EP1146179A2 EP01107542A EP01107542A EP1146179A2 EP 1146179 A2 EP1146179 A2 EP 1146179A2 EP 01107542 A EP01107542 A EP 01107542A EP 01107542 A EP01107542 A EP 01107542A EP 1146179 A2 EP1146179 A2 EP 1146179A2
Authority
EP
European Patent Office
Prior art keywords
building panel
fact
meshes
panels
formwork building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP01107542A
Other languages
German (de)
French (fr)
Other versions
EP1146179A3 (en
Inventor
Angelo Candiracci
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP1146179A2 publication Critical patent/EP1146179A2/en
Publication of EP1146179A3 publication Critical patent/EP1146179A3/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • E04B2/8658Walls made by casting, pouring, or tamping in situ made in permanent forms using wire netting, a lattice or the like as form leaves
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/842Walls made by casting, pouring, or tamping in situ by projecting or otherwise applying hardenable masses to the exterior of a form leaf
    • E04B2/845Walls made by casting, pouring, or tamping in situ by projecting or otherwise applying hardenable masses to the exterior of a form leaf the form leaf comprising a wire netting, lattice or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/842Walls made by casting, pouring, or tamping in situ by projecting or otherwise applying hardenable masses to the exterior of a form leaf
    • E04B2/847Walls made by casting, pouring, or tamping in situ by projecting or otherwise applying hardenable masses to the exterior of a form leaf the form leaf comprising an insulating foam panel
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • E04B2/8647Walls made by casting, pouring, or tamping in situ made in permanent forms with ties going through the forms

Definitions

  • pre-armed formwork building panel in accordance with this invention, comprising two parallel layers (2, 3) of expanded plastic material respectively placed between electro-welded steel wire meshes (6, 7) on the external faces and trussing in electro-welded reinforcement steel bars (8, 9) inserted on the inner faces, all assembled at given distances by crosspieces (10) in electro-welded steel wire on to these meshes (6, 7) and bars (8, 9) as well as pre-shaped brackets (11) in reinforcement steel bars protruding laterally (12) for linear connection with the armature of adjacent panels (1).

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Epoxy Compounds (AREA)

Abstract

Pre-armed formwork building panel comprising two parallel layers (2, 3) of expanded plastic material respectively placed between electro-welded steel wire meshes (6, 7) on the external faces and trussing in electro-welded reinforcement steel bars (8, 9) inserted on the inner faces, all assembled at given distances by crosspieces (10) in electro-welded steel wire on to these meshes(6, 7) and bars (8, 9) as well as pre-shaped brackets (11) in reinforcement steel bars protruding laterally (12) for linear connection with the armature of adjacent panels (1).

Description

    DETAILED SPECIFICATION Prior Art
    • Sandwich-type building panels in a mesh of steel wire and expanded plastic material are well-known, made up of a core in expanded plastic material, such as polystyrene, caged between two networks of electro-welded steel wire, reciprocally connected again by means of electro-welding to segments of steel wire making up crosspieces perforating the core;
    • the enbloc product thus manufactured can be installed in modular fashion and finished with plaster, held by the metal meshes, to construct prefabricated walls with excellent characteristics of strength, seismic resistance, thermal insulation, sound-proofing and fire-proofing.
    • Moreover, a twin pair of these panels can be used, with excellent results, as a formwork for so-called "lost applications", i.e. as a container for pouring cement conglomerate between two panels which remain incorporated with it, encompassed to help form the partition, finished for the purpose on the outer faces with plaster, as described above for the single panel.
    Limitations of the known technique
    • The meshes of steel wire covering the opposing panels reciprocally assembled in the production of these "double building panels" or "lost formworks" are embedded in the mass of the cement conglomerate, thereby reinforcing it with appreciable results in terms of overcoming the static deficiencies of concrete, i.e. by acting as an armature, since the slenderness of the steel wires making up the meshes is overcome by their high number.
    • Despite this, European (Eurocodes EC 2, design rules) and national regulations dictate a minimum section of five millimetres for concrete reinforcing steel bars, so that the said armature with "many wires" for "double panels" or "lost formworks" in accordance with the known technique, although actually feasible and effective, is not in keeping with reference to these compulsory dispositions, since reinforcement armature cross-sections of less than five millimetres are not even taken into consideration as such.
    Objects of the invention
    • The principal object of this invention is, in this context, to provide a "sandwich" building panel structure having a network of steel wire and expanded plastic material, in a double implementation form with functions as a "lost formwork", such as to satisfy the legislative and regulatory dispositions which require a minimum section of concrete reinforcing steel bars at the same time as not compromising the characteristics of the panels in question as regards pre-assembly, lightness, ease of installation, modularity and all other attributable advantages.
    • Other objects of this invention are to achieve the purpose described above and simultaneously:
    • ensure armature continuity between consecutive adjacent panels;
    • ensure optimal incorporation between cement conglomerate and armature;
    • enhance production, assembly and installation modularity as far as possible;
    • ensure multi-function structure for various kinds of installation;
    • provide a structure which is easily and rapidly implemented, which equally does not involve substantial modifications of the nature and configuration of the artefacts with which it is used;
    • ensure a structure suitable for utilisation in the widest possible range of applications, as well as conforming to the multi-function and modularity requirements of components progressively developed in every technological sector and in particular in the building industry;
    • provide a structure which readily ensures conformity with the strictest constructional standards in terms of safety.
    • A further purpose of this invention is to achieve the foregoing purposes through a simple and functional structure, safe application and relatively economic cost in consideration of the results obtained.
    Summary of the invention
  • These and other purposes are all achieved with the pre-armed formwork building panel, in accordance with this invention, comprising two parallel layers (2, 3) of expanded plastic material respectively placed between electro-welded steel wire meshes (6, 7) on the external faces and trussing in electro-welded reinforcement steel bars (8, 9) inserted on the inner faces, all assembled at given distances by crosspieces (10) in electro-welded steel wire on to these meshes (6, 7) and bars (8, 9) as well as pre-shaped brackets (11) in reinforcement steel bars protruding laterally (12) for linear connection with the armature of adjacent panels (1).
  • Brief description of the drawings
    • Other characteristics and advantages of the structure in accordance with this invention will be more readily appreciated in the following detailed description of a preferred but not exclusive embodiment, exemplified by but not limited to the six drawings enclosed, in which:
      • figure 1 is a perspective view of a panel in accordance with this invention;
      • figure 2 is a perspective view of a panel in accordance with this invention in partial cross-section;
      • figure 3 is a plan view;
      • figure 4 is a profile view;
      • figure 5 is a plan view omitting certain components;
      • figure 6 is a profile view omitting certain components.
    Detailed static description of the preferred embodiment
    • With reference to these figures and in particular to the first figure, 1 depicts a "double building panel" or "formwork panel" in accordance with this invention, comprising two panels 2 and 3 of expanded plastic material, for example and preferably polystyrene, equally preferably prepared by splitting a single original solid piece of material.
    • Panels 2 and 3 (see in particular fig. 3) have relief undulations 4 on the external faces and offset reliefs 5 on the respective linked internal faces, spaced out for the functions illustrated in more detail below.
    • The undulation reliefs 4 on the external faces of panels 2 and 3 (see also figure 2) are respectively in contact with galvanised metallic meshes indicated with 6 and 7, formed by a dense network at right angles made up of electro-welded steel wires, for example and preferably with a cross-section of 2.5 mm.
    • The offset reliefs 5 on the inner faces linking with panels 2 and 3 on the other hand are respectively in contact with trusses comprising vertical steel reinforcement bars 8, for example and preferably with a cross-section of 5 mm, electro-welded to identical horizontal bars 9, spaced by a series of crosspieces 10 (see in particular figures 3 and 4) made up of segments of steel wire, for example and preferably with a cross-section of 2.5 mm, electro-welded to these as well as passing through panels 2 and 3 and also electro-welded externally to these to meshes 6 and 7, thereby assembling the entire double building panel 1.
    • The crosspieces 10, between the trusses made up of right- angled bars 8 and 9, supports shaped brackets 11 (see in particular figures 5 and 6), formed by reinforcement steel bars, for example and preferably also having a cross-section of 5 mm, closed on themselves and dimensioned to protrude over a section 12 externally to one side of the formwork panel 1 when placed flush with the other, where they are equipped with an attachment 13 designed to be fitted into the body of panels 2 and 3, all for the functions described in more detail below.
    Detailed dynamic description of the preferred embodiment
    • Having thus completed the Static Description of a preferred implementation example of the structure in accordance with this invention, there follows a dynamic description relating to:
      the "double building panel" or "formwork panel" in accordance with this invention is pre-assembled in its structure as described in static terms above, so that the device for the production of electro-welded metallic meshes and the device for inserting and cutting of crosspieces in metallic wire for the manufacture of building panels already covered by patents owned by the present applicant are suitable.
    • The double building panel 1 thus emerges from the production line complete in every part, as shown in figure 1, lacking only the brackets 11 therein illustrated, and in view of its permanent characteristics of lightness can be easily transported, handled and installed by operators in the walls of the building under construction.
    • Having installed two consecutive formwork panels 1, on the one hand one of these may be fitted with a number of overlapping brackets 11, inserted until flush with the insertion side and clamped with the perforating link of attachment 13 within a panel 2 or 3;
    • in this way, on the other side, the brackets 11 protrude by section 12 within the adjacent formwork panel 1, and thus for the length of wall to be built.
    • At this stage, cement conglomerate may be pouted into the gap or the formwork defined by panels 2 and 3, which is thus reinforced in accordance with legal requirements by vertical steel bars 8 electro-welded to identical horizontal steel bars 9 flush with panels 2 and 3, yet held apart in accordance with legal requirements by reliefs 5;
    • in this context, the discontinuity of the armature imposed by the prefabricated nature of the panels is overcome by the brackets 11, and in particular by the relative portions 12 inserted into the adjacent panel, thus ensuring seamless continuity of the armature always in keeping with legal requirements.
    • The square-network plaster support meshes 6 and 7 may then be finished with plaster which is held in place by known techniques.
    Implementation Alternatives
    • Evidently, in alternative forms of implementation, while always in keeping with the solution concept in the implementation example illustrated above and below in relative claims, the pre-armed formwork panel structure in accordance with this invention may also be implemented and installed in other ways, with technical and mechanical equivalents or integrative adaptations while always in keeping with the descriptions outlined above and detailed below in the conceptual solution claims.
    Advantages of the invention
    • As evidenced by the above detailed description of a preferred but not exclusive form of implementation and the above comments concerning alternative forms of implementation, the pre-armed formwork panel in accordance with this invention offers the following advantages for the purposes envisaged and other purposes:
    • it in fact integrates a simple, economic and multi-function structure of "lost formwork" designed to be manufactured, handled and installed as artefacts in accordance with known technique, i.e. with all the relative advantages in terms of lightness, rapidity and modularity, but at the same time suitable for satisfying the strictest parameters of law and regulations in terms of concrete reinforcement and seismic criteria, as well as presenting excellent characteristics in terms of thermal insulation (KT 0.36 W/m2 x K°) and fire resistance (REI 180).
    KEY TO NUMBERS
  • 1 ) overall view of the double panel or formwork panel
  • 2 ) panel
  • 3 ) panel
  • 4 ) external undulation reliefs
  • 5 ) internal offset reliefs
  • 6 ) overall view of the metallic network
  • 7 ) overall view of the metallic network
  • 8 ) vertical reinforcement steel bars
  • 9 ) horizontal reinforcement steel bars
  • 10 ) crosspieces
  • 11 ) shaped brackets
  • 12 ) relative protruding portions
  • 13 ) relative panel insertion attachment

Claims (13)

  1. Formwork building panel characterised by the fact that it includes at least two panels (2, 3) in expanded plastic material respectively placed between metallic meshes (6, 7) on the external faces and reinforcement bar meshes (8, 9) inserted on the inner faces, all assembled at given distances by metallic crosspieces (10) welded to these meshes (6, 7) and bars (8, 9) as well as pre-shaped metal brackets (11) protruding laterally (12) for linear connection with the armature of adjacent panels (1).
  2. Formwork building panel characterised by the fact that it includes two parallel panels (2, 3) in expanded plastic material respectively placed between electro-welded steel wire meshes (6, 7) on the external faces and electro-welded reinforcement steel bar meshes (8, 9) inserted on the inner faces, assembled at given distances by metallic crosspieces (10) in electro-welded steel wire welded to these meshes (6, 7) and bars (8, 9) as well as pre-shaped steel bar armature brackets (11) protruding laterally (12) for linear connection with the armature of adjacent panels (1).
  3. Formwork building panel, according to claim 2, characterised by the fact that said panels (2, 3) have relief undulations (4) on the external faces in contact with these meshes (6, 7) in electro-welded steel wire.
  4. Formwork building panel, according to claim 2, characterised by the fact that said panels (2, 3) have linking inner faces with protruding reliefs to maintain the armature steel bars (8, 9) separated by at least the minimum distance required by law.
  5. Formwork building panel, according to claim 2, characterised by the fact that said pre-shaped brackets (11) are made up of steel armature bars closed on themselves and dimensioned to protrude over a section (12) externally to one side of the formwork panel (1) when placed flush with the other.
  6. Formwork building panel, according to claim 2, characterised by the fact that said pre-shaped brackets (11) are fitted with an attachment (13) designed to be inserted in the body of these panels (2, 3).
  7. Formwork building panel, according to claim 2, characterised by the fact that said panels (2, 3) have any configuration and dimension suitable for the purpose.
  8. Formwork building panel, according to claim 2, characterised by the fact that said steel wire making up said meshes (6, 7) has a cross-section of 2.5 mm (two point five millimetres).
  9. Formwork building panel, according to claim 2, characterised by the fact that said steel armature bars (8, 9) have a cross-section of 5 mm (five millimetres).
  10. Formwork building panel, according to claim 2, characterised by the fact that said pre-shaped brackets (11) have a cross-section of 5 mm (five millimetres) .
  11. Formwork building panel, according to claim 2, characterised by the fact that said steel wire making up said meshes (6, 7) have any cross-section suitable for the purpose.
  12. Formwork building panel, according to claim 2, characterised by the fact that said steel armature bars (8, 9) have any cross-section suitable for the purpose.
  13. Formwork building panel, according to claim 2, characterised by the fact that said pre-shaped brackets (11) have any cross-section suitable for the purpose.
EP01107542A 2000-04-10 2001-03-27 Pre-armed formwork building panel Withdrawn EP1146179A3 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ITPS000010 2000-04-10
IT2000PS000010A ITPS20000010A1 (en) 2000-04-10 2000-04-10 PRE-ARMED FORMWORK PANEL

Publications (2)

Publication Number Publication Date
EP1146179A2 true EP1146179A2 (en) 2001-10-17
EP1146179A3 EP1146179A3 (en) 2003-09-24

Family

ID=11453507

Family Applications (1)

Application Number Title Priority Date Filing Date
EP01107542A Withdrawn EP1146179A3 (en) 2000-04-10 2001-03-27 Pre-armed formwork building panel

Country Status (2)

Country Link
EP (1) EP1146179A3 (en)
IT (1) ITPS20000010A1 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2853339A1 (en) 2003-04-03 2004-10-08 Claude Blouet Wall building process, involves joining two walls by cross bars such that walls are assembled, assembling panels by edges having joint profiles in each wall and inserting cross bars between adjacent edges of panels in each wall
FR2858990A1 (en) 2003-08-19 2005-02-25 E M2 Reunion Prefabricated and insulated panel construction procedure uses additional reinforcing rods and metal frames on corners
FR2942824A1 (en) * 2009-03-09 2010-09-10 Fehr Integrated framework wall for dwelling, has frame whose one portion is secured another portion, where former portion extends to outer side of wall laterally with respect to edge of wall and along extension of internal volume of wall
WO2012004427A1 (en) * 2010-07-09 2012-01-12 Angel Fernandez Fernandez Freestanding permanent formwork
WO2013079731A1 (en) * 2011-12-02 2013-06-06 Sanfer Global System, S.L. Lightweight permanent formwork including an external mesh
ES2404887R1 (en) * 2010-09-28 2013-06-17 Sanfer Global System S L WRAPPED LOST WINDING FOR VERTICAL ELEMENTS WITH EMBASSY MESH
EP2792805A1 (en) * 2013-04-15 2014-10-22 Kappema Fertigteilindustrie GmbH Wallelement consisting of prefabricated elements
ITUB20160077A1 (en) * 2016-01-18 2017-07-18 Emmedue S P A PREFABRICATED BUILDING CONSTRUCTION STRUCTURE
ITUA20162536A1 (en) * 2016-04-13 2017-10-13 Emmedue S P A PREFABRICATED BUILDING CONSTRUCTION STRUCTURE AND RELATED PRODUCTION DEVICE
ITUA20164467A1 (en) * 2016-06-17 2017-12-17 Nidyon S R L Prefabricated element for the construction of an insulated concrete wall, and relative wall comprising this element
CN111997233A (en) * 2020-08-10 2020-11-27 四川省红川建材科技有限责任公司 Steel wire net frame template cast-in-place concrete composite heat preservation system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0180667A1 (en) * 1984-11-08 1986-05-14 SISMO INTERNATIONAL personenvennootschap met beperkte aansprakelijkheid Preassembled modules and their use in a building construction
US4700523A (en) * 1984-12-28 1987-10-20 Fujikigyo Co., Ltd. Reinforcing frame work for constructing reinforced concrete structure
GB2254863A (en) * 1991-04-16 1992-10-21 Mariano Capozzi Building panel.
WO1994019557A1 (en) * 1993-02-26 1994-09-01 N.T.C. S.R.L. A prefabricated structural panel

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0180667A1 (en) * 1984-11-08 1986-05-14 SISMO INTERNATIONAL personenvennootschap met beperkte aansprakelijkheid Preassembled modules and their use in a building construction
US4700523A (en) * 1984-12-28 1987-10-20 Fujikigyo Co., Ltd. Reinforcing frame work for constructing reinforced concrete structure
GB2254863A (en) * 1991-04-16 1992-10-21 Mariano Capozzi Building panel.
WO1994019557A1 (en) * 1993-02-26 1994-09-01 N.T.C. S.R.L. A prefabricated structural panel

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2853339A1 (en) 2003-04-03 2004-10-08 Claude Blouet Wall building process, involves joining two walls by cross bars such that walls are assembled, assembling panels by edges having joint profiles in each wall and inserting cross bars between adjacent edges of panels in each wall
FR2858990A1 (en) 2003-08-19 2005-02-25 E M2 Reunion Prefabricated and insulated panel construction procedure uses additional reinforcing rods and metal frames on corners
FR2942824A1 (en) * 2009-03-09 2010-09-10 Fehr Integrated framework wall for dwelling, has frame whose one portion is secured another portion, where former portion extends to outer side of wall laterally with respect to edge of wall and along extension of internal volume of wall
WO2012004427A1 (en) * 2010-07-09 2012-01-12 Angel Fernandez Fernandez Freestanding permanent formwork
ES2404887R1 (en) * 2010-09-28 2013-06-17 Sanfer Global System S L WRAPPED LOST WINDING FOR VERTICAL ELEMENTS WITH EMBASSY MESH
WO2013079731A1 (en) * 2011-12-02 2013-06-06 Sanfer Global System, S.L. Lightweight permanent formwork including an external mesh
EP2792805A1 (en) * 2013-04-15 2014-10-22 Kappema Fertigteilindustrie GmbH Wallelement consisting of prefabricated elements
AT514300A1 (en) * 2013-04-15 2014-11-15 Kappema Fertigteilindustrie Gmbh building
AT514300B1 (en) * 2013-04-15 2015-10-15 Kappema Fertigteilindustrie Gmbh building
ITUB20160077A1 (en) * 2016-01-18 2017-07-18 Emmedue S P A PREFABRICATED BUILDING CONSTRUCTION STRUCTURE
ITUA20162536A1 (en) * 2016-04-13 2017-10-13 Emmedue S P A PREFABRICATED BUILDING CONSTRUCTION STRUCTURE AND RELATED PRODUCTION DEVICE
ITUA20164467A1 (en) * 2016-06-17 2017-12-17 Nidyon S R L Prefabricated element for the construction of an insulated concrete wall, and relative wall comprising this element
CN111997233A (en) * 2020-08-10 2020-11-27 四川省红川建材科技有限责任公司 Steel wire net frame template cast-in-place concrete composite heat preservation system

Also Published As

Publication number Publication date
ITPS20000010A0 (en) 2000-04-10
ITPS20000010A1 (en) 2001-10-10
EP1146179A3 (en) 2003-09-24

Similar Documents

Publication Publication Date Title
US6202375B1 (en) Method for concrete building system using composite panels with highly insulative plastic connector
US7100336B2 (en) Concrete building panel with a low density core and carbon fiber and steel reinforcement
FI82520B (en) PREFABRICATED MODULE FOR ANALYSIS WITH HUSBYGNAD.
US7143554B2 (en) Composite column and beam framing members for building construction
CN108867935B (en) L-shaped wall connecting structure and assembled building structure system
EP1146179A2 (en) Pre-armed formwork building panel
US6625948B2 (en) Element made from brick material and method for manufacturing prefabricated panels for building construction
US3885296A (en) Method for making cast-in-place concrete structures
US4676035A (en) Reinforced concrete panels with improved welded joint
EP3656942A1 (en) Structure and method for connecting a composite insulation exterior wall panel and a steel structural beam-column
US4597813A (en) Method of making a reinforced preformed building wall
CN108867934B (en) T-shaped wall connecting structure and assembled building structure system
CN111727292B (en) Structural panel
EP0558826A1 (en) Method for producing a floor part or ribbed floor, and sheet of a thermally insulating material for floor parts
CN210067118U (en) L-shaped and T-shaped concrete shear wall structure combined prefabricated edge component
KR20180094673A (en) Double plate walls and manufacturing method thereof
JP2002227295A (en) Thin outer shell-like structure precast beam and beam constructing method
JP2544524B2 (en) Construction method of wall using three-dimensional wire mesh panel
JP2557785B2 (en) Architectural panel
CN217537493U (en) Integrated floor slab
CN115977275B (en) Prefabricated shear wall system and construction method thereof
US12018487B2 (en) Wall panel apparatus
CN213014703U (en) Assembled building that billet is connected
CN221073116U (en) Superimposed shear wall connection node
GB2470084A (en) Building panel comprising a reinforcing cage enclosing a low density core

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AX Request for extension of the european patent

Extension state: AL LT LV MK RO SI

AKX Designation fees paid
REG Reference to a national code

Ref country code: DE

Ref legal event code: 8566

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20040325