KR100617395B1 - Building repairing system through column raising - Google Patents

Building repairing system through column raising Download PDF

Info

Publication number
KR100617395B1
KR100617395B1 KR1020060005015A KR20060005015A KR100617395B1 KR 100617395 B1 KR100617395 B1 KR 100617395B1 KR 1020060005015 A KR1020060005015 A KR 1020060005015A KR 20060005015 A KR20060005015 A KR 20060005015A KR 100617395 B1 KR100617395 B1 KR 100617395B1
Authority
KR
South Korea
Prior art keywords
column
pillar
stand
abstract
building
Prior art date
Application number
KR1020060005015A
Other languages
Korean (ko)
Inventor
정언섭
Original Assignee
정언섭
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정언섭 filed Critical 정언섭
Priority to KR1020060005015A priority Critical patent/KR100617395B1/en
Application granted granted Critical
Publication of KR100617395B1 publication Critical patent/KR100617395B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G23/0229Increasing or restoring the load-bearing capacity of building construction elements of foundations or foundation walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266Enlarging

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

본 발명은 블록아웃부가 형성되며, 기둥하부(A) 주위바닥면에 하부가 지지되어 기둥 하부 주위를 감싸도록 설치된 H 형강을 포함하는 하부추상대;상기 하부추상대 상부면에 유압잭을 포함하는 승강수단이 지지되도록 설치된 승강수단설치부; 및 상기 승강수단의 상부면과 기둥상부(B) 주위 천정면 사이에 기둥 상부 주위를 감싸도록 설치된 H 형강을 포함하는 상부추상대;를 포함하여 단절된 기둥상부를 인상시켜 부등침하된 건물을 원상회복시키는 기둥 인상을 통한 건물보수시스템에 관한 것이다.The present invention is a block-out portion is formed, the lower lower support including a H-shaped steel is installed so as to support the lower portion around the bottom of the column bottom (A) surrounding the lower column; Lifting including a hydraulic jack on the upper surface of the lower abstract Elevating means installation unit installed to support the means; And an upper abstract stage including an H-shaped steel installed between the upper surface of the elevating means and the ceiling surface around the columnar portion (B) to cover the upper portion of the column. It is about building repair system by raising pillar.

부등침하, 건물기둥 Uneven sink

Description

기둥 인상을 통한 건물보수시스템{BUILDING REPAIRING SYSTEM THROUGH COLUMN RAISING}BUILDING REPAIRING SYSTEM THROUGH COLUMN RAISING}

도 1은 종래의 기둥구조물 인상시스템을 도시한 것이다.1 illustrates a conventional columnar pulling system.

도 2a는 본 발명의 기둥 보수시스템을 도시한 것이다.Figure 2a shows a column repair system of the present invention.

도 2b, 도 2c 및 도 2d는 본 발명의 하부추상대의 예를 도시한 것이다.2B, 2C and 2D show examples of the lower abstraction stage of the present invention.

도 3은 본 발명의 기둥 보수시스템을 한 공간에 설치시킨 상태도를 도시한 것이다.3 shows a state diagram in which the pillar repair system of the present invention is installed in one space.

도 4는 본 발명의 기둥절단부마감부의 설치상태를 도시한 것이다.Figure 4 shows the installation state of the column cut portion of the present invention.

도 5는 본 발명의 기둥구조물 인상시스템을 이용하여 부등침하된 건물이 복원된 상태를 도시한 것이다.5 is a view showing a state in which an unequivocally settled building is restored using the columnar structure pulling system of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

100:본 발명의 기둥 인상을 통한 건물보수시스템100: building repair system through the column impression of the present invention

110:하부추상대 120:승강수단설치부110: lower abstract platform 120: lifting means installation unit

130:상부추상대 200:기둥절단부130: upper upper target 200: column cutting

300:승강수단 400:건물기둥300: lifting means 400: building pillar

500:슬라브(천정) 600:중앙제어장치500: slab (ceiling) 600: central control unit

700:절단기둥부용 마감부 710:철근연결수단700: cutting column finishing portion 710: reinforcing rod connecting means

720:절단기둥부 거푸집 730:피복콘크리트720: cutting pillar formwork 730: coated concrete

800:받침대 900:복원된 건물800: stand 900: restored building

본 발명은 기둥인상을 통한 건물보수시스템에 관한 것이다. 더욱 구체적으로 지반의 침하 등으로 건물이 부등침하가 된 경우에 있어, 기둥 인상을 통하여 부등침하된 건물을 보수할 수 있도록 하는 건물보수시스템에 관한 것이다.The present invention relates to a building repair system through column impressions. More specifically, the present invention relates to a building repair system for repairing a building that is unequally settled by raising a column when the building is unequally settled due to ground subsidence.

종래 건물들의 대부분은 지반을 굴착하면서 지하구조물을 시공하고, 지하구조물 위에 각 층을 형성시킴에 있어서, 각 층에 기둥을 먼저 설치하고, 상기 기둥과 천정 및 벽체를 형성시키는 작업을 층마다 순서를 반복하는 것이 통상적이며 거의 모든 기둥은 RC 콘크리트 구조물로 제작되는 것이 일반적이다.Most of the conventional buildings construct underground structures while excavating the ground, and in forming each layer on the underground structure, the pillars are first installed on each floor, and the operations of forming the columns, the ceiling, and the walls are performed in order. It is common to repeat and it is common for almost all columns to be made of RC concrete structures.

이때, 건물을 지지하고 있는 지반이 여러 이유로 국부적으로 침하하는 경우 건물도 지반이 침하는 쪽으로 기울어지는 현상이 발생하게 되어 건물의 안전을 크게 위협하게 되는데, 이에, 건물을 원 위치로 복구시키기 위하여 침하된 건물부위를 어떤식으로든 인상시킬 필요가 있다. At this time, if the ground supporting the building is submerged locally for various reasons, the building also becomes inclined toward the ground subsidence, which greatly threatens the safety of the building. The building site needs to be raised in some way.

이에 종래에 침하된 지반에 우레탄수지계열의 충진재를 충전시킴으로서 침하된 지반을 인상시키는 공법이 소개되어 있기도 하지만, 부등침하가 심할 경우 기울어진 건물을 원 상태로 완전하게 인상시키는 것은 쉽지 않아, 결국 건물자체를 재 인상시킬 필요성도 있고, 지반침하가 아닌 다른 원인으로 건물이 부등침하된 경우 건물만을 인상시킬 공법개발의 필요성이 대두되었다.Therefore, a method of raising the subsided soil by introducing a urethane resin-based filler into the subsided ground has been introduced. However, it is not easy to completely raise a slanted building to its original state when the inequality is severe. There is also a need to re-increase itself and the need to develop a process to raise only the building if the building is inevitably settled for reasons other than subsidence.

이에 건물인상 장치로서 소개된 것이 도 1과 같은 인상시스템(10,대한민국 공개특허 2004-85894호)이다.In this regard, what was introduced as a building lifting device is an impression system 10 (Korean Patent Laid-Open Publication No. 2004-85894) as shown in FIG. 1.

상기 인상시스템은 고정용지주대(20)와 고정용지주대에 삽입되어 길이방향으로 높이가 증감되는 이동용지주대(30)와 상측, 하측케이블 지지판(40,50)과 금속케이블(60) 및 유압실린더(70)를 이용하여 상기 이동용지주대(30)가 건물등의 슬라브등(80)을 밀어올리는 방식을 반복함으로서 큰 중량의 구조물이 인상되도록 하고 있음을 알 수 있다.The pulling system is inserted into the fixed holder 20 and the fixed holder, the movable holder 30 is increased in the longitudinal direction and the upper and lower cable support plates (40, 50) and the metal cable (60) and the hydraulic cylinder It can be seen that by using the 70 repeating the method for pushing the slab lamp 80, such as buildings, such that the large weight of the structure is raised.

하지만 이러한 인상시스템은 구조물에 영구적으로 설치되어 그 자체가 구조물을 지지하는 방식을 채택하는 것이므로 빌딩과 같은 건물에 임시적으로 설치한 후 해체할 수 없다는 문제점이 있으며, 침하된 건물을 지지하는 기둥 자체가 지속적으로 건물을 지탱해줄 수 있도록 하는 방식을 채택한 것이 아니므로 근본적인 보수방법으로서 보기에는 한계가 있다는 문제점이 있었다.However, such an impression system is permanently installed in the structure and adopts a method of supporting the structure itself. Therefore, the impression system cannot be dismantled after temporarily installing in a building such as a building. There was a problem that there was a limit to view as a fundamental repair method because it did not adopt the method to continuously support the building.

본 발명은 상기 종래 기술적 문제점을 해결하기 위한 것으로서, The present invention is to solve the above technical problem,

본 발명의 목적은 기둥 자체의 보수 및 기둥이 지지하는 건물의 층간을 인상이 가능한 기둥 인상을 통한 건물보수시스템을 제공하는 것이다.It is an object of the present invention to provide a building repair system through a column impression capable of raising the repair of the pillar itself and the floors of the building supported by the pillar.

본 발명의 다른 목적은 건물보수시스템에 의하여 인상된 기둥을 다시 구조부재로서 건물을 지지할 수 있도록 할 수 있는 건물인상시스템을 제공하는 것이다.Another object of the present invention is to provide a building lifting system capable of supporting the building as a structural member again the column raised by the building repair system.

본 발명은 상기 기술적과제를 달성하기 위하여,The present invention to achieve the above technical problem,

첫째, 건물의 층간에 시공된 건물기둥을 단절시킨 상태에서 기둥상부 주위를 인상시킨 후 상기 기둥절단부(120)를 원상회복 시킴으로서 부등침하된 건물을 원 위치로 복원될 수 있도록 하였다.First, after raising the circumference of the column in the state of disconnecting the building pillars constructed between the floors of the building, the column cut portion 120 is restored to its original position so that the eroded building can be restored to its original position.

둘째, 기둥상부 주위를 인상시키기 위하여, 기둥 하부 주위에 하부출상대(110)를 설치하고, 기둥 상부 주위에 상부추상대(130)를 설치하고, 하부추상대와 상부추상대 사이인 승강수단설치부(120)에 유압잭을 포함하는 승강수단(300)을 설치하되, 하부추상대(110)의 일부를 블록아웃시켜 기둥절단부(120)가 노출되도록 하면서 소정의 작업공간 역할을 하는 블록아웃부(112)를 형성시키되 단절된 기둥상부가 직접 상기 승강수단(300)의 작동에 의하여 인상될 수 있도록 하였다.Second, in order to raise around the columnar upper portion, the lower riser 110 is installed around the lower portion of the column, the upper abstraction stand 130 is installed around the upper portion of the column, and the lifting means installed between the lower abstraction and the upper abstraction stand. The lifting unit 300 including the hydraulic jack is installed in the unit 120, and the block-out unit serving as a predetermined work space while blocking a part of the lower abstract stand 110 to expose the column cutting unit 120 ( 112 is formed so that the disconnected columnar portion can be directly lifted by the operation of the elevating means (300).

셋째, 하부추상대(110) 및 상부추상대(130)는 H 형강과 같은 형강을 조적시켜 상,하 설치할 수 있도록 함으로서 종래 기성제품을 이용할 수 있도록 하여 보다 경제적이며, 그 조적에 있어서 보강지지판(114)과 볼트 및 너트와 같은 체결구(115)를 이용함으로서 그 설치 및 해체가 용이하도록 하였다.Third, the lower abstract stand 110 and the upper abstract stand 130 can be installed up and down by masonry, such as H-beams to install the conventional ready-made products, more economical, reinforcement support plate in the masonry ( 114) and fasteners 115, such as bolts and nuts, to facilitate installation and dismantling.

넷째, 건물기둥의 크기 및 단면형태에 따라 하부추상대(110) 및 상부추상대(130)의 크기를 매번 변경하지 않고서도 기둥인상이 가능한 조립체 형태로 설치될 수 있도록 하여 효용성을 높일 수 있도록 하였다.Fourth, according to the size and the cross-sectional shape of the building pillar to be installed in the form of an assembly capable of column impression without changing the size of the lower abstract stand 110 and the upper abstract stand 130 each time to increase the efficiency. .

다섯째, 기둥절단부의 단절된 철근을 서로 연결시켜주고, 이를 피복시킥 위하여 상기 기둥절단부 주위에 깔때기 형태의 거푸집을 설치할 수 있도록 하였다.Fifth, to connect the disconnected reinforcing bars of the column cutting portion, it was possible to install a funnel-shaped formwork around the column cutting to cover it.

본 발명을 보다 명확하고 용이하게 설명하기 위해서 이하 본 발명의 최선의 실시예를 첨부도면에 의하여 상세하게 설명하며, 본 발명에 따른 실시예는 여러 가지 다른 형태로 변형될 수 있으므로, 본 발명의 범위가 아래에서 설명되는 실시예에 한정되지 않는다.BRIEF DESCRIPTION OF DRAWINGS To describe the present invention more clearly and easily, the following describes the best embodiments of the present invention in detail with reference to the accompanying drawings, and embodiments according to the present invention may be modified in various other forms, and thus the scope of the present invention. Is not limited to the embodiment described below.

본 발명의 기둥 인상을 통한 건물보수시스템(100)은Building repair system 100 through the column impression of the present invention

건물 기둥(400) 내부에 매립된 철근(210)을 노출시켜 단절시킨 기둥절단부(200)가 노출되도록 블록아웃부(112)가 형성되며, 기둥하부(A) 주위바닥면에 하부가 지지되어 기둥 하부 주위를 감싸도록 설치된 H 형강을 포함하는 하부추상대(110);The block out part 112 is formed to expose the column cutting part 200 exposed by exposing the reinforcing steel 210 embedded in the building pillar 400, and the lower part is supported on the bottom surface of the lower part of the column A. A lower abstract stand 110 including an H-shaped steel installed to surround the lower part of the lower part;

상기 하부추상대(110) 상부면에 유압잭을 포함하는 승강수단(300)이 지지되도록 설치된 승강수단설치부(120); 및 Lifting means installation unit 120 is installed so that the lifting means 300 including the hydraulic jack on the upper surface of the lower abstract stand 110; And

상기 승강수단(300)의 상부면과 기둥상부(B) 주위 천정면 사이에 기둥 상부 주위를 감싸도록 설치된 H 형강을 포함하는 상부추상대(130);를 포함하며, 도 2a를 기준으로 설명한다.And an upper abstract stage 130 including an H-shaped steel installed to wrap around the upper portion of the column between the upper surface of the elevating means 300 and the ceiling surface around the columnar portion B. This will be described with reference to FIG. 2A. .

하부추상대(110)는 후술되는 승강수단(300)인 유압잭을 작동시킬 때 승강수단(300) 하부를 지지할 수 있도록 하는 역할을 하는 것으로서 H 형강과 같은 기성제품의 철골 제품을 상,하로 조적시켜 기둥 하부 주위를 감싸도록 설치함으로서 구입, 운반, 가공작업의 편의성을 도모하게 된다.The lower abstract stand 110 serves to support the lower portion of the elevating means 300 when operating the hydraulic jack of the elevating means 300, which will be described later, to assemble the steel products of the ready-made products such as H-shaped steel up and down By enclosing it around the lower part of the column, it is convenient for purchase, transportation and processing.

이로서 승강수단(300)인 유압잭을 작동시키는 경우 하부가 지지된 유압잭의 실린더가 상승하게 되고, 상기 유압잭의 실린더 상부면에 접하여 기둥상부 주위에 설치된 상부추상대(130)가 인상되게 되고, 이러한 상부추상대의 인상에 의하여 건 물의 천정(슬래브)이 함께 인상될 수 있게 된다.As a result, when operating the hydraulic jack of the lifting means 300, the cylinder of the hydraulic jack supported by the lower portion is raised, the upper abstract stand 130 is installed around the column upper portion in contact with the cylinder upper surface of the hydraulic jack is raised, The ceiling of the building allows the ceiling of the building to be raised together.

이러한 하부추상대(110)에는 기둥 하부 소정 위치에 블록아웃부(112)를 형성시킴으로서 기둥절단부(200)가 형성되도록 H 형강을 조적시켜 설치할 수 있다.The lower abstract stand 110 may be installed by forming the H-shaped steel so that the column cutting portion 200 is formed by forming the block-out portion 112 at a predetermined position under the column.

즉, 기둥 하부 주위를 감싸도록 상, 하로 조적되어 배치된 H 형강, 사각관 및 원형관 중 어느 하나로 설치된 수직대(111); That is, the vertical stand 111 is installed in any one of the H-shaped steel, square tube and circular tube arranged up and down to wrap around the lower part of the pillar;

절단기둥부가 노출되도록 수직대가 조적 배치된 공간을 블록아웃시켜 형성시킨 블록아웃부(112); 및 A block out part 112 formed by blocking out a space in which the vertical stand is arranged to expose the cutter pillar; And

상기 수직대를 결속시키도록 수직대를 관통하여 수직대 양 단부측면에 설치된 보강지지판(114)에 볼트 및 너트를 포함한 고정구(115)에 의하여 결속되는 관통지지부재(113);를 포함하여 구성될 수 있다.And a penetrating support member 113 penetrated by the fasteners 115 including bolts and nuts to the reinforcing support plates 114 installed on both end sides of the vertical stand through the vertical stand to bind the vertical stand. Can be.

수직대(111)는 도 2a와 같이 기둥 하부 주위를 감싸도록 상, 하로 조적되어 배치되는 것으로서, 수직대는 H형강, H 형강, 사각관 및 원형관 중 어느 하나가 이용될 수 있으며, 달리 제한은 없으나 기성제품을 이용하는 경우에 있어서는 위와 같은 형강이나 관형태로 제작된 것을 이용하는 것이 바람직하다. 본 발명에서는 다른 언급이 없는 한 H 형강을 이용하는 경우를 기준으로 한다.Vertical stand 111 is to be arranged up and down to wrap around the bottom of the column as shown in Figure 2a, the vertical stand may be any one of the H-shaped steel, H-shaped steel, square tube and round tube, otherwise limited However, in the case of using a ready-made product it is preferable to use those made in the shape of the above-mentioned steel or tube. In the present invention, unless otherwise stated, the H-beam is used as a reference.

기둥절단부(200)는 기둥을 구성하는 피복콘크리트를 파쇄시킨 후, 그 내부에 수직으로 배근된 철근을 절단함으로서 절단될 기둥부위를 지칭하며, 이러한 피복콘크리트 및 철근 절단작업은 수작업으로 해야 하기 때문에 작업자가 용이하게 기둥절단부에 접근할 수 있도록 일종의 작업공간을 확보할 필요가 있다. The pillar cutting part 200 refers to a pillar portion to be cut by crushing the coated concrete constituting the pillar, and then cutting the reinforcement vertically reinforced therein, and the coated concrete and reinforcing steel cutting work must be performed manually. It is necessary to secure some kind of working space so that the pillar cuttings can be easily accessed.

이러한 작업공간의 역할을 하는 것이 본 발명의 블록아웃부(112)이다.It is the block out part 112 of the present invention that serves as such a workspace.

이러한 블록아웃부(112)는 하부추상대(110)를 모두 설치한 후, 형성시키는 것 보다는 하부추상대를 설치할 때 자연스럽게 형성되도록 하는 것이 바람직하므로, 본 발명에서도 하부추상대를 조적배치시킬 때, 자연스럽게 블록아웃부(112)가 형성되도록 하부추상대를 제작, 설치하게 된다.Since the block-out part 112 is preferably formed after installing all of the lower abstract stand 110, rather than forming the lower abstract stand, in the present invention when placing the lower abstract stand, The lower abstract stand is manufactured and installed so that the block out part 112 is naturally formed.

이러한 블록아웃부(112)를 형성시키는 예로서,As an example of forming the block out part 112,

첫째, 도 2a와 같이 사각단면의 건물기둥(400)을 기준으로 양 측면에 H 형강을 조적시켜 설치하고, 나머지 측면들은 기둥절단부가 형성될 수 있도록 H 형강을 기둥절단부(200) 상,하부 위만 조적배치되도록 하는 방법이 하나의 예가 될 수 있다. First, as shown in FIG. 2a, H-beams are installed on both sides based on the building pillars 400 of the rectangular section, and the H-sections are only above and below the column-cutting portions 200 so that the column-cutting portions can be formed. An example would be a method that allows for masonry placement.

이때 조적배치된 각 H 형강들은 결속되어 있지 않기 때문에 H 형강들을 서로 결속시켜 줄 필요가 있다.At this time, since the H-beams arranged in the masonry are not bound, it is necessary to bind the H-beams to each other.

이에 본 발명에서는 보강지지판(114)을 이용하게 된다. 즉, 조적배치된 H형강의 양 측면에 ㄷ 자형 채널등을 포함한 보강지지판(114)를 덧대고, 관통지지부재(113)를 이용하여 보강지지판(114) 사이에 위치한 H 형강을 결속시켜주게 되며, 상기 관통지지부재(113)는 볼트 및 너트를 포함한 고정구(115)에 보강지지판(114)에 체결될 수 있도록 할 수 있다.Therefore, in the present invention, the reinforcing support plate 114 is used. That is, the reinforcement support plate 114 including the c-shaped channel, etc. is added to both sides of the H-shaped steel that is arranged, and the H-shaped steels located between the reinforcement support plates 114 are bound by using the penetrating support member 113. The through support member 113 may be fastened to the reinforcing support plate 114 to the fixture 115 including the bolt and the nut.

도 2b 및 도 2c는 수직대로서 H 형강을 이용하지 않고, 원형관 또는 사각관을 이용하는 경우를 절단면도 형태로 도시한 것으로서, 마찬가지로 원형관 또는 사각관을 보강지지판(114)를 덧대고, 관통지지부재(113) 및 고정구(115)를 이용하여 결속시킬 수 있다.2B and 2C show a case in which a circular tube or a square tube is used in the form of a cutaway view without using H-shaped steel as a vertical stand, and similarly, a circular tube or a square tube is padded with a reinforcing support plate 114, and penetrated. It can be bound using the support member 113 and the fixture 115.

둘째, 위와 같이 H 형강을 수직대(111)로 이용함에 있어서는 건물기둥의 단면크기, 기둥 하부의 높이 등을 고려하여 H 형강의 조적높이, 단면크기 등을 미리 정하여 세팅하여야 하는데 이는 곧 다른 기둥에는 적용하기 어려울 수도 있다는 문제점이 있을 수 있다. Second, when using the H-beam as a vertical stand 111 as described above, in consideration of the cross-sectional size of the building pillar, the height of the lower part of the column, etc., the height and cross-sectional size of the H-beam should be set in advance. There may be a problem that it may be difficult to apply.

이에 본 발명에서는 이러한 문제점을 해결하기 위한 하부추상대(110)로서, 도 2d와 같이,Accordingly, in the present invention, as the lower abstract stand 110 for solving this problem, as shown in Figure 2d,

고정대(116a);와 고정대 일측면으로부터 돌출되어 배치된 H 형강을 포함하는 양 측면대(116b);로 이루어져 전체적으로 ㄷ 자 형태로 기둥 주위를 감싸도록 제작되고 상, 하로 조적되어 설치된 고정형추상대(116); 및Fixed stand 116a; and both side stand (116b) including the H-shaped steel protruding from one side of the fixed stand; consisting of a fixed abstract installed to be wrapped around the pillar in a c-shape as a whole and installed up and down ( 116); And

상기 고정형추상대(116) 안쪽으로 배치된 기둥 주위의 개방된 공간에 절단기둥부(200) 형성을 위한 블록아웃부를 제외하고, 폐합된 공간으로 하부추상대가 이루어지도록 현장에서 상,하로 조적되어 설치된 가변형추상대(117);를 포함하도록 하였다.Except for the block-out portion for forming the cutter column 200 in the open space around the pillar disposed inside the fixed abstract stand 116, it is installed up and down in the field so that the lower abstract stand is made into a closed space Variable abstract stand 117; to include.

고정대(116a)는 건물기둥(400) 일측면 주위에 위치하도록 설치하되 위에서 수직대(111)와 동일한 방식으로 상,하로 조적되어 설치될 수 있다. 즉, 고정대(116a)의 결속을 위한 볼트 및 너트를 이용하여 건물기둥(400)의 일측면 주위에 H 형강을 상,하 조적 배치하여 결속시킴으로서 설치될 수 있다.Fixing stand 116a may be installed so as to be positioned around one side of the building pillar 400, and may be installed up and down in the same manner as the vertical stand 111. That is, by using the bolt and nut for the binding of the fixing table (116a) can be installed by binding the H-shaped steel around the one side of the building pillar 400 to the upper and lower constitutive arrangement.

이때, 도 2a의 경우에는 하부추상대의 폭(D1)을 건물기둥의 폭(D2)을 기준으로 소정의 길이를 가지도록 제작하였으나 상기 고정대(116a)의 폭(D3)는 건물기둥의 폭 등을 고려하지 않고 제작하된 제작, 운반 및 현장설치공간이 허럭하는 범위 안에서 자유롭게 결정함으로서 건물기둥의 크기에 관계없이 자유롭게 전용이 가능하도록 하였다.In this case, in the case of FIG. 2A, the width D1 of the lower abstract stand is manufactured to have a predetermined length based on the width D2 of the building pillar, but the width D3 of the fixing stand 116a is the width of the building pillar. It is possible to freely transfer regardless of the size of the building pillar by freely deciding within the bounds of the fabricated, transported, and on-site installation spaces without considering these factors.

측면대(116b)도 고정대 일측면으로부터 돌출되어 배치된 형강을 포함하여 상기 고정대(116a)와 측면대(116b)의 결합된 전체적인 형상은 ㄷ 자형태로 제작된다. The side stand 116b also includes a section steel protruding from one side of the stand, and the combined overall shape of the stand 116a and the side stand 116b is manufactured in a c-shape.

이러한 ㄷ 자형태의 고정대(116a)와 측면대(116b)는 건물 기둥(400)이 내측에 위치하도록 세팅되며, 상기 양 측면대 사이의 길이 즉, 도 2d를 기준으로 하면 양 측면대(116b)의 상하거리(D4)를 조정함으로서 역시 건물기둥의 단면크기 등에 제한없이 전용이 가능하도록 하며, 고정대(116a)와의 결속을 위하여 볼트 및 너트를 이용하되 상,하 조적 배치하여 결속시킴으로서 설치될 수 있다.The c-shaped holder 116a and the side stand 116b are set so that the building pillar 400 is located inside, and the lengths between the two side stands, that is, the side stand 116b based on FIG. 2D. By adjusting the upper and lower distance (D4) of the building can also be used without limitation, such as the cross-sectional size of the column, and can be installed by binding to the upper and lower bundling arrangement using the bolt and nut for binding with the fixing table (116a). .

상기 고정대(116a)와 측면대(116b)의 조합구성을 본 발명에는 고정형 추상대(116)로 지칭하며, 이는 적용 대상 건물기둥에 상관없이 일정한 길이를 가질 수 있기 때문이다.The combination of the fixing stand 116a and the side stand 116b is referred to as the fixed abstract stand 116 in the present invention, because it can have a constant length irrespective of the building pillar to be applied.

가변형추상대(117)는 고정형추상대(116)의 설치에 의한 건물기둥의 개방된 공간에 기둥절단부(200) 형성을 위한 블록아웃부(112)를 제외하고, 건물기둥을 감싸도록 H형강을 상,하로 조적시킨 후 역시 볼트 및 너트를 이용하여 서로 결속시키는 것이며, 고정형추상대(117)의 양 측면대의 폭(D4) 및 건물기둥의 폭(D2)에 의하여 대부분 조정된다는 의미에서 가변형추상대(117)로 지칭된다고 할 수 있다.The variable abstract stand 117 is an H-shaped steel to surround the building pillar, except for the block-out portion 112 for forming the column cutting portion 200 in the open space of the building pillar by the installation of the fixed abstract stand 116. After tightening up and down, it is also fastened to each other by using a bolt and nut, and the variable type in the sense that it is mostly adjusted by the width (D4) and the width of the building pillar (D2) of the side of the fixed abstract 117 It can be said that (117).

이로서 가변형추상대(117)는 건물기둥(400)의 크기 등에 따라 제작하되, 고정형추상대(116)는 고정된 크기로 미리 제작한 것을 전용함으로서 그 설치, 운반, 제작비용을 효율적으로 운용할 수 있다는 장점이 있게 된다.As a result, the variable abstract stand 117 is manufactured according to the size of the building pillar 400, etc., but the fixed abstract stand 116 can be efficiently operated by installing, transporting, and manufacturing costs by using only those manufactured in advance in a fixed size. There is an advantage.

승강수단설치부(120)는 도 2a와 같이 위에서 살펴본 하부추상대(110) 상부면에 유압잭을 포함하는 승강수단(300)이 설치되는 부위로서, 후술되는 상부추상대와 하부추상대 사이의 이격된 공간부를 의미하며, 그 상면에는 승강수단(300)이 설치된다.The elevating means installation unit 120 is a portion in which the elevating means 300 including the hydraulic jack is installed on the upper surface of the lower abstract stand 110 as described above as shown in FIG. 2A, and is spaced between the upper abstract stand and the lower abstract stand which will be described later. It means a space portion, the lifting means 300 is installed on the upper surface.

즉, 승강수단(300)으로서 유압잭을 이용하는 경우 그 지지대 역할을 하는 것이 하부추상대(110)의 일 기능이라고 보았을 때, 유압잭이 하부추상대(110) 상부면에 지지될 수 있도록 하는 공간을 확보할 수 있도록 하는 기능을 가지게 된다.That is, when using the hydraulic jack as the lifting means 300, when it is seen that the role of the support function of the lower abstract stand 110, to secure a space for the hydraulic jack to be supported on the upper surface of the lower abstract stand (110) It has the ability to do that.

이로서 하부추상대(110) 상부면은 수평면을 유지할 수 있도록 마감처리되는 것이 바람직하다. 즉, H형 철골(116)을 도 2a와 같이 추가로 더 설치할 수 있다.As a result, the upper surface of the lower abstract stand 110 is preferably finished to maintain a horizontal plane. That is, the H-type steel frame 116 may be further installed as shown in Figure 2a.

상기 유압잭인 승강수단(300)은 부등침하된 건물기둥 및 그 주위부를 인상시킬 수 있는 용량을 가지도록 제작, 설치되어야 하며, 한 층에는 여러 건물기둥이 설치되어 있는 것이 대부분이므로 각 건물기둥의 개수 및 작용하중상태를 고려하여 각 건물기둥에 설치해야 할 유압잭의 전체개수를 미리 정해두게 된다.The lifting jack 300, which is the hydraulic jack, should be manufactured and installed to have a capacity to raise an unequally settled building pillar and its surroundings. Since most building pillars are installed on one floor, the number of each building pillar And the total number of hydraulic jacks to be installed in each building column in advance in consideration of the working load state.

이때, 유압잭은 작동 시 유압실린더가 상부로 인출되면서 상부추상대를 인상시키게 되므로 승강수단설치부(120)의 전체 형성 높이는 이러한 인상량, 유압잭의 작동상승량을 고려하여 하부추상대의 설치 높이 등을 고려하여 정하도록 한다.At this time, the hydraulic jack is pulled up the upper cylinder as the hydraulic cylinder is pulled out during operation, so the overall height of the lifting means installation unit 120 is formed in consideration of such an increase, the installation height of the lower cylinder in consideration of the operation of the hydraulic jack. Consider it.

이러한 유압잭의 작동은 최종적인 인상높이를 단번에 확보할 수 있도록 할 수도 있으나, 다단계로 다른 건물기둥에 설치된 유압잭의 작동상태 등을 고려할 필요가 있으므로 1차 인상 이후 이러한 인상을 유지할 수 있는 잭 서포트등과 같이 인상상태를 유지할 수 있는 미도시된 승강유지수단을 더 설치하는 것이 바람직하 다.The operation of the hydraulic jack may be able to secure the final impression height at once, but it is necessary to consider the operation status of the hydraulic jack installed in the other building pillar in multiple stages, and thus the jack support for maintaining such an impression after the first impression and the like. It is preferable to further install the lifting maintenance means not shown, which can maintain the pulling state.

즉, 시차를 두고 승강수단(300)을 단계적으로 작동시킬 수 있도록 통상적으로 이용되는 스크류잭을 포함한 승강유지장치를 승강수단설치부에 더 설치할 수 있다.That is, the elevating means installation unit including a screw jack which is commonly used to operate the elevating means 300 step by step with a parallax can be further installed in the elevating means installation unit.

상부추상대(130)는 상기 승강수단(300)의 상부면과 기둥 상부 주위 천정면 사이에 기둥 상부 주위를 감싸도록 설치된 H 형강을 포함하는 추상대로서,The upper abstract stand 130 is an abstract stage including an H-shaped steel installed between the upper surface of the elevating means 300 and the ceiling around the column upper portion,

기둥 상부 주위를 감싸도록 상, 하로 조적되어 배치된 H 형강, 사각관 및 원형관 중 어느 하나로 설치된 수직대(131); 및 A vertical stand 131 installed as one of an H-shaped steel, a square tube, and a circular tube arranged up and down to surround the upper part of the pillar; And

상기 수직대를 결속시키도록 수직대를 관통하여 수직대 양 단부측면에 설치된 보강지지판(132)에 볼트 및 너트를 포함한 고정구(133)에 의하여 결속되는 관통지지부재(134);를 포함한다.It includes; penetrating support member 134 penetrates the vertical stand to the reinforcing support plate 132 installed on both end sides of the vertical stand to bind the vertical stand by a fastener 133 including a bolt and a nut.

상부추상대의 수직대(131)는 하부추상대(110)과 같이 H 형강, 원형관 또는 사각관을 수직대로 이용하되, 하부추상대와 다른 점은 기둥절단부(200)를 형성시킬 필요가 없으므로 건물기둥을 감싸되 폐합된 단면형태가 이루어지도록 H 형강 등을 상,하로 조적하여 설치하게 된다는 점이다.The vertical bar 131 of the upper abstract bar uses the H-shaped steel, a circular pipe or a square pipe vertically like the lower abstract bar 110, but the difference from the lower abstract bar does not need to form the column cutting part 200. It is to install the H-beams up and down to wrap the building pillars to form a closed cross-sectional shape.

또한 관통지지부재(135)의 경우에도 하부추상대와 마찬가지로 수직대를 결속시키기 위하여 수직대를 관통하여 수직대 양 단부측면에 설치된 ㄷ 자형 채널을 포함하는 보강지지판(132)에 볼트 및 너트를 포함한 고정구(134)를 이용하게 된다.In addition, the through support member 135 also includes bolts and nuts in the reinforcing support plate 132 including the c-shaped channels installed on both end sides of the vertical stand through the vertical stand to bind the vertical stand like the lower abstract stand. Fixture 134 is used.

이러한 상부추상대(130)는 기둥 상부 주위의 건물의 슬라브(500,천정)과 접하게 되는데, 기둥과 기둥사이에는 주형과 같은 가로보가 설치될 수 있고, 승강수 단의 작동에 의하여 기둥절단부에 의하여 단절된 기둥상부가 인상될때, 상기 가로보 및 슬라브는 상재하중으로서 작용하므로 상부추상대의 수직대(131) 상부에는 천정면 및 가로보 하면에 접하여 설치된 H 형강을 포함하는 보강빔(140)이 더 설치되도록 하며, 보강빔(140)과 수직대(131)는 볼트 및 너트를 포함하는 고정구를 이용하여 연결시킬 수 있도록 한다.The upper abstract stand 130 is in contact with the slab (500, ceiling) of the building around the top of the column, between the column and the pillar can be installed, such as a cross beam, by the operation of the lifting step When the disconnected columnar portion is pulled up, the cross beams and slabs act as upper loads, so that a reinforcement beam 140 including H-beams installed in contact with the ceiling surface and the bottom beams is further installed on the vertical pole 131 of the upper abstract rod. The reinforcing beam 140 and the vertical stand 131 may be connected using a fixture including a bolt and a nut.

이때, 하부추상대(110) 하부 주위에는 건물기둥(400)의 인상 시 발생하는 반력의 분산을 위하여 H 파일을 틀 형태로 하부추상대 주위에 조립설치한 뒤, 경사대(810)로 하부추상대(110)와 연결지지토록 설치한 받침대(800)을 설치하는 것이 바람직하다.At this time, in order to distribute the reaction force generated when the building pillar 400 is pulled around the lower abstract stand 110, the H pile is assembled and installed around the lower abstract stand in the form of a frame, and then the lower abstract stand is used as a slope 810. It is preferable to install the pedestal 800 installed to support the connection with the (110).

위와 같이 하부추상대(110), 승강수단(300)이 설치된 승강수단설치부(120) 및 상부추상대(130)에 의하여 기둥 상부가 슬라브(500,천정)와 함께 인상될 때, 도 3과 같이 한 층에 설치된 모든 기둥들(400a 내지 400l)에도 본 발명의 기둥 인상을 통한 건물보수시스템(100)을 설치하되, 승강수단(300)의 작동은 동시에 이루어지게 함으로서 단계적으로 일시에 건물의 부등침하가 원상으로 회복될 수 있도록 한다. 이를 위하여 각 기둥에 설치된 건물보수시스템의 승강수단을 컨트롤 할 수 있는 중앙제어장치(600)를 설치함이 바람직하며, 상기 중앙제어장치(600)는 승강수단에 작동신호를 조정할 수 있는 컨트롤러, 상기 컨트롤러에 의하여 승강수단의 작동량을 조정하는 승강제어부 및 상기 컨트롤러와 승강제어부의 디스플레이부를 포함하도록 하여 승강수단설치부에 설치되도록 할 수 있다. When the upper column is lifted up with the slab 500 and the ceiling by the lower abstract stand 110, the elevating means installation unit 120 and the upper abstract stand 130 is installed, as shown in Figure 3 and The building repair system 100 through the column impression of the present invention is also installed on all the pillars 400a to 400l installed on the same floor, but the operation of the elevating means 300 is performed at the same time by stepping the building in time. Allow the settlement to return to normal. To this end, it is preferable to install a central control unit 600 that can control the lifting means of the building repair system installed in each column, the central control unit 600 is a controller that can adjust the operation signal to the lifting means, the The controller may include a lift controller configured to adjust an operation amount of the lift means by a controller, and a display unit of the controller and the lift controller.

또한 기둥 외 해당 층 바닥판과 천정에 부착되어 설치된 구조물도 승강이 가 능하도록 상,하 단절시키도록 한다. 예컨대 단절된 기둥외에 벽체, 엘리베이터 등과 같은 코아부가 있는 경우 이러한 구조물이 기둥 인상에 장해가 되지 않도록 단절시켜 놓는다.In addition, the structure attached to the floor plate and the ceiling besides the column should be cut up and down to allow lifting. For example, if there is a core part such as a wall, an elevator, etc. in addition to the disconnected column, the structure is disconnected so that it does not interfere with the column impression.

또한 상기 기둥 상부가 상승된 이후에, 도 4와 같이 기둥 내부에 단절된 철근을 이어주는 커플러를 포함하는 철근연결수단(710); 및 하부가 기둥절단부 하부 주위에 고정되고, 상부가 기둥절단부 상부 주위로 벌어지면서 개방된 깔때기 형태로 형성된 절단기둥부 거푸집(720); 상기 절단기둥부 거푸집 내부로 충전된 후 양생되어 마감되는 피복콘크리트(730);를 포함하는 절단기둥부용 마감부(700)를 형성시킬 수 있다.In addition, after the upper portion of the pillar is raised, the reinforcing bar connecting means 710 including a coupler for connecting the reinforcing bars in the interior as shown in Figure 4; And the lower part is fixed around the columnar lower portion, the upper portion of the cutter cutting die 720 is formed in the form of an open funnel open around the column upper portion; It is possible to form the finishing portion for the cutting portion 700, including; coated concrete 730 is cured and finished after the filling into the cutter die form.

즉, 인상된 기둥상부의 기둥절단부에 있어서, 절단시킨 철근들은 커플러인 철근연결수단(710)을 절단된 기둥철근단부에 설치하고, 커플러 사이에 연결철근을 설치함으로서 구조적으로 절단된 철근이 서로 연속성을 가지도록 한다.That is, in the column cutting portion of the columnar portion of the raised column, the cut reinforcing bar is provided by connecting the reinforcing bar connecting means 710, which is a coupler, to the cut column reinforcing bar, and connecting bars between the couplers structurally cut the reinforcing bar To have.

다음으로는 이러한 철근들이 마감모르타르 등에 의하여 피복될 수 있도록 마감모르타르 등으로 피복 콘크리트(730)를 타설하기 위하여, 기둥절단부에 거푸집을 설치하게 된다.Next, in order to pour the coated concrete 730 with the finishing mortar so that these rebars may be covered by the finishing mortar, the formwork is installed at the column cutting portion.

이러한 거푸집은 하부가 기둥절단부 하부 외주면에 앵커볼트 등에 의하여 임시로 고정되며, 마감모르타르 등을 부을 수 있도록 상부가 벌어져 개방된 깔때기 형상으로 설치된다. 이러한 벌어진 거푸집판은 기둥의 모든 측면에 대하여 벌어지도록 형성시킬 필요는 없고, 사각기둥이라면 양 측면에만 상부가 벌어지도록 하고, 나머지 측면은 건물기둥 표면에 그대로 접하도록 설치할 수도 있다.The formwork is temporarily fixed to the lower outer peripheral surface of the pillar cutting portion by anchor bolts and the like, and is installed in a funnel shape with the upper portion open to pour the finishing mortar. The open form plate does not need to be formed to be open to all sides of the column, if the square pillars can be installed so as to open the upper side only on both sides, the other side as it is in contact with the building pillar surface.

이에 상부로 마감모르타르 등을 타설하여 당초 건물기둥의 마감면이 형성될 수 있도록 하며, 벌어진 상부에 의하여 당초 건물기둥 표면으로부터 돌출된 피복콘크리트는 연마기 등으로 갈아 없앨 수 있다.In order to form the finishing mortar and the like to form the finishing surface of the original building pillar, the coated concrete protruding from the surface of the original building pillar by the gaping top can be removed by a grinding machine.

이러한 작업이 모두 완료되면 하부추상대(110), 상부추상대(130), 승강수단(300)을 해체하고 전용이 가능하도록 한다.When all of these operations are completed, the lower abstract stand 110, the upper abstract stand 130, the lifting means 300 to dismantle and enable the dedicated.

도 5는 부등침하된 건물(점선)이 본 발명의 인상시스템에 의하여 복원된 상태를 도시한 것이다.Fig. 5 shows a state in which an unevenly set building (dotted line) is restored by the pulling system of the present invention.

즉, 본 발명의 인상시스템(100)에 의하여 침하가 복원된 건물(900)은 1층의 건물기둥들에 본 발명의 인상시스템을 설치하여 침하된 1층을 인상시켜 전체적으로 침하된 건물이 원상태로 복원되도록 하는 것이다. 이는 1층의 인상에 의하여 상부층도 자연스럽게 인상될 수 있기 때문이다.That is, in the building 900 where the settlement has been restored by the impression system 100 of the present invention, the impression system of the present invention is installed on the building pillars of the first floor to raise the first floor that has been settled so that the entire settled building is in its original state. To be restored. This is because the upper layer may be naturally raised by the impression of the first floor.

본 발명의 기둥 인상을 통한 건물보수시스템에 의하여 부등침하된 건물의 원상회복에 있어 기중자체를 그대로 이용함으로서 경제적이며 효율적인 방법의 적용이 가능하게 된다.The economical and efficient method can be applied by using the crane itself as it is in the original restoration of a building that has been inevitably settled by the building repair system through the column raising of the present invention.

즉, 각 기둥의 인상에 있어 사용되는 추상대 및 승강수단은 그 제작, 설치 및 해체가 용이하여 시공이 매우 용이하게 되며, 다른 건물의 인상에 전용이 가능하여 매우 효율적이고 경제적인 건물인상이 가능하게 된다.In other words, the abstract stage and the lifting means used for the impression of each column are easy to manufacture, install and dismantle, and the construction is very easy. Done.

앞에서 설명되고, 도면에 도시된 본 발명의 일 실시예는 본 발명의 기술적사상을 한정하는 것으로 해석되어서는 안 된다. 본 발명의 보호범위는 청구범위에 기재된 사항에 의하여만 제한되고, 본 발명의 기술분야에서 통상의 지식을 가진 자는 본 발명의 기술적 사상을 다양한 형태로 개량 변경하는 것이 가능하다. 따라서 이러한 개량 및 변경은 통상의 지식을 가진 자에게 자명한 것인 한 본 발명의 보호범위에 속하게 된다.An embodiment of the present invention described above and illustrated in the drawings should not be construed as limiting the technical spirit of the present invention. The protection scope of the present invention is limited only by the matters described in the claims, and those skilled in the art can change and change the technical idea of the present invention in various forms. Therefore, such improvements and modifications fall within the protection scope of the present invention as long as it will be apparent to those skilled in the art.

Claims (9)

건물 기둥 내부에 매립된 철근을 노출시켜 단절시킨 기둥절단부가 노출되도록 블록아웃부가 형성되며, 기둥하부(A) 주위바닥면에 하부가 지지되어 기둥 하부 주위를 감싸도록 설치된 H 형강을 포함하는 하부추상대; 상기 하부추상대 상부면에 유압잭을 포함하는 승강수단이 지지되도록 설치된 승강수단설치부; 및 상기 승강수단의 상부면과 기둥상부(B) 주위 천정면 사이에 기둥 상부 주위를 감싸도록 설치된 H 형강을 포함하는 상부추상대;를 포함하되, 승강수단에는 시차를 두고 승강수단을 단계적으로 작동시킬 수 있도록 스크류잭을 포함한 승강유지장치가 승강수단설치부에 더 설치되며, 상기 승강수단의 작동에 의하여 단절된 기둥 상부 자체가 상승되도록 하는 것을 특징으로 하는 기둥 인상을 통한 건물보수시스템.A block out part is formed to expose the column cutting part exposed by exposing the reinforcing steel bars embedded in the building pillar, and the lower weight including the H-beam installed to surround the lower part of the column by supporting the lower part on the bottom surface of the lower part of the column (A). opponent; An elevating means installation part installed to support an elevating means including a hydraulic jack on an upper surface of the lower abstract stand; And an upper abstract stage including an H-shaped steel installed between the upper surface of the elevating means and the ceiling surface around the columnar portion B to surround the upper portion of the column. The elevating means includes stepwise operation of the elevating means with a time difference. A lifting maintenance device including a screw jack is further installed on the lifting means installation unit so that the upper part of the column itself is cut off by the operation of the lifting means. 제 1항에 있어서, 하부추상대는The lower abstract stand of claim 1, wherein 기둥 하부 주위를 감싸도록 상, 하로 조적되어 배치된 H 형강을 포함하는 수직대; A vertical stand including an H-shaped steel disposed up and down to be wrapped around the lower part of the column; 절단기둥부가 노출되도록 수직대가 조적 배치된 공간을 블록아웃시켜 형성시킨 블록아웃부; 및 A block out part formed by blocking out a space in which the vertical stand is arranged to expose the cutter pillar; And 상기 수직대를 결속시키도록 수직대를 관통하여 수직대 양 단부측면에 설치된 보강지지판에 볼트 및 너트를 포함한 고정구에 의하여 결속되는 관통지지부재;를 포함하는 것을 특징으로 하는 기둥 인상을 통한 건물보수시스템.Building repair system through the column lifting characterized in that it comprises; through the vertical support penetrating the vertical stand to be connected to the reinforcement support plate installed on both end sides of the vertical stand by a fastener including a bolt and a nut; . 제 2항에 있어서, 상기 하부추상대의 수직대는 기둥의 높이 및 단면형태를 미리 고려하여 설계되어 미리 제작되어 세팅된 H 형강, 원형관 및 사각관 중 어느 하나로 설치된 것을 특징으로 하는 기둥 보수시스템.The pillar repair system according to claim 2, wherein the vertical stand of the lower abstract stand is installed in any one of a H-beam, a circular tube, and a square tube, which are designed and manufactured in advance in consideration of the height and the cross-sectional shape of the pillar. 제 1항에 있어서, 보수해야할 기둥의 단면형태 밑 크기에 관계없이 설치될 수 있도록 상기 하부추상대는,According to claim 1, wherein the lower abstract so that it can be installed regardless of the cross-sectional size of the column to be repaired, 고정대;와 고정대 일측면으로부터 돌출되어 배치된 H 형강을 포함하는 양 측면대;로 이루어져 전체적으로 ㄷ 자 형태로 기둥 주위를 감싸도록 제작되고 상, 하로 조적되어 설치된 고정형추상대; 및Fixed side; and both side bars including an H-shaped steel protruding from one side of the fixed side; consisting of a fixed abstract installed to be wrapped around the pillar in a c-shape as a whole and installed up and down; And 상기 고정형추상대 안쪽으로 배치된 기둥 주위의 개방된 공간에 절단기둥부 형성을 위한 블록아웃부를 제외하고, 폐합된 공간으로 하부추상대가 이루어지도록 현장에서 상,하로 조적되어 설치된 가변형추상대;를 포함하는 것을 특징으로 하는 기둥 보수시스템.Excluding block-out portion for forming a cutter pillar in the open space around the column arranged in the fixed abstract bar, the variable abstract bar is installed up and down in the site so that the lower abstract is made to the closed space; Pillar repair system characterized in that. 제 1항에 있어서, 상기 상부추상대는 According to claim 1, wherein the upper abstract stand 기둥 상부 주위를 감싸도록 상, 하로 조적되어 배치된 H 형강, 사각관 및 원형관 중 어느 하나로 설치된 수직대; 및 Vertical stand installed in any one of the H-shaped steel, square tube and round tube arranged up and down to wrap around the top of the column; And 상기 수직대를 결속시키도록 수직대를 관통하여 수직대 양 단부측면에 설치된 보강지지판에 볼트 및 너트를 포함한 고정구에 의하여 결속되는 관통지지부재; 를 포함하는 것을 특징으로 하는 기둥 보수시스템.A penetrating support member which penetrates the vertical stand so as to bind the vertical stand and is fastened by fasteners including bolts and nuts to reinforcement support plates provided at both end sides of the vertical stand; Pillar repair system comprising a. 제 5항에 있어서, 상기 수직대 상부에는 천정면 또는 가로빔 하면에 접하여 설치된 H 형강을 포함하는 보강빔이 다른 기둥의 수직대 상부에 더 연결 설치되는 것을 특징으로 하는 기둥 보수시스템.6. The pillar repair system of claim 5, wherein a reinforcing beam including an H-beam installed in contact with the ceiling surface or the lower surface of the horizontal beam is further connected to the vertical column of another pillar. 삭제delete 제 1항 내지 제 6항중 어느 한 항에 있어서, 상기 기둥보수 시스템은 건물의 한 층에 설치된 모든 기둥에 설치되어 동시에 각 승강수단이 작동되도록 하되, 기둥 외 각 층 바닥판과 천정에 부착되어 설치된 구조물도 승강이 가능하도록 상,하 단절시킬 수 있으며, 상기 하부추상대 하부 주위에 경사대에 의하여 하부추상대와 연결지지된 받침대가 더 설치되는 것을 특징으로 하는 기둥 보수시스템.7. The pillar repair system according to any one of claims 1 to 6, wherein the pillar repair system is installed on all pillars installed on one floor of the building so that each lifting means is operated at the same time, and is attached to the floor plate and the ceiling of each floor outside the pillar. The structure can also be disconnected up and down to enable the lifting, the pillar maintenance system, characterized in that the pedestal is further connected to the lower abstract stand by the inclined platform around the lower lower stand. 제 1항 내지 제 6항중 어느 한 항에 있어서, 기둥 내부에 단절된 철근을 이어주는 커플러를 포함하는 철근연결수단; 및 하부가 기둥절단부 하부 주위에 고정되고, 상부가 기둥절단부 상부 주위로 벌어지면서 개방된 깔때기 형태로 형성된 절단기둥부 거푸집; 상기 절단기둥부 거푸집 내부로 충전된 후 양생되어 마감되는 피 복콘크리트;를 포함하는 절단기둥부용 마감부를 더 형성시키는 것을 특징으로 하는 기둥 보수시스템.According to any one of claims 1 to 6, Reinforcing bar connecting means including a coupler for connecting the reinforcing bar in the column; And the lower portion is fixed around the columnar lower portion, the upper portion is formed around the upper portion of the column cutting portion cutter cutter formed in the form of open funnel; Pillar repair system, characterized in that to further form a cutting portion for cutting including including; concrete coated with the curing after filling the inside of the cutter die.
KR1020060005015A 2006-01-17 2006-01-17 Building repairing system through column raising KR100617395B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060005015A KR100617395B1 (en) 2006-01-17 2006-01-17 Building repairing system through column raising

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060005015A KR100617395B1 (en) 2006-01-17 2006-01-17 Building repairing system through column raising

Publications (1)

Publication Number Publication Date
KR100617395B1 true KR100617395B1 (en) 2006-09-01

Family

ID=37625466

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060005015A KR100617395B1 (en) 2006-01-17 2006-01-17 Building repairing system through column raising

Country Status (1)

Country Link
KR (1) KR100617395B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100877596B1 (en) 2008-03-03 2009-01-07 제일구조건설(주) Building repairing method using column reinforcing member
KR101704245B1 (en) 2015-08-20 2017-02-08 유창호 Steel structure lifting device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04231550A (en) * 1990-12-19 1992-08-20 Bernon M Smith Jack rig and jacking method
JPH11107540A (en) * 1997-10-02 1999-04-20 Kumagai Gumi Co Ltd Method for base isolation of existing reinforced concrete structure having columnar structural member
JPH11222812A (en) * 1998-02-04 1999-08-17 East Japan Railway Co Changing method of height of structure
KR200256837Y1 (en) * 2001-09-10 2001-12-24 주식회사 건화엔지니어링 Pier sheeting support structure using an assembly band and support
JP2002227425A (en) * 2001-01-30 2002-08-14 Mitsui Constr Co Ltd Temporary structure for setting base isolation device to existing building, and method for setting the same
KR20030073280A (en) * 2002-03-09 2003-09-19 오원균 A system for increase of Heigrt a concrete building.
KR20050033128A (en) * 2003-10-06 2005-04-12 노윤근 Apparatus for raising the upper structure of a bridge and method for raising a bridge using the apparatus

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04231550A (en) * 1990-12-19 1992-08-20 Bernon M Smith Jack rig and jacking method
JPH11107540A (en) * 1997-10-02 1999-04-20 Kumagai Gumi Co Ltd Method for base isolation of existing reinforced concrete structure having columnar structural member
JPH11222812A (en) * 1998-02-04 1999-08-17 East Japan Railway Co Changing method of height of structure
JP2002227425A (en) * 2001-01-30 2002-08-14 Mitsui Constr Co Ltd Temporary structure for setting base isolation device to existing building, and method for setting the same
KR200256837Y1 (en) * 2001-09-10 2001-12-24 주식회사 건화엔지니어링 Pier sheeting support structure using an assembly band and support
KR20030073280A (en) * 2002-03-09 2003-09-19 오원균 A system for increase of Heigrt a concrete building.
KR20050033128A (en) * 2003-10-06 2005-04-12 노윤근 Apparatus for raising the upper structure of a bridge and method for raising a bridge using the apparatus

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
04231550 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100877596B1 (en) 2008-03-03 2009-01-07 제일구조건설(주) Building repairing method using column reinforcing member
KR101704245B1 (en) 2015-08-20 2017-02-08 유창호 Steel structure lifting device

Similar Documents

Publication Publication Date Title
JP6448817B2 (en) PC truss wall structure and construction method thereof
US3921362A (en) Method of and means for multi-story building construction
KR100991208B1 (en) Prestress composite wale for earth retaining scaffolding and this construction technique
US7607274B1 (en) Method of constructing a building in a typically flood prone area employing a pre-cast concrete chain wall
KR100837608B1 (en) J.K Bracket Method
KR100908321B1 (en) Prestress composition wale construction method for sheathing work
KR20200112052A (en) Precast wall reinforced with built-in pressure resistance
KR100775767B1 (en) Top-down method using the vertical steel bar for the src column
KR101954155B1 (en) Bridge with full-deck and protective wall, and construction method for the same
KR20120085641A (en) Assembling structure for beam and slab and method for constructing cosstructure using it
KR100617395B1 (en) Building repairing system through column raising
KR101105883B1 (en) Basic mat constructing method of high rise concrete structure
KR100646178B1 (en) temporary facilities using steel pipe
JP7072483B2 (en) How to build a skeleton
US7144200B2 (en) Innovative prestressed scaffolding system
KR102511485B1 (en) A device for introducing lateral support using the support force of both ends of a collective facility for building civil engineering, including a group stake for temporary facilities, and a method for installing the same and constructing a soil barrier temporary facility
KR101880813B1 (en) A sandwitch pc pannel structure and construction method of structure using thereof
KR100877596B1 (en) Building repairing method using column reinforcing member
JP5368040B2 (en) Horizontal force restraint method in seismic isolation work
KR102214872B1 (en) Structure using support beam and method for constructing the same
KR100381411B1 (en) Modified T-shape PC slab which include service duct in the web of slab and method for constructing structure using the same
JP5437876B2 (en) Method of dismantling and removing support members in the construction process of RC RC ramen structure viaduct
KR100612662B1 (en) Steel-frame assembly body production method of ferroconcrete infrastructure
KR100278767B1 (en) Formwork for beam forming and building construction method using the same
JP7311456B2 (en) Construction method of underground structure

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130809

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20140602

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20150810

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20160810

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20170821

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20181010

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20190910

Year of fee payment: 14