position of the track slab being calculated; the slab adjustment command being issued to a fine adjustment trolley; the fine adjustment trolley completing adjustment action; repeating the above procedures as required, until the track slab adjustment being in place.
      • 3) using the vertical supporting device for the track slab with adjustable height, the space shape and position of the track slab after fine adjustment are maintained and fixed; each track slab is provided with a number of support points according to needs, and the vertical support device can be arranged in the slab or on the side of the slab; in order to adapt to the structure slope which may exist in the tunnel structure at the bottom, a universal adjustable movable ball head pad which can adapt to the slope angle independently is installed at the bottom of the vertical supporting device; the vertical supporting device is designed with disassembly and reuse capacity, the vertical supporting device should be able to ensure the absolute stability of the track slab at all times so that the position accuracy of the track slab can always meet the error limit requirements of fine adjustment when pouring the filling layer under the slab later.
      • 4) pouring concrete filling layer under the slab, which is carried out through a pouring hole preserved for filling in the track slab; in order to avoid the track slab precision affected by the track slab floating in the filling layer filling process, filling layer pouring can be done by 2 and 3 times of pouring processes.
      • 5) when the filling layer is poured and reaches a certain strength, the vertical supporting device is taken out, and the movable ball head cushion at the bottom thereof is automatically separated from the supporting device and left in the concrete; in order to ensure that the supporting device can be removed smoothly, the part of the supporting body structure in the concrete is in the form of a cone, and is provided with a central exhaust hole.
      • 6) installation of fasteners. After the filling layer reaches certain strength, the upper buckle components of the track slab are installed, and the buckle components are transported to the working surface by the track slab transporter, the order thereof is of the elastic cushion under the slab → the iron plate → the elastic cushion under the rail.
      • 7) Steel rail installation. Steel rails will be moved to working surface by a rail transporter, and through the transporter, the steel rails is unloaded to installation point and spread out, through the manual way, the steel rail will be put into the rail groove of the iron plate, and the gauge block, connecting bolts and elastic bars will be installed.
  • According to the structure and the supporting construction method, the damping track structure system with prefabricated slab and a supporting construction method of the invention can make the track structure system have damping function by adopting the prefabricated track slab and the damping cushion, and can solve the vibration problem caused by rail transit. By reserving pre-embedded parts or installation condition for hoisting, slab cushion compound, track slab measurement, filling layer pouring under the track slab, laying and positioning of the slab, fixing of the slab, etc., in the slab, and by using rail laying equipment such as slab carrier, crane and fine adjustment trolley and the like, the hoisting, laying and precise positioning of the slab is realized, which solves the problems of rapid and high-precision construction and the replacement of track slab and elastic cushion in later period. The invention has the advantages of simple construction procedure, fast construction speed, high construction precision, good rail smoothness and low labor intensity, etc.
  • Detailed contents of the invention may be obtained by means of the later description and the drawings.
  • BRIEF DESCRIPTION OF THE DRAWINGS
    • Fig. 1 shows a structural schematic diagram of a damping track structure system with prefabricated slab of the present invention.
    • Fig. 2 shows a top view of the surface support of the invention.
    • Fig. 3 shows a top view of the point support of the invention.
    • Fig. 4 shows a top view of the stripe support of the invention.
    • Fig. 5 shows a schematic diagram of the invention when the slab is fixed by the adjusting rod after the slab is adjusted in place.
    • Fig. 6 shows a schematic diagram of the structure of the slab transporter of the present invention.
    • Fig. 7 shows a schematic diagram of the structure of the crane of the invention.
    • Fig. 8 shows a schematic diagram of the structure of a crane of the present invention with fine adjustment function.
    • Fig. 9 shows a schematic diagram of the structure of the fine adjustment trolley of the present invention.
    DETAILED DESCRIPTION
  • Referring to Fig. 1, the invention relates to a damping track structure system with prefabricated slab, which is of a multi-layer design, comprising a filling layer 1, an elastic cushion 4 and a track slab 6, from the bottom to the top.
  • The filling layer 1 is the lowest layer, and the elastic cushion 4 is laid on the filling layer 1. Preferably, the filling layer is made of self-compacting concrete, thereby providing good fluidity during pouring and providing good supporting effect. End of the elastic cushion 4 is made of sealing material (polyurethane seaming adhesive and the like) 15 to ensure that dust, sundries, water, and so on will not enter the gap between the elastic cushion 4 and the rail 6 or the elastic cushion 4 and the filled layer 1.
  • The elastic cushion 4 is arranged on the filling layer 1 to provide elastic cushioning to the filling layer 1 to avoid rapid damage thereof. Alternatively, the elastic cushion 4 is made of elastic material such as rubber or polyurethane, which can provide good damping effect.
  • The track slab 6 is arranged on the elastic cushion 4 for damping, and the track slab 6 is provided with two parallel steel rails 7, each of which being respectively fixed on the track slab 6 by a plurality of fasteners 5.
  • Alternatively, the elastic cushion 4 may be of surface supporting (see Fig. 2), point supporting (see Fig. 3), and strip supporting (see Fig. 4).
  • In the surface supporting shown in Fig. 2, the lower surface of the track slab 6 is laid flat on the entire upper surface of the elastic cushion 4 which is integrally coated on the bottom and side parts on both sides of the track slab 6
  • In the point supporting shown in Fig. 3, the elastic cushion 4 includes a plurality of rectangular, cylindrical, circular or ridge-shaped elastic cushion 4 arranged at intervals, the lower surface of the track slab 6 being laid on the plurality of elastic cushions.
  • In the strip supporting shown in Fig. 4, the elastic cushion 4 includes at least two parallel elastic supporting strips and the lower surface of the track slab 6 is laid on the top surface of the two elastic supporting strips.
  • Alternatively, section of the track slab 6 is a symmetrically set polygon, with a beveled structure on both sides to enhance adaptability to the tunnel section.
  • The upper surface of the track slab 6 is a horizontal plane or with a slope, and can be provided with a convex platform, surface of which is a horizontal plane or a slope.
  • The upper surface of track slab 6 is reserved with four lifting points 11 for hoisting and laying, mark 14 for centering, preserved hole 12 for fixing and adjusting slab, and holes for setting prism can be realized by using nylon pipe for setting fastener or by pre-embedding nylon pipe in the slab particularly.
  • Both sides of the track slab 6 can be provided with longitudinal connection device 10, by which the track slabs 6 can be connected each other, so as to better avoid mutual dislocation between the slabs, wherein, the longitudinal connecting device 10 may comprise a plurality of mounting holes on the track slab 6 and connecting bars secured to the mounting holes by bolts so as to longitudinally connect the two prefabricated slabs.
  • Middle part of the track slab δ is provided with two holes 2, the hole 2 penetrates the track slab 6 and the elastic cushion 4, and after pouring the filling layer through the hole 2, a limit pile of the slab is formed.
  • A sealing sleeve 3 is installed in the hole 2, and is of a cylinder structure made of elastic material, which ensures that when the filling layer is poured from inner of the hole, the filling material is prevented from entering between the slab and the elastic cushion and resulting in damping failure. Also, buffering is formed between the slab and the limit pile.
  • The track slab 6 is of industrialized production, and the elastic cushion and the track slab are integrated in the factory (the elastic cushion can also be laid on the site under special circumstances). After being transported to the site by a slab carrier, the slab can be laid and finely adjusted by the fine adjustment trolley and fixed by the adjusting rod 14, then is poured into the filling layer, and the seamless line is laid.
  • The two sides of the track slab 6 may be provided with a drain 8, and the lower part of the elastic cushion 4 may be provided with a ditch (at this time, the drain 8 is not necessary) or without a ditch.
  • In order to provide the damping track structure system with prefabricated slab of the invention, effective compounding should be carried out when prefabricating, wherein the compounding method of the rail damping structure comprises the following steps:
  • Step 1: track slab prefabrication.
  • Steel bar binding within track slab, concrete pouring in track slab and track slab maintenance after prefabrication is conducted in factory, which can be realized by using maintenance measures such as covering, water retaining, film moisturizing, spraying or painting curing agent and other.
  • Step 2: compounding of slab and cushion.
  • After the maintenance of the track slab, the bottom face, the inclined plane and the side surface of the track slab are covered with a damping cushion, which is formed as a whole of the slab end, the slab underside and the slab side to avoid cutting and second connecting. The compounding of damping cushion and track slab adopts a unique compounding method without affecting the performance of the damping cushion.
  • The supporting construction method of the invention mainly comprises the following steps:
  • Step 1: transport of track slabs.
  • The track slab is transported to the working site by a dedicated slab conveyer vehicle, wherein the track slab is hoisted on the slab conveyer vehicle, which is provided with a self-locking device, which automatically fixes the track slab and automatically aligns the center of the track slab with the center of baseboard of the vehicle to control the position of the track slab during transportation. When the slab conveyer vehicle runs to the working surface, the track slab is automatically unloaded to the working surface by the associated slab unloading mechanism. The slab conveyer vehicle in the tunnel adopts rail-less transportation mode. Referring to Fig. 6 the slab conveyer vehicle in the tunnel comprises a vehicle body 16 carrying a plurality of track slabs, a plurality of running parts 18 located at the lower end of the vehicle body. A belt conveyor 17 and a slab automatic unloading mechanism 19 for unloading track slab are set at one end of the transport slab, wherein, the slab conveyer vehicle in the tunnel is also provided with a driver control room at front and rear thereof, and the running mechanism can be adjusted according to the different sections of the tunnel structure to adapt to the running requirements of different structural forms (on plane or curved surface basis).
  • Step 2. Lifting of track slabs.
  • The dedicated crane can hoist the track slab on the working surface and run on the circular shield wall in the tunnel. It can also run on the horizontal plane to adapt to different types of structural planes (that is, on a plane and curved surface basis). Referring to Figs. 7 and 8, the crane has frame structure 20, running mechanism 21 that can walk on curved surface and plane, lifting mechanism 22 that controls the track slab up and down, control system 23, hydraulic system 25, positioning system 24 and so on.
  • Step 3. Fine adjustment of track slab.
  • There are two solutions for fine adjustment of the track slab, namely:
  • 1. Solution 1
  • Fine adjustment mechanism and precise control system are provided in the dedicated crane. Referring to Fig. 8, it mainly includes frame structure 20 and front and backward running mechanism 21. The frame structure 20 is provided with a regulating oil cylinder 22, the regulating oil cylinder 22 can comprise two longitudinal adjusting oil cylinders and two transverse regulating oil cylinders, which can adjust the track slab by a adjusting rod connected to the track slab, and can feedback data to control system of the fine adjustment trolley by measure equipment. Slab adjustment vehicle can automatically adjust the elevation, the positioning of the central line and the superelevation of the track slab, to make position of the track slab reach the precision required by fine adjustment. The running mechanism 21 adopts a precision control system 23, feeds back to the hydraulic system 25 through the measurement of the total station, and realizes the accurate positioning of the crane through the measurement positioning system 24 of the total station, and accomplishes the fine adjustment of the track slab. After the fine adjustment, a track slab supporter 13 is installed on the track slab to fix the track slab position, so as to ensure that the position accuracy of the track slab in the following pouring of the lower filling layer 1 always meets the error limits.
  • 2. Solution 2
  • After the dedicated crane unloads the track slab to the fine adjustment trolley developed by the inventor, the track slab can be precisely adjusted and located through the fine adjustment trolley.
  • Referring to Fig.9, the fine adjustment trolley mainly comprises a tractor 27, a fine adjustment frame 26, a rotary tray 29, vertical and horizontal guide rails 28 and 30, a height adjustment cylinder 31, and so on. By feeding back data from measuring equipment to control system of the fine adjustment trolley, the attitude of the track slab can be adjusted automatically. The axis of the track slab is parallel to the central line of the line by rotating the rotation tray 29 for core rotation, then the degree of freedom of rotation is locked. The position of the tray moving along and perpendicular to the line direction is adjusted by using the longitudinal 28 and the transverse guide rail 30, and the projection position (horizontal position) of the track slab on the moving tray is adjusted in place. The height of the track slab is adjusted by vertical adjustment Jack 31 located above moving mechanism. Finally, the position of the track slab reaches the precision required by fine adjustment. After the fine adjustment, the track slab supporter 13 is installed on the track slab to fix position of the track slab, so as to ensure that the position accuracy of the track slab in following pouring of the lower filling layer 1 always meets the error limit.
  • Step 2: concrete pouring.
  • The concrete can be poured after checking the compound condition of the damping cushion and the track slab as well as the sealing condition around the damping cushion. The filling layer in the lower part of the track slab is made of self-compacting concrete.
  • The self-compacting concrete is poured in the field mixing method. The self-compacting concrete should be bagged. After being transported to the site, the concrete should be mixed with mixing equipment. After mixed evenly, the self-compacting concrete should be poured through the filling hole reserved in the track slab (and also as a convex platform for limit).
  • In order to achieve smooth surface and increase compactness during pouring of the self-compacting concrete, a small vibrator can be inserted to assist vibration and stirring.
  • After pouring, concrete settlement may be caused by bubble overflow during the standing process, the concrete shall be added to the specified elevation before the initial setting of the concrete. In order to avoid the track slab precision affected by the track slab floating in pouring the filling the layer, the filling layer can be poured in place by pouring two times as following: the filling, layer being poured to 50mm above the bottom of the slab for the first time, and then further poured after the concrete is finally set.
  • Step 3: buckle components laying.
  • After the self-compacting concrete reaches certain strength, the assembly of the buckle components on top of the track slab is carried out, wherein the buckle components are transported to the working surface by the track slab transporter, and the order of installation is: rubber pad plate under the slab → iron plate → rubber plate under the rail.
  • Step 4: rail laying.
  • The rail is transported to the working surface by the track slab transport vehicle, and the steel rail is discharged to the installation point by the transport vehicle, and the steel rail is manually allocated to the rail groove of the iron plate bearing plate, and the gauge block, connecting bolts and elastic bars are installed and welded together.
  • The invention has the following advantages:
    1. 1. the form of structure can adapt to the size of subway shield tunnel and reduce the influence of civil construction error on rail laying.
    2. 2. by adopting the prefabricated slab structure, the laying schedule and construction quality are improved, the reliability of the track structure system is enhanced, and the appearance is more beautiful.
    3. 3. by adopting the factory compound way of prefabricated slab and elastic cushion, it can realize the protection of the slab when hoisting and upper bearing, and because of canceling the link of laying elastic cushion on the site, the construction progress has been accelerated.
    4. 4. many measures such as reserved lifting point, center mark, adjusting rod hole and measuring prism hole are adopted on the slab, which realizes the rapid and accurate construction of the track slab and improves the exchangeability of the damping track structure system.
    5. 5. self-compacting concrete being adopted to enhance the fluidity of concrete and ensure the compactness of concrete under track slab.
    6. 6. the limit device and the bottom concrete are molded at the same time.
    7. 7. by using the fine adjustment trolley system developed by the inventor to carry on the planking construction, the construction procedure is simple, the construction progress speeds up greatly, the laying precision is high, the labor intensity is reduced by a large margin.
  • Therefore, the supporting construction method of the slab-type rail damping structure machine can be used in the field of rail transit, and not only the damping performance can be designed according to the demand, but also the characteristics of simple construction procedure, fast construction speed, high construction precision, good rail smoothness and low labor intensity can be realized. It accords with the current direction of rail transit environmental protection, high efficiency and disease reduction, and has great social benefit. It can effectively reduce the vibration and secondary structure noise caused by the operation of urban rail transit vehicles.
  • It is obvious that the above descriptions and records are merely illustrations and are not intended to limit the disclosure application or use of the present invention. The scope of the invention will include any embodiments that fall into the accompanying claims.

Claims (6)

  1. A damping track structure system having a multi-layer design and comprising
    a filling layer (1), an elastic cushion (4) and a prefabricated track slab (6), the filling layer (1), the elastic cushion (4) and the prefabricated track slab (6) being arranged, in use, from the bottom to the top
    wherein the elastic cushion (4) is laid on the filling layer (1), the elastic cushion (4) and the prefabricated slab (6) are compounded as a whole, the prefabricated track slab (6) is arranged on the elastic cushion (4) for damping, the prefabricated track slab (6) is provided with two parallel steel rails (7), each of which being respectively fixed on the track slab (6) by a plurality of fasteners,
    wherein the middle part of the track slab (6) is provided with 2 holes (2), wherein the holes (2) are arranged to penetrate the prefabricated track slab (6) and the elastic cushion (4) through the thickness direction of the track slab (6),
    wherein a sealing sleeve (3) is installed in the holes (2), wherein the sealing sleeve (3) is of a cylinder structure made of elastic material.
  2. The damping track structure system as in claim 1, wherein the elastic cushion (4) includes at least two parallel elastic supporting strips and the lower surface of the track slab (6) is laid on the top surface of the two elastic supporting strips.
  3. The damping track structure system as in any of claims 1 to 2, wherein the section of the track slab (6) is a symmetrically set polygon, with a beveled structure on both sides to enhance adaptability to the tunnel section.
  4. The damping track structure system as in claim 1, wherein bottom face, inclined plane and side surface of the track slab (6) are covered with the elastic cushion (4), which is formed as a whole of the slab end.
  5. The damping track structure system as in claim 1, wherein a special elastic sealing sleeve with cap brim at the bottom of the sealing sleeve (3) is effectively and tightly connected with the base surface of the elastic cushion (4) in sealed state.
  6. A supporting construction method for the damping track structure system of any one of claims 1 to 5, wherein a prefabricated track slab having the features of any of claims 1 to 5 is provided, and wherein the construction method comprises the following steps:
    Step 1: transporting and laying at least one track slab (6); wherein the at least one track slab (6) is carried to site by a slab conveyer vehicle, the running mechanism of which can be adjusted according to different sections of the tunnel structure to adapt to running requirements of different structural forms;
    Step 2: pouring concrete, wherein concrete construction is carried out after cleaning the water in the foundation of the tunnel, checking compound situation of the elastic cushion (4) and rail slab (6) and sealing condition around the elastic cushion (4), concrete material including self-compacting concrete is used in the lower part of the rail slab (6) for casting at one time;
    Step 3: concrete maintaining;
    Step 4: laying buckle components;
    Step 5: laying the two steel rails (7), each of which respectively can be fixed on the track slab (6) by a plurality of fasteners.
EP16884604.6A 2016-01-11 2016-04-08 Precast slab railway track structural system for vibration mitigation and associated construction method Active EP3404142B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610013534.7A CN105625104B (en) 2016-01-11 2016-01-11 A kind of Prefabricated slab type vibration damping track system and matching operation method
PCT/CN2016/078779 WO2017121044A1 (en) 2016-01-11 2016-04-08 Precast slab railway track structural system for vibration mitigation and associated construction method

Publications (3)

Publication Number Publication Date
EP3404142A1 EP3404142A1 (en) 2018-11-21
EP3404142A4 EP3404142A4 (en) 2019-09-25
EP3404142B1 true EP3404142B1 (en) 2024-01-24

Family

ID=56040419

Family Applications (1)

Application Number Title Priority Date Filing Date
EP16884604.6A Active EP3404142B1 (en) 2016-01-11 2016-04-08 Precast slab railway track structural system for vibration mitigation and associated construction method

Country Status (4)

Country Link
EP (1) EP3404142B1 (en)
JP (1) JP6961898B2 (en)
CN (1) CN105625104B (en)
WO (1) WO2017121044A1 (en)

Families Citing this family (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223137B (en) * 2016-08-29 2019-06-28 株洲长远铁路建机有限公司 A kind of concrete precision screed operation vehicle of tunnel railway roadbed construction operation
CN106436495A (en) * 2016-11-21 2017-02-22 中铁第勘察设计院集团有限公司 Wide sleeper plate sticking type ballast track
CN107653755B (en) * 2017-09-15 2019-05-07 中铁十七局集团有限公司铺架分公司 Solid concrete roabed, which pours, in Subway Tunnel separate tunnel inverse makees formula construction method
CN107401091B (en) * 2017-09-19 2023-08-18 北京市轨道交通建设管理有限公司 Assembled track structure and construction method thereof
CN209323264U (en) * 2017-09-25 2019-08-30 洛阳双瑞橡塑科技有限公司 A kind of road bed board elastic limit device
CN108004854A (en) * 2017-11-30 2018-05-08 上海材料研究所 The Hierarchical Track harden structure of embedded energy-consuming device
CN107858869A (en) * 2017-12-14 2018-03-30 浙江天铁实业股份有限公司 The road bed board of rubber and metal composite and the component comprising the road bed board
CN108005678A (en) * 2017-12-27 2018-05-08 中铁二院工程集团有限责任公司 π shape tunnels bottom liner structure with low level sluicing kinetic energy
CN108131162B (en) * 2018-02-11 2023-06-13 中铁二院工程集团有限责任公司 Tunnel drainage device and tunnel integral ballast bed
CN108678785B (en) * 2018-05-04 2023-06-13 中铁第五勘察设计院集团有限公司 Box culvert crane for hoisting railway tunnel prefabricated inverted arch side box culvert
CN108560330B (en) * 2018-06-26 2024-05-17 青岛科而泰环境控制技术有限公司 Secondary pouring type upgradeable general ballast bed and construction method thereof
CN109112901A (en) * 2018-09-14 2019-01-01 同济大学 A kind of preformed rubber concrete vibration reducing track plate
CN109881542A (en) * 2019-04-16 2019-06-14 郑州铁路职业技术学院 A kind of embedded traffic track component
CN110424194A (en) * 2019-08-26 2019-11-08 中铁二院工程集团有限责任公司 The prefabricated ballast bed structure of vibration isolator and its construction method on a kind of bridge
CN110468628A (en) * 2019-08-28 2019-11-19 吴永芳 A kind of position limiting structure and assembled track for assembled track
CN110616634A (en) * 2019-10-24 2019-12-27 成都天府轨谷科技有限公司 Embedded assembled continuous supporting rail plate beam structure and production method
CN110909427A (en) * 2019-11-18 2020-03-24 广东博智林机器人有限公司 Method and device for determining structural parameters of shock pad and automatic guided vehicle
CN111576104B (en) * 2020-04-09 2021-07-27 重庆工程职业技术学院 Method for automatically adjusting installation position of track slab
CN111851184A (en) * 2020-07-01 2020-10-30 上海市政工程设计研究总院(集团)有限公司 Prefabricated base in shield tunnel and connection structure of prefabricated base and section of jurisdiction
CN111914356B (en) * 2020-07-30 2023-08-08 中车唐山机车车辆有限公司 Vibration reduction supporting device, railway vehicle and train floor area vibration isolation design method
CN111877054A (en) * 2020-08-11 2020-11-03 北京城建设计发展集团股份有限公司 Prefabricated plate type track structure convenient for rapid construction and construction method thereof
RU2755804C1 (en) * 2020-11-10 2021-09-21 Акционерное общество "РЖДстрой" Ballast-free railway track for cargo and passenger high-speed traffic and method for construction thereof
CN112444235B (en) * 2020-11-17 2022-08-02 中铁十二局集团电气化工程有限公司 Trackless measurement method for regional evacuation platform of subway tunnel
CN112580210A (en) * 2020-12-22 2021-03-30 中国铁路设计集团有限公司 Vibration isolation frequency band regulation and control design method for one-dimensional periodic cushion layer vibration reduction ballast bed
AU2021431182A1 (en) * 2021-03-05 2023-09-21 Overail S.R.L. Process and system for laying tracks for underground, railway and tramway lines
CN113026435B (en) * 2021-03-12 2023-02-24 中铁二十三局集团轨道交通工程有限公司 Subway shield interval plate type ballastless track construction method
CN114369976B (en) * 2021-12-23 2023-08-22 中国华冶科工集团有限公司 Method for laying ground rail with interval support
CN114519286B (en) * 2022-02-17 2023-04-25 中铁二院工程集团有限责任公司 Method for rapidly calculating secondary structural noise of vibration caused by rail transit vehicle
CN114481710A (en) * 2022-02-22 2022-05-13 河北中烁轨道科技有限公司 Composite track plate convenient to disassemble and production process thereof
CN114575878A (en) * 2022-03-10 2022-06-03 山东金岭矿业股份有限公司 Damping and buffering method and device during mine tunnel blasting construction
CN114525705A (en) * 2022-03-21 2022-05-24 成都天府轨谷科技有限公司 Wheel tooth rail plate beam steel rail embedded type structure and construction method
CN114941264A (en) * 2022-05-31 2022-08-26 中国二十二冶集团有限公司 Method for installing track and basic embedded plate
CN115595829A (en) * 2022-10-24 2023-01-13 西南交通大学(Cn) Steel spring floating slab precast slab track construction method
CN115627665B (en) * 2022-12-06 2023-03-21 中国铁路设计集团有限公司 Construction method of fast-supporting integrally-assembled prefabricated track structure
CN116971223B (en) * 2023-09-22 2023-12-08 中铁三局集团有限公司 Damping structure and damping method of track slab fine adjustment equipment

Family Cites Families (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5237242B2 (en) * 1972-09-14 1977-09-21
JPS5326361B2 (en) * 1973-01-23 1978-08-02
JPS5322724B2 (en) * 1973-09-20 1978-07-11
JPS547085B2 (en) * 1974-02-04 1979-04-04
JPS5838002Y2 (en) * 1978-06-09 1983-08-27 日本国有鉄道 Sound absorbing board installation device on railway tracks
US4303199A (en) * 1978-08-22 1981-12-01 Eisses Jacobus A Restored vibration isolation for railway tracks
DE2901283A1 (en) * 1979-01-13 1980-07-24 Erich Radler Railway track superstructure concrete support - has support slabs, intermediate layers and elastic inlay on troughed base
JPS60246901A (en) * 1984-05-18 1985-12-06 財団法人鉄道総合技術研究所 Stabilization of railroad foundation
JPH1181201A (en) * 1997-09-05 1999-03-26 Kumagai Gumi Co Ltd Panel of subway track slab
DE10303177A1 (en) * 2003-01-27 2004-07-29 Max Bögl Bauunternehmung GmbH & Co. KG Alignment of prefabricated parts in rigid roadway or track, especially for railway slab track permanent way, whereby a moving device with a tacheometer is used to measure target points and compare actual and set positions
AT413552B (en) * 2004-04-08 2006-03-15 Porr Technobau Und Umwelt Ag SCOTTLESS CONSTRUCTION FOR RAIL-LINKED TRANSPORT
DE102005054820A1 (en) * 2005-11-15 2007-05-24 Rail.One Gmbh Fixed carriageway for rail vehicles
CN1844578A (en) * 2005-12-09 2006-10-11 中铁八局集团有限公司 Vibration damping and sheet type ballastless track
JP2009046821A (en) * 2007-08-14 2009-03-05 Oriental Shiraishi Corp Concrete structure for railroad and its reinforcing structure
DE102008016953A1 (en) * 2008-04-01 2009-10-08 Railone Gmbh Fixed carriageway for rail vehicles
JP4888737B2 (en) * 2008-09-01 2012-02-29 清水建設株式会社 Under-orbit transport mechanism
JP2010255363A (en) * 2009-04-28 2010-11-11 Mitsubishi Heavy Ind Ltd Sleeper fastening structure of magnetic levitation system
JP5415240B2 (en) * 2009-11-30 2014-02-12 鹿島道路株式会社 Precast concrete paving slab that can be used on both sides and its installation method
CN101748665B (en) * 2009-12-22 2011-07-27 中铁二局股份有限公司 Fragment-free track slab pavement method
CN101798786B (en) * 2010-04-08 2012-05-30 中铁二院工程集团有限责任公司 Plate-type ballastless track vibration-reducing construction
CN201908236U (en) * 2010-12-17 2011-07-27 中国铁道科学研究院铁道建筑研究所 Shock absorption type slab ballastless track
CN102182120A (en) * 2011-03-31 2011-09-14 中铁第四勘察设计院集团有限公司 Precast slab type ballastless track structure
CN202055116U (en) * 2011-03-31 2011-11-30 中铁第四勘察设计院集团有限公司 Prefabricated slab type ballastless track structure
CN102767123A (en) * 2012-08-13 2012-11-07 浙江天铁实业股份有限公司 Slab track vibration reduction structure
CN103669114B (en) * 2012-09-06 2015-07-22 隔而固(青岛)振动控制有限公司 Ballast bed base prefabricated slab and application thereof
ES2526840B1 (en) * 2013-04-18 2015-12-15 Idvia 2020 Horizonte 2020, S.L. RAILWAY ROAD IN BITUMINOUS PLATE AND PROCEDURE FOR EXECUTION OF SUCH VIA
CN103255686B (en) * 2013-05-13 2015-05-06 西南交通大学 Ballastless track disengaging-resisting elastic anti-vibration cushion
CN103741561B (en) * 2014-01-26 2015-11-25 北京九州一轨隔振技术有限公司 Ballast bed of track and construction method, macromolecule vibration isolating suspension replacing options
CN204435133U (en) * 2015-01-20 2015-07-01 北京宝曼科技有限公司 There iing the vibration insulating system under water condition with excellent effectiveness in vibration suppression

Also Published As

Publication number Publication date
EP3404142A1 (en) 2018-11-21
JP2019501320A (en) 2019-01-17
CN105625104A (en) 2016-06-01
WO2017121044A1 (en) 2017-07-20
JP6961898B2 (en) 2021-11-05
CN105625104B (en) 2018-08-24
EP3404142A4 (en) 2019-09-25

Similar Documents

Publication Publication Date Title
EP3404142B1 (en) Precast slab railway track structural system for vibration mitigation and associated construction method
CN107401091B (en) Assembled track structure and construction method thereof
CN101215812B (en) Construction method for passenger transport dedicated line bolster embedded large-size ballastless track
CN105525541B (en) Track traffic Prefabricated slab type vibration damping track
CN103362036B (en) Quick construction method of embedded rail system
CN205934593U (en) Assemble board -like track structure
CN105625188A (en) Construction method for 48m sectional beam of passenger railway based on BIM technology
EP3384088B1 (en) Modular system for the laying of underground and railroad and tram lines
CN109235292B (en) Railway bridge beam replacing process
CN104532690B (en) Separate type track structure is prefabricated and construction method
CN103938534B (en) Elevated rail hands over the integrated bridge structure in station and its application process
CN105625105A (en) Construction method for precast type vibration damping track board
CN112411265A (en) Ballastless track structure suitable for large-span bridge and mounting method
CN103321111A (en) Tramcar track continuous-laying construction method
CN110593902B (en) Construction method for filling inverted arch and integrally pouring
WO2011120186A1 (en) Track system for magnetic suspension passenger traffic line
CN105908583A (en) System for replacing tunnel ballast track bed with ballastless track under non-interruption traveling condition
CN114645490A (en) Construction method of ballastless track of precast slab of urban rail transit underground line
WO2024041054A1 (en) Prefabricated track structure for built-in pump house section in rail transportation and construction method
CN111851155A (en) Steel spring floating plate construction method based on concentric tunnel of line tunnel
CN105926381A (en) Method for changing ballast track bed of tunnel to ballastless track under condition of uninterrupted train working
CN115491932A (en) Multi-layer composite vibration reduction track structure for urban rail transit engineering and construction method
CN213772737U (en) Strut type straight-paving slab ballastless track system
CN113026435B (en) Subway shield interval plate type ballastless track construction method
CN111877054A (en) Prefabricated plate type track structure convenient for rapid construction and construction method thereof

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180810

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20190828

RIC1 Information provided on ipc code assigned before grant

Ipc: E01B 29/00 20060101ALI20190822BHEP

Ipc: E01B 1/00 20060101AFI20190822BHEP

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20210408

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20231114

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602016085534

Country of ref document: DE

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20240124