EP0970284B1 - Frame section to be used as a modular structural element for buildings, method for the production thereof - Google Patents

Frame section to be used as a modular structural element for buildings, method for the production thereof Download PDF

Info

Publication number
EP0970284B1
EP0970284B1 EP98924019A EP98924019A EP0970284B1 EP 0970284 B1 EP0970284 B1 EP 0970284B1 EP 98924019 A EP98924019 A EP 98924019A EP 98924019 A EP98924019 A EP 98924019A EP 0970284 B1 EP0970284 B1 EP 0970284B1
Authority
EP
European Patent Office
Prior art keywords
posts
transverse
longitudinal
another
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP98924019A
Other languages
German (de)
French (fr)
Other versions
EP0970284A1 (en
Inventor
Karl-Heinz Weissinger
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HDB Weissinger GmbH
Original Assignee
HDB Weissinger GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HDB Weissinger GmbH filed Critical HDB Weissinger GmbH
Publication of EP0970284A1 publication Critical patent/EP0970284A1/en
Application granted granted Critical
Publication of EP0970284B1 publication Critical patent/EP0970284B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • E04B1/6108Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
    • E04B1/612Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces
    • E04B1/6145Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces with recesses in both frontal surfaces co-operating with an additional connecting element
    • E04B1/6158Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces with recesses in both frontal surfaces co-operating with an additional connecting element the connection made by formlocking
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/10Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of wood
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
    • E04C2/38Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure with attached ribs, flanges, or the like, e.g. framed panels

Definitions

  • the present invention relates to a frame part, in particular Wall element, according to the generic term of the independent Claim, its use as a modular component for buildings or the like structures and a method of manufacture of such a frame part.
  • DE-U 88 07 441 is a plate-shaped wall element, in particular Insulating element for heat and / or sound insulation known which is characterized by a self-contained frame, the clear cross-sectional area of heat and / or sound insulation the insulating material is arranged, as well as by one, on both sides the top layer arranged on the frame level, which is fixed to the frame is connected and the insulating material in the spanned by the frame Includes cavity.
  • a plate-shaped component is known from CH-A 397 200, the forms at least the outer wall of a room, with a plastic outer surface, an insulating material filling and a wooden frame, whereby the wooden frame is covered on both sides by clamping plates, parallel to the vertical wood of the frame and perpendicular to the plate level, a plurality of parallel clamping plate strips are arranged next to each other at a distance, which with the horizontal Timbers of the frame and the clamping plates are firmly connected are and the plastic outer surface in one piece with a plastic cover is formed, which is the abutting surface of the component covers.
  • the object underlying the present invention is therein, a frame part for building a building and a manufacturing process for the frame part and a using it Specify buildings that can be manufactured extremely inexpensively and that still meets all requirements for stability and durability becomes.
  • the present invention is first achieved by a method according to claim 1 solved, after which the posts (wooden beams or natural stone strips) parts subject to tolerances, especially rough sawn are connected to each other in such a way that a rail part with exactly given external dimensions (length and width).
  • the Opening of the frame part can be done by planking from alike parts that are subject to tolerance, in particular rough sawn become; the longitudinal beams and possibly also the transverse beams on the outside of the long grooves in which during assembly for Improvement of the sealing effect sealing wedges are inserted.
  • a particular aspect of the present invention is that inferior because of by-products of a sawmill (or a stone work) a positive recovery or To use.
  • two opposing cross posts be clamped on a mounting / worktop so that their external dimensions correspond to the specified external dimensions of the frame part, that the cross posts according to the specified external dimensions Cut length so that the two side / end Longitudinal posts are those specified by the clamped cross posts Internal dimensions are cut and fitted accordingly, and that the cross and longitudinal posts in the corner area with each other get connected.
  • the starting point is a worktop / assembly plate 1 (assembly island) on which the posts are aligned and cut relative to each other (tailored).
  • a cross post is first 2 aligned on the worktop 1 (see arrow ⁇ ) and fixed, namely - compare Fig. 2 - parallel to a guide groove (20), along whose machining tools or the like can be moved.
  • the second cross post 3 placed and aligned (see arrow ⁇ ) and fixed that both cross posts 2, 3 with respect to their outer sides lie exactly parallel to each other; the outer sides define it exactly the length dimension L of the frame part to be manufactured.
  • Fig. 2 is now a section of one based on the 1 illustrated method shown frame part 10 shown in the area of the second Querptostens 3 and the two Longitudinal posts 4, 5.
  • Fig. 3 shows a finished frame part 10, which consists of two exactly cut to length Cross posts 2, 3 and two precisely inserted longitudinal posts 4, 5 and the cross posts 2, 3 on the one hand (via their assignment to each other) the exact length dimension L and on the other hand Ensure the exact width dimension B (over its length).
  • FIG. 4 shows a section of a wall area and in the corner area of two - here identical - frame parts 10, 10 '. From this representation it can be seen in particular how the Posts in the corner areas of the frame parts 10, 10 'via brackets or dowels 11 are clamped together and it continues to see how the openings between the posts with one or Multi-layer planking 100 from longitudinal and transverse, if necessary diagonally laid tolerances, especially rough sawn Wooden beams or boards (or other wooden materials) covered and the frame parts 10, 10 'thus connection rigid are made. 4 is in particular still recognizable as the cavity between the planking 100 and the posts are filled with insulation 13, namely especially with sawdust and / or shavings (i.e. by-products the sawing industry).
  • Frame parts 10, 10 'developed connectors (see Fig. 5 / Fig. 6) assumes that in the frame parts 10, 10 'in spatial Corresponding assignment to each other, a mounting hole 15 is set to - as will be described with reference to FIG. 5 - Receiving sleeves and round bolts, which are then relative to each other pulled together via a right / left thread combination until the sides of the frame fit snugly against each other. Are the Frame parts 10, 10 'contracted, so if necessary additional Bracket elements 14 are placed.
  • FIG. 5 essentially shows the detail "A" from FIG. 4 for explanation and disclosure of the connector for two frame parts 10, 10 'in a view across the longitudinal posts 4, 5.
  • this longitudinal post 4, 5 is - as already mentioned with reference to FIG. 4 -
  • a receiving bore 15 is provided, into which a receptacle 30 is fitted.
  • sockets 30 is now from a round pin 31 with a screw element 32 on both sides used, the coaxial and diametrical to the round pin 31 each Thread attachment with a right hand thread 33 and a thread attachment with a left hand thread 34.
  • the two thread approaches 33, 34 sit in through holes in the round bolts, 31 and can pass through Bores in the receptacles 30 on the inner sides of the longitudinal posts 4, 5 can be screwed into this. So becomes the screw element 32 rotated via a central polygonal extension 35, so the two longitudinal posts 4, 5 on the opposite thread approaches 33, 34 contracted (see arrow X).
  • each connection / Clamping point between the two longitudinal posts 4, 5, two round bolts each 31 and a screw element 32 are provided.
  • the non-positive connection also with a screw element 32 be realized alone.
  • the space between the sheeting 12 in the area the connector is closed using suitable elements and that only these elements need to be removed for disassembly, to loosen the screw connection.
  • Fig. 6 are a socket 30, a round pin 31 and a Screw element 32 shown in detail.
  • the socket 30 has an incision 301 on both end faces; this Opposed to incisions 301 in the receptacle 30 is one Hole 302 provided. Is when mounting the round bolts 31 in inserted the socket 30, the screw element 32 arrives hangs loosely in the round bolt 31, via the incision 301 in the inner Area of the plug-in sleeve 30.
  • the tip of the threaded attachments 33 (or 34) reach through the hole 302 and penetrate the longitudinal posts 4, 5 a. When turning the polygonal extension 35 the longitudinal posts 4, 5 are thus drawn together.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Wood Science & Technology (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Panels For Use In Building Construction (AREA)
  • Mirrors, Picture Frames, Photograph Stands, And Related Fastening Devices (AREA)
  • Door And Window Frames Mounted To Openings (AREA)
  • Shaping Of Tube Ends By Bending Or Straightening (AREA)
  • Finishing Walls (AREA)
  • Residential Or Office Buildings (AREA)

Abstract

Modular construction elements are produced by assembling cross posts and longitudinal posts to form a frame of exact specification having a void between the assembled posts. Planks are affixed to the assembled posts and an insulation medium may be located within the void to enhance performance of the elements. The modular construction elements are interconnected by interposing a joiner therebetween. The joiner has a receptacle casing, a round bolt and a screw structure. When the screw structure is in place and initially engaged with the modular construction elements, it is actuated to urge the elements together in a desirable fashion.

Description

Die vorliegende Erfindung bezieht sich auf ein Rahmenteil, insbesondere Wandelement, nach dem Oberbegriff des diesbezüglichen unabhängigen Anspruches, dessen Verwendung als modulares Bauelement für Gebäude oder dergleichen Bauwerke und auf ein Verfahren zur Herstellung eines derartigen Rahmenteils.The present invention relates to a frame part, in particular Wall element, according to the generic term of the independent Claim, its use as a modular component for buildings or the like structures and a method of manufacture of such a frame part.

Es ist zunehmend unbezahlbar geworden ein Wohnhaus zu finanzieren. Abgesehen von den Grundstückspreisen spielen die Baukosten eine ganz entscheidende Rolle.It has become increasingly unaffordable to finance a house. Apart from the land prices, the construction costs play a whole decisive role.

Fertigbautechniken sind zwar lange bekannt, die herkömmlichen Fertighäuser sind jedoch nach wie vor gleichemaßen relativ teuer. Holzhäuser, insbesondere Fachwerkhäuser, sind gleichermaßen seit langem Stand der Technik - das Problem ist diesbezüglich darin zu sehen, daß die zu verarbeitenden Balken und Pfosten relativ aufwendig und damit kostspielig zugeschnitten und oberflächenbearbeitet werden, so daß letztendlich wieder nichts eingespart wird.Prefabricated building techniques have long been known, the conventional prefabricated houses are still relatively expensive, however. Wooden houses, especially half-timbered houses, have been alike since Long state of the art - the problem in this regard is too see that the beams and posts to be processed are relatively expensive and thus costly cut and finished so that ultimately nothing is saved again.

Ein besonderes Problem im Hinblick auf die genannten Fertighäuser einerseits und die Fachwerkhäuser andererseits besteht darin, daß ihre Demontage im allgemeinen gleichbedeutend damit ist, daß die Häuser zerstört werden.A particular problem with regard to the prefabricated houses mentioned on the one hand and the half-timbered houses on the other hand is that their disassembly is generally equivalent to the fact that the Houses are destroyed.

Aus der DE-U 88 07 441 ist ein plattenförmiges Wandelement, insbesondere Isolierelement zur Wärme und/oder Schallisolierung bekannt, welches sich auszeichnet durch einen in sich geschlossenen Rahmen, dessen lichte Querschnittfläche an Wärme- und/oder Schallisolierung des Dämmaterials angeordnet ist, sowie durch je eine, zu beiden Seiten der Rahmenebene angeordnete Deckschicht, die mit dem Rahmen fest verbunden ist und das Dämmaterial in dem von dem Rahmen aufgespannten Hohlraum einschließt.DE-U 88 07 441 is a plate-shaped wall element, in particular Insulating element for heat and / or sound insulation known which is characterized by a self-contained frame, the clear cross-sectional area of heat and / or sound insulation the insulating material is arranged, as well as by one, on both sides the top layer arranged on the frame level, which is fixed to the frame is connected and the insulating material in the spanned by the frame Includes cavity.

Aus der CH-A 397 200 ist ein plattenförmiges Bauelement bekannt, das mindestens die Außenwand eines Zimmers bildet, mit einer Kunststoffaußenfläche, einer Isolierstoffüllung und einem Holzrahmen, wobei der Holzrahmen beidseitig von Preßspannplatten abgedeckt ist, parallel zu den senkrecht stehenden Hölzern des Rahmens und senkrecht zu der Plattenebene eine Mehrzahl von parallelen Preßspannplattenstreifen mit Abstand nebeneinander angeordnet sind, welche mit dem waagrechten Hölzern des Rahmens sowie den Preßspannplatten fest verbunden sind und die Kunststoffaußenfläche einstückig mit einer Kunststoffabdeckung ausgebildet ist, welche die Stoßfläche des Bauelementes abdeckt.A plate-shaped component is known from CH-A 397 200, the forms at least the outer wall of a room, with a plastic outer surface, an insulating material filling and a wooden frame, whereby the wooden frame is covered on both sides by clamping plates, parallel to the vertical wood of the frame and perpendicular to the plate level, a plurality of parallel clamping plate strips are arranged next to each other at a distance, which with the horizontal Timbers of the frame and the clamping plates are firmly connected are and the plastic outer surface in one piece with a plastic cover is formed, which is the abutting surface of the component covers.

Die der vorliegenden Erfindung zugrunde liegende Aufgabe besteht darin, ein Rahmenteil zur Erstellung eines Gebäudes sowie ein Herstellungsverfahren für das Rahmenteil und ein dieses verwendendes Gebäude anzugeben, das äußerst preiswert gefertigt werden kann und das trotzdem allen Anforderungen an Stabilität und Haltbarkeit gerecht wird.The object underlying the present invention is therein, a frame part for building a building and a manufacturing process for the frame part and a using it Specify buildings that can be manufactured extremely inexpensively and that still meets all requirements for stability and durability becomes.

Die vorliegende Erfindung wird zunächst durch ein Verfahren nach Anspruch 1 gelöst, wonach die Pfosten (Holzbalken beziehungsweise Natursteinleisten) toleranzbehaftete, insbesondere sägerauhe Teile sind, die so miteinander verbunden sind, daß ein Bahmenteil mit genau vorgegebenen Außenabmessungen (Länge und Breite) entsteht. Die Öffnung des Rahmenteils kann mittels einer Beplankung aus gleichermaßen toleranzbehafteten, insbesondere sägerauhen Teilen verdeckt werden; die Längsbalken und gegebenenfalls auch die Querbalken weisen an ihren Außenseiten Langsnuten auf, in die bei der Montage zur Verbesserung der Dichtwirkung Dichtkeile eingelegt werden.The present invention is first achieved by a method according to claim 1 solved, after which the posts (wooden beams or natural stone strips) parts subject to tolerances, especially rough sawn are connected to each other in such a way that a rail part with exactly given external dimensions (length and width). The Opening of the frame part can be done by planking from alike parts that are subject to tolerance, in particular rough sawn become; the longitudinal beams and possibly also the transverse beams on the outside of the long grooves in which during assembly for Improvement of the sealing effect sealing wedges are inserted.

Ein besonderer Aspekt der vorliegenden Erfindung besteht darin, die minderwertigen, weil maßungenauen Nebenprodukte eines Sägewerks (oder auch eines Steinwerks) einer positiven Verwertung beziehungsweise Verwendung zu zuführen. A particular aspect of the present invention is that inferior because of by-products of a sawmill (or a stone work) a positive recovery or To use.

Es ist weiter vorgesehen, daß zwei sich gegenüber liegende Querpfosten auf einer Montage- / Arbeitsplatte so aufgespannt werden, daß ihre Außenmaße dem vorgegebenen Außenmaß des Rahmenteils entsprechen, daß die Querpfosten dem vorgegebenen Außenmaß entsprechend auf Länge geschnitten werden, daß die beiden seitlich an- / abschließenden Längspfosten den durch die aufgespannten Querpfosten vorgegebenen Innenabmessungen entsprechend zugeschnitten und eingepaßt werden, und daß die Quer- und Längspfosten im Eckbereich miteinander verbunden werden.It is further contemplated that two opposing cross posts be clamped on a mounting / worktop so that their external dimensions correspond to the specified external dimensions of the frame part, that the cross posts according to the specified external dimensions Cut length so that the two side / end Longitudinal posts are those specified by the clamped cross posts Internal dimensions are cut and fitted accordingly, and that the cross and longitudinal posts in the corner area with each other get connected.

Mit anderen Worten ist für die vorliegende Erfindung relevant, maßungenaus, insbesondere sägerauhe Holzbalken beziehungsweise Holzbretter (und auch Steinleisten) als Ausgangsmaterial für modulare Rahmenteile zu verwenden und diese so zusammenzufügen, daß ein - bezogen auf die für das Gesamtbauwerk entscheidenden Außenabmessungen - maßgenaues Rahmenteil zur Verfügung steht, das nach Art einer üblichen Baukastentechnik mit anderen Rahmenteilen vergleichbarer Art und Größe zusammengefügt (und auch wieder demontiert) werden kann.In other words, relevant to the present invention, in particular rough-sawn wooden beams or wooden boards (and also stone moldings) as starting material for modular Use frame parts and assemble them so that they are included to the external dimensions that are decisive for the entire structure - Dimensionally accurate frame part is available in the manner of a usual Modular technology with other frame parts of a comparable type and size can be put together (and also disassembled).

Es ist insoweit ersichtlich, daß die Baukosten nicht nur infolge der erheblichen Verbilligung der Bauwerksteile, sondern auch infolge der günstigeren Bauzeiten und des Wegfalls schweren Geräts, ganz wesentlich vermindert sind.In this respect it can be seen that the construction costs are not only due to the considerable cheaper parts of the building, but also as a result of cheaper construction times and the elimination of heavy equipment, very much are reduced.

Im Hinblick auf die Montage der Rahmenteile wird die Verwendung eines (Rahmen-) Verbinders vorgeschlagen, der es erlaubt, jeweils zwei Rahmenteile über eine einstückige Kombination eines Rechts- / Linksgewindes so zusammenzuziehen, daß sie letztlich satt aneinander anliegen. With regard to the assembly of the frame parts, the use of a (Frame) connector proposed that allows two each Frame parts via a one-piece combination of a right / left thread move in such a way that they finally fit snugly against each other.

Die Erfindung wird im folgenden anhand der Zeichnung näher erläutert. Dies zeigt in

Fig. 1
eine Schemadarstellung zur Erläuterung des Verfahrens zur Herstellung eines Rahmenteils;
Fig. 2
einen perspektivischen Ausschnitt aus Fig. 1;
Fig. 3
ein Beispiel eines Rahmenteils mit maßgenauen Abmessungen;
Fig. 4
einen perspektivischen Ausschnitt aus einer aus zwei Rahmenteilen montierten Wand;
Fig. 5
eine Detaildarstellung (gemäß Ausschnitt A nach Fig. 4; einer Verbindungsstelle zweier Rahmenteile;
Fig. 6
eine Darstellung eines Verbinders nach Fig. 5 in Gestalt einer Art Explosionszeichnung.
The invention is explained below with reference to the drawing. This shows in
Fig. 1
a schematic representation to explain the method for producing a frame part;
Fig. 2
a perspective section of Fig. 1;
Fig. 3
an example of a frame part with accurate dimensions;
Fig. 4
a perspective section of a wall assembled from two frame parts;
Fig. 5
a detailed representation (according to section A of FIG. 4; a junction of two frame parts;
Fig. 6
a representation of a connector according to FIG. 5 in the form of a kind of exploded drawing.

In Fig. 1 ist der der vorliegenden Erfindung zugrunde liegende Kerngedanke in Prinzipdarstellung wiedergegeben. Dieser Grundgedanke besteht darin, daß toleranzbehaftete, insbesondere sägerauhe Holzbalken und Holzbretter (Pfosten) einer wirtschaftlichen Nutzung und damit einer Wertschöpfung dadurch zugeführt werden, daß sie zu einem Rahmenteil zusammengefügt werden, dessen Außenabmessungen trotz der Maßungenauigkeiten der sägerauhen Pfosten exakt stimmen (und deren Isolierhohlräume mit Dämmstoffen, insbesondere mit Produktionsabfällen der Sägewerke isoliert werden).1 is the one on which the present invention is based Core idea reproduced in a schematic diagram. This basic idea is that those with tolerance, especially rough sawn Wooden beams and wooden boards (posts) of economic use and thus add value by: they are assembled into a frame part, the external dimensions of which accurate despite the inaccurate dimensions of the rough sawn posts agree (and their insulating cavities with insulation materials, in particular with production waste from sawmills).

Ausgangspunkt ist eine Arbeits- / Montageplatte 1 (Montageinsel) auf der die Pfosten relativ zueinander ausgerichtet und abgelängt (zugeschnitten) werden. Ausgehend davon, daß ein rechtwinkliges Rahmenteil hergestellt werden soll, wird zunächst ein Querpfosten 2 auf der Arbeitsplatte 1 ausgerichtet (vergleiche Pfeil α) und fixiert, und zwar - vergleiche Fig. 2 - parallel zu einer Führungsnut (20), längs derer Bearbeitungswerkzeuge oder dergleichen verfahren werden können. Im zweiten Schritt wird der zweite Querpfosten 3 aufgelegt und so ausgerichtet (vergleiche Pfeil β) und fixiert, daß beide Querpfosten 2, 3 bezüglich ihrer Außenseiten genau parallel zueinander liegen; die Außenseiten definieren dabei exakt das Längenmaß L des zu fertigenden Rahmenteils. Nunmehr werden die beiden Querpfosten 2, 3 dem Breitenmaß B des Rahmenteils entsprechend auf Länge geschnitten und zwar exakt im rechten Winkel zu den Außenseiten. Anschließend wird ein erster Längspfosten 4 aufgelegt und dem Innenmaß der Querpfosten 2, 3 entsprechen abgelängt; dieser Längspfosten 4 wird sodann paßgenau zwischen die Querpfosten 2, 3 geschoben (vergleiche Pfeil γ). Die Querpfosten 2, 3 und der Längspfosten 4 werden nunmehr im Eckbereich miteinander verbunden, so daß die eine Längsseite des Rahmenteils fest liegt. Nunmehr wird der zweite Längspfosten 5 aufgelegt, dem Innenmaß der Querpfosten entsprechend abgelängt und zwischen die Querpfosten 2, 3 eingefügt (vergleiche Pfeil δ). Die Außenseite des zweiten Längspfostens 5 schließt dabei bündig mit den Stirnflächen der Querpfosten 2, 3 ab.The starting point is a worktop / assembly plate 1 (assembly island) on which the posts are aligned and cut relative to each other (tailored). Assuming that a right angle Frame part is to be produced, a cross post is first 2 aligned on the worktop 1 (see arrow α) and fixed, namely - compare Fig. 2 - parallel to a guide groove (20), along whose machining tools or the like can be moved. In the second step, the second cross post 3 placed and aligned (see arrow β) and fixed that both cross posts 2, 3 with respect to their outer sides lie exactly parallel to each other; the outer sides define it exactly the length dimension L of the frame part to be manufactured. Now be the two cross posts 2, 3 the width dimension B of the frame part cut accordingly to length and exactly at right angles to the outside. Then a first longitudinal post 4 placed and the internal dimensions of the cross posts 2, 3 correspond to length; this longitudinal post 4 will then fit between the Cross posts 2, 3 pushed (see arrow γ). The cross posts 2, 3 and the longitudinal post 4 are now together in the corner area connected so that the one long side of the frame part firmly lies. Now the second longitudinal post 5 is placed, the inside dimension the cross post cut to length and between the Cross posts 2, 3 inserted (see arrow δ). The outside of the second longitudinal post 5 closes flush with the end faces the cross posts 2, 3 from.

In Fig. 2 ist nunmehr ein Ausschnitt eines nach dem anhand von Fig. 1 erläuterten Verfahren hergestellten Rahmenteils 10 dargestellt und zwar im Bereich des zweiten Querptostens 3 und der beiden Längspfosten 4, 5. In der darstellung nach Fig. 2 sind insbesondere die Führungsnuten 20 der Arbeits- / Montageplatte 1 zu ernennen, längs derer in definierter Weise Bearbeitungs-, Verschiebe- und Arretierungswerkzeuge verstellt und fixiert werden können.In Fig. 2 is now a section of one based on the 1 illustrated method shown frame part 10 shown in the area of the second Querptostens 3 and the two Longitudinal posts 4, 5. In the illustration according to FIG. 2, in particular to appoint the guide grooves 20 of the work / mounting plate 1, along which machining, moving and locking tools can be adjusted and fixed.

Fig. 3 zeigt ein fertiges Rahmenteil 10, das aus zwei exakt abgelängten Querpfosten 2, 3 und zwei paßgenau eingefügten Längspfosten 4, 5 besteht und wobei die Querpfosten 2, 3 einerseits (über ihre Zuordnung zueinander) das exakte Längenmaß L und andererseits (über ihre Länge) das exakte Breitenmaß B gewährleisten. Der Verwendung als modulares Bauelement entsprechend wird dann - wie strichliniert angedeutet - die Öffnung zwischen den Quer- und Längspfosten beidseitig mit einer (gegebenenfalls nach dem sogenannten Brett-Schicht-Verfahren hergestellten mehrschichtigen) Beplankung 100 versehen; der Zwischenraum zwischen der beidseitigen Beplankung 100 kann dabei selbstverständlich mit einem geeigneten Dammstoff ausgefüllt werden.Fig. 3 shows a finished frame part 10, which consists of two exactly cut to length Cross posts 2, 3 and two precisely inserted longitudinal posts 4, 5 and the cross posts 2, 3 on the one hand (via their assignment to each other) the exact length dimension L and on the other hand Ensure the exact width dimension B (over its length). The use accordingly as a modular component - how indicated by dashed lines - the opening between the cross and Longitudinal posts on both sides with a (possibly after the so-called Board-layer process produced multilayer) planking 100 provided; the space between the two-sided Planking 100 can of course be done with a suitable one Dammstoff be filled.

In Fig. 4 ist ein Ausschnitt eines Wandbereichs dargestellt und zwar im Eckbereich zweier - hier identischer - Rahmenteile 10, 10'. Aus dieser Darstellung ist insbesondere zu erkennen, wie die Pfosten in den Eckbereichen der Rahmenteile 10, 10' über Klammern oder Dübel 11 miteinander verklammert sind und es ist weiter zu ersehen, wie die Öffnungen zwischen den Pfosten mit Ein- oder Mehrschicht-Beplankung 100 aus längs- und quer-, gegebenenfalls diagonal verlegten toleranzbehafteten, insbesondere sägerauhen Holzbalken beziehungsweise -brettern (oder anderweitigen Holzwerkstoffen) abgedeckt und die Rahmenteile 10, 10' somit verbindungssteif gemacht sind. In der Darstellung nach Fig. 4 ist insbesondere noch zu erkennen, wie der Hohlraum zwischen den Beplankungen 100 und den Pfosten mit Dämmstoff 13 ausgefüllt sind, und zwar insbesondere mit Säge- und/oder Hobelspänen (also Nebenprodukten der Sägeindustrie).4 shows a section of a wall area and in the corner area of two - here identical - frame parts 10, 10 '. From this representation it can be seen in particular how the Posts in the corner areas of the frame parts 10, 10 'via brackets or dowels 11 are clamped together and it continues to see how the openings between the posts with one or Multi-layer planking 100 from longitudinal and transverse, if necessary diagonally laid tolerances, especially rough sawn Wooden beams or boards (or other wooden materials) covered and the frame parts 10, 10 'thus connection rigid are made. 4 is in particular still recognizable as the cavity between the planking 100 and the posts are filled with insulation 13, namely especially with sawdust and / or shavings (i.e. by-products the sawing industry).

Die Darstellung nach Fig. 4 soll insbesondere auch zeigen, wie die benachbarten Rahmenteile 10, 10' miteinander verbunden werden beziehungsweise sind. Der in Verbindung mit den erfindungsgemäßen Rahmenteilen 10, 10' entwickelte Verbinder (vergleiche Fig. 5 / Fig. 6) geht davon aus, daß in den Rahmenteilen 10, 10' in räumlich entsprechender Zuordnung zueinander je eine Aufnahmebohrung 15 gesetzt ist, um - wie anhand von Fig. 5 beschrieben wird - Steckhülsen und Rundbolzen aufzunehmen, die dann relativ zueinander über eine Rechts- / Linksgewindekombination zusammen gezogen werden, bis die Rahmenseiten satt aneinander anliegen. Sind die Rahmenteile 10, 10' zusammengezogen, so können gegebenenfalls zusätzliche Klammerelemente 14 aufgesetzt werden. In Fig. 4 ist darüber hinaus dargestellt, daß die Langspfosten 4, 5 und - wie hier gezeichnet - die Stirnseiten der Querpfosten 2 beziehungsweise 2' jeweils Nuten 200 aufweisen, in die bei der Montage Dichtkeile eingepaßt sind. Damit läßt sich die Dichtwirkung (Isolation) des aus erfindungsgemäßen Rahmenteilen gefertigten Gebäudes wesentlich verbessern.4 should also show how the adjacent frame parts 10, 10 'are connected to each other or are. The in connection with the invention Frame parts 10, 10 'developed connectors (see Fig. 5 / Fig. 6) assumes that in the frame parts 10, 10 'in spatial Corresponding assignment to each other, a mounting hole 15 is set to - as will be described with reference to FIG. 5 - Receiving sleeves and round bolts, which are then relative to each other pulled together via a right / left thread combination until the sides of the frame fit snugly against each other. Are the Frame parts 10, 10 'contracted, so if necessary additional Bracket elements 14 are placed. 4 is about it also shown that the Langspotosten 4, 5 and - as here drawn - the end faces of the cross posts 2 or 2 ' each have grooves 200, in the sealing wedges during assembly are fitted. This allows the sealing effect (insulation) of the building made of frame parts according to the invention essential improve.

Fig. 5 zeigt im wesentlicnen den Ausschnitt "A" aus Fig. 4 zur Erläuterung und Offenbarung des Verbinders für zwei Rahmenteile 10, 10' und zwar in einer Sicht quer durch die Längspfosten 4, 5. In diesen Längspfosten 4, 5 ist - wie anhand von Fig. 4 bereits erwähnt - je eine Aufnahmebohrung 15 vorgesehen, in die eine Steckhülse 30 eingepaßt ist. In diese Steckhülsen 30 wird nunmehr von beiden Seiten her je ein Rundbolzen 31 mit einem Schraubelement 32 eingesetzt, das koaxial und diametral zum Rundbolzen 31 je einen Gewindeansatz mit einem Rechtsgewinde 33 und einen Gewindeansatz mit einem Linksgewinde 34 umfaßt. Die beiden Gewindeansätze 33, 34 sitzen in Durchgangslöchern der Rundbolzen,31 und können durch Bohrungen in den Steckhülsen 30 an den inneren Seiten der Längspfosten 4, 5 in diese eingedreht werden. Wird also das Schraubelement 32 über einen zentralen Mehrkantansatz 35 verdreht, so werden die beiden Längspfosten 4, 5 über die gegenläufigen Gewindeansätze 33, 34 zusammengezogen (vergleiche Pfeil X).FIG. 5 essentially shows the detail "A" from FIG. 4 for explanation and disclosure of the connector for two frame parts 10, 10 'in a view across the longitudinal posts 4, 5. In this longitudinal post 4, 5 is - as already mentioned with reference to FIG. 4 - A receiving bore 15 is provided, into which a receptacle 30 is fitted. In these sockets 30 is now from a round pin 31 with a screw element 32 on both sides used, the coaxial and diametrical to the round pin 31 each Thread attachment with a right hand thread 33 and a thread attachment with a left hand thread 34. The two thread approaches 33, 34 sit in through holes in the round bolts, 31 and can pass through Bores in the receptacles 30 on the inner sides of the longitudinal posts 4, 5 can be screwed into this. So becomes the screw element 32 rotated via a central polygonal extension 35, so the two longitudinal posts 4, 5 on the opposite thread approaches 33, 34 contracted (see arrow X).

Gemäß dem Ausführungsbeispiel nach Fig. 5 sind je Verbindungs- / Spannstelle zwischen den zwei Längspfosten 4, 5 je zwei Rundbolzen 31 und je ein Schraubelement 32 vorgesehen. Grundsätzlich kann die kraftschlüssige Verbindung jedoch auch mit einem Schraubelement 32 alleine realisiert werden. Der Vollständigkeit halber sei noch angemerkt, daß der Zwischenraum zwischen den Beplankungen 12 im Bereich der Verbinder über geeignete Elemente geschlossen wird und daß zur Demontage dann nur diese Elemente entfernt zu werden brauchen, um die Schraubverbindung wieder zu lösen.5, each connection / Clamping point between the two longitudinal posts 4, 5, two round bolts each 31 and a screw element 32 are provided. Basically, the non-positive connection also with a screw element 32 be realized alone. For the sake of completeness, it should also be noted that the space between the sheeting 12 in the area the connector is closed using suitable elements and that only these elements need to be removed for disassembly, to loosen the screw connection.

In Fig. 6 sind eine Steckhülse 30, ein Rundbolzen 31 und ein Schraubelement 32 im Einzelnen dargestellt. Die Steckhülse 30 weist an beiden Stirnseiten je einen Einschnitt 301 auf; diesen Einschnitten 301 gegenüberliegend ist in der Steckhülse 30 je eine Bohrung 302 vorgesehen. Wird beim Montieren der Rundbolzen 31 in die Steckhülse 30 eingefügt, so gelangt das Schraubelement 32, das lose im Rundbolzen 31 hängt, über den Einschnitt 301 in den inneren Bereich der Steckhülse 30. Die Spitze der Gewindeansätze 33 (beziehungsweise 34) durchgreifen die Bohrung 302 und dringen in die Längspfosten 4, 5 ein. Beim Verdrehen der Mehrkantansatzes 35 werden somit die Längspfosten 4, 5 zusammengezogen.In Fig. 6 are a socket 30, a round pin 31 and a Screw element 32 shown in detail. The socket 30 has an incision 301 on both end faces; this Opposed to incisions 301 in the receptacle 30 is one Hole 302 provided. Is when mounting the round bolts 31 in inserted the socket 30, the screw element 32 arrives hangs loosely in the round bolt 31, via the incision 301 in the inner Area of the plug-in sleeve 30. The tip of the threaded attachments 33 (or 34) reach through the hole 302 and penetrate the longitudinal posts 4, 5 a. When turning the polygonal extension 35 the longitudinal posts 4, 5 are thus drawn together.

Im Hinblick auf die Verwendung / Verarbeitung der toleranzbehafteten, insbesondere sägerauhen Holzbalken / -pfosten sei noch angemerkt, daß der Schallschutz den herkömmlichen Holzbauelementen gegenüber wesentlich besser ist.With regard to the use / processing of the tolerant, in particular rough-sawn wooden beams / posts should be noted, that the sound insulation compared to the conventional wooden components is much better.

Claims (10)

  1. Method for the production of a frame part to be used as a modular structural element for buildings or like structures which with regard to length and width has precisely predetermined external dimensions but is produced using poets composed of tolerance-affected and dimensionally inaccurate wooden beams, wooden boards or strips of natural stone by the steps that two posts located opposite one another on an assembly island having a guide groove along which machining tools or the like can be moved are mounted in such a way that their external dimensions match the
    predetermined external transverse size of the frame part, these transverse posts are cut to length using machining tools to match the predetermined external size, the two laterally adjoining/terminating longitudinal posts are cut to size and fitted in each case to match the predetermined internal dimensions predetermined by the mounted transverse posts and the transverse and longitudinal posts are connected to one another in the corner region.
  2. Method according to the preceding claim, characterised in that the posts are provided as rough hewn parts from tolerance-affected wooden beams, wooden boards or strips of natural stone by sawing.
  3. Method according to one of the preceding claims, characterised in that provided in the outer sides of the posts are grooves into which sealing wedges are inserted during assembly.
  4. Method according to one of the preceding claims, characterised in that the aperture between the transverse and longitudinal posts is provided with planking composed of tolerance-affected parts.
  5. Method according to one of the preceding claims, characterised in that the planking for the aperture is built from rough hewn parts.
  6. Method according to one of the preceding claims, characterised in that the aperture is planked over in such a way that an insulating space is formed.
  7. Method according to one of the preceding claims, characterised in that the hollow insulating space formed by the planking and posts is filled with waste byproducts.
  8. Method according to the preceding claim, characterised in that sawdust and/or wood shavings from sawmills are selected to be the waste byproducts.
  9. Frame part (10) to be used as a modular structural element for buildings or like structures having with regard to length and width precisely predetermined external dimensions with transverse and longitudinal posts connected to one another, characterised in that the frame part (10) has posts (2, 3. 4, 5) made from wooden beams, wooden boards or strips of natural atone affected by tolerances due to rough hewing from which the transverse posts (2, 3) are cut to length to match the predetermined external size and the longitudinal posts are fitted in to match the internal dimensions predetermined by the mounted transverse posts, the transverse and longitudinal posts being connected to one another in the corner region.
  10. Buildings having at least two frame parts according to the preceding claim 9, characterised in that these are arranged side by side and connected by at least one connector which comprises sockets (30) which are arranged in appropriate spatial correspondence to one another in receiving bores (15) each for one socket in the frame parts (10), round bolts (31) and threaded bolts, it being possible to brace each pair of sockets relative to one another via complementary round bolts and threaded bolts penetrating the latter and each having a left-hand and a right-hand thread (33, 34) in such a way that the frame parts rest flush against one another.
EP98924019A 1997-03-25 1998-03-18 Frame section to be used as a modular structural element for buildings, method for the production thereof Expired - Lifetime EP0970284B1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE19712347 1997-03-25
DE19712347A DE19712347A1 (en) 1997-03-25 1997-03-25 Frame part for use as a modular component for buildings, and method for producing such a frame part
PCT/DE1998/000795 WO1998042932A1 (en) 1997-03-25 1998-03-18 Frame section to be used as a modular structural element for buildings, method for the production thereof

Publications (2)

Publication Number Publication Date
EP0970284A1 EP0970284A1 (en) 2000-01-12
EP0970284B1 true EP0970284B1 (en) 2001-08-08

Family

ID=7824464

Family Applications (1)

Application Number Title Priority Date Filing Date
EP98924019A Expired - Lifetime EP0970284B1 (en) 1997-03-25 1998-03-18 Frame section to be used as a modular structural element for buildings, method for the production thereof

Country Status (23)

Country Link
US (1) US6519907B1 (en)
EP (1) EP0970284B1 (en)
JP (1) JP2001518158A (en)
KR (1) KR20010005576A (en)
CN (1) CN1297505A (en)
AT (1) ATE204049T1 (en)
AU (1) AU7637498A (en)
BG (1) BG103767A (en)
CA (1) CA2284701A1 (en)
CZ (1) CZ295821B6 (en)
DE (3) DE19712347A1 (en)
DK (1) DK0970284T3 (en)
EA (1) EA001288B1 (en)
EE (1) EE9900427A (en)
ES (1) ES2163866T3 (en)
HU (1) HUP0002776A3 (en)
NO (1) NO994483L (en)
PL (1) PL335778A1 (en)
PT (1) PT970284E (en)
SK (1) SK129399A3 (en)
TR (1) TR199902314T2 (en)
WO (1) WO1998042932A1 (en)
YU (1) YU47299A (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6799404B2 (en) * 2002-02-14 2004-10-05 Daw Technologies, Inc. Wall panel assembly and method of assembly
CA2568062C (en) * 2006-11-09 2012-10-09 Omniglass Ltd. Mullion joint between two frame members of a window or door frame
US7841142B2 (en) * 2006-11-22 2010-11-30 Steelcase Inc. Stack-on panel assembly
DE102011015600B4 (en) 2011-03-30 2017-03-30 Christoph Maier Production plant for the production of prefabricated components from mineral bonded building materials
CN103967164A (en) * 2013-01-28 2014-08-06 吴淑环 Assembled wall assembled on side of main building structure in held manner
CN114099193B (en) * 2021-10-18 2023-04-07 湖南西雅德辐射防护科技有限公司 Lead-free CT (computed tomography) shelter structure
CN117536344B (en) * 2023-11-13 2024-06-07 桂林天马装配式建筑有限公司 Building outer wall insulation board

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE7241223U (en) * 1973-02-01 Knoedler K Gmbh & Co Device for connecting two plate-shaped prefabricated elements
US2732598A (en) * 1956-01-31 Wood panel constructiony
US1659326A (en) * 1927-09-17 1928-02-14 Vitrolite Company Compound slab and wall constructed therefrom
US2832101A (en) * 1955-07-22 1958-04-29 Lamteck Corp Of America Paneled structure
CH397200A (en) * 1962-03-14 1965-08-15 Sperrholz Und Isolierplatten A Plate-shaped component
US3296764A (en) * 1963-12-26 1967-01-10 Tremblay Joseph Rosaire Coupling for construction elements
CH469955A (en) * 1968-06-27 1969-03-15 Diserens Pierre Refrigeration chamber formed of prefabricated panels
US4072548A (en) * 1976-12-27 1978-02-07 Gerson Howard S Panel door and method of construction
DE2753014A1 (en) * 1977-11-28 1979-05-31 Napier Donald Stewart Load bearing building panel for wall - has wall panels erected between vertical roof support posts with cover plates for inner edges
US4236365A (en) * 1978-08-25 1980-12-02 Wood Processes, Oregon Ltd. Rigid building component and method of manufacture
DE3247883A1 (en) * 1982-12-23 1984-09-27 Oswald 8542 Roth Lux Exterior-wall element
YU47133B (en) * 1985-05-03 1995-01-31 Peter Brauchl PREFABRICATED HOUSE
FR2603317A1 (en) * 1986-08-29 1988-03-04 Francoise Lesourd WOODEN PANEL FOR THE PARTICULAR CONSTRUCTION OF BUILDINGS, WORKS OF ART AND FURNITURE
DE8807441U1 (en) * 1988-06-07 1988-07-21 Fülöp, Attila, 7904 Erbach Plate-shaped wall element
US5171366A (en) * 1989-10-12 1992-12-15 Georgia-Pacific Corporation Gypsum building product
US5155959A (en) * 1989-10-12 1992-10-20 Georgia-Pacific Corporation Firedoor constructions including gypsum building product
DE29513784U1 (en) * 1995-08-28 1995-10-26 PURschaum und Holz GmbH, 09648 Mittweida Composite panel element
US5832692A (en) * 1995-08-29 1998-11-10 Bush Industries, Inc. Panel construction and method for manufacturing
DE19628043C2 (en) * 1995-09-06 1999-03-18 Graf Dragica Compartmental element
DE29705324U1 (en) * 1997-03-25 1997-08-21 HDB Weissinger GmbH, 75331 Engelsbrand Frame part for use as a modular component for buildings

Also Published As

Publication number Publication date
WO1998042932A1 (en) 1998-10-01
ATE204049T1 (en) 2001-08-15
TR199902314T2 (en) 2000-01-21
US6519907B1 (en) 2003-02-18
CZ295821B6 (en) 2005-11-16
NO994483D0 (en) 1999-09-16
NO994483L (en) 1999-10-14
ES2163866T3 (en) 2002-02-01
SK129399A3 (en) 2000-06-12
DE19880364D2 (en) 2000-03-16
DK0970284T3 (en) 2001-12-17
DE59801173D1 (en) 2001-09-13
EP0970284A1 (en) 2000-01-12
AU7637498A (en) 1998-10-20
JP2001518158A (en) 2001-10-09
EE9900427A (en) 2000-04-17
PL335778A1 (en) 2000-05-22
KR20010005576A (en) 2001-01-15
YU47299A (en) 2000-10-30
CA2284701A1 (en) 1998-10-01
DE19712347A1 (en) 1998-10-01
EA199900841A1 (en) 2000-04-24
PT970284E (en) 2002-02-28
HUP0002776A3 (en) 2002-01-28
CZ337899A3 (en) 2000-06-14
HUP0002776A2 (en) 2000-12-28
EA001288B1 (en) 2000-12-25
CN1297505A (en) 2001-05-30
BG103767A (en) 2000-02-29

Similar Documents

Publication Publication Date Title
EP2821191B1 (en) Wooden panel element
EP0560013B1 (en) Wooden panel
EP0970284B1 (en) Frame section to be used as a modular structural element for buildings, method for the production thereof
DE4227170A1 (en) BLOCK BLOCK
EP0606633A2 (en) A set of wooden building blocks
EP1815081A1 (en) Wooden structural part
DE20114883U1 (en) Connection fitting for mullion-transom wooden constructions, in particular full facade wooden constructions to be finally assembled on site
EP3974594B1 (en) Wall
DE602004006849T2 (en) Method for solidifying or reinforcing masonry structures and the like
EP0380057A1 (en) Multi-layered wooden beam
DE2535980B2 (en) Wall construction with at least two wall components connected to a common post and running at an angle to one another
EP0882849A2 (en) Construction element for walls
EP1995387B1 (en) Wood component and wall element composed of same
DE102006055976B4 (en) Method for producing a structural part for wooden buildings
DE2908126A1 (en) Pre-machined baulk for timber dwelling - has double v=section tongue and groove formation for bed joints which include compressible sealing strips
DE2836701A1 (en) Timber block built house interlocking prefab walls - have all alternating shorter beams of greater height than long beams
DE102022131160A1 (en) Built-in element for storing objects in a drywall and arrangement therewith
EP4289310A1 (en) Installation element for storing objects in a dry wall and arrangement therewith
DE29705324U1 (en) Frame part for use as a modular component for buildings
DE102018124918B4 (en) Furniture system that can be assembled without screws and method for assembling a furniture system
DE3625645C1 (en) Wall structural element
DE20306942U1 (en) System of interconnected components
AT500671B1 (en) Corner joint formed by corner strip arranged in inner corner of outer plates of adjacent wall elements connected by spacing strips shaped to form an oblique angle at sides
EP1652451A1 (en) Joining device for mounting a table leg to at least one frame
DE20120460U1 (en) Handle for a block stand construction

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19991025

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Free format text: AL PAYMENT 19991025;LT PAYMENT 19991025;LV PAYMENT 19991025;MK PAYMENT 19991025;RO PAYMENT 19991025;SI PAYMENT 19991025

17Q First examination report despatched

Effective date: 20000211

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Free format text: AL PAYMENT 19991025;LT PAYMENT 19991025;LV PAYMENT 19991025;MK PAYMENT 19991025;RO PAYMENT 19991025;SI PAYMENT 19991025

LTIE Lt: invalidation of european patent or patent extension
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20010808

REF Corresponds to:

Ref document number: 204049

Country of ref document: AT

Date of ref document: 20010815

Kind code of ref document: T

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 20010808

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: GERMAN

REF Corresponds to:

Ref document number: 59801173

Country of ref document: DE

Date of ref document: 20010913

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: ISLER & PEDRAZZINI AG

REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

EN Fr: translation not filed
REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2163866

Country of ref document: ES

Kind code of ref document: T3

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 20011108

Ref country code: GR

Ref legal event code: EP

Ref document number: 20010402038

Country of ref document: GR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020318

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020318

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020318

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020319

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020319

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020331

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020331

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020402

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FI

Payment date: 20020716

Year of fee payment: 5

26N No opposition filed
BERE Be: lapsed

Owner name: *HDB WEISSINGER G.M.B.H.

Effective date: 20020331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20021001

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20021007

EUG Se: european patent has lapsed

Ref document number: 98924019.7

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20020318

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee

Effective date: 20021001

REG Reference to a national code

Ref country code: DK

Ref legal event code: EBP

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030318

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030930

REG Reference to a national code

Ref country code: PT

Ref legal event code: MM4A

Free format text: LAPSE DUE TO NON-PAYMENT OF FEES

Effective date: 20030930

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20030410

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20050318

ET Fr: translation filed
REG Reference to a national code

Ref country code: FR

Ref legal event code: ERR

Free format text: BOPI DE PUBLICATION N: 02/01 PAGES: 290 PARTIE DU BULLETIN CONCERNEE: BREVETS EUROPEENS DONT LA TRADUCTION N'A PAS ETE REMISE A I'INPI IL Y A LIEU DE SUPPRIMER: LA MENTION DE LA NON REMISE. LA REMISE DE LA TRADUCTION EST PUBLIEE DANS LE PRESENT BOPI.

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20060331

Year of fee payment: 9

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20070318

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20080229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020318

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020331

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20110329

Year of fee payment: 14

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 59801173

Country of ref document: DE

Effective date: 20121002

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20121002