EP1375747A2 - Method and device for handling bulk material - Google Patents

Method and device for handling bulk material Download PDF

Info

Publication number
EP1375747A2
EP1375747A2 EP03076989A EP03076989A EP1375747A2 EP 1375747 A2 EP1375747 A2 EP 1375747A2 EP 03076989 A EP03076989 A EP 03076989A EP 03076989 A EP03076989 A EP 03076989A EP 1375747 A2 EP1375747 A2 EP 1375747A2
Authority
EP
European Patent Office
Prior art keywords
bulk material
container
containers
dispensing location
train
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP03076989A
Other languages
German (de)
French (fr)
Other versions
EP1375747A3 (en
Inventor
Antonius Gerardus Dubbers
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Volker Stevin Rail & Traffic Bv
Original Assignee
Volker Stevin Rail & Traffic Bv
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Volker Stevin Rail & Traffic Bv filed Critical Volker Stevin Rail & Traffic Bv
Publication of EP1375747A2 publication Critical patent/EP1375747A2/en
Publication of EP1375747A3 publication Critical patent/EP1375747A3/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers

Definitions

  • the bulk material can be solid but also fluid.
  • ballast material loose rock or similar bulk material
  • a lifting conveyor belt In connection therewith e.g. 200 l/s bulk material becomes available.
  • the object of the invention is versatile. It is e.g. concerned with one or more of the following aspects: ensuring of the operational continuity of the chain digger or such bulk material handling appliance; avoiding spoiling of bulk material; increasing the storage capacity for bulk material.
  • a method wherein bulk material is dispensed from a dispensing location (preferably with the aid of gravity) into a plurality of succeeding (e.g. riding) containers (container train) having (e.g. at least substantially equal) mutual distances, wherein said dispensing location and the containers mutually move such that the dispensing location either is (alternatingly) present above a container or a space between two containers or dispenses bulk material directly into a container or a space between two containers, and wherein use is made of a horizontally displaceable bridging element which is located within the track of the bulk material between the dispensing location and the container and receives the bulk material originating from the dispensing location which at least comes in an space between two containers, and brings it into a container.
  • a horizontally displaceable bridging element which is located within the track of the bulk material between the dispensing location and the container and receives the bulk material originating from the dispensing location which at least comes in an space between two containers, and brings it into
  • the invention is also concerned with a method wherein a device is moved over a plurality of successive wagons, possibly having a mutual (e.g. substantially equal) space and possibly moving, e.g. riding, along a railway track, and also the device to be used with said method.
  • This method can be part of the method indicated in the above paragraph.
  • the bridging element contains one or more of the following:
  • the embodiment based on the invention can contain the following:
  • Fig. 1 shows a top view
  • fig. 2 shows a side view
  • fig. 3 shows a sectional front view.
  • Fig. 1 shows a train with wagons, each with two shafts, designed as relatively shallow trays 1 with open top.
  • a bridging element hereafter called "auxiliary cart" 4.
  • the auxiliary cart 4 stands movably onto the opposite longitudinal top edges 8 of the trays 1, receives the bulk material coming from the convey- or 3 thereabove and poures it in a tray 1 therebelow.
  • the auxiliary cart 4 contains pneumatic tires at both sides, the ultimate front and back 5 whereof are at a slightly higher level, such that a possible level difference between the top of two succeeding trays 1 can be bridged more easy.
  • the mutual distance, location and number of wheels 6 is designed such that the cart 4 maintains a stable position when riding from the one tray 1 to the next and bridging the gap 12 between two trays 1.
  • the distance between two wheels 6 at least equals the distance between two trays 1.
  • rollers 7 with vertical rotation shaft, rolling along the outer side of the trays 1 to provide a side guide.
  • the conveyor belt 9 of the cart 4 endlessly extends around rollers 11.
  • One of the rollers 11 is actively driven to turn either to the right or the left.
  • the rotating direction is changed just before the cart begins to pass a gap 12, such that the feeding of bulk material 10 from that moment takes place from the opposite longitudinal end en no bulk material is poured into the gap 12.
  • the rotating direction becomes as usual, zuch that the material is poured into the next tray 1. It is feasible to stop the conveyor belt 9 when passing a gap 12 such that in that case the cart serves as bulk material buffer.
  • trays 1 and hor 2 can advance with different speeds, possibly in opposite directions.
  • the cart continuously receives the bulk material, it is e.g. also possible that the cart is merely kept below the conveyor 3 during bridging of the gap 12.
  • the cart can e.g. be provided with a stationary slide gutter, the inclination of which is possibly adjustable, e.g. to be (almost) horizontal when passing a gap such that bulk material does not slide therefrom by gravity force, such that the gutter is then active as if it was a bulk material buffer, and thereafter to be (further) inclined such that bulk material slides therefrom.
  • a stationary slide gutter the inclination of which is possibly adjustable, e.g. to be (almost) horizontal when passing a gap such that bulk material does not slide therefrom by gravity force, such that the gutter is then active as if it was a bulk material buffer, and thereafter to be (further) inclined such that bulk material slides therefrom.
  • the cart has an undercarriage with tracks such that going from the one to the next tray 1 is improved.
  • the cart can be further provided with fixed side guides at both longitudinal ends (e.g. at a level below the rollers 7) with a "seeking" edge, to further assure a reliable transfer onto the next wagon.
  • the active part of the conveyor belt 9 can be bulged, see fig. 3, to contain the bulk material better.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Structure Of Belt Conveyors (AREA)
  • Belt Conveyors (AREA)
  • Control Of Conveyors (AREA)

Abstract

Method wherein a conveyor belt (3) advances (arrow A) across a container train (1) and poures bulk material onto a bridging conveyor belt (4) above said container train and moving with said belt (3), wherein the operation of said bridging conveyor belt (4) is controlled such that it prevents that bulk material falls between two adjacent containers (1) if said conveyor belt (3) poures bulk material above the gap (12) between said adjacent containers (1).

Description

  • Although the invention is illustrated by way of processing the bed of ballast of a railway track, it will be appreciated that the field of application is broader. The bulk material can be solid but also fluid.
  • When a bed of ballast is renewed, an apparatus riding along the railway track, such as a chain digger, removes ballast material (loose rock or similar bulk material) from below the rail and poures it into a wagon through a lifting conveyor belt. In connection therewith e.g. 200 l/s bulk material becomes available.
  • The object of the invention is versatile. It is e.g. concerned with one or more of the following aspects: ensuring of the operational continuity of the chain digger or such bulk material handling appliance; avoiding spoiling of bulk material; increasing the storage capacity for bulk material.
  • Therefor a method is provided wherein bulk material is dispensed from a dispensing location (preferably with the aid of gravity) into a plurality of succeeding (e.g. riding) containers (container train) having (e.g. at least substantially equal) mutual distances, wherein said dispensing location and the containers mutually move such that the dispensing location either is (alternatingly) present above a container or a space between two containers or dispenses bulk material directly into a container or a space between two containers, and wherein use is made of a horizontally displaceable bridging element which is located within the track of the bulk material between the dispensing location and the container and receives the bulk material originating from the dispensing location which at least comes in an space between two containers, and brings it into a container.
  • The invention is also concerned with a method wherein a device is moved over a plurality of successive wagons, possibly having a mutual (e.g. substantially equal) space and possibly moving, e.g. riding, along a railway track, and also the device to be used with said method. This method can be part of the method indicated in the above paragraph.
  • According to a further development, the bridging element contains one or more of the following:
    • longitudinally moving or riding relative to the container train;
    • a length substantially more (e.g. at least twice) the distance between two adjacent containers;
    • conveyor-, buffer-, and/or pouring means to (temporarily) store bulk material and/or to pour it into a desired container (e.g. by being able to pour through the one or opposite longitudinal end;
    • a conveyor belt of which the (active) top part at least substantially extends parallel to the container train, wherein said conveyor belt can preferably be driven in to one or opposite direction, for which preferably an (electric) motor with changable direction of rotation is used;
    • movably supported by the container train;
    • a side guide engaging the container train;
    • able to independently convey bulk material in a desired (lengtwise) direction;
    • able to independently convey bulk material in the desired one or opposite (lengtwise) direction;
    • at least the bulk material conveying surface (e.g. top part) of the longitudinal conveyor end thereof is provided at a higher level than the top of the containers;
    • appliances to, resting on the containers, move between two adjacent containers wherein its orientation is substantially unchanged;
    • an own propulsion;
    • when the dispensing location passess a gap between containers, the bridging element advances (almost) as fast as, (substantially) faster or slower than or opposite to the dispensing location and/or the container train;
    • as soon as its longitudinal end from which the bulk material is poured in a container starts passing a gap, pouring from said side is ended untill after said side has passed said gap, wherein in the mean time e.g. pouring is carried out from the opposite longitudinal end.
  • Furthermore, the embodiment based on the invention can contain the following:
    • the work is carried out with two parallel railway tracks, wherein the bed of ballast of the one railway track is processed and the container train is present at the adjacent railway track;
    • the container train advances with a speed (almost) equal to or (substantially) faster of slower than or opposite to the speed of the dispensing location;
    • the dispensing location is provided by the longitudinal end of the conveyor extending from the chain digger or such device.
  • The enclosed drawing illustrates a preferred embodiment. Fig. 1 shows a top view, fig. 2 shows a side view and fig. 3 shows a sectional front view.
  • Fig. 1 shows a train with wagons, each with two shafts, designed as relatively shallow trays 1 with open top. At the adjacent railway track there is a in the direction of arrow A advancing (walking speed) chain digger 2, taking up the gravel of the bed of ballast there below and upward feeding it with the aid of the conveyor belt 3 towards a broad distance above the top of the trays 1, to pour the bulk material 10 therein. To assure continuous action of the digger 2, wherein the conveyor 3 continuously feeds bulk material, use is made of a bridging element, hereafter called "auxiliary cart" 4.
  • As fig. 2 and 3 show, the auxiliary cart 4 stands movably onto the opposite longitudinal top edges 8 of the trays 1, receives the bulk material coming from the convey- or 3 thereabove and poures it in a tray 1 therebelow.
  • The auxiliary cart 4 contains pneumatic tires at both sides, the ultimate front and back 5 whereof are at a slightly higher level, such that a possible level difference between the top of two succeeding trays 1 can be bridged more easy. The mutual distance, location and number of wheels 6 is designed such that the cart 4 maintains a stable position when riding from the one tray 1 to the next and bridging the gap 12 between two trays 1. Preferably the distance between two wheels 6 at least equals the distance between two trays 1.
  • Below the supporting surface of the wheels 6 the cart 4 has rollers 7 with vertical rotation shaft, rolling along the outer side of the trays 1 to provide a side guide.
  • The conveyor belt 9 of the cart 4 endlessly extends around rollers 11. One of the rollers 11 is actively driven to turn either to the right or the left. According to an embodiment the rotating direction is changed just before the cart begins to pass a gap 12, such that the feeding of bulk material 10 from that moment takes place from the opposite longitudinal end en no bulk material is poured into the gap 12. After the cart 4 has bridged the gap, and before the cart completes the passage of the gap, the rotating direction becomes as usual, zuch that the material is poured into the next tray 1. It is feasible to stop the conveyor belt 9 when passing a gap 12 such that in that case the cart serves as bulk material buffer.
  • Thus the cart 4 "walks" along with the chain digger 2 past all trays 1. Depending on the working speed of the digger 2 and the volume capacity of the trays 1, trays 1 and hor 2 can advance with different speeds, possibly in opposite directions.
  • In stead the cart continuously receives the bulk material, it is e.g. also possible that the cart is merely kept below the conveyor 3 during bridging of the gap 12.
  • In stead of a conveyor belt 9 or other means positively propelling the bulk material the cart can e.g. be provided with a stationary slide gutter, the inclination of which is possibly adjustable, e.g. to be (almost) horizontal when passing a gap such that bulk material does not slide therefrom by gravity force, such that the gutter is then active as if it was a bulk material buffer, and thereafter to be (further) inclined such that bulk material slides therefrom.
  • According to an alternative the cart has an undercarriage with tracks such that going from the one to the next tray 1 is improved.
  • Also further variants belong to the invention. E.g. the cart can be further provided with fixed side guides at both longitudinal ends (e.g. at a level below the rollers 7) with a "seeking" edge, to further assure a reliable transfer onto the next wagon. The active part of the conveyor belt 9 can be bulged, see fig. 3, to contain the bulk material better.

Claims (4)

  1. Method wherein a device advances across a container train, possibly receiving bulk material and pouring it in the container train.
  2. Method according to claim 1, wherein bulk material is dispensed from a dispensing location (preferably with the aid of gravity) into a plurality of succeeding (e.g. riding) containers (container train) having (e.g. at least substantially equal) mutual distances, wherein said dispensing location and the containers mutually move such that the dispensing location either is (alternatingly) present above a container or a space between two containers or dispenses bulk material directly into a container or a space between two containers, and wherein use is made of a horizontally displaceable bridging element which is located within the track of the bulk material between the dispensing location and the container and receives the bulk material originating from the dispensing location which at least comes in an space between two containers, and brings it into a container.
  3. Method according to claim 1 or 2, wherein the bridging part contains the following:
    longitudinally moving or riding relative to the container train;
    a length substantially more (e.g. at least twice) the distance between two adjacent containers;
    conveyor-, buffer-, and/or pouring means to (temporarily) store bulk material and/or to pour it into a desired container (e.g. by being able to pour through the one or opposite longitudinal end;
    a conveyor belt of which the (active) top part at least substantially extends parallel to the container train, wherein said conveyor belt can preferably be driven in to one or opposite direction, for which preferably an (electric) motor with changable direction of rotation is used;
    movably supported by the container train;
    a side guide engaging the container train;
    able to independently convey bulk material in a desired (lengtwise) direction;
    able to independently convey bulk material in the desired one or opposite (lengtwise) direction;
    at least the bulk material conveying surface (e.g. top part) of the longitudinal conveyor end thereof is provided at a higher level than the top of the containers;
    appliances to, resting on the containers, move between two adjacent containers wherein its oriëntation is substantially unchanged;
    an own propulsion;
    when the dispensing location passess a gap between containers, the bridging element advances (almost) as fast as, (substantially) faster or slower than or opposite to the dispensing location and/or the container train;
    as soon as its longitudinal end from which the bulk material is poured in a container starts passing a gap, pouring from said side is ended untill after said side has passed said gap, wherein in the mean time e.g. pouring is carried out from the opposite longitudinal end.
  4. Method according to any of the preceeding claims, wherein:
    the work is carried out with two parallel railway tracks, wherein the bed of ballast of the one railway track is processed and the container train is present at the adjacent railway track;
    the container train advances with a speed (almost) equal to or (substantially) faster of slower than or opposite to the speed of the dispensing location;
    the dispensing location is provided by the longitudinal end of the conveyor extending from the chain digger or such device.
EP03076989A 2002-06-26 2003-06-25 Method and device for handling bulk material Withdrawn EP1375747A3 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
NL1020939 2002-06-26
NL1020939 2002-06-26
NL1023663 2003-06-13
NL1023663A NL1023663C2 (en) 2002-06-26 2003-06-13 Method and device for handling bulk materials.

Publications (2)

Publication Number Publication Date
EP1375747A2 true EP1375747A2 (en) 2004-01-02
EP1375747A3 EP1375747A3 (en) 2004-08-11

Family

ID=29718474

Family Applications (1)

Application Number Title Priority Date Filing Date
EP03076989A Withdrawn EP1375747A3 (en) 2002-06-26 2003-06-25 Method and device for handling bulk material

Country Status (2)

Country Link
EP (1) EP1375747A3 (en)
NL (1) NL1023663C2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2002709C2 (en) * 2009-04-02 2010-10-05 Arcadis Nederland B V METHOD FOR CLEANING POLLUTED GROUND FROM A BALLAST BED

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2085175A2 (en) * 1969-12-26 1971-12-24 Bomstein Jacques
US4190394A (en) * 1978-04-28 1980-02-26 Herzog Contracting Corporation Method for loading and unloading railroad cars
EP0835959A1 (en) * 1996-10-10 1998-04-15 LEONHARD WEISS GmbH & Co. NIEDERLASSUNG CRAILSHEIM Method for reprocessing ballast of railway tracks
JP2000248501A (en) * 1999-03-03 2000-09-12 Hosen Kiki Seibi Kk Ballast exchanging method for track bed in track and ballast scattering car for track

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2085175A2 (en) * 1969-12-26 1971-12-24 Bomstein Jacques
US4190394A (en) * 1978-04-28 1980-02-26 Herzog Contracting Corporation Method for loading and unloading railroad cars
EP0835959A1 (en) * 1996-10-10 1998-04-15 LEONHARD WEISS GmbH & Co. NIEDERLASSUNG CRAILSHEIM Method for reprocessing ballast of railway tracks
JP2000248501A (en) * 1999-03-03 2000-09-12 Hosen Kiki Seibi Kk Ballast exchanging method for track bed in track and ballast scattering car for track

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
PATENT ABSTRACTS OF JAPAN vol. 2000, no. 12, 3 January 2001 (2001-01-03) & JP 2000 248501 A (HOSEN KIKI SEIBI KK), 12 September 2000 (2000-09-12) *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2002709C2 (en) * 2009-04-02 2010-10-05 Arcadis Nederland B V METHOD FOR CLEANING POLLUTED GROUND FROM A BALLAST BED

Also Published As

Publication number Publication date
EP1375747A3 (en) 2004-08-11
NL1023663C2 (en) 2005-06-07
NL1023663A1 (en) 2003-12-30

Similar Documents

Publication Publication Date Title
GB2127377A (en) A bulk-material wagon more particularly for loading waste spoil from a ballast cleaning machine
CN210735606U (en) Uniform distribution device of bulk material belt type stacker
US6073561A (en) Box car for transporting bulk material
JPS5836829A (en) Device for treating and collecting bulk material
EP0000550A1 (en) Vertical bulk-conveying apparatus and bulk delivering system utilizing the characteristics thereof
KR20100015454A (en) Storage cart for bulk material
US20140166442A1 (en) Method and apparatus for unloading a stockpile
GB2113168A (en) A travelling on-track assembly for transporting bulk material
US10717451B2 (en) Aggregate train and methods of loading and unloading
CN86103536A (en) At least to the equipment of a crusher feed
NL8401329A (en) BELT TRANSPORTER FOR THE VERTICAL OR STEEL TRANSPORTATION OF GOODS.
JP6177322B2 (en) Ballast processing equipment
EP1375747A2 (en) Method and device for handling bulk material
JP5631388B2 (en) Ballast processing equipment for track correction
JPH08310654A (en) Device which carries and feeds can for spinning machine suchas card or drawing frame
WO1982003209A1 (en) A method of grouping,orienting,and packing objects and a system for carrying out the method
GB2277725A (en) A rail vehicle for transporting and discharging bulk material
CN108473146B (en) Bulk material storage compartment
CN210735589U (en) Bridge type chain bucket stacker-reclaimer
CN106379749B (en) Three-dimensional Bulk Grain puts in storage transportation system
US2543518A (en) Coal feeder elevator
US4231467A (en) Dry stacker and reclaimer
RU2048625C1 (en) Railway freight car for friable materials
JPH0289795A (en) Device for dividingly handling heterogeneous material
JP2002002946A (en) Device for aligning and encasing long agricultural product

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL LT LV MK

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL LT LV MK

RIC1 Information provided on ipc code assigned before grant

Ipc: 7E 01B 27/02 B

Ipc: 7E 01B 27/00 A

AKX Designation fees paid
REG Reference to a national code

Ref country code: DE

Ref legal event code: 8566

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20050212