EP2449716A2 - Method and arrangement in a telecommunication system - Google Patents
Method and arrangement in a telecommunication systemInfo
- Publication number
- EP2449716A2 EP2449716A2 EP10768299A EP10768299A EP2449716A2 EP 2449716 A2 EP2449716 A2 EP 2449716A2 EP 10768299 A EP10768299 A EP 10768299A EP 10768299 A EP10768299 A EP 10768299A EP 2449716 A2 EP2449716 A2 EP 2449716A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- component carriers
- downlink
- assignment
- carriers
- user equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0044—Arrangements for allocating sub-channels of the transmission path allocation of payload
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/0091—Signaling for the administration of the divided path
- H04L5/0094—Indication of how sub-channels of the path are allocated
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/0091—Signaling for the administration of the divided path
- H04L5/0096—Indication of changes in allocation
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/23—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/10—Scheduling measurement reports ; Arrangements for measurement reports
Definitions
- the present invention relates to a method and arrangement in a telecommunication system, in particular to methods and arrangements in E-UTRAN for reconfiguration of component carriers monitored by a mobile user equipment.
- E-UTRAN UTRAN
- LTE long-term evolution of the UTRAN
- LTE Rel-8 LTE Rel-8
- spectrum compatibility implies that a carrier of an advanced version of the 3GPP-specification which is wider than 20 MHz appears as a number of LTE carriers to an LTE Rel-8 terminal (or user equipment unit) .
- Each such carrier can be referred to as a component carrier.
- Carrier aggregation implies that a terminal that is compliant to an advanced version of the 3GPP-specification can receive multiple component carriers, where the component carriers have, or at least have the possibility to have, the same structure as a Rel-8 carrier. Carrier aggregation is shown in figure 1 illustrating 5 carriers with 20MHz bandwidth forming an aggregated bandwidth of 10OMHz.
- the number of aggregated component carriers as well as the bandwidth of the individual component carrier may be different for Uplink (UL) and Downlink (DL) .
- a symmetric configuration refers to the case where the number of component carriers in DL and UL is the same whereas an asymmetric configuration refers to the case that the number of component carriers is different. It is important to note that the number of component carriers configured in a cell may be different from the number of component carriers seen by a terminal: A terminal may for example support more DL component carriers than UL component carriers, even though the cell is configured with the same number of UL and DL component carriers .
- a majority of the power consumption in a terminal is consumed by its analog front-end. Forcing a terminal to always monitor multiple DL component carriers is therefore not very energy efficient .
- One possible solution to avoid this disadvantage is to semi- statically configure the DL component carriers that the terminal should monitor. Monitoring here typically means reading the physical Downlink Control Channel (PDCCH) and if a DL assignment is found also reading Physical Downlink Shared Channel (PDSCH) . Semi-static configurations are typically performed via RRC signaling. It is a disadvantage of this solution that a long delay is introduced: As reconfiguring the component carriers to be monitored by the terminal can take several hundred milliseconds, a terminal could only start to receive on multiple component carriers after said several hundred milliseconds. Also the reconfiguration from multiple to one (or few) component carriers requires the same time resulting in low energy efficiency. On the other hand, an advantage of semi- statically configurations is a high degree of reliability.
- L1/L2 control signaling Another solution to avoid the above mentioned disadvantage is the usage of L1/L2 control signaling.
- L1/L2 control signaling is fast, it is not very reliable; it is not even protected by HARQ retransmissions.
- the embodiments of the present invention relate to a method in a user equipment unit and an arrangement in a user equipment unit for which, via RRC signaling, the component carriers to be monitored are configured. Even though configured to monitor multiple component carriers, the user equipment unit does not start to monitor them immediately but only one, or very few, carriers. Only if it decodes a DL assignment it will start to monitor multiple component carriers. After one, or possibly multiple, subframes where the user equipment unit has not been scheduled anymore it falls back to its original state, i.e. it only monitors one (or very few) component carriers.
- the embodiments of the present invention imply the advantage that they enable a radio reconfiguration in the terminal with reasonable reliability and delay. Further, it is possible to create a guard times for a terminal that might be needed to reconfigure their radio.
- Figure 1 illustrates an example of carrier aggregation.
- Figure 2 illustrates a first embodiment of the present invention .
- Figure 3 illustrates a second embodiment of the present invention .
- Figure 4 illustrates a third embodiment of the present invention .
- Figures 5a-5c illustrate embodiments of the method according to the present invention as performed by a user equipment .
- Figure 6 illustrates embodiments of a user equipment unit according to the present invention.
- a UE is semi-statically configured to receive a certain set of component carriers. This set is denoted the "DL component carrier set”. However, in its initial state the terminal still monitors only one or very few component carriers. These carrier (s) can be denoted as anchor carrier (s). Exactly which carrier (s) these are can be semi-statically configured or broadcasted via system information. Anchor carrier (s) could also be denoted, e.g., "Reduced DL component carrier set” or "Default DL component carrier set”.
- Figures 5a-5c illustrate embodiments of the method according to the present invention as performed by a user equipment.
- the user equipment monitors 52 a first set of component carriers consisting of very few component carriers as described above.
- a downlink scheduling assignment via a downlink control channel on one of the component carriers of said first set the user equipment starts monitoring 54 the carriers within a second set of component carriers and returns to a monitoring state of only said first set of component carriers after that the user equipment has not been scheduled for one or more subframes 55yes.
- Said monitoring of said second set is started 53 after one, or optionally a number n (n>l) , of subframes after having received said assignment, whereby said number n has either a fixed standardized quantity or has been interchanged between user equipment and base station during a capability exchange .
- the activation of said second set is only performed if said downlink assignment exceeds at least one of a predetermined data allocation size or radio bearer allocation size (56yes) .
- a feedback message is transmitted 57 on receipt of the downlink scheduling assignment.
- the terminal receives in the current subframe on the resource blocks assigned to it and starts monitoring the DL component carrier set n subframes later ( «>1) .
- the size of n depends on the time that is needed to reconfigure the terminal and on the reliability eNodeB assumes for this reconfiguration. This can be either a fixed standardized number or can be interchanged between terminal and eNodeB during capability exchange.
- Figure 2 illustrates an example where the terminal requires two subframes to reconfigure its radio. In the example of figure 2, reception of the original bandwidth is not interrupted until the radio is reconfigured to the new bandwidth.
- the first DL assignment 21 is therefore a non-zero RB (resource block) assignment.
- Another embodiment is that activation of the DL component carrier set is only triggered if the DL assignment exceeds a certain data or RB allocation size. This is useful since the eNodeB probably assigns a terminal for which the eNodeB has much data in its DL buffer - and would require multiple component carriers (when once activated) - which probably is a rather large portion of the resources available on the anchor carrier (s). As said before, this threshold can be data or transport block size as well as number of allocated RB. The exact size of threshold would be configured.
- a terminal is scheduled in the DL but the assignment is actually zero RB to create a guard time.
- a terminal may be unable to receive any component carrier, not even the anchor carrier (s), for a certain time. Typically this time is less than one subframe.
- the guard time created by the zero RB DL assignment can be used by the terminal to reconfigure the radio. After the terminal receives a zero RB DL assignment it starts monitoring the DL component carrier set n subframes later
- FIG. 3 An example is illustrated in figure 3.
- the terminal cannot receive on any DL component carrier during radio reconfiguration 35.
- the first DL assignment 31 is therefore a zero RB assignment.
- the terminals After reading the control region of the subframe and decoding the DL assignment the terminals starts to reconfigure its radio.
- assignments ca be for all component carriers within the downlink component carrier set.
- the last DL assignment 33 can either be omitted or another zero RB assignment is sent to reconfigure the terminal back to receive only on the anchor carrier (s) .
- the control region 34 spans only the beginning of the subframe.
- the eNodeB trusts the terminal to receive DL assignment correctly and therefore schedules the terminal after the first DL assignment on component carries within DL component carrier set.
- the eNodeB After the eNodeB has scheduled a terminal in the DL it does actually not know whether the terminal could successfully decode the DL assignment and thus started to monitor DL component carrier set. It may anyway, if this reliability is high enough for an eNodeB implementation, start immediately to schedule the terminal on carriers within DL component carrier set. If the eNodeB requires more reliability it does not schedule the terminal in the next subframe (s) but waits until it receives HARQ ACK/NACK feedback on the DL assignment. Even if the assigned resources were zero RB, an
- ACK/NACK feedback needs to be created. In this special case, however, the ACK/NACK does not indicate the integrity of the
- the eNodeB receives ACK/NACK feedback it knows that the terminal received the DL assignment and reconfigured the radio to monitor the DL component carrier set. Thus, it is not important whether the received feedback is ACK or NACK, it is only important that a feedback is received.
- the HARQ round trip time is 8 ms
- the eNodeB knows 8 ms later whether the terminal has received the DL assignment and reconfigured its radio. From this time the eNodeB schedules the terminal on carriers within DL component carrier set. TCP slow start an initial delay of 8 ms does not pose a problem.
- the terminal can still be scheduled on the anchor carrier (s) .
- An example is provided in figure 4.
- the terminal cannot receive on any DL component carrier during radio reconfiguration 45.
- the first DL assignment is therefore a zero RB assignment.
- the terminals After reading the control region of the subframe and decoding the DL assignment the terminals starts to reconfigure its radio. Even though the terminal successfully receives the DL assignment and reconfigures its radio the eNodeB does not rely on this and schedules only the anchor carrier (s) . Assignments within the HARQ round trip time can be for all anchor carriers whereas the eNodeB after having received the HARQ feedback (not shown in the picture) starts to schedule on component carriers 43 within the DL component carrier set.
- the eNodeB configures the anchor carrier (s) of the terminal to be the same set as the DL component carrier set. In this case the UE always observes the complete configured set. Since this configuration is done semi- statically - typically with reliable RRC signaling - the highest reliability is achieved. As stated before, the price that needs to be paid is long delays and high power consumption of the terminal.
- Deactivation of the DL component carrier set After a terminal has not been scheduled on any DL component carrier within the DL component carrier set for n subframes ( «>1), it is one conceivable embodiment of the present invention that the terminal reconfigures the radio and starts to monitor only the anchor carrier (s) . Another embodiment is to use again a zero RB DL assignment. In this case the zero RB assignment toggles the radio from DL component carrier set reception to anchor carrier (s) reception.
- the eNodeB can check that the terminal received zero RB assignment and reconfigured radio by checking HARQ ACK/NACK feedback. If said feedback has been received, the terminal received the zero RB assignment and reconfigured the radio; otherwise eNodeB can send the zero RB assignment again.
- FIG. 6 illustrates embodiments of a user equipment unit 61 according to the present invention.
- the user equipment unit 61 is located in a cell of a cellular radio communication system 60 and comprises receiver and transmitter elements 611 to communicate with a radio base station (62) in said cell.
- the user equipment unit includes a first processor 612 operable to monitor a first or second set of component carriers for downlink scheduling assignments received from radio base station via a downlink control channel on one of the component carriers; and includes a second processor 613 connected to said first processor 611 and operable to initiate said first processor 612 to monitor the second set of component carriers in response to a received downlink scheduling assignment on one of the component carriers of a first set of component carriers and to monitor the first set of component carriers in response to not having received a downlink scheduling assignment for one or more subframes.
- the eNodeB may receive information from a terminal, for example via UE buffer status report, that it has much data to transmit. If UL grants are transmitted to such a terminal on carriers within DL component carrier set (depends on PDCCH design) UE needs to monitor DL component carrier set. This can be done with zero or none-zero DL assignments as described above. Additionally, the terminal needs to configure UL transmitters. However, UL grant is valid for the UL subframe 4 ms later; this is enough time to reconfigure the UL transmitter if needed.
Landscapes
- Engineering & Computer Science (AREA)
- Signal Processing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Mobile Radio Communication Systems (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US22119709P | 2009-06-29 | 2009-06-29 | |
PCT/SE2010/050743 WO2011002404A2 (en) | 2009-06-29 | 2010-06-29 | Method and arrangement in a telecommunication system |
Publications (1)
Publication Number | Publication Date |
---|---|
EP2449716A2 true EP2449716A2 (en) | 2012-05-09 |
Family
ID=43242190
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP10768299A Withdrawn EP2449716A2 (en) | 2009-06-29 | 2010-06-29 | Method and arrangement in a telecommunication system |
Country Status (4)
Country | Link |
---|---|
US (1) | US20120099439A1 (zh) |
EP (1) | EP2449716A2 (zh) |
CN (1) | CN102474403A (zh) |
WO (1) | WO2011002404A2 (zh) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8830969B2 (en) * | 2009-07-15 | 2014-09-09 | Lg Electronics Inc. | Carrier reconfiguration in multi-carrier aggregation |
WO2011021152A1 (en) * | 2009-08-17 | 2011-02-24 | Nokia Corporation | Discontinuous reception for multi-component carrier system |
WO2011038252A2 (en) * | 2009-09-25 | 2011-03-31 | Fong, Mo-Han | System and method for multi-carrier network operation |
KR101646789B1 (ko) * | 2010-01-19 | 2016-08-08 | 삼성전자주식회사 | 이동통신 시스템에서 캐리어 활성화 방법 및 장치 |
KR101265646B1 (ko) * | 2010-02-24 | 2013-05-24 | 엘지전자 주식회사 | 멀티 캐리어 시스템에서 상향링크 피드백 채널을 통해 캐리어의 하향링크에 대한 상향링크 피드백 정보를 전송하기 위한 방법 및 장치 |
KR20180003635A (ko) | 2010-12-03 | 2018-01-09 | 인터디지탈 패튼 홀딩스, 인크 | 멀티 무선 액세스 기술 캐리어 결합을 수행하는 방법, 장치 및 시스템 |
EP2475128A1 (en) * | 2011-01-07 | 2012-07-11 | Alcatel Lucent | Data transmission in a multi-carrier wireless telecommunications network |
US9113450B2 (en) * | 2012-08-23 | 2015-08-18 | Interdigital Patent Holdings, Inc. | Operating with multiple schedulers in a wireless system |
WO2014059672A1 (zh) | 2012-10-19 | 2014-04-24 | 富士通株式会社 | 小区切换与重配的方法和装置 |
WO2014070181A1 (en) * | 2012-11-01 | 2014-05-08 | Research In Motion Limited | Method and system for battery energy savings for carrier aggregation |
US9955463B2 (en) * | 2012-11-01 | 2018-04-24 | Blackberry Limited | Method and system for battery energy savings for carrier aggregation |
EP2755341B1 (en) | 2013-01-11 | 2016-01-06 | Telefonaktiebolaget L M Ericsson (publ) | Timing for radio reconfiguration |
BR112015028078B1 (pt) | 2013-05-10 | 2023-03-07 | Telefonaktiebolaget Lm Ericsson (Publ) | Métodos para habilitar um equipamento de usuário e para determinar um subquadro, n de rede, e, equipamento de usuário |
US10728852B2 (en) | 2016-07-18 | 2020-07-28 | Qualcomm Incorporated | Efficient power utilization for enhanced component carriers |
CN110300427A (zh) * | 2018-03-22 | 2019-10-01 | 联发科技股份有限公司 | 无线通信方法和相应地无线通信装置 |
JP7270731B2 (ja) * | 2018-11-12 | 2023-05-10 | 北京小米移動軟件有限公司 | 帯域幅部分の構成方法及び装置 |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100568753C (zh) * | 2003-10-17 | 2009-12-09 | 高通股份有限公司 | 载波搜索方法和设备 |
US7450721B2 (en) * | 2004-09-24 | 2008-11-11 | Research In Motion Limited | Methods and apparatus for reducing airlink congestion and processing time associated with ciphering information in wireless network |
CN100438700C (zh) * | 2005-11-09 | 2008-11-26 | 大唐移动通信设备有限公司 | 一种无线承载业务重配置失败的处理方法 |
TW201608907A (zh) * | 2006-01-31 | 2016-03-01 | 內數位科技公司 | 無縣通信系統中提供及利用非競爭基礎頻道方法及裝置 |
US20090163158A1 (en) * | 2007-08-07 | 2009-06-25 | Interdigital Patent Holdings, Inc. | Support of downlink dual carriers and other features of evolved geran networks |
US8711785B2 (en) * | 2008-03-25 | 2014-04-29 | Qualcomm Incorporated | Fast carrier allocation in multi-carrier systems |
KR101330870B1 (ko) * | 2008-11-21 | 2013-11-18 | 인터디지탈 패튼 홀딩스, 인크 | 무선 통신에서 다중 캐리어 활용을 위한 방법 및 장치 |
US20110002281A1 (en) * | 2008-12-30 | 2011-01-06 | Interdigital Patent Holdings, Inc. | Discontinuous reception for carrier aggregation |
US8441996B2 (en) * | 2009-04-02 | 2013-05-14 | Lg Electronics Inc. | Method and apparatus for monitoring control channel in multiple carrier system |
US8655395B2 (en) * | 2009-05-04 | 2014-02-18 | Qualcomm Incorporated | Systems, methods and apparatus for facilitating discontinuous reception |
-
2010
- 2010-06-29 EP EP10768299A patent/EP2449716A2/en not_active Withdrawn
- 2010-06-29 WO PCT/SE2010/050743 patent/WO2011002404A2/en active Application Filing
- 2010-06-29 CN CN2010800303470A patent/CN102474403A/zh active Pending
- 2010-06-29 US US13/381,026 patent/US20120099439A1/en not_active Abandoned
Non-Patent Citations (1)
Title |
---|
See references of WO2011002404A2 * |
Also Published As
Publication number | Publication date |
---|---|
US20120099439A1 (en) | 2012-04-26 |
WO2011002404A3 (en) | 2011-02-24 |
CN102474403A (zh) | 2012-05-23 |
WO2011002404A2 (en) | 2011-01-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20120099439A1 (en) | Method and Device for Component Carrier Activation and Reconfiguration in a Mobile User Equipment | |
CN110915286B (zh) | 在无线通信***中操作终端的方法和使用该方法的装置 | |
US10834763B2 (en) | Method and apparatus for handling overlap of different channels in wireless communication system | |
US10433333B2 (en) | Method for configuring uplink grants over multiple subframes in a wireless communication system and a device therefor | |
US9363799B2 (en) | Method for transmitting an uplink control signal, user equipment, method for receiving an uplink signal, and base station | |
EP2898741B1 (en) | Maximization of scheduling opportunities in in-device coexistence interference scenarios | |
EP2443903B1 (en) | Downlink transmissions for type 2 relay | |
JP5937115B2 (ja) | 中継ノードのコンポーネントキャリアのための動的puschの非アクティブ化/アクティブ化 | |
US10129812B2 (en) | Uplink transmissions for type 2 relay | |
CN107624263B (zh) | 无线通信***中确定基于竞争的pusch的传输结果的方法及其设备 | |
EP3603256B1 (en) | Network node and method in a wireless communications network | |
EP3231118A1 (en) | Preemptive retransmissions on listen-before-talk cells | |
CN112703807A (zh) | 作为非许可上行链路和下行链路的回退的许可补充上行链路 | |
KR20120103400A (ko) | 통신시스템에서 하이브리드 자동재전송요구 지원 방법 및 장치 | |
US20120269113A1 (en) | Apparatus for transmitting and receiving uplink backhaul signal in wireless communication system and method thereof | |
US10680765B2 (en) | Control information transmission method, and apparatus | |
EP4017188A1 (en) | Signal transmission method and apparatus, and system | |
KR20100116120A (ko) | 무선 통신 시스템상에서 서비스의 품질(QoS)을 보장하는 방법 | |
EP4250858A1 (en) | Wireless communication method, terminal device and network device | |
WO2021035393A1 (en) | Dynamic retransmission configuration | |
US11601960B2 (en) | Methods and arrangements for resource allocation | |
US20180115988A1 (en) | Method for transmitting a contention-based pusch in a wireless communication system and a device therefor | |
WO2014137079A1 (en) | Method for transmitting a harq feedback and device therefor | |
US20180115985A1 (en) | Method for transmitting a contention-based pusch in a wireless communication system and a device therefor | |
US11330631B2 (en) | Remote apparatus in base station, base station, and random access method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20120110 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20130430 |