Distributing device for thick substances, especially concrete Download PDFInfo
- Publication number
- EP1129265B1 EP1129265B1 EP99953859A EP99953859A EP1129265B1 EP 1129265 B1 EP1129265 B1 EP 1129265B1 EP 99953859 A EP99953859 A EP 99953859A EP 99953859 A EP99953859 A EP 99953859A EP 1129265 B1 EP1129265 B1 EP 1129265B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- conveying line
- telescopic
- concrete
- line elements
- conveying
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/04—Devices for both conveying and distributing
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/04—Devices for both conveying and distributing
- E04G21/0418—Devices for both conveying and distributing with distribution hose
- E04G21/0436—Devices for both conveying and distributing with distribution hose on a mobile support, e.g. truck
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T137/00—Fluid handling
- Y10T137/8593—Systems
- Y10T137/8807—Articulated or swinging flow conduit
Definitions
- the invention relates to a distributor device according to the preamble of the claim 1.
- Such distribution devices are used in particular for the promotion of Concrete, used in building construction, for example to move concrete ceilings into buildings. Depending on the height and size, it is necessary to pour the concrete over a to distribute further area. To do this, one uses distribution systems that are mostly formed from a distribution boom on several boom sections and on transport vehicles, on cranes or the like. transportable or stationary are. When it comes to placing booms, it depends on clever subdivision of the mast into individual mast sections that are articulated or are telescopically connected, a maximum distribution field for conveying of being able to operate concrete.
- This high mobility of the distributor boom is particularly important in the front, area of the jib near the tip of the distributor.
- the area of the distributor boom that is close to the bogie is Stretch function of greater importance because of the associated achievability of height and width. It is useful to have at least one distributor mast and preferably to make the basic boom telescopic, what about the alternative of angling the distribution booms Brings the advantage of a smaller space requirement.
- a generic known distribution device in a generic known distribution device according to the US patent US-A-4 130 134 is the distribution device on a bogie Truck and has a telescopic boom, its length adjustment by a scissor system made up of several conveyor line elements is achieved.
- the known conveyor line shears for length adjustment to the telescopic hub of a basic boom three conveyor line elements used in a row. These conveyor line elements are arranged so that they are between a folded position in the retracted telescopic position and between an extended position of the Conveyor line elements are folded in the extended telescopic position can.
- each of the delivery line elements vibrates during the Telescopic process by approx. 180 ° and takes up a vertical position to the telescopic direction.
- the well-known delivery line scissors needed at least three conveyor line elements, of which the two are on the outside each with one of its ends on the centrally arranged conveyor line element are articulated and with their other ends on the respective telescopic part of the placing boom attached and there with the supply or discharge concrete delivery line are connected.
- these three delivery line elements are the outer ones Delivery line elements for telescopic length compensation in principle without Significance because they are only insignificant compared to the telescopic tubes they carry Execute evasive movement perpendicular to the telescopic longitudinal axis, to the extent that the articulation points change during the telescopic process Remove vertically from the telescopic longitudinal axis on the middle conveyor line element.
- the telescopic length compensation is done exclusively by swiveling of the middle conveyor line element. This is on an am Manifold boom centrally supported in the longitudinal direction of the boom and due to the arrangement encompassing the mast profile only up to around 120 ° pivotable. That's why the telescopic length compensation is only approx. 1.7 times the true length of the middle conveyor line element can be used.
- middle Telescopic position in which the middle conveying line element is roughly in one 90 ° position to the telescope of the distributor boom, this concrete conveyor line element protrudes simultaneously on each side of the jib by about 1 ⁇ 4 of the telescope stroke, so that the entire system height of such a Arrangement corresponds to about half of the telescope stroke. This is common practice Telescopic stroke lengths of 4-6 m are extremely annoying.
- the known concrete spreading device thus has the disadvantage that it in Cross direction builds comparatively large, but considering the circumstance it is disadvantageous that in such distribution devices a variety of folded mast sections can be accommodated in the tightest of spaces must be subdivided into individual sections, including those supported by them Concrete delivery line along with the other accessories for the distribution device. As a result, a more compact and simpler version of a distribution device comes with telescopic mast section increased importance.
- the conveyor line elements pivot by about 90 °, what necessarily results in a system height of about half a telescope length. This is with standard telescope lengths of 4-6 m extremely annoying, because of it a relatively large space requirement when unfolding the system and also an increased construction effort results.
- the object of the invention is to provide a distributor device which is particularly suitable for conveying concrete to create the comparatively simple and structurally compact Setting up a desired length adjustment of a concrete delivery line to a telescopic Pylon allows.
- the conveyor line elements are each rectified Leg ends formed on each other with respect to the two conveyor line elements are prepared. This results in an essentially S-shaped construction in the extended position the delivery line elements. This results in a very compact structure, which is great for the distribution device is of great advantage because it has a variety of moveable Has elements that are not when extending or unfolding the mast sections may hinder.
- the articulation points of the two conveyor line elements articulated on the telescopic pipes are essentially alternating in the two telescope end positions arranged crosswise to each other.
- the two conveyor line elements relevant to length compensation have approximately the length of 1 ⁇ 4 of the stroke of the telescopic mast section.
- Each of the conveyor line elements pivots through the entire telescopic process by about 180 ° and takes a vertical position to the telescopic direction.
- Applying the roll folding principle ensures that this vertical position the two delivery line elements never occur simultaneously, but one after the other. That means, that the system height, i.e. the space requirement, makes up about a quarter of the telescope stroke, which corresponds approximately to the length of a single conveyor line element.
- This is beneficial for the compact construction of the delivery line shears. Not only the whole System height, depending on the number of conveyor line elements, only approx. 1 ⁇ 4 or less of the stroke amount, but there are also no intermediate pieces and the associated additional construction effort. Overall, the moving components and are also reduced the necessary joints including their displacement.
- the articulation points of the conveyor line elements are expediently relative to one another movable telescopic tubes spaced from each other, whereby the Articulation points of the delivery line shears are static in every phase of the telescopic movement form a certain triangle, so that the forces acting on the conveyor line elements are statically determined at all times are what the design, stability and durability of the structure is important.
- the articulation points move on precisely defined Paths, namely the fixed articulation points parallel to the telescopic direction Orbits relative to each other.
- each conveying line element essentially Is C-shaped, with adjacent and directly articulated with each other connected conveyor line elements essentially an S-shape or Waveform with two opposite amplitudes. Thereby can the two conveyor line elements together with little space pass.
- Fig. 1 shows a purely schematic and partial representation of a placing boom for thick materials, in particular concrete, which, for example, at 1 on a transport conveyor vehicle, a truck, for example.
- Distribution booms are used to place concrete on site using a concrete pump, for example to promote the erection of a concrete ceiling, the generally of several Mast sections built up by swiveling and extending the sections can cover a wide distribution area.
- the one shown Distribution boom has a telescopic mast section which can be pivoted about the structure 1 2, which, as shown in FIG. 3, consists of a first telescopic tube 3 and a in contrast, extendable second telescopic tube 4 is constructed.
- the extendable telescopic tube so here the telescopic tube 4, is arranged extendable within the telescopic tube 3, but also the position shown in Fig. 3 is possible, in which the telescopic tube 3 within, overlapped by the telescopic tube 4, is arranged.
- the concrete placing boom serves as a support for the actual concrete delivery line, which consist of several, articulated concrete delivery pipes is constructed.
- the invention is concerned with the concrete delivery line in the field of the telescopic boom section, because here due to the telescopic Extending the telescopic tubes a length adjustment of those arranged in this area Concrete delivery line is required.
- the following is regarding the Concrete delivery pipes of delivery line elements arranged in this area spoken.
- the concrete delivery line is adjacent arranged the placing boom 2.
- a concrete delivery pipe 5 which is attached at 6 to the telescopic pipe 3 and as a result the articulation 7 with pivoting of the telescopic boom section 2 is equally pivotable.
- Concrete delivery pipe 5 is fixed via a bearing block 8 with respect to the telescopic pipe 3.
- a conveying line element 9 connects to this concrete conveying pipe 5, which with one end at 10 pivotally mounted on the bearing block 8 and the rest is fixed immovable. That is, the conveying line member 9 is pivotable with respect to the axis 11.
- Delivery line element 9 is directly at 12 with a further delivery line element 13 articulated, the pivot axis being designated 14.
- the second conveyor line element 13 is at its other end at 15 in turn articulated, d. H. pivotable, but non-displaceable on a bearing block 16 mounted, which is attached to the extendable telescopic tube 4.
- Bearing block 16 is also a concrete delivery pipe connected to the delivery line element 13 17 added, the further, not shown here Concrete delivery line area is illustrated at 18.
- FIG. 1 and 2 show the telescopic boom section 2 in its retracted telescopic end position.
- this Mast section 2 in a known manner to further mast sections 19 and 20 are folded or rolled up and after extending and swiveling the telescopic Distribution boom section 2 rolled up and forward or can be folded out.
- Corresponding joints are designated with 21 and 22, however, this does not require further discussion here.
- FIGS. 1 and 2 In the telescopic end position shown in FIGS. 1 and 2 are the Conveying line elements 9 and 13 in the extended position, wherein in this extended position the conveying line elements 9 and 13 extend counter to the concrete conveying direction F. That is, the articulation point 15 at one end of the conveying line element 13 is to the left of the articulation point 10 of the end of the other concrete conveying line element 9th
- the conveying line element 13 moves with its articulation point 15 in the telescopic direction and runs depending on the telescopic extension position at the articulation point 10 at the end of the other conveyor line element 9 past, with articulation point 10 here due to the fixed, ie not extendable Telescopic tube 3 remains stationary.
- pivot point 15 1 to the left of the articulation point 10 arranged pivot point 15 is in the extended position shown in FIG. 4 of the tube 4 now to the right of the articulation point 10. That is, in the two telescopic end positions are the two pivot points 10 and 15 of the scissor assembly from the two conveyor line elements alternately to each other Arranged cross.
- FIG. 5 shows the basic structure of a structure as already shown in FIGS. 1-4 explained delivery line scissors from delivery line elements 9, 13, wherein for same components the same reference numerals are used.
- the telescopic distributor mast is on the top left in its retracted telescopic end position and on the right schematically shown the extended telescopic tube.
- the delivery line elements 9 and 13 are only shown schematically as straight lines, to explain the functional course. The ends of the two are visible Delivery line elements 9 and 13 at 10 and 15 fixed relative to the corresponding Telescopic tubes 4 and 3 relocated, but with a pivoting movement within of the joint is made possible.
- the feed line element swivels clearly 9 with the start of the extension movement of the telescopic tube 4 upwards and the articulation point 15 runs in the conveying direction F to the right.
- the course of the The articulation point 15 here runs on a straight line parallel to the telescopic axis of the telescopic structure, wherein the pivot point 15 can be seen by a distance h is offset downwards relative to the fixed articulation point 10, consequently the path of the articulation point 15 over its entire path by the distance h is offset.
- the articulation point 15 passes the following lower illustrations finally the articulation point 10 and the conveyor line scissors come out of the Function position shown above with extended position of the elements 9 and 13 opposite corresponding to the conveying direction F in the extended position in the concrete conveying direction F. the illustration below.
- the maximum deflection across the direction of concrete delivery F is evident when the articulation point 15 is below the Joint is located between the two elements 9 and 13, the transverse extent in principle determined by the length of the conveyor line element 13 is. Since it is also possible in an advantageous manner, the lengths of both conveyor line elements to be different, can be shown in FIG. 5 Constellation of a delivery line scissor assembly the delivery line element 13 with a short length compared to the other conveying line element 9 be chosen or vice versa.
- FIG. 6 A further advantageous embodiment results from FIG. 6, in which the conveyor line elements 9, 13 with an anti-folding movement of the scissors, here acted elastically acting pivoting moment.
- a schematically indicated Spring device 23 is provided in the illustrated embodiment fixed with respect to the telescopic tube 3 and with its other end on Delivery line element 9 is articulated. It is useful if, as in the illustrated embodiment, the conveyor line element with the elastic acting swing torque is applied, which with its end, here the pivot point 10, on the non-extendable part, here telescopic tube 3, stored is.
- This embodiment favors the stability of the delivery line shear in all intermediate layers including the end positions.
- FIG. 7-10 show various structural variants of the delivery line shear system according to the invention, depending on the structurally specified on the vehicle Ratios can be chosen, making a suitable adjustment to it allows the overall structure of the device.
- the Position or the position can be determined and thus adjusted, resulting in the vertical arrangement of one of the conveyor line elements 9, 13 sets the maximum width of the folded state of the delivery line shears.
- the conveyor line elements possible with different lengths.
- the conveying line element 9 is fixed Telescopic tube 3 with its articulation point 10 shifted, however, the articulation point 15 of the element 13 on the extendable telescopic tube 4, the extended position in the telescopic end position shown above is such that the articulation point between the two conveyor line elements 9 and 13 in a slight kink position is arranged above.
- the conditions are analogous to those in the Embodiment according to Fig. 7, but in the extended position in the retracted Telescopic end position of the common articulation point of the two conveyor line elements 9 and 13 is in a lower kink position. This results in different kink positions with regard to the articulation point 12 also in the extended position Telescope end position, as can easily be seen from a comparison of the 7 and 8, lower representation, results.
- Fig. 10 shows a structure analogous to Fig. 9, but with an upward bend in the Stretched position in the retracted telescopic end position of the scissor assembly.
- Fig. 11 shows the structure of a telescopic boom section 2, consisting consisting of three telescopic tubes 3, 4 and 24. With this construction there are for length adjustment to the telescopic hub two conveyor line shears 9, 13 and 9 ', 13' intended. The articulation points 15 and 15 'are shown by a dashed line Concrete delivery pipe 25 connected. The other two articulation points are at 10 and 10 '. The conveyor line elements are at 12 or 12 'with each other articulated. In Fig. 11, designated by reference numeral 26 Component a hydraulic cylinder that is used to pivot the telescopic Mast section 2 adjoining mast section is used.
- Fig. 12 finally shows a structure of a conveyor line shear 9, 13, with the reverse Arrangement of the boom telescope, what the collision between Avoids delivery line system and boom joint drive.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Road Paving Machines (AREA)
- Extrusion Moulding Of Plastics Or The Like (AREA)
Abstract
Description
Die Erfindung betrifft eine Verteilervorrichtung gemäß dem Oberbegriff des Patentanspruches 1.The invention relates to a distributor device according to the preamble of the claim 1.
Derartige Verteilervorrichtungen werden insbesondere für die Förderung von Beton, im Hochbau verwendet, um beispielsweise Betondecken in Gebäude einzuziehen. Je nach Bauhöhe und Baugröße ist es erforderlich, den Beton über einen weiteren Bereich zu verteilen. Dazu bedient man sich Verteilersysteme, die zumeist aus einem Verteilermast an mehreren Mastabschnitten gebildet sind und auf Transportfahrzeugen, auf Kränen oder dgl. transportabel oder stationär verlagert sind. Bei den Verteilermasten kommt es darauf an, durch geschickte Unterteilung des Mastes in einzelne Mastabschnitte, die miteinander gelenkig oder teleskopierbar verbunden sind, ein maximales Verteilungsfeld für das Fördern von Beton bedienen zu können.Such distribution devices are used in particular for the promotion of Concrete, used in building construction, for example to move concrete ceilings into buildings. Depending on the height and size, it is necessary to pour the concrete over a to distribute further area. To do this, one uses distribution systems that are mostly formed from a distribution boom on several boom sections and on transport vehicles, on cranes or the like. transportable or stationary are. When it comes to placing booms, it depends on clever subdivision of the mast into individual mast sections that are articulated or are telescopically connected, a maximum distribution field for conveying of being able to operate concrete.
Deswegen ist der Einsatz mobiler Betonpumpen entscheidend geprägt durch hochsensible gelenkige Verteilerausleger. Diese sind auf einem Drehgestell angeordnet und tragen eine Betonförderleitung. Derartige Verteilermasten können die verschiedensten vor Ort erforderlichen Arbeitsstellungen einnehmen, z. B. vertikal oder horizontal ausgestreckt, abgewinkelt und dgl. Sie können somit, in welcher Konfiguration auch immer, das Austragsende der von Ihnen getragenen Betonförderleitung zielgenau an die Betoneinbringstelle heranführen. Das Führen der Spitze des Verteilerauslegers erfolgt dabei durch Drehen des Verteilerauslegers und/oder Winkelverstellung der einzelnen Verteilermastsektionen untereinander.That is why the use of mobile concrete pumps is decisively shaped by highly sensitive articulated distributor boom. These are arranged on a bogie and carry a concrete delivery line. Such placing booms can take on a wide variety of work positions required on site, e.g. B. stretched vertically or horizontally, angled and the like. You can thus, in whatever configuration, the discharge end of the one you carried Guide the concrete delivery line precisely to the concrete placement point. Leading the tip of the distributor boom is made by turning the distributor boom and / or angle adjustment of the individual distributor mast sections with each other.
Diese hohe Beweglichkeit des Verteilerauslegers ist besonders wichtig im vorderen, der Verteilerspitze nahegelegenen Bereich des Verteilerauslegers. In dem dem Drehgestell nahegelegenen Bereich des Verteilerauslegers hingegen ist die Streckfunktion von größerer Bedeutung wegen der damit verbundenen Erzielbarkeit von Höhe und Weite. Hierbei ist es zweckmäßig, mindestens ein Verteilermaststück und zwar vorzugsweise den Grundausleger teleskopierbar auszubilden, was gegenüber der Alternative des Abwinkelns der Verteilermaststücke den Vorteil eines geringeren Raumbedarfs bringt. This high mobility of the distributor boom is particularly important in the front, area of the jib near the tip of the distributor. By doing on the other hand, the area of the distributor boom that is close to the bogie is Stretch function of greater importance because of the associated achievability of height and width. It is useful to have at least one distributor mast and preferably to make the basic boom telescopic, what about the alternative of angling the distribution booms Brings the advantage of a smaller space requirement.
Im Bereich des teleskopierbaren Aufbaus eines Verteilermastabschnittes muß hierbei für eine Längenanpassung der Betonförderleitungen gesorgt werden. Zwar läßt sich durch eine flexible Ausbildung der Betonförderleitungselemente im Bereich des teleskopierbaren Mastabschnittes eine Längenangleichung ermöglichen, jedoch ist dies auf geringe Hublängen beschränkt, da sich flexible Betonförderleitungsrohre nur begrenzt biegen lassen. Bei größeren Hublängen verbietet sich eine solche Konstruktion, vielmehr muß man dann auf starre Betonförderleitungselemente übergehen.In the area of the telescopic construction of a boom section a length adjustment of the concrete delivery lines must be ensured. Admittedly, a flexible design of the concrete delivery line elements can be used enable length adjustment in the area of the telescopic mast section, however, this is limited to short stroke lengths because there are flexible concrete delivery pipes only allow limited bending. With longer stroke lengths Such a construction is forbidden, rather you have to use rigid concrete delivery line elements pass.
Bei einer gattungsgemäßen bekannten Verteilervorrichtung gemäß US-Patentschrift US-A-4 130 134 ist die Verteilervorrichtung auf einem Drehgestell eines Lastkraftwagens montiert und verfügt über einen teleskopierbaren Grundausleger, dessen Längenanpassung durch ein Scherensystem aus mehreren Förderleitungselementen erreicht wird. Bei der bekannten Förderleitungsschere zur Längenanpassung an den Teleskophub eines Grundauslegers werden hierbei mindestens drei Förderleitungselemente in Aneinanderreihung verwendet. Diese Förderleitungselemente sind hierbei derart angeordnet, daß sie zwischen einer Faltlage in der eingefahrenen Teleskopendstellung und zwischen einer Strecklage der Förderleitungselemente in der ausgefahrenen Teleskopendstellung gefaltet werden können. Hierbei schwingt jedes der Förderleitungselemente während des Teleskopiervorganges um ca. 180° und nimmt dabei einmal eine vertikale Stellung zur Teleskopierichtung ein. Die bekannte Förderleitungsschere benötigt wenigstens drei Förderleitungselemente, von denen die beiden außen gelegenen jeweils mit einem ihrer Enden am mittig angeordneten Förderleitungselement angelenkt sind und mit ihren anderen Enden am jeweiligen Teleskopteil des Verteilermastes befestigt und dort mit der zu- bzw. abführenden Betonförderleitung verbunden sind. Von diesen drei Förderleitungselementen sind jedoch die äußeren Förderleitungselemente für den Teleskoplängenausgleich im Prinzip ohne Bedeutung, weil sie gegenüber den sie tragenden Teleskoprohren nur eine unwesentliche Ausweichbewegung senkrecht zur Teleskoplängsachse durchführen, und zwar in dem Maße, wie sich beim Teleskopiervorgang die Anlenkungspunkte am mittleren Förderleitungselement senkrecht von der Teleskoplängsachse entfernen. Der Teleskoplängenausgleich erfolgt damit ausschließlich durch Verschwenkung des mittleren Förderleitungselementes. Dieses ist auf einem am Verteilerausleger in Auslegerlängsrichtung geführten Element mittig gelagert und aufgrund der das Mastprofil umgreifenden Anordnung nur bis gegen 120° schwenkbar. Deswegen ist für den Teleskoplängenausgleich ca. nur das 1,7-fache der wahren Länge des mittleren Förderleitungselementes nutzbar. In mittlerer Teleskopstellung, in der sich das mittlere Förderleitungselement etwa in einer 90°-Position zum Teleskop des Verteilerauslegers befindet, kragt dieses Betonförderleitungselement gleichzeitig auf jeder Seite des Verteilerauslegers jeweils um etwa ¼ des Teleskophubes aus, so daß die gesamte Systemhöhe einer solchen Anordnung etwa der Hälfte des Teleskophubes entspricht. Dies ist bei praxisüblichen Teleskop-Hublängen von 4-6 m außerordentlich störend.In a generic known distribution device according to the US patent US-A-4 130 134 is the distribution device on a bogie Truck and has a telescopic boom, its length adjustment by a scissor system made up of several conveyor line elements is achieved. In the known conveyor line shears for length adjustment to the telescopic hub of a basic boom three conveyor line elements used in a row. These conveyor line elements are arranged so that they are between a folded position in the retracted telescopic position and between an extended position of the Conveyor line elements are folded in the extended telescopic position can. Here, each of the delivery line elements vibrates during the Telescopic process by approx. 180 ° and takes up a vertical position to the telescopic direction. The well-known delivery line scissors needed at least three conveyor line elements, of which the two are on the outside each with one of its ends on the centrally arranged conveyor line element are articulated and with their other ends on the respective telescopic part of the placing boom attached and there with the supply or discharge concrete delivery line are connected. Of these three delivery line elements, however, are the outer ones Delivery line elements for telescopic length compensation in principle without Significance because they are only insignificant compared to the telescopic tubes they carry Execute evasive movement perpendicular to the telescopic longitudinal axis, to the extent that the articulation points change during the telescopic process Remove vertically from the telescopic longitudinal axis on the middle conveyor line element. The telescopic length compensation is done exclusively by swiveling of the middle conveyor line element. This is on an am Manifold boom centrally supported in the longitudinal direction of the boom and due to the arrangement encompassing the mast profile only up to around 120 ° pivotable. That's why the telescopic length compensation is only approx. 1.7 times the true length of the middle conveyor line element can be used. In middle Telescopic position in which the middle conveying line element is roughly in one 90 ° position to the telescope of the distributor boom, this concrete conveyor line element protrudes simultaneously on each side of the jib by about ¼ of the telescope stroke, so that the entire system height of such a Arrangement corresponds to about half of the telescope stroke. This is common practice Telescopic stroke lengths of 4-6 m are extremely annoying.
Zwar wird nach der US-A-41 30 134 alternativ auch eine Zweifach-Anordnung der Förderleitungsschere bei besonders langem Teleskophub oder einer Mehrfach-Teleskopierung angeregt, was jedoch gleichwohl weiterhin den Nachteil bedingt, daß für jede zusätzliche Anordnung einer Förderleitungsschere zusätzliche Förderleitungselemente verwendet werden müssen, nämlich ein für den Teleskoplängenausgleich relevantes und eines für den Teleskoplängenausgleich nicht relevanten Teiles als verbindendes Zwischenstück. Dies führt zwangsweise zu einem erheblichen baulichen Mehraufwand und zu einer Komplexität der Anordnung der Betonförderleitungselemente.According to US-A-41 30 134, a double arrangement is alternatively also the delivery line scissors for a particularly long telescopic stroke or multiple telescoping stimulated, which nevertheless still has the disadvantage that for each additional arrangement of a delivery line shear additional Conveyor line elements must be used, namely one for telescopic length compensation relevant and one not for telescope length compensation relevant part as a connecting intermediate piece. This inevitably leads to considerable additional construction work and complexity of the arrangement of the concrete delivery line elements.
Die bekannte Betonverteilervorrichtung besitzt somit den Nachteil, daß sie in Querrichtung vergleichsweise groß baut, was jedoch in Anbetracht des Umstandes nachteilhaft ist, daß bei derartigen Verteilervorrichtungen eine Vielzahl von ineinandergefalteten Mastsektionen auf engstem Räume untergebracht werden müssen, einschließlich der dadurch getragenen, in einzelne Abschnitte untergliederten Betonförderleitung nebst dem weiteren Zubehör der Verteilervorrichtung. Demzufolge kommt einer kompakteren und einfacheren Ausführung einer Verteilervorrichtung mit teleskopierbarem Mastabschnitt erhöhte Bedeutung zu.The known concrete spreading device thus has the disadvantage that it in Cross direction builds comparatively large, but considering the circumstance it is disadvantageous that in such distribution devices a variety of folded mast sections can be accommodated in the tightest of spaces must be subdivided into individual sections, including those supported by them Concrete delivery line along with the other accessories for the distribution device. As a result, a more compact and simpler version of a distribution device comes with telescopic mast section increased importance.
Zwar ist es bekannt, die Betonförderleitung selbst zu teleskopieren (DE-A-196 41 789), was jedoch mit der Problematik verbunden ist, daß an der Stelle der Abstufung zwischen Innen- und Außenrohr der Betonförderleitung der Beton erhärtet und somit das Ein- und Ausfahren bzw. die Reinigung erheblich erschwert, wenn nicht gar unmöglich macht. Auch die Führung der teleskopierbaren Betonförderrohre ineinander und die Probleme betreffend Rundheit der Rohre haben dazu geführt, daß sich eine solche Konstruktion bislang praxisgerecht nicht umsetzen ließ. It is known to telescope the concrete delivery line itself (DE-A-196 41 789), but this is connected with the problem that in the place of gradation the concrete hardens between the inner and outer pipe of the concrete delivery line and thus the entry and exit or cleaning is considerably more difficult, if not impossible. Also the guidance of the telescopic Concrete conveying pipes and the problems of roundness of the Pipes have meant that such a construction has so far been practical not implemented.
Schließlich ist es noch aus der US-A-39 42 554 bekannt, bei einem teleskopartig verstellbaren Kranmast, der eine Förderleitung trägt, zum Zwecke des Längenausgleichs der Ein- und Ausfahrbewegung des Kranmastes zwei untereinander gelenkig miteinander verbundene Förderleitungselemente an dem vorderen und hinteren Teleskopteil anzulenken, so dass sich bei Ein- und Ausfahrbewegung des Kranmastes eine Z-artige Ein- und Ausfaltbewegung der Förderleitung ergibt (siehe Fig. 1 und Fig. 6 und 7). Beim Teleskopieren bewegen sich die Förderleitungselemente jeweils aus einer zur Teleskoprichtung etwa parallelen Strecklage bei ausgefahrenem Mast bis in etwa zur Teleskoprichtung senkrechten Lage bei eingefahrenem Mast oder umgekehrt. Dabei schwenken die Förderleitungselemente um etwa 90°, was notwendigerweise eine Systemhöhe von etwa einer halben Teleskophublänge ergibt. Dies ist bei praxisüblichen Teleskophublängen von 4-6 m außerordentlich störend, weil sich daraus ein verhältnismäßig großer Raumbedarf beim Ausfalten des Systems und zudem ein erhöhter baulicher Aufwand ergibt.Finally, it is known from US-A-39 42 554, in a telescopically adjustable Crane mast, which carries a conveyor line, for the purpose of length compensation of the inlet and Extension movement of the crane mast two articulated with each other Articulate conveyor line elements on the front and rear telescopic part, so that a Z-like folding and unfolding movement of the crane mast when moving in and out Delivery line results (see Fig. 1 and Fig. 6 and 7). They move when telescoping Conveying line elements each from an extended position approximately parallel to the telescopic direction when the mast is extended up to a position perpendicular to the telescope direction when the mast is retracted Mast or vice versa. The conveyor line elements pivot by about 90 °, what necessarily results in a system height of about half a telescope length. This is with standard telescope lengths of 4-6 m extremely annoying, because of it a relatively large space requirement when unfolding the system and also an increased construction effort results.
Aus der EP-A-432 854 ist eine Verteilervorrichtung gattungsgemäßer Art bekannt, bei der zwei Förderleitungselemente in einer Teleskopstellung zueinander über Kreuz angeordnet sind und in der anderen Teleskopendstellung in geschrägter Lage zueinander, wobei während des Ausfahrens des einen Teleskopteils die beiden Förderleitungselemente aneinander vorbeilaufen. Allerdings ist der Aufbau des Verbunds aus den miteinander verbundenen Förderleitungselementen vergleichsweise sperrig, was bei der Vielfalt der beweglichen Elemente der Verteilervorrichtung beim Ausfalten bzw. Ausfahren des Mastes nachteilhaft und störend ist.From EP-A-432 854 a distribution device of the generic type is known in which two conveyor line elements in a telescopic position to each other arranged crosswise are and in the other telescopic end position in an inclined position to each other, while the extension of one telescopic part, the two conveyor line elements to each other pass. However, the structure of the network is made up of the interconnected Conveyor line elements comparatively bulky, what with the variety of moving elements the distribution device disadvantageous when unfolding or extending the mast and is disturbing.
Aufgabe der Erfindung ist es, eine insbesondere für das Fördern von Beton geeignete Verteilervorrichtung zu schaffen, die bei vergleichsweise einfachem und baulich kompaktem Aufbau eine gewünschte Längenanpassung einer Betonförderleitung an einen teleskopierbaren Tragmast ermöglicht.The object of the invention is to provide a distributor device which is particularly suitable for conveying concrete to create the comparatively simple and structurally compact Setting up a desired length adjustment of a concrete delivery line to a telescopic Pylon allows.
Diese Aufgabe wird erfindungsgemäß durch eine Vorrichtung gemäß Anspruch 1 gelöst, wobei zweckmäßige Ausgestaltungen durch die in den Unteransprüchen enthaltenen Merkmale gekennzeichnet sind. This object is achieved according to the invention by a device according to claim 1 solved, expedient configurations by the in the dependent claims included features are marked.
Nach Maßgabe der Erfindung sind die Förderleitungselemente jeweils mit gleichgerichteten Schenkelenden ausgebildet, die bezüglich der beiden Förderleitungselemente aufeinander zugerichtet sind. Dadurch ergibt sich ein im wesentlichen S-förmiger Aufbau in Strecklage der Förderleitungselemente. Daraus resultiert ein sehr kompakter Aufbau, was für die Verteilervorrichtung deswegen von großem Vorteil ist, weil diese eine Vielzahl beweglicher Elemente aufweist, die beim Ausfahren bzw. beim Ausfalten der Mastabschnitte sich nicht behindern dürfen. Die Anlenkpunkte der beiden an die Teleskoprohre angelenkten Förderleitungselemente sind in den beiden Teleskopendstellungen im wesentlichen wechselweise über Kreuz zueinander angeordnet. Beim Aus- und Einfahren des beweglichen Teleskoprohres in seine Teleskopendstellungen laufen die beiden Anlenkpunkte der Förderleitungselemente aneinander vorbei, wobei sich die Förderleitungselemente in beiden Teleskopendstellungen in Strecklage befinden , jedoch in einer Endstellung entgegen der Betonförderrichtung und in der anderen in Richtung der Betonförderrichtung.According to the invention, the conveyor line elements are each rectified Leg ends formed on each other with respect to the two conveyor line elements are prepared. This results in an essentially S-shaped construction in the extended position the delivery line elements. This results in a very compact structure, which is great for the distribution device is of great advantage because it has a variety of moveable Has elements that are not when extending or unfolding the mast sections may hinder. The articulation points of the two conveyor line elements articulated on the telescopic pipes are essentially alternating in the two telescope end positions arranged crosswise to each other. When extending and retracting the movable telescopic tube the two articulation points of the conveyor line elements run into its telescopic end positions past each other, with the delivery line elements in both telescopic end positions are in the stretched position, but in an end position opposite to the concrete conveying direction and in the other in the direction of the concrete conveying direction.
Die beiden längenausgleichsrelevanten Förderleitungselemente haben dabei etwa die Länge von einem ¼ des Hubes des teleskopierbaren Mastabschnittes. Jedes der Förderleitungselemente schwenkt während des gesamten Teleskopiervorganges um etwa 180° und nimmt dabei einmal eine vertikal Stellung zur Teleskopierrichtung ein. Durch die erfindungsgemäße Anwendung des Rollfaltungsprinzipes ist es sichergestellt, dass diese Senkrechtstellung beider Förderleitungselemente nie gleichzeitig erfolgt, sondern hintereinander. Das bedeutet, dass die Systemhöhe, also der Raumbedarf etwa ein ¼ des Teleskophubes ausmacht, was etwa der Länge eines einzelnen Förderleitungselements entspricht. Dies ist vorteilhaft für den kompakten Aufbau der Förderleitungsschere. Dabei kann nicht nur die gesamte Systemhöhe, je nach Anzahl der Förderleitungselemente, nur ca. ¼ oder weniger des Hubes betragen, sondem es entfallen auch etwaige Zwischenstücke und der damit verbundene bauliche Mehraufwand. Insgesamt reduzieren sich damit auch die beweglichen Bauteile und die erforderlichen Gelenke einschl. deren Verlagerung.The two conveyor line elements relevant to length compensation have approximately the length of ¼ of the stroke of the telescopic mast section. Each of the conveyor line elements pivots through the entire telescopic process by about 180 ° and takes a vertical position to the telescopic direction. By the invention Applying the roll folding principle ensures that this vertical position the two delivery line elements never occur simultaneously, but one after the other. That means, that the system height, i.e. the space requirement, makes up about a quarter of the telescope stroke, which corresponds approximately to the length of a single conveyor line element. This is beneficial for the compact construction of the delivery line shears. Not only the whole System height, depending on the number of conveyor line elements, only approx. ¼ or less of the stroke amount, but there are also no intermediate pieces and the associated additional construction effort. Overall, the moving components and are also reduced the necessary joints including their displacement.
Hinzu kommt, dass infolge der Längenbestimmung, aber auch der Anlenkung der Förderleitungselemente an den beiden relativ zueinander verschiebbaren Teleskoprohren individuelle Anpassungen der Förderleitungsschere an vorgegebene Verhältnisse am Transportfahrzeug und dem zu verwendenden Verteilermast möglich sind. In addition, as a result of the length determination, but also the articulation of the conveyor line elements individual on the two telescopic tubes that can be moved relative to each other Adjustments of the delivery line shears to the given conditions on the transport vehicle and the boom to be used are possible.
Zweckmäßigerweise sind die Anlenkpunkte der Förderleitungselemente an den relativ zueinander beweglichen Teleskoprohren in einem Abstand zueinander versetzt, wodurch die Gelenkpunkte der Förderleitungsschere in jeder Phase der Teleskopbewegung ein statisch bestimmtes Dreieck bilden, so dass auch die an den Förderleitungselementen angreifenden Kräfte jederzeit statisch bestimmt sind, was für die Auslegung, die Stabilität sowie die Dauerhaftigkeit des Aufbaus von Bedeutung ist. Hierbei bewegen sich die Gelenkpunkte auf genau definierten Bahnen und zwar die festen Anlenkpunkte auf zur Teleskopierrichtung parallelen Bahnen relativ zueinander.The articulation points of the conveyor line elements are expediently relative to one another movable telescopic tubes spaced from each other, whereby the Articulation points of the delivery line shears are static in every phase of the telescopic movement form a certain triangle, so that the forces acting on the conveyor line elements are statically determined at all times are what the design, stability and durability of the structure is important. Here the articulation points move on precisely defined Paths, namely the fixed articulation points parallel to the telescopic direction Orbits relative to each other.
Mit der Erfindung wird also nicht nur die für komplizierte Verteilermasten und deren Bewegungsablauf entscheidende kleine Systemhöhe realisiert, sondern es ist bezüglich Gestaltung und Anordnung der längenausgleichsrelevanten Förderleitungselemente und deren Gelenke eine bei der Komplexität der heute bekannten Betonverteilermasten entscheidende Anpassung an die konstruktive Umgebung möglich. Hierbei ist zu bedenken, daß bei den aus verschiedenen Mastsegmenten bestehenden Betonverteilervorrichtungen mehr oder weniger begrenzter Einbauraum und Bewegungsspielraum zur Verfügung steht, weil in diesem Bereich zugleich Antriebsteile, wie Zylinder, Hebel und dgl. für die Verteilerausleger-Schwenkbewegung auf engstem Raume unterzubringen sind.With the invention is not only for complicated placing booms and their movement sequence realizes crucial small system height, but it is regarding the design and arrangement of the conveyor line elements relevant for length compensation and their joints one with the complexity of the known today Concrete placing masts decisive adaptation to the structural environment possible. It should be borne in mind that in the case of different mast segments existing concrete spreading devices more or less limited Installation space and freedom of movement is available because in this area at the same time drive parts such as cylinders, levers and the like for the distributor boom pivoting movement must be accommodated in the smallest of spaces.
Hierbei ist es ferner zweckmäßig, daß jedes Förderleitungselement im wesentlichen C-förmig ausgebildet ist, wobei benachbarte und unmittelbar gelenkig miteinander verbundene Förderleitungselemente im wesentlichen eine S-Form bzw. Wellenform mit zwei entgegengesetzt gerichteten Amplituden ergeben. Dadurch können bei geringem Raumbedarf die beiden Förderleitungselemente aneinander vorbeilaufen.It is also expedient here that each conveying line element essentially Is C-shaped, with adjacent and directly articulated with each other connected conveyor line elements essentially an S-shape or Waveform with two opposite amplitudes. Thereby can the two conveyor line elements together with little space pass.
Nachfolgend werden Ausführungsbeispiele der Erfindung anhand der Zeichnung beschrieben. Darin zeigen
- Fig. 1
- eine Seitenansicht eines Teils eines Verteilermastes für Beton in schematischer Darstellung und in eingefahrener Teleskopendstellung,
- Fig. 2
- eine Ansicht des in Fig. 1 dargestellten Betonverteilermastes in Draufsicht,
- Fig. 3
- eine Ansicht des in Fig. 1 dargestellten Betonverteilermastes in ausgefahrener Teleskopendstellung und in Seitenansicht,
- Fig. 4
- eine Ansicht des Betonverteilermastes von Fig. 3 in Draufsicht,
- Fig. 5
- eine Ansicht einer schematischen Darstellung eines Betonverteilermastes mit schematischen Darstellungen verschiedener Teleskopstellungen,
- Fig. 6
- eine Ansicht einer weiteren Ausführungsform analog Fig. 5,
- Fig. 7
- eine Ausführungsform mit einer erfindungsgemäßen Anordnung von Förderleitungselementen mit darunter angeordneten verschiedenen Zwischenstufen von Teleskopstellungen (Funktionsschema),
- Fig. 8
- eine weitere Variante zu Fig. 7,
- Fig. 9
- eine weitere Variante zu Fig. 7,
- Fig. 10
- eine weitere Variante zu Fig. 7,
- Fig. 11
- einen aus drei Teleskoprohren aufgebauten Teleskopverteilermastabschnitt, gemäß der Erfindung, sowie
- Fig. 12
- einen Teleskopverteilermast mit umgekehrter Anordnung.
- Fig. 1
- a side view of part of a placing boom for concrete in a schematic representation and in the retracted telescopic position,
- Fig. 2
- 1 shows a plan view of the concrete placing boom shown in FIG. 1,
- Fig. 3
- 1 shows a view of the concrete placing boom shown in FIG. 1 in the extended telescopic end position and in a side view,
- Fig. 4
- 3 shows a top view of the concrete placing boom of FIG. 3,
- Fig. 5
- 1 shows a schematic representation of a concrete placing boom with schematic representations of different telescopic positions,
- Fig. 6
- 5 shows a view of a further embodiment analogous to FIG. 5,
- Fig. 7
- an embodiment with an arrangement according to the invention of conveying line elements with different intermediate stages of telescopic positions arranged underneath (functional diagram),
- Fig. 8
- another variant of FIG. 7,
- Fig. 9
- another variant of FIG. 7,
- Fig. 10
- another variant of FIG. 7,
- Fig. 11
- a telescopic distributor mast section constructed from three telescopic tubes, according to the invention, and
- Fig. 12
- a telescopic placing boom with the reverse arrangement.
Fig. 1 zeigt in rein schematischer und teilweiser Darstellung einen Verteilermast
für Dickstoffe, insbesondere Beton, der beispielsweise bei 1 auf einem Transportförderfahrzeug,
etwa einem Lastkraftwagen, angeordnet sein kann. Derartige
Verteilermasten dienen dazu, Beton vor Ort mittels einer Betonpumpe beispielsweise
zum Errichten einer Betondecke zu fördern, wobei der allgemein aus mehreren
Mastsektionen aufgebaute Verteilermast durch Verschwenken und Ausfahren
der Sektionen ein breites Verteilfeld überstreichen kann. Der dargestellte
Verteilermast weist einen um den Aufbau 1 verschwenkbaren Teleskopmastabschnitt
2 auf, der, wie Fig. 3 zeigt, aus einem ersten Teleskoprohr 3 und einem
demgegenüber ausfahrbaren zweiten Teleskoprohr 4 aufgebaut ist. Dabei ist allgemein
bevorzugt, daß das ausfahrbare Teleskoprohr, also hier das Teleskoprohr
4, innerhalb des Teleskoprohres 3 ausfahrbar angeordnet ist, wobei jedoch auch
die in Fig. 3 dargestellte Stellung möglich ist, bei der das Teleskoprohr 3 innerhalb,
also vom Teleskoprohr 4 übergriffen, angeordnet ist.Fig. 1 shows a purely schematic and partial representation of a placing boom
for thick materials, in particular concrete, which, for example, at 1 on a transport conveyor vehicle,
a truck, for example. such
Distribution booms are used to place concrete on site using a concrete pump, for example
to promote the erection of a concrete ceiling, the generally of several
Mast sections built up by swiveling and extending
the sections can cover a wide distribution area. The one shown
Distribution boom has a telescopic mast section which can be pivoted about the structure 1
2, which, as shown in FIG. 3, consists of a first
Der Betonverteilermast dient hierbei als Träger für die eigentliche Betonförderleitung, die aus mehreren, gelenkig miteinander verbundenen Betonförderrohren aufgebaut ist. Die Erfindung befaßt sich mit der Betonförderleitung im Bereich des teleskopierbaren Verteilmastabschnitts, da hier infolge des teleskopartigen Ausfahrens der Teleskoprohre eine Längenanpassung der in diesem Bereich angeordneten Betonförderleitung erforderlich ist. Im folgenden wird bezüglich der in diesem Bereich angeordneten Betonförderrohre von Förderleitungselementen gesprochen.The concrete placing boom serves as a support for the actual concrete delivery line, which consist of several, articulated concrete delivery pipes is constructed. The invention is concerned with the concrete delivery line in the field of the telescopic boom section, because here due to the telescopic Extending the telescopic tubes a length adjustment of those arranged in this area Concrete delivery line is required. The following is regarding the Concrete delivery pipes of delivery line elements arranged in this area spoken.
Bei der Ausführungsform und den Fig. 1 bis 4 ist die Betonförderleitung neben
dem Verteilermast 2 angeordnet. Sie weist, wie am besten aus Fig. 4 hervorgeht,
ein Betonförderrohr 5 auf, welches bei 6 am Teleskoprohr 3 befestigt ist und infolge
der Gelenkverbindung 7 mit Verschwenken des teleskopierbaren Verteilermastabschnittes
2 gleichermaßen verschwenkbar ist. Am anderen Ende ist das
Betonförderrohr 5 über einen Lagerbock 8 bezüglich des Teleskoprohres 3 festgelegt.
An diesem Betonförderrohr 5 schließt sich ein Förderleitungselement 9 an,
welches mit einem Ende bei 10 schwenkbar am Lagerbock 8 gelagert und im übrigen
längsunverschieblich festgelegt ist. Das heißt, das Förderleitungselement 9
ist bezüglich der Achse 11 verschwenkbar. Dieses bezüglich seines einen Endes
bei 10 gegenüber dem Teleskoprohr 3 festgelegt, jedoch verschwenkbar gelagerte
Förderleitungselement 9 ist direkt bei 12 mit einem weiteren Förderleitungselement
13 gelenkig verbunden, wobei die Schwenkachse mit 14 bezeichnet ist. Das
zweite Förderleitungselement 13 ist an seinem anderen Ende bei 15 wiederum
gelenkig, d. h. verschwenkbar, jedoch längsunverschieblich an einem Lagerbock
16 gelagert, welcher am ausfahrbaren Teleskoprohr 4 befestigt ist. An diesem
Lagerbock 16 ist auch ein an das Förderleitungselement 13 anschließendes Betonförderrohr
17 aufgenommen, wobei der weitere, hier nicht näher dargestellte
Betonförderleitungsbereich mit 18 verdeutlicht ist.In the embodiment and FIGS. 1 to 4, the concrete delivery line is adjacent
arranged the
Die Fig. 1 und 2 zeigen den teleskopierbaren Verteilermastabschnitt 2 in seiner
eingefahrenen Teleskopendstellung. Ersichtlich schließen sich an diesem
Mastabschnitt 2 in bekannter Weise weitere Mastabschnitte 19 und 20 an, die
eingefaltet bzw. eingerollt sind und nach Ausfahren und Verschwenken des teleskopierbaren
Verteilermastabschnittes 2 nach oben und nach vornehin ausgerollt
bzw. ausgefaltet werden können. Entsprechende Gelenke sind mit 21 und 22 bezeichnet,
wobei dieser Sachverhalt hier jedoch keiner näheren Erörterung bedarf.
Auch sind ggf. weiter anschließende Betonförderleitungen, die von diesen
Mastabschnitten 19 und 20 getragen werden, hier nicht dargestellt.1 and 2 show the
In der in den Fig. 1 und 2 dargestellten Teleskopendstellung befinden sich die
Förderleitungselemente 9 und 13 in Strecklage, wobei sich in dieser Strecklage
die Förderleitungselemente 9 und 13 entgegen der Betonförderrichtung F erstrecken.
Das heißt, der Anlenkpunkt 15 an dem einen Ende des Förderleitungselementes
13 befindet sich links vom Anlenkpunkt 10 des Ende des anderen Betonförderleitungselementes
9.In the telescopic end position shown in FIGS. 1 and 2 are the
Conveying
Beim Ausfahren des Teleskoprohres 4 bewegt sich das Förderleitungselement 13
mit seinem Anlenkpunkt 15 in Teleskoprichtung und läuft je nach Teleskopausfahrstellung
am Anlenkpunkt 10 am Ende des anderen Förderleitungselementes
9 vorbei, wobei Anlenkpunkt 10 hier infolge des feststehenden, also nicht ausfahrbaren
Teleskoprohres 3 ortsfest bleibt. Dies ist abhängig von der Gestaltung
des Scherenaufbaus aus den beiden Förderleitungselementen 9 und 13, wie anhand
der verschiedenen Varianten gemäß Fig. 7 - 10 noch näher erläutert wird.
Ersichtlich befinden sich in der ausgefahrenen Teleskopendstellung nach den
Fig. 3 und 4 des Teleskoprohres 4 die Anlenkpunkte 10 und 15 zueinander wechselweise
über Kreuz angeordnet, d. h. der in Fig. 1 links vom Anlenkpunkt 10
angeordnete Anlenkpunkt 15 befindet sich in der in Fig. 4 dargestellten Ausfahrlage
des Rohres 4 nunmehr rechts vom Anlenkpunkt 10. D. h., in den beiden Teleskopendstellungen
sind die beiden Anlenkpunkte 10 und 15 des Scherenaufbaus
aus den beiden Förderleitungselementen wechselweise zueinander über
Kreuz angeordnet.When the
Mit dem beschriebenen Aufbau ist es möglich, bei überraschend einfachem und vor allem kompakten Aufbau einer Förderleitungsschere Längenanpassungen einer Betonförderleitung an einem teleskopierbaren Verteilermast vorzunehmen.With the structure described it is possible with surprisingly simple and Above all, compact construction of a conveyor line shear length adjustments a concrete delivery line on a telescopic boom.
Fig. 5 zeigt oben den prinzipiellen Aufbau einer wie bereits anhand der Fig. 1 - 4
erläuterten Förderleitungsschere aus Förderleitungselementen 9, 13, wobei für
gleiche Bauteile dieselben Bezugszeichen verwendet sind. Oben links ist der Teleskopverteilermast
in seiner eingefahrenen Teleskopendstellung und rechts
schematisiert das ausgefahrene Teleskoprohr dargestellt. Darunter befinden sich
verschiedene Teleskopstellungen der Förderleitungsschere, wobei die Förderleitungselemente
9 und 13 nurmehr schematisch als gerade Linien dargestellt sind,
um den funktionellen Verlauf zu erläutern. Ersichtlich sind die Enden der beiden
Förderleitungselemente 9 und 13 bei 10 und 15 fest gegenüber den entsprechenden
Teleskoprohren 4 und 3 verlagert, wobei jedoch eine Schwenkbewegung innerhalb
des Gelenks ermöglicht ist. Ersichtlich schwenkt das Förderleitungselement
9 mit Beginn der Ausfahrbewegung des Teleskoprohres 4 nach oben und
läuft der Anlenkpunkt 15 in Förderrichtung F nach rechts. Der Bahnverlauf des
Anlenkpunktes 15 verläuft hierbei auf einer Geraden parallel zur Teleskopierachse
des Teleskopaufbaus, wobei ersichtlich der Anlenkpunkt 15 um einen Abstand
h gegenüber dem festen Anlenkpunkt 10 nach unten versetzt ist, mithin
der Bahnverlauf des Anlenkpunktes 15 über seine gesamte Bahn um den Abstand
h versetzt ist. Mit Fortschritt der teleskopartigen Ausfahrbewegung entsprechend
den folgenden unteren Darstellungen passiert der Anlenkpunkt 15
schließlich den Anlenkpunkt 10 und es gelangt die Förderleitungsschere aus der
oben dargestellten Funktionsstellung mit Strecklage der Elemente 9 und 13 entgegen
der Förderrichtung F in Strecklage in Betonförderrichtung F entsprechend
der unteren Darstellung. Die maximale Auslenkung quer zur Betonförderrichtung
F ergibt sich ersichtlich dann, wenn der Anlenkpunkt 15 sich unterhalb des
Gelenks zwischen den beiden Elementen 9 und 13 befindet, wobei die Quererstreckung
im Prinzip durch die Länge des Förderleitungselementes 13 bestimmt
ist. Da zudem in vorteilhafter Weise es auch möglich ist, die Längen beider Förderleitungselemente
unterschiedlich auszubilden, kann bei der in Fig. 5 dargestellten
Konstellation eines Förderleitungsscherenaufbaus das Förderleitungselement
13 mit geringer Länge gegenüber dem anderen Förderleitungselement 9
gewählt werden oder umgekehrt.FIG. 5 shows the basic structure of a structure as already shown in FIGS. 1-4
explained delivery line scissors from
Beim Einfahren des Teleskoprohres 4 verläuft das Funktionsschema von unten
nach oben ab, bis in der eingefahrenen Teleskopendstellung die Förderleitungsschere
aus den Elementen 9, 13 die oben ersichtliche Strecklage entgegen der
Betonförderrichtung F einnimmt.When the
Eine weitere vorteilhafte Ausführungsform ergibt sich aus Fig. 6, bei der die Förderleitungselemente
9, 13 mit einem gegen die Ausfaltbewegung der Schere gerichteten,
hier elastisch wirkenden Schwenkmoment beaufschlagt sind. Dies
kann beispielsweise dadurch erreicht werden, daß eine nur schematisch angedeutete
Federeinrichtung 23 vorgesehen ist, die im dargestellten Ausführungsbeispiel
bezüglich des Teleskoprohres 3 festgelegt und mit ihren anderen Ende am
Förderleitungselement 9 angelenkt ist. Hierbei ist es zweckmäßig, wenn, wie in
der dargestellten Ausführungsform, das Förderleitungselement mit dem elastisch
wirkenden Schwenkmoment beaufschlagt wird, welches mit seinem Ende, hier
der Anlenkpunkt 10, am nicht ausfahrbaren Teil, hier Teleskoprohr 3, gelagert
ist. Diese Ausführungsform begünstigt die Stabilität der Förderleitungsschere in
sämtlichen Zwischenlagen einschließlich der Endstellungen.A further advantageous embodiment results from FIG. 6, in which the
Die Fig. 7 - 10 zeigen verschiedene bauliche Varianten des Förderleitungsscherensystems
gemäß der Erfindung, die je nach den baulich am Fahrzeug vorgegebenen
Verhältnissen gewählt werden können, was eine geeignete Anpassung an
den Gesamtaufbau der Vorrichtung ermöglicht. Dadurch kann beispielsweise die
Stellung bzw. die Stelle bestimmt und damit eingestellt werden, bei der sich infolge
der senkrechten Anordnung eines der Förderleitungselemente 9, 13 die
maximale Breite des Faltzustands der Förderleitungsschere einstellt. Selbstverständlich
ist eine Einflußnahme auch durch Anordnung der Förderleitungselemente
mit unterschiedlichen Längen möglich.7-10 show various structural variants of the delivery line shear system
according to the invention, depending on the structurally specified on the vehicle
Ratios can be chosen, making a suitable adjustment to it
allows the overall structure of the device. For example, the
Position or the position can be determined and thus adjusted, resulting in
the vertical arrangement of one of the
Bei der Ausführungsform nach Fig. 7 ist das Förderleitungselement 9 am festen
Teleskoprohr 3 mit seinem Anlenkpunkt 10 verlagert, hingegen der Anlenkpunkt
15 des Elementes 13 am ausfahrbaren Teleskoprohr 4, wobei die Strecklage in
der oben dargestellten Teleskopendstellung so ist, daß der Anlenkpunkt zwischen
den beiden Förderleitungselementen 9 und 13 in leichter Knicklage nach
oben angeordnet ist.In the embodiment according to FIG. 7, the conveying
Die darunter befindlichen Funktionsskizzen zeigen die unterschiedlichen Stellungen
der Förderleitungsschere während des Ausfahrens- bzw. Einfahrens des
Teleskoprohres 4. Hierbei ist es insgesamt zweckmäßig, wenn, wie sich aus der
mittleren Funktionsdarstellung ergibt, in dem Punkt, in welchem die beiden fixen
Anlenkpunkte 10 und 15 einander passieren, ein bestimmter Winkelabstand
zwischen den beiden Scheren 9 und 13 gegeben ist, also der Abstand zwischen
den Anlenkpunkten 10 und 15 ungleich 0 ist. Dies wird durch Versetzung der
Anlenkpunkte 10 und 15 gemäß Fig. 7 obere Darstellung erreicht.The functional sketches below show the different positions
the conveyor line scissors during the extension or retraction of the
Bei der Ausführungsform nach Fig. 8 sind die Verhältnisse analog, wie bei der
Ausführungsform nach Fig. 7, wobei jedoch in Strecklage in der eingefahrenen
Teleskopendstellung der gemeinsame Anlenkpunkt der beiden Förderleitungselemente
9 und 13 sich in einer unteren Knicklage befindet. Daraus ergeben sich
unterschiedliche Knicklagen bezüglich des Gelenkpunktes 12 auch in der ausgefahrenen
Teleskopendstellung, wie sich ohne weiteres aus einem Vergleich der
Fig. 7 und 8, untere Darstellung, ergibt.In the embodiment according to FIG. 8, the conditions are analogous to those in the
Embodiment according to Fig. 7, but in the extended position in the retracted
Telescopic end position of the common articulation point of the two
Bei der Ausführungsform nach Fig. 9 sind die Verhältnisse umgekehrt, was die
Anlenkpunkte der Scherenelemente 9, 13 betrifft. Ersichtlich ist hier der mit
dem feststehenden Teleskoprohr 3 fixe Anlenkpunkt 10 gegenüber dem anderen
Anlenkpunkt 15 nach unten versetzt angeordnet, und weist die Strecklage in der
eingefahrenen Teleskopendstellung einen Knick nach unten auf. Daraus resultiert
ein Knick nach oben in der ausgefahrenen Teleskopendstellung, wie die untere
Darstellung ausweist. In the embodiment of FIG. 9, the relationships are reversed, which is the
Articulation points of the
Fig. 10 zeigt einen Aufbau analog Fig. 9, jedoch mit Knicklage nach oben in der Strecklage in der eingefahrenen Teleskopendstellung des Scherenaufbaus.Fig. 10 shows a structure analogous to Fig. 9, but with an upward bend in the Stretched position in the retracted telescopic end position of the scissor assembly.
Fig. 11 zeigt den Aufbau eines teleskopierbaren Verteilermastabschnitts 2, bestehend
aus drei Teleskoprohren 3, 4 und 24. Bei diesem Aufbau sind zur Längenanpassung
an den Teleskophub zwei Förderleitungsscheren 9, 13 und 9', 13'
vorgesehen. Die Anlenkpunkte 15 bzw. 15' sind durch ein strichliert dargestelltes
Betonförderrohr 25 verbunden. Die beiden anderen Anlenkpunkte sind mit 10
und 10' bezeichnet. Die Förderleitungselemente sind bei 12 bzw. 12' untereinander
gelenkig verbunden. In Fig. 11 bezeichnet das mit Bezugszeichen 26 versehene
Bauteil einen Hydraulikzylinder, der zur Verschwenkung des sich an den teleskopierbaren
Mastabschnittes 2 anschließenden Mastabschnitt dient.Fig. 11 shows the structure of a
Fig. 12 zeigt schließlich einen Aufbau einer Förderleitungsschere 9, 13, bei umgekehrter
Anordnung des Verteilermast-Teleskops, was die Kollision zwischen
Förderleitungssystem und Verteilermastgelenkantrieb vermeidet.Fig. 12 finally shows a structure of a
Claims (9)
- Distributor device for viscous materials, particularly for concrete, including a distributor mast, which carries a concrete conveying line and is constituted by a plurality of mast sections, which are foldable towards one another and of which at least one is telescopable and has at least one first telescope tube (3) and a second telescope tube (4), which is extendable with respect to it, and in which the concrete conveying line is constructed, in the region of the telescopable distributor mast section (2), for the purpose of matching the length of the concrete conveying line to the telescoping movement, in the form of a system comprising a plurality of conveying line elements (9, 13) which are pivotally connected together and of which one conveying line element (9) is arranged with one end pivoted with respect to the first telescope tube (3) and a further conveying line element (13) is arranged with its end pivotal with respect to the second telescope tube (4) and the pivotal connection points (10, 15) of the two conveying line elements (9, 13), which are pivotally connected to the telescope tubes (3, 4), are arranged in the two telescoping end positions substantially alternately crosswise with respect to one another so that when one telescope tube (4) is retracted and extended into its telescoping end positions the two pivotal connection points (10, 15) move past one another and the conveying line elements (9, 13) are extended opposite to the concrete conveying direction (F) in one telescoping end position, and in the concrete conveying direction (F), in the other telescoping end position, characterised in that the conveying line elements (9, 13) each have two equidirectional curved limb ends and the limb ends of the two associated conveying line elements are directed towards one another so that the two conveying line elements (9, 13), which are pivotally connected together, substantially form an S shape or a wave shape.
- Device as claimed in Claim 1, characterised in that the heights of the two pivotal connections points (10, 15) are offset from one another such that the two paths of the pivotal connection points (10, 15) are spaced from one another during the telescoping movement.
- Device as claimed in one of the preceding claims, characterised in that the conveying line elements (9, 13) are each of substantially C shape with an elongate central portion and two equidirectional curved limb ends and in their extended position together define an S shape or wave shape with two oppositely directed amplitudes.
- Device as claimed in one of the preceding claims, characterised in that at least one of the conveying line elements (9, 13) is resiliently suspended with respect to the associated telescope tube.
- Device as claimed in one of the preceding claims, characterised in that with n telescope tubes of the telescopable distributor mast, (n-1) conveying line systems are correspondingly provided with a scissors construction.
- Device as claimed in one of the preceding claims, characterised in that the two pivotal connection points (10, 15) are vertically offset from one another such that the two paths of the pivotal connection points (10, 15) are spaced from one another during the telescoping movement.
- Device as claimed in one of the preceding claims, characterised in that each conveying line element (9, 18) is constructed of substantially C shape with an elongate middle portion and two equidirectionally curved limb ends and in their extended position together define an S shape or wave shape with two oppositely directed amplitudes.
- Device as claimed in one of the preceding claims, characterised in that at least one of the conveying line elements (9, 13) is resiliently suspended with respect to the associated telescopic tube.
- Device as claimed in one of the preceding claims, characterised in that with n telescopic tubes of the telescopic distributor mast (n-1) conveying line systems are correspondingly provided with a scissors construction.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19849747 | 1998-10-28 | ||
DE19849747A DE19849747C5 (en) | 1998-10-28 | 1998-10-28 | Distributor device for thick materials, in particular for concrete |
PCT/EP1999/007850 WO2000024988A1 (en) | 1998-10-28 | 1999-10-15 | Distributing device for thick substances, especially concrete |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1129265A1 EP1129265A1 (en) | 2001-09-05 |
EP1129265B1 true EP1129265B1 (en) | 2003-02-05 |
Family
ID=7885960
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP99953859A Expired - Lifetime EP1129265B1 (en) | 1998-10-28 | 1999-10-15 | Distributing device for thick substances, especially concrete |
Country Status (13)
Country | Link |
---|---|
US (1) | US6463958B1 (en) |
EP (1) | EP1129265B1 (en) |
JP (1) | JP4187416B2 (en) |
KR (1) | KR100467225B1 (en) |
CN (1) | CN1174153C (en) |
AT (1) | ATE232258T1 (en) |
AU (1) | AU751813B2 (en) |
BR (1) | BR9914609A (en) |
DE (2) | DE19849747C5 (en) |
ES (1) | ES2192087T3 (en) |
HK (1) | HK1036308A1 (en) |
TR (1) | TR200101203T2 (en) |
WO (1) | WO2000024988A1 (en) |
Families Citing this family (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10106427B4 (en) * | 2001-02-12 | 2006-06-22 | Schwing Gmbh | Distributor device for thick materials, in particular for concrete |
DE10112086A1 (en) * | 2001-03-12 | 2002-09-26 | Putzmeister Ag | Distribution device for thick matter |
US6588448B1 (en) | 2002-01-07 | 2003-07-08 | Glazer Enterprises, Inc. | Telescopic boom-mounted concrete pump apparatus |
DE10328769A1 (en) * | 2003-06-25 | 2005-01-20 | Putzmeister Ag | Articulated mast for mobile concrete pumps |
US7258710B2 (en) * | 2004-04-29 | 2007-08-21 | Advanced Cleanup Technologies, Inc. | Maritime emissions control system |
US8327631B2 (en) * | 2005-03-28 | 2012-12-11 | Sal Caro | Air pollution control system for ocean-going vessels |
US7712481B1 (en) * | 2005-04-13 | 2010-05-11 | Vactor/Guzzler Manufacturing, Inc. | Suction hose arrangement for refuse tank trucks |
US8808415B2 (en) | 2008-02-01 | 2014-08-19 | Sal Caro | Exhaust intake bonnet (EIB) for maritime emissions control system |
US8075651B2 (en) * | 2009-01-21 | 2011-12-13 | Sal Caro | Ellipsoid exhaust intake bonnet (EIB) for maritime emissions control system |
US8402746B2 (en) | 2010-05-03 | 2013-03-26 | John Powell | Exhaust gas capture system for ocean going vessels |
US8584864B2 (en) | 2010-11-19 | 2013-11-19 | Coldcrete, Inc. | Eliminating screens using a perforated wet belt and system and method for cement cooling |
CN102296822A (en) * | 2011-06-08 | 2011-12-28 | 三一重工股份有限公司 | Outrigger engineering machinery and outrigger device thereof |
CN103216096A (en) * | 2012-01-21 | 2013-07-24 | 徐工集团工程机械股份有限公司 | Telescopic distribution rod mechanism and concrete pump truck with same |
DE102012109526A1 (en) * | 2012-10-08 | 2014-04-10 | Götz Hudelmaier | Apparatus and method for conveying thick matter |
US20140103698A1 (en) * | 2012-10-17 | 2014-04-17 | Bo Feng | Horizontally rotatable multi-knuckle boom |
US8845940B2 (en) | 2012-10-25 | 2014-09-30 | Carboncure Technologies Inc. | Carbon dioxide treatment of concrete upstream from product mold |
EP2951122B1 (en) | 2013-02-04 | 2020-05-27 | Carboncure Technologies Inc. | System and method of applying carbon dioxide during the production of concrete |
US20160107939A1 (en) | 2014-04-09 | 2016-04-21 | Carboncure Technologies Inc. | Methods and compositions for concrete production |
US10927042B2 (en) | 2013-06-25 | 2021-02-23 | Carboncure Technologies, Inc. | Methods and compositions for concrete production |
US9376345B2 (en) | 2013-06-25 | 2016-06-28 | Carboncure Technologies Inc. | Methods for delivery of carbon dioxide to a flowable concrete mix |
US9388072B2 (en) | 2013-06-25 | 2016-07-12 | Carboncure Technologies Inc. | Methods and compositions for concrete production |
WO2015123769A1 (en) | 2014-02-18 | 2015-08-27 | Carboncure Technologies, Inc. | Carbonation of cement mixes |
CA2943791C (en) | 2014-04-07 | 2023-09-05 | Carboncure Technologies Inc. | Integrated carbon dioxide capture |
SG10202010009XA (en) | 2016-04-11 | 2020-11-27 | Carboncure Tech Inc | Methods and compositions for treatment of concrete wash water |
AU2018288555A1 (en) | 2017-06-20 | 2020-01-30 | Carboncure Technologies Inc. | Methods and compositions for treatment of concrete wash water |
DE102022111755A1 (en) | 2022-05-11 | 2023-11-16 | Putzmeister Engineering Gmbh | Distributor device for thick materials and truck-mounted concrete pump |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3942454A (en) * | 1974-06-19 | 1976-03-09 | Portec, Inc. | Adjustable compression unit and lading band anchor |
US4130134A (en) * | 1976-12-13 | 1978-12-19 | Morgen Manufacturing Company | Material conveying apparatus |
US4548236A (en) * | 1983-04-06 | 1985-10-22 | Fmc Corporation | Vehicle supported foldable service conduit |
NL8903073A (en) * | 1989-12-14 | 1991-07-01 | Pieter Faber | DEVICE FOR REMOTE CASTING OF CONCRETE. |
DE19641789C1 (en) | 1996-10-10 | 1998-07-16 | Korthaus Ernst | Concrete distribution system for ready-mixed concrete |
US6142180A (en) * | 2000-04-12 | 2000-11-07 | Woodling; Roger M. | Crane-mounted concrete pump apparatus |
-
1998
- 1998-10-28 DE DE19849747A patent/DE19849747C5/en not_active Expired - Fee Related
-
1999
- 1999-10-15 KR KR10-2001-7005191A patent/KR100467225B1/en not_active IP Right Cessation
- 1999-10-15 AT AT99953859T patent/ATE232258T1/en active
- 1999-10-15 JP JP2000578536A patent/JP4187416B2/en not_active Expired - Fee Related
- 1999-10-15 CN CNB998126659A patent/CN1174153C/en not_active Expired - Lifetime
- 1999-10-15 DE DE59904245T patent/DE59904245D1/en not_active Expired - Lifetime
- 1999-10-15 US US09/830,322 patent/US6463958B1/en not_active Expired - Fee Related
- 1999-10-15 BR BR9914609A patent/BR9914609A/en not_active IP Right Cessation
- 1999-10-15 AU AU10397/00A patent/AU751813B2/en not_active Ceased
- 1999-10-15 EP EP99953859A patent/EP1129265B1/en not_active Expired - Lifetime
- 1999-10-15 WO PCT/EP1999/007850 patent/WO2000024988A1/en active IP Right Grant
- 1999-10-15 ES ES99953859T patent/ES2192087T3/en not_active Expired - Lifetime
- 1999-10-15 TR TR200101203T patent/TR200101203T2/en unknown
-
2001
- 2001-10-10 HK HK01107103A patent/HK1036308A1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
TR200101203T2 (en) | 2001-10-22 |
ES2192087T3 (en) | 2003-09-16 |
WO2000024988A1 (en) | 2000-05-04 |
DE19849747C2 (en) | 2002-10-10 |
CN1324427A (en) | 2001-11-28 |
CN1174153C (en) | 2004-11-03 |
DE59904245D1 (en) | 2003-03-13 |
US6463958B1 (en) | 2002-10-15 |
ATE232258T1 (en) | 2003-02-15 |
KR20010082246A (en) | 2001-08-29 |
DE19849747C5 (en) | 2005-10-27 |
BR9914609A (en) | 2001-07-03 |
KR100467225B1 (en) | 2005-01-24 |
AU751813B2 (en) | 2002-08-29 |
JP4187416B2 (en) | 2008-11-26 |
AU1039700A (en) | 2000-05-15 |
JP2002528665A (en) | 2002-09-03 |
HK1036308A1 (en) | 2001-12-28 |
DE19849747A1 (en) | 2000-05-11 |
EP1129265A1 (en) | 2001-09-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1129265B1 (en) | Distributing device for thick substances, especially concrete | |
EP1360387B1 (en) | Distribution device for thick matter, especially for concrete | |
EP1290292B1 (en) | Distributor device for thick matter | |
EP1005436B2 (en) | Mobile work machine with telescopic supporting legs | |
EP0838562B1 (en) | Concrete pump boom | |
WO2008119798A1 (en) | Distributing boom particularly for a concrete pump | |
DE3409474A1 (en) | Collapsible concrete spreading device | |
EP1770050A1 (en) | Foldable crane | |
EP2877651B1 (en) | Rotary distributor for thick matter | |
WO2013004508A1 (en) | Distributing boom for concrete pumps | |
EP1951972B1 (en) | Articulated mast for a thick-matter delivery installation | |
EP3622132B1 (en) | Distribution boom for mobile concrete pumps comprising joints for adjacent arms, and mobile concrete pump | |
EP3278664B1 (en) | Spray boom for crop protection equipment | |
EP0604681B1 (en) | Nozzleboom for raining upon especially agricultural surfaces | |
DE7932713U1 (en) | Lifting device | |
DE102013218383A1 (en) | Articulated mast, in particular concrete distributor mast | |
DE2520348C2 (en) | SWIVELING FASTENING DEVICE FOR AN EXTRACTION TOOL AT THE FRONT END OF A BOOM IN SUB-PIT OPERATION | |
EP0539919B1 (en) | Support device for special vehicles, especially for movable concrete pumps | |
WO2023217832A1 (en) | Distributing device for sealants, and truck-mounted concrete pump | |
DE102019134657A1 (en) | Concrete placing boom with swivel joint | |
DE202005016267U1 (en) | Folding crane, especially motor vehicle crane, has articulated arm system with lift arm having preferably fork-type support section of articulated arm in region of lift arm's pivot connection to articulated arm | |
DE7514711U (en) | Pivoting fastening device, in particular for an extraction tool in underground mining operations | |
DE9202610U1 (en) | Side finisher | |
DE10227697A1 (en) | Drive device for pivoting a supporting cantilever for mobile use of defined antenna masts is deployed to supporting position by two movements that are dynamically combined and caused by a drive | |
DE2920776A1 (en) | Grab assembly operated by ram - has levers attached to telescoping arms of yokes on piston rod and cylinder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20010525 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
17Q | First examination report despatched |
Effective date: 20020521 |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Designated state(s): AT DE ES FR GB IT |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REF | Corresponds to: |
Ref document number: 59904245 Country of ref document: DE Date of ref document: 20030313 Kind code of ref document: P |
|
GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 20030506 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2192087 Country of ref document: ES Kind code of ref document: T3 |
|
ET | Fr: translation filed | ||
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20031106 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20121113 Year of fee payment: 14 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 59904245 Country of ref document: DE Representative=s name: SCHNEIDERS & BEHRENDT RECHTS- UND PATENTANWAEL, DE |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20121023 Year of fee payment: 14 Ref country code: GB Payment date: 20121023 Year of fee payment: 14 Ref country code: IT Payment date: 20121024 Year of fee payment: 14 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20121022 Year of fee payment: 14 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20131230 Year of fee payment: 15 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 232258 Country of ref document: AT Kind code of ref document: T Effective date: 20131015 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20131015 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131015 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20140630 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131015 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131031 Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131015 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20150401 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131016 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 59904245 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150501 |