EP2287343A2 - Continuous press hardening process and apparatus therefor - Google Patents
Continuous press hardening process and apparatus therefor Download PDFInfo
- Publication number
- EP2287343A2 EP2287343A2 EP09810135A EP09810135A EP2287343A2 EP 2287343 A2 EP2287343 A2 EP 2287343A2 EP 09810135 A EP09810135 A EP 09810135A EP 09810135 A EP09810135 A EP 09810135A EP 2287343 A2 EP2287343 A2 EP 2287343A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- hot
- steel sheet
- rolled steel
- press
- blanking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D1/00—General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
- C21D1/62—Quenching devices
- C21D1/673—Quenching devices for die quenching
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D1/00—General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
- C21D1/18—Hardening; Quenching with or without subsequent tempering
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/46—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D28/00—Shaping by press-cutting; Perforating
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D9/00—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
- C21D9/46—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for sheet metals
- C21D9/48—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for sheet metals deep-drawing sheets
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B9/00—Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity
- F27B9/14—Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity characterised by the path of the charge during treatment; characterised by the means by which the charge is moved during treatment
- F27B9/20—Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity characterised by the path of the charge during treatment; characterised by the means by which the charge is moved during treatment the charge moving in a substantially straight path tunnel furnace
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D11/00—Process control or regulation for heat treatments
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D2211/00—Microstructure comprising significant phases
- C21D2211/008—Martensite
Definitions
- the present invention relates to a continuous press hardening process and apparatus therefor, and more particularly, to a process of continuous press hardening which integrates hot rolling with press hardening to simplify the process and an apparatus therefor.
- a method of manufacturing a part in press hardening is a process of manufacturing a high-strength part for vehicles, which includes heating a steel material having improved hardenability by adding boron (B) at about 900°C above Ac3 transformation point in complete an austenite state, and then hot-forming and rapidly cooling the steel sheet to a desired shape at one time in a press die into martensite structure.
- B boron
- the press hardening is achieved by reheating a blanking device B which is obtained from a hot-rolled steel sheet coil C and is not hardened through a straight furnace O, conveying the blank to a press P with a robot R, and then pressing it (hot forming), as shown in FIG. 1 .
- a hot-rolled steel sheet that is supplied in press hardening of the related art is as follows.
- a slab is manufactured by continuously casting molten metal discharged from an electric furnace or a blast furnace.
- the slab is reheated and rolled at austenite transformation temperature or more (about 1100°C), scales are removed using high-pressure cooling water, and through cooling process, the hot-rolled steel sheet having desired dimensions and the desired shape is manufactured in a coil shape.
- the method of manufacturing a part in press hardening process has a problem in terms of manufacturing cost and processing time, because the process of manufacturing a hot-rolled steel sheet and the press hardening are separated such that the process of reheating and cooling is added before the press hardening.
- a hot-rolled steel sheet is manufactured by a slab casting process that is performed in the order of (a) manufacturing molten metal - (b) continuous casting - (c) manufacturing a slab - (d) reheating the slab - (e) hot rolling - (f) winding, and then press hardening is performed in the order of (g) blanking - (h) reheating a steel sheet - (i) forming - (j) cooling - (k) achieving a complete product (high-strength part); therefore, an apparatus for reheating the steel sheet is necessarily required and the working time increases.
- the present invention has been made in an effort to provide a continuous press hardening process and apparatus therefor which integrates the process lines for hot rolling with press hardening such that a part for press hardening is continuously hot-rolled and press-hardened in the manufacturing process.
- an embodiment of the present invention provides a process of continuous press hardening, which includes: slab casting that includes making a slab by continuously casting molten steel refined by an electric furnace or a blast furnace, and then reheating and hot-rolling the slab into a hot-rolled steel sheet; blanking that includes, after the slab casting, conveying the hot-rolled steel sheet to a blanking device through a sealed oven and blanking the hot-rolled steel sheet; and press hardening that includes, after the blanking, conveying the hot-rolled steel sheet to a press die and pressing the hot-rolled steel sheet.
- Another embodiment of the present invention provides a process of continuous press hardening, which includes: thin slab casting or strip casting that includes making a hot-rolled steel sheet by continuous-casting molten steel refined by an electric furnace or a blast furnace; blanking that includes, after the thin slab casting or strip casting, conveying the hot-rolled steel sheet to a blanking device through a sealed oven and blanking the hot-rolled steel sheet; and press hardening that includes, after the blanking, conveying the hot-rolled steel sheet to a press die disposed at an outlet of the sealed oven and pressing the hot-rolled steel sheet.
- the blanking of a hot-rolled steel sheet is performed in the sealed oven that is supplied with hot air from a blast furnace or a electric furnace.
- the internal temperature of the sealed oven is maintained in the range of 1000 to 1200°C such that the temperature of the hot-rolled steel sheet is maintained in an austenite region.
- the steel sheet pressed in the press hardening is cooled such that the structure becomes a martensite structure.
- a path changing process that changes a conveying path of the hot-rolled steel sheet when a problem occurs in the press die is included.
- the path changing process includes: sensing, by a sensor, a problem in the press die; determining, by a controller, whether a problem has occurred in the press die in response to the signal from the sensor and changing the conveying path of the hot-rolled steel sheet by driving an emergency cutter and leading roller when a problem has occurred; and winding the hot-rolled steel sheet transferred through the changed conveying path.
- a plurality of press dies is operated to continuously press the blanked hot-rolled steel sheet, wherein a conveying direction of the blanked hot-rolled steel sheet is determined by the controller receiving the signal from the sensor that has sensed the problem, and the blanked hot-rolled steel sheet is supplied to a corresponding press die through a high-speed conveyer disposed between the outlet of the sealed oven and the press dies.
- Yet another embodiment of the present invention provides an apparatus for press hardening, including: a slab casting device that manufactures a hot-rolled steel sheet; a blank that is disposed at an outlet of a rolling machine in the equipment for slab casting and blanks the hot-rolled steel sheet in a predetermined size; a press die that comprises into upper and lower die portions located at an outlet side of the blank and presses the blanked steel sheet at a high temperature; and a sealed oven that is disposed between the outlet of the rolling machine and the press die such that the blank is positioned therein, and connected with an air channel of a blast furnace or an electric furnace to maintain the temperature of the hot-rolled steel sheet passing through the sealed oven within an austenite region.
- the sealed oven has an inlet and an outlet and is provided with a conveying line extending from the inlet toward the outlet therein such that the hot-rolled steel sheet is conveyed.
- Leading rollers that guides the hot-rolled steel sheet toward a position lower than the outlet of the rolling machine when a problem occurs in the press die and a winder that winds the hot-rolled steel sheet guided by the leading rollers disposed between the outlet of the rolling machine and the sealed oven.
- a plurality of the press dies are provided, and a high-speed conveyer that conveys the hot-rolled steel sheet discharged from the outlet of the sealed oven to the press dies and is disposed between the outlet of the sealed oven and the press die.
- the method does not need additional reheating, because of directly putting hot steel sheet obtained by hot rolling into the press hardening. Therefore, it is possible to reduce the prime cost by simplifying the process.
- a method of press hardening includes: sequential processes of slab casting that includes making a slab by continuously casting molten steel refined by an electric furnace or a blast furnace, and then reheating and hot-rolls the slab into a hot-rolled steel sheet; and press hardening that includes conveying, blanking, and pressing the hot-rolled steel sheet manufactured by the slab casting.
- the slab casting and the press hardening are implemented in a continuous line.
- a blanking device B for cutting the hot-rolled steel sheet into a predetermined width and a hot press die P are disposed to the outlet side of the equipment for slab casting for manufacturing the hot-rolled steel sheet instead of equipment for cooling and winding.
- the press die P includes upper and lower dies which are respectively provided with cooling water for hardening the surface structure of the hot-rolled steel sheet.
- the slab casting is implemented in the order of (a) manufacturing molten metal - (b) continuous casting - (c) manufacturing a slab - (d) reheating the slab - (e) hot rolling and the press hardening is implemented in the order of (f) blanking - (g) forming - (h) cooling - (i) achieving a complete product.
- the processes are sequentially implemented, and the processes and temperature changes in the processes are shown in FIGS. 3 and 4 .
- a hot-rolled steel sheet S finally hot-rolled by the slab casting equipment is conveyed to the blanking device B and cut in a predetermined width, and then conveyed and pressed by the press die P, which sequentially proceeds.
- Press forming is hot forming and should be performed to the hot-rolled steel sheet at temperature above austenite transformation temperature where the elongation is good; therefore, blanking is performed in a sealed oven M to maintain the temperature of the hot-rolled steel sheet during the rolling.
- the rolling and blanking are processes before the press forming.
- the hot-rolled steel sheet S is exposed to the air in the rolling and blanking, it is cooled at a rate of 20°C per second and the temperature can be below the austenite transformation temperature in the press forming after the blanking is finished, thereby deteriorating formability of the hot-rolled steel sheet. Therefore, it is required to provide a sealed section before the press forming. Further, the sealed section also prevents the hot-rolled steel sheet from oxidation.
- a space having a predetermined size is defined in the sealed oven M and the space communicates with the outside through an inlet and an outlet.
- a conveyer line L extending outside through the inlet and the outlet is disposed in the space to convey the hot-rolled steel sheet from the inlet to the outlet.
- the temperature of the sealed oven M is maintained by hot air blown out of an electric furnace or a blast furnace between 1000 and 1200°C such that temperature of the blanked hot-rolled steel sheet, that is, the hot-rolled steel sheet blank S1 is maintained at 900°C or more in press forming, assuming that hot rolling temperature is 1000°C or more. This is determined in consideration of that the movement time of the hot-rolled steel sheet from the blanking to the press forming is about 8 seconds and the hot-rolled steel sheet is cooled for the time.
- the temperature inside the sealed oven M can be adjusted in consideration of the process design change. For this reason, the sealed oven M is connected to an air channel 10 of the blast furnace or the electric furnace such that hot air is consistently supplied into the space.
- the present invention provides a configuration against a problem of the press die, because the process is sequentially implemented.
- a first alternative is a winder 20 disposed under and between the outlet of a rolling machine R and the sealed oven M, as shown in FIG. 7 .
- the winder 20 is provided to wind the hot-rolled steel sheet without blanking, when a problem occurs in the press die P.
- Leading rollers 21 and 23 are disposed above the winder 20 to guide the hot-rolled steel sheet S to not the sealed oven M, but the winder 20.
- the leading rollers 21 and 23 are an upper leading roller 21 and a lower leading roller 23.
- the upper leading roller 21 is movable up/down with respect to the lower leading roller 23 such that it allows the hot-rolled steel sheet S to smoothly move into the sealed oven M by moving up when the press die is in normal operation.
- the downward movement of the roller changes the conveying path of the hot-rolled steel sheet S to the winder 20 when a problem occurs in the press die P.
- the upper leading roller 21 can be moved up/down by an external driving unit or hydraulic pressure.
- a sensor 25 is provided to sense a problem in the press die P.
- the sensor 25 is disposed close to the press die P and senses a problem in the press die P.
- the sensor 25 is a typical sensor that is widely used.
- a signal for a problem in the press die P is transmitted from the sensor 25 to a controller 27.
- the controller 27 controls the upper leading roller 21 to move to the lower leading roller 23 such that the hot-rolled steel sheet S is guided downward to be wound by the winder 20.
- An emergency cutter 29 is provided between the outlet of the rolling machine R and the lead rollers 21 and 23.
- the emergency cutter 29 cuts the hot-rolled steel sheet S that is being conveyed, when the upper leading roller 21 moves down. This is because cutting the hot-rolled steel sheet S is required to guide downward the hot-rolled steel sheet S, which is being conveyed, to be wound by the winder 20.
- the present invention includes a process of changing the path that changes the conveying path of the hot-rolled steel sheet S, when a problem occurs in the press die P.
- the path changing process includes: sensing a problem of the press die P and outputting a signal in the sensor 25; determining, by a controller 27, whether a problem has occurred in the press die P in response to the signal from the sensor 25 and changing the conveying path of the hot-rolled steel sheet S by operating the emergency cutter 29 and the leading rollers 21 and 23 when there is a problem; and winding the hot-rolled steel sheet S with the changed conveying path.
- reference numeral '28' in FIG. 7 indicates a robot that carries a hot-rolled steel sheet blank S1 to the press P.
- a second alternative is to operate a plurality of press dies P1, P2, and P3, as shown in FIG. 8 . This is for continuing the press forming when a problem occurs in any one press die P1, by distributing the hot-rolled steel sheet blank S1 that has been guided to the outlet of the sealed oven M to the other press dies P2 and P3 having no problem.
- a high-speed conveyer 30 is provided between the sealed oven M and the press dies P1, P2, and P3.
- the high-speed conveyer 30 is an apparatus for conveying the hot-rolled steel sheet blank S1 that has been guided to the outlet of the sealed oven M to any one of the press dies P1, P2, and P3.
- the high-speed conveyer 30 has a main line 31 and sub-lines 33 diverging from the main line 31.
- the main line 31 and the sub-lines 33 are implemented, for example, by a plurality of rollers and the rollers in the main line 31 conveys the hot-rolled steel sheet blank S1 to the sub-lines 33 while rotating forward or backward.
- the hot-rolled steel sheet blank S1 conveyed to the sub-lines 33 is conveyed and pressed between the upper and lower dies of the press die.
- a sensor 35 is provided to sense a problem in the press dies P1, P2, and P3.
- the sensor 35 is disposed close to the press dies P1, P2, and P3 and senses a problem in the press dies P1, P2, and P3.
- the sensor 35 is a typical sensor that is widely used.
- a signal for a problem in the press dies P1, P2, and P3 is transmitted from the sensor 35 to a controller 39.
- the controller 39 determines the conveying direction of the hot-rolled steel sheet blank S1 that has been guided to the outlet of the sealed oven M in response to a detection signal from the sensor 35 and then controls the operation of the high-speed conveyer 30.
- the controller 39 controls the operation of the high-speed conveyer 30 such that the hot-rolled steel sheets blank S1 are distributed to the other press dies P2 and P3 that have no problem.
- the hot-rolled steel sheet S that has been finally hot-rolled by the equipment for slab casting can continue being conveyed to be blanking device B, cut in a predetermined width, conveyed to the other press dies P2 and P3, and pressed therein, even if a problem occurs in any one, for example, the press die P1 in the press dies P1, P2, and P3.
- the pressed hot-rolled steel sheet is cooled by water such that the structure of the hot-rolled steel sheet becomes to have a martensite structure, without crossing the low-strength ferrite and pearlite transformation curves in the CCT curve shown in FIG. 9 .
- press hardening described above is also applied to thin slab casting and strip casting equipment, in which the rolling line is short, in addition to the slab casting.
- the process of manufacturing a part for press hardening proceeds, as shown in FIGS. 10 and 11 , in the order of (a) manufacturing molten metal - (b) continuous casting - (c) hot-rolled steel sheet - (d) blanking - (e) forming - (f) cooling, and manufacturing a slab, reheating the slab, winding, and reheating the hot-rolled reheating for press forming are not performed.
- a process of manufacturing a part for press hardening is described with reference to FIGS. 4 to 6 .
- a continuous-cast slab is hot-rolled and the hot-rolled steel sheet S is conveyed into the sealed oven M.
- the hot-rolled steel sheet conveyed in the sealed oven is conveyed to the blanking device B by the conveying line and blanked (cut) to a predetermined size.
- the blanked hot-rolled steel sheets S1 are sequentially conveyed and discharged to the outlet of the sealed oven M.
- the internal temperature of the sealed oven M is about 1000°C, which maintains the temperature of the hot-rolled steel sheet within the austenite region until press forming.
- the configuration of the section where the sealed oven M may be changed in consideration of temperature in the hot-rolling for the slab casting and the thin slab casting/strip casting (see FIGS. 10 and 11 ).
- the blank S1 conveyed outside through the outlet of the sealed oven M is conveyed between the upper and lower dies of the press die and then pressed into a complete product S2.
- the pressed hot-rolled steel sheet is cooled into a martensite structure having high structure strength by cooling.
- the entire process is simplified with a continuous line of the manufacturing process of the part for press hardening, by making the blanking device and the press die for press hardening in a continuous line outside the equipment for slab casting and the equipment for thin slab casting/strip slab casting.
- the process of cooling and winding the steel sheet in a coil after hot rolling and the process of reheating the hot-rolled steel sheet for press forming are removed.
- the temperature of the hot-rolled steel sheet is maintained at the austenite transformation temperature or more by the sealed oven, until before the hot-rolled steel sheet is pressed after being hot-rolled, even if the reheating is removed, a high-strength part can be manufactured.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Mechanical Engineering (AREA)
- Materials Engineering (AREA)
- Thermal Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Physics & Mathematics (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- General Engineering & Computer Science (AREA)
- Metal Rolling (AREA)
- Shaping Metal By Deep-Drawing, Or The Like (AREA)
- Heat Treatment Of Articles (AREA)
Abstract
Description
- The present invention relates to a continuous press hardening process and apparatus therefor, and more particularly, to a process of continuous press hardening which integrates hot rolling with press hardening to simplify the process and an apparatus therefor.
- In general, when the strength increases, the formability decreases in typical machining steel sheets which are used as parts for vehicles; therefore, steel sheets having low strength and high elongation are generally used for parts that are complicated and needs lots of portions transformed. Accordingly, the strength of the finished parts is weak and the thickness of the material increases to ensure rigidity such that weight of the parts increases. Parts for press hardening are used to overcome those problems.
- A method of manufacturing a part in press hardening is a process of manufacturing a high-strength part for vehicles, which includes heating a steel material having improved hardenability by adding boron (B) at about 900°C above Ac3 transformation point in complete an austenite state, and then hot-forming and rapidly cooling the steel sheet to a desired shape at one time in a press die into martensite structure.
- As well known in the art, since when the steel sheets are heated, the elongation increases, the formability is better than cold-worked steel sheet and the strength is very high (1400 Mpa) such that they can greatly contribute to reducing weight of vehicles, and they are used for ultra-high parts that are difficult to form, because there is little springback after machining.
- The press hardening is achieved by reheating a blanking device B which is obtained from a hot-rolled steel sheet coil C and is not hardened through a straight furnace O, conveying the blank to a press P with a robot R, and then pressing it (hot forming), as shown in
FIG. 1 . - Further, a hot-rolled steel sheet that is supplied in press hardening of the related art is as follows. A slab is manufactured by continuously casting molten metal discharged from an electric furnace or a blast furnace. The slab is reheated and rolled at austenite transformation temperature or more (about 1100°C), scales are removed using high-pressure cooling water, and through cooling process, the hot-rolled steel sheet having desired dimensions and the desired shape is manufactured in a coil shape.
- However, the method of manufacturing a part in press hardening process has a problem in terms of manufacturing cost and processing time, because the process of manufacturing a hot-rolled steel sheet and the press hardening are separated such that the process of reheating and cooling is added before the press hardening.
- That is, according to the method of manufacturing a part in press hardening, as shown in
FIGS. 2A and 2B , a hot-rolled steel sheet is manufactured by a slab casting process that is performed in the order of (a) manufacturing molten metal - (b) continuous casting - (c) manufacturing a slab - (d) reheating the slab - (e) hot rolling - (f) winding, and then press hardening is performed in the order of (g) blanking - (h) reheating a steel sheet - (i) forming - (j) cooling - (k) achieving a complete product (high-strength part); therefore, an apparatus for reheating the steel sheet is necessarily required and the working time increases. - In order to solve the above problems, the present invention has been made in an effort to provide a continuous press hardening process and apparatus therefor which integrates the process lines for hot rolling with press hardening such that a part for press hardening is continuously hot-rolled and press-hardened in the manufacturing process.
- In order to achieve the objects, an embodiment of the present invention provides a process of continuous press hardening, which includes: slab casting that includes making a slab by continuously casting molten steel refined by an electric furnace or a blast furnace, and then reheating and hot-rolling the slab into a hot-rolled steel sheet; blanking that includes, after the slab casting, conveying the hot-rolled steel sheet to a blanking device through a sealed oven and blanking the hot-rolled steel sheet; and press hardening that includes, after the blanking, conveying the hot-rolled steel sheet to a press die and pressing the hot-rolled steel sheet.
- Another embodiment of the present invention provides a process of continuous press hardening, which includes: thin slab casting or strip casting that includes making a hot-rolled steel sheet by continuous-casting molten steel refined by an electric furnace or a blast furnace; blanking that includes, after the thin slab casting or strip casting, conveying the hot-rolled steel sheet to a blanking device through a sealed oven and blanking the hot-rolled steel sheet; and press hardening that includes, after the blanking, conveying the hot-rolled steel sheet to a press die disposed at an outlet of the sealed oven and pressing the hot-rolled steel sheet.
- The blanking of a hot-rolled steel sheet is performed in the sealed oven that is supplied with hot air from a blast furnace or a electric furnace.
- The internal temperature of the sealed oven is maintained in the range of 1000 to 1200°C such that the temperature of the hot-rolled steel sheet is maintained in an austenite region.
- The steel sheet pressed in the press hardening is cooled such that the structure becomes a martensite structure.
- A path changing process that changes a conveying path of the hot-rolled steel sheet when a problem occurs in the press die is included.
- The path changing process includes: sensing, by a sensor, a problem in the press die; determining, by a controller, whether a problem has occurred in the press die in response to the signal from the sensor and changing the conveying path of the hot-rolled steel sheet by driving an emergency cutter and leading roller when a problem has occurred; and winding the hot-rolled steel sheet transferred through the changed conveying path.
- When a problem has occurred in the press die, a plurality of press dies is operated to continuously press the blanked hot-rolled steel sheet, wherein a conveying direction of the blanked hot-rolled steel sheet is determined by the controller receiving the signal from the sensor that has sensed the problem, and the blanked hot-rolled steel sheet is supplied to a corresponding press die through a high-speed conveyer disposed between the outlet of the sealed oven and the press dies.
- Yet another embodiment of the present invention provides an apparatus for press hardening, including: a slab casting device that manufactures a hot-rolled steel sheet; a blank that is disposed at an outlet of a rolling machine in the equipment for slab casting and blanks the hot-rolled steel sheet in a predetermined size; a press die that comprises into upper and lower die portions located at an outlet side of the blank and presses the blanked steel sheet at a high temperature; and a sealed oven that is disposed between the outlet of the rolling machine and the press die such that the blank is positioned therein, and connected with an air channel of a blast furnace or an electric furnace to maintain the temperature of the hot-rolled steel sheet passing through the sealed oven within an austenite region.
- The sealed oven has an inlet and an outlet and is provided with a conveying line extending from the inlet toward the outlet therein such that the hot-rolled steel sheet is conveyed.
- Leading rollers that guides the hot-rolled steel sheet toward a position lower than the outlet of the rolling machine when a problem occurs in the press die and a winder that winds the hot-rolled steel sheet guided by the leading rollers disposed between the outlet of the rolling machine and the sealed oven.
- A plurality of the press dies are provided, and a high-speed conveyer that conveys the hot-rolled steel sheet discharged from the outlet of the sealed oven to the press dies and is disposed between the outlet of the sealed oven and the press die.
- According to the embodiments of the present invention, it is possible to supply a steel sheet to press hardening before micro-structure transformation by maintaining high temperature in hot rolling, without accompanying cooling and winding after hot rolling in manufacturing a steel sheet. Further, it is possible to manufacture a high-strength part by controlling the cooling rate after press forming.
- The method does not need additional reheating, because of directly putting hot steel sheet obtained by hot rolling into the press hardening. Therefore, it is possible to reduce the prime cost by simplifying the process.
- Further, according to the embodiments of the present invention, it is possible to reduce the manufacturing cost because specific equipment for cooling, winding, and reheating a hot-rolled steel sheet is not needed, and it is possible to improve productivity because press hardening is sequentially performed after hot rolling.
- Further, since a configuration to resolve any problem in the press die is provided, the continuous process can be continued and it is possible to improve production efficiency.
-
-
FIG. 1 is a view schematically showing press hardening of the related art. -
FIGS. 2 and3 are process diagrams illustrating press hardening of the related art. -
FIGS. 4 and5 are process diagrams illustrating continuous press hardening according to the present invention. -
FIG. 6 is a view schematically showing the configuration of a sealed oven that is used in an embodiment of a continuous press hardening apparatus according to the present invention. -
FIG. 7 is a view schematically showing the configuration of a sealed oven that is used in another embodiment of a continuous press hardening apparatus according to the present invention. -
FIG. 8 is a view schematically showing the configuration of a sealed oven that is used in yet another embodiment of a continuous press hardening apparatus according to the present invention. -
FIG. 9 is a CCT curve showing temperature changes according to forming and cooling in the process of continuous press hardening of the present invention. -
FIGS. 10 and11 are process diagrams illustrating another embodiment of the process of continuous press hardening according to the present invention. -
FIG. 12 is a picture of the structure of a press-hardened part manufactured according to the present invention. - A continuous press hardening process and apparatus therefor according to an embodiment of the present invention is described hereafter in detail with reference to the accompanying drawings.
- A method of press hardening according to an embodiment of the present invention includes: sequential processes of slab casting that includes making a slab by continuously casting molten steel refined by an electric furnace or a blast furnace, and then reheating and hot-rolls the slab into a hot-rolled steel sheet; and press hardening that includes conveying, blanking, and pressing the hot-rolled steel sheet manufactured by the slab casting.
- For those processes, the slab casting and the press hardening are implemented in a continuous line. A blanking device B for cutting the hot-rolled steel sheet into a predetermined width and a hot press die P are disposed to the outlet side of the equipment for slab casting for manufacturing the hot-rolled steel sheet instead of equipment for cooling and winding. For reference, the press die P includes upper and lower dies which are respectively provided with cooling water for hardening the surface structure of the hot-rolled steel sheet.
- The slab casting is implemented in the order of (a) manufacturing molten metal - (b) continuous casting - (c) manufacturing a slab - (d) reheating the slab - (e) hot rolling and the press hardening is implemented in the order of (f) blanking - (g) forming - (h) cooling - (i) achieving a complete product. The processes are sequentially implemented, and the processes and temperature changes in the processes are shown in
FIGS. 3 and4 . - A hot-rolled steel sheet S finally hot-rolled by the slab casting equipment is conveyed to the blanking device B and cut in a predetermined width, and then conveyed and pressed by the press die P, which sequentially proceeds.
- Press forming is hot forming and should be performed to the hot-rolled steel sheet at temperature above austenite transformation temperature where the elongation is good; therefore, blanking is performed in a sealed oven M to maintain the temperature of the hot-rolled steel sheet during the rolling.
- The rolling and blanking are processes before the press forming. When the hot-rolled steel sheet S is exposed to the air in the rolling and blanking, it is cooled at a rate of 20°C per second and the temperature can be below the austenite transformation temperature in the press forming after the blanking is finished, thereby deteriorating formability of the hot-rolled steel sheet. Therefore, it is required to provide a sealed section before the press forming. Further, the sealed section also prevents the hot-rolled steel sheet from oxidation.
- As shown in
FIG. 6 , a space having a predetermined size is defined in the sealed oven M and the space communicates with the outside through an inlet and an outlet. A conveyer line L extending outside through the inlet and the outlet is disposed in the space to convey the hot-rolled steel sheet from the inlet to the outlet. - The temperature of the sealed oven M is maintained by hot air blown out of an electric furnace or a blast furnace between 1000 and 1200°C such that temperature of the blanked hot-rolled steel sheet, that is, the hot-rolled steel sheet blank S1 is maintained at 900°C or more in press forming, assuming that hot rolling temperature is 1000°C or more. This is determined in consideration of that the movement time of the hot-rolled steel sheet from the blanking to the press forming is about 8 seconds and the hot-rolled steel sheet is cooled for the time.
- However, since the movement time and the cooling of the hot-rolled steel sheet may change in accordance with the dimensions of the equipment for press forming, and the width and thickness of the hot-rolled steel sheet, the temperature inside the sealed oven M can be adjusted in consideration of the process design change. For this reason, the sealed oven M is connected to an
air channel 10 of the blast furnace or the electric furnace such that hot air is consistently supplied into the space. - Meanwhile, the present invention provides a configuration against a problem of the press die, because the process is sequentially implemented.
- A first alternative is a
winder 20 disposed under and between the outlet of a rolling machine R and the sealed oven M, as shown inFIG. 7 . Thewinder 20 is provided to wind the hot-rolled steel sheet without blanking, when a problem occurs in the press die P. - Leading
rollers winder 20 to guide the hot-rolled steel sheet S to not the sealed oven M, but thewinder 20. - The leading
rollers roller 21 and a lower leadingroller 23. The upper leadingroller 21 is movable up/down with respect to the lower leadingroller 23 such that it allows the hot-rolled steel sheet S to smoothly move into the sealed oven M by moving up when the press die is in normal operation. The downward movement of the roller changes the conveying path of the hot-rolled steel sheet S to thewinder 20 when a problem occurs in the press die P. - For reference the upper leading
roller 21 can be moved up/down by an external driving unit or hydraulic pressure. - A
sensor 25 is provided to sense a problem in the press die P. Thesensor 25 is disposed close to the press die P and senses a problem in the press die P. Thesensor 25 is a typical sensor that is widely used. A signal for a problem in the press die P is transmitted from thesensor 25 to acontroller 27. - When determining that a problem has occurred in the press die P in response to the signal received from the
sensor 25, thecontroller 27 controls the upper leadingroller 21 to move to the lower leadingroller 23 such that the hot-rolled steel sheet S is guided downward to be wound by thewinder 20. - An
emergency cutter 29 is provided between the outlet of the rolling machine R and thelead rollers emergency cutter 29 cuts the hot-rolled steel sheet S that is being conveyed, when the upper leadingroller 21 moves down. This is because cutting the hot-rolled steel sheet S is required to guide downward the hot-rolled steel sheet S, which is being conveyed, to be wound by thewinder 20. - That is, the present invention includes a process of changing the path that changes the conveying path of the hot-rolled steel sheet S, when a problem occurs in the press die P.
- The path changing process includes: sensing a problem of the press die P and outputting a signal in the
sensor 25; determining, by acontroller 27, whether a problem has occurred in the press die P in response to the signal from thesensor 25 and changing the conveying path of the hot-rolled steel sheet S by operating theemergency cutter 29 and the leadingrollers - For reference, reference numeral '28' in
FIG. 7 indicates a robot that carries a hot-rolled steel sheet blank S1 to the press P. Although supplying the hot-rolled steel sheet blank S1 to the press die P with the robot exemplified in this embodiment, it is not limitative and it is possible to connect the rollers to the press die P in a continuous line without using the robot. - A second alternative is to operate a plurality of press dies P1, P2, and P3, as shown in
FIG. 8 . This is for continuing the press forming when a problem occurs in any one press die P1, by distributing the hot-rolled steel sheet blank S1 that has been guided to the outlet of the sealed oven M to the other press dies P2 and P3 having no problem. - A high-
speed conveyer 30 is provided between the sealed oven M and the press dies P1, P2, and P3. The high-speed conveyer 30 is an apparatus for conveying the hot-rolled steel sheet blank S1 that has been guided to the outlet of the sealed oven M to any one of the press dies P1, P2, and P3. - The high-
speed conveyer 30 has amain line 31 and sub-lines 33 diverging from themain line 31. Themain line 31 and the sub-lines 33 are implemented, for example, by a plurality of rollers and the rollers in themain line 31 conveys the hot-rolled steel sheet blank S1 to the sub-lines 33 while rotating forward or backward. - Further, the hot-rolled steel sheet blank S1 conveyed to the sub-lines 33 is conveyed and pressed between the upper and lower dies of the press die. In this configuration, it may be possible to convey the hot-rolled steel sheet blank S1 between the upper and lower dies of the press dies P1, P2, and P3, using a robot at the end of the sub-line 33.
- A
sensor 35 is provided to sense a problem in the press dies P1, P2, and P3. - The
sensor 35 is disposed close to the press dies P1, P2, and P3 and senses a problem in the press dies P1, P2, and P3. Thesensor 35 is a typical sensor that is widely used. A signal for a problem in the press dies P1, P2, and P3 is transmitted from thesensor 35 to a controller 39. - The controller 39 determines the conveying direction of the hot-rolled steel sheet blank S1 that has been guided to the outlet of the sealed oven M in response to a detection signal from the
sensor 35 and then controls the operation of the high-speed conveyer 30. - In detail, when determining a problem has occurred in the press die P1 in response to the detection signal from the
sensor 35, the controller 39 controls the operation of the high-speed conveyer 30 such that the hot-rolled steel sheets blank S1 are distributed to the other press dies P2 and P3 that have no problem. - When the second alternative is selected, it is advantageous to maintain the hot-rolled steel sheet blank S1 at high temperature by variably operating the press dies P1, P2, and P3 in accordance with the conveying speed of the hot-rolled steel sheet blank S1.
- Further, the hot-rolled steel sheet S that has been finally hot-rolled by the equipment for slab casting can continue being conveyed to be blanking device B, cut in a predetermined width, conveyed to the other press dies P2 and P3, and pressed therein, even if a problem occurs in any one, for example, the press die P1 in the press dies P1, P2, and P3.
- The pressed hot-rolled steel sheet is cooled by water such that the structure of the hot-rolled steel sheet becomes to have a martensite structure, without crossing the low-strength ferrite and pearlite transformation curves in the CCT curve shown in
FIG. 9 . - Meanwhile, the press hardening described above is also applied to thin slab casting and strip casting equipment, in which the rolling line is short, in addition to the slab casting.
- When the press hardening is applied to the thin slab casting and the strip casting, the process of manufacturing a part for press hardening proceeds, as shown in
FIGS. 10 and11 , in the order of (a) manufacturing molten metal - (b) continuous casting - (c) hot-rolled steel sheet - (d) blanking - (e) forming - (f) cooling, and manufacturing a slab, reheating the slab, winding, and reheating the hot-rolled reheating for press forming are not performed. - The operation of a process of continuous press hardening according to the present invention is described hereafter.
- A process of manufacturing a part for press hardening is described with reference to
FIGS. 4 to 6 . - First, a continuous-cast slab is hot-rolled and the hot-rolled steel sheet S is conveyed into the sealed oven M. The hot-rolled steel sheet conveyed in the sealed oven is conveyed to the blanking device B by the conveying line and blanked (cut) to a predetermined size. The blanked hot-rolled steel sheets S1 are sequentially conveyed and discharged to the outlet of the sealed oven M.
- In this process, the internal temperature of the sealed oven M is about 1000°C, which maintains the temperature of the hot-rolled steel sheet within the austenite region until press forming. The configuration of the section where the sealed oven M may be changed in consideration of temperature in the hot-rolling for the slab casting and the thin slab casting/strip casting (see
FIGS. 10 and11 ). - Thereafter, the blank S1 conveyed outside through the outlet of the sealed oven M is conveyed between the upper and lower dies of the press die and then pressed into a complete product S2. The pressed hot-rolled steel sheet is cooled into a martensite structure having high structure strength by cooling.
- It was ascertained as a result of an experiment that the part for press hardening which was manufactured by the processes described above had a martensite structure shown in
FIG. 12 . - According to the process of continuous press hardening, the entire process is simplified with a continuous line of the manufacturing process of the part for press hardening, by making the blanking device and the press die for press hardening in a continuous line outside the equipment for slab casting and the equipment for thin slab casting/strip slab casting.
- Therefore, the process of cooling and winding the steel sheet in a coil after hot rolling and the process of reheating the hot-rolled steel sheet for press forming are removed. In this configuration, since the temperature of the hot-rolled steel sheet is maintained at the austenite transformation temperature or more by the sealed oven, until before the hot-rolled steel sheet is pressed after being hot-rolled, even if the reheating is removed, a high-strength part can be manufactured.
- Meanwhile, when a problem occurs in the press die P, it is possible to dealt with the problem of the press die by moving down the upper leading
roller 21 to the lower leadingroller 23 such that the hot-rolled steel sheet S is guided down, and winding it with thewinder 20. - Further, it is possible to continue press forming by using the plurality of press dies P1, P2, and P3 and conveying the hot-rolled steel sheet to the other press dies P2 and P3, when a problem occurs in any one, for example, the press die P1.
- The present invention may be modified in various ways by those skilled in the art, within the basic scope of the present invention, and the scope of the present invention should be construed on the basis of the claims.
Claims (12)
- A process of continuous press hardening, comprising:slab casting step that comprises making a slab by continuously casting molten steel refined by an electric furnace or a blast furnace, and then reheating and hot-rolling the slab into a hot-rolled steel sheet;blanking step that comprises, after the slab casting step, conveying the hot-rolled steel sheet to a blanking device through a sealed oven and blanking the hot-rolled steel sheet; andpress hardening step that comprises, after the blanking step, conveying the hot-rolled steel sheet to a press die and pressing the hot-rolled steel sheet.
- A process of continuous press hardening, comprising:thin slab casting or strip casting step that comprises making a hot-rolled steel sheet by continuous-casting molten steel refined by an electric furnace or a blast furnace;blanking step that comprises, after the thin slab casting or strip casting step, conveying the hot-rolled steel sheet to a blanking device through a sealed oven and blanking the hot-rolled steel sheet; andpress hardening step that comprises, after the blanking step, conveying the hot-rolled steel sheet to a press die disposed at an outlet of the sealed oven and pressing the hot-rolled steel sheet.
- The process of continuous press hardening according to claim 1 or 2, wherein the blanking of a hot-rolled steel sheet is performed in the sealed oven that is supplied with hot air from a blast furnace or an electric furnace.
- The process of continuous press hardening according to claim 3, wherein the internal temperature of the sealed oven is maintained between 1000°C and 1200°C such that the temperature of the hot-rolled steel sheet is maintained within an austenite region.
- The process of continuous press hardening according to claim 4, wherein the steel sheet pressed in the press hardening is cooled such that the structure becomes to a martensite structure.
- The process of continuous press hardening according to claim 1 or 2, comprising a path changing process that changes a conveying path of the hot-rolled steel sheet, when a problem occurs in the press die.
- The process of continuous press hardening according to claim 6, wherein the path changing process includes:sensing, by a sensor, a problem in the press die and outputting a signal;determining, by a controller, whether a problem has occurred in the press die in response to the signal from the sensor, and changing a conveying path of the hot-rolled steel sheet by driving an emergency cutter and leading roller, when a problem has occurred; andwinding the hot-rolled steel sheet transferred through the changed conveying path.
- The process of continuous press hardening according to claim 1 or 2, wherein when a problem has occurred in the press die, a plurality of press dies is operated to continuously press the blanked hot-rolled steel sheet, wherein a conveying direction of the blanked hot-rolled steel sheet is determined by the controller receiving the signal from a sensor that has sensed the problem, and the blanked hot-rolled steel sheet is supplied to a corresponding press die through a high-speed conveyer disposed between the outlet of the sealed oven and the press dies.
- An apparatus for press hardening, comprising:a slab casting device that manufactures a hot-rolled steel sheet;a blanking device that is disposed at an outlet of a rolling machine in the slab casting device and blanks the hot-rolled steel sheet in a predetermined size;a press die that comprises into upper and lower die portions located at an outlet side of the blanking device and presses the blanked steel sheet at a high temperature; anda sealed oven that is disposed between the outlet of the rolling machine and the press die such that the blanking device is positioned therein, and connected with an air channel of a blast furnace or an electric furnace to maintain the temperature of the hot-rolled steel sheet passing through the sealed oven within an austenite region.
- The apparatus for press hardening according to claim 9, wherein the sealed oven has an inlet and an outlet and is provided with a conveying line extending from the inlet toward the outlet therein such that the hot-rolled steel sheet is conveyed.
- The apparatus for press hardening according to claim 10, further comprising leading rollers that guides the hot-rolled steel sheet toward a position lower than the outlet of the rolling machine when a problem occurs in the press die and a winder that winds the hot-rolled steel sheet guided by the leading rollers disposed between the outlet of the rolling machine and the sealed oven.
- The apparatus for press hardening according to claim 10, wherein a plurality of the press dies are provided, and a high-speed conveyer that conveys the hot-rolled steel sheet discharged from the outlet of the sealed oven to the press dies and is disposed between the outlet of the sealed oven and the press die.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20080084681 | 2008-08-28 | ||
PCT/KR2009/004162 WO2010024530A2 (en) | 2008-08-28 | 2009-07-27 | Continuous press hardening process and apparatus therefor |
Publications (3)
Publication Number | Publication Date |
---|---|
EP2287343A2 true EP2287343A2 (en) | 2011-02-23 |
EP2287343A4 EP2287343A4 (en) | 2011-11-16 |
EP2287343B1 EP2287343B1 (en) | 2012-12-26 |
Family
ID=41722061
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP09810135A Not-in-force EP2287343B1 (en) | 2008-08-28 | 2009-07-27 | Continuous press hardening process and apparatus therefor |
Country Status (5)
Country | Link |
---|---|
US (1) | US20110073220A1 (en) |
EP (1) | EP2287343B1 (en) |
JP (1) | JP5311429B2 (en) |
KR (1) | KR101149176B1 (en) |
WO (1) | WO2010024530A2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018091381A1 (en) * | 2016-11-17 | 2018-05-24 | Sms Group Gmbh | Furnace for heating metal strips, and device and method for producing metal strips by continuous casting and rolling |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6381967B2 (en) * | 2014-05-22 | 2018-08-29 | 住友重機械工業株式会社 | Molding apparatus and molding method |
KR20220013098A (en) * | 2020-07-24 | 2022-02-04 | 주식회사 포스코 | Method and apparatus manufacturing hot press formed parts for multi-step process |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102006032617A1 (en) * | 2006-07-12 | 2008-01-24 | Universität Kassel | Process for the production of a sheet-metal semi-finished product suitable for molding |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2162143A (en) * | 1937-07-01 | 1939-06-13 | Brassert & Co | Apparatus for the annealing of metal |
US3358743A (en) * | 1964-10-08 | 1967-12-19 | Bunker Ramo | Continuous casting system |
JPS56108820A (en) * | 1980-02-04 | 1981-08-28 | Nippon Kokan Kk <Nkk> | Heat treating furnace |
US4537242A (en) * | 1982-01-06 | 1985-08-27 | Olin Corporation | Method and apparatus for forming a thixoforged copper base alloy cartridge casing |
JPS62286626A (en) * | 1986-06-04 | 1987-12-12 | Nippon Steel Corp | Press forming method for steel plate |
US5972134A (en) * | 1997-10-02 | 1999-10-26 | Benteler Ag | Manufacture of a metallic molded structural part |
KR100435447B1 (en) * | 1998-12-08 | 2004-09-04 | 주식회사 포스코 | Manufacturing method of austenitic stainless hot rolled steel sheet by hot direct rolling |
AUPQ436299A0 (en) * | 1999-12-01 | 1999-12-23 | Bhp Steel (Jla) Pty Limited | Casting steel strip |
JP2004130377A (en) * | 2002-10-15 | 2004-04-30 | Nippon Steel Corp | High temperature pressing method for metal band |
DE10333166A1 (en) * | 2003-07-22 | 2005-02-10 | Daimlerchrysler Ag | Press-hardened component and method for producing a press-hardened component |
KR20050067967A (en) * | 2003-12-29 | 2005-07-05 | 주식회사 포스코 | Heating method for producing press hardening products with uniform hardeness |
DE102004007071B4 (en) * | 2004-02-13 | 2006-01-05 | Audi Ag | Method for producing a component by forming a circuit board and apparatus for carrying out the method |
JP4449795B2 (en) * | 2005-03-22 | 2010-04-14 | 住友金属工業株式会社 | Hot-rolled steel sheet for hot pressing, manufacturing method thereof, and manufacturing method of hot-press formed member |
KR101124239B1 (en) * | 2006-03-17 | 2012-03-27 | 정우창 | Automotive seat rail having high strength and manufacturing method of the same |
KR101052008B1 (en) * | 2006-03-17 | 2011-07-27 | 정우창 | Steel pipe for high strength automobile parts and manufacturing method thereof |
JP4994934B2 (en) | 2007-04-24 | 2012-08-08 | アイシン高丘株式会社 | Die quench method |
KR100946044B1 (en) * | 2007-12-03 | 2010-03-09 | 주식회사 포스코 | Milling system for manufacturing plate and milling method using the same |
-
2009
- 2009-07-27 EP EP09810135A patent/EP2287343B1/en not_active Not-in-force
- 2009-07-27 JP JP2011511524A patent/JP5311429B2/en not_active Expired - Fee Related
- 2009-07-27 WO PCT/KR2009/004162 patent/WO2010024530A2/en active Application Filing
- 2009-07-27 KR KR1020090068462A patent/KR101149176B1/en not_active IP Right Cessation
-
2010
- 2010-11-29 US US12/955,862 patent/US20110073220A1/en not_active Abandoned
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102006032617A1 (en) * | 2006-07-12 | 2008-01-24 | Universität Kassel | Process for the production of a sheet-metal semi-finished product suitable for molding |
Non-Patent Citations (2)
Title |
---|
See also references of WO2010024530A2 * |
STEINHOFF K ET AL: "Verbessertes Festigkeits-/Dehnungs-Verhältnis durch modifizierte Wärmebehandlung hochfester Vergütungsstähle vom Typ 22MnB5", NEUERE ENTWICKLUNGEN IN DER BLECHUMFORMUNG: VORTRAGSTEXTE ZURVERANSTALTUNG INTERNATIONALE KONFERENZ, 9 May 2006 (2006-05-09), pages 185-206, XP009093702, * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018091381A1 (en) * | 2016-11-17 | 2018-05-24 | Sms Group Gmbh | Furnace for heating metal strips, and device and method for producing metal strips by continuous casting and rolling |
Also Published As
Publication number | Publication date |
---|---|
JP2011523593A (en) | 2011-08-18 |
KR20100026974A (en) | 2010-03-10 |
EP2287343A4 (en) | 2011-11-16 |
JP5311429B2 (en) | 2013-10-09 |
WO2010024530A2 (en) | 2010-03-04 |
KR101149176B1 (en) | 2012-05-25 |
WO2010024530A3 (en) | 2010-05-27 |
US20110073220A1 (en) | 2011-03-31 |
EP2287343B1 (en) | 2012-12-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1103647C (en) | Method and arrangement for producing hot-rolled strip | |
KR101992077B1 (en) | Manufacturing method of press molded article | |
CN101214514B (en) | Corner iron manufacturing method | |
CN105121042B (en) | Method for manufacturing metal tape by casting rolling | |
CN107641699B (en) | Method based on CSP process production thin gauge hot rolling DP780 steel | |
KR20070112879A (en) | A continuous casting and rolling method for medium plate | |
CN103826771A (en) | Method for manufacturing press-molded article and press molding equipment | |
CN109922904B (en) | Casting-rolling-cladding plant and method for continuously producing hot-rolled finished strip | |
CN109536830A (en) | 550MPa grades of titaniferous thin gauge weathering steels of yield strength and its production method | |
CN102549173A (en) | Method and device for producing a microalloyed steel, in particular a pipe steel | |
KR101759915B1 (en) | Method for producing a metal strip | |
CN107716551B (en) | Method based on CSP process production thin gauge hot rolling DP980 steel | |
CN110087801A (en) | For continuously manufacturing the method for the hot-strip of winding in rolling casting bonding equipment, method and rolling casting bonding equipment for starting rolling casting bonding equipment | |
EP2287343B1 (en) | Continuous press hardening process and apparatus therefor | |
CN104399745A (en) | Steekle mill production line provided with roughing mill and work method of steekle mill production line | |
CN1195585A (en) | Continuous metal manufacturing method and apparatus therefor | |
CN103624081A (en) | Intermediate mill area of casting-rolling composite equipment | |
CN107107138B (en) | Milling method, continuous casting milling method and continuous casting rolling device | |
US7137437B2 (en) | Method and device for producing continuously cast steel slabs | |
CN105755370A (en) | Ultralow-carbon cold-rolled steel plate and production method thereof | |
CN101215626B (en) | Continuous heat treatment method for angle steel and angle steel manufacturing method | |
CN107641700B (en) | Method based on CSP process production thin gauge hot rolling DP1180 steel | |
EP4034318B1 (en) | Apparatus and method for producing and further processing slabs | |
CN104073718B (en) | The production method of high tenacity S355J2 steel plate | |
CN105828978A (en) | Device And Method For Continuous Casting/Hot Rolling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20101123 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA RS |
|
A4 | Supplementary search report drawn up and despatched |
Effective date: 20111018 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B21B 15/00 20060101ALI20111012BHEP Ipc: C21D 1/673 20060101ALI20111012BHEP Ipc: C21D 8/04 20060101ALI20111012BHEP Ipc: C22C 38/04 20060101ALI20111012BHEP Ipc: C21D 1/18 20060101AFI20111012BHEP Ipc: F27B 9/20 20060101ALI20111012BHEP Ipc: C21D 9/48 20060101ALI20111012BHEP Ipc: C21D 8/02 20060101ALI20111012BHEP Ipc: C21D 9/46 20060101ALI20111012BHEP |
|
DAX | Request for extension of the european patent (deleted) | ||
RIC1 | Information provided on ipc code assigned before grant |
Ipc: C22C 38/04 20060101ALI20120525BHEP Ipc: F27B 9/20 20060101ALI20120525BHEP Ipc: C21D 8/02 20060101ALI20120525BHEP Ipc: C21D 8/04 20060101ALI20120525BHEP Ipc: C21D 1/18 20060101AFI20120525BHEP Ipc: B21B 15/00 20060101ALI20120525BHEP Ipc: C21D 9/46 20060101ALI20120525BHEP Ipc: C21D 9/48 20060101ALI20120525BHEP Ipc: C21D 1/673 20060101ALI20120525BHEP |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 590538 Country of ref document: AT Kind code of ref document: T Effective date: 20130115 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602009012340 Country of ref document: DE Representative=s name: MICHALSKI HUETTERMANN & PARTNER PATENTANWAELTE, DE |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602009012340 Country of ref document: DE Effective date: 20130314 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130326 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: VDEP Effective date: 20121226 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130327 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130406 Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130426 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130326 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130426 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 |
|
26N | No opposition filed |
Effective date: 20130927 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602009012340 Country of ref document: DE Effective date: 20130927 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20130727 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130731 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130731 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130727 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130727 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20140730 Year of fee payment: 6 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20140730 Year of fee payment: 6 Ref country code: AT Payment date: 20140729 Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121226 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20090727 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130727 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602009012340 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 590538 Country of ref document: AT Kind code of ref document: T Effective date: 20150727 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160202 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20160331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150731 Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150727 |