EP2451214B1 - Verfahren zum Entscheiden über eine mögliche Lastausgleichsoperation in einem drahtlosen Netzwerk und entsprechendes Netzwerkelement - Google Patents

Verfahren zum Entscheiden über eine mögliche Lastausgleichsoperation in einem drahtlosen Netzwerk und entsprechendes Netzwerkelement Download PDF

Info

Publication number
EP2451214B1
EP2451214B1 EP10290594A EP10290594A EP2451214B1 EP 2451214 B1 EP2451214 B1 EP 2451214B1 EP 10290594 A EP10290594 A EP 10290594A EP 10290594 A EP10290594 A EP 10290594A EP 2451214 B1 EP2451214 B1 EP 2451214B1
Authority
EP
European Patent Office
Prior art keywords
cell
base station
load balancing
pico
balancing operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP10290594A
Other languages
English (en)
French (fr)
Other versions
EP2451214A1 (de
Inventor
Christian Georg Dr. Gerlach
Oliver Stanze
Bozo Cesar
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alcatel Lucent SAS
Original Assignee
Alcatel Lucent SAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to EP10290594A priority Critical patent/EP2451214B1/de
Application filed by Alcatel Lucent SAS filed Critical Alcatel Lucent SAS
Priority to CN2011800485986A priority patent/CN103155648A/zh
Priority to JP2013537056A priority patent/JP5592568B2/ja
Priority to US13/880,617 priority patent/US20130217407A1/en
Priority to BR112013011169A priority patent/BR112013011169A2/pt
Priority to KR1020137010302A priority patent/KR101494242B1/ko
Priority to PCT/EP2011/067988 priority patent/WO2012059310A1/en
Priority to TW100137881A priority patent/TWI448174B/zh
Publication of EP2451214A1 publication Critical patent/EP2451214A1/de
Application granted granted Critical
Publication of EP2451214B1 publication Critical patent/EP2451214B1/de
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/08Load balancing or load distribution
    • H04W28/086Load balancing or load distribution among access entities
    • H04W28/0861Load balancing or load distribution among access entities between base stations
    • H04W28/0864Load balancing or load distribution among access entities between base stations of different hierarchy levels, e.g. Master Evolved Node B [MeNB] or Secondary Evolved node B [SeNB]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/08Load balancing or load distribution
    • H04W28/086Load balancing or load distribution among access entities
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/16Performing reselection for specific purposes
    • H04W36/165Performing reselection for specific purposes for reducing network power consumption
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/04Reselecting a cell layer in multi-layered cells
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/16Performing reselection for specific purposes
    • H04W36/20Performing reselection for specific purposes for optimising the interference level
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/16Performing reselection for specific purposes
    • H04W36/22Performing reselection for specific purposes for handling the traffic
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W84/00Network topologies
    • H04W84/02Hierarchically pre-organised networks, e.g. paging networks, cellular networks, WLAN [Wireless Local Area Network] or WLL [Wireless Local Loop]
    • H04W84/04Large scale networks; Deep hierarchical networks
    • H04W84/042Public Land Mobile systems, e.g. cellular systems
    • H04W84/045Public Land Mobile systems, e.g. cellular systems using private Base Stations, e.g. femto Base Stations, home Node B

Definitions

  • the present invention refers to a method for deciding on a potential load balancing operation in a wireless network comprising a first base station having a first cell and at least one second base station having a second cell, the first cell and the second cell at least partially overlapping each other. Furthermore, the present invention refers to a network element of a wireless network, such as a macro base station or a pico base station, being arranged for executing such a method.
  • Hierarchical cellular networks are known in the art.
  • Hierarchical networks typically have comparatively large macro cells.
  • So-called pico cells which are smaller than the macro cells are embedded at least partially within a macro cell.
  • a mobile terminal that is registered with a macro cell and located within a coverage area of a pico cell embedded within the macro cell may perform a handover from the macro cell to the pico cell, switching data traffic originally transferred between the macro base station and the terminal to the pico base station.
  • the pico cell improves the overall performance of the cellular network because the macro base station may hand over at least some terminals located within the pico cell to the pico base station so that these terminals perceive a better quality of service and the macro base station has more radio resources available to serve the terminals that remain registered with a macro base station.
  • the size of the pico cell depends on the transmit power used by the macro base station and the one used by the pico base station for transmitting on these radio resources or a portion thereof. For instance, if the transmit power of the pico base station can not be increased or if the macro transmit power is comparatively high then interference between the macro base station and the pico base station results in a comparatively low size of the pico cell. A low transmit power results in a comparatively large pico cell because the interference is comparatively low.
  • the published patent application US 2010/0238884 A1 discloses a method for wireless communication. According to this method, overall metrics for a plurality of possible actions related to association and resource partitioning are obtained and the action with the best overall metric is selected.
  • 3GPP R3-102 817 “On TDM eICIC coordination for Macro+Pico Coses ", discloses a basic principle of TDM eICIC for macro + pico communication scenarios.
  • the object of the present invention is to provide a method for deciding on a potential load balancing operation that allows for coordinating the operation of the macro base station and at least one pico base station such that an overall performance of the macro cell and the pico cell embedded in that macro cell is improved.
  • This object is solved by a method according to claim 1 and a network element according to claim 13.
  • a method for deciding on whether to perform a load balancing operation in a wireless network comprising a first base station having a first cell and at least one second base station having a second cell, the first cell and the second cell at least partially overlapping each other.
  • This method comprises evaluating an impact of a potential load balancing operation to an overall performance metric, said metric characterizing the performance of the first cell and the at least one second cell, and performing the load balancing operation if said evaluating indicates that the potential load balancing operation would improve the performance according to the performance metric.
  • the performance metric may characterize or depend on an overall throughput of the first cell and the second cell and/or a fairness of resource assignment to terminals registered with the first base station or the second base station. However, in certain embodiments, the performance metric may depend on different characteristics of the wireless network.
  • the method prognosticates whether the load balancing operation most probably would improve the performance according to the performance metric or not. Thus, inappropriate load balancing operations can be avoided and the overall performance in terms of throughput, fairness or the like is improved.
  • the network is a hierarchical cellular network, the first cell being a macro cell and the second cell being a pico cell, a coverage area of the pico cell being smaller than a coverage area of the macro cell, and wherein the first base station is a macro base station controlling the macro cell and the second base station is a pico base station controlling the pico cell.
  • the macro cell and the pico cell overlap each other at least partially, i.e., the pico cell may be located completely within the macro cell or the pico cell may be located at a cell border of the macro cell so that only a part of the pico cell is located within the macro cell.
  • said evaluating comprises calculating a current value of the performance metric related to a current operating station of the first cell and the at least one second cell and calculating a predicted value of the performance metric related to an operating state of the first cell and the at least one second cell that would appear if the load balancing operation would be performed.
  • the current value and the predicted value may be compared with each other. The method may decide depending on this comparison on whether to perform the load balancing operation.
  • the values of performance metric are determined based on a radio resource management model and the metric is preferably a minimum terminal bitrate.
  • the overall performance metric characterizes the performance of the first cell including the at least one second cell that at least partially overlaps that first cell and therefore relates to multiple cells and the corresponding base stations.
  • the method comprises determining at least one cell specific value of a cell specific performance metric, said cell specific value characterizing the performance of the first cell or the second cell and determining the current value and/or the predicted value depending on the at least one cell specific value.
  • Deciding on the load balancing operation is related to the first base station and the at least one second base station. Therefore, it is desirable to coordinate decisions on whether to perform the load balancing operation among the first base station and the concerned second base stations.
  • this coordinating is carried out by exchanging with network elements, preferably with the first base station and/or the second base station, the cell specific values, the values of the overall performance metric, and/or an indication for indicating whether said evaluating indicates that the potential load balancing operation would improve the performance according to the performance metric.
  • performing the load balancing operation comprises triggering a handover of a terminal from the first cell to the second cell or from the second cell to the first cell.
  • a potential handover is evaluated using the performance metric. If this evaluation shows that a handover would improve the combined performance of the first cell and the at least one second cell then the handover is performed. Otherwise, the handover is postponed or completely cancelled.
  • the method comprises transmitting to a handover target base station at least one parameter characterizing radio conditions related to the terminal, preferably a pathloss between the terminal and at least one base station.
  • performing the load balancing operation comprises limiting a transmit power of a signal transmitted by the first base station over a portion of radio resources of the first cell and the second cell. Limiting the transmit power typically augments the size of the second cell so that more terminals residing within the first cell may register with the second cell. However, increasing the size of the second cell does not always improve the overall performance. For example, if there is already a large number of terminals registered with the second cell and if there is a comparatively high load in the second cell then increasing the size of the second cell making even more terminals register with that second cell will not improve the overall performance because a large number of terminals share the second cell whereas the first cell is used only little.
  • the portion of the radio resources corresponds to a time interval, preferably a frame or a subframe of a framing structure of the wireless network, or a portion of the frame or the subframe.
  • the first base station may limit the transmit power, preferably completely suppress signal transmissions, within at least one portion of the frame or the subframe.
  • the first base station transmits only in that part of the frame or the subframe that is used for transmission of reference symbols (e.g. pilots) for mobility measurements, whereas the remaining parts of the frame or the subframe are not used by the first base station at all. This way the suppression by the first base station also eliminates interference on the portion of the subframe that is used for the control channel.
  • the first base station may suppress transmission in all portions of a subframe except these portions of the subframe that are used for transmitting reference symbols (pilots). These subframes are also referred to almost blank subframes (ABS).
  • ABS almost blank subframes
  • the method comprises reverting said limiting the transmit power. For example, if a large size of the second cell is not required anymore then the first base station may stop limiting the transmit power and use the corresponding portion of the radio resources for communicating with a terminal registered with the first base station.
  • the method comprises evaluating an impact of reverting limiting the transmit power to the overall performance metric and reverting said limiting if said evaluating indicates that said reverting would improve the performance according to the performance metric.
  • the method may comprise calculating the current value of the performance metric relating to the current operating state, calculating the predicted value of the performance metric relating to an operating state that most probably will appear if limiting the transmit power is reverted. For deciding on reverting limiting the transmit power the current value of the performance metric may be compared with the predicted value of the performance metric.
  • the method may comprise determining at least one cell specific value of a cell specific performance metric, said cell specific value characterizing the performance of the first cell or the second cell, and wherein the predicted value of one cell is derived in approximation from a load information submitted in relation to predefined thresholds.
  • the method comprises transmitting a handover request message from the first base station to the second base station and signalling to the second base station a portion of the radio resources on which the first base station is willing to limit the transmit power if the second base station accepts a handover specified by the handover request.
  • the method comprises transmitting a limiting request from the second base station to the first base station for requesting the first base station to limit the transmit power of the signal transmitted over a portion of radio resources.
  • the method comprises transmitting a handover request from the first base station to the second base station and receiving a handover rejection from the second base station, the handover rejection indicating whether the second base station cannot accept the requested handover due to insufficient control channel radio condition to the terminal.
  • the method comprises transmitting a handover request from the first base station to the second base station and limiting the transmit power of the signal transmitted by the first base station over a portion of the radio resources if a handover rejection related to said handover request is received from the second base station.
  • the method comprises that a handover rejection indicates that the second base station cannot accept the requested handover due to insufficient control channel condition to the terminal.
  • the first base station may transmit a further handover request to the second base station.
  • limiting the transmit power should have removed the insufficient control channel condition to the terminal and the second base station should be able to accept the requested handover.
  • the method comprises transmitting a limiting request from the second base station to the first base station for requesting the first base station to limit the transmit power of the signal transmitted over a portion of the radio resources.
  • the limiting request may be a muting request for requesting the first base station to insert almost blank subframes (ABS) into the framing structure of LTE.
  • said evaluating is performed on a single network element, preferably on a base station.
  • the performance metric may be calculated by the first base station only, with the second base station transmitting values specific to the second cell to the first base station.
  • the second base station may calculate only the current value of the metric specific to the second cell and transmit this value to the first base station.
  • a network element of a wireless network comprising a first base station having a first cell and at least one second base station having a second cell, the first cell and the second cell at least partially overlapping each other, wherein the network element comprises control means arranged for evaluating an impact of a potential load balancing operation to an overall performance metric, said metric characterizing the performance of the first cell and the at least one second cell, and performing the load balancing operation if said evaluating indicates that the potential load balancing operation would improve the performance according to the performance metric.
  • the control means may comprise, e.g., a processor or micro computer programmed for executing a method according the present invention, embodiments of which are described above.
  • the network element is the first base station or the at least one second base station, the control means of which being arranged for executing a method a method according to the present invention, embodiments of which are described above.
  • Figure 1 shows a cellular network 11 having multiple macro cells 13.
  • Each macro cell 13 has a macro base station 15 arranged for controlling the macro cell 13, in particular terminals 17 located within that macro cell 13 and registered with the macro base station 15 of that macro cell 13.
  • a single macro base station 15 is assigned to three macro cells 13.
  • only one macro cell 13 is assigned to a macro base station 15.
  • the cellular network 11 has multiple pico cells 19, each of them having a pico base station 21.
  • each pico base station 21 controls exactly one pico cell 19 and terminals 17 registered with the corresponding pico base station 21.
  • a maximum transmission power of a radio signal transmitted by a pico base station 21 is less than a maximum transmission power of a radio signal sent by the macro base station 15. Consequently, the size of a pico cell 19, i.e., the coverage area of a pico cell, is less than the size of a macro cell 13.
  • the pico cells 19 are overlapping with at least one macro cell 13.
  • a pico base station 21 is preferably located within an area where a density of terminals 17 is comparatively high.
  • At least a part of the terminals 17 located within a pico cell 19 may leave the macro cell 13 and register with the pico base station 21 of the pico cell 19. In this way, installing pico base stations 21 in areas with a high density of terminals 17 helps to improve a quality of service and/or a channel capacity experienced by users of the terminal 17 located in that area having a high terminal density.
  • the cellular network 11 may be part of a Long Term Evolution (LTE) or Long Term Evolution advanced (LTE advanced) mobile communication system. Both LTE and LTE advanced are specified by the Third Generation Partnership project (3GPP). However, the present invention is not limited to LTE or LTE advanced.
  • LTE Long Term Evolution
  • LTE advanced are specified by the Third Generation Partnership project (3GPP).
  • 3GPP Third Generation Partnership project
  • the present invention is not limited to LTE or LTE advanced.
  • the base stations 13, 15 are referred to as enhanced nodeB (eNodeB).
  • eNodeB enhanced nodeB
  • the terminals 17 are often referred to as User Equipment (UE).
  • the invention may be applied in connection with different types of cellular networks or mobile communication systems, too.
  • FIG. 2 shows network elements of the network 11, such as the macro base station 15 and the pico base station 21 in more detail.
  • Each base station 15, 21 has a transceiver 23 coupled with an antenna 25 for transmitting a radio signal to terminals 17 and for receiving a radio signal sent by the terminals 17.
  • the base stations 15, 21 have interconnection network interface circuitry 27 connected to interconnection means for interconnecting the base stations 15, 21 to each other, such as an interconnection network 29.
  • interconnection network 29 When using LTE, the base stations 15, 21 may communicate with each other according to the so-called X2 interface.
  • the base stations 15, 21 comprise control means 31 such as control circuitry preferably comprising a processor programmed for executing a method for operating the base station 15, 21.
  • control means 31 may be configured, preferably programmed, for executing a method for deciding on a potential load balancing operation in the wireless network 11. An exemplary method for deciding on the potential load balancing operation is described below.
  • the network 11 When operating the network 11 having at least one pico cell 19 located at least partially inside a coverage of the macro cell 13 the overall throughputs of all cells 13, 19 and or the quality of service seen by the terminals 17 shall be maximized.
  • the network 11 may perform a load balancing operation in order to move load from the macro cell 13 to a pico cell 19 and vice versa.
  • time domain inter-cell interference coordination may be used in order to coordinate interference on the control channel.
  • frequency-domain ICIC may be used in order to coordinate interference on the control channel.
  • a coverage area A 1 of a pico cell 19 is smaller than the coverage area of a macro cell 13.
  • a possible load balancing operation may consist in decreasing a maximum transmit power used by the macro base station 15 for transmitting a portion of radio transmission resources 32 in order to increase the coverage area of the pico cell 19.
  • Decreasing of the transmit power used by the macro base station 15 in that portion of the radio resources 32 reduces interference between the macro base station 15 and the terminals 17 of the pico base station 21 so that the pico base station 21 may reach terminals 17 that are located rather distant from the pico base station 21.
  • reducing or limiting the maximum transmit power on the portion of the radio resources 32 by the macro base station leads to an increased coverage area A 2 (see figure 1 ) of the pico cell 19.
  • the increase of the coverage area of the pico cell 19 due to reducing the interference by the macro base station is also referred to as "foot print increase".
  • the transmit power of the pico base station 21 is limited by the small form factor of the pico base station 21 or by regulatory restrictions.
  • Figure 3 shows a transmit power P of signals emitted by the macro base station 15 of a macro cell M 1 and a pico base station 21 of a pico cell P 1 over a common time axis.
  • the radio transmission resources 32 comprise a carrier 33 that is used in both cells M 1 and P 1 .
  • the network 11 maintains a framing structure 35.
  • the framing structure 35 comprises subsequent radio frames 37.
  • Each radio frame 37 is subdivided into multiple subframes S 1 , ... S R , with R indicating the total number of subframes within a single radio frame 37.
  • the base stations 15, 21 of cells M 1 and P 1 are synchronized with respect to each other concerning the framing structure 35, in particular the timing of the radio frames 37 and the subframes S 1 , ... S R .
  • a subframe S 3 with a limited transmission power is inserted into the sequence of subframes S 1 , ... S R of the macro base station 15.
  • the macro base station 15 transmits during this subframe S 3 only essential reference symbols. Therefore, only the parts of the subframe S 3 allocated for the corresponding reference symbols are used by the macro base station 15, whereas the macro base station 15 does not transmit at all during the remaining parts of that subframe S 3 . Therefore, the subframe S 3 is also referred to as Almost Blank Subframe (ABS).
  • ABS Almost Blank Subframe
  • the transmit power P of the signal emitted by the macro base station 15 of cell M 1 is limited to a reduced power level P red for subframe S 3 .
  • the macro base station 15 of cell M 1 does not transmit at all during the whole subframe S 3 .
  • the pico base station 21 of cell P 1 can reach terminals 17 that are relatively distant from that pico base station 21. In other words, the coverage area of the pico cell P 1 increases.
  • Terminal 17 located in the increased coverage area A 2 can receive control channel signals emitted by the pico base station 21 (e.g. the Physical Downlink Control Channel, PDCCH of LTE) without experience interference from the macro base station 15 of cell P 1 in subframe S 3 .
  • a data channel e.g. the Physical Downlink Shared Channel, PDSCH of LTE
  • the subframe S 3 during which a transmit power of the macro base station 15 is reduced is signalled to the terminal 17 in order to avoid problems of channel estimation, channel state measurements and radio/or link failure detection that may occur when inserting ABS into the radio frame 37.
  • terminals 17 that reside within the increased coverage area A 2 but not within the regularly coverage area A 1 are preferably scheduled in the subframes that are power restricted by the macro base station 15 because they can then receive the control channel (PDCCH) from the pico base station 21.
  • PDCCH control channel
  • the pico base station 21 does not change the transmit power of the signals emitted into the pico cell P 1 .
  • the transmit power is always P pico for all subframes S 1 , ... S R .
  • only one subframe S 3 with reduced transmit power is inserted into the radio frame 37.
  • multiple subframes with limited transmit power e.g. ABS, may be inserted into a single radio frame 37.
  • a second type of load balancing operation consists in triggering a handover of a communication session of a terminal 17 from one base station 15, 21 to another base station 21, 15. Handovers between the macro base station 15 and the pico base station 21 immediately transfers network load caused by this terminal 17 between the base stations 15, 21.
  • Figure 4 shows a method for semi-statically deciding on whether to perform a load balancing operation, e.g. inserting a subframe with limited transmit power or triggering a handover between the macro cell 13 and the pico cell 19, depending on a current operating state of the network 11, in particular of the macro cell 13 and all pico cells 19 that are located at least partially within that macro cell 13.
  • a load balancing operation e.g. inserting a subframe with limited transmit power or triggering a handover between the macro cell 13 and the pico cell 19, depending on a current operating state of the network 11, in particular of the macro cell 13 and all pico cells 19 that are located at least partially within that macro cell 13.
  • Block 45 comprises a step 47 of calculating a current value M cur of the performance metric M related to the current operating state of the macro cell 13 and the pico cells 19. Furthermore, the block 45 comprises a step 49 of calculating a predicted value M pre of the performance metric M related to an hypothetical operating state that will appear if the load balancing operation is performed. After steps 47 and 49 a step 51 is executed that compares the current value M cur and the predicted value M pre of the performance metric M and determines whether the load balancing operation would improve the performance characterized by the performance metric M. Step 51 takes a decision d on whether the load balancing operation should be performed.
  • the method 41 may be executed in a distributed manner.
  • multiple network elements of the network 11, such as the macro base station 15 and the pico base station 21 may execute at least some of the steps shown in figure 4 .
  • the method 41 may comprise a step 53 that exchanges the values M cur , M pre of the performance metric M and/or the decision d taken based on these values M cur , M pre with other network elements 15, 21.
  • a branch 55 is executed for definitely decide on whether to perform the load balancing operation. Step 55 may decide depending on the decision d and/or a result of the information exchange 53.
  • step 55 decides that the load balancing operation shall be performed (Y) then the step 57 of the method 41 is executed that triggers or performs the load balancing operation. Otherwise (N) step 57 is skipped and the method 41 is terminated. After step 55 has been executed the method 41 is terminated.
  • branch 55 decides to perform the load balancing operation if the decision d indicates that the load balancing operation shall be performed and step 53 shows that the other network elements 15, 21 have taken the same decision d.
  • the network elements 15, 21 carry out the same method on the same input parameters independently and come to the same decision.
  • the network elements 15, 21 may negotiate whether the load balancing operation shall be performed in a different way.
  • step 53 is omitted and branch 55 decides depending on the decision d only.
  • the method 41 may be executed repeatedly or periodically. In an example, the method 41 is executed each time a potential load balancing operation has been determined and a decision on whether to perform this load balancing operation is required.
  • the metric M comprises the result of a radio resource management model (RRM model).
  • RRM model radio resource management model
  • These performance metrics include at least one of: cell throughput, a minimum throughput of the terminals 17 (e.g. a certain percentile related to the throughput, for instance the fifth percentile), a minimum terminal bit rate in a cell 13, 19, an average or maximum packet delay, or a fairness metric characterizing an overall fairness of radio resource allocation to the individual terminals 17.
  • the RRM model may use one or more of the following input parameters: number of terminals 17 registered with a cell 13, 19, traffic characteristics (e.g. required bit rates) of the terminals 17, interference experience by the terminals 17, channels of the serving cell 13, 19, path losses between a base station 15, 21 and a terminal 17.
  • traffic characteristics e.g. required bit rates
  • the RRM model may use a part of the above parameters only. For example, a quite simple RRM model may be provided that models an average terminal throughput.
  • the load balancing operation 57 may comprise a handover 61 between the macro cell 13 and a pico cell 19.
  • the performance metric is evaluated before a handover has taken place (symbol "noHO") and evaluated assuming a handover would take place (symbol "HO").
  • PerfP ⁇ 1 noHO RRMpico noHO
  • PerfM ⁇ 1 noHO RRMmacro noHO ⁇ M cur
  • the situation before the handover is a combined resulting in an the performance indicator M cur and the operating state predicted after the handover is combined resulting in a predicted indicator M pre .
  • the handover decision is taken when an overall improvement of the combined performance is achieved, i.e. the handover is performed if M pre > M cur .
  • the values M cur and M pre of the overall performance metric M may be calculated depending on values PerfP1 (), PerfM1 () of cell specific performance metrics. These values may be calculated by using a cell specific radio resource model RRMpico (), RRMmacro ().
  • the base stations 15, 21 exchange the cell specific values PerfP1 (), PerfM1 () and/or the overall values M cur , M pre .
  • Step 53 may comprise exchanging the values PerfP1 (), PerfM1 () of the cell specific performance metrics as current and predicted values and/or exchanging values M cur and M pre of the overall performance metric M between the base stations 15, 21.
  • the macro base station 15 calculates the values PerfM1 () of the cell specific performance metric related to the macro cell M1 and/or the pico base station 21 calculates the values PerfM1 () of the cell specific performance metric related to the pico cell P1. In this case, the macro base station 15 does not need to calculate the values PerfP1 and the pico base station 21 does not need to calculate the values PerfM1.
  • the above described predicted evaluation of the operating state after the handover may facilitated by sending information about the designated terminal 17 (e.g. its path loss to the serving cell and or interference cell) to a target base station 15, 21.
  • the designated terminal 17 e.g. its path loss to the serving cell and or interference cell
  • the load balancing operation may also comprise limiting (step 63) the transmit power of a signal send by the macro base station 15 on a portion of the radio transmission resources 32.
  • This portion of the transmission resources 32 may correspond to a time interval such as a subframe S 1 , ... S R .
  • at least one ABS may be inserted into the framing structure 35 as described above.
  • the macro base station 15 offers with a handover request message sent to a pico base station 21 to add one or more ABS.
  • the pico base station 21 takes into account this offered ABS in evaluating the performance metrics. Due to an improved performance, in particular control channel performance, in the pico cell 19 due to the offered ABS it is more likely that the handover will be performed.
  • the macro base station 21 does not offer with the handover request message to insert an ABS into the framing structure 45. This could lead to the performance - as indicated by the estimated value of the performance metric - decreasing after the potential handover has been performed such that the handover will not take place.
  • the pico base station 21 may send a handover rejection message to the macro base station 15, this message including an indication that the handover rejection is due to insufficient control channel condition to the location of the terminal 17. After having received this handover rejection message the macro base station 21 may change the ABS configuration, in particular the macro base station 15 may add an ABS in the framing structure 45 and send a new handover request message to the pico base station 21.
  • a handover from the macro base station 15 to the pico base station 21 is combined with limiting the transmit power of the signal send by the macro base station 15 on a portion of the radio transmission resources 42.
  • the pico base station 21 may send a qualified muting request 65 to the macro base station 15 as shown in figure 5 .
  • the pico base station 21 requests adding an ABS in the framing structure 35 of the macro cell 13.
  • the muting request 65 may comprise the current value PerrP 1( curABS ) being part of the performance metric M cur or the current value M cur of the overall metric M and the predicted value PerfP 1( newABS ) being part of the performance metric M pre or this metric M pre itself.
  • the predicted value PerfP 1( curABS ) characterizes an estimated performance the pico base station 21 would have if the ABS is inserted.
  • the macro base station 15 receives the muting request 65 or maybe multiple muting requests and evaluates its own performance without the additional ABS and the predicted performance when the ABS is added. By combining the multiple performance metrics into two overall performance metrics M cur and M pre and comparing them the decision to add an ABS is taken. To take this decision, the method 41 may be executed. When the overall performance of multiple cells (one or more pico cells 19 and one macro cell 13) is estimated to be improved then the additional ABS is set, otherwise it is not.
  • the operating state curABS before the additional ABS is inserted into the framing structure 35 is evaluated by the current value M cur .
  • the operating state newABS predicted after a potential insertion of an additional ABS is evaluated by the predicted value M pre .
  • the final decision on whether to insert the ABS is taken if an overall improvement of a overall performance is expected to be achieved.
  • values PerfP1 (), PerfM1 () of cell specific performance metrics determined based on cell specific radio resource models may be calculated.
  • the values M cur , M pre of the overall performance metric M may be determined depending on the cell specific values PerfP1 (), PerfM1 ().
  • the values PerfP1, PerfM1, M cur and/or M pre may be exchanged between the base stations 15, 21 as described above in connection with evaluating a possible handover.
  • the load balancing operation of inserting an ABS may be automatically reverted.
  • the macro base station 15 and/or the pico base station 21 may recalculate the overall performance metric in order to evaluate whether removing the ABS would increase the performance of the network 11.
  • the base stations 15, 21 may exchange the values PerfP1, PerfM1, M cur and/or M pre as described above in connection with evaluating a possible reverting of the ABS setting.
  • the decision process of removing the ABS may be initiated by the macro base station 15 by requesting load information from at least one pico base station 21.
  • the macro base station 21 indicates to the pico base station 21 which ABS is intended to be declared to a normal (non-ABS) subframe.
  • the macro base station 15 may request the cell specific performance metric or overall performance metric related to the current operating state and a predicted performance metric under the assumption that one ABS is removed from the framing structure 35.
  • the macro base station 15 calculates the current and the predicted performance metrics related to the macro cell 13 and determines an overall performance, i.e., the values M cur and Mpre.
  • the values M cur and M pre may be determined as descried above, e.g., depending on cell specific values PerfM1, PerfP1. If comparing the values M cur and M pre shows that removing an ABS would improve the overall performance then the ABS is reverted to a normal subframe, otherwise not.
  • the macro base station 21 may have determined a fixed set of subframes during which the macro base station 21 uses a limited transmit power, e.g. by treating these subframes as ABS.
  • a handover of a terminal 17 registered with the macro base station 15 in a cell border region (region A 2 except region A 1 ) is always possible since the terminal 17 can be reached by the pico base station 21 through a control channel in one of the subframes during which the transmit power of the macro base station 15 is limited (e.g. during the ABS).
  • the pico base station 21 may request at least one further ABS from the macro base station 21 by sending a qualified muting request (see figure 5 ).
  • no fixed set of subframes during which the transmit power of the macro base station 15 is limited such as ABS
  • ABS no fixed set of subframes during which the transmit power of the macro base station 15 is limited
  • a handover request for a terminal 17 registered with the macro base station 15 and located in the cell border region of a pico cell 19 will fail because the pico base station 21 cannot communicate to this terminal 17 located too far away from the pico base station 21.
  • the handover rejection message send by the pico base station 21 back to the macro base 15 station may comprise the indication that the handover is rejected because of an insufficient control channel condition to the terminal due to a missing resource restriction by ABS in the macro cell 19.
  • the macro base station 15 may add at least one ABS into its framing structure 35 and request the handover again.
  • the minimum terminal bit rate of a cell may be used. For example, if the minimum of the two minimum bit rates of the pico cell 19 and the macro cell 13 is estimated to be increased if the handover is performed then the handover takes place, otherwise is does not take place.
  • the evaluation 45 is performed by a single network element, e.g., the macro base station 15 or one of the pico base stations 21.
  • At least one base station 15, 21 may signal a parameter characterizing a load value, preferably load in the extended coverage region (A 2 except region A 1 ), depending on a load of the cell 13, 19 controlled by this base station 15, 21 to said single network element.
  • This parameter can be used to derive the current and predicted performance value preferably of the pico cell 19 assuming a potentially changed ABS setting by the macro base station 15.
  • This parameter may be conveyed in a muting request. This allows that the receiving side can use its current and predicted performance metrics to put into the evaluation and take the decision based on this information.
  • the load value may also correspond to a number n p of terminals 17 in the extended coverage region (A 2 except region A 1 ) or the number of terminals n p , n m registered with the cell 13, 19.
  • the parameter characterizing the load is quantized in relation to predefined load thresholds and can have one of a few discrete values only, such that the parameter can be represented by a set of 1 bit, 2 bits, 3 bits, 4 bits, or even more bits. This bitset can easily be integrated into the muting request.
  • the radio resource management model estimates the performance of the network 11, a group of cells (e.g. a macro cell 13 and the pico cells 19 located at least partially within that macro cell 13), or a single cell 13, 19 by evaluating parameters that can be easily obtained, e.g., by measurement procedures or acquisition of an operating state of a network element such as the base stations 15, 21 or the terminal 17.
  • a first RRM model allows for calculating a performance metric for a handover decision where some subframes in the macro cell have a limited transmit power (e.g. ABS).
  • ABS transmit power
  • performance metrics for handover decision for a Pico cell can be expressed by the following equation (with round robin assumption).
  • the Pico cell throughput (under the assumption that an incoming or outgoing terminal is served in the subframes with limited transmit power) can be approximated as follows.
  • RRM_Pico (xHO) gives the throughput of the Pico cell. It is assumed that the available resources in the subframes with limited transmit power are equally distributed among the PMUEs which have to be served in the subframes with limited transmit power because they are located in the overlapping region (region A 2 except region A 1 ) and the available resources in the normal subframes are equally distributed among the PNUEs which can be served in the normal subframes because they are located in the center region of a Pico cell (region A 1 in Figure 1 ).
  • Evaluation of performance metrics for handover decision for a macro cell can be expressed by the following equation.
  • RRM_Macro (xHO) gives the throughput of the macro cell averaged over a radio frame. It is assumed that the available resources in the normal subframes are equally distributed among the MUEs because they can only be served in the normal subframes.
  • performance metrics for additional ABS setting decision for a pico cell can be expressed by the following equation (with round robin assumption).
  • RRM_Pico(xABS) gives the throughput of the Pico cell. It has to be noted that the number NPMUE and NPNUE of UEs classified in muted or normal subframes can also depend on the muted subframe setting m.
  • RRM_Macro(xABS) gives the throughput of the macro cell averaged over a radio frame.
  • the examples of the present invention allow for improving the overall performance of a wireless network, in particular a set of radio cells comprising a macro cell 13 and at least one pico cell 19 overlapping at least partially with that macro cell 13.
  • examples of the present invention perform decisions on restricting resource usage by the macro base station 15, in particular limiting a transmit power of a portion of a radio transmission resources 32 including inserting ABS in the framing structure 35 of the macro cell 13.
  • decisions on reverting these restrictions. may be performed.
  • handover decisions concerning handovers of terminals 17 from the macro base station 15 to a pico base station 21 may be taken either if the control channel of the macro base station 15 cannot longer reach the terminal 17 or in order to off load traffic to the pico base station 21.
  • decision related to handovers of terminal 17 from the pico base station 21 to the macro base station 13 may be performed. These decisions may be taken if the terminal 17 can no longer be reached by the control channel transmitted by the pico base station 21.
  • a handover from a pico base station 21 to the macro base station 15 may also be determined to be necessary if the traffic in the pico cell 13 has increased and the traffic should be off loaded to the macro cell 13.
  • any functional blocks labeled as 'processors' or 'control means 31' may be provided through the use of dedicated hardware as well as hardware capable of executing software in association with appropriate software.
  • the functions may be provided by a single dedicated processor, by a single shared processor, or by a plurality of individual processors, some of which may be shared.
  • DSP digital signal processor
  • ASIC application specific integrated circuit
  • FPGA field programmable gate array
  • ROM read only memory
  • RAM random access memory
  • switches shown in the figures are conceptual only. Their function may be carried out through the operation of program logic, through dedicated logic, through the interaction of program control and dedicated logic, or even manually, the particular technique being selectable by the implementer as more specifically understood from the context.
  • any block diagrams herein represent conceptual views of illustrative circuitry embodying the principles of the invention.
  • any flow charts, flow diagrams, state transition diagrams, pseudo code, and the like represent various processes which may be substantially represented in computer readable medium and so executed by a computer or processor, whether or not such computer or processor is explicitly shown.
  • steps of various above-described methods can be performed by programmed computers.
  • program storage devices e.g., digital data storage media, which are machine or computer readable and encode machine-executable or computer-executable programs of instructions, wherein said instructions perform some or all of the steps of said above-described methods.
  • the program storage devices may be, e.g., digital memories, magnetic storage media such as a magnetic disks and magnetic tapes, hard drives, or optically readable digital data storage media.
  • the examples are also intended to cover computers programmed to perform said steps of the above-described methods.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Claims (14)

  1. Verfahren (41) zum Entscheiden über eine mögliche Lastausgleichsoperation (57) In einem drahtlosen Netzwerk (11), welches eine erste Basisstation (15) mit einer ersten Zelle (13) und mindestens eine zweite Basisstation (21) mit einer zweiten Zelle (19) umfasst, wobei sich die erste Zelle (13) und die zweite Zelle (19) zumindest teilweise überlappen, wobei das Verfahren (41) das Bewerten (45) einer Auswirkung der möglichen Lastausgleichsoperation (57) auf eine Gesamtleistungsmetrik (M), wobei die besagte Metrik (M) die Leistung der ersten Zelle (13) und der mindestens einen zweiten Zelle (19) kennzeichnet, sowie das Ausführen der Lastausgleichsoperation (57), wenn die besagte Bewertung ergibt, dass die mögliche Lastausgleichsoperation (57) die Leistung gemäß der Leistungsmetrik (M) verbessern würde, umfasst, dadurch gekennzeichnet, dass das Ausführen der Lastausgleichsoperation das Auslösen eines Handovers (61) eines Endgeräts (17) von der ersten Zelle (13) an die zweite Zelle (19) oder von der zweiten Zelle (19) an die erste Zelle (13) umfasst, und dass die Lastausgleichsoperation (57) die Übertragung einer Handover-Anforderung von der ersten Basisstation (15) an die zweite Basisstation (21) und den Empfang einer Handover-Verweigerung von der zweiten Basisstation (21) umfasst, wobei die Handover-Verweigerung dem Endgerät (17) anzeigt, ob die zweite Basisstation den angeforderten Handover aufgrund einer unzureichenden Funkbedingung des Steuerkanals nicht akzeptieren kann.
  2. Verfahren nach Anspruch 1, wobei das Netzwerk ein zellulares Netzwerk (11) ist, wobei die erste Zelle eine Makrozelle (13) und die zweite Zelle eine Picozelle (19) Ist, wobei ein Abdeckungsbereich der Picozelle (19) kleiner ist als ein Abdeckungsbereich der Makrozelle (13), und wobei die erste Basisstation eine Makro-Basisstation (15) ist, welche die Makrozelle (13) steuert, und die zweite Basisstation eine Pico-Basisstation (21) ist, welche die Picozelle (19) steuert.
  3. Verfahren (41) nach Anspruch 1 oder 2, wobei das besagte Bewerten (45) das Berechnen (47) eines aktuellen Wertes (Mcur) der Leistungsmetrik (M) in Bezug auf einen aktuellen Betriebszustand der ersten Zelle (13) und der mindestens einen zweiten Zelle (19) und das Berechnen eines Prognosewertes (Mpre) der Leistungsmetrik (M) in Bezug auf einen Betriebszustand der ersten Zelle (13) und der mindestens einen zweiten Zelle (19), der eintreten würde, wenn die Lastausglelchsoperation (57) erfolgen würde, umfasst.
  4. Verfahren nach einem der vorstehenden Ansprüche, wobei die Werte (Mour, Mpre) der Leistungsmetrik (M) auf der Basis eines Funkressourcenvenrvaltungsmodells ermittelt werden, wobei die Leistungsmetrik vorzugsweise eine Mindestbitrate des Endgeräts umfasst.
  5. Verfahren (41) nach einem der vorstehenden Ansprüche, wobei das Verfahren (41) das Ermitteln mindestens eines zellspezifischen Wertes (PerfM1, PerfP1) einer zellspezifischen Leistungsmetrik, wobei der besagte zellspezifische Wert (PerfM1, PerfP1) die Leistung der ersten Zelle (13) oder der zweiten Zelle (19) kennzeichnet, sowie das Ermitteln des aktuellen Wertes (Mour) und/oder des Prognosewertes (Mpre) in Abhängigkeit von dem aktuellen Wert und von den Prognosewerten der mindestens einen zellspezifischen Leistungsmetrik (PerfM1, PerfP1) umfasst.
  6. Verfahren (41) nach einem der vorstehenden Ansprüche, wobei das Verfahren (41) das Austauschen (53) der zellspezifischen Werte (PerfM1, PerfP1) als aktuelle und Prognosewerte, und/oder der Werte (Moun" Mpre) der Gesamtleistungsmetrik, und/oder einer Angabe (d) darüber, ob die besagte Bewertung (45) ergibt, dass die mögliche Lastausgleichsoperation (57) die Leistung gemäß der Leistungsmetrik (M) verbessern würde, mit Netzwerkelementen (15, 21), vorzugsweise mit der ersten Basisstation (15) und/oder der zweiten Basisstation (21), umfasst.
  7. Verfahren (41) nach Anspruch 1, wobei das Verfahren (41) das Übertragen mindestens eines Parameters, welcher auf ein Endgerät (17) bezogene Funkbedingungen, vorzugsweise einen Pfadverlust zwischen dem Endgerät (17) und mindestens einer Basisstation (15, 21), kennzeichnet, an eine Handover-Zielbasisstation (15, 21) umfasst.
  8. Verfahren (41) nach einem der vorstehenden Ansprüche, wobei das Ausführen der Lastausgleichsoperation (57) das Begrenzen (63) einer Sendeleistung eines von der ersten Basisstation (15) über einen Teil von Funkressourcen (32) der ersten Zelle (13) und der zweiten Zelle (19) übertragenen Signals umfasst, wobei der besagte erste Teil einem Zeitintervall, vorzugsweise einem Rahmen oder einem Tellrahmen (S3) einer Rahmenstruktur (35) des drahtlosen Netzwerks, oder einem Teil des Rahmens oder des Teilrahmens (S3) entspricht.
  9. Verfahren (41) nach Anspruch 8, wobei das Verfahren das Zurücksetzen der besagten Begrenzung der Sendeleistung und das Bewerten einer Auswirkung des Zurücksetzens der Begrenzung (63) der Sendeleistung auf die Gesamtleistungsmetrik (M) und das Zurücksetzen der besagten Begrenzung (63), wenn die besagte Bewertung ergibt, dass das besagte Zurücksetzen die Leistung gemäß der Leistungsmetrik verbessern würde, umfasst.
  10. Verfahren (41) nach einem der Ansprüche 5 bis 9, wobei das Verfahren das Ermitteln mindestens eines zellspezifischen Wertes (PorfM1, ParfP1) einer zelispezifischen Leistungsmetrik umfasst, wobei der besagte zellspezifische Wert (PartM1, PerfP1) die Leistung der ersten Zelle (13) oder der zweiten Zelle (19) kennzeichnet, und wobei der Prognosewert einer Zelle annähernd von einer in Bezug auf vordefinierte Grenzwerte übermittelten Lastinformation abgeleitet wird.
  11. Verfahren (41) nach einem der Ansprüche 1 bis 10, wobei die Lastausgleichsoperation die Übertragung einer Handover-Anforderungsnachricht von der ersten Basisstation (15) an die zweite Basisstation (21) und die Signalisierung eines Teils (S3) der Funkressourcen (32), auf welchen die Basisstation (15) bereit ist, die Sendeleistung zu begrenzen, an die zweite Basisstation (21) umfasst.
  12. Verfahren nach Anspruch 1, wobei das Verfahren (41) das Übertragen einer Begrenzungsanforderung von der zweiten Basisstation (21) an die erste Basisstation (15) umfasst, um die erste Basisstation (15) aufzufordern, die Sendeleistung des über einen Teil (S3) der Funkressourcen (32) übertragenen Signals zu begrenzen (63).
  13. Netzwerkelement (15, 21) für ein drahtloses Netzwerk (11), wobei das besagte Netzwerk (11) eine erste Basisstation (15) mit einer ersten Zelle (13) und mindestens eine zweite Basisstation (21) mit einer zweiten Zelle (19) umfasst, wobei sich die erste Zelle (13) und die zweite Zelle (19) zumindest teilweise überlappen), wobei das Netzwerkelement (15, 21) Steuermittel zum Bewerten (45) einer Auswirkung einer möglichen Lastausgleichsoperation (57) auf eine Gesamtleistungsmetrik (M) und zum Ausführen der Lastausgleichsoperation (57), wenn die besagte Bewertung (45) ergibt, dass die mögliche Lastausgleichsoperation (57) die Leistung gemäß der Leistungsmetrlk (M) verbessern würde, umfasst, dadurch gekennzeichnet, dass das Ausführen der Lastausgleichsoperstion das Auslösen eines Handovers (61) eines Endgeräts (17) von der ersten Zelle (13) an die zweite Zelle (19) oder von der zweiten Zelle (19) an die erste Zelle (13) umfasst, und dass die Steuermittel (31) für die Übertragung einer Handover-Anforderung von der ersten Basisstation (15) an die zweite Basisstation (21) und für den Empfang einer Handover-Verweigerung von der zweiten Basisstation (21) umfasst, wobei die Handover-Verweigerung dem Endgerät (17) anzeigt, ob die zweite Basisstation den angeforderten Handover aufgrund einer unzureichenden Funkbedingung des Steuerkanals nicht akzeptieren kann.
  14. Netzwerkelement nach Anspruch 13, wobei das Netzwerkelement die erste Basisstation (15) oder die mindestens eine zweite Basisstation (21) ist, deren Steuermittel (31) für das Durchführen eines Verfahrens (41) gemäß einem der Ansprüche 2 bis 12 ausgelegt sind.
EP10290594A 2010-11-05 2010-11-05 Verfahren zum Entscheiden über eine mögliche Lastausgleichsoperation in einem drahtlosen Netzwerk und entsprechendes Netzwerkelement Not-in-force EP2451214B1 (de)

Priority Applications (8)

Application Number Priority Date Filing Date Title
EP10290594A EP2451214B1 (de) 2010-11-05 2010-11-05 Verfahren zum Entscheiden über eine mögliche Lastausgleichsoperation in einem drahtlosen Netzwerk und entsprechendes Netzwerkelement
JP2013537056A JP5592568B2 (ja) 2010-11-05 2011-10-14 無線ネットワーク内の潜在的な負荷平衡化動作を決定する方法および無線ネットワークのネットワーク要素
US13/880,617 US20130217407A1 (en) 2010-11-05 2011-10-14 Method for deciding on a potential load balancing operation in a wireless network and network element for a wireless network
BR112013011169A BR112013011169A2 (pt) 2010-11-05 2011-10-14 método para decidir sobre uma operação de balanciamento de carga potencial em uma rede sem fio e elemento de rede para uma rede sem fio.
CN2011800485986A CN103155648A (zh) 2010-11-05 2011-10-14 用于决定无线网络中的潜在的负载均衡操作的方法和用于无线网络的网络元件
KR1020137010302A KR101494242B1 (ko) 2010-11-05 2011-10-14 무선 네트워크 및 무선 네트워크를 위한 네트워크 요소에서 잠재적인 로드 밸런싱 동작을 결정하기 위한 방법
PCT/EP2011/067988 WO2012059310A1 (en) 2010-11-05 2011-10-14 Method for deciding on a potential load balancing operation in a wireless network and network element for a wireless network
TW100137881A TWI448174B (zh) 2010-11-05 2011-10-19 決定無線網路中潛在負載平衡操作之方法及無線網路的網路元件

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP10290594A EP2451214B1 (de) 2010-11-05 2010-11-05 Verfahren zum Entscheiden über eine mögliche Lastausgleichsoperation in einem drahtlosen Netzwerk und entsprechendes Netzwerkelement

Publications (2)

Publication Number Publication Date
EP2451214A1 EP2451214A1 (de) 2012-05-09
EP2451214B1 true EP2451214B1 (de) 2012-11-28

Family

ID=43602845

Family Applications (1)

Application Number Title Priority Date Filing Date
EP10290594A Not-in-force EP2451214B1 (de) 2010-11-05 2010-11-05 Verfahren zum Entscheiden über eine mögliche Lastausgleichsoperation in einem drahtlosen Netzwerk und entsprechendes Netzwerkelement

Country Status (8)

Country Link
US (1) US20130217407A1 (de)
EP (1) EP2451214B1 (de)
JP (1) JP5592568B2 (de)
KR (1) KR101494242B1 (de)
CN (1) CN103155648A (de)
BR (1) BR112013011169A2 (de)
TW (1) TWI448174B (de)
WO (1) WO2012059310A1 (de)

Families Citing this family (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105682162B (zh) 2010-11-05 2019-04-09 Lg电子株式会社 在无线通信***中执行切换的方法
WO2013065837A1 (ja) * 2011-11-03 2013-05-10 京セラ株式会社 通信制御方法、基地局、及びユーザ端末
EP2848055B8 (de) * 2012-05-10 2019-09-11 Nokia Solutions and Networks Oy Verbesserung einer systemleistung durch konfigurationsänderung an einem zugangsknoten
EP2918119B1 (de) 2012-09-28 2019-05-15 Telefonaktiebolaget LM Ericsson (publ) Interferenzgeschützte steuernachrichtenübertragung in einem mobilen kommunikationsnetz
US9198046B2 (en) 2012-10-01 2015-11-24 Nokia Solutions And Networks Oy Enhanced metrics exchange for a wireless network
US9119071B2 (en) * 2012-10-26 2015-08-25 Telefonaktiebolaget L M Ericsson (Publ) Methods controlling extended range areas in heterogeneous networks and related network nodes
EP2728926A1 (de) * 2012-11-05 2014-05-07 Alcatel-Lucent Belastungsausgleich in Telekommunikationsnetzwerken
KR101502141B1 (ko) * 2012-12-21 2015-03-12 주식회사 케이티 헤테로지니어스 네트워크의 허브 장치, 그리고 이의 부하 분산 방법
US9155013B2 (en) * 2013-01-14 2015-10-06 Qualcomm Incorporated Cell range expansion elasticity control
WO2014113072A1 (en) * 2013-01-17 2014-07-24 Intel IP Corporation Centralized partitioning of user devices in a heterogeneous wireless network
US20140274101A1 (en) * 2013-03-14 2014-09-18 Alcatel-Lucent Usa Inc. Methods and systems for load balancing and interference coordination in networks
US9661507B2 (en) * 2013-06-19 2017-05-23 Sony Corporation Communication control device, communication control method, and terminal device
CN105191396A (zh) * 2013-06-28 2015-12-23 华为技术有限公司 负载均衡方法和装置
EP2830359B1 (de) * 2013-07-26 2016-09-21 Mitsubishi Electric R&D Centre Europe B.V. Verfahren zum Entladen durch mindestens einer Heimbasisstation einer Basisstation eines drahtlosen zellulären Telekommunikationsnetzwerks
CN105723771B (zh) 2013-09-06 2020-07-21 华为技术有限公司 在无线通信***中调度和/或静默无线电资源的方法
US9813966B1 (en) * 2013-09-11 2017-11-07 Sprint Spectrum L.P. Sub-cell power adjustment
EP3024270B1 (de) * 2013-09-18 2017-12-27 Huawei Technologies Co., Ltd. Zeitbereichs-interferenzkoordinationsverfahren und netzwerkvorrichtung
US9271212B1 (en) * 2013-10-10 2016-02-23 Sprint Communications Company L.P. Managing access node selection for a wireless device
JP2015080066A (ja) * 2013-10-16 2015-04-23 株式会社Nttドコモ 移動通信システム
JP2015080065A (ja) * 2013-10-16 2015-04-23 株式会社Nttドコモ 移動通信システム
CN105814940A (zh) 2013-10-29 2016-07-27 瑞典爱立信有限公司 用于优化的调度的输送的方法和布置
JP6336595B2 (ja) * 2013-12-05 2018-06-06 ホアウェイ・テクノロジーズ・カンパニー・リミテッド 異種ネットワークエネルギー節約方法およびデバイス
JP6465032B2 (ja) * 2013-12-10 2019-02-06 日本電気株式会社 無線パラメータ制御装置、無線パラメータ制御方法、無線基地局および無線パラメータ制御プログラム
CN103763747B (zh) * 2014-02-21 2017-03-08 重庆邮电大学 一种实现异构网络中动态负载均衡的方法
WO2015147510A1 (ko) * 2014-03-25 2015-10-01 삼성전자 주식회사 이동 통신 시스템에서 핸드오버 장치 및 방법
US9461917B1 (en) * 2014-04-01 2016-10-04 Clearwire Ip Holdings Llc Controlling base station power status based on quality of service load
CN105025526B (zh) * 2014-04-29 2018-06-26 ***通信集团设计院有限公司 一种异构网络的几乎空子帧abs的调整方法、装置及基站
KR102301828B1 (ko) * 2014-05-02 2021-09-14 삼성전자 주식회사 무선 통신 시스템에서 실시간 송신 전력 조절 방법 및 장치
GB2526617A (en) 2014-05-30 2015-12-02 Nec Corp Communication system
US9820188B2 (en) 2014-10-02 2017-11-14 Telefonaktiebolaget Lm Ericsson (Publ) Method, system and device for inter-frequency load balancing in a mobile telecommunications network
US9432901B1 (en) * 2015-07-24 2016-08-30 Cisco Technology, Inc. System and method to facilitate radio access point load prediction in a network environment
JP6688578B2 (ja) * 2015-09-14 2020-04-28 曙ブレーキ工業株式会社 ディスクブレーキ用摩擦パッド組立て体
FI127196B (en) 2016-11-15 2018-01-31 Elisa Oyj Load balancing in cellular networks
CN110831068B (zh) * 2018-08-08 2022-10-11 中兴通讯股份有限公司 负荷均衡方法、装置、存储介质及电子装置
DE102019213477A1 (de) * 2019-09-05 2021-03-11 Robert Bosch Gmbh Bedieneinrichtung, Netzwerkanordnung mit der Bedieneinrichtung und Funkverbindungssicherungsverfahren für die Bedieneinrichtung

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202005021930U1 (de) * 2005-08-01 2011-08-08 Corning Cable Systems Llc Faseroptische Auskoppelkabel und vorverbundene Baugruppen mit Toning-Teilen
EP1895801A1 (de) * 2006-08-30 2008-03-05 Nokia Siemens Networks Gmbh & Co. Kg Verfahren zur ausgeglichenen Verteilung der Verkehrslast zwischen nahen, in innere und äußere Gruppierungen angeordnete, LTE/WiMAX-Funkzellen
EP2073579A1 (de) * 2007-12-21 2009-06-24 Nokia Siemens Networks S.p.A. Verfahren und Systeme für die Handhabung von Übergabeprozessen in zellularen Kommunikationsnetzen, entsprechendes Netzwerk und Computerprogrammprodukt
KR101447750B1 (ko) * 2008-01-04 2014-10-06 엘지전자 주식회사 랜덤 액세스 과정을 수행하는 방법
US8185060B2 (en) * 2008-04-22 2012-05-22 Qualcomm Incorporated Serving base station selection using backhaul quality information
US8554255B2 (en) * 2008-04-29 2013-10-08 Nokia Siemens Networks Oy Method and apparatus for providing power control of a wireless terminal
WO2009132709A1 (en) * 2008-04-30 2009-11-05 Nokia Siemens Networks Oy Transmitting node b load status information in a self organising network
US8688117B2 (en) * 2008-06-13 2014-04-01 Fujitsu Limited Seamless handover and load balance between macro base stations and publicly accessible femto base stations
WO2009155380A2 (en) * 2008-06-18 2009-12-23 Spidercloud Wireless, Inc. Methods and apparatus for coordinating network monitoring and/or automating device confirgurations based on monitoring results
US8989138B2 (en) * 2008-07-15 2015-03-24 Qualcomm Incorporated Wireless communication systems with femto nodes
US9084119B2 (en) * 2009-01-07 2015-07-14 Qualcomm Incorporated Carrier reuse in a multicarrier wireless communication environment
US8588178B2 (en) * 2009-03-19 2013-11-19 Qualcomm Incorporated Adaptive association and joint association and resource partitioning in a wireless communication network
US8750098B2 (en) * 2010-07-28 2014-06-10 At&T Intellectual Property I, L.P. Femtocell service through a secondary connection
US8520526B2 (en) * 2010-08-18 2013-08-27 Ubeeairwalk Method and apparatus of load balancing femtocell cluster access

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
NOKIA SIEMENS NETWORKS: "On TDM eICIC Coordination for Macro+Pico Cases", 3GPP DRAFT; R3-102817 PICOMACRO_TDMEICICCOORD, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG3, no. Xi'an; 20101011, 2 October 2010 (2010-10-02), XP050453624 *

Also Published As

Publication number Publication date
TWI448174B (zh) 2014-08-01
EP2451214A1 (de) 2012-05-09
JP2014500651A (ja) 2014-01-09
BR112013011169A2 (pt) 2016-08-23
KR20130102076A (ko) 2013-09-16
CN103155648A (zh) 2013-06-12
KR101494242B1 (ko) 2015-02-17
US20130217407A1 (en) 2013-08-22
TW201238371A (en) 2012-09-16
WO2012059310A1 (en) 2012-05-10
JP5592568B2 (ja) 2014-09-17

Similar Documents

Publication Publication Date Title
EP2451214B1 (de) Verfahren zum Entscheiden über eine mögliche Lastausgleichsoperation in einem drahtlosen Netzwerk und entsprechendes Netzwerkelement
CN110731092B (zh) 实现关于相邻小区中无线电帧配置的信息的交换
JP5281688B2 (ja) スケジューリングおよびリンクアダプテーションによる通信ネットワークにおける干渉の低減
US8594672B2 (en) Methods and apparatus for interference management
US8010147B2 (en) Method and apparatus for interference limitation in uplink communication in a cellular communication system
US10999774B2 (en) Method and apparatus for inter-cell load distribution and interference mitigation in wireless communication system
KR101660351B1 (ko) 부하 밸런싱 방법 및 네트워크 제어 노드
JP7017639B2 (ja) 電力制御方法および装置
EP3132555B1 (de) Uplink-basierte auswahl einer konfiguration der downlink-konnektivität
EP2835022B1 (de) Kommunikation zwischen vorrichtungen
KR101599472B1 (ko) 폐쇄 가입자 그룹 저-전력 기지국들에 대한 개방 액세스의 장려
US10034299B2 (en) Cooperating clusters in cellular communications systems
US20170055270A1 (en) Resource allocation system and method adapted to implement device-to-device communications in wireless communication networks
EP2809114B1 (de) Verfahren und vorrichtung zur bestimmung der übertragungsleistung
Challita et al. Holistic small cell traffic balancing across licensed and unlicensed bands
CN114208334A (zh) 用于协调侧行链路通信的网络设备之间的信息交换
US20140016588A1 (en) Apparatus and Corresponding Method for Allocating a Component Carrier to a Cell in a Communication System
CN114449531A (zh) 频谱共享资源的分配方法、设备、装置及存储介质
EP3449676B1 (de) Reichweitenerweiterung für drahtlose vorrichtungen
Wang et al. Efficient coordination of almost blank subframes with coupling macro cells in heterogeneous networks
CN112997523B (zh) 提高无线通信的效率

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20110712

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RIC1 Information provided on ipc code assigned before grant

Ipc: H04W 36/16 20090101AFI20120508BHEP

Ipc: H04W 28/08 20090101ALN20120508BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RIC1 Information provided on ipc code assigned before grant

Ipc: H04W 36/16 20090101AFI20120605BHEP

Ipc: H04W 28/08 20090101ALN20120605BHEP

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 586707

Country of ref document: AT

Kind code of ref document: T

Effective date: 20121215

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602010003834

Country of ref document: DE

Effective date: 20130131

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 586707

Country of ref document: AT

Kind code of ref document: T

Effective date: 20121128

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20121128

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130311

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130228

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130328

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130301

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130228

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

Free format text: REGISTERED BETWEEN 20130926 AND 20131002

26N No opposition filed

Effective date: 20130829

REG Reference to a national code

Ref country code: FR

Ref legal event code: GC

Effective date: 20131018

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602010003834

Country of ref document: DE

Effective date: 20130829

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

REG Reference to a national code

Ref country code: CH

Ref legal event code: PCOW

Free format text: NEW ADDRESS: 148/152 ROUTE DE LA REINE, 92100 BOULOGNE-BILLANCOURT (FR)

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20131105

REG Reference to a national code

Ref country code: FR

Ref legal event code: RG

Effective date: 20141016

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141130

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20101105

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141130

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20131105

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 7

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 8

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 9

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121128

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20191022

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20191014

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20191031

Year of fee payment: 10

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602010003834

Country of ref document: DE

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20201105

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210601

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201105