EP2672038A2 - A building seismic strengthening system - Google Patents

A building seismic strengthening system Download PDF

Info

Publication number
EP2672038A2
EP2672038A2 EP13169294.9A EP13169294A EP2672038A2 EP 2672038 A2 EP2672038 A2 EP 2672038A2 EP 13169294 A EP13169294 A EP 13169294A EP 2672038 A2 EP2672038 A2 EP 2672038A2
Authority
EP
European Patent Office
Prior art keywords
walls
laminated timber
cross laminated
massive cross
fact
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP13169294.9A
Other languages
German (de)
French (fr)
Other versions
EP2672038B1 (en
EP2672038A3 (en
Inventor
Bruno Dujic
Iztok Sustersic
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CBD d o o
Original Assignee
CBD d o o
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CBD d o o filed Critical CBD d o o
Publication of EP2672038A2 publication Critical patent/EP2672038A2/en
Publication of EP2672038A3 publication Critical patent/EP2672038A3/en
Application granted granted Critical
Publication of EP2672038B1 publication Critical patent/EP2672038B1/en
Priority to HRP20180248TT priority Critical patent/HRP20180248T1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/027Preventive constructional measures against earthquake damage in existing buildings

Definitions

  • the subject of the invention is a system for seismic strengthening of buildings, or to be more specific, a system for seismic strengthening of walls and connecting of floor planes of existing buildings with massive cross laminated timber panels, which also includes an insulation effect.
  • the invention belongs to E04G23/02 and to E04H9/02 and, additionally, to E04B1/74.
  • the technical problem solved by this invention is seismic and energy retrofit of existing buildings that were not built to withstand seismic loads.
  • the retrofit is performed with cross laminated timber panels, which are used to strengthen the walls and floor planes of timber, stone, masonry and concrete buildings with the aim to withstand horizontal forces caused by an earthquake or strong wind and at the same time to ensure a higher thermal insulation of buildings.
  • the technical problem is resolved with a seismic strengthening system whose main feature is that it is conceived as a cladding from massive cross laminated timber panels that can be used to confine all load bearing and partition walls from the outer and/or inner sides of existing buildings regardless of the building material.
  • the massive cross laminated timber panels serve as strengthening panels that due to their structure also serve as a thermal insulation of the building.
  • Various implementations of massive plates are possible and are glued to the walls and additionally connected with bolts.
  • the building seismic strengthening system is made from massive cross laminated timber panels 3 with which the walls 1 of an existing building are cladded from the outer and/or inner side.
  • the massive cross laminated timber panels 3 are attached to the walls with a layer of glue 4 and additionally fixed with connections, namely anchor bolts 5 in the presented feasibility example, and self-tapping wood screws 11.
  • the openings 7 for the existing windows and doors in walls 1 of an existing building are cut out of the massive cross laminated timber panels 3 and/or encircled with them so that they are left uncovered.
  • some doors and windows in the walls 1 of an existing building can also be covered with massive cross laminated timber panels 3.
  • the massive cross laminated timber panels 3 are interconnected with flat steel ties 6, typically at around each floor structure 2 area.
  • the massive cross laminated timber plates 3 are placed onto the walls 1 of the masonry building. This is shown in Fig. 1 .
  • the massive cross laminated timber plates 3 can also be used to clad and strengthen walls 1 made from concrete, timber or any other material, which can be used for this purpose, or a combination of materials, with or without an insulation layer and/or a façade.
  • the walls 1 in the appurtenant storeys of an existing building can be strengthened with a monolithic massive cross laminated timber plate 3 that completely and in one piece covers the inner and/or outer side of an individual wall 1.
  • the openings 7 for existing doors and/or windows in wall 1 are cut out of the massive cross laminated timber panel 3, which runs from the foundation 8 and partially over the edge of the floor structure 2, in advance.
  • the monolithic massive cross laminated timber panels 3 are attached to the walls 1 and floor structures 2 with a layer of glue 4 and additionally connected with anchoring bolts 5 placed over their surface at a certain spacing.
  • a layer of glue 4 suitable for the task is used.
  • the walls 1 of the existing building can be cladded, conversely strengthened, from one or both sides, with massive cross laminated timber panels 3 made from several smaller pieces 3.1, 3.2, 3.3, 3.4, 3.5, 3.6, 3.7 to 3.n of various shapes and dimensions. Together they form connecting areas 9 that are additionally connected on adjacent edges with self-tapping wood screws 11. Individual pieces 3.1 to 3.n of the massive cross laminated timber panel 3 are attached to wall 1 as in the feasibility example in Fig. 2 , namely with anchoring bolts 5.
  • the advantage of the multi-piece assembly of the massive cross laminated timber panels 3 over before described monolithic one, is that cutting of openings 7 for the existing windows and doors is not necessary as the openings are formed during the cladding and attaching of pieces of massive cross laminated timber panels 3.1 to 3.n around window and door openings in walls 1 of an existing building. Above all the multi-piece assembly is easier if the massive cross laminated timber panels 3 are being attached to the inner side of walls 1. Smaller pieces 3.1 to 3.n are lighter and allow for an easier manipulation without the need for lifting equipment.
  • different walls 1 can be cladded with massive cross laminated timber panels 3, both with monolithic and multi-piece assemblies combined, as shown in Fig. 2 and Fig. 3 .
  • the connecting areas 9 in the floor structure 2 zones of an existing building are made in the same way as prescribed below.
  • the connecting areas 9, where the massive cross laminated timber plates 3 attached to walls 1 in two adjacent stories connect, are preferentially covered along the perimeter of the floor structure 2 with a flat steel tie 6 with holes 12 that is attached to the adjacent connecting massive cross laminated timber panels 3 with self-tapping wood screws 11. Shear forces and bending moments are transferred via the flat steel ties 6 from higher to lower floors of an existing building.
  • the massive cross laminated timber panels 3 are attached to the walls 1 of an existing building with a layer of glue 4 and additionally fastened with anchoring bolts 5 and washers 10. The described is presented in Fig. 4 .
  • the walls 1 of existing buildings can be cladded and strengthened with massive cross laminated timber panels 3 that run from the foundation 8 to the roof of the building, or any other height, in one piece.
  • the massive cross laminated timber panels 3 are tailored to the geometry of the existing building's envelope. Optimally, they are made from 3 to 7 or even more layers of cross laminated timber lamellas of arbitrary thickness where every layer runs perpendicularly to the two neighbouring ones.
  • the necessary thickness of the massive cross laminated timber panels 3 is prescribed according to the static and seismic demands of the building.
  • the panels need to be made [Z1] with a hydraulic system press.
  • the massive cross laminated timber panels 3 can be attached to the walls 1 of an existing building from the outer and/or inner side in the same formerly prescribed manner.
  • the layer of glue 4 is made of epoxide resin and added fillers with which we can fill larger deviations between the existing walls 1 of an existing building and massive cross laminated timber panels 3.
  • An epoxy resin allowing for up to a few centimetre glue layer 4 is chosen.
  • the openings 7 in massive cross laminated timber panels 3 can be cut out before their attachment onto the walls 1 of an existing building or they can be tailored to shape by assembling smaller pieces 3.1 to 3.n around the existing windows and doors in the wall 1. If using monolithic massive cross laminated timber panels 3, there is a possibility of a prior installation of builders' joinery into the openings 7, which shortens and simplifies the work on terrain and ensures a higher quality of individual part assembly.
  • the massive cross laminated panels 3 are glued and bolted onto walls 1 of an existing building but not also into its foundation 8, hence leaving them undamaged and in their original shape.
  • the massive cross laminated timber panels 3 attached to the walls 1 of an existing building have a relatively low mass the additional load on the foundation is minimal and can hence be neglected in practice.
  • the building seismic strengthening system according to the invention is above all useful for strengthening the walls 1 of existing buildings built in seismically active areas but not designed to withstand seismic loads. In case of a catastrophic earthquake the system allows minor damage to buildings but it prevents their collapse due to the fairly flexible strengthening cage formed by massive cross laminated timber panels 3 attached to the walls 1.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Emergency Management (AREA)
  • Business, Economics & Management (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Electrochemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Chemical & Material Sciences (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The building seismic strengthening system according to the invention solves the problem of strengthening walls (1) of existing buildings with massive cross laminated timber panels (3) of monolithic or multi-piece assembly, with or without openings (7) for the existing windows and doors, and attached to the inner and/or outer side of walls (1) with a layer of glue (4) and additionally connected with anchoring bolts (5) and self-tapping wood screws (11). The system is especially useful for strengthening of existing buildings on seismically active areas.

Description

    The subject of the invention
  • The subject of the invention is a system for seismic strengthening of buildings, or to be more specific, a system for seismic strengthening of walls and connecting of floor planes of existing buildings with massive cross laminated timber panels, which also includes an insulation effect.
  • According to the international patent classification the invention belongs to E04G23/02 and to E04H9/02 and, additionally, to E04B1/74.
  • Technical problem
  • The technical problem solved by this invention is seismic and energy retrofit of existing buildings that were not built to withstand seismic loads. The retrofit is performed with cross laminated timber panels, which are used to strengthen the walls and floor planes of timber, stone, masonry and concrete buildings with the aim to withstand horizontal forces caused by an earthquake or strong wind and at the same time to ensure a higher thermal insulation of buildings.
  • Current state of the art
  • There are quite some known systems for seismic strengthening of existing buildings.
  • According to document KR 100989218 a method for seismic strengthening of partition walls of an existing masonry building is known. Steel rods are drilled into the walls from one or both sides. They are sticking out and are orientated perpendicularly to the wall plane. Just next to the wall, from one or both sides, steel rods are placed diagonally over the whole wall area in both directions. The steel rods are moulded in a layer of non-shrinkable mortar that connects the new construction with the existing one. Weakness and deficiency of this solution is above all in the fact that in order to provide the mortar layer(s), a framework needs to be constructed and later removed. The proposed solution of clamping a wall with steel rods does not significantly differ from the conventional solution of using a steel mesh.
  • According to document JP 9228658 a method for seismic strengthening of the walls of an existing building with laminated timber plates made of glued laminated timber (parallel lamination) is known. The plates are used as infill of existing frames and are attached to them with connecting construction and steel mechanical fasteners. Weakness and deficiency of this solution is above all in the fact that parallel glued laminated timber plates are used that are very deformation sensitive to moisture changes, which negatively influences the existing strengthening construction. In addition, the compression and tension strengths of parallel-glued laminated timber elements perpendicularly to fibers are very low. Furthermore, weakness and deficiency is in the fact that this solution is only usable for concrete frame constructions and only from the inside but not the outside of an existing building. Hence the outer walls of a building are not seismically strengthened. Such strengthening structures are only used as partition walls. As the strengthening timber structure can only be attached around its perimeter, it can only be connected at floor levels. Therefore such a system is especially problematic for buildings that do not have RC floor slabs.
  • According to document JP 2009174148 a method for seismic strengthening of reinforced concretes buildings with strengthening panels, additional concrete walls and light-weight infills is known. The walls of an existing building are confined with strengthening panels, bolted together with threaded rods, hence clamping the walls and transferring friction forces to themselves. Weakness and deficiency of this solution is in the fact that it is only suitable for reinforced concrete frame-type structures and that using a light material for filling in the gap between the strengthening panels and existing walls is unreliable, making the construction more demanding.
  • Furthermore, according to document JP 2009097165 an outer strengthening structure of an existing building where the strengthening frame is connected to the outer side of the structure at storey levels is known. A separate strengthening frame is connected to each individual storey and the frames are later connected together, as a rule, at mid-storey height. Weakness and deficiency of this solution is in the fact that it is mostly suitable for frame-type structures, that it is only attached to the existing structures at storey levels and that the strengthening frames on the outer side significantly change the buildings' appearance.
  • The common characteristic of described known solutions is that the walls of buildings are cladded with unsuitable strengthening panels or infills, whereby their construction and connections do not enable sufficient seismic strengthening, they are not useful for all types of walls and partition walls of a building, they do not improve the thermal insulation of seismically retrofitted buildings and due to the high carbon footprint of steel and concrete they do not meet contemporary ecology demands. As these strengthening panels and infills do not provide a thermal insulation effect, additional thermal insulation needs to be installed on building façades.
  • Due to the formerly mentioned weaknesses and deficiencies of known seismic retrofitting solutions of existing buildings in seismic areas, there is a need for an effective strengthening system for all types of walls that will allow a sufficient seismic mainly horizontal load transfer and also a sufficient thermal insulation of buildings, all in the scope of valid ecology standards.
  • The technical problem solution
  • According to the invention, the technical problem is resolved with a seismic strengthening system whose main feature is that it is conceived as a cladding from massive cross laminated timber panels that can be used to confine all load bearing and partition walls from the outer and/or inner sides of existing buildings regardless of the building material. The massive cross laminated timber panels serve as strengthening panels that due to their structure also serve as a thermal insulation of the building. Various implementations of massive plates are possible and are glued to the walls and additionally connected with bolts.
  • The invention will be more precisely described in relation to the feasibility example and figures, which show as follows:
  • Fig. 1
    the strengthening system according to the invention shown via a partial cross section of the outer envelope of an existing building in an isometric projection
    Fig. 2
    a building's wall cladded with a massive monolithic panel in a dimetric projection
    Fig. 3
    same as in Fig. 2, however, the massive panel used for cladding and strengthening a wall is assembled from smaller pieces
    Fig. 4
    a longitudinal cross section through a floor construction of a strengthened wall cladded with a massive timber panel and partial cross sections of connection elements
    Fig. 5
    a detail of massive panel connections in the example of assembled panels, with a partial cross-section of attachment
    Fig. 6
    a cladded and strengthened building's wall with a massive panel running uninterrupted from the foundation to the roof of the building
  • The building seismic strengthening system is made from massive cross laminated timber panels 3 with which the walls 1 of an existing building are cladded from the outer and/or inner side. The massive cross laminated timber panels 3 are attached to the walls with a layer of glue 4 and additionally fixed with connections, namely anchor bolts 5 in the presented feasibility example, and self-tapping wood screws 11. The openings 7 for the existing windows and doors in walls 1 of an existing building are cut out of the massive cross laminated timber panels 3 and/or encircled with them so that they are left uncovered. In some other feasibility example, not shown here, some doors and windows in the walls 1 of an existing building can also be covered with massive cross laminated timber panels 3.
  • For existing buildings with two or more floors the massive cross laminated timber panels 3 are interconnected with flat steel ties 6, typically at around each floor structure 2 area. In the described feasibility example of the seismic strengthening system according to the invention the massive cross laminated timber plates 3 are placed onto the walls 1 of the masonry building. This is shown in Fig. 1. In some other feasibility example, not shown here, the massive cross laminated timber plates 3 can also be used to clad and strengthen walls 1 made from concrete, timber or any other material, which can be used for this purpose, or a combination of materials, with or without an insulation layer and/or a façade.
  • As shown in Fig. 2, the walls 1 in the appurtenant storeys of an existing building can be strengthened with a monolithic massive cross laminated timber plate 3 that completely and in one piece covers the inner and/or outer side of an individual wall 1. In such a case the openings 7 for existing doors and/or windows in wall 1 are cut out of the massive cross laminated timber panel 3, which runs from the foundation 8 and partially over the edge of the floor structure 2, in advance. As mentioned before the monolithic massive cross laminated timber panels 3 are attached to the walls 1 and floor structures 2 with a layer of glue 4 and additionally connected with anchoring bolts 5 placed over their surface at a certain spacing. A layer of glue 4 suitable for the task is used.
  • As shown in Fig. 3, the walls 1 of the existing building can be cladded, conversely strengthened, from one or both sides, with massive cross laminated timber panels 3 made from several smaller pieces 3.1, 3.2, 3.3, 3.4, 3.5, 3.6, 3.7 to 3.n of various shapes and dimensions. Together they form connecting areas 9 that are additionally connected on adjacent edges with self-tapping wood screws 11. Individual pieces 3.1 to 3.n of the massive cross laminated timber panel 3 are attached to wall 1 as in the feasibility example in Fig. 2, namely with anchoring bolts 5. The advantage of the multi-piece assembly of the massive cross laminated timber panels 3 over before described monolithic one, is that cutting of openings 7 for the existing windows and doors is not necessary as the openings are formed during the cladding and attaching of pieces of massive cross laminated timber panels 3.1 to 3.n around window and door openings in walls 1 of an existing building. Above all the multi-piece assembly is easier if the massive cross laminated timber panels 3 are being attached to the inner side of walls 1. Smaller pieces 3.1 to 3.n are lighter and allow for an easier manipulation without the need for lifting equipment.
  • In some other feasibility example, not shown here, different walls 1 can be cladded with massive cross laminated timber panels 3, both with monolithic and multi-piece assemblies combined, as shown in Fig. 2 and Fig. 3.
  • Regardless of the type of the aforementioned assemblies of massive cross laminated timber panels 3, monolithic or multi-piece or combined, the connecting areas 9 in the floor structure 2 zones of an existing building are made in the same way as prescribed below. The connecting areas 9, where the massive cross laminated timber plates 3 attached to walls 1 in two adjacent stories connect, are preferentially covered along the perimeter of the floor structure 2 with a flat steel tie 6 with holes 12 that is attached to the adjacent connecting massive cross laminated timber panels 3 with self-tapping wood screws 11. Shear forces and bending moments are transferred via the flat steel ties 6 from higher to lower floors of an existing building. As described before, in all these examples, the massive cross laminated timber panels 3 are attached to the walls 1 of an existing building with a layer of glue 4 and additionally fastened with anchoring bolts 5 and washers 10. The described is presented in Fig. 4.
  • When assembling the massive cross laminated timber panels 3 at parallel or perpendicular connecting areas 9 the so called seam-connections are made with self-tapping wood screws 11, preferentially drilled under an angle 90° or 45° as shown in Fig. 5. It applies that 45°drilling is used for parallel plate connecting areas 9 and 90°drilling for overlapping connections.
  • In some feasibility examples the walls 1 of existing buildings can be cladded and strengthened with massive cross laminated timber panels 3 that run from the foundation 8 to the roof of the building, or any other height, in one piece.
  • The massive cross laminated timber panels 3 are tailored to the geometry of the existing building's envelope. Optimally, they are made from 3 to 7 or even more layers of cross laminated timber lamellas of arbitrary thickness where every layer runs perpendicularly to the two neighbouring ones. The necessary thickness of the massive cross laminated timber panels 3 is prescribed according to the static and seismic demands of the building. The panels need to be made[Z1] with a hydraulic system press.
  • The massive cross laminated timber panels 3 can be attached to the walls 1 of an existing building from the outer and/or inner side in the same formerly prescribed manner.
  • The layer of glue 4 is made of epoxide resin and added fillers with which we can fill larger deviations between the existing walls 1 of an existing building and massive cross laminated timber panels 3. An epoxy resin allowing for up to a few centimetre glue layer 4 is chosen.
  • The anchoring bolts 5, with which massive cross laminated timber panels 3 are attached to the walls 1 on an existing building, preferentially ensure a suitable bond forming between the two. During an earthquake the anchoring bolts 5 ensure that delamination does not occur between the massive cross laminated timber panels 3 and the cladded and strengthened existing walls 1, namely allowing the layer of glue 4 to perform.
  • As described earlier, the openings 7 in massive cross laminated timber panels 3 can be cut out before their attachment onto the walls 1 of an existing building or they can be tailored to shape by assembling smaller pieces 3.1 to 3.n around the existing windows and doors in the wall 1. If using monolithic massive cross laminated timber panels 3, there is a possibility of a prior installation of builders' joinery into the openings 7, which shortens and simplifies the work on terrain and ensures a higher quality of individual part assembly.
  • The massive cross laminated panels 3 are glued and bolted onto walls 1 of an existing building but not also into its foundation 8, hence leaving them undamaged and in their original shape. As the massive cross laminated timber panels 3 attached to the walls 1 of an existing building have a relatively low mass the additional load on the foundation is minimal and can hence be neglected in practice.
  • The building seismic strengthening system according to the invention is above all useful for strengthening the walls 1 of existing buildings built in seismically active areas but not designed to withstand seismic loads. In case of a catastrophic earthquake the system allows minor damage to buildings but it prevents their collapse due to the fairly flexible strengthening cage formed by massive cross laminated timber panels 3 attached to the walls 1.

Claims (8)

  1. The building seismic strengthening system is characterised by the fact that the walls (1) of an existing building are cladded with massive cross laminated timber panels (3) from the outer and/or inner side with the use of a layer of epoxide glue (4) and additionally connected with anchoring bolts (5) with washers (10); that the height of individual massive cross laminated timber panels (3) can be arbitrary, though preferentially equal to the distance between the floor structures (2) and/or equal to the distance between the foundation (8) and the roof of the building.
  2. The system according to Claim 1 is characterised by the fact that the massive cross laminated timber panels (3) that can be made either monolithic, covering complete individual walls (1) of an existing building in one piece or in a multi-piece assembly where more pieces (3.1) to (3.n) are put together to cover the individual walls (1).
  3. The system according to Claim 2 is characterised by the fact that the openings (7) for the existing doors and windows in walls (1) can be previously cut out of the monolithic massive cross laminated timber panels (3), if necessary.
  4. The system according to Claim 2 is characterised by the fact that the windows and doors in walls (1) of the existing building can be encircled with separate pieces (3.1) to (3.n) of massive cross laminated timber panels (3) so that they form appropriate openings (7).
  5. The system according to Claim 1 is characterised by the fact that the massive cross laminated timber panels (3) are connected within an individual storey at connecting areas (9) and are joined together with self-tapping wood screws (11).
  6. The system according to Claim 1 is characterised by the fact that the massive cross laminated timber panels (3), attached to walls (1) between adjacent storeys, are connected together at transitions from lower to upper storey with at least one flat steel tie (6) so that the latter covers the appurtenant connecting area (9) and is connected to the massive cross laminated timber panels (3) with self-tapping wood screws (11).
  7. The system according to Claim 1 is characterised the fact that the massive cross laminated timber panels (3) are optimally made from at least three to seven or more layers of timber lamellas that run perpendicularly to each other and are glued together.
  8. The system according to Claim 1 is characterised the fact that the massive cross laminated timber panels (3) are glued and attached to walls (1) on the inner and/or outer side of existing buildings made from arbitrary building materials, non-metallic and/or metallic.
EP13169294.9A 2012-06-06 2013-05-27 A building seismic strengthening system Active EP2672038B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
HRP20180248TT HRP20180248T1 (en) 2012-06-06 2018-02-08 A building seismic strengthening system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SI201200184A SI23678B (en) 2012-06-06 2012-06-06 Anti-earthquake building reinforcement system

Publications (3)

Publication Number Publication Date
EP2672038A2 true EP2672038A2 (en) 2013-12-11
EP2672038A3 EP2672038A3 (en) 2014-06-25
EP2672038B1 EP2672038B1 (en) 2017-11-15

Family

ID=46880828

Family Applications (1)

Application Number Title Priority Date Filing Date
EP13169294.9A Active EP2672038B1 (en) 2012-06-06 2013-05-27 A building seismic strengthening system

Country Status (3)

Country Link
EP (1) EP2672038B1 (en)
HR (1) HRP20180248T1 (en)
SI (1) SI23678B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT201700024226A1 (en) * 2017-03-03 2018-09-03 Renzo Manganello COMBINED STATIC AND SEISMIC CONSOLIDATION SYSTEM AND THERMAL AND ACOUSTIC INSULATION OF WALLS AND EXISTING BUILDINGS AND OF NEW CONSTRUCTION
IT201800005726A1 (en) * 2018-05-25 2019-11-25 PREFABRICATED MODULE FOR THE CONSOLIDATION OR CONSOLIDATION OF BUILDING CONSTRUCTIONS AND METHOD OF CONSTRUCTION
CN113833306A (en) * 2021-10-22 2021-12-24 武汉楚天鼎盛建设有限公司 Reinforcing device for house wall and construction process thereof
IT202200006944A1 (en) * 2022-04-07 2023-10-07 Marlegno S R L Tecnologie Del Legno METHOD OF ANTISEISMIC STRENGTHENING OF A BUILDING AND RESPECTIVE BUILDING

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09228658A (en) 1996-02-28 1997-09-02 Kajima Corp Earthquake-resisting reinforcing method of existing building by using woody group member
JP2009097165A (en) 2007-10-15 2009-05-07 Ando Corp Outer shell-reinforcing structure of existing building
JP2009174148A (en) 2008-01-22 2009-08-06 Univ Of Ryukyus Seismic strengthening structure and seismic strengthening method for concrete structure
KR100989218B1 (en) 2010-08-10 2010-10-20 이정우 Reinforcing method for seismic strengthening of mansory partition wall

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1993014278A1 (en) * 1992-01-17 1993-07-22 Heydon John J Improved building structure and method of use
US6074149A (en) * 1999-06-30 2000-06-13 G. Lyle Habermehl False threadscrew and screwstrip
US20040071524A1 (en) * 2002-10-11 2004-04-15 Habermehl G. Lyle Fastener with stepped head for composite decking
JP2005126955A (en) * 2003-10-22 2005-05-19 Nippon Steel Corp Anti-seismic strengthening structure and seismic strengthening method
JP2006125069A (en) * 2004-10-29 2006-05-18 Tetsuo Fushimi Seismic strengthening method for wooden building, and seismic strengthening plate therefor
CN101215930A (en) * 2008-01-02 2008-07-09 湖南大学 Method for reinforcing wall using bamboo wood
CN101863058B (en) * 2010-06-11 2012-01-04 德华兔宝宝装饰新材股份有限公司 Novel laminated wood and manufacturing method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09228658A (en) 1996-02-28 1997-09-02 Kajima Corp Earthquake-resisting reinforcing method of existing building by using woody group member
JP2009097165A (en) 2007-10-15 2009-05-07 Ando Corp Outer shell-reinforcing structure of existing building
JP2009174148A (en) 2008-01-22 2009-08-06 Univ Of Ryukyus Seismic strengthening structure and seismic strengthening method for concrete structure
KR100989218B1 (en) 2010-08-10 2010-10-20 이정우 Reinforcing method for seismic strengthening of mansory partition wall

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT201700024226A1 (en) * 2017-03-03 2018-09-03 Renzo Manganello COMBINED STATIC AND SEISMIC CONSOLIDATION SYSTEM AND THERMAL AND ACOUSTIC INSULATION OF WALLS AND EXISTING BUILDINGS AND OF NEW CONSTRUCTION
IT201800005726A1 (en) * 2018-05-25 2019-11-25 PREFABRICATED MODULE FOR THE CONSOLIDATION OR CONSOLIDATION OF BUILDING CONSTRUCTIONS AND METHOD OF CONSTRUCTION
CN113833306A (en) * 2021-10-22 2021-12-24 武汉楚天鼎盛建设有限公司 Reinforcing device for house wall and construction process thereof
IT202200006944A1 (en) * 2022-04-07 2023-10-07 Marlegno S R L Tecnologie Del Legno METHOD OF ANTISEISMIC STRENGTHENING OF A BUILDING AND RESPECTIVE BUILDING

Also Published As

Publication number Publication date
EP2672038B1 (en) 2017-11-15
SI23678A (en) 2012-09-28
SI23678B (en) 2021-10-29
HRP20180248T1 (en) 2018-03-09
EP2672038A3 (en) 2014-06-25

Similar Documents

Publication Publication Date Title
CN101245618A (en) Two-side-connection combined steel plate shearing force wall
CN104763085B (en) The double T floor frames structures of assembled integral prestressing force and its construction method
CN103321328A (en) Double-layer light-steel-keel sound-insulating wall and construction method thereof
CN103437463A (en) Prefabricated light steel fireproof load-bearing combined wall structure
CN203412140U (en) Double-layer lightgage steel joist sound proof wall
EP2672038B1 (en) A building seismic strengthening system
CN110593449B (en) Assembled light vertical slat type load-bearing wall structure and construction method thereof
CN106988452A (en) A kind of and supporting industrialization EPS modular wall panel systems of assembled steel framework
CN204475580U (en) Wall panel assembly and full prefabricated building
CN219386748U (en) Assembled double-interlayer heat-insulation five-layer composite concrete shear wall board with sash leaf plates
CN107355027B (en) Section steel concrete shear wall assembly type space modularized structural system and construction method
CN110593397A (en) Multilayer assembled plate type building
KR101190547B1 (en) Earthquake-resistant frame and seismic retrofit method for rahmen building using the same
DE202011005374U1 (en) Device for thermal insulation of a building with vacuum insulation panels
CN111622383B (en) Self-resetting concrete frame structure steel plate energy-consumption infilled wall and assembling method thereof
CN214034053U (en) Strengthen evaporating and pressing aerated concrete slab building structure system
CN205348439U (en) Fire prevention antiknock board
CN115162814A (en) Frame corrugated steel plate shear wall building
CN211200814U (en) Assembled light vertical bar plate type bearing wall structure
CN111576880B (en) Assembling construction method for connecting beam of windowing hole superposed shear wall
CN211200692U (en) Multilayer assembled plate type building
CN102926459B (en) Combined house
CN206800635U (en) A kind of big plate prefabricated buildings
RU68025U1 (en) MULTI-LAYERED WALL
CN115949160B (en) Assembled inner and outer blade double-interlayer heat-insulation five-layer composite shear wall plate and manufacturing method thereof

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RIC1 Information provided on ipc code assigned before grant

Ipc: E04H 9/02 20060101ALI20140516BHEP

Ipc: E04H 9/08 20060101ALI20140516BHEP

Ipc: E04G 23/02 20060101AFI20140516BHEP

17P Request for examination filed

Effective date: 20150105

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

17Q First examination report despatched

Effective date: 20160509

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20170602

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: GB

Ref legal event code: FG4D

Ref country code: AT

Ref legal event code: REF

Ref document number: 946436

Country of ref document: AT

Kind code of ref document: T

Effective date: 20171115

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602013029369

Country of ref document: DE

REG Reference to a national code

Ref country code: HR

Ref legal event code: TUEP

Ref document number: P20180248

Country of ref document: HR

REG Reference to a national code

Ref country code: HR

Ref legal event code: T1PR

Ref document number: P20180248

Country of ref document: HR

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20171115

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 946436

Country of ref document: AT

Kind code of ref document: T

Effective date: 20171115

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180215

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180215

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180216

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602013029369

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20180817

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20180527

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20180531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180531

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180527

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180531

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180527

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180527

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180531

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20180248

Country of ref document: HR

Payment date: 20190520

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180527

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20130527

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20180248

Country of ref document: HR

Payment date: 20200520

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171115

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171115

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180315

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20180248

Country of ref document: HR

Payment date: 20210519

Year of fee payment: 9

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20180248

Country of ref document: HR

Payment date: 20220517

Year of fee payment: 10

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20180248

Country of ref document: HR

Payment date: 20230515

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20230531

Year of fee payment: 11

Ref country code: DE

Payment date: 20230323

Year of fee payment: 11

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20180248

Country of ref document: HR

Payment date: 20240522

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: HR

Payment date: 20240522

Year of fee payment: 12