Prior art keywords
wall
prefabricated panel
construction
major structure
assembling body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310123623.3A
Other languages
Chinese (zh)
Inventor
吴淑环
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310123623.3A priority Critical patent/CN103967164A/en
Publication of CN103967164A publication Critical patent/CN103967164A/en
Pending legal-status Critical Current

Links

Landscapes

  • Building Environments (AREA)

Abstract

The invention provides an assembled wall assembled on the side of a main building structure in a held manner, relates to assembled walls of buildings, and aims to solve the problems that a frame-structure wall has a large amount of thermal bridges, joints are prone to cracking, force bearing capability is low, and energy save and housing industrialization are affected. The assembled wall structurally comprises a main building structure and prefabricated wall boards arranged on the outer side of the main building structure. A concrete board of the main building structure holds the prefabricated wall boards which are connected to the outer side of the main building structure. The joints of the prefabricated wall boards are adhered through elastic sealing adhesive with or without the effect of transmitting the internal force, one kind of the elastic sealing adhesive can be selected or different structures can be selected in different positions. The assembled wall assembled on the side of the main building structure in the held manner is obtained. Energy-saving and heat-insulating effects are improved greatly, assembling speed is high, durability is high, and housing industrialization can be developed.

Description

A kind of assembling body of wall of installing in major structure of construction side support formula
Technical field
The present invention relates to a kind of building heat preservation body of wall in building, particularly a kind of assembling body of wall of installing in major structure of construction side support formula.
Background technology
Currently problem that assembling body of wall exists is installed mainly with prefabricated panel:
Frame beam column area accounts for exterior wall area 25~40%, and the wallboard that tradition is installed in framework is arranged on the inner side of edge, framework hole keel more, and a framed side wallboard is installed in frame beam column outside again, and the insulation of beam column place is weak, forms heat bridge, unfavorable to energy-saving heat preserving; And wallboard is divided into inside and outside both sides to be installed, and has weakened wall stiffness, and installation constitution is to stressed unfavorable.
There is prefabricated panel seam crossing common quality defect easy to crack in assembling body of wall.
Also as the out-hung panel of building standard design atlas " precast concrete out-hung panel " 08SJ110-2,08SG333, because of interior siphonal lobe concrete too heavy, to stressed unfavorable, insulation layer thickness is restricted, and there is a large amount of oblique pull reinforcing bars through insulation layer, increase a large amount of heat transfer, very large on the impact of body of wall energy-saving heat preserving.
(as sandwich heat preserving wall body inner thermal insulating layer, there is air layer at place, forms cross-ventilation to add a large amount of door and window hole periphery heat bridges, steel tie heat bridge, cross-ventilated heat bridge.), the heat bridge that these are a large amount of, makes heat bridge amount of calculation large, and designer calculates heat bridge difficulty, causes body of wall mean thermal transmittance not have transparency, has often misled building energy conservation.
The problems referred to above affect building energy conservation and reduce discharging, and impact building durability, affects Process of Housing Industrialization.
For addressing the above problem, convenient construction, reduces cost, and the present invention proposes a kind of assembling body of wall of installing in major structure of construction side support formula.
Summary of the invention
The object of the invention is to provide a kind of assembling body of wall of installing in major structure of construction side support formula, to solve the problem described in background technology.
A kind of assembling body of wall of installing in major structure of construction side support formula of the present invention, it comprises major structure of construction, prefabricated panel; Prefabricated panel is placed in beam column, the shear wall outside of major structure of construction, the concrete slab support prefabricated panel in major structure of construction beam column, shear wall outside, and prefabricated panel is connected with the lateral surface of major structure of construction;
Between prefabricated panel, seam is connected with following 2 kinds of structures, selects one and selects or diverse location is selected not isostructure:
1), bonding with adhesives, adhesives has the effect of transmission internal force, can co-operation between prefabricated panel, become a cooperative primary structure member;
2), with elastic sealant bonding, elastic sealant does not have the effect of transmission internal force;
Form a kind of assembling body of wall of installing in major structure of construction side support formula.
The present invention and the difference of public technology are:
1, when embodiment of the present invention one prefabricated panel is light-duty composite thermo-insulating wall board, seam between prefabricated panel both can be bonding with the adhesives with transmission internal force, again can be gluing with the elastic packing without transmission internal force effect, in the time that Prefabricated heat-insulation wall plate seam is bonding with the adhesives with transmission internal force, between prefabricated panel, can form a cooperative primary structure member, this is that public technology is not available.Can not transmission capacity between the light-duty composite thermo-insulating wall board that public technology has been installed, can not co-operation between the prefabricated panel of assembling body of wall, be only at the flexible fluid sealant of seam crossing, waterproof, windproof.
2, the installation constitution of embodiment of the present invention one, when prefabricated panel meets the demands with the connecting length of upper and lower beam slab, can carry out Force Calculation by calculation diagram, thereby determine suitable prefabricated panel thickness and determine the netted tensile materials in it, meet bending resistance designing requirement, safety of structure is good; And the light heat insulating board of current installation and the connected mode of major structure of construction do not meet structural calculation requirement, safety of structure is bad.
3, the fire prevention measure that embodiment of the present invention three is taked crab-bolt is that public technology is unexistent.
4, the anticorrosive measure that embodiment of the present invention four is taked crab-bolt is that public technology is unexistent.
5, the invention process side five forms flexible joint at prefabricated panel seam crossing, and it is regulation and the case history of flexible joint that existing assembling body of wall does not have seam.Embodiment one does not require flexible joint structure, is applicable to the building in the less area of summer in the winter temperature difference, and for the building of summer in winter temperature difference larger area, should adopt the side's of enforcementing five flexible joints to construct.
Technique effect of the present invention:
1, assembling body of wall of the present invention, in the time that prefabricated panel is prefabricated light thermal-insulating wallboard, has outstanding energy-saving heat preserving effect.
This is because eliminated beam column heat bridge, then takes hole heat insulation break bridge structure, the heat bridge that finally only cornices, and cornice and can local arrange, the instrument that cornices increases body of wall mean thermal transmittance 0.015~0.02w/m 2.k.Approximately reduce energy consumption 60~75% than current energy-saving wall, significantly promote body of wall energy-saving heat preserving level, significantly reduce construction investment.
The thermal transmittance of table 1 is the thermal transmittance that comprises various heat bridges, and it is unrestricted to increase insulation layer thickness, assembling body of wall easily reaches low heat transfer coefficient, has solved described in background technology current frame construction many at position heat bridges such as beam columns, affects body of wall energy-saving heat preserving effect problem.
The assembling body of wall mean thermal transmittance reference table that table 1 is installed in major structure of construction side support formula
EPS thickness of slab mm Body of wall mean thermal transmittance w/m 2.k
150 0.28
180 0.24
200 0.215
250 0.175
2, assembling wall structure of the present invention is simple, prefabricated panel can adopt prefabricated light thermal-insulating wallboard, composite thermo-insulating wall board is lightweight, steel using amount is few, installation rate is fast, easy construction, safety of structure and good endurance, can meet the requirement of structural limits Design of State, the present invention is the optimization to assembling wall structure.Not only assembling wall cost is low, and reduces major structure of construction cost and reduce building thermal environments cost, wide application of the present invention.
Existing plant equipment approximately can reach produces prefabricated light wall plate 1000m every day 2, added health, occupied ground is few, and the amount of labour used is few, and prefabricated cost is low.
3, the invention solves the problem that the fire prevention of assembling wall anchor bolt is bad, durability is bad.
4, the invention solves assembling body of wall prefabricated panel seam and be easy to the common quality defect ftractureing.
The invention solves the problem that current assembling body of wall exists described in background technology, have advantages of that simple structure, safety are good, easy construction, installation rate is fast, cost is low, energy and land saving, can significantly promote body of wall energy-saving horizontal, with thin body of wall construction low heat transfer coefficient body of wall, adapt to low-carbon (LC) social situations, assembling body of wall self cost is low, and reduces major structure of construction investment; The present invention is conducive to advance housing industrialization, is conducive to control global warming, wide application, has important social effect.
Brief description of the drawings
Fig. 1 is embodiment one assembling body of wall prefabricated panel mounting vertical plane figure, the elongated setting of concrete cornice, and breast is divided into upper and lower 2 prefabricated panels and installs;
Fig. 2 is embodiment one assembling body of wall prefabricated panel mounting vertical plane figure, the local setting of cornicing on coagulation, breast directly with beam outside monoblock installation;
Fig. 3 is embodiment one assembling body of wall prefabricated panel mounting vertical plane figure, the local part setting of concrete cornice, and breast is provided with breach by structure supporting parts support, and easy construction can monoblock be installed; Also can be divided into upper and lower 2 prefabricated panels installs;
Fig. 4 is that embodiment one is arranged on prefabricated panel 15 both ends horizontal on the structure supporting parts 1-1 of major structure of construction 1 post, assembling body of wall prefabricated panel 15 mounting vertical plane figure;
Fig. 5 is the 1-1 vertical cross section of Fig. 1~Fig. 3;
Fig. 6 is the 2-2 vertical cross section of Fig. 2, Fig. 3;
Fig. 7 assembling body of wall is connected constructional drawing with post;
Fig. 8 is that embodiment one prefabricated panel is arranged on the assembling wall body vertical sectional drawing on floor:
Fig. 4~Fig. 8 also represents the structure of embodiment four~six installation crab-bolts;
Fig. 9 is embodiment two, three flexible joint horizontal profile organigrams, flexible joint inner thermal insulating layer 3 seam crossing, with resilient glue material 4-1 by insulation layer adjacent assembling body of wall 3 seam crossing adhering and sealings;
Figure 10 is embodiment two, three flexible joint horizontal profile organigrams, and the adhesives 4 that flexible joint is positioned at indoor partial-length is non-resilient glue material 4-2, and the adhesives 4 that is positioned at outside partial-length is resilient glue material 4-1;
Figure 11 is that seam is vertical masonry joint with the difference of Figure 10;
The difference of Figure 12 and Figure 11 is that elastic sealant is in the inner side of resilient cement polymer mortar 8-1;
Figure 13 is that seam adopts heat insulation break bridge structure;
Figure 14 is that seam adopts heat insulation break bridge structure, and seam crossing is installed insulation layer, has reinforcing bar inside and outside insulation layer, the convenient on-the-spot seam reinforcing bar of installing of this structure.
Fig. 9, Figure 10, Figure 14 are all illustrated in the seam crossing of a side prefabricated panel vertical reinforcing bar are installed, and also can not establish reinforcing bar, determine according to Structural Design Requirement.
Fig. 9~Figure 14 also represents that the topping at seam two ends plasters as resilient cement polymer mortar 8-1, and resilient cement polymer mortar 8-1 pastes Alkali-resisting fiberglass mesh 5 to be connected with contiguous prefabricated wallboard 15; In resilient cement polymer mortar (Figure 12) or outside (Fig. 9~Figure 11, Figure 13, Figure 14), be also provided with the structure of elastic sealant 9;
The structure that accompanying drawing section represents is all that prefabricated panel is the structure of composite thermo-insulating wall board.Accompanying drawing 5, Fig. 6, Fig. 8, Fig. 9, Figure 10, Figure 14 represent that assembling body of wall is provided with the structure of reinforcing bar, in assembling body of wall, reinforcing bar can be installed, and how reinforcing bar to be installed unrelated to the invention.
Other patent of applicant has set forth how reinforcing bar is installed, therefore the figure that the present invention has represents to install reinforcing bar, some figure do not represent to install reinforcing bar.
Detailed description of the invention
Embodiment one: see Fig. 1~Figure 14, a kind of assembling body of wall of installing in major structure of construction side support formula of present embodiment, it is made up of major structure of construction 1, prefabricated panel 15; Described major structure of construction 1 is slab column wall and basis, major structure of construction 1 can be concrete frame structure, steel reinforced concrete frame structure, frame structure, steel framed structure, the combination frame structure of concrete and steel, steel wood frame construction, shear wall structure, or be bamboo wood frame construction;
Prefabricated panel 15 is placed in beam column, the shear wall outside of major structure of construction 1;
The concrete slab 1-2 support prefabricated panel 15 in major structure of construction 1 beam column, shear wall outside, prefabricated panel 15 is connected with the lateral surface of major structure of construction 1;
Or be provided with structure supporting parts 1-1 at major structure of construction 1 lateral surface, and structure supporting parts 1-1 is major structure of construction 1 extension in the horizontal direction, structure supporting parts 1-1 is connected with major structure of construction 1, prefabricated panel 15 described in structure supporting parts 1-1 support; Described structure supporting parts 1-1 is local arranges or for arranging along building border (concrete cornice arranging as part or border), or be floor or be sole plate; Or described structure supporting parts 1-1 is that metal supporting parts (is recommended with cornicing on coagulation when major structure of construction is concrete material, when being steel work, major structure of construction use metal supporting parts as the supporting parts of shaped steel or steel plate making, reinforcing bar and steel structure connection also can be installed, outside steel work, formwork concreting cornices), or be wood or bamboo cornice (when major structure of construction is wood or bamboo, being cornicing of wood or bamboo, also available metal supporting parts);
Prefabricated panel 15 installation constitutions are as follows:
1), will be positioned at the prefabricated panel 15 of wall between windows and be arranged on concrete slab 1-2 without prefabricated panel 15 lower ends of hole place body of wall (as gable), or it is upper to be arranged on structure supporting parts 1-1, prefabricated panel 15 upper ends are connected with slab column, the shear wall side of major structure of construction 1; This structure is that the two ends up and down of prefabricated panel 15 are connected with the beam slab of levels; While being provided with structure supporting parts 1-1, the vertical load (assembling wall weight) that the assembling body of wall of prefabricated panel composition transmits is passed to major structure of construction by structure supporting parts 1-1;
2) (it is upper that the prefabricated panel 15 of breast is installed to structure supporting parts 1-1, sees Fig. 3, the prefabricated panel 15 that is positioned at breast to be arranged on to the beam slab side of major structure of construction 1; Or it is upper not establish structure supporting parts 1-1, be directly installed to the side of major structure of construction 1, see Fig. 2, Fig. 6), and be connected with major structure of construction 1; Breast is not established and is corniced, and beam slab side direct prefabricated panel 15 and major structure of construction 1 is posted by connecting, and is connected with wall between windows, and the assembling body of wall of formation is also the assembling body of wall by structure supporting parts support;
3) or that prefabricated panel 15 left and right both ends horizontal are arranged on to the structure supporting parts 1-1 of major structure of construction 1 post is upper, see Fig. 4; This structure requires post apart from less, and indoor-bollard is too much, otherwise the span of plate is large, to stressed unfavorable; Also be inconvenient to install the vertical reinforcing bar in hole, can establish hole steel hoop.Prove by finite element analysis software, body of wall maximal bending moment is positioned at about 100mm eminence on reveal windowsill, the vertical reinforcing bar of reveal is set to stressed favourable, therefore recommend adoption Fig. 4 structure not;
Recommend adoption 1), 2) structure fit applications.
Be positioned at structure sediment seam place, between prefabricated panel 15, seam need be pressed the standard construction atlas construction of settlement joint, does not belong to content of the present invention.Between all the other prefabricated panels 15, seam connects (prefabricated panel seam outer end or along seam total length) following 2 kinds of structures, selects one and selects or diverse location is selected not isostructure, sees Fig. 9~Figure 14:
1), bonding with adhesives 4, adhesives 4 has the effect of transmission internal force, can co-operation between prefabricated panel 15, become a cooperative primary structure member (ability transmission internal force under bonding reliable condition, between prefabricated panel 15, material can form a cooperative primary structure member);
2), bonding with elastic sealant 9, elastic sealant 9 do not have transmission internal force effect (be only waterproof, windproof, not recommend adoption, not recommend adoption, or inner side has the seam of beam column to adopt.);
Form a kind of assembling body of wall of installing in major structure of construction side support formula.
The prefabricated light thermal-insulating wallboard that described prefabricated panel 15 is various structures.As: 1), light-duty composite thermo-insulating wall board, the various materials of composite thermo-insulating wall board are connected as a single entity, and form an overall primary structure member; 2) or be lightweight aggregate coagulation upper plate, lightweight concrete slab (as arrangement of reinforcement rice husk concrete, arrangement of reinforcement foamed concrete) and straw plate, honeycomb card board;
When described prefabricated panel 15 is light-duty composite thermo-insulating wall board, light-duty composite thermo-insulating wall board is made up of insulation layer 3, topping 8, netted tensile materials 5; Described insulation layer 3 is inorganic or organic insulation material, as polymer thermal insulative material, foam cement, mineral wool, straw, honeycomb card board, thermal insulation mortar, rice husk concrete, glue powder polyphenyl particle or foamed glass; Described insulation layer 3 is identical heat insulating material, or be different heat insulating materials (for example local difficult combustion phenolic resins at the insulation layer 3 of diverse location, and other position is EPS plate), in described insulation layer 3, can be provided with hole or not be provided with hole (have hole can increase heat insulation effect, save heat insulating material); In described insulation layer 3 and prefabricated panel 15 surrounding sections can be provided with ribs or not be provided with ribs that (ribs is oblique or perpendicular to topping setting, to increase wallboard rigidity in insulation layer.Ribs mostly in the market is magnesia cement or cement mortar, is provided with reinforcing bar or is not provided with reinforcing bar in ribs, and magnesia cement durability is bad); Described netted tensile materials 5 is wire lath or Alkali-resisting fiberglass mesh or basalt fibre screen cloth; Described topping 8 is cement mortar or layer of concrete, or described topping 8 is the cement mortar of modification or the layer of concrete of modification, or described topping 8 is cement calcium silicate board with microporous, cement fibrolite plate; The external surface of topping 8 is plane, or the external surface of topping 8 is matsurface; Or described prefabricated panel 15 is steel wire net rack cement filled board; Described topping 8 is positioned at insulation layer 3 both sides, and insulation layer 3 is connected with topping 8 that (as bonding connection, and insulation layer surface is fluted is connected with topping; And steel wire net rack cement filled board relies on oblique pull steel wire to socket connection.), or local reduction is provided with topping 8 or thickening topping 8 (as at Prefabricated heat-insulation wall plate seam areas topping 8 attenuates; While being provided with reinforcing bar, reinforcement location need be thickeied topping 8); Netted tensile materials 5 is positioned at topping 8, or Alkali-resisting fiberglass mesh or Black Warrior person fiber mesh cloth Pasting be on topping 8 surfaces, and netted tensile materials 5 can be selected one or select multiple installation simultaneously, or the local netted tensile materials 5 that is provided with reinforcement;
The external surface of described prefabricated panel 15 can be provided with decorative layer or not be provided with decorative layer;
Can the installation room inside and outside vertical reinforcing bar of described prefabricated panel 15 seam crossings or/and structure supporting parts 1-1 is connected, or is not installed the vertical reinforcing bar of indoor and outdoor with major structure of construction 1;
(having formed major structure of construction 1 before installation prefabricated panel 15) that described major structure of construction 1 forms for formerly construction, or the side template of major structure of construction 1 using prefabricated panel 15 as major structure of construction 1, install with assembling body of wall synchronous construction; Or part major structure of construction 1 be formerly construction form, the side template of part major structure of construction 1 using prefabricated panel 15 as major structure of construction 1, installs with assembling body of wall synchronous construction; The formation of first constructing of for example concrete column, and build as template using prefabricated panel in the outside of the outside of concrete beam, balcony slab edge-perpendicular concrete slab.
When assembling body of wall of the present invention is energy-saving wall, prefabricated panel adopts light-duty composite thermo-insulating wall board optimum; While building the less demanding non-bearing wall body of energy conservation standard, the prefabricated panel of assembling body of wall can be lightweight concrete slab etc.
The beam column outside of framework should be in the same plane, if Liang Yuzhu is not in the same plane, floor need to be stretched out, and vertical concrete slab need be installed on beam limit, should notice that post should not give prominence to the outside at beam, and impact is installed.
Embodiment two: see Fig. 1~Fig. 8, the difference of present embodiment and embodiment one is that present embodiment assembling body of wall also has following mode with being connected of major structure of construction 1, selects wherein one or more modes to connect:
1), by crab-bolt 20, prefabricated panel 15 and the side of major structure of construction 1 are fixed;
2), with cementitious materials, prefabricated panel 15 is bonding with slab column, the shear wall side of major structure of construction 1, or/and bonding with the additional part 1-3 side that reclines;
3), with cementitious materials by bonding to the termination of prefabricated panel 15 and structure supporting parts 1-1 or concrete slab 1-2, or be also provided with netted tensile materials 5 (as Fig. 5 in cementitious materials between bonding plane; The prefabricated panel lower end of Fig. 8 and the bonding length of beam sides hour, are also provided with netted tensile materials 5 in the cementitious materials of bonding termination.), or be provided with netted tensile materials 5 in bonding plane between upper and lower prefabricated panel 15; In bonding plane, netted tensile materials 5 is connected with indoor topping 8, and netted tensile materials 5 is connected with major structure of construction 1, or netted tensile materials 5 connects upper and lower prefabricated panel 15.
Crab-bolt is provided with following situation, need to select according to using:
1), the crab-bolt of accompanying drawing of the present invention is all expressed as nailing plastic crab-bolt, recommend to select.Nailing plastic crab-bolt does not increase heat transfer, can at once prefabricated panel be fixed, installation rate is fast, price is low, bonding strength can meet the demands, reduce cost, do not increase heat transfer, enhanced polyethylene plastics crab-bolt good endurance, as the nailing plastic crab-bolt of the Sichuan Province China South Mountain fastening equipment of nailing Co., Ltd production; And if need stainless steel by steel crab-bolt, cost is high and increase and conduct heat.
2), at prefabricated panel 15 during as the template of major structure of construction 1 one sides, the inside and outside two ends of crab-bolt 20 should be with the termination or the crotch that expand.When crab-bolt 20 is installed, by crab-bolt 20, through prefabricated panel 15, one end that crab-bolt 20 expands termination or crotch is embedded in the concrete of major structure of construction, after concrete solidifies, sockets by prefabricated panel 15 and major structure of construction 1; Also can socket with basalt reinforcing bar, carbon fiber anchoring piece etc.
3), when the steel structure connection, with the penetrable 8mm steel plate that is not more than of nailing plastic crab-bolt 20, be connected with steel plate, if steel work thickness is greater than 8mm, can on steel work, welds and add steel plate, nailing plastic crab-bolt 20 is connected with additional steel plate.
In addition in the topping of prefabricated panel 15 and major structure of construction 1 bonding plane, also can be connected with major structure of construction 1 by embedded iron parts.Crab-bolt is provided with following situation, need to select according to using:
Embodiment three: the difference of present embodiment and embodiment one or two is; present embodiment in the topping 8 of crab-bolt 20 outer ends or surface have fire proofing material; or crab-bolt 20 outer end localised protection layers 8 are exactly the topping that meets fire protection requirement; make crab-bolt 20 meet fire protection requirement: described structure supporting parts 1-1 arranges or for (as concrete cornice border arranges) is set along building border for local, or be floor or be sole plate.
As on crab-bolt surface or the local brushing fireproof paint of protective layer, or fire proofing material is joined to plastering in topping of certain limit in crab-bolt, or topping self is exactly the fire proofing material that can meet fire protection requirement, if thermal insulation mortar thermal resistance is exactly greatly fire proofing material; Crab-bolt above hole or in vertical side certain limit should adopt this fire prevention measure.
Embodiment four: the difference of present embodiment and embodiment two or three is, present embodiment is injected basic matterial 9 (as used cement polymer mortar in the sleeve pipe of crab-bolt 20, outer end blocks with heat insulating material again, just can ensure that durable years is not less than 50 years, very convenient, price is low), nailing or other the steel connector of protection in crab-bolt 20 meets life requirement; Described structure supporting parts 1-1 is local arranges or for (as concrete cornice border arranges) is set along building border, or be floor or be sole plate.
The galvanized layer thickness of nailing is limited, affects durability.When by nailing plastic crab-bolt 20, can in plastic bushing, inject basic matterial, as cement polymer mortar, outer end blocks with heat insulating material again, just can ensure that durable years is not less than 50 years, very convenient, price is low.
Embodiment five: Fig. 8~Figure 14, the difference of one of present embodiment and embodiment one~tetra-is, and between the prefabricated panel 15 of present embodiment assembling body of wall, seam is flexible joint, and described joint face is plane or for tongue and groove shape or be stairstepping connection; At seam crossing, adhesives 4 is installed, adhesives 4 is by bonding both sides prefabricated panel 15 connection; Adhesives 4 energy transmission internal force, and seam crossing adhesives 4 also has the ability (ability of being for example out of shape under temperature action that adapts to certain distortion, and the ability of being out of shape under load action), the flexible joint that forms a kind of assembling body of wall is constructed; Described structure supporting parts 1-1 is local arranges or for arranging along building border, or be floor or be sole plate.The assembling body of wall adaptive deformation of present embodiment is good.
Described elastic connecting is sewed with following 4 kinds of structures (for reference), selects one and selects:
1), adhesives 4 is resilient glue material 4-1; Or seam is resilient glue material 4-1 near the adhesives 4 of a fierce side (normally outside) the certain length inseam of variations in temperature, the adhesives 4 of a little side (normally indoor) seam of variations in temperature is non-resilient adhesives 4-2: this also belongs to flexible joint, because be flexible joint as long as satisfied temperature changes a fierce side seams, assembling body of wall just can change by adaptive temperature.
2) or also on the basis of above-mentioned structure, there is heat insulation break bridge structure in seam near middle position, see Figure 13, Figure 14, be applicable to heating districts, insulation layer 3 middle parts of for example prefabricated panel 15 are jagged, at gap position, elastic heat preserving material 3-1 are installed, elastic heat preserving material 3-1 inserts in the breach of insulation layer 3 of both sides prefabricated panel 15, or the local setting of elastic heat preserving material 3-1, there are air space insulation, above formation heat insulation break bridge structure in centre; Elastic heat preserving material 3-1 can select second the third foamed plastics, polyethylene soft bubble plastics and EPS plate etc.; Although the adjacent insulation layer 3 of prefabricated panel 15 does not interconnect in heat insulation break bridge structure position, as long as within the scope of certain length, prefabricated panel 15 is adjacent inside and outside seam the mutual bonding connection of insulation layer 3, seam crossing still can transmission internal force;
3) or on the basis of above-mentioned structure, the topping 8 of the fierce one end of seam two ends or variations in temperature is plastered as resilient cement polymer mortar 8-1, resilient cement polymer mortar 8-1 pastes netted tensile materials 5 to be connected with contiguous prefabricated wallboard 15, sees Fig. 9~Figure 14;
4) or also have elastic sealant 9, the installation position of elastic sealant 9 is equipped with following 3 kinds, selects one and selects:
1., in outer end, seam gap flexible fluid sealant 9 adhering and sealings (for the assembling body of wall outside of temperature Change fierceness; Or also have resilient cement polymer mortar 8-1 that netted tensile materials 5 is pasted and is connected with contiguous prefabricated wallboard 15 in the outer end of elastic sealant 9;
2. or at structure 3) the netted tensile materials 5 of resilient cement polymer mortar 8-1 inner clip is positioned at flexible fluid sealant 9 adhering and sealings (being applicable to the outdoor gap place of assembling body of wall) on the outer end in gap;
Resilient cement polymer mortar 8-1, and resilient cement polymer thermal insulation mortar has the ability of cementability and certain adaptive deformation, forms the flexible joint between a kind of prefabricated panel.
Resilient cement polymer mortar 8-1 can be both seam crossing resilient glue material 4-1; can also be positioned at seam two ends topping 8 certain limits; become a part for topping 8; expand the range of application of resilient glue material 4-1; adapt to summer in winter temperature deformation better, different from resilient glue material 4-1 installation site for distinguishing with resilient cement polymer mortar 8-1.
Embodiment six: the difference of one of present embodiment and embodiment one~five is, present embodiment also increases following fire protection construction measure, selects as required one of them or multiple selecting:
1), the topping 8 of assembling body of wall meets fire protection requirement, opening protection layer 8-1 is door and window hole fire barrier, opening protection layer 8-1 meets fire protection requirement; When assembling wall body door or window hole is heat-insulating bridge-cut-off hole,, forms opening protection layer 8-1, as be thermal insulation mortar, rock wool or hydrophobic type silicate aluminum board etc. as hole insulation layer 3 with fire-retardant heat-insulation material; Opening protection layer is cement mortar or concrete floated coat, or is the cement mortar of modification or the concrete floated coat of modification, is formed with heat bridge hole:
When the insulation layer of light-duty composite thermo-insulating wall board is organic material, when prefabricated panel protective layer thickness 25mm, (do not comprise reinforcing bar periphery topping), approximately can meet fire endurance 1 hour, can adjust protective layer thickness according to fire protection requirement.
2), in the topping 8 of crab-bolt 20 outer ends or surface have fire proofing material, or the topping 8 of bolt 20 outer ends is exactly the topping that meets fire protection requirement, makes crab-bolt 20 meet fire protection requirement;
The crab-bolt that is positioned at hole periphery certain limit should adopt this fire prevention measure
3), in assembling body of wall, increase fire barrier, fire barrier meets fire protection requirement; If fire barrier 11 is for not firing or difficult combustion heat insulating material (as thermal insulation mortar, rock wool etc.) or cement mortar or concrete, or be the cement mortar of modification or the concrete of modification etc.; Fire barrier be provided with following 2 kinds of modes, need to select according to use:
1., at interlayer, horizontal fire barrier is set;
2., in prefabricated panel 15 vertical joints, vertical fire barrier is set; Form closed fire compartmentation structure;
Heat insulating material in standard construction atlas Elastic shrinkage joint is rock wool, is exactly vertical fire barrier;
4), the setting of assembling body of wall be connected with major structure of construction 1 longitudinal reinforcement 6-1 time, the topping of longitudinal reinforcement 6-1 meets fire protection requirement, on major structure of construction 1 arrange built-in fitting (such as embedded bar) meet fire protection requirement;
5), the heat preservation strip installed of doorframe and window frame outside meets fire protection requirement, as smears thermal insulation mortar, or increases the protective layer thickness etc. of heat preservation strip.
6), PLASTIC LAMINATED is installed, as magnesite fireproof plate, hydrophobic type silicate aluminum board etc. in indoor.Can be used for fire rating requirement when higher.
About explanation of the present invention:
1, the difference of resilient glue material 16-1 of the present invention and elastic sealant 9 is:
The elongation per unit length of seam crossing resilient glue material 16-1 is far smaller than elastic sealant 9, and its elastic extension is generally not more than 3%, can meet the requirement of flexible joint adhesive strength, just can transmission internal force, there is again certain elasticity, and adapt to necessarily distortion.
And the elastic extension of elastic sealant 9 can reach even 10 times of several times, the larger tensile strength of elongation rate is lower.Do not require that elastic sealant 9 has the effect of transmission power, the effect of application elastic sealant 9 is:
1), can't see in appearance crack; 2), there is waterproof, windbreak function.
Therefore, adopting elastic sealant 9 is double insurances of butt joint processing.
When wider in gap, may in adhesives 16, need to add micro-expanding agent.
And the elastic extension of elastic sealant 9 can reach even 10 times of several times, the larger tensile strength of elongation rate is lower.Do not require that elastic sealant 9 has the effect of transmission power, the effect of application elastic sealant 9 is:
1), can't see in appearance crack;
2), there is waterproof action.
Therefore, adopting elastic sealant 9 is double insurances of butt joint processing.
The assembling body of wall adaptive deformation of flexible joint structure is good, and good endurance when wider in gap, may need to add micro-expanding agent in adhesives 16.
2, there have been at present basalt silk and basalt cloth, also had basalt reinforcing bar.Undoubtedly, will there is the basalt fibre net with the braiding of basalt silk.Basalt silk has excellent ageing-resistant, high temperature resistant, anti acid alkali performance energy, excellent mechanical property, and the basalt fibre screen cloth being woven by basalt silk will occur.Along with scientific and technological development, may also have other net that is suitable for doing netted tensile materials, be applied to combined wall of the present invention.

Claims (8)

1. an assembling body of wall of installing in major structure of construction side support formula, it comprises major structure of construction, prefabricated panel: prefabricated panel is placed in beam column, the shear wall outside of major structure of construction, the concrete slab support prefabricated panel in major structure of construction beam column, shear wall outside, prefabricated panel is connected with the lateral surface of major structure of construction;
It is characterized in that, between described prefabricated panel, seam is connected with following 2 kinds of structures, selects one and selects or diverse location is selected not isostructure:
1), bonding with adhesives, adhesives has the effect of transmission internal force, can co-operation between prefabricated panel;
2), with elastic sealant bonding, elastic sealant does not have the effect of transmission internal force;
Form a kind of assembling body of wall of installing in major structure of construction side support formula.
2. a kind of assembling body of wall of installing in major structure of construction side support formula according to claim 1,
It is characterized in that, it also comprises structure supporting parts, is provided with structure supporting parts at major structure of construction lateral surface, and described structure supporting parts is connected with major structure of construction, prefabricated panel described in structure supporting parts support.
3. a kind of assembling body of wall of installing in major structure of construction side support formula according to claim 1 and 2,
It is characterized in that, described prefabricated panel is also connected by following one or more modes with described major structure of construction:
1), by crab-bolt, the side of prefabricated panel and major structure of construction or the additional part that reclines is fixed;
2), with cementitious materials by bonding to prefabricated panel and major structure of construction side, or/and bonding with the additional part side that reclines;
3), with cementitious materials by the termination of prefabricated panel and described structure supporting parts or bonding with concrete slab, or be also provided with netted tensile materials in cementitious materials between bonding plane, or be provided with netted tensile materials in bonding plane between upper and lower prefabricated panel; Netted tensile materials is overhanging to be connected with indoor topping, and netted tensile materials is connected with major structure of construction, or upper and lower prefabricated panel is connected.
4. a kind of assembling body of wall of installing in major structure of construction side support formula according to claim 3,
It is characterized in that, there is fire proofing material in the topping of described crab-bolt outer end or surface, or crab-bolt outer end localised protection layer is exactly the topping that meets fire protection requirement, and crab-bolt meets fire protection requirement.
5. a kind of assembling body of wall of installing in major structure of construction side support formula according to claim 3,
It is characterized in that, in the sleeve pipe of crab-bolt, inject basic matterial, nailing or other steel connector in protection crab-bolt meet life requirement.
6. a kind of assembling body of wall of installing in major structure of construction side support formula according to claim 4,
It is characterized in that, in the sleeve pipe of crab-bolt, inject basic matterial, nailing or other steel connector in protection crab-bolt meet life requirement.
7. according to claim 1,2, one of 4~6 described a kind of assembling bodies of wall of installing in major structure of construction side support formula,
It is characterized in that, between the prefabricated panel of described assembling body of wall, seam is flexible joint,
At seam crossing, adhesives is installed, adhesives is by bonding both sides prefabricated panel connection; Adhesives energy transmission internal force, seam crossing adhesives also has the ability that adapts to certain distortion, forms a kind of flexible joint structure of assembling body of wall.
8. a kind of assembling body of wall of installing in major structure of construction side support formula according to claim 3,
It is characterized in that, the prefabricated panel seam of described assembling body of wall is flexible joint,
At seam crossing, adhesives is installed, adhesives is by bonding both sides prefabricated panel connection; Adhesives energy transmission internal force, seam crossing adhesives also has the ability that adapts to certain distortion, forms a kind of flexible joint structure of assembling body of wall.
CN201310123623.3A 2013-01-28 2013-04-11 Assembled wall assembled on side of main building structure in held manner Pending CN103967164A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310123623.3A CN103967164A (en) 2013-01-28 2013-04-11 Assembled wall assembled on side of main building structure in held manner

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201310030545 2013-01-28
CN201310030545.2 2013-01-28
CN201310123623.3A CN103967164A (en) 2013-01-28 2013-04-11 Assembled wall assembled on side of main building structure in held manner

Publications (1)

Publication Number Publication Date
CN103967164A true CN103967164A (en) 2014-08-06

Family

ID=51237129

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310123623.3A Pending CN103967164A (en) 2013-01-28 2013-04-11 Assembled wall assembled on side of main building structure in held manner

Country Status (1)

Country Link
CN (1) CN103967164A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017031627A1 (en) * 2015-08-21 2017-03-02 陈敬全 Assembled building structure, wallboard installation hanger, and assembled building construction method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6427407B1 (en) * 1999-03-31 2002-08-06 Soloflex, Inc. Modular building panels and method of constructing walls from the same
US6519907B1 (en) * 1997-03-25 2003-02-18 Karl-Heinz Weissinger Frame section to be used as a modular structural element for buildings, method for the production thereof
CN1423022A (en) * 2001-12-04 2003-06-11 胡永生 Building wall in-situ assembling construction method
CN101082339A (en) * 2007-07-03 2007-12-05 浙江大学 Screw rod line of screw air compressor
CN101550734A (en) * 2009-05-06 2009-10-07 东莞市彩丽建筑维护技术有限公司 Heat preserving, energy-conserving and water proofing and drainage method for construction external wall
CN201687102U (en) * 2010-06-04 2010-12-29 北京万科企业有限公司 Assembled integral type shear wall structure system
CN201924481U (en) * 2011-01-04 2011-08-10 胡永忠 Sandwich self-thermal-insulation external wall
CN102425265A (en) * 2011-09-10 2012-04-25 威海建设集团股份有限公司 High-performance composite wallboard, manufacturing method thereof, and installation method thereof
CN102535739A (en) * 2012-03-05 2012-07-04 沈汉杰 Prefabricated module board body and outer wall system of curtain wall type building as well as construction method of outer wall system
CN102561553A (en) * 2012-03-05 2012-07-11 河北联合大学 Prefabricated concrete-filled steel tube frame-shear wall and construction method thereof

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6519907B1 (en) * 1997-03-25 2003-02-18 Karl-Heinz Weissinger Frame section to be used as a modular structural element for buildings, method for the production thereof
US6427407B1 (en) * 1999-03-31 2002-08-06 Soloflex, Inc. Modular building panels and method of constructing walls from the same
CN1423022A (en) * 2001-12-04 2003-06-11 胡永生 Building wall in-situ assembling construction method
CN101082339A (en) * 2007-07-03 2007-12-05 浙江大学 Screw rod line of screw air compressor
CN101550734A (en) * 2009-05-06 2009-10-07 东莞市彩丽建筑维护技术有限公司 Heat preserving, energy-conserving and water proofing and drainage method for construction external wall
CN201687102U (en) * 2010-06-04 2010-12-29 北京万科企业有限公司 Assembled integral type shear wall structure system
CN201924481U (en) * 2011-01-04 2011-08-10 胡永忠 Sandwich self-thermal-insulation external wall
CN102425265A (en) * 2011-09-10 2012-04-25 威海建设集团股份有限公司 High-performance composite wallboard, manufacturing method thereof, and installation method thereof
CN102535739A (en) * 2012-03-05 2012-07-04 沈汉杰 Prefabricated module board body and outer wall system of curtain wall type building as well as construction method of outer wall system
CN102561553A (en) * 2012-03-05 2012-07-11 河北联合大学 Prefabricated concrete-filled steel tube frame-shear wall and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017031627A1 (en) * 2015-08-21 2017-03-02 陈敬全 Assembled building structure, wallboard installation hanger, and assembled building construction method

Similar Documents

Publication Publication Date Title
WO2021253808A1 (en) Building technique for low-carbon society in high-technology era
CN100464043C (en) Bound-type composite heat-insulation wall with support body
CN201037279Y (en) Exterior wall prefabricated wall board
WO2010105496A1 (en) External heat preservation composite wall of exterior wall with support
CN202611016U (en) Thermal insulating wall on concrete overhanging eaves board
CN203684460U (en) Assembled wall
CN101936046A (en) Heat preservation composite wall provided with meshed plaster on two sides
CN203174810U (en) Bearing-and-leaning type installed assembly wall body
CN103590511A (en) Bearing-reclining-type mounted assembly-type wall
CN207376869U (en) The high fireproof thermal insulation wall board of flexible connection
CN101881053A (en) Hole heat insulation break bridge structure of composite heat-preservation wall door and window
CN104234256A (en) Energy-saving heat-insulating wall body
WO2012119479A1 (en) Outer insulating composite wall of outer wall
CN104420549A (en) Prefabricated heat insulation board
WO2013155869A1 (en) Assemblable wall
CN205369593U (en) Fire prevention sound insulation heat preservation antidetonation wall body
CN203034652U (en) Curtain wall integrating fireprotection and heat preservation
CN104420556A (en) Assembly type energy-saving wall
CN209603296U (en) A kind of assembly concrete building prefabrication exterior wall connecting structure
CN202170580U (en) Compound thermal insulation wall for building
CN209277343U (en) A kind of multi-functional complex heat-preservation exempts to tear exterior sheathing open
CN208415678U (en) Active low energy consumption precast concrete truss structure wall
CN103374980A (en) Block-insulated wall on concrete overhang plate
CN103967164A (en) Assembled wall assembled on side of main building structure in held manner
CN201952918U (en) Door and window hole heat insulation break bridge structure for composite heat insulation wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140806

WD01 Invention patent application deemed withdrawn after publication