EP0943745A2 - Anchoring device for a tension bar in a reinforced concrete mass - Google Patents

Anchoring device for a tension bar in a reinforced concrete mass Download PDF

Info

Publication number
EP0943745A2
EP0943745A2 EP99810233A EP99810233A EP0943745A2 EP 0943745 A2 EP0943745 A2 EP 0943745A2 EP 99810233 A EP99810233 A EP 99810233A EP 99810233 A EP99810233 A EP 99810233A EP 0943745 A2 EP0943745 A2 EP 0943745A2
Authority
EP
European Patent Office
Prior art keywords
holder
rod
opening
parts
protective tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP99810233A
Other languages
German (de)
French (fr)
Other versions
EP0943745A3 (en
EP0943745B1 (en
Inventor
Giulio Albanese
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP0943745A2 publication Critical patent/EP0943745A2/en
Publication of EP0943745A3 publication Critical patent/EP0943745A3/en
Application granted granted Critical
Publication of EP0943745B1 publication Critical patent/EP0943745B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/08Members specially adapted to be used in prestressed constructions
    • E04C5/12Anchoring devices

Definitions

  • the invention relates to a device for anchoring a tie rod in a reinforced concrete mass, with one for laying and fastening on the Reinforcement provided holder element, the tie rod the holder element penetrates and through the holder element at a predetermined angle is held to the support plane of the holder element.
  • Single-sided concrete walls are made with the help of trestles.
  • the up for complete hardening of the concrete mass to be picked up from the trestles Concrete pressure is introduced into the ground via tension rods.
  • the Tension rod via a holder plate tied to the upper reinforcement layer fixed for concreting.
  • the holder plate has a correspondingly angled V-shaped Middle part on.
  • This guide part enables a stable position and direction Installation of the tie rod.
  • the disadvantage of this anchoring device is that in addition to the holder plate, a separate guide sleeve for the tie rod must be provided, mainly due to the increase of the production costs for the anchoring device.
  • the invention is therefore based on the object of a device at the outset to create the type mentioned, which overcomes the aforementioned disadvantages, is inexpensive to manufacture and easy to use position and directionally stable installation of a tie rod enables.
  • the holder element leads to the achievement of the object according to the invention consists of two holder parts, at least a first holder part one for Implementation of the tie rod provided opening, the opening width is selected in at least one direction so that the maximum possible Tilt angle of the tie rod corresponds to the installation angle, and where the second holder part is arranged at a distance from the opening in the first holder part Stop for fixing the tension rod in the specified installation angle having.
  • At least those holder parts which have openings as plate-shaped flat parts designed, wherein the holder element preferably from a single Flat part blank is shaped.
  • the second one Holder part also an opening provided for the passage of the tie rod on.
  • the stop for fixing the tie rod in the predetermined installation angle formed by part of the opening are the plate-shaped flat parts in this embodiment arranged parallel to each other, so that openings of the same dimension can be arranged. Basically, however the two holder parts in a wide range at any angle to each other stand.
  • the plate-shaped flat parts are essentially vertical arranged to each other.
  • the second holder part is preferably made of Part of the first holder part is punched out and out of the support plane of the holder element bent into its final position.
  • the two are Holder parts formed from rod or wire material
  • the holder element is preferably formed from a single bar or wire blank.
  • the main advantage of the holder element according to the invention over The holder plates according to the prior art is that the holder parts in a simple way for screwing a tie rod into the holder element can be prepared by just the shape of the openings in the holder parts and, if necessary, the mutual distance between the two openings in the holder parts to the thread of a screwable into the holder element Must be adjusted.
  • the invention Device penetrates one provided for receiving the tie rod Protection tube the openings in the holder parts and is non-positive in these and held in the specified installation angle via the stop.
  • the Protective tube is put together a sleeve-shaped anchoring element, this anchoring element on the one hand a threaded part for a this usable tie rod and on the other hand an anchoring part for Remains in the concrete mass.
  • any materials can be used to manufacture the holder element are used, which meet the requirements regarding deformability, mechanical strength and corrosion resistance.
  • a preferred one Material is steel, but there are also designs in, for example Plastic or composite materials possible.
  • Anchoring device with a protective tube are the openings in the holder parts designed so that the standardized and on construction sites Spacer tubes usually used in the inventive Holder element can be used and the specified installation angle without further measures.
  • the outside diameter is the same of the sleeve-shaped anchoring element in the area of it Plug connection with the protective tube the inside diameter of the standardized Spacer tubes adapted. This has the advantage of being a standard spacer tube in the anchoring element according to the invention without further ado Protection tube can be used.
  • a holder element 10 for a tie rod 12 shown in FIGS. 1 to 3 or for a protective tube 14 provided for receiving a tension rod has a strip-shaped support plate 16. Approximately in the middle of a longitudinal side edge the support plate 16 protrudes at right angles to this and with a Inclination according to the axial direction z of the tie rod 12 or a protective strip 14 from a side strip 18. The free end of the side strip 18 is bent at right angles to a holder strip 20, so that it is cross-sectional results in a C-shaped profile, the support plate 16 and the holder strips 20 are parallel to each other.
  • an opening 22, 24 is arranged for the passage of the tie rod 12 and the protective tube 14, respectively.
  • the dimension of the openings 22, 24 at a distance from one another is selected such that the tension rod 12 or the protective tube 14 inserted into the holder element 10 assumes the maximum possible angle of inclination and is thus held in the holder element 10 in a positive and / or non-positive manner .
  • the maximum possible installation angle of the tension rod 12 or the protective tube 14 corresponds to the predetermined installation angle ⁇ with respect to a support plane E defined by the support plate 16.
  • the shape and the dimension of the two openings 22, 24 can vary within wide limits.
  • the opening width in the direction of inclination is decisive for setting the installation angle ⁇ ; this is corresponding to the installation angle ⁇ to be set larger than the diameter D of the tension rod 12 or the protective tube 14.
  • the shape of the opening 22, 24 is, for example, an ellipse, the small diameter Y of which essentially corresponds to the diameter D of the tension rod 12 or the protective tube 14 corresponds and whose large diameter X is selected so that the desired installation angle ⁇ between the rod or protective tube axis z and the support plane E is obtained.
  • strip-shaped platen 16 are to facilitate tying the holder plate 10 on a reinforcement layer longitudinal slots 26 for Carrying iron trusses arranged.
  • the strip-shaped Platen 16 at one end to form the side stripe 18 and the holder strip 20 bent twice at right angles.
  • the support plate is also here 16 and the holder strip 20 arranged parallel to each other.
  • the location of the openings 22, 24 corresponds to that of FIG. 1.
  • a holder element 10 shown in FIG. 5 is made of a sheet metal blank to form a U-shaped cross section with parallel mutually standing leg strips 28, 30 are formed.
  • openings 32, 34 are arranged in pairs. These openings 32, 34 can have the same or different dimensions in pairs and also define different installation angles ⁇ . This makes it possible only holder element for tie rods 12 or protective tubes 14 different To provide diameters. It should be noted here that for a screw-in tie rod, the shape of the openings and, if applicable, mutual distance of the openings can be easily adjusted can.
  • FIG. 6 shows a holder element 10 in which the strip-shaped support plate 16 is bent at the end to the holder strip 20.
  • the tie rod 12 or that Protective tube 14 penetrates the opening 22 in the support plate 16 and is from Holder strip 20, the free end of which forms a stop 36, in its Installation angle a corresponding maximum inclination angle fixed.
  • FIG. 7 is the same in the embodiment of a holder element 10 according to FIG Way as in the embodiment according to FIGS. 1 to 3 on the platen 16 approximately in the middle of one of its longitudinal edges of the side strips 18 below Formation of a stop strip 42 bent twice at right angles.
  • This Embodiment corresponds essentially to that of FIGS. 1 to 3, wherein however, only the opening 22 is present in the platen and the holder strip 20 with opening 24 on the minimally required stop strips 42, whose one longitudinal edge forms the stop 36 has been reduced.
  • Fig. 8 is a modification of the holder element of Fig. 7, wherein the stop strip 42 chosen so wide and positioned is that it has two stops 36a, b for the two possible tilt positions the tension rod 12 or the protective tube 14 offers.
  • this Holder element can thus be a tension rod 12 penetrating opening 22 or a protective tube 14 can be positioned in two different directions.
  • holder element 8 modified variant is instead of the wide stop strip 42 a holder part with two differently dimensioned openings for example for a tie rod and a protective tube.
  • the opening 22 in the holder part 16 is dimensioned in this case so that it forms a stop for both a tie rod and a protective tube.
  • FIGS. 9 to 11 10 are two instead of a strip-shaped support plate 16
  • Support strips 38, 40 are provided.
  • a first support strip 38 protrudes from the side strip in one direction in the support plane E.
  • the second support strip 40 is with the side strip 18 via a stop strip 42 forming connecting web and protrudes into the first contact strip 38 opposite direction in the support plane E.
  • From the hard shoulder 18 protrudes at right angles from the holder strip 20 with the opening 24.
  • An in the opening 24 inserted tie rod 12 or a protective tube 14 is from Stop 42 in its inclined position predetermined by opening 24 Formation of the installation angle a held non-positively.
  • the support strips 38, 40 rising from the support level E are on their Roughened upper edge or provided with teeth 44. This gives a better position stabilization of the holder element 10, if this with Iron trusses are tied to a reinforcement. Of course you can the support strips 38, 40 also with slots or holes for implementation be provided by iron binders.
  • the embodiment variant of a holder element 10 shown in FIG. 12 is from a wire or rod 46 formed.
  • a first support loop 48 forms the support plane E.
  • An additional turn delimits an opening 50 for Implementation of a tie rod 12 or a protective tube 14.
  • the wire or the rod 46 is to a further holder loop 52 as a second opening formed at a distance a from the first opening 50.
  • 12 is readily understandable that instead of a closed holder loop 52, a stop for fixing the tension rod 12 or the protective tube 14 in its maximum, the inclination corresponding to the installation angle ⁇ is sufficient.
  • Opening loops for the passage of a tie rod or a protective tube to arrange, such as above in connection with that of Fig. 8 modified embodiment is described.
  • FIGS. 1 to 12 and 14 and 15 represent only a small selection from a large number of possible variations a holder element with two openings or one opening and a stop for fixing a tie rod or a protective tube represents.
  • an anchoring device shown in FIG. 13 1 is a protective tube 14 made of plastic inserted into the openings 22, 24 in the support plate 16 or in the holder strip 20.
  • An anchoring element 56 with a threaded part 58 and one Anchoring part 60 is inserted into protective tube 14 at one end.
  • the tie rod 12 passes through the protective tube 14 and is with the threaded part 58 of the anchoring element 56 screwed.
  • the free end of the protective tube 14 is a closure cap 62 is placed. From the inner wall of the cap 62 protrudes an integrally molded flexible and tapering inward trained sealing ring 64 from, the clear width about the core diameter of the tie rod 12 used corresponds.
  • an opening for the tie rod 10 to be used later closing plug 66 may be provided as a lid.
  • the anchoring element 56 is positioned before the pouring the concrete mass 68 by tying the holder element 10 to the upper Reinforcement layer 54 of reinforcement.
  • the holder member 10 can Slots 26 are tied in the platen 16.
  • a wall formwork created and supported on trestles After pouring and hardening the concrete mass 68, a wall formwork created and supported on trestles.
  • the trestles are in in a known manner via the tie rod protruding from the concrete mass 68 12 anchored. It is particularly important that the tension rod in an angle of 45 ° to the foundation is built in, because of the manufacturing the concrete pressure on the wall is anchored in the floor slab or must be introduced into the foundation. Because the dimension of Openings 22, 24 in the support plate 16 and in the holder strip 20 are selected in this way is that an inserted tie rod or a protective tube with the support level E of the support plate 16 the predetermined angle ⁇ of 45 °, for example forms, the angle of inclination of the protective tube 14 to the foundation professional arrangement of the holder element also 45 °. After making the wall becomes the tie rod 12 from the anchoring element 56 unscrewed and can be used again. That in the concrete mass 68 Protective tube 14 remaining is then cut off at ground level.
  • a second holder part 70 is partially punched out of the strip-shaped support plate 16 and at right angles leaving an opening 72 in the platen 16 bent over to this.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The bracket (10) has a two-part construction, at least one part (16) containing an opening (22,24) for a tension rod (12) to be passed through, and the other part (20) including a stop for fixing the rod in a preselected angle relative to the bracket plane. The width of the tension rod opening in at least one direction (X) is chosen to provide the maximum tension rod angle.

Description

Die Erfindung betrifft eine Vorrichtung zur Verankerung eines Spannstabes in einer bewehrten Betonmasse, mit einem zur Auflage und Befestigung auf der Bewehrung vorgesehenen Halterelement, wobei der Spannstab das Halterelement durchdringt und durch das Halterelement in einem vorgegebenen Winkel zur Auflageebene des Halterelementes gehalten ist.The invention relates to a device for anchoring a tie rod in a reinforced concrete mass, with one for laying and fastening on the Reinforcement provided holder element, the tie rod the holder element penetrates and through the holder element at a predetermined angle is held to the support plane of the holder element.

Einhäuptige Betonwände werden mit Hilfe von Stützböcken hergestellt. Der bis zum vollständigen Aushärten der Betonmasse von den Stützböcken aufzunehmende Betondruck wird über Spannstäbe in den Boden eingeleitet.Single-sided concrete walls are made with the help of trestles. The up for complete hardening of the concrete mass to be picked up from the trestles Concrete pressure is introduced into the ground via tension rods.

Bei der Verankerung von Stützböcken in Bodenplatten oder Fundamenten ist der lage- und richtungsstabile Einbau der Verankerungsteile von wesentlicher Bedeutung. Insbesondere muss streng darauf geachtet werden, dass der üblicherweise mit einem Verankerungselement bestückte Spannstab in einem Winkel von 45° zur Ebene der Bodenplatte bzw. des Fundamentes eingebaut wird.When anchoring trestles in floor slabs or foundations the positionally and directionally stable installation of the anchoring parts is essential Meaning. In particular, care must be taken to ensure that the usual tension rod equipped with an anchoring element in one Angle of 45 ° to the level of the base plate or the foundation installed becomes.

Bei einer aus DE-C-42 34 892 bekannten Verankerungsvorrichtung wird der Spannstab über eine auf der oberen Bewehrungslage festgebundene Halterplatte zum Einbetonieren fixiert. Zur Einhaltung des genannten Einbauwinkels von 45° weist die Halterplatte einen entsprechend abgewinkelten V-förmigen Mittelteil auf. In einer der beiden Schenkelteile des V-förmigen Mittelteils ist eine den Schenkelteil durchsetzende Hülse zur Durchführung des Spannstabes eingesetzt. Dieses Führungsteil ermöglicht einen lage- und richtungsstabilen Einbau des Spannstabes. Der Nachteil dieser Verankerungsvorrichtung liegt darin, dass zusätzlich zur Halterplatte eine separate Führungshülse für den Spannstab bereitgestellt werden muss, was sich vor allem auf die Erhöhung der Gestehungskosten für die Verankerungsvorrichtung auswirkt.In an anchoring device known from DE-C-42 34 892 the Tension rod via a holder plate tied to the upper reinforcement layer fixed for concreting. To maintain the specified installation angle of 45 °, the holder plate has a correspondingly angled V-shaped Middle part on. In one of the two leg parts of the V-shaped middle part a sleeve passing through the leg part for carrying out the tension rod used. This guide part enables a stable position and direction Installation of the tie rod. The disadvantage of this anchoring device is that in addition to the holder plate, a separate guide sleeve for the tie rod must be provided, mainly due to the increase of the production costs for the anchoring device.

Bei einer anderen, ebenfalls aus DE-C-42 34 892 bekannten Verankerungsvorrichtung ist anstelle des V-förmigen Mittelteils an der Halterplatte ein Führungsrohr für den Spannstab im vorgegebenen Einbauwinkel angesetzt. Ein wesentlicher Nachteil dieser Ausführungsform liegt darin, dass das Führungsrohr in einem separaten, zusätzliche Kosten verursachenden Arbeitsgang an die Halterplatte angesetzt werden muss. Zudem ist das Einschrauben eines Gewindestabes nur möglich, wenn ein Führungsrohr mit entsprechendem Innengewinde bzw. mit einem speziellen Gewindeeinsatz verwendet wird. Hinzu kommt, dass es bei starker Verschmutzung des Führungsrohres, wenn beispielsweise Betonmasse in das Rohrinnere eindringt, praktisch nicht mehr möglich ist, einen Spannstab ohne vorgängige mühsame Reinigung einzuführen oder gar einzuschrauben.In another anchoring device, also known from DE-C-42 34 892 is a guide tube instead of the V-shaped middle part on the holder plate for the tie rod in the specified installation angle. An essential one The disadvantage of this embodiment is that the guide tube in a separate, additional costly operation on the holder plate must be applied. In addition, screwing in a threaded rod only possible if a guide tube with a corresponding internal thread or used with a special thread insert. Come in addition, that if the guide tube is very dirty, for example Concrete mass penetrates into the pipe interior, is practically no longer possible Inserting the tension rod without prior laborious cleaning or even screw in.

Der Erfindung liegt deshalb die Aufgabe zugrunde, eine Vorrichtung der eingangs genannten Art zu schaffen, welche die vorerwähnten Nachteile überwindet, kostengünstig in der Herstellung ist und bei einfacher Handhabung einen lage- und richtungsstabilen Einbau eines Spannstabes ermöglicht.The invention is therefore based on the object of a device at the outset to create the type mentioned, which overcomes the aforementioned disadvantages, is inexpensive to manufacture and easy to use position and directionally stable installation of a tie rod enables.

Zur erfindungsgemässen Lösung der Aufgabe führt, dass das Halterelement aus zwei Halterteilen besteht, wobei zumindest ein erster Halterteil eine zur Durchführung des Spannstabes vorgesehene Öffnung aufweist, deren Öffnungsweite in zumindest einer Richtung so gewählt ist, dass der maximal mögliche Neigungswinkel des Spannstabes dem Einbauwinkel entspricht, und wobei der zweite Halterteil einen in Abstand zur Öffnung im ersten Halterteil angeordneten Anschlag zur Fixierung des Spannstabes im vorgegebenen Einbauwinkel aufweist.The holder element leads to the achievement of the object according to the invention consists of two holder parts, at least a first holder part one for Implementation of the tie rod provided opening, the opening width is selected in at least one direction so that the maximum possible Tilt angle of the tie rod corresponds to the installation angle, and where the second holder part is arranged at a distance from the opening in the first holder part Stop for fixing the tension rod in the specified installation angle having.

Mit dem erfindungsgemässen Halterelement ergeben sich bezüglich des lage- und richtungsstabilen Einbaus eines Spannstabes die gleichen Vorteile wie mit einem Führungsrohr, jedoch ohne die Nachteile einer erschwerten Handhabung bei Verschmutzung.With the holder element according to the invention, and directionally stable installation of a tie rod the same advantages as with a guide tube, but without the disadvantages of difficult handling when dirty.

Bei einer ersten bevorzugten Ausführungsform der Erfindung sind zumindest diejenigen Halterteile, welche Öffnungen aufweisen, als plattenförmige Flachteile ausgestaltet, wobei das Halterelement bevorzugt aus einem einzigen Flachteilzuschnitt geformt ist.In a first preferred embodiment of the invention, at least those holder parts which have openings as plate-shaped flat parts designed, wherein the holder element preferably from a single Flat part blank is shaped.

Bei einer besonders stabilen Ausführungsform der Erfindung weist der zweite Halterteil ebenfalls eine zur Durchführung des Spannstabes vorgesehene Öffnung auf. In diesem Fall wird der Anschlag zur Fixierung des Spannstabes im vorgegebenen Einbauwinkel von einem Teil der Öffnung gebildet. Zweck-mässigerweise sind bei dieser Ausführungsform die plattenförmigen Flachteile parallel zueinander angeordnet, so dass in beiden Halterteilen Öffnungen der gleichen Dimension angeordnet werden können. Grundsätzlich können jedoch die beiden Halterteile in einem weiten Bereich in einen beliebigen Winkel zueinander stehen.In a particularly stable embodiment of the invention, the second one Holder part also an opening provided for the passage of the tie rod on. In this case, the stop for fixing the tie rod in the predetermined installation angle formed by part of the opening. Appropriately are the plate-shaped flat parts in this embodiment arranged parallel to each other, so that openings of the same dimension can be arranged. Basically, however the two holder parts in a wide range at any angle to each other stand.

Bei einer einfachen und daher kostengünstig herzustellenden Ausführungsform der Erfindung sind die plattenförmigen Flachteile im wesentlichen senkrecht zueinander angeordnet. Hierbei ist der zweite Halterteil bevorzugt aus dem ersten Halterteil teilweise ausgestanzt und aus der Auflageebene des Halterelementes in seine Endlage umgebogen.In a simple and therefore inexpensive embodiment According to the invention, the plate-shaped flat parts are essentially vertical arranged to each other. Here, the second holder part is preferably made of Part of the first holder part is punched out and out of the support plane of the holder element bent into its final position.

Bei einer zweiten bevorzugten Ausführungsform der Erfindung sind die beiden Halterteile aus Stangen- oder Drahtmaterial geformt, wobei das Halterelement bevorzugt aus einem einzigen Stangen- oder Drahtzuschnitt geformt ist.In a second preferred embodiment of the invention, the two are Holder parts formed from rod or wire material, the holder element is preferably formed from a single bar or wire blank.

Der wesentliche Vorteil des erfindungsgemässen Halterelementes gegenüber den Halterplatten nach dem Stand der Technik liegt darin, dass die Halterteile auf einfache Weise für das Einschrauben eines Spannstabes in das Halterelement vorbereitet werden können, indem lediglich die Form der Öffnungen in den Halterteilen sowie ggf. der gegenseitige Abstand der beiden Öffnungen in den Halterteilen an das Gewinde eines in das Halterelement einschraubbaren Spannstabes angepasst werden müssen.The main advantage of the holder element according to the invention over The holder plates according to the prior art is that the holder parts in a simple way for screwing a tie rod into the holder element can be prepared by just the shape of the openings in the holder parts and, if necessary, the mutual distance between the two openings in the holder parts to the thread of a screwable into the holder element Must be adjusted.

Bei einer besonders zweckmässigen Ausgestaltung der erfindungsgemässen Vorrichtung durchdringt ein zur Aufnahme des Spannstabes vorgesehenes Schutzrohr die Öffnungen in den Halterteilen und ist in diesen kraftschlüssig und über den Anschlag im vorgegebenen Einbauwinkel gehalten. Mit dem Schutzrohr ist ein hülsenförmiges Verankerungselement zusammengesteckt, wobei dieses Verankerungselement einerseits einen Gewindeteil für einen in diesen einsetzbaren Spannstab und andererseits einen Verankerungsteil zum Verbleib in der Betonmasse aufweist. Durch die Verwendung dieser Anordnung mit einem Schutzrohr kann das Einsetzen eines Spannstabes nach erfolgtem Einbetonieren erfolgen. Dadurch wird die Unfallgefahr auf Baustellen infolge der nach dem Stand der Technik direkt einbetonierten und demzufolge frei aufragenden Spannstäbe erheblich reduziert. Zudem entfällt das umständliche Abtrennen der Spannstäbe mittels einer Trennscheibe nach dem Einbetonieren, da die Spannstäbe bei Verwendung des Schutzrohres einfach herausgedreht und wieder verwendet werden können.In a particularly expedient embodiment of the invention Device penetrates one provided for receiving the tie rod Protection tube the openings in the holder parts and is non-positive in these and held in the specified installation angle via the stop. With the Protective tube is put together a sleeve-shaped anchoring element, this anchoring element on the one hand a threaded part for a this usable tie rod and on the other hand an anchoring part for Remains in the concrete mass. By using this arrangement with a protective tube, the insertion of a tie rod after the Set in concrete. This will result in the risk of accidents on construction sites that directly concreted in according to the state of the art and consequently freely towering Tension rods significantly reduced. In addition, the cumbersome Cutting off the tension rods using a cutting disc after concreting in, because the tension rods are simply unscrewed when using the protective tube and can be used again.

Zum Schutz gegen das Eindringen von noch flüssiger Betonmasse ist dem freien Ende des Schutzrohres bevorzugt eine Verschlusskappe aufgesetzt, wobei bei einer besonders bevorzugten Variante im Innern der Verschlusskappe ein nach innen gerichteter und einem in den Gewindeteil eingesetzten und das Schutzrohr sowie die aufgesetzte Verschlusskappe durchdringenden Spannstab anliegender Dichtungsring angeordnet ist. Wird das Verankerungselement ohne in den Gewindeteil eingesetzten Spann- oder Ankerstab einbetoniert, d.h. wird der Ankerstab erst nach erfolgtem Einbetonieren in das Verankerungselement eingeschraubt, so kann zum Verschliessen der Öffnung am freien Ende der aufgesetzten Verschlusskappe ein Verschlusszapfen eingesetzt werden. Weitere zur Verwendung mit dem erfindungsgemässen Verankerungselement bevorzugte Verschlusskappen sind beispielsweise der DE-U-9314656 zu entnehmen.This is to protect against the penetration of still liquid concrete free end of the protective tube preferably placed a cap, wherein in a particularly preferred variant inside the cap one inward and one inserted in the threaded part and that Protective tube and the tension rod penetrating the cap adjacent sealing ring is arranged. Becomes the anchoring element Concreted without tension or anchor rod inserted in the threaded part, i.e. the anchor rod is only after concreting into the anchoring element screwed in so that the opening can be closed at the open A plug is inserted at the end of the cap become. Others for use with the anchoring element according to the invention preferred caps are for example DE-U-9314656 refer to.

Grundsätzlich können für die Herstellung des Halterelementes beliebige Werkstoffe eingesetzt werden, welche die Anforderungen bezüglich Verformbarkeit, mechanischer Festigkeit sowie Korrosionsbeständigkeit erfüllen. Ein bevorzugter Werkstoff ist Stahl, jedoch sind auch Ausführungen in beispielsweise Kunststoff oder Verbundmaterialien denkbar.In principle, any materials can be used to manufacture the holder element are used, which meet the requirements regarding deformability, mechanical strength and corrosion resistance. A preferred one Material is steel, but there are also designs in, for example Plastic or composite materials possible.

Bei einer besonders zweckmässigen Ausführungsform der erfindungsgemässen Verankerungsvorrichtung mit einem Schutzrohr sind die Öffnungen in den Halterteilen derart ausgestaltet, dass die standardisierten und auf Baustellen üblicherweise verwendeten Distanzrohre in das erfindungsgemässe Halterelement eingesetzt werden können und sich der vorgegebene Einbauwinkel ohne weitere Massnahmen einstellt. In gleicher Weise ist der Aussen-durchmesser des hülsenförmigen Verankerungselementes im Bereich seiner Steckverbindung mit dem Schutzrohr dem Innendurchmesser der standardisierten Distanzrohre angepasst. Dies hat den Vorteil, dass ein Standard-Distanzrohr beim erfindungsgemässen Verankerungselement ohne weiteres als Schutzrohr verwendet werden kann.In a particularly expedient embodiment of the invention Anchoring device with a protective tube are the openings in the holder parts designed so that the standardized and on construction sites Spacer tubes usually used in the inventive Holder element can be used and the specified installation angle without further measures. The outside diameter is the same of the sleeve-shaped anchoring element in the area of it Plug connection with the protective tube the inside diameter of the standardized Spacer tubes adapted. This has the advantage of being a standard spacer tube in the anchoring element according to the invention without further ado Protection tube can be used.

Weitere Vorteile, Merkmale und Einzelheiten der Erfindung ergeben sich aus der nachfolgenden Beschreibung bevorzugter Ausführungsbeispiele sowie anhand der Zeichnung; diese zeigt schematisch in

  • Fig. 1 ein Schrägsicht auf eine erste Ausführungsform eines Halterelementes;
  • Fig. 2 eine Seitenansicht des Halterelementes von Fig. 1 in Blickrichtung y;
  • Fig. 3 eine Seitenansicht des Halterelementes von Fig. 1 in Blickrichtung x;
  • Fig. 4 eine Seitenansicht einer zweiten Ausführungsform eines Halterelementes;
  • Fig. 5 eine Schrägsicht auf eine dritte Ausführungsform eines Halterelementes;
  • Fig. 6 eine Seitenansicht einer vierten Ausführungsform eines Halterelementes;
  • Fig. 7 eine Schrägsicht auf eine fünfte Ausführungsform eines Halterelementes;
  • Fig. 8 eine Seitenansicht einer sechsten Ausführungsform eines Halterelementes;
  • Fig. 9 eine Schrägsicht auf eine siebte Ausführungsform eines Halterelementes;
  • Fig. 10 eine Seitenansicht auf das Halterelement von Fig. 9 in Blickrichtung y;
  • Fig. 11 eine Seitenansicht auf das Halterelement von Fig. 9 in Blickrichtung x;
  • Fig. 12 eine Schrägsicht auf eine achte Ausführungsform eines Halterelementes;
  • Fig. 13 eine Seitenansicht einer Verankerungsvorrichtung mit dem Halterelement von Fig. 1;
  • Fig. 14 eine Schrägsicht auf eine neunte Ausführungsform eines Halterelementes;
  • Fig. 15 eine Seitenansicht des Halterelementes von Fig. 14 in Blickrichtung y.
  • Further advantages, features and details of the invention result from the following description of preferred exemplary embodiments and from the drawing; this shows schematically in
  • Figure 1 is an oblique view of a first embodiment of a holder element.
  • FIG. 2 shows a side view of the holder element from FIG. 1 in viewing direction y;
  • FIG. 3 shows a side view of the holder element from FIG. 1 in the viewing direction x;
  • 4 shows a side view of a second embodiment of a holder element;
  • 5 shows an oblique view of a third embodiment of a holder element;
  • 6 shows a side view of a fourth embodiment of a holder element;
  • 7 shows an oblique view of a fifth embodiment of a holder element;
  • 8 shows a side view of a sixth embodiment of a holder element;
  • 9 shows an oblique view of a seventh embodiment of a holder element;
  • FIG. 10 shows a side view of the holder element from FIG. 9 in viewing direction y;
  • FIG. 11 shows a side view of the holder element from FIG. 9 in the viewing direction x;
  • 12 shows an oblique view of an eighth embodiment of a holder element;
  • FIG. 13 shows a side view of an anchoring device with the holder element from FIG. 1; FIG.
  • 14 shows an oblique view of a ninth embodiment of a holder element;
  • FIG. 15 shows a side view of the holder element from FIG. 14 in the direction of view y.
  • Ein in den Fig. 1 bis 3 dargestelltes Halterelement 10 für einen Spannstab 12 bzw. für ein zur Aufnahme eines Spannstabes vorgesehenes Schutzrohr 14 weist eine streifenförmige Auflageplatte 16 auf. Etwa in der Mitte einer Längs-seitenkante der Auflageplatte 16 ragt in rechtem Winkel zu dieser und mit einer Schrägneigung entsprechend der Achsenrichtung z des Spannstabes 12 bzw. des Schutzrohres 14 ein Seitenstreifen 18 ab. Das freie Ende des Seitenstrei-fens 18 ist rechtwinklig zu einem Halterstreifen 20 gebogen, so dass sich quer-schnittlich eine C-förmige Profilierung ergibt, wobei die Auflageplatte 16 und der Halterstreifen 20 einander parallel gegenüber stehen. A holder element 10 for a tie rod 12 shown in FIGS. 1 to 3 or for a protective tube 14 provided for receiving a tension rod has a strip-shaped support plate 16. Approximately in the middle of a longitudinal side edge the support plate 16 protrudes at right angles to this and with a Inclination according to the axial direction z of the tie rod 12 or a protective strip 14 from a side strip 18. The free end of the side strip 18 is bent at right angles to a holder strip 20, so that it is cross-sectional results in a C-shaped profile, the support plate 16 and the holder strips 20 are parallel to each other.

    In der Auflageplatte 16 und im Halterstreifen 20 ist je eine Öffnung 22, 24 zur Durchführung des Spannstabes 12 bzw. des Schutzrohres 14 angeordnet. Die Dimension der in Abstand a zueinander stehenden Öffnungen 22, 24 ist so gewählt, dass der in das Halterelement 10 eingesetzte Spannstab 12 bzw. das Schutzrohr 14 den maximal möglichen Neigungswinkel einnimmt und auf diese Weise im Halterelement 10 form- und/oder kraftschlüssig gehalten wird. Der maximal mögliche Einbauwinkel des Spannstabes 12 bzw. des Schutzrohres 14 entspricht dem vorgegebenen Einbauwinkel α bezüglich einer durch die Auflageplatte 16 definierten Auflageebene E.In the support plate 16 and in the holder strip 20, an opening 22, 24 is arranged for the passage of the tie rod 12 and the protective tube 14, respectively. The dimension of the openings 22, 24 at a distance from one another is selected such that the tension rod 12 or the protective tube 14 inserted into the holder element 10 assumes the maximum possible angle of inclination and is thus held in the holder element 10 in a positive and / or non-positive manner . The maximum possible installation angle of the tension rod 12 or the protective tube 14 corresponds to the predetermined installation angle α with respect to a support plane E defined by the support plate 16.

    Die Form und die Dimension der beiden Öffnungen 22, 24 kann in weiten Grenzen variieren. Zur Einstellung des Einbauwinkels α ist die Öffnungsweite in Neigungsrichtung massgebend; diese ist entsprechend dem einzustellenden Einbauwinkel α grösser als der Durchmesser D des Spannstabes 12 bzw. des Schutzrohres 14. Die Form der Öffnung 22, 24 ist beispielsweise eine Ellipse, deren kleiner Durchmesser Y im wesentlichen dem Durchmesser D des Spannstabes 12 bzw. des Schutzrohres 14 entspricht und deren grosser Durchmes-ser X so gewählt wird, dass sich der gewünschte Einbauwinkel α zwischen Stab- bzw. Schutzrohrachse z und Auflageebene E ergibt.The shape and the dimension of the two openings 22, 24 can vary within wide limits. The opening width in the direction of inclination is decisive for setting the installation angle α ; this is corresponding to the installation angle α to be set larger than the diameter D of the tension rod 12 or the protective tube 14. The shape of the opening 22, 24 is, for example, an ellipse, the small diameter Y of which essentially corresponds to the diameter D of the tension rod 12 or the protective tube 14 corresponds and whose large diameter X is selected so that the desired installation angle α between the rod or protective tube axis z and the support plane E is obtained.

    In der streifenförmigen Auflageplatte 16 sind zur Erleichterung des Festbindens der Halterplatte 10 auf einer Bewehrungslage längslaufende Schlitze 26 zur Durchführung von Eisenbindern angeordnet.In the strip-shaped platen 16 are to facilitate tying the holder plate 10 on a reinforcement layer longitudinal slots 26 for Carrying iron trusses arranged.

    Bei der in Fig. 4 gezeigten Ausführungsform einer Halterplatte 10 ist die streifenförmige Auflageplatte 16 an einem ihrer Enden unter Bildung des Seiten-streifens 18 und des Halterstreifens 20 zweimal rechtwinklig umgebogen. Wie bei der Ausführungsform gemäss den Fig. 1 bis 3 sind auch hier die Auflageplatte 16 und der Halterstreifen 20 parallel zueinander angeordnet. Die Lage der Öffnungen 22, 24 entspricht derjenigen von Fig. 1. In the embodiment of a holder plate 10 shown in Fig. 4, the strip-shaped Platen 16 at one end to form the side stripe 18 and the holder strip 20 bent twice at right angles. How in the embodiment according to FIGS. 1 to 3, the support plate is also here 16 and the holder strip 20 arranged parallel to each other. The location of the openings 22, 24 corresponds to that of FIG. 1.

    Die in Fig. 5 dargestellte Ausführungsform eines Halterelementes 10 ist aus einem Blechzuschnitt unter Bildung eines U-förmigen Querschnitts mit parallel zueinander stehenden Schenkelstreifen 28, 30 geformt. In den Schenkelstreifen 28, 30 sind paarweise Öffnungen 32, 34 angeordnet. Diese Öffnungen 32, 34 können paarweise gleiche oder verschiedene Dimensionen aufweisen und auch unterschiedliche Einbauwinkel α definieren. Dadurch ist es möglich, ein einziges Halterelement für Spannstäbe 12 bzw. Schutzrohre 14 unterschiedlicher Durchmesser zur Verfügung zu stellen. Es sei hier noch angemerkt, dass für einen einschraubbaren Spannstab die Form der Öffnungen sowie ggf. der gegenseitige Abstand der Öffnungen auf einfache Weise angepasst werden kann.The embodiment of a holder element 10 shown in FIG. 5 is made of a sheet metal blank to form a U-shaped cross section with parallel mutually standing leg strips 28, 30 are formed. In the thigh strips 28, 30 openings 32, 34 are arranged in pairs. These openings 32, 34 can have the same or different dimensions in pairs and also define different installation angles α. This makes it possible only holder element for tie rods 12 or protective tubes 14 different To provide diameters. It should be noted here that for a screw-in tie rod, the shape of the openings and, if applicable, mutual distance of the openings can be easily adjusted can.

    Da der maximale Neigungswinkel des Spannstabes 12 bzw. des Schutzrohres 14 durch die Weite einer der beiden Öffnungen 20, 24 bzw. 32, 34 in der Neigungsrichtung vorgegeben ist, ist grundsätzlich eine einzige Öffnung ausreichend. Anstelle einer zweiten Öffnung ist ein Anschlagelement, welches den Spannstab 12 bzw. das Schutzrohr 14 in seiner dem Einbauwinkel α entsprechenden maximalen Neigestellung fixiert. Derartige Ausführungsformen mit einer Öffnung und einem zugehörigen Anschlagelement sind in den Fig. 6 bis 11 dargestellt.Since the maximum angle of inclination of the tie rod 12 or the protective tube 14 through the width of one of the two openings 20, 24 and 32, 34 in the direction of inclination a single opening is generally sufficient. Instead of a second opening is a stop element, which the Tension rod 12 or the protective tube 14 in its corresponding to the installation angle α maximum tilt position fixed. Such embodiments with an opening and an associated stop element are shown in FIGS 11 shown.

    Fig. 6 zeigt ein Halterelement 10, bei dem die streifenförmige Auflageplatte 16 endständig zum Halterstreifen 20 umgebogen ist. Der Spannstab 12 bzw. das Schutzrohr 14 durchdringt die Öffnung 22 in der Auflageplatte 16 und wird vom Halterstreifen 20, dessen freies Ende einen Anschlag 36 bildet, in seinem dem Einbauwinkel a entsprechenden maximalen Neigungswinkel fixiert.6 shows a holder element 10 in which the strip-shaped support plate 16 is bent at the end to the holder strip 20. The tie rod 12 or that Protective tube 14 penetrates the opening 22 in the support plate 16 and is from Holder strip 20, the free end of which forms a stop 36, in its Installation angle a corresponding maximum inclination angle fixed.

    Bei der Ausführungsform eines Halterelementes 10 gemäss Fig. 7 ist in gleicher Weise wie bei der Ausführungsform gemäss den Fig. 1 bis 3 an der Auflageplatte 16 etwa in der Mitte einer ihrer Längskanten der Seitenstreifen 18 unter Bildung eines Anschlagstreifens 42 zweimal rechtwinklig abgebogen. Diese Ausführungsform entspricht im wesentlichen derjenigen der Fig. 1 bis 3, wobei jedoch nur die Öffnung 22 in der Auflageplatte vorhanden ist und der Halterstreifen 20 mit Öffnung 24 auf den minimal erforderlichen Anschlagstreifen 42, dessen eine Längskante den Anschlag 36 bildet, reduziert worden ist.7 is the same in the embodiment of a holder element 10 according to FIG Way as in the embodiment according to FIGS. 1 to 3 on the platen 16 approximately in the middle of one of its longitudinal edges of the side strips 18 below Formation of a stop strip 42 bent twice at right angles. This Embodiment corresponds essentially to that of FIGS. 1 to 3, wherein however, only the opening 22 is present in the platen and the holder strip 20 with opening 24 on the minimally required stop strips 42, whose one longitudinal edge forms the stop 36 has been reduced.

    Die in Fig. 8 gezeigte Ausführungsform ist eine Abwandlung des Halterelementes von Fig. 7, wobei der Anschlagstreifen 42 so breit gewählt und so positioniert ist, dass er zwei Anschläge 36a, b für die beiden möglichen Kippstellungen des Spannstabes 12 bzw. des Schutzrohres 14 anbietet. Bei diesem Halterelement kann somit ein die Öffnung 22 durchdringender Spannstab 12 bzw. ein Schutzrohr 14 in zwei verschiedenen Richtungen positioniert werden.The embodiment shown in Fig. 8 is a modification of the holder element of Fig. 7, wherein the stop strip 42 chosen so wide and positioned is that it has two stops 36a, b for the two possible tilt positions the tension rod 12 or the protective tube 14 offers. With this Holder element can thus be a tension rod 12 penetrating opening 22 or a protective tube 14 can be positioned in two different directions.

    Bei einer in der Zeichnung nicht dargestellten weiteren, vom Halterelement gemäss Fig. 8 abgewandelten Ausführungsvariante ist anstelle des breiten Anschlagstreifens 42 ein Halterteil mit zwei unterschiedlich dimensionierten Öffnungen für beispielsweise einen Spannstab und ein Schutzrohr vorgesehen. Die Öffnung 22 im Halterteil 16 ist in diesem Fall so dimensioniert, dass sie sowohl für einen Spannstab als auch für ein Schutzrohr einen Anschlag bildet.In another, not shown in the drawing, from the holder element 8 modified variant is instead of the wide stop strip 42 a holder part with two differently dimensioned openings for example for a tie rod and a protective tube. The opening 22 in the holder part 16 is dimensioned in this case so that it forms a stop for both a tie rod and a protective tube.

    Bei der in den Fig. 9 bis 11 dargestellten Ausführungsvariante eines Halterelementes 10 sind anstelle einer streifenförmigen Auflageplatte 16 zwei Auflagestreifen 38, 40 vorgesehen. Ein erster Auflagestreifen 38 ragt vom Seitenstreifen in einer Richtung in der Auflageebene E ab. Der zweite Auflagestreifen 40 ist mit dem Seitenstreifen 18 über einen den Anschlagstreifen 42 bildenden Verbindungssteg verbunden und ragt in die dem ersten Auflagestreifen 38 entgegengesetzte Richtung in der Auflageebene E ab. Vom Seitenstreifen 18 ragt rechtwinklig der Halterstreifen 20 mit der Öffnung 24 ab. Ein in die Öffnung 24 eingesetzter Spannstab 12 bzw. ein Schutzrohr 14 wird vom Anschlag 42 in seiner durch die Öffnung 24 vorgegebenen Schräglage unter Bildung des Einbauwinkels a kraftschlüssig gehalten. In the embodiment variant of a holder element shown in FIGS. 9 to 11 10 are two instead of a strip-shaped support plate 16 Support strips 38, 40 are provided. A first support strip 38 protrudes from the side strip in one direction in the support plane E. The second support strip 40 is with the side strip 18 via a stop strip 42 forming connecting web and protrudes into the first contact strip 38 opposite direction in the support plane E. From the hard shoulder 18 protrudes at right angles from the holder strip 20 with the opening 24. An in the opening 24 inserted tie rod 12 or a protective tube 14 is from Stop 42 in its inclined position predetermined by opening 24 Formation of the installation angle a held non-positively.

    Die von der Auflageebene E aufragenden Auflagestreifen 38, 40 sind an ihrer Oberkante aufgerauht bzw. mit einer Zahnung 44 versehen. Dadurch ergibt sich eine bessere Lagestabilisierung des Halterelementes 10, wenn dieses mit Eisenbindern auf einer Bewehrung festgebunden wird. Selbstverständlich können die Auflagestreifen 38, 40 auch mit Schlitzen oder Löchern zur Durchführung von Eisenbindern versehen sein.The support strips 38, 40 rising from the support level E are on their Roughened upper edge or provided with teeth 44. This gives a better position stabilization of the holder element 10, if this with Iron trusses are tied to a reinforcement. Of course you can the support strips 38, 40 also with slots or holes for implementation be provided by iron binders.

    Die in Fig. 12 gezeigte Ausführungsvariante eines Halterelementes 10 ist aus einem Draht bzw. einer Stange 46 geformt. Eine erste Auflageschleife 48 bildet die Auflageebene E. Eine zusätzliche Windung begrenzt eine Öffnung 50 zur Durchführung eines Spannstabes 12 bzw. eines Schutzrohres 14. Der Draht bzw. die Stange 46 ist zu einer weiteren Halterschlaufe 52 als zweite Öffnung im Abstand a zur ersten Öffnung 50 geformt. Aus Fig. 12 ist ohne weiteres verständlich, dass anstelle einer geschlossenen Halterschlaufe 52 ein Anschlag zur Fixierung des Spannstabes 12 bzw. des Schutzrohres 14 in seiner maximalen, dem Einbauwinkel α entsprechenden Schrägneigung ausreichend ist. Selbstverständlich ist es auch möglich, mehrere unterschiedlich dimensionierte Öffnungsschlaufen zur Durchführung eines Spannstabes oder eines Schutzrohres anzuordnen, wie dies beispielsweise oben im Zusammenhang mit der von Fig. 8 abgewandelten Ausführungsform beschrieben ist.The embodiment variant of a holder element 10 shown in FIG. 12 is from a wire or rod 46 formed. A first support loop 48 forms the support plane E. An additional turn delimits an opening 50 for Implementation of a tie rod 12 or a protective tube 14. The wire or the rod 46 is to a further holder loop 52 as a second opening formed at a distance a from the first opening 50. 12 is readily understandable that instead of a closed holder loop 52, a stop for fixing the tension rod 12 or the protective tube 14 in its maximum, the inclination corresponding to the installation angle α is sufficient. Of course, it is also possible to have several different dimensions Opening loops for the passage of a tie rod or a protective tube to arrange, such as above in connection with that of Fig. 8 modified embodiment is described.

    Die in den Fig. 1 bis 12 sowie 14 und 15 dargestellten Ausführungsvarianten stellen nur einen kleinen Ausschnitt aus einer grossen Anzahl von Variationsmöglichkeiten eines Halterelementes mit zwei Öffnungen bzw. einer Öffnung und einem Anschlag zur Fixierung eines Spannstabes bzw. eines Schutzrohres dar.The embodiment variants shown in FIGS. 1 to 12 and 14 and 15 represent only a small selection from a large number of possible variations a holder element with two openings or one opening and a stop for fixing a tie rod or a protective tube represents.

    Bei dem in Fig. 13 dargestellten Ausführungsbeispiel einer Verankerungsvorrichtung mit dem Halterelement von Fig. 1 ist ein Schutzrohr 14 aus Kunststoff in die Öffnungen 22, 24 in der Auflageplatte 16 bzw. im Halterstreifen 20 eingesetzt. Ein Verankerungselement 56 mit einem Gewindeteil 58 und einem Verankerungsteil 60 ist einends in das Schutzrohr 14 eingesteckt. Der Spannstab 12 durchsetzt das Schutzrohr 14 und ist mit dem Gewindeteil 58 des Verankerungselementes 56 verschraubt. Dem freien Ende des Schutzrohres 14 ist eine Verschlusskappe 62 aufgesetzt. Von der Innenwandung der Verschlusskappe 62 ragt ein integral angeformter flexibler und nach innen verjüngend ausgebildeter Dichtungsring 64 ab, dessen lichte Weite etwa dem Kerndurchmesser des eingesetzten Spannstabes 12 entspricht. Wird das Verankerungselement 56 ohne eingesetzten Spannstab 12 einbetoniert, so kann an der Verschlusskappe 62 ein die Öffnung für den später einzusetzenden Spannstab 10 verschliessender Verschlusszapfen 66 als Deckel vorgesehen sein.In the embodiment of an anchoring device shown in FIG. 13 1 is a protective tube 14 made of plastic inserted into the openings 22, 24 in the support plate 16 or in the holder strip 20. An anchoring element 56 with a threaded part 58 and one Anchoring part 60 is inserted into protective tube 14 at one end. The tie rod 12 passes through the protective tube 14 and is with the threaded part 58 of the anchoring element 56 screwed. The free end of the protective tube 14 is a closure cap 62 is placed. From the inner wall of the cap 62 protrudes an integrally molded flexible and tapering inward trained sealing ring 64 from, the clear width about the core diameter of the tie rod 12 used corresponds. Becomes the anchoring element 56 concreted in without inserted tie rod 12, this can be done on the sealing cap 62 an opening for the tie rod 10 to be used later closing plug 66 may be provided as a lid.

    Die Positionierung des Verankerungselementes 56 erfolgt vor dem Aufgiessen der Betonmasse 68 durch Festbinden des Halterelementes 10 auf der oberen Bewehrungslage 54 einer Armierung. Das Halterelement 10 kann über die Schlitze 26 in der Auflageplatte 16 festgebunden werden.The anchoring element 56 is positioned before the pouring the concrete mass 68 by tying the holder element 10 to the upper Reinforcement layer 54 of reinforcement. The holder member 10 can Slots 26 are tied in the platen 16.

    Nach dem Aufgiessen und Aushärten der Betonmasse 68 wird eine Wand-schalung erstellt und über Stützböcke abgestützt. Die Stützböcke werden in bekannter Weise über den aus der Betonmasse 68 herausragenden Spannstab 12 verankert. Hierbei ist es von besonderer Bedeutung, dass der Spannstab in einem Winkel von 45° zum Fundament eingebaut ist, da der bei der Herstellung der Wand auftretende Betondruck über die Verankerung in die Bodenplatte bzw. in das Fundament eingeleitet werden muss. Da die Dimension der Öffnungen 22, 24 in der Auflageplatte 16 und im Halterstreifen 20 so gewählt ist, dass ein eingesetzter Spannstab bzw. ein Schutzrohr mit der Auflageebene E der Auflageplatte 16 den vorgegebenen Winkel α von beispielsweise 45° bildet, beträgt der Neigungswinkel des Schutzrohres 14 zum Fundament bei fachgerechter Anordnung des Halterelementes ebenfalls 45°. Nach der Herstellung der Wand wird der Spannstab 12 aus dem Verankerungselement 56 herausgedreht und kann wieder verwendet werden. Das in der Betonmasse 68 zurückbleibende Schutzrohr 14 wird sodann ebenerdig abgeschnitten.After pouring and hardening the concrete mass 68, a wall formwork created and supported on trestles. The trestles are in in a known manner via the tie rod protruding from the concrete mass 68 12 anchored. It is particularly important that the tension rod in an angle of 45 ° to the foundation is built in, because of the manufacturing the concrete pressure on the wall is anchored in the floor slab or must be introduced into the foundation. Because the dimension of Openings 22, 24 in the support plate 16 and in the holder strip 20 are selected in this way is that an inserted tie rod or a protective tube with the support level E of the support plate 16 the predetermined angle α of 45 °, for example forms, the angle of inclination of the protective tube 14 to the foundation professional arrangement of the holder element also 45 °. After making the wall becomes the tie rod 12 from the anchoring element 56 unscrewed and can be used again. That in the concrete mass 68 Protective tube 14 remaining is then cut off at ground level.

    Bei der in Fig. 4 und 5 gezeigten Ausführungsform einer Halterplatte 10 ist aus der streifenförmigen Auflageplatte 16 ein zweites Halterteil 70 teilweise ausgestanzt und unter Freilassung einer Öffnung 72 in der Auflageplatte 16 rechtwinklig zu dieser umgebogen.In the embodiment of a holder plate 10 shown in FIGS. 4 and 5 is off a second holder part 70 is partially punched out of the strip-shaped support plate 16 and at right angles leaving an opening 72 in the platen 16 bent over to this.

    Claims (13)

    Vorrichtung zur Verankerung eines Spannstabes (12) einer bewehrten Betonmasse (68), mit einem zur Auflage und Befestigung auf der Bewehrung (54) vorgesehenen Halterelement (10), wobei der Spannstab (12) das Halterelement (10) durchdringt und durch das Halterelement (10) in einem vorgegebenen Einbauwinkel (α) zur Auflageebene (E) des Halterelementes (10) gehalten ist,
    dadurch gekennzeichnet, dass
    das Halterelement (10) aus zwei Halterteilen (16,20;28,30;38,40) besteht, wobei zumindest ein erster Halterteil eine zur Durchführung des Spannstabes (12) vorgesehene Öffnung (22,24;32,34;50,52) aufweist, deren Öffnungsweite in zumindest einer Richtung (x) so gewählt ist, dass der maximal mögliche Neigungswinkel des Spannstabes (12) dem Einbauwinkel (α) entspricht, und wobei der zweite Halterteil einen in Abstand (α) zur Öffnung im ersten Halterteil angeordneten Anschlag zur Fixierung des Spannstabes (12) im vorgegebenen Einbauwinkel (α) aufweist.
    Device for anchoring a tie rod (12) of a reinforced concrete mass (68), with a holder element (10) provided for resting and fastening on the reinforcement (54), the tie rod (12) penetrating the holder element (10) and through the holder element ( 10) is held at a predetermined installation angle (α) to the support plane (E) of the holder element (10),
    characterized in that
    the holder element (10) consists of two holder parts (16, 20; 28, 30; 38, 40), at least one first holder part having an opening (22, 24; 32, 34; 50, 52) provided for the passage of the tensioning rod (12) ), the opening width of which is selected in at least one direction (x) such that the maximum possible angle of inclination of the tensioning rod (12) corresponds to the installation angle ( α ), and the second holder part being arranged at a distance (α) from the opening in the first holder part Has stop for fixing the tie rod (12) in the specified installation angle ( α ).
    Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass zumindest Öffnungen aufweisende Halterteile plattenförmige Flachteile sind und das Halterelement bevorzugt aus einem einzigen Flachteilzuschnitt geformt ist.Device according to claim 1, characterized in that at least Holder parts having openings are plate-shaped flat parts and that Holder element preferably formed from a single flat part blank is. Vorrichtung nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass der am zweiten Halterteil angeordnete Anschlag zur Fixierung des Spannstabes (12) im vorgegebenen Einbauwinkel (α) Teil einer Öffnung ist.Apparatus according to claim 1 or 2, characterized in that the stop arranged on the second holder part for fixing the tension rod (12) in the predetermined installation angle ( α ) is part of an opening. Vorrichtung nach Anspruch 2 oder 3, dadurch gekennzeichnet, dass die plattenförmigen Flachteile parallel zueinander angeordnet sind. Device according to claim 2 or 3, characterized in that the plate-shaped flat parts are arranged parallel to each other. Vorrichtung nach Anspruch 2 oder 3, dadurch gekennzeichnet, dass die plattenförmigen Flachteile im wesentlichen senkrecht zueinander angeordnet sind.Device according to claim 2 or 3, characterized in that the plate-shaped flat parts arranged substantially perpendicular to each other are. Vorrichtung nach Anspruch 5, dadurch gekennzeichnet, dass der zweite Halterteil (70) aus dem ersten Halterteil(16) teilweise ausgestanzt und aus der Auflageebene (E) des Halterelementes (10) im wesentlichen rechtwinklig umgebogen ist.Apparatus according to claim 5, characterized in that the second Holder part (70) partially punched out of the first holder part (16) and out the support plane (E) of the holder element (10) substantially at right angles is bent. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die Halterteile aus Stangen oder Drahtmaterial (46) geformt sind und das Halterelement (10) bevorzugt aus einem einzigen Stangen- oder Drahtzuschnitt geformt ist.Device according to claim 1, characterized in that the holder parts are formed from rods or wire material (46) and the holder element (10) preferably from a single bar or wire blank is shaped. Vorrichtung nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, dass die Form der Öffnungen (22,24;32,34;50,52) in den Halterteilen (16,20;28,30;38,40) sowie ggf. der gegenseitige Abstand (a) der beiden Öffnungen in den Halterteilen an das Gewinde eines in das Halterelement (10) einschraubbaren Spannstabes (12) angepasst ist.Device according to one of claims 1 to 7, characterized in that that the shape of the openings (22,24; 32,34; 50,52) in the holder parts (16.20; 28.30; 38.40) and, if applicable, the mutual distance (a) of the two Openings in the holder parts to the thread one in the holder element (10) screw-in tension rod (12) is adapted. Vorrichtung nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass ein zur Aufnahme des Spannstabes (12) vorgesehenes Schutzrohr (14) die Öffnungen (22,24;32,34;50,52) in den Halterteilen (16,20;28,30;38,40) durchdringt und in diesen kraftschlüssig und über den Anschlag im vorgegebenen Einbauwinkel (α) gehalten ist.Device according to one of claims 1 to 8, characterized in that that a protective tube provided for receiving the tensioning rod (12) (14) the openings (22,24; 32,34; 50,52) in the holder parts (16.20; 28.30; 38.40) penetrates and in these non-positively and over the Stop is held in the specified installation angle (α). Vorrichtung nach Anspruch 9, dadurch gekennzeichnet, dass ein hülsenförmiges Verankerungselement (56) mit einem Gewindeteil (58) für einen in diesen einsetzbaren Spannstab (12) und einem Verankerungsteil (60) mit dem Schutzrohr (14) zusammengesteckt ist. Apparatus according to claim 9, characterized in that a sleeve-shaped Anchoring element (56) with a threaded part (58) for one in this insertable tie rod (12) and an anchoring part (60) is put together with the protective tube (14). Vorrichtung nach Anspruch 9 oder 10, dadurch gekennzeichnet, dass dem freien Ende des Schutzrohres (14) eine Verschlusskappe (62) aufgesetzt ist.Apparatus according to claim 9 or 10, characterized in that the a cap (62) is placed on the free end of the protective tube (14) is. Vorrichtung nach Anspruch 11, dadurch gekennzeichnet, dass im Inneren der Verschlusskappe (62) ein nach innen gerichteter und einem in den Gewindeteil (58) eingesetzten und das Schutzrohr (14) sowie die aufgesetzte Verschlusskappe (62) durchdringenden Spannstab (12) anliegender Dichtungsring (64) angeordnet ist.Device according to claim 11, characterized in that inside the cap (62) one inward and one in the Threaded part (58) inserted and the protective tube (14) and the attached Closing cap (62) penetrating tension rod (12) Sealing ring (64) is arranged. Vorrichtung nach Anspruch 11 oder 12, dadurch gekennzeichnet, dass die Verschlusskappe (62) an ihrem freien Ende eine mit einem Verschlusszapfen (66) verschliessbare Öffnung aufweist.Apparatus according to claim 11 or 12, characterized in that the Locking cap (62) at its free end, one with a locking pin (66) has a closable opening.
    EP99810233A 1998-03-18 1999-03-15 Anchoring device for a tension bar in a reinforced concrete mass Expired - Lifetime EP0943745B1 (en)

    Applications Claiming Priority (2)

    Application Number Priority Date Filing Date Title
    CH65398 1998-03-18
    CH65398 1998-03-18

    Publications (3)

    Publication Number Publication Date
    EP0943745A2 true EP0943745A2 (en) 1999-09-22
    EP0943745A3 EP0943745A3 (en) 2001-01-10
    EP0943745B1 EP0943745B1 (en) 2005-05-04

    Family

    ID=4192028

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP99810233A Expired - Lifetime EP0943745B1 (en) 1998-03-18 1999-03-15 Anchoring device for a tension bar in a reinforced concrete mass

    Country Status (3)

    Country Link
    EP (1) EP0943745B1 (en)
    AT (1) ATE294904T1 (en)
    DE (1) DE59911998D1 (en)

    Cited By (4)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE10258435A1 (en) * 2002-12-13 2004-08-12 Doka Industrie Gmbh Anchor holder used during concrete arrangement, has two holding section marked by through holes, in which second holding section is inclined at an angle larger than zero degrees with respect to direction perpendicular to retaining direction
    WO2006134266A1 (en) 2005-06-15 2006-12-21 Tolemecane Sas Support for shuttering and passing through a conduit, cable and a flexible hose
    WO2010051379A1 (en) * 2008-10-31 2010-05-06 Simpson Strong-Tie Company, Inc. Construction frame shear lug
    EP2096223A3 (en) * 2008-02-27 2012-06-06 Pino Albanese Device for positioning and anchoring a tensioning rod with a precise position and angle

    Citations (2)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE9314656U1 (en) 1992-09-30 1994-01-27 Albanese, Giulio, Winterthur Spacer tube
    DE4234892A1 (en) 1992-10-16 1994-05-19 Karl Bisani Anchor for steel rod in concrete block - has expanded anchor head and distance piece separating it from bent reinforcing plate in concrete

    Family Cites Families (5)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    US5388804A (en) * 1993-07-19 1995-02-14 Cohen; Jack H. Anchor bolt holder-spacer
    US5670076A (en) * 1994-08-04 1997-09-23 Simpson Strong-Tie Company, Inc. Reusable coupler for foundation anchor
    CH690727A5 (en) * 1995-11-09 2000-12-29 Giulio Albanese Sleeve-shaped anchoring element to embed in Betongiessmasse.
    US5937609A (en) * 1995-11-27 1999-08-17 Roth; Steven A. Concrete insert to support anchor bolt
    EP0943744B1 (en) * 1998-03-20 2004-01-28 Reto Bonomo Process and element for introducing shear forces in a reinforced concrete element and reinforced concrete element

    Patent Citations (2)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE9314656U1 (en) 1992-09-30 1994-01-27 Albanese, Giulio, Winterthur Spacer tube
    DE4234892A1 (en) 1992-10-16 1994-05-19 Karl Bisani Anchor for steel rod in concrete block - has expanded anchor head and distance piece separating it from bent reinforcing plate in concrete

    Cited By (11)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE10258435A1 (en) * 2002-12-13 2004-08-12 Doka Industrie Gmbh Anchor holder used during concrete arrangement, has two holding section marked by through holes, in which second holding section is inclined at an angle larger than zero degrees with respect to direction perpendicular to retaining direction
    AT500503A1 (en) * 2002-12-13 2006-01-15 Doka Ind Gmbh ANCHOR BRACKET
    AT500503B1 (en) * 2002-12-13 2006-07-15 Doka Ind Gmbh ANCHORING ELEMENT
    DE10258435B4 (en) * 2002-12-13 2008-03-13 Doka Industrie Gmbh anchoring element
    WO2006134266A1 (en) 2005-06-15 2006-12-21 Tolemecane Sas Support for shuttering and passing through a conduit, cable and a flexible hose
    FR2887320A1 (en) * 2005-06-15 2006-12-22 Tolemecane Sarl FORMWORK AND TRAVERSE SUPPORT FOR CONDUITS, CABLES AND FLEXIBLE.
    EP2096223A3 (en) * 2008-02-27 2012-06-06 Pino Albanese Device for positioning and anchoring a tensioning rod with a precise position and angle
    EP2977520A1 (en) * 2008-02-27 2016-01-27 Pino Albanese Device for anchoring of tensioning rods and positioning it in a precise angle and position
    WO2010051379A1 (en) * 2008-10-31 2010-05-06 Simpson Strong-Tie Company, Inc. Construction frame shear lug
    US8336267B2 (en) 2008-10-31 2012-12-25 Simpson Strong-Tie Company, Inc. Construction frame shear lug
    AU2016204963B2 (en) * 2008-10-31 2018-07-26 Simpson Strong-Tie Company Inc. Construction frame shear lug

    Also Published As

    Publication number Publication date
    ATE294904T1 (en) 2005-05-15
    DE59911998D1 (en) 2005-06-09
    EP0943745A3 (en) 2001-01-10
    EP0943745B1 (en) 2005-05-04

    Similar Documents

    Publication Publication Date Title
    DE69837524T2 (en) Method for producing an anchoring, anchoring part and tensioning element for this purpose
    DE3224986C2 (en) Device for attaching assembly parts to a concrete wall
    DE2229093A1 (en) Assembly or fastening element for reinforcement or a reinforcement element in reinforced concrete construction
    EP0410079A1 (en) Connecting casing for linked concrete slabs
    EP3569795B1 (en) Device for positioning a transport anchor
    EP0943745B1 (en) Anchoring device for a tension bar in a reinforced concrete mass
    EP3892789B1 (en) Formwork system
    EP0697047B1 (en) Device for anchoring safety barrier posts in a foundation
    EP2516761B1 (en) Device for connecting two components separated by a gap and for absorbing transverse forces that occur between the components
    DE19548440A1 (en) Wall component with at least two sheathing components
    DE19645759C2 (en) Sleeve-shaped anchoring element for embedding in a concrete casting compound
    DE2732183B2 (en) Connection of two reinforced concrete parts facing each other with their end faces
    DE2952700C2 (en) Anchor sleeve
    DE10258435B4 (en) anchoring element
    DE19537373A1 (en) Reinforcing system for chimney in building
    DE19522280A1 (en) Reinforcement establishment
    DE2853349C2 (en) Locking device
    DE1609878A1 (en) Hollow column made of steel with a base plate for use in steel frame buildings
    DE19810034C2 (en) Stop bracket for a wall formwork
    DE29617673U1 (en) Shuttering element
    DE20216945U1 (en) Anchor strip for structural engineering has through-anchors each with anchor head connected to strip section and immovably fastened on strip section by polymer connecting element which shrinks under heat action
    DE1900476C3 (en) Holding device for posts of a guardrail
    DE202023103836U1 (en) Positioning device
    DE29517654U1 (en) Device for determining a measuring point in a site
    AT405958B (en) METHOD FOR PRODUCING A STRIP-SHAPED GRID ELEMENT

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    AK Designated contracting states

    Kind code of ref document: A2

    Designated state(s): AT CH DE GB LI

    AX Request for extension of the european patent

    Free format text: AL;LT;LV;MK;RO;SI

    PUAL Search report despatched

    Free format text: ORIGINAL CODE: 0009013

    AK Designated contracting states

    Kind code of ref document: A3

    Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

    AX Request for extension of the european patent

    Free format text: AL;LT;LV;MK;RO;SI

    RIC1 Information provided on ipc code assigned before grant

    Free format text: 7E 04C 5/12 A, 7E 04G 21/12 B, 7E 04B 1/41 B

    17P Request for examination filed

    Effective date: 20010703

    AKX Designation fees paid

    Free format text: AT CH DE GB LI

    17Q First examination report despatched

    Effective date: 20030523

    GRAP Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOSNIGR1

    GRAS Grant fee paid

    Free format text: ORIGINAL CODE: EPIDOSNIGR3

    GRAA (expected) grant

    Free format text: ORIGINAL CODE: 0009210

    AK Designated contracting states

    Kind code of ref document: B1

    Designated state(s): AT CH DE GB LI

    REG Reference to a national code

    Ref country code: GB

    Ref legal event code: FG4D

    Free format text: NOT ENGLISH

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: EP

    REF Corresponds to:

    Ref document number: 59911998

    Country of ref document: DE

    Date of ref document: 20050609

    Kind code of ref document: P

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: NV

    Representative=s name: PATENTANWAELTE BREITER + WIEDMER AG

    GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

    Effective date: 20050624

    PLBE No opposition filed within time limit

    Free format text: ORIGINAL CODE: 0009261

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

    26N No opposition filed

    Effective date: 20060207

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: NV

    Representative=s name: HANS RUDOLF GACHNANG PATENTANWALT

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: NV

    Representative=s name: GACHNANG AG PATENTANWAELTE, CH

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: GB

    Payment date: 20180326

    Year of fee payment: 20

    Ref country code: DE

    Payment date: 20180322

    Year of fee payment: 20

    Ref country code: CH

    Payment date: 20180323

    Year of fee payment: 20

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: AT

    Payment date: 20180320

    Year of fee payment: 20

    REG Reference to a national code

    Ref country code: DE

    Ref legal event code: R071

    Ref document number: 59911998

    Country of ref document: DE

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: PL

    REG Reference to a national code

    Ref country code: GB

    Ref legal event code: PE20

    Expiry date: 20190314

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: GB

    Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

    Effective date: 20190314

    REG Reference to a national code

    Ref country code: AT

    Ref legal event code: MK07

    Ref document number: 294904

    Country of ref document: AT

    Kind code of ref document: T

    Effective date: 20190315