EP2345779B1 - A method for making an opening in a floor - Google Patents

A method for making an opening in a floor Download PDF

Info

Publication number
EP2345779B1
EP2345779B1 EP10014117.5A EP10014117A EP2345779B1 EP 2345779 B1 EP2345779 B1 EP 2345779B1 EP 10014117 A EP10014117 A EP 10014117A EP 2345779 B1 EP2345779 B1 EP 2345779B1
Authority
EP
European Patent Office
Prior art keywords
loadbearing
opening
slab
slabs
adjacent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP10014117.5A
Other languages
German (de)
French (fr)
Other versions
EP2345779A1 (en
Inventor
Arvu Mägi
Andrei Uibukant
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Amhold AS
Original Assignee
Amhold AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Amhold AS filed Critical Amhold AS
Publication of EP2345779A1 publication Critical patent/EP2345779A1/en
Application granted granted Critical
Publication of EP2345779B1 publication Critical patent/EP2345779B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging

Definitions

  • the invention belongs in the construction field, treating more specifically a method for making an opening with a substantial size into a floor.
  • a known solution also provides a method ( RU2197585 , Kuban State University of Agriculture, published on 10.08.2002), in which a reconstructed building has short grooves cut into covering plates under hollows, and pulling anchors are installed into the grooves.
  • the plates are fixed to walls by means of angle irons and bolt connections. This method does not allow making large openings.
  • a well-known solution is also the structural solution ( JP9078745 , Yoshino Gypsum Co, published on 25.03.1997) for reinforcing an opening in a floor, which is technically closest to the presented invention.
  • the structure of the opening in a floor is reinforced, using a reinforcement element that contains a hollow that holds the edge of the opening in the floor, and the reinforcement element is installed to the edge of the opening.
  • the reinforcement element includes a support part that reaches out into the opening in the floor and supports the opening.
  • the structure includes a connection element for the connection with a cross-beam, locating between the cross-beam and the reinforcement element, while the base of the connection element is installed in the void of the cross-beam.
  • the connection beam is fixed, using a tensioner.
  • the opening Before making an opening in the floor with the purpose of maintaining the existing load situation and 100% of the rated loadbearing capacity, the opening is created so that the load that acts on the preserved floor section is transferred to the supporting surface of the loadbearing structure (loadbearing wall or beam) of the removed section of the floor, using a special loadbearing framework from profiled steel, connected to the preserved floor section through pulling anchors.
  • the dimensions of the opening are marked on the floor slab, and the slab is supported with temporary supports. This is followed by cutting the opening into the slab, the sides of slabs adjacent to the opening are cleaned and primed. Loadbearing beams are installed to the sides of the adjacent slabs.
  • the hollows in the preserved slab sections are cleaned and primed, and pulling anchors are installed in the hollows.
  • On the edge of preserved slab sections a slab with the width of the opening is installed, while connection elements are mounted to the corners of the slab and the adjacent loadbearing beams, beams are mutually connected from the corners, another beam is mounted between the ends of adjacent loadbearing beams and is connected to the loadbearing beams. This generates a loadbearing framework, which is connected to the preserved slab section by means of pulling anchors.
  • Figures 1 to 3 present the floor structure that is obtained with the execution of the presented method.
  • the sides 7 of slabs 6 adjacent to opening 2 are cleaned from dust and infirmly fixed parts and are primed with bonding agent 8. Then steel loadbearing box beams 9 are installed to the sides 7.
  • the length of loadbearing beam 9 is selected so that it would reach to the support surface 4 of slabs 1 in loadbearing structure 5 and exceed the length of opening 2 by the double width of loadbearing beam 9.
  • the opening 2 is cut along the adjacent slabs 6 at the length of the width of loadbearing beam 9, vertical openings between the reserved panel sections 12 and the adjacent panels 6 of opening 2, and loadbearing beam 9 is installed symmetrically with opening 2 on both sides of the opening.
  • the hollows 13 of preserved panel sections 12 are cleaned of dust, are primed with bonding agent 8, and plastic plugs 14 are installed in the hollows 13 of preserved panel sections 12.
  • pulling anchors 15 from threaded steel, which take the tensile stress, are installed in the hollows 13 of the preserved panel sections 12, while pulling anchors 15 include at the rear end a steel support 16, which holds the pulling anchor 15 in the horizontal position and anchors it.
  • Pulling anchors 15 are located in the hollows 13 of preserved panel sections 12 at the height of anchor diameter, and from the cut edge of slab 1 at the minimum distance of the 30-times diameter of the pulling anchor.
  • plastic plugs 14 are installed from the cut edge of slab 1 at the minimum distance of the 31-times diameter of the pulling anchor.
  • Pulling anchors protrude from the hollows of preserved slab sections by the minimum length of the 15-times diameter of the pulling anchor.
  • the quantity of pulling anchors 15, the strength and diameter of steel is selected so that the anchors would hold the tensile stresses occurring due to the bending moment of preserved slab sections 12 without substantial deformations in cases of maximum dead load and imposed load.
  • steel box beam 17 is installed, which contains holes 18 for pulling anchors 15 that protrude from hollows 13 of panel sections 12.
  • the diameter of hollows 18 is the 1.5-times diameter of the pulling anchor.
  • Steel elements 19 that transfer the traction force arising from the bending moment and steel elements 20 that transfer the compressive force are installed in the corners of steel box beam 17 and adjacent loadbearing beams 9 by welding.
  • the thickness of elements 19 and 20 is equal to the mean thickness of the side of beam 17, and the distance between elements 19 and 20 is at maximum the 5-times thickness of element 19.
  • Elements 19 and 20 have the equal thickness and similar shape.
  • Elements 19 and 20 are installed from bottom to top.
  • beam 17 and loadbearing beam 9 are mutually connected by welding in the corners along the cross-section.
  • Steel box beam 21 is installed on the supporting surface 4 of slabs 1 in the loadbearing structure 5 between the ends of loadbearing beams 9, connected to adjacent loadbearing beams 9 by welding along the cross-section, and for supplementary rigidity an extra support 22 from angle iron is connected by welding.
  • the resulting loadbearing framework from profiled steel is connected electrically with the equipotential bonding loop 23.
  • the internal side of steel box beam 21 that is facing the shaft is filled with dense insulation material 24 (e.g. mineral wool) to isolate the impacts of sound and fire.
  • dense insulation material 24 e.g. mineral wool
  • wedges 25 under the beam provide beam 21 with prestress, which in later casting and loading will ensure beam 21 with uniform pressure against supporting surface 4.
  • holes 18 are drilled also in the vertical wall of loadbearing beam 9 at the base level of the upper ring of adjacent loadbearing beam 9. Holes 18 are drilled in the centre of loadbearing beam 9 and longitudinally at the distance of 1/6 width of opening 2 from the ends of loadbearing beam 9. Then holes 26 are drilled by hollows 13 of preserved slab sections 12. The diameter of holes 26 is 1/2 of the diameter of hollows 13 and holes 26 are located at the ends of pulling anchors 15 at the distance of the double height of hollows 13. Then the hollows 13 of the preserved slab sections 12 and the gaps between beams 9, 21 and slab sections 12 and loadbearing structure 5 are filled with fine-grain soldering concrete 27 with expansion rate of up to 0.5%.
  • pins 28 and pressure nuts 29 are installed to the pulling anchors, tensioning the pulling anchors 15 by means of pressure nuts 29. Then the preserved slab sections 12 are released from the hog, temporary supports 3 are removed and the steel surfaces are covered with fire-proofing compound 30.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention describes a method for the making of an opening into a loadbearing floor. The method includes the stages: the dimensions of opening 2 to be cut are marked on the floor slab 1 and floor slab 1 is supported with temporary supports 3. Then the opening 2 is cut into floor slab 1. Loadbearing beams 9 are installed to the sides 7 of slabs 6 that are adjacent to opening 2. The hollows 13 of preserved panel sections 12 are cleaned and primed, and pulling anchors 15 are installed in the hollows. Connecting the beams and loadbearing beams results in a loadbearing framework, which will help in transferring the load of preserved slab sections 12 to the supporting surface 4 of loadbearing structure 5.

Description

    Technical field
  • The invention belongs in the construction field, treating more specifically a method for making an opening with a substantial size into a floor.
  • Prior art
  • When designing buildings it is necessary to create relatively large openings into loadbearing floors, such as for building additional shafts for the entrance of modern ventilation, water, sewage, heating, electrical cables, technical pipes, elevators and light.
  • In practice, a method is used in which the preserved parts of cut panels are supported on a beam, while the imposed load and the dead load of panels are transferred to adjacent panels (e.g. US2001005964 , Hunter Douglas Inc., published on 06.08.2002). Such solution cannot be used in many cases, since the adjacent panels have been designed and built to prescribed loads. When imposing extra loads to the panels next to the opening, the panels can no longer be loaded with the rated load and therefore the designed service load should be reduced, which again reduces substantially exploitation possibilities. Also the adjacent panels could already be at the border condition of load endurance and no additional load can be imposed to the panels.
  • A known solution also provides a method ( RU2197585 , Kuban State University of Agriculture, published on 10.08.2002), in which a reconstructed building has short grooves cut into covering plates under hollows, and pulling anchors are installed into the grooves. The plates are fixed to walls by means of angle irons and bolt connections. This method does not allow making large openings.
  • A well-known solution is also the structural solution ( JP9078745 , Yoshino Gypsum Co, published on 25.03.1997) for reinforcing an opening in a floor, which is technically closest to the presented invention. In this solution the structure of the opening in a floor is reinforced, using a reinforcement element that contains a hollow that holds the edge of the opening in the floor, and the reinforcement element is installed to the edge of the opening. The reinforcement element includes a support part that reaches out into the opening in the floor and supports the opening. The structure includes a connection element for the connection with a cross-beam, locating between the cross-beam and the reinforcement element, while the base of the connection element is installed in the void of the cross-beam. The connection beam is fixed, using a tensioner. This solution is intended for the reinforcement of a floor slab with an existing opening and does not solve current problems.
  • Description of the invention
  • Before making an opening in the floor with the purpose of maintaining the existing load situation and 100% of the rated loadbearing capacity, the opening is created so that the load that acts on the preserved floor section is transferred to the supporting surface of the loadbearing structure (loadbearing wall or beam) of the removed section of the floor, using a special loadbearing framework from profiled steel, connected to the preserved floor section through pulling anchors. For this purpose, the dimensions of the opening are marked on the floor slab, and the slab is supported with temporary supports. This is followed by cutting the opening into the slab, the sides of slabs adjacent to the opening are cleaned and primed. Loadbearing beams are installed to the sides of the adjacent slabs. The hollows in the preserved slab sections are cleaned and primed, and pulling anchors are installed in the hollows. On the edge of preserved slab sections a slab with the width of the opening is installed, while connection elements are mounted to the corners of the slab and the adjacent loadbearing beams, beams are mutually connected from the corners, another beam is mounted between the ends of adjacent loadbearing beams and is connected to the loadbearing beams. This generates a loadbearing framework, which is connected to the preserved slab section by means of pulling anchors.
  • List of figures
  • Figures 1 to 3 present the floor structure that is obtained with the execution of the presented method.
  • Embodiment of the invention
  • When designing buildings it is necessary to create relatively large openings into loadbearing floors, such as for building additional shafts for the entrance of modern ventilation, water, sewage, heating, electrical cables, technical pipes, elevators and light. In most of the cases it would be necessary to cut through the existing loadbearing reinforced concrete slabs and to demolish entire slabs at the width of the opening, and to build a new loadbearing floor around the shaft. Such a solution is relatively costly and time-consuming and pollutes the environment due to the relatively large quantity of wastes.
  • The method for making an opening into a floor, with the created floor structure shown in figures 1 to 3, accordingly to the invention is executed as follows:
    • First the dimensions of opening 2 to be created are marked on slabs 1 of the floor. Then slabs 1 are supported from beneath with temporary supports 3. Supports 3 are installed from the opening 2 at the maximum distance of three times the height of slabs 1 and in the centre of the loadbearing opening of slabs 1. The width of supports 3 on both sides of opening 2 is bigger than the height of slabs 2. To support slabs 1, slabs 1 are set in the horizontal position by means of supports 3, meaning that the flexible subsiding within the designed limits that occurs during use is temporarily eliminated. After supporting slabs 1, slabs 1 are cut vertically with a diamond cutter at the width of opening 2 and slabs 1 are removed from the area of opening 2. Slab sections are also removed from their supporting area 4 in loadbearing structure 5.
  • The sides 7 of slabs 6 adjacent to opening 2 are cleaned from dust and infirmly fixed parts and are primed with bonding agent 8. Then steel loadbearing box beams 9 are installed to the sides 7. The length of loadbearing beam 9 is selected so that it would reach to the support surface 4 of slabs 1 in loadbearing structure 5 and exceed the length of opening 2 by the double width of loadbearing beam 9. For the installation of loadbearing beam 9, first a respective horizontal opening is cut with a diamond cutter along the upper 10 and lower 11 surface of the adjacent slab 6 for the length of the supporting surface 4 of adjacent slab 6 and at the depth of the width of loadbearing beam 9 in loadbearing structure 5. Then the opening 2 is cut along the adjacent slabs 6 at the length of the width of loadbearing beam 9, vertical openings between the reserved panel sections 12 and the adjacent panels 6 of opening 2, and loadbearing beam 9 is installed symmetrically with opening 2 on both sides of the opening.
  • Then the hollows 13 of preserved panel sections 12 are cleaned of dust, are primed with bonding agent 8, and plastic plugs 14 are installed in the hollows 13 of preserved panel sections 12. In addition, pulling anchors 15 from threaded steel, which take the tensile stress, are installed in the hollows 13 of the preserved panel sections 12, while pulling anchors 15 include at the rear end a steel support 16, which holds the pulling anchor 15 in the horizontal position and anchors it. Pulling anchors 15 are located in the hollows 13 of preserved panel sections 12 at the height of anchor diameter, and from the cut edge of slab 1 at the minimum distance of the 30-times diameter of the pulling anchor. Prior to this, plastic plugs 14 are installed from the cut edge of slab 1 at the minimum distance of the 31-times diameter of the pulling anchor. Pulling anchors protrude from the hollows of preserved slab sections by the minimum length of the 15-times diameter of the pulling anchor. The quantity of pulling anchors 15, the strength and diameter of steel is selected so that the anchors would hold the tensile stresses occurring due to the bending moment of preserved slab sections 12 without substantial deformations in cases of maximum dead load and imposed load.
  • On the edge of preserved slab sections 12, at the width of opening 2, steel box beam 17 is installed, which contains holes 18 for pulling anchors 15 that protrude from hollows 13 of panel sections 12. The diameter of hollows 18 is the 1.5-times diameter of the pulling anchor.
  • Steel elements 19 that transfer the traction force arising from the bending moment and steel elements 20 that transfer the compressive force are installed in the corners of steel box beam 17 and adjacent loadbearing beams 9 by welding. The thickness of elements 19 and 20 is equal to the mean thickness of the side of beam 17, and the distance between elements 19 and 20 is at maximum the 5-times thickness of element 19. Elements 19 and 20 have the equal thickness and similar shape. Elements 19 and 20 are installed from bottom to top. In addition, beam 17 and loadbearing beam 9 are mutually connected by welding in the corners along the cross-section.
  • Steel box beam 21 is installed on the supporting surface 4 of slabs 1 in the loadbearing structure 5 between the ends of loadbearing beams 9, connected to adjacent loadbearing beams 9 by welding along the cross-section, and for supplementary rigidity an extra support 22 from angle iron is connected by welding. The resulting loadbearing framework from profiled steel is connected electrically with the equipotential bonding loop 23. The internal side of steel box beam 21 that is facing the shaft is filled with dense insulation material 24 (e.g. mineral wool) to isolate the impacts of sound and fire. In the central section of steel box beam 21, wedges 25 under the beam provide beam 21 with prestress, which in later casting and loading will ensure beam 21 with uniform pressure against supporting surface 4.
  • After the installation of the loadbearing framework from the profiled steel, holes 18 are drilled also in the vertical wall of loadbearing beam 9 at the base level of the upper ring of adjacent loadbearing beam 9. Holes 18 are drilled in the centre of loadbearing beam 9 and longitudinally at the distance of 1/6 width of opening 2 from the ends of loadbearing beam 9. Then holes 26 are drilled by hollows 13 of preserved slab sections 12. The diameter of holes 26 is 1/2 of the diameter of hollows 13 and holes 26 are located at the ends of pulling anchors 15 at the distance of the double height of hollows 13. Then the hollows 13 of the preserved slab sections 12 and the gaps between beams 9, 21 and slab sections 12 and loadbearing structure 5 are filled with fine-grain soldering concrete 27 with expansion rate of up to 0.5%.
  • After the hardening of soldering concrete 27, pins 28 and pressure nuts 29 are installed to the pulling anchors, tensioning the pulling anchors 15 by means of pressure nuts 29. Then the preserved slab sections 12 are released from the hog, temporary supports 3 are removed and the steel surfaces are covered with fire-proofing compound 30.
  • The final result will be opening 2 in floor slabs 1, while the preserved floor section 12, which surrounds opening 2, holds the initially designed load, adjacent slabs 6 are not overloaded and the load stresses to loadbearing structure 5 have not increased.

Claims (16)

  1. A method for making an opening in a floor, comprising the installation of a reinforcing structure to a floor slab with an opening, connection of slabs adjacent to the opening with the loadbearing beams, and the installation of a tensioning device, is characterized in that the method comprises the following stages:
    - measurements of the opening (2) are marked on the floor slab (1);
    - floor slab (1) is supported from beneath with temporary supports (3), which set the slabs (1) in the horizontal position, eliminating temporarily the flexible subsiding that has occurred in the slabs (1) during use;
    - after the installation of the temporary supports (3), the floor slabs (1) are cut vertically at the width of the opening (2);
    - floor slabs (1) in the area of the opening (2) and the sections of floor slabs (1) by their supporting surface (4) in the loadbearing structure (5) are removed;
    - the sides (7) of slabs (6) adjacent to the opening (2) are cleaned and primed;
    - loadbearing beams (9) are installed to the sides (7) of adjacent slabs (6), and for the purpose of this installation first a horizontal gap is cut along the upper (10) and lower surface (11) of the adjacent slab (6), and then vertical gaps are cut along the adjacent slabs (6) of the opening (2) between the preserved slab sections (12) and the adjacent slabs (6) of the opening (2), and the loadbearing beam (9) is installed symmetrically with the opening (2) on both of its sides;
    - the hollows (13) of the preserved slab sections (12) are cleaned and primed;
    - a plug (14) and a pulling anchor (15) that takes the tensile stress are installed to the hollows (13) together with a support (16);
    - a beam (17) with holes (18) are installed to the edge of preserved panel sections (12) at the width of the opening (2);
    - in the corners of the beam (17) and adjacent loadbearing beams (9), elements (19) that transfer the traction force arising from the bending moment and elements (20) that transfer the compressive force are installed, the beam (17) and loadbearing beam (9) are mutually connected in the corners along the cross-section;
    - on the supporting surface (4) of slabs (1) in the loadbearing structure (5), a beam (21) is installed between the ends of adjacent loadbearing beams (9), which is connected with loadbearing beams (9) along the cross-section and for supplementary rigidity is connected to a supplementary support (22), resulting in a loadbearing framework from profiled steel, which is connected electrically with the equipotential bonding loop (23);
    - the internal side of the beam (21) that is facing the opening is filled with insulation material (24) and in the central section of beam (21) the beam (21) is pre-tensioned by means of wedges (25) under the beam;
    - the installation of the loadbearing framework from profiled steel is followed by drilling holes (18) also in the vertical wall of the loadbearing beam (9) at the base level of the upper ring of the loadbearing beam (9) and then holes (26) are drilled by the hollows (13) of preserved slab sections (12), and the gaps between preserved slab sections (12), beams (9) and (21), slab sections (12) and the loadbearing structure (5) are filled with soldering concrete (27);
    - after the hardening of the soldering concrete (27), pins (28) and pressure nuts (29) are installed to pulling anchors (15), and the pulling anchors (15) are tensioned;
    - then the preserved slab sections (12) are released from the hog, temporary supports (3) are removed and the steel surfaces are covered with a fire-proofing compound (30).
  2. Method accordingly to claim 1, characterized in that the supports (3) are installed from the opening (2) at the maximum distance of three times the height of the slabs (1) and in the centre of the loadbearing opening of the slabs (1), the width of supports (3) on both sides of the opening (2) is bigger than the height of the slabs (2).
  3. Method accordingly to claim 1, characterized in that the sides (7) of adjacent slabs (6) are cleaned from dust and infirmly fixed parts, and are primed with a bonding agent (8).
  4. Method accordingly to claim 1, characterized in that the loadbearing beams (9) are made from box steel and the length of the loadbearing beams (9) is selected so that the beams would reach on the supporting surface (4) of the slabs in the loadbearing structure (5) and the length would exceed the length of the opening (2) by two widths of the loadbearing beam (9).
  5. Method accordingly to claim 1, characterized in that a horizontal gap is cut along the upper (10) and lower surface (11) of the adjacent slab (6), which is in the loadbearing structure (5) by the depth of the length of the supporting surface (4) of the adjacent slab (6) and the width of the loadbearing beam (9), and vertical gaps are cut along the adjacent slab (6) with the length equal to the width of the loadbearing beam (9).
  6. Method accordingly to claim 1, characterized in that the hollows (13) of the preserved panel sections (12) are primed with a bonding agent (8) after cleaning from dust.
  7. Method accordingly to claim 1, characterized in that a plug (14) is installed in the hollows (13), made from plastic and installed from the cut edge of the slab (1) at the minimum distance of the 31-times diameter of the pulling anchor (15).
  8. Method accordingly to claim 1, characterized in that the pulling anchor (15) is produced from threaded steel, at the rear end of the pulling anchor (15) is a support (16); the pulling anchor (15) is mounted in the hollow (13) of the preserved slab (12) at the height of the diameter of the pulling anchor (15) from the bottom, and at the minimum distance of the 30-times diameter of the pulling anchor from the cut edge of the slab (1); the pulling anchor (15) protrudes from the hollow (13) of the slab section (12) by the three-times diameter of the pulling anchor (15) at minimum.
  9. Method accordingly to claim 1, characterized in that the beam (17) is produced from box steel and the beam contains holes (18) for the pulling anchors (15) protruding from the hollows (13) of slab sections (12), while the diameter of the holes (18) is one-and-a half diameter of the pulling anchors (15).
  10. Method accordingly to claim 1, characterized in that the elements (19) and (20) are produced from steel and are installed to the corners of beams (17) and (19) by welding, whereas the thickness of elements (19) and (20) is equal to the mean thickness of the side of the beam (17) and the mutual distance between elements (19) and (20) is the maximum of five times the thickness of element (19), while elements (19) and (20) have the equal thickness and similar shape..
  11. Method accordingly to claim 1, characterized in that the elements (19) and (20) are installed from bottom to top.
  12. Method accordingly to claim 1, characterized in that the beam (21) is produced from box steel, the supplementary support (22) is an angle iron, the beam (21) and supplementary support (22) are connected by welding.
  13. Method accordingly to claim 1, characterized in that the holes (18) are drilled in the centre of the loadbearing beam (9) and longitudinally at the distance of 1/6 width of the opening (2) from the ends of the loadbearing beam.
  14. Method accordingly to claim 1, characterized in that the diameter of holes (26) is 1/2 of the diameter of the hollows (13) and the holes (26) are located from the ends of the pulling anchors (15) at the distance of the double height of hollows (13).
  15. Method accordingly to claim 1, characterized in that mineral wool is used as the insulation material (24).
  16. Method accordingly to claim 1, characterized in that the soldering concrete (27) is fine-grained, expanding up to 0.5%.
EP10014117.5A 2009-11-02 2010-10-29 A method for making an opening in a floor Not-in-force EP2345779B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EEP200900106 2009-11-02

Publications (2)

Publication Number Publication Date
EP2345779A1 EP2345779A1 (en) 2011-07-20
EP2345779B1 true EP2345779B1 (en) 2013-12-25

Family

ID=44044391

Family Applications (1)

Application Number Title Priority Date Filing Date
EP10014117.5A Not-in-force EP2345779B1 (en) 2009-11-02 2010-10-29 A method for making an opening in a floor

Country Status (2)

Country Link
EP (1) EP2345779B1 (en)
ES (1) ES2452141T3 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0978745A (en) * 1995-09-13 1997-03-25 Yoshino Sekko Kk Reinforcing structure of ceiling opening
US6199337B1 (en) 1995-11-22 2001-03-13 Hunter Douglas Inc. Cladding system and panel for use in such system
RU2197585C2 (en) 2000-08-01 2003-01-27 Кубанский государственный аграрный университет Technique for reinforcement of reconstructed buildings

Also Published As

Publication number Publication date
ES2452141T3 (en) 2014-03-31
EP2345779A1 (en) 2011-07-20

Similar Documents

Publication Publication Date Title
JP6448817B2 (en) PC truss wall structure and construction method thereof
FI85745B (en) BRANDSAEKER PREFABRICERAD STAOLBALK.
US10041244B2 (en) Device and method for the thermal decoupling of concrete building parts
EP2251503B1 (en) Method for replacing a loadbearing wall
KR101672924B1 (en) Fire proof reinforced panel using high strength steel plate and construction method of the same
JP6021545B2 (en) Platform door fixing structure and platform door fixing method
JP6166560B2 (en) Extension structure of seismic isolation building
JP5393263B2 (en) Masonry wall reinforcement method and masonry structure.
CN108060789B (en) wall underpinning method for seismic isolation and reinforcement of existing masonry structure
CN207739437U (en) A kind of prefabricated steel reinforced concrete shear wall structure
KR20120085641A (en) Assembling structure for beam and slab and method for constructing cosstructure using it
JP2008266910A (en) Projection structure of anchorage or deviator of tendon, and construction method therefor
KR101407512B1 (en) Steel composite beam for reducing story height, slim floor structure and construction method using the same
JP5865567B2 (en) Connecting slab and its construction method
JPH11148231A (en) Assembled and laid building reinforcing structure, its reinforcing method, and base isolating construction method
JP5579403B2 (en) Masonry wall reinforcement structure and masonry structure
EP2241690A2 (en) Insulated foundation element for mounting on precast base foundation
EP2345779B1 (en) A method for making an opening in a floor
JP5749620B2 (en) Seismic isolation method for existing buildings
CN209891381U (en) Building structure
RU126342U1 (en) PANEL BUILDING ROOM ASSEMBLY
KR100617395B1 (en) Building repairing system through column raising
RU85174U1 (en) COLUMN ASSEMBLY ASSEMBLY
JP4439938B2 (en) Wall type reinforced concrete structure and its construction method
JP2009114662A (en) Concrete solid permanent sub-substructural column

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

17P Request for examination filed

Effective date: 20111222

RIC1 Information provided on ipc code assigned before grant

Ipc: E04G 23/02 20060101AFI20130201BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20130402

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 646754

Country of ref document: AT

Kind code of ref document: T

Effective date: 20140115

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602010012587

Country of ref document: DE

Effective date: 20140213

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2452141

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20140331

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20131225

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 646754

Country of ref document: AT

Kind code of ref document: T

Effective date: 20131225

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

Ref country code: NO

Ref legal event code: T2

Effective date: 20131225

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140425

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140428

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602010012587

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

26N No opposition filed

Effective date: 20140926

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602010012587

Country of ref document: DE

Effective date: 20140926

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20141001

Year of fee payment: 5

Ref country code: FR

Payment date: 20141027

Year of fee payment: 5

Ref country code: GB

Payment date: 20141030

Year of fee payment: 5

Ref country code: NO

Payment date: 20141027

Year of fee payment: 5

Ref country code: SE

Payment date: 20141015

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: LU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141029

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141031

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141029

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

REG Reference to a national code

Ref country code: NO

Ref legal event code: MMEP

REG Reference to a national code

Ref country code: SE

Ref legal event code: EUG

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20151029

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140326

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NO

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20151031

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20151029

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20101029

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20160630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20151102

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20151030

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20161125

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20161027

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20151030

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602010012587

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180501

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131225