EP1084983A1 - Tower crane - Google Patents
Tower crane Download PDFInfo
- Publication number
- EP1084983A1 EP1084983A1 EP00118413A EP00118413A EP1084983A1 EP 1084983 A1 EP1084983 A1 EP 1084983A1 EP 00118413 A EP00118413 A EP 00118413A EP 00118413 A EP00118413 A EP 00118413A EP 1084983 A1 EP1084983 A1 EP 1084983A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- boom
- piece
- support
- fixed point
- tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/26—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
- B66C23/34—Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes
- B66C23/342—Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes with telescopic elements
Definitions
- the invention relates to a guyed tower crane with a to the top of the tower Articulated boom articulation piece, with which another articulated boom piece is articulated is connected to a rear guy element from a fixed point on a revolving stage to a fixed point at one in the area of the spire articulated support runs, and with two additional bracing elements, which by one Fixed point of support or a fixed point of another, in the area of Spire articulated support that is connected to the first support by a tension element is connected to fixed points on the boom link and the other Boom piece run.
- a self-assembling tower crane is included telescopic tower known, at the outer end of a boom link is articulated, with which, if necessary, an outer boom part via a boom center piece is articulated.
- a guy rope runs from a fixed point the revolving stage supporting the tower is articulated via two in the area of the top of the tower Props to a fixed point on the boom-side prop, at the two additional guy ropes are attached, one of which is at a fixed point on the Boom articulation piece and the other to at least one additional support Fixed point is guided on the outer boom part, such that the crane by telescoping the tower into its erected operating position leaves.
- the object of the invention is therefore to provide an easily assembled tower crane to create the type specified, its boom in the assembled state represents a statically determined system.
- this object is achieved in that between the boom link piece and the further boom section switched a short boom section is that articulated with its upper boom with the boom link and its Lower chord articulated to the other boom section and with stop pieces is provided on the end faces of the remaining upper and lower chords, which are in the region of an approximately extended position of the jib pieces at the stop points the lower straps of the boom link and the short boom put together.
- the Another boom piece is a boom center piece with an articulated lower chord outer boom section is connected to the top chords of the boom center section and the outer boom section are provided with stop pieces, which are in Area of their extended position to each other, and that a guy from the fixed point of the support instead of to a fixed point on the middle of the boom, via the support in the area between the boom link piece and the boom center piece and a support in the area between the boom center piece and the outer boom piece to a fixed point on the outer boom piece runs.
- in the guyed Condition of the boom a gap between the stop pieces of the The top chords of the center boom section and the outer boom section remain, see above that there is a statically determined system.
- the boom center piece is provided with a support fork provided is that during the boom deployment with a holding piece of the guy element hooked.
- This support with the catch fork is an auxiliary support during the unfolding of the boom, which the necessary transfer of the Guy element between the boom center piece and the outer boom piece causes.
- the holding piece can be a hinge axis between two the guy element forming poles.
- the support provided with the safety fork is Expediently provided with a holding device, which this in such Condition keeps the catch fork when folding the boom again comes into engagement with the holding piece.
- the support can also be designed as a telescopic rod, in which case the Catch fork can be omitted by permanently attaching the upper support point to the guy point is articulated. This solution is safer because of the intervention a catch fork is not required.
- the telescopic support part guarantees a sure that the corresponding boom bracing point hits the support during boom assembly.
- the geometric Arrangement of the support and boom articulation points is chosen so that the guy lines in the operating, assembly and transport positions are always present in almost stretched form, so that they can also be designed as ropes which, on the one hand, cannot be found anywhere due to the elongated shape can get tangled during assembly and which, on the other hand, can pivot sideways allow the boom parts to each other in a simple manner.
- this embodiment is a very light and inexpensive in weight Bracing created.
- a mostly Assembly rope provided with an assembly thread over a roll of the support between the boom link and the boom center to a fixed point runs on the boom center piece.
- the assembly rope also has a load-bearing function when the boom is extended and the boom center piece stops as a third jib guying at an end point during crane operation, so that the upper belt attachment point between the boom center and head piece in the stretched Boom condition is without contact. This makes a statically indeterminate System avoided.
- the rotating tower crane shown schematically in Fig. 1 consists of a pedestal 1 supported on the floor, which also, as from FIGS. 2 and 3 can be replaced by the undercarriage of a mobile crane, which in its operating position is supported by extendable supports, and from one on the pedestal 1 or undercarriage via a slewing ring 2 superstructure or revolving platform 3.
- a lower tower part 4 is connected to the revolving platform 3, from which an upper tower part 5 by drive means, for example a block and tackle, can be extended and retracted.
- the tower 4, 5 can be between his on the revolving stage 3 lying transport position and its apparent from Fig.
- a tension element 20 which consists of a Rope or a telescopic rod can exist to the fixed point 21st in the end region of the boom linkage 13.
- a tension element 20 which consists of a Rope or a telescopic rod can exist to the fixed point 21st in the end region of the boom linkage 13.
- the rod 25 is designed here as a telescopic rod.
- the guy 25, 26, 27, 28 between the fixed point 15 on the support 14 and the fixed point 23 on the outer boom piece 24 runs over fixed points of the Intermediate supports 50 and 51, of which the support 50 is articulated on the articulation axis the hinge 54 between the boom link and the boom center and the support 51 is articulated to the end portion of the boom center 33 is.
- the rear guy 9 can also be made of a rope or articulated and / or telescopically interconnected rods 30, 31, 32.
- this can be connected to the boom center piece 33 Jib piece 24 also rock over the assembly winch 34, the rope 35 in the manner shown via rollers to the fixed point 36 on the boom center 33 runs.
- the tower crane shown in FIG. 1 can be erected by erecting the tower 4, 5 and then telescoping the outer tower part 5 into its operating position spend.
- the tower crane shown schematically in Fig. 1 is a mobile crane in shown its transport position.
- the undercarriage 1 of the mobile crane consists of the chassis, which is provided with extendable supports 40.
- the boom center piece 33 is folded sideways onto the boom articulation piece 35, thereby increasing the transport height of the mobile crane in the transport position reduce.
- On the boom center piece 33 is located in the area of the base straps Cross joint the outer boom part 24 folded.
- the tower crane is in various states during of his raising up.
- Fig. 4 shows the pivoted by an angle of about 60 degrees to the rotating platform Tower to which the zig-zag-like boom parts are attached the tower is folded.
- the boom center piece 33 and boom part 24 is still laterally applied to the boom link 13 to reduce the transport height.
- the rear guy 9 is still without tension, some of which is still the rods forming the bracing are angled on top of each other.
- Fig. 7 shows the increasing unfolding of the guy lines with further telescoping the inner tower section 5.
- a short boom piece 52 is between the boom link 13 and the Boom center piece 33 a short boom piece 52 with a similar profile switched.
- This short extension piece 52 is with the upper chord or the upper chords, depending on whether the cantilever pieces from lattice girders with triangular or square Profile exist, the boom link 13 through the hinge with the hinge axis 54 connected.
- the short boom section 52 is with its lower belt supports with the lower belt supports of the boom center piece 33 articulated by a hinge with the hinge axis 55 connected.
- the lower flange of the boom link 13 and the short Cantilever piece 52 are provided with stops 56 which extend when stretched Support the booms against each other.
- the upper belt carrier is also in a corresponding manner or the top chord beams of the short boom section 52 and the boom center section 33 provided with stops 57, which during the boom deployment and usually support each other in the transport state.
- the outer boom piece 24 is also articulated Connection of the lower chords with the articulated axis 58 to the middle section of the boom 33 connected.
- the upper belt carriers are provided with stops 59 on their end faces, that lie against each other in the stretched state.
- the components are designed that in the operating state shown in Fig. 1 between the upper flange of the The boom center piece 33 and the short boom piece 52 have a gap on the one hand is, so the stops 57 are not supported on each other and on the other between the upper chord of the boom part 33 and 24, the upper chord stops 59 support each other.
- auxiliary support 60 mounted, which is provided with a catch fork 61 at its outer end is.
- This auxiliary support 60 serves in the unfolding and folding of the Cantilever pieces of the tension cable over the articulated connection between the boom center piece 33 and the outer boom piece 24 engages the catch fork in a hinge axis 62 which the guy rods 27 and 27 ' connects with each other.
- the auxiliary support remains in the assembled position of the crane 60 in a position in which it engages again when the crane is folded comes with the hinge axis 62.
- the location and component lengths of the supports 51, 60 and the boom guy lines 27, 28 are chosen according to the invention so that the guy lines 27 and 28 during crane operation and in the assembly and transport position are stretched so far that tangling of these braces with others Components is prevented (see e.g. Fig. 7).
- the assembly rope 35 takes over in the Operating position of the crane, i.e. when the boom is unfolded, a load-bearing function.
- the mounting screw 34 In order to fulfill this function, the mounting screw 34 must be used accordingly dimensioned and locked in operation.
- a statically determined system However, the following modification to the system according to FIG. 1 must be ensured 10 is required: between the stops 59 of the upper chords of the middle section of the boom 33 and the outer boom part 24 must when the boom is extended a gap should be formed in the working position.
- the formed by the stops 59 Upper belt contact point is not necessary in the arrangement shown in FIG. 11 and only serves as a security element in the event that the assembly and Should break tether 35, then to prevent the boom from falling.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Jib Cranes (AREA)
- Control And Safety Of Cranes (AREA)
Abstract
Description
Die Erfindung betrifft einen abgespannten Turmdrehkran mit einem an die Turmspitze angelenkten Auslegeranlenkstück, mit dem ein weiteres Auslegerstück gelenkig verbunden ist, mit einem hinteren Abspannelement, das von einem Festpunkt an einer Drehbühne zu einem Festpunkt an einer im Bereich der Turmspitze angelenkten Stütze verläuft, und mit zwei weiteren Abspannelementen, die von einem Festpunkt der Stütze oder einem Festpunkt einer weiteren, im Bereich der Turmspitze angelenkten Stütze, die mit der ersten Stütze durch ein Zugelement verbunden ist, zu Festpunkten an dem Auslegeranlenkstück und dem weiteren Auslegerstück verlaufen.The invention relates to a guyed tower crane with a to the top of the tower Articulated boom articulation piece, with which another articulated boom piece is articulated is connected to a rear guy element from a fixed point on a revolving stage to a fixed point at one in the area of the spire articulated support runs, and with two additional bracing elements, which by one Fixed point of support or a fixed point of another, in the area of Spire articulated support that is connected to the first support by a tension element is connected to fixed points on the boom link and the other Boom piece run.
Turmdrehkräne dieser Art sind in unterschiedlichen Ausführungsformen bekannt.Tower cranes of this type are known in different embodiments.
Aus EP 0 132 572 B1 ist beispielsweise ein selbstmontierender Turmdrehkran mit teleskopierbarem Turm bekannt, an dessen äußerem Ende ein Auslegeranlenkstück angelenkt ist, mit dem ggf. über ein Auslegermittelstück ein äußeres Auslegerteil gelenkig verbunden ist. Ein Abspannseil verläuft von einem Festpunkt auf der den Turm tragenden Drehbühne über zwei im Bereich der Turmspitze angelenkte Stützen zu einem Festpunkt an der auslegerseitigen Stütze, an dem zwei weitere Abspannseile befestigt sind, von denen eines zu einem Festpunkt an dem Auslegeranlenkstück und das andere über mindestens eine weitere Stütze zu einem Festpunkt an dem äußeren Auslegerteil geführt ist, derart, daß sich der Kran durch Austeleskopieren des Turms in seine aufgerichtete Betriebsstellung verbringen läßt.From EP 0 132 572 B1, for example, a self-assembling tower crane is included telescopic tower known, at the outer end of a boom link is articulated, with which, if necessary, an outer boom part via a boom center piece is articulated. A guy rope runs from a fixed point the revolving stage supporting the tower is articulated via two in the area of the top of the tower Props to a fixed point on the boom-side prop, at the two additional guy ropes are attached, one of which is at a fixed point on the Boom articulation piece and the other to at least one additional support Fixed point is guided on the outer boom part, such that the crane by telescoping the tower into its erected operating position leaves.
Bei derartigen selbstmontierenden Turmdrehkranen ist in der Transportstellung das Auslegeranlenkstück an den einteleskopierten Turm angeklappt und das äußere Auslegerstück auf das Auslegeranlenkstück zurückgeklappt. Bei einem dreiteiligen Ausleger werden das Auslegeranlenkstück, das Auslegermittelstück und das äußere Auslegerstück zick-zack-förmig zusammengelegt. Dabei kann eine gelenkige Verbindung zwischen den Unter- und Obergurte aufweisenden und aus Gitterträgern bestehenden Auslegerstücken jeweils in der Weise bestehen, daß diese gelenkig an ihren Unter- oder Obergurten verbunden sind. Die frei auseinanderklappenden nicht mit Gelenken versehenen Ober- und Untergurte sind dann an ihren Stirnflächen mit Anschlägen versehen, so daß sich diese im Bereich ihres gestreckten Zustands gegeneinander abstützen können. Besteht aber neben der Abspannung eine derartige Abstützung, ergeben sich bei montiertem Ausleger statisch unbestimmte Systeme, die grundsätzlich zu vermeiden sind.With such self-assembling tower cranes, this is in the transport position Boom articulation piece folded onto the telescoped tower and the outer one Boom piece folded back onto the boom link piece. With a three-part Booms are the boom link, the boom center and the outer Boom piece folded in a zigzag shape. It can be articulated Connection between the lower and upper chords and made of lattice girders existing boom pieces each in such a way that they are articulated are connected to their lower or upper chords. The freely unfolding non-hinged upper and lower belts are then on theirs End faces with stops so that they are in the area of their straight Can support the state against each other. But exists alongside the guy Such a support is static when the boom is installed indefinite systems that are to be avoided in principle.
Aufgabe der Erfindung ist es daher, einen einfach montierbaren Turmdrehkran der eingangs angegebenen Art zu schaffen, dessen Ausleger im montierten Zustand ein statisch bestimmtes System darstellt.The object of the invention is therefore to provide an easily assembled tower crane to create the type specified, its boom in the assembled state represents a statically determined system.
Weiterhin soll eine sehr einfache und gleichzeitig sehr sichere Auslegerentfaltung und Zusammenfaltung erreicht werden.Furthermore, a very simple and at the same time very safe boom deployment is intended and folding can be achieved.
Erfindungsgemäß wird diese Aufgabe dadurch gelöst, daß zwischen das Auslegeranlenkstück und dem weiteren Auslegerstück ein kurzes Auslegerstück geschaltet ist, das mit seinem Obergurt gelenkig mit dem Auslegeranlenkstück und seinem Untergurt gelenkig mit dem weiteren Auslegerstück verbunden und mit Anschlagstücken an den Stirnseiten der verbleibenden Ober- und Untergurte versehen ist, die sich im Bereich einer etwa gestreckten Stellung der Auslegerstücke an den Anschlagstellen der Untergurte des Auslegeranlenkstücks und des kurzen Auslegerstücks aneinanderlegen.According to the invention, this object is achieved in that between the boom link piece and the further boom section switched a short boom section is that articulated with its upper boom with the boom link and its Lower chord articulated to the other boom section and with stop pieces is provided on the end faces of the remaining upper and lower chords, which are in the region of an approximately extended position of the jib pieces at the stop points the lower straps of the boom link and the short boom put together.
Bei dem erfindungsgemäßen Turmdrehkran stützen sich im montierten Zustand des Auslegers die Untergurte des Auslegeranlenkstücks und des kurzen Auslegerstücks gegeneinander ab. Hingegen wird die Abspannung so ausgeführt, daß sich die Obergurte des kurzen Auslegerstücks und des weiteren Auslegerstücks nicht gegeneinander abstützen, so daß zwischen diesen ein Spalt verbleibt. Dieser Spalt entlastet das Gelenk zwischen den Obergurten des kurzen Auslegerstücks und des Auslegeranlenkstücks. Die gelenkige Verbindung im Bereich der Untergurte des kurzen Auslegerstücks und des weiteren Auslegerstücks schaffen ein günstiges, statisch bestimmtes System, das zu einer günstigen Beanspruchung und Belastung der einzelnen Kranteile führt. Die Anschlagstelle zwischen den Obergurten des kurzen Auslegerstücks und des weiteren Auslegerstücks kommt nur beim Transport und bei der Auslegermontage zum Einsatz.In the tower crane according to the invention are supported in the assembled state of the The lower straps of the boom link and the short boom against each other. In contrast, the guying is carried out so that the top chords of the short boom section and the other boom section are not support each other so that a gap remains between them. That gap relieves the joint between the top chords of the short boom section and the Boom linkage. The articulated connection in the area of the lower chords of the short boom section and the further boom section create an inexpensive, statically determined system that creates a favorable stress and strain of the individual crane parts leads. The anchor point between the top chords of the short The jib piece and the other jib piece only come during transport and used for boom assembly.
Um jedoch zu verhindern, daß sich zwischen den Anschlagstücken der Obergurte des kurzen Auslegerstücks und des weiteren Auslegerstücks während der Montage ein unerwünscht großer Spalt bildet, ist in weiterer Ausgestaltung der Erfindung vorgesehen, daß zwischen den Anschlagstücken der Obergurte des kurzen Auslegerstücks und des weiteren Auslegerstücks ein den Schwenkwinkel begrenzendes Zugelement, z.B. ein mit einem Langloch versehener Riegel, angeordnet ist.However, to prevent that between the stop pieces of the top chords the short boom section and the other boom section during assembly an undesirably large gap is in a further embodiment of the invention provided that between the stop pieces of the top chords of the short boom section and the further jib piece limiting the swivel angle Tension element, e.g. a bolt provided with an elongated hole is arranged.
Nach einer bevorzugten Ausführungsform der Erfindung ist vorgesehen, daß das weitere Auslegerstück ein Auslegermittelstück ist, mit dessen Untergurt gelenkig ein äußeres Auslegerstück verbunden ist, daß die Obergurte des Auslegermittelstücks und des äußeren Auslegerstücks mit Anschlagstücken versehen sind, die sich im Bereich ihrer gestreckten Stellung aneinanderlegen, und daß ein Abspannelement von dem Festpunkt der Stütze, statt zu einem Festpunkt an dem Auslegermittelstück, über die Stütze im Bereich zwischen dem Auslegeranlenkstück und Auslegermittelstück und über eine Stütze im Bereich zwischen dem Auslegermittelstück und dem äußeren Auslegerstück zu einem Festpunkt an dem äußeren Auslegerstück verläuft. Auch nach dieser Ausgestaltung ist vorgesehen, daß im abgespannten Zustand des Auslegers ein Spalt zwischen den Anschlagstücken der Obergurte des Auslegermittelstücks und des äußeren Auslegerstücks verbleibt, so daß sich ein statisch bestimmtes System ergibt.According to a preferred embodiment of the invention it is provided that the Another boom piece is a boom center piece with an articulated lower chord outer boom section is connected to the top chords of the boom center section and the outer boom section are provided with stop pieces, which are in Area of their extended position to each other, and that a guy from the fixed point of the support instead of to a fixed point on the middle of the boom, via the support in the area between the boom link piece and the boom center piece and a support in the area between the boom center piece and the outer boom piece to a fixed point on the outer boom piece runs. According to this embodiment, it is provided that in the guyed Condition of the boom a gap between the stop pieces of the The top chords of the center boom section and the outer boom section remain, see above that there is a statically determined system.
Nach einer weiteren bevorzugten Ausführungsform ist vorgesehen, daß im Endbereich des Auslegermittelstücks eine mit einer Fanggabel versehene Stütze angeordnet ist, die sich während der Auslegerentfaltung mit einem Haltestück des Abspannelements verhakt. Diese mit der Fanggabel versehene Stütze ist eine Hilfsstütze während des Entfaltens des Auslegers, die die erforderliche Überleitung des Abspannelements zwischen dem Auslegermittelstück und dem äußeren Auslegerstück bewirkt. Das Haltestück kann eine Gelenkachse zwischen zwei das Abspannelement bildenden Stangen sein. Die mit der Fanggabel versehene Stütze ist zweckmäßigerweise mit einer Halteeinrichtung versehen, die diese in einem derartigen Zustand hält, daß die Fanggabel beim Zusammenfalten des Auslegers wieder in Eingriff mit dem Haltestück kommt.According to a further preferred embodiment it is provided that in the end region the boom center piece is provided with a support fork provided is that during the boom deployment with a holding piece of the guy element hooked. This support with the catch fork is an auxiliary support during the unfolding of the boom, which the necessary transfer of the Guy element between the boom center piece and the outer boom piece causes. The holding piece can be a hinge axis between two the guy element forming poles. The support provided with the safety fork is Expediently provided with a holding device, which this in such Condition keeps the catch fork when folding the boom again comes into engagement with the holding piece.
Die Stütze kann auch als teleskopierbarer Stab ausgebildet werden, wobei dann die Fanggabel entfallen kann, indem der obere Stützenpunkt dauerhaft mit dem Abspannpunkt gelenkig verbunden wird. Diese Lösung ist sicherer, weil das Eingreifen einer Fanggabel nicht benötigt wird. Das austeleskopierende Stützteil garantiert ein sicheres Auftreffen des entsprechenden Auslegerabspannpunkts auf der Stütze während der Auslegermontage.The support can also be designed as a telescopic rod, in which case the Catch fork can be omitted by permanently attaching the upper support point to the guy point is articulated. This solution is safer because of the intervention a catch fork is not required. The telescopic support part guarantees a sure that the corresponding boom bracing point hits the support during boom assembly.
Nach einer weiteren bevorzugten Ausführungsform ist vorgesehen, daß die geometrische Anordnung der Stützen- und Auslegeranlenkpunkte so gewählt ist, daß die Abspannungen in der Betriebs- in der Montage- und in der Transportstellung immer in fast gestreckter Form vorhanden sind, so daß sie auch als Seile ausgeführt werden können, welche sich einerseits wegen der gestreckten Form nirgends bei der Montage verheddern können und welche andererseits das seitliche Verschwenken der Auslegerteile aneinander auf einfache Weise ermöglichen. Durch diese Ausführungsform wird eine gewichtsmäßig sehr leichte und kostengünstige Abspannung geschaffen.According to a further preferred embodiment it is provided that the geometric Arrangement of the support and boom articulation points is chosen so that the guy lines in the operating, assembly and transport positions are always present in almost stretched form, so that they can also be designed as ropes which, on the one hand, cannot be found anywhere due to the elongated shape can get tangled during assembly and which, on the other hand, can pivot sideways allow the boom parts to each other in a simple manner. By this embodiment is a very light and inexpensive in weight Bracing created.
Nach einer weiteren bevorzugten Ausführungsform ist vorgesehen, daß ein meistens mit einer Montagewinde versehenes Montageseil über eine Rolle der Stütze zwischen dem Auslegeranlenkstück und dem Auslegermittelstück zu einem Festpunkt an dem Auslegermittelstück verläuft.According to a further preferred embodiment it is provided that a mostly Assembly rope provided with an assembly thread over a roll of the support between the boom link and the boom center to a fixed point runs on the boom center piece.
Nach einer weiteren Ausführungsform ist vorgesehen, daß das Montageseil auch bei gestrecktem Ausleger eine tragende Funktion hat und das Auslegermittelstück als dritte Auslegerabspannung in einem Endpunkt während des Kranbetriebs hält, so daß die Obergurtanschlagstelle zwischen Auslegermittel- und Kopfstück im gestreckten Auslegerzustand ohne Kontakt ist. Hierdurch wird ein statisch unbestimmtes System vermieden.According to a further embodiment it is provided that the assembly rope also has a load-bearing function when the boom is extended and the boom center piece stops as a third jib guying at an end point during crane operation, so that the upper belt attachment point between the boom center and head piece in the stretched Boom condition is without contact. This makes a statically indeterminate System avoided.
Ein Ausführungsbeispiel der Erfindung wird nachstehend anhand der Zeichnung näher erläutert. In dieser zeigt
- Fig. 1
- eine Seitenansicht eines unten drehenden selbstmontierenden Turmdrehkrans im aufgerichteten Zustand in schematischer Darstellung,
- Fig. 2
- eine Seitenansicht des Turmdrehkrans nach Fig. 1 in seinem auf einem Kranfahrzeug zusammengefalteten Transportzustand,
- Fig. 3
- eine Vorderansicht des zusammengefalteten mobilen Turmdrehkrans nach Fig. 2,
- Fig. 4 bis Fig. 8
- den Turmdrehkran nach den Fig. 1 bis 3 in unterschiedlichen Zuständen während seines Aufrichtens,
- Fig. 9
- den Ausleger kurz vor Erreichen seiner montierten Endstellung,
- Fig. 10
- den Ausleger nach Fig. 9 in seiner montierten Endstellung und
- Fig. 11
- den Ausleger in der montierten Endstellung, in der das Auslegermittelstück zusätzlich über das Montageseil gehalten wird.
- Fig. 1
- 2 shows a side view of a self-assembling tower crane rotating below in the erected state in a schematic illustration,
- Fig. 2
- 1 in its transport state folded on a crane vehicle,
- Fig. 3
- 3 shows a front view of the folded-up mobile tower crane according to FIG. 2,
- 4 to 8
- the tower crane according to FIGS. 1 to 3 in different states during its erection,
- Fig. 9
- the boom shortly before reaching its assembled end position,
- Fig. 10
- 9 in its assembled end position and
- Fig. 11
- the boom in the assembled end position, in which the boom center piece is also held over the assembly cable.
Der in Fig. 1 schematisch dargestellte unten drehende Turmdrehkran besteht aus
einem auf dem Boden abgestützten Podest 1, das auch, wie aus den Fig. 2 und 3
ersichtlich, durch den Unterwagen eines Mobilkrans ersetzt werden kann, der in
seiner Betriebsstellung durch ausfahrbare Stützen abgestützt ist, und aus einem
auf dem Podest 1 oder Unterwagen über eine Drehverbindung 2 gelagerten Oberwagen
oder Drehbühne 3. Mit der Drehbühne 3 ist ein unteres Turmteil 4 verbunden,
aus dem ein oberes Turmteil 5 durch Antriebsmittel, beispielsweise einen Flaschenzug,
aus- und einteleskopierbar ist. Der Turm 4, 5 läßt sich zwischen seiner
auf der Drehbühne 3 liegenden Transportstellung und seiner aus Fig. 1 ersichtlichen
aufgerichteten Stellung verschwenken, wobei diese Verschwenkung üblicherweise
durch einen Montageflaschenzug erfolgt und die beidseits gelenkig gelagerten
Abstützstreben 6 und 7 den Turm im Montageablauf führen. In der aufgerichteten
Stellung wird der Turm 4, 5 mit der Drehbühne 3 durch eine fußseitige Verbolzung
100 verriegelt. Mit einem Festpunkt 8 auf der Drehbühne 3 ist ein Zugelement
9 verbunden, das zu einem Festpunkt 10 einer rückwärtigen Stütze 11 verläuft, die
im Bereich der Turmspitze im Gelenk 12 mit dem Auslegeranlenkstück 13 verbunden
ist. Im Gelenk 12 ist eine weitere Stütze 14 angelenkt, von deren äußeren
Festpunkt 15 ein Zugelement zu dem Festpunkt 10 der Rückenstütze 11 verläuft,
das beispielsweise aus zwei durch das Gelenk 16 verbundene Abspannstäbe 17,
18 bestehen kann. Von dem Festpunkt 15 verläuft ein Zugelement 20, das aus einem
Seil oder einem teleskopierbaren Stab bestehen kann, zu dem Festpunkt 21
im Endbereich des Auslegeranlenkstücks 13. Von dem Festpunkt 15 verläuft weiterhin
eine Abspannung zu dem Festpunkt 23 an dem äußeren Auslegerteil 24, wobei
die Abspannung aus faltbar miteinander verbundenen Stäben 25, 26 oder Seilen
27, 28 bestehen kann. Zudem ist der Stab 25 hier als Teleskopstab ausgeführt.The rotating tower crane shown schematically in Fig. 1 consists of
a pedestal 1 supported on the floor, which also, as from FIGS. 2 and 3
can be replaced by the undercarriage of a mobile crane, which in
its operating position is supported by extendable supports, and from one
on the pedestal 1 or undercarriage via a slewing
Die Abspannung 25, 26, 27, 28 zwischen dem Festpunkt 15 an der Stütze 14 und
dem Festpunkt 23 an dem äußeren Auslegerstück 24 verläuft über Festpunkte der
Zwischenstützen 50 und 51, von denen die Stütze 50 gelenkig auf der Gelenkachse
des Gelenks 54 zwischen dem Auslegeranlenkstück und dem Auslegermittelstück
und die Stütze 51 gelenkig mit dem Endbereich des Auslegermittelstücks 33 verbunden
ist.The
Die rückwärtige Abspannung 9 kann ebenfalls aus einem Seil oder aber aus gelenkig
und/oder teleskopierbar miteinander verbundenen Stäben 30, 31, 32 bestehen.The rear guy 9 can also be made of a rope or articulated
and / or telescopically
Wie aus der Fig. 1 ersichtlich ist, läßt sich das mit dem Auslegermittelstück 33 verbundene
Auslegerstück 24 auch über die Montagewinde 34 wippen, deren Seil 35
in der dargestellten Weise über Rollen zu dem Festpunkt 36 an dem Auslegermittelstück
33 verläuft.As can be seen from FIG. 1, this can be connected to the
Der aus Fig. 1 ersichtliche Turmdrehkran läßt sich durch Aufrichten des Turms 4, 5
und anschließendem Austeleskopieren des äußeren Turmteils 5 in seine Betriebsstellung
verbringen.The tower crane shown in FIG. 1 can be erected by erecting the
Aus Fig. 2 ist der in Fig. 1 schematisch dargestellte Turmdrehkran als Mobilkran in
seiner Transportstellung dargestellt. Der Unterwagen 1 des Mobilkrans besteht aus
dem Fahrgestell, das mit ausfahrbaren Stützen 40 versehen ist. In der aus den Fig.
2 und 3 ersichtlichen Transportstellung ist das Auslegeranlenkstück 35 an den einteleskopierten
Turm 4, 5 angeklappt. Das auf das Auslegeranlenkstück 35 zurückgefaltete
Auslegermittelstück 33 ist seitlich an das Auslegeranlenkstück 35 angeklappt,
um dadurch die Transporthöhe des Mobilkrans in der Transportstellung zu
verringern. An das Auslegermittelstück 33 ist um ein im Bereich der Basisgurte liegendes
Quergelenk das äußere Auslegerteil 24 angeklappt.From Fig. 2 the tower crane shown schematically in Fig. 1 is a mobile crane in
shown its transport position. The undercarriage 1 of the mobile crane consists of
the chassis, which is provided with extendable supports 40. In the from the Fig.
2 and 3 visible transport position is the
Aus den Fig. 4 bis 7 ist der Turmdrehkran in verschiedenen Zuständen während seines Aufrichtens ersichtlich.4 to 7, the tower crane is in various states during of his raising up.
Fig. 4 zeigt den um einen Winkel von etwa 60 Grad zu der Drehbühne verschwenkten
Turm, an den die zick-zack-artig zusammengefalteten Auslegerteile an
den Turm angeklappt sind. Das Auslegermittelstück 33 und Auslegerteil 24 ist noch
seitlich an das Auslegeranlenkstück 13 zur Verringerung der Transporthöhe angelegt.
Die hintere Abspannung 9 ist noch ohne Spannung, wobei teilweise noch die
die Abspannung bildenden Gestänge abgewinkelt aufeinander liegen.Fig. 4 shows the pivoted by an angle of about 60 degrees to the rotating platform
Tower to which the zig-zag-like boom parts are attached
the tower is folded. The
In der aus Fig. 5 ersichtlichen Stellung ist der Turm vollständig aufgerichtet und mit
der Drehbühne verriegelt. Die hintere Abspannung 9 befindet sich im gestreckten
Zustand, so daß durch weiteres Austeleskopieren des inneren Turmstücks 5 aus
dem äußeren Turmstück 4 über die Abspannung 9 eine den Ausleger entfaltende
Spannung ausgeübt wird. In der aus Fig. 5 ersichtlichen Stellung ist das Auslegermittelstück
33 relativ zu dem Auslegeranlenkstück 13 um eine zu den beiden Auslegerteilen
parallele Achse in eine Stellung gedreht worden, in der die Höhen der
Profile bzw. die Mittelebenen der Auslegerteile miteinander fluchten. Nach Lösen
des oberen Gelenks zwischen dem Auslegeranlenkstück 13 und dem Auslegermittelstück
33, das eine Drehung der beiden Auslegerteile um eine zu diesen parallelen
Achse gestattet, wird in der aus Fig. 6 ersichtlichen Weise das Auslegermittelstück
33 relativ zu dem Auslegeranlenkstück 13 abgesenkt. Dieses Absenken geschieht
in bekannter Weise über das Montageteil 35 mit Hilfe der Montagewinde 34.In the position shown in Fig. 5, the tower is fully erected and with
the revolving stage locked. The rear guy 9 is in the stretched
Condition so that by further telescoping the
Das Absenken des Teiles 33 muß, vor einem weiteren Turmausteleskopieren, soweit
erfolgen, daß sich die Stützen 12 und 14 am Auslegerteil 33 vorbei entfalten
können (siehe Fig. 7).The lowering of
Fig. 7 zeigt die zunehmende Entfaltung der Abspannungen bei weiterem Austeleskopieren
des inneren Turmstücks 5.Fig. 7 shows the increasing unfolding of the guy lines with further telescoping
the
Fig. 8 zeigt den Zustand nach weiterem Austeleskopieren des inneren Turmstücks5
und gleichzeitigem Abspulen des Montageseiles 35 durch die Montagewinde 34;
das Auslegerteil 33 muß nämlich immer etwas nach rechts geneigt sein, damit es
nicht auf das Auslegerteil 13 fällt. 8 shows the state after the
Wie aus Fig. 9 ersichtlich ist, ist zwischen dem Auslegeranlenkstück 13 und dem
Auslegermittelstück 33 ein kurzes Auslegerstück 52 mit ähnlichem Profil geschaltet.
Dieses kurze Auslegerstück 52 ist mit dem Obergurt oder den Obergurten, je nach
dem, ob die Auslegerstücke aus Gitterträgern mit dreieckigem oder viereckigem
Profil bestehen, des Auslegeranlenkstücks 13 durch das Gelenk mit der Gelenkachse
54 verbunden.As can be seen from Fig. 9, is between the
Das kurze Auslegerstück 52 ist mit seinen Untergurtträgern mit den Untergurtträgern
des Auslegermittelstücks 33 durch ein Gelenk mit der Gelenkachse 55 gelenkig
verbunden. Die Untergurtträger des Auslegeranlenkstücks 13 und des kurzen
Auslegerstücks 52 sind mit Anschlägen 56 versehen, die sich bei gestrecktem
Ausleger aufeinander abstützen. In entsprechender Weise ist auch der Obergurtträger
oder die Obergurtträger des kurzen Auslegerstücks 52 und des Auslegermittelstücks
33 mit Anschlägen 57 versehen, die sich während der Auslegerentfaltung
und im Transportzustand meistens aufeinander abstützen. Nachdem während
der Auslegermontage auch teilweise Zugkräfte an dieser Obergurtstelle auftreten
können, sind die Obergurtträger des kurzen Auslegerstücks 52 und des Auslegermittelstücks
33 durch ein Zugglied oder einen Riegel mit einer Langlochführung in
der Weise miteinander verbunden, daß sich die Anschläge 57 nur unter Bildung
eines verhältnismäßig schmalen Spalts voneinander entfernen können. Bei gestrecktem
Ausleger (Arbeitsposition) ist die Langlochverbindung weder auf Zug
noch auf Druckkontakt; d.h. die Obergurtstelle 57 ist dann kraftfrei.The
In entsprechender Weise ist auch das äußere Auslegerstück 24 durch eine gelenkige
Verbindung der Untergurte mit der Gelenkachse 58 mit dem Auslegermittelstück
33 verbunden. Die Obergurtträger sind an ihren Stirnseiten mit Anschlägen 59 versehen,
die sich im Bereich des gestreckten Zustands aneinander anlegen.In a corresponding manner, the
Um ein statisch bestimmtes System zu schaffen, sind die Bauteile so ausgeführt,
daß in dem aus Fig. 1 ersichtlichen Betriebszustand zwischen dem Obergurt des
Auslegermittelstücks 33 und des kurzen Auslegerstücks 52 einerseits ein Spalt vorhanden
ist, also sich die Anschläge 57 nicht aufeinander abstützen und andererseits
zwischen dem Obergurt des Auslegerteils 33 und 24 die Obergurtanschläge
59 aufeinander abstützen.In order to create a statically determined system, the components are designed
that in the operating state shown in Fig. 1 between the upper flange of the
The
Ist bei der Ausführungsform nach den Fig. 9 und 10 der Ausleger vollständig in seine
Betriebsstellung aufgeklappt, wird das Montageseil 35 in der dargestellten Weise
schlaff.In the embodiment according to FIGS. 9 and 10, the boom is completely in its
Unfolded operating position, the
Im Bereich des äußeren Endes des Auslegermittelstücks ist eine schwenkbare
Hilfsstütze 60 gelagert, die an ihrem äußeren Ende mit einer Fanggabel 61 versehen
ist. Diese Hilfsstütze 60 dient bei dem Entfalten und Zusammenklappen der
Auslegerstücke der Überleitung des Abspannseils über die gelenkige Verbindung
zwischen dem Auslegermittelstück 33 und dem äußeren Auslegerstück 24. Dabei
greift die Fanggabel in eine Gelenkachse 62, die die Abspanngestänge 27 und 27'
miteinander verbindet. In der montierten Stellung des Krans verharrt die Hilfsstütze
60 in einer Stellung, in der sie beim Zusammenlegen des Krans wieder in Eingriff
mit der Gelenkachse 62 kommt. Die Lage und Bauteillängen der Stützen 51, 60 und
der Auslegerabspannungen 27, 28 sind erfindungsgemäß so gewählt, daß die Abspannungen
27 und 28 beim Kranbetrieb und in der Montage- und Transportposition
soweit gestreckt sind, daß ein Verheddern dieser Abspannungen mit anderen
Bauteilen verhindert wird (siehe hierzu z.B. Fig. 7). Dadurch ist auch die Abspannung
27 in einer kostengünstigen und gewichtsparenden Art als Seil ausführbar,
weil auch das seitliche Umklappen des Auslegerteils 33 an das Auslegerteil 13
(gemäß Fig. 3) damit auf einfache Weise möglich ist.In the area of the outer end of the boom center piece is a pivotable
Bei dem Ausführungsbeispiel nach Fig. 11 übernimmt das Montageseil 35 in der
Betriebsstellung des Krans, also bei entfaltetem Ausleger, eine tragende Funktion.
Um dieser Funktion gerecht zu werden, muß die Montagewinde 34 entsprechend
dimensioniert und im Betrieb arretiert sein. Um hierbei ein statisch bestimmtes System
zu gewährleisten ist jedoch folgende Abänderung zum System gemäß Fig. 1
bzw. Fig. 10 erforderlich: Zwischen den Anschlägen 59 der Obergurte des Auslegermittelstücks
33 und des äußeren Auslegerteils 24 muß beim gestreckten Ausleger
in der Arbeitsposition ein Spalt gebildet sein. Die durch die Anschläge 59 gebildete
Obergurtkontaktstelle ist bei der aus Fig. 11 ersichtlichen Anordnung nicht erforderlich
und dient nur als Sicherheitselement für den Fall, daß das Montage- und
Halteseil 35 reißen sollte, um dann zu verhindern, daß der Ausleger nicht abstürzt.In the embodiment of FIG. 11, the
Claims (8)
dadurch gekennzeichnet,
characterized,
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE29916415U | 1999-09-17 | ||
DE29916415 | 1999-09-17 | ||
DE29919790U | 1999-11-04 | ||
DE29919790U DE29919790U1 (en) | 1999-09-17 | 1999-11-04 | Tower crane |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1084983A1 true EP1084983A1 (en) | 2001-03-21 |
EP1084983B1 EP1084983B1 (en) | 2005-10-26 |
Family
ID=26062776
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP00118413A Expired - Lifetime EP1084983B1 (en) | 1999-09-17 | 2000-08-24 | Tower crane |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP1084983B1 (en) |
AT (1) | ATE307777T1 (en) |
DE (1) | DE50011424D1 (en) |
ES (1) | ES2250057T3 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102012018111A1 (en) | 2012-09-13 | 2014-03-13 | Liebherr-Werk Biberach Gmbh | Tower Crane |
WO2014048516A1 (en) * | 2012-09-28 | 2014-04-03 | Liebherr-Werk Biberach Gmbh | Rotating tower crane |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102009005237A1 (en) | 2009-01-21 | 2010-07-29 | Liebherr-Werk Biberach Gmbh | Tower Crane |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0132572A1 (en) * | 1983-06-21 | 1985-02-13 | Liebherr-Werk Bischofshofen GmbH | Crane with a telescopic tower |
DE8205723U1 (en) * | 1982-03-02 | 1986-04-24 | König, Wilhelm, 5020 Frechen | Slewing crane |
DE29916410U1 (en) * | 1999-09-17 | 2000-04-27 | Liebherr-Werk Biberach GmbH, 88400 Biberach | Lattice girders articulated to each other, triangular in cross section |
-
2000
- 2000-08-24 DE DE50011424T patent/DE50011424D1/en not_active Expired - Lifetime
- 2000-08-24 ES ES00118413T patent/ES2250057T3/en not_active Expired - Lifetime
- 2000-08-24 AT AT00118413T patent/ATE307777T1/en not_active IP Right Cessation
- 2000-08-24 EP EP00118413A patent/EP1084983B1/en not_active Expired - Lifetime
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE8205723U1 (en) * | 1982-03-02 | 1986-04-24 | König, Wilhelm, 5020 Frechen | Slewing crane |
EP0132572A1 (en) * | 1983-06-21 | 1985-02-13 | Liebherr-Werk Bischofshofen GmbH | Crane with a telescopic tower |
DE29916410U1 (en) * | 1999-09-17 | 2000-04-27 | Liebherr-Werk Biberach GmbH, 88400 Biberach | Lattice girders articulated to each other, triangular in cross section |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102012018111A1 (en) | 2012-09-13 | 2014-03-13 | Liebherr-Werk Biberach Gmbh | Tower Crane |
WO2014048516A1 (en) * | 2012-09-28 | 2014-04-03 | Liebherr-Werk Biberach Gmbh | Rotating tower crane |
Also Published As
Publication number | Publication date |
---|---|
ES2250057T3 (en) | 2006-04-16 |
ATE307777T1 (en) | 2005-11-15 |
EP1084983B1 (en) | 2005-10-26 |
DE50011424D1 (en) | 2005-12-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1900675B1 (en) | Crane truck | |
DE20020974U1 (en) | mobile crane | |
DE102017101113B3 (en) | Telescopic boom with pole tensioning system for a mobile crane and guying method | |
DE2552111A1 (en) | CRANE, IN PARTICULAR TRUCK-MOUNTED CRANE, WITH A STORAGE DEVICE FOR AN OPTIONALLY USABLE TOP BOOM | |
DE2552113A1 (en) | CRANE, IN PARTICULAR TRUCK-MOUNTED CRANE, AND METHOD OF CONNECTING A LIFTING BOOM TO THE END OF A MULTIPLE TELESCOPIC BOOM | |
EP0370314B1 (en) | Mobile antenna assembly with a telescopic mast | |
DE2807415A1 (en) | JIB CRANE | |
DE202005005627U1 (en) | Crane with anchoring device for moving loads has at least one anchoring support fixed to rocker cylinder | |
WO2020011657A1 (en) | Support for the rear anchoring line of a telescopic crane | |
EP0624542A2 (en) | Crane with a telescopic tower | |
EP1426321B1 (en) | Mobile crane with two part boom | |
DE3207443A1 (en) | TURNING CRANE | |
EP0384112B1 (en) | Tower crane, preferably a crane rotating at the top of the tower | |
DE3340845C1 (en) | Lattice boom crane with main boom that can be dismantled | |
EP1084983B1 (en) | Tower crane | |
DE20203443U1 (en) | Telescopic jib has bracing supports pivotable around only one single respective pivot point inclined do that supports spread out in V-form during orientation into operating position | |
EP2984024B1 (en) | Folding crane jib and crane | |
DE4210483C1 (en) | Telescopic tower crane - has at least two-part jib with assembly rope which passes over guide rollers on the inner tower and is controlled by adjusting roller | |
DE8009033U1 (en) | CRANE WITH TELESCOPE TOWER | |
DE2133111A1 (en) | Free standing crane | |
DE3337163C2 (en) | Suspension of a driver's cab on a tower crane | |
DE29919790U1 (en) | Tower crane | |
DE3401094C2 (en) | Crane with telescopic tower | |
EP1084981B1 (en) | Articulated trussed beam with triangular section | |
DE102019122071B3 (en) | Telescopic boom with fold-out mast |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20000831 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
AKX | Designation fees paid |
Free format text: AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
17Q | First examination report despatched |
Effective date: 20040514 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20051026 Ref country code: IE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20051026 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REF | Corresponds to: |
Ref document number: 50011424 Country of ref document: DE Date of ref document: 20051201 Kind code of ref document: P |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060126 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060126 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060126 |
|
GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 20060112 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060327 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2250057 Country of ref document: ES Kind code of ref document: T3 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FD4D |
|
ET | Fr: translation filed | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060831 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060831 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060831 Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060831 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20060727 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060824 |
|
BERE | Be: lapsed |
Owner name: LIEBHERR-WERK BIBERACH G.M.B.H. Effective date: 20060831 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060824 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20051026 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 17 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 18 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 19 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20190826 Year of fee payment: 20 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20190912 Year of fee payment: 20 Ref country code: FR Payment date: 20190826 Year of fee payment: 20 Ref country code: DE Payment date: 20190903 Year of fee payment: 20 Ref country code: IT Payment date: 20190830 Year of fee payment: 20 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20190827 Year of fee payment: 20 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R071 Ref document number: 50011424 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MK Effective date: 20200823 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: PE20 Expiry date: 20200823 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20200823 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20201201 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20200825 |