EP0670400A1 - Method for erecting columns for buildings or similar cut tubular form for realising such method - Google Patents

Method for erecting columns for buildings or similar cut tubular form for realising such method Download PDF

Info

Publication number
EP0670400A1
EP0670400A1 EP94116052A EP94116052A EP0670400A1 EP 0670400 A1 EP0670400 A1 EP 0670400A1 EP 94116052 A EP94116052 A EP 94116052A EP 94116052 A EP94116052 A EP 94116052A EP 0670400 A1 EP0670400 A1 EP 0670400A1
Authority
EP
European Patent Office
Prior art keywords
formwork
height
tube
situ concrete
tube shape
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
EP94116052A
Other languages
German (de)
French (fr)
Inventor
Eberhard Schrade
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CZ942632A priority Critical patent/CZ263294A3/en
Publication of EP0670400A1 publication Critical patent/EP0670400A1/en
Ceased legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • E04G13/021Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor for circular columns
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms

Definitions

  • the invention is based on a method according to the preamble of claim 1 or on a support or column produced by such a method according to the preamble of claim 13.
  • the tubular form of the formwork usually thus the folded spiral-seam pipe or also a pre-cast (filigree) concrete pipe to fix precise height specifications as well as a precise vertical adjustment on an existing ceiling or at least on the foundation of the building to be constructed, which previously required a large number of very complex mounting measures and supports, including the sprouting of the formwork in practically every direction.
  • the folded spiral-seam pipe or also a pre-cast (filigree) concrete pipe to fix precise height specifications as well as a precise vertical adjustment on an existing ceiling or at least on the foundation of the building to be constructed, which previously required a large number of very complex mounting measures and supports, including the sprouting of the formwork in practically every direction.
  • the invention is therefore based on the object to remedy this situation and to drastically reduce the assembly and, as a result, the cost involved in the production of (load-bearing) supports or columns in the construction of buildings and the like, and while maintaining the basic principle of a tubular form of formwork to design them in such a way that one can do without any formings that hold the formwork.
  • the invention solves this problem with the features of claim 1 and the features of claim 13 directed to a device and has the advantages that there is a decisive reduction in the assembly effort of such formwork for columns or supports in building manufacture, that at all without any Bracket or other sprouts, trestles or the like the formwork for the support or column by attaching, for. B. welding or screwing is installed on the respective floor, which can easily be done by two, possibly only by one worker, who are also able to assemble and set up a variety of such formwork during the day.
  • the hollow, tubular formwork forms when the hollow, tubular formwork forms are fixed, they are attached to upright threaded studs in the foot region, preferably with the aid of angle forms, only care being taken to ensure that an exact positioning and adjustment in the vertical is ensured, which can be accomplished, for example, by appropriate washers, wedges and the like.
  • the tubular formwork form By tightening the screw connections or spot welds, the tubular formwork form has a completely adequate, vertically precisely adjusted stability without any further formwork and other aids, so that it is possible to add a steel basket or reinforcement from above, if desired retract and then pour out the pipe.
  • a further particularly advantageous embodiment of the present invention is that the tube is made to length, with an additional adapter piece making high-precision height adjustment possible, so that in addition to the vertical adjustment, the desired height of the column or support can be achieved. and in this respect the floor height - to be specified by a corresponding setting of an adapter between the top and bottom point of the column shape.
  • the formwork tube for the support or pillar can be a common, naturally correspondingly modified spiral-seam tube, a cement tube or some other preform.
  • This leveling of the vertically adjusted formwork tube screwed into the base point defines the reference points (for several columns) for pulling off the in-situ concrete slab with high accuracy, whereby filigree panels arranged between the individual columns or columns can also be used without any problems.
  • the folded spiral tube itself has, for example by means of a suitable flanging that can be produced on automatically working machines, flange-like collar collars projecting outwards at the end regions, which in the foot region of the fastening of the folded spiral-seam tube forming the formwork serve on a support and, for example, mark the lower edge of an in-situ concrete layer to be applied in the head region and, if appropriate, can also be used to attach filigree slabs, other supports and the like.
  • a modified intermediate adapter device is designed so that it simultaneously fulfills several tasks, namely a height adjustment simplified and made possible by a thread engagement for precise vertical adjustment of the pulling level for the in-situ concrete ceiling, and at the same time forms the installation level, i.e. the foot fitting for a subsequent formwork tube form, together with their flanged lower collar.
  • the intermediate adapter device consists of height adjustment rods, which are guided inside in threaded receptacles of the spiral folding tube, in the manner of a screw, and end in end plates, which, with their upper edges, form the level of deduction for the in-situ concrete layer and at the same time enable the fastening of the next spiral folding tube placed on them .
  • the internal thread receptacles for the height adjustment rods can be simple indentations or bruises Be spiral duct; but they can preferably also be formed in the form of bent sheet metal strips, which are riveted to the inner walls at an evenly spaced distance and form hollow passages which have a stamping, so that correspondingly inserted height adjustment rods with an external corrugation in the manner of a screw in these threaded receptacles let it move.
  • the reinforcement cages used in the form of the formwork tube have an upstanding, protruding protruding length that serves as a static embedding length, is guided through the in-situ concrete layer to be applied and extends down to the lower area of the next one adjoining tubular formwork, so that there is a secure static, monostructural unit and strength of a suitably equipped building, with high tensile and compressive strength.
  • tubular formwork form up to a predetermined length in the form of, for example, a spiral seam tube or also a cement tube, with simultaneous automatic, mechanical flanging of the edge edges.
  • an angular flange adapted to the ring shape of the formwork form can again be arranged at the upper end of the folded spiral-seam tube (relates to the first exemplary embodiment), this time threaded sleeves, for example evenly distributed over the circumference, into which threaded rods or rods pointing upwards are screwed, which, with adjustable nuts, support a height, adjustment or setting ring that can be freely adjusted upwards, which then has a surface with a high level of precision for the subsequent in-situ concrete ceiling to be applied specifies which is subtracted.
  • the threaded rod stumps which extend further upwards above the height adjustment ring form the stud bolts for the attachment and the fastening of an upwardly following next tubular form of formwork, so that this can also be fastened and adjusted vertically by simply screwing it tight.
  • the basic idea of the present invention is to dispense with the hitherto required, extremely high expenditure in sprouting and positioning, including vertical and height adjustment of formwork forms for columns or supports, to fix the formwork form itself on a respective building floor, e.g. B. screw or weld - a job that may be carried out in quick succession by a single employee - and, based on such a vertical and fixed in all respects formwork, pour the column with high accuracy, being in an embodiment at the same time by an intermediate adapter device the height level for the subsequent in-situ concrete ceiling layer can be specified, possibly in connection with the creation of a leveled support surface for a next column.
  • tubular formwork form for the creation of columns or pillars in buildings with 10
  • the folded spiral-seam pipe area - or the hollow shape of a cement or concrete pipe that forms the "formwork" for the later pillar - extends in height, for example, to just below the ceiling made of in-situ concrete plus the thickness of the filigree slabs, but leaves at least this distance for the height of the intermediate adapter piece 11 is free, so that corresponding adjustments are possible without problems.
  • the folded spiral-seam tube 12a sits flush on a respective previous floor or the foundation of a building and can be adjusted vertically and in a suitable manner on this floor attached.
  • a preferred possibility for fastening the folded spiral-seam tube 12a is that it has a flange at the bottom, ie in the foot region, with which the tubular column formwork is attached to the floor.
  • this flange is designed as a fastening angle flange 13 and can have a shape as shown in more detail in FIG. 3; it consists of a cylindrical neck part 13a, with which the flange surrounds the lower foot region of the folded spiral tube 12a flush and is also fastened in a suitable manner, for example by corresponding transverse screw connections, welds or the like, and a radial flange 13b preferably attached to the neck part in the one-piece transition below (in a conventional embodiment), with which the folded spiral tube 12a is attached to the floor.
  • the mounting bracket flange 13 has holes 14 corresponding to its circumference, the spacing of which, for. B. threaded stubs emerging from the ground are coordinated and accommodate them. The anchoring of the threaded stumps in the floor will be discussed further below.
  • the folded spiral-seam tube 12a is then open at the top and has an elongated intermediate-level angle flange 15 at its upper end region, which, however, does not correspond to the head part of the tubular form of the formwork, since this head part is formed by the intermediate adapter piece to be explained, with the only difference that that instead of the holes 14 extending over a predetermined height threaded bushings 16 are provided, preferably also distributed uniformly over the circumference, at least three, but usually four such threaded bushings are provided.
  • the intermediate-level fastening angle flange 15 is also fastened to the upper end region of the folded spiral-seam tube 12a by suitable fastening means, for example welding, transverse screwing or the like.
  • Spacers preferably in the form of threaded rods 17, extend upwards from this intermediate-level fastening flange 15, which are screwed into the threaded bushings 16 of the intermediate-level angle flange and, as the upper connection, jointly support a ceiling-level element, preferably in the form of a simple flat head ring 18, as shown in plan view in Fig. 2 again.
  • this head ring 18 has bores 19 through which the ends of the threaded rods pass - by lower adjusting nuts 20, which are screwed onto the ends of the threaded rod first, the head ring 18 can, as can be easily seen, be adjusted in height , since it is easily possible to adjust the adjusting nuts 20 so that with high or highest accuracy - if one uses optical setting devices, for example - with the larger number of available Columns all head rings are set by manipulation of the nuts 20 so that there is a perfect pull-off level for the leveling corresponding to the top edge of the head ring of the next ceiling to be subsequently applied in the form of in-situ concrete.
  • the threaded rods 17 are dimensioned in length so that they extend a further distance beyond the top ring top edge as a later in-situ concrete ceiling level, and so at the same time again form the threaded stumps required further ahead for the attachment of the next spiral duct , which is designated in Fig. 1 with 12a '.
  • the half-shell 21 can thus consist of a lower pot base 21a with the (central) cutout for the passage of the spiral-seam tube or its intermediate level fastening flange and of an upwardly extending one Ring cylinder 21b, on the upper edge of which filigree plates 22 adjoining one or both sides can advantageously immediately lie, which are preferably used for the production of (intermediate) ceilings from in-situ concrete when building, as is known per se.
  • support and support means can also be provided here, but in this respect not the positioning and arrangement of the support or their formwork form, but hold the filigree panels 22 accordingly.
  • Such support means can be timbers, sprouts, intermediate punches, crossbeams and the like, which are indicated in the drawing in FIG. 1 and denoted overall by 23.
  • the rest of the procedure can be such that, for example, before attaching the threaded rods 17 in the threaded sleeves 16 of the intermediate level fastening angle flange 15, a reinforcement cage indicated at 24 is lowered into the tubular cavity of the folded spiral tube 12a which is open to the top, and which can also be lowered to can extend upwards to the height or in the area of the on-site concrete to be applied later - afterwards, each of the folded spiral-seam pipes, which are also available in large numbers, can be filled up to the intermediate level with concrete on site, which is then hardened; this gives these "partial supports" a high stability with already existing high-precision vertical adjustment; Subsequently, the manipulations already described above can be carried out without any problems, namely attaching the threaded rods, laying on the filigree panels, possibly using half-shell formwork and the like.
  • such a concrete ceiling can easily be pulled off using the existing (multiple) orientation level points corresponding to the top edge of the top ring, and once the local cast concrete has solidified, work can be continued immediately by re-attaching the base point mounting angle flanges to the threaded stumps 17 of the threaded rods 17 that stand upwards of the next generation of formwork for supports or columns, adjusted vertically and then further processed.
  • a simplified and therefore particularly advantageous variant of the present invention consists in the fact that, with preferred retention of a spiral-seam tube as formwork for a reinforced concrete column to be created, the spiral-seam tube 12a ', preferably one at its two end points has externally projecting ring flange forming flanges, which are referred to below as the upper collar 25a or lower collar 25b.
  • the lower collar collar 25b serves, comparable to the lower fastening angle flange of the first exemplary embodiment, to rest on lower supporting elements of a respective previous column structure, more precisely a height adjustment intermediate adapter device formed by the upper head region of the previous column structure.
  • the folded spiral-seam tube 12a ' has internal receptacles 26 which are used for the threaded positioning of threaded rods, screw bolts or height-adjusting means 17' and can be designed, for example, in a particularly simple manner in the form of pinches of the spiral-seam fold tube or in the form of sheet metal angles riveted on the inside, for example in a triangular shape, which have one or more indentations pressed inwards, so that these sheet metal angles, of which a possible embodiment is shown in FIG.
  • the plates 28 then simultaneously form the flat contact points for the next column formwork, i.e. for the subsequent subsequent folded spiral-seam tube 12a ′′, which, as the plan view of FIG. 6 shows, with its lower flanged collar 25b onto the head plates 28 the height adjustment rods 17 'are attached and attached to them, for example by welding to the outwardly projecting ring segment 28a of each plate.
  • each height adjustment rod 17 'with the end plate 28 carried by it ensures that at the same time the next following tubular formwork form is precisely aligned vertically; should adhere to this, possibly due to deformations during transport or the like, inaccuracies in the lower collar surface result, then the vertical adjustment can easily be carried out by means of some washers, whereupon the collar can be attached to the plates 28 of the intermediate adapter device thus formed by welding spots.
  • the intermediate adapter device formed from the height adjustment rods 17 'with upper end head plates, which are operatively connected to inner receptacles of the folded spiral tube, simultaneously forms precise pull-off points for an in-situ concrete cover layer to be subsequently applied as an auxiliary gauge and furthermore the installation points for the subsequent pipe formwork realize.
  • the respective center of the formwork tube can also be easily determined by means of a suitable gauge, and then , starting from this, mark the set-up lines for the collar of the following folded spiral-seam tube on the plates 28.
  • a further advantageous embodiment consists in that, as already mentioned above, by introducing a reinforcement cage 24 ', the static and dynamic strength against the effects of tension and pressure can be decisively increased, with an overlap of the respective reinforcement cages being particularly preferred from one another being vertically overlapping Pillars one So-called static integration length is guaranteed, through which considerable tensile influences can be absorbed.
  • a first steel frame which is inserted into the lower spiral folding tube 12a 'in FIG. 4 and forms a reinforcement cage, extends beyond the upper end of the plates 28 carried by the height adjustment rods 17' into the lower region of the subsequent spiral folding tube 12a '', in order to avoid the plates, corresponding steel or iron reinforcing bars can run cranked inwards.
  • the formwork for the in-situ concrete ceiling can be made by means of lower filigree plates 22 ', which are arranged in the usual way.
  • the upper collar 25a can be used as a closure or as a support element.
  • a screed layer 30 applied to an intermediate insulating layer 29 can still be seen.
  • Fig. 5 shows in an enlarged view the threaded rod forming the height adjustment rod 17 'with an upper plate-shaped end plate 28 and the preferred ones Welding area 31 between the protruding plate segment and the lower flanged collar of the folded spiral tube 12a '.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The method involves a sheathing tube form with a foot fitting on each floor of storeys or in the foundation plate of the building and adjusted vertically. In the head area of the sheathing tube form an intermediate adapter device is formed and is pre-adjusted as an accurate height level reference dim. for the withdrawal of an applied local concrete cover. In the sheathing tube form adjusted in the vertical is fitted a reinforcement basket (24',24''). The foot fitting has the form of a foot fixture angle flange and is firmly screwed to the threaded stub extending out of the floor or foundation plate and vertically adjusted.

Description

Stand der TechnikState of the art

Die Erfindung geht aus von einem Verfahren nach dem Oberbegriff des Anspruchs 1 bzw. von einer nach einem solchen Verfahren hergestellten Stütze oder Säule nach dem Oberbegriff des Anspruchs 13.The invention is based on a method according to the preamble of claim 1 or on a support or column produced by such a method according to the preamble of claim 13.

Die Herstellung von Stützen oder Säulen für Deckenkonstruktionen bei der Erstellung von Gebäuden, Bauanlagen, Häusern und dergleichen ist bisher mit sehr viel Aufwand verbunden, auch dann, wenn für das Vergießen von Stützen oder tragenden Säulen Schalungshohlrohre, beispielsweise sogenannte Wickelfalzrohre Verwendung finden, die an Ort und Stelle aufgestellt und mit Ortbeton vergossen werden. Auch bei einem solchen Vorgehen ist es erforderlich, die rohrförmige Schalungsform, üblicherweise also das Wickelfalzrohr oder auch ein vorgegossenes (Filigran)Betonrohr sicher und fest und vor allen Dingen auch mit präzisen Höhenvorgaben sowie einer genauen Justierung in der Vertikalen auf einer schon vorhandenen Decke oder jedenfalls auf dem Fundament des zu erstellenden Gebäudes zu fixieren, wozu bisher eine Vielzahl von sehr aufwendigen Halterungsmaßnahmen und Abstützungen erforderlich gewesen sind einschließlich dem Versprießen der Schalungsform in praktisch jeder Richtung.The production of supports or pillars for ceiling constructions in the construction of buildings, construction systems, houses and the like has so far been associated with a great deal of effort, even if hollow formwork pipes, for example so-called spiral-seam pipes, are used for the casting of supports or supporting columns, which are used on site and set up and poured with in-situ concrete. Even with such a procedure, it is necessary to securely and firmly, and above all with, the tubular form of the formwork, usually thus the folded spiral-seam pipe or also a pre-cast (filigree) concrete pipe to fix precise height specifications as well as a precise vertical adjustment on an existing ceiling or at least on the foundation of the building to be constructed, which previously required a large number of very complex mounting measures and supports, including the sprouting of the formwork in practically every direction.

Der Erfindung liegt daher die Aufgabe zugrunde, hier Abhilfe zu schaffen und zur Herstellung von (tragenden) Stützen oder Säulen bei der Erstellung von Gebäuden und dergleichen sowohl den Montage- als auch daraus resultierend den Kostenaufwand drastisch zu reduzieren und unter Beibehaltung des Grundprinzips einer rohrförmigen Schalungsform diese so auszubilden, daß man im wesentlichen ohne diese Schalungsform haltende Absprießungen auskommt.The invention is therefore based on the object to remedy this situation and to drastically reduce the assembly and, as a result, the cost involved in the production of (load-bearing) supports or columns in the construction of buildings and the like, and while maintaining the basic principle of a tubular form of formwork to design them in such a way that one can do without any formings that hold the formwork.

Die Erfindung löst diese Aufgabe mit den Merkmalen des Anspruchs 1 bzw. den Merkmalen des auf eine Vorrichtung gerichteten Anspruchs 13 und hat die Vorteile, daß sich eine entscheidende Reduzierung des Montageaufwands solcher Schalungen für Säulen oder Stützen bei der Gebäudeherstellung dadurch ergibt, daß überhaupt ohne jede Halterung oder sonstige Absprießungen, Bockhölzern oder dergleichen die Schalungsform für die Stütze oder Säule durch Befestigen, z. B. Anschweißen oder Festschrauben am jeweiligen Boden montiert wird, was problemlos von zwei, gegebenenfalls auch nur von einer Arbeitskraft erledigt werden kann, die dadurch auch in der Lage sind, eine Vielzahl solcher Schalungsformen im Tagesverlauf zu montieren und einzurichten.The invention solves this problem with the features of claim 1 and the features of claim 13 directed to a device and has the advantages that there is a decisive reduction in the assembly effort of such formwork for columns or supports in building manufacture, that at all without any Bracket or other sprouts, trestles or the like the formwork for the support or column by attaching, for. B. welding or screwing is installed on the respective floor, which can easily be done by two, possibly only by one worker, who are also able to assemble and set up a variety of such formwork during the day.

Bei einer ersten Ausführungsform der Erfindung werden bei der Fixierung der hohlen, rohrförmigen Schalungsformen diese im Fußbereich, bevorzugt mit Hilfe von Winkelformen, an aufrechtstehenden Gewindestehbolzen befestigt, wobei lediglich darauf zu achten ist, daß eine genaue Positionierung und Justage in der Vertikalen sichergestellt ist, was beispielsweise durch entsprechende Unterlegscheiben, Keile und dergleichen bewerkstelligt werden kann. Durch das Festziehen der Verschraubungen oder punktförmiger Anschweißungen ergibt sich für die rohrförmige Schalungsform eine vollkommen ausreichende, vertikal genau justierte Stabilität ohne jede weitere Abschalung und sonstige Hilfsmittel, so daß es möglich ist, anschließend von oben, soweit gewünscht, noch einen Stahlkorb bzw. eine Bewehrung einzufahren und das Rohr anschließend auszugießen.In a first embodiment of the invention, when the hollow, tubular formwork forms are fixed, they are attached to upright threaded studs in the foot region, preferably with the aid of angle forms, only care being taken to ensure that an exact positioning and adjustment in the vertical is ensured, which can be accomplished, for example, by appropriate washers, wedges and the like. By tightening the screw connections or spot welds, the tubular formwork form has a completely adequate, vertically precisely adjusted stability without any further formwork and other aids, so that it is possible to add a steel basket or reinforcement from above, if desired retract and then pour out the pipe.

Dabei besteht eine weitere besonders vorteilhafte Ausgestaltung vorliegender Erfindung darin, daß das Rohr auf Länge hergestellt wird, wobei durch ein zusätzliches Adapterstück eine hochpräzise Höheneinstellung möglich wird, so daß es gelingt, zusätzlich zu der Justierung in der Vertikalen die gewünschte Höhe der Säule oder Stütze - und insofern die Geschoßhöhe - durch eine entsprechende Einstellung eines Adapterzwischenstücks zwischen Kopf- und Fußpunkt der Säulenform vorzugeben.A further particularly advantageous embodiment of the present invention is that the tube is made to length, with an additional adapter piece making high-precision height adjustment possible, so that in addition to the vertical adjustment, the desired height of the column or support can be achieved. and in this respect the floor height - to be specified by a corresponding setting of an adapter between the top and bottom point of the column shape.

Es gelingt so, sowohl die Geschwindigkeit als auch die Maßgenauigkeit des Stahlbaus im Stahlbetonbau zu erzielen, der der Erfindung zugrunde liegt, wobei das Schalungsrohr für die Stütze oder Säule ein gängiges, natürlich entsprechend modifiziertes Wickelfalzrohr, ein Zementrohr oder eine sonstige Vorform sein kann.It is possible to achieve both the speed and the dimensional accuracy of the steel structure in reinforced concrete construction on which the invention is based, whereby the formwork tube for the support or pillar can be a common, naturally correspondingly modified spiral-seam tube, a cement tube or some other preform.

Durch die Anordnung von die Form von Winkeleisen aufweisenden Fußflanschen an der rohrförmigen Schalungsform, üblicherweise also am Wickelfalzrohr, wie eine solche Schalungsform im folgenden und stellvertretend auch für alle anderen geeigneten Formen bezeichnet werden soll, ist es möglich, die sichere Fixierung und die genaue vertikale Justierung zu erreichen, wobei sich die Schalungsform nach oben zum Kopfpunkt durch das erwähnte Zwischenadapterstück fortsetzt, welches durch Gewindeeinstellung in der Höhe beliebig justiert werden kann.The arrangement of foot flanges with the shape of angle irons on the tubular formwork form, usually on the spiral-seam tube, as such a formwork form is to be referred to below and on behalf of all other suitable forms, makes it possible to ensure secure fixation and precise vertical adjustment to achieve, the formwork continues up to the head point through the mentioned intermediate adapter piece, which can be adjusted in height by thread adjustment.

Durch diese Höhennivellierung des im Fußpunkt festgeschraubten vertikal justierten Schalungsrohrs werden die Bezugspunkte (bei mehreren Stützen) für das Abziehen der Ortbetondecke mit hoher Genauigkeit vorgegeben, wobei problemlos auch mit zwischen den einzelnen Säulen oder Stützen angeordneten Filigranplatten gearbeitet werden kann.This leveling of the vertically adjusted formwork tube screwed into the base point defines the reference points (for several columns) for pulling off the in-situ concrete slab with high accuracy, whereby filigree panels arranged between the individual columns or columns can also be used without any problems.

Dabei besteht die Möglichkeit, die rohrförmige Schalungsform bis zum Zwischenadapterstück vorab auszugießen und anschließend in der Höheneinstellung, dem Anbringen von Filigranplatten, dem Absprießen entsprechender Träger für diese und dem nachfolgenden Aufbringen der Ortbetonschicht weiterzuarbeiten, oder es ist alternativ möglich, diese sämtlichen Arbeiten, beginnend mit dem Festschrauben des Schalungsform-Fußflansches in einem Durchgang zu erledigen und die Säulen in Verbindung mit dem Aufbringen der Ortbetonschicht durchgehend zu betonieren, da sich hierdurch schon eine fest fixierte stabile Auflage für die Positionierung und Justierung des Zwischenadapterstücks ergibt.It is possible to pour the tubular form of the form up to the intermediate adapter piece in advance and then to continue working on the height adjustment, the attachment of filigree slabs, the sprouting of appropriate supports for this and the subsequent application of the in-situ concrete layer, or it is alternatively possible to do all this work, starting with the screwing of the formwork foot flange in one pass and to continuously concrete the columns in connection with the application of the in-situ concrete layer, since this already results in a firmly fixed stable support for the positioning and adjustment of the intermediate adapter piece.

Bei der weiteren bevorzugten Ausführungsform, die eine zusätzliche Vereinfachung in der Montage und im Aufbau ermöglicht, verfügt das Wickelfalzrohr selbst, beispielsweise durch eine geeignete, an automatisch arbeitenden Maschinen herstellbare Umbördelung an den Endbereichen über flanschartig nach außen ragende ringförmige Bundkragen, die im Fußbereich der Befestigung des die Schalungsform bildenden Wickelfalzrohrs an einer Auflage dienen und im Kopfbereich beispielsweise die Unterkante einer aufzubringenden Ortbetonschicht markieren und ggf. auch der Anbringung von Filigranplatten, sonstigen Stützen und dergleichen dienen können.In the further preferred embodiment, which enables an additional simplification in assembly and construction, the folded spiral tube itself has, for example by means of a suitable flanging that can be produced on automatically working machines, flange-like collar collars projecting outwards at the end regions, which in the foot region of the fastening of the folded spiral-seam tube forming the formwork serve on a support and, for example, mark the lower edge of an in-situ concrete layer to be applied in the head region and, if appropriate, can also be used to attach filigree slabs, other supports and the like.

Ferner ist eine modifizierte Zwischenadaptereinrichtung so ausgebildet, daß sie gleichzeitig mehrere Aufgaben erfüllt, nämlich eine durch einen Gewindeeingriff vereinfachte und ermöglichte Höhenverstellung zur präzisen vertikalen Einstellung des Abziehniveaus für die Ortbetondecke erlaubt und gleichzeitig die Aufstellebene, also die Fußarmatur für eine nächstfolgende Schalungsrohrform bildet, zusammen mit deren umgebördelten unteren Bundkragen.Furthermore, a modified intermediate adapter device is designed so that it simultaneously fulfills several tasks, namely a height adjustment simplified and made possible by a thread engagement for precise vertical adjustment of the pulling level for the in-situ concrete ceiling, and at the same time forms the installation level, i.e. the foot fitting for a subsequent formwork tube form, together with their flanged lower collar.

Zu diesem Zweck besteht die Zwischenadaptereinrichtung aus Höheneinstellstangen, die innen in Gewindeaufnahmen des Wickelfalzrohrs, nach Art einer Schraube, geführt sind und in Abschlußtellern enden, die mit ihren Oberkanten das Abziehniveau für die Ortbetonschicht bilden und gleichzeitig die Befestigung des nächstfolgenden, auf sie aufgesetzten Wickelfalzrohrs ermöglichen.For this purpose, the intermediate adapter device consists of height adjustment rods, which are guided inside in threaded receptacles of the spiral folding tube, in the manner of a screw, and end in end plates, which, with their upper edges, form the level of deduction for the in-situ concrete layer and at the same time enable the fastening of the next spiral folding tube placed on them .

Die inneren Gewindeaufnahmen für die Höheneinstellstangen können einfache Eindrückungen oder Quetschungen des Wickelfalzrohres sein; sie können aber bevorzugt auch in Form von abgebogenen Blechstreifen gebildet sein, die an die Innenwände im gleichmäßig verteilten Abstand angenietet sind und hohle Durchführungen bilden, die eine Einstanzung aufweisen, so daß sich entsprechend eingeschobene Höheneinstellstangen mit einer äußeren Riefelung nach Art einer Schraube in diesen Gewindeaufnahmen verschieben lassen.The internal thread receptacles for the height adjustment rods can be simple indentations or bruises Be spiral duct; but they can preferably also be formed in the form of bent sheet metal strips, which are riveted to the inner walls at an evenly spaced distance and form hollow passages which have a stamping, so that correspondingly inserted height adjustment rods with an external corrugation in the manner of a screw in these threaded receptacles let it move.

Schließlich ist noch besonders vorteilhaft der Umstand, daß in die Schalungsrohrform eingesetzte Bewehrungskörbe über eine nach oben reichende, abgekröpfte Überstehlänge verfügen, die als statische Einbindelänge dient, durch die jeweils aufzubringende Ortbetonschicht geführt ist und sich bis hin in den unteren Bereich der sich nach oben nächstfolgend anschließenden rohrförmigen Schalung erstreckt, so daß sich eine sichere statische, monostrukturelle Einheit und Festigkeit eines entsprechend ausgestatteten Gebäudes ergibt, mit hoher Zug- und Druckfestigkeit.Finally, it is particularly advantageous that the reinforcement cages used in the form of the formwork tube have an upstanding, protruding protruding length that serves as a static embedding length, is guided through the in-situ concrete layer to be applied and extends down to the lower area of the next one adjoining tubular formwork, so that there is a secure static, monostructural unit and strength of a suitably equipped building, with high tensile and compressive strength.

Durch die in den Unteransprüchen aufgeführten Maßnahmen sind vorteilhafte Weiterbildungen und Verbesserungen der Erfindung möglich. Besonders vorteilhaft ist die Vorfertigung der rohrförmigen Schalungsform bis zu einer vorgegebenen Länge in Form beispielsweise eines Wickelfalzrohrs oder auch eines Zementrohrs, bei gleichzeitiger automatischer, maschineller Umbördelung der Randkanten.Advantageous further developments and improvements of the invention are possible through the measures listed in the subclaims. It is particularly advantageous to prefabricate the tubular formwork form up to a predetermined length in the form of, for example, a spiral seam tube or also a cement tube, with simultaneous automatic, mechanical flanging of the edge edges.

Dabei kann am oberen Ende des Wickelfalzrohrs wiederum ein der Ringform der Schalungsform angepaßter Winkelflansch angeordnet sein (betrifft das erste Ausführungsbeispiel), der diesmal Gewindehülsen, beispielsweise gleichmäßig auf den Umfang verteilt aufweist, in welche nach oben gerichtete Gewindestangen oder -stäbe eingeschraubt sind, die nach oben frei einstellbar durch entsprechende Muttern einen Höhen-, Justier- oder Einstellring lagern, der dann mit einer Oberfläche hochgenau das Höhenniveau für die aufzubringende nachfolgende Ortbetondecke vorgibt, auf welches abgezogen wird.In this case, an angular flange adapted to the ring shape of the formwork form can again be arranged at the upper end of the folded spiral-seam tube (relates to the first exemplary embodiment), this time threaded sleeves, for example evenly distributed over the circumference, into which threaded rods or rods pointing upwards are screwed, which, with adjustable nuts, support a height, adjustment or setting ring that can be freely adjusted upwards, which then has a surface with a high level of precision for the subsequent in-situ concrete ceiling to be applied specifies which is subtracted.

Gleichzeitig bilden die über den Höhenjustierring sich weiter nach oben erstreckenden Gewindestangenstümpfe die Stehbolzen für das Aufsetzen und die Befestigung einer nach oben sich anschließenden nächstfolgenden rohrförmigen Schalungsform, so daß auch diese durch insofern einfaches Festschrauben befestigt und vertikal justiert werden kann.At the same time, the threaded rod stumps which extend further upwards above the height adjustment ring form the stud bolts for the attachment and the fastening of an upwardly following next tubular form of formwork, so that this can also be fastened and adjusted vertically by simply screwing it tight.

Zeichnungdrawing

Ausführungsbeispiele der Erfindung sind in der Zeichnung dargestellt und werden in der nachfolgenden Beschreibung näher erläutert.
Es zeigen:

Fig. 1
schematisiert in Zusammenschau im Querschnitt eine Ausführungsform einer rohrförmigen Schalungsform mit Fuß- und Kopfbereichen sowie Zwischenadapterstück, an welches seitlich vorgefertigte Filigranplatten als Unterlage für die nächstfolgende Deckenortbetonschicht heranreichen;
Fig. 2
in Draufsicht die einfache Form eines Höhenjustierrings,
Fig. 3
die ebenfalls einfache Form eines Fuß- oder Zwischenniveau-Befestigungsflansches in perspektivischer Darstellung;
Fig. 4
zeigt eine weitere vorteilhafte Ausführungsform der Erfindung im Längsschnitt mit übereinander angeordneten, zur besseren zeichnerischen Darstellung in sich gekürzten Schalungsformen, wobei die
Fig. 5
eine ausschnittsweise Detaildarstellung im seitlichen Schnitt darstellt mit einer an eine der Höheneinstellung dienenden Gewindestange angehefteten Scheibe und die
Fig. 6
grob vereinfachend in Draufsicht die zentrale Position eines auf die Teller der Gewindestangen aufgesetztes nächstfolgendes Wickelfalzrohr mit seinem unteren Bundkragen erkennen läßt.
Exemplary embodiments of the invention are shown in the drawing and are explained in more detail in the following description.
Show it:
Fig. 1
schematically in cross-section an embodiment of a tubular form of form with foot and head areas and intermediate adapter piece, to which laterally prefabricated filigree slabs reach as a base for the next layer of in-situ concrete;
Fig. 2
in plan view the simple form of a height adjustment ring,
Fig. 3
the also simple shape of a foot or intermediate level mounting flange in a perspective view;
Fig. 4
shows a further advantageous embodiment of the invention in longitudinal section with stacked formwork forms arranged one above the other for better graphic representation, the
Fig. 5
shows a detail of a detail in a lateral section with a washer attached to a threaded rod for height adjustment and the
Fig. 6
roughly simplified in plan view the central position of a next following folded spiral-seam tube placed on the plates of the threaded rods can be seen with its lower collar.

Beschreibung der AusführungsbeispieleDescription of the embodiments

Der Grundgedanke vorliegender Erfindung besteht darin, unter Verzicht auf den bisher erforderlichen, außerordentlich hohen Aufwand beim Versprießen und Positionieren einschließlich Vertikal- und Höhenjustierung von Schalungsformen für Säulen oder Stützen die Schalungsform selbst auf einem jeweiligen Gebäudeboden zu befestigen, z. B. festzuschrauben oder anzuschweißen - eine Arbeit, die unter Umständen in schneller Abfolge von einem einzigen Beschäftigten durchgeführt werden kann - und, ausgehend von einer solchermaßen in der Vertikalen justierten und in jeder Hinsicht fixierten Schalungsform, die Säule mit hoher Genauigkeit zu gießen, wobei in einer Ausgestaltung gleichzeitig durch eine Zwischenadaptereinrichtung das Höhenniveau für die nachfolgende Ortbeton-Deckenschicht vorgegeben werden kann, gegebenenfalls in Verbindung mit der Schaffung einer nivellierten Auflagefläche für eine nächste Säule.The basic idea of the present invention is to dispense with the hitherto required, extremely high expenditure in sprouting and positioning, including vertical and height adjustment of formwork forms for columns or supports, to fix the formwork form itself on a respective building floor, e.g. B. screw or weld - a job that may be carried out in quick succession by a single employee - and, based on such a vertical and fixed in all respects formwork, pour the column with high accuracy, being in an embodiment at the same time by an intermediate adapter device the height level for the subsequent in-situ concrete ceiling layer can be specified, possibly in connection with the creation of a leveled support surface for a next column.

In Fig. 1 ist die rohrförmige Schalungsform zur Erstellung von Stützen oder Säulen bei Gebäuden mit 10, ein die Stütze oder Säule in der Höhe vervollständigendes Zwischenadapterstück mit 11 und der beispielsweise durch ein Wickelfalzrohr repräsentierte Stützen- oder Säulenbereich mit 12 bezeichnet.In Fig. 1, the tubular formwork form for the creation of columns or pillars in buildings with 10, an intermediate adapter piece completing the column or pillar in height with 11 and the column or pillar area represented, for example, by a spiral folded tube, is designated with 12.

Der Wickelfalzrohrbereich - oder auch die Hohlform eines insofern die "Schalung" für die spätere Säule bildenden Zement- oder Betonrohrs - erstreckt sich in der Höhe beispielsweise bis knapp unter die später aufzubringende Decke aus Ortbeton zuzüglich der Dicke der Filigranplatten, läßt jedoch mindestens diesen Abstand für die Höhe des Zwischenadapterstücks 11 frei, so daß problemlos entsprechende Justierungen möglich sind.The folded spiral-seam pipe area - or the hollow shape of a cement or concrete pipe that forms the "formwork" for the later pillar - extends in height, for example, to just below the ceiling made of in-situ concrete plus the thickness of the filigree slabs, but leaves at least this distance for the height of the intermediate adapter piece 11 is free, so that corresponding adjustments are possible without problems.

Das Wickelfalzrohr 12a, dessen Bezeichnung hier stellvertretend für alle anderen möglichen Vorschalungsformen für die Stütze im folgenden ausschließlich noch verwendet wird, sitzt bündig auf einem jeweils vorhergehenden Boden oder dem Fundament eines Gebäudes auf und ist an diesem Boden in der Vertikalen präzise justierbar und in geeigneter Weise befestigt.The folded spiral-seam tube 12a, the name of which is used here as a representative of all other possible formwork for the support in the following, sits flush on a respective previous floor or the foundation of a building and can be adjusted vertically and in a suitable manner on this floor attached.

Eine bevorzugte Möglichkeit zur Befestigung des Wickelfalzrohres 12a besteht darin, daß dieses unten, also im Fußbereich einen Flansch aufweist, mit welchem die rohrförmige Stützen-Schalungsform am Boden befestigt wird.A preferred possibility for fastening the folded spiral-seam tube 12a is that it has a flange at the bottom, ie in the foot region, with which the tubular column formwork is attached to the floor.

Dieser Flansch ist bei einer ersten in den Fig. 1 bis 3 gezeigten Ausführungsform als Befestigungswinkelflansch 13 ausgebildet und kann eine Form aufweisen, wie sie in Fig. 3 genauer dargestellt ist; er besteht aus einem zylindrischen Halsteil 13a, mit welchem der Flansch den unteren Fußbereich des Wickelfalzrohres 12a bündig umfaßt und in geeigneter Weise, beispielsweise durch entsprechende Querverschraubungen, Verschweißungen oder dergleichen auch befestigt ist, und einem an das Halsteil vorzugsweise im einstückigen Übergang unten angesetzten Radialflansch 13b (in an sich üblicher Ausführungsform), mit welchem das Wickelfalzrohr 12a am Boden befestigt ist. Zu diesem Zweck verfügt der Befestigungswinkelflansch 13 über entsprechend seinen Umfang verteilte Bohrungen 14, die in ihrem Abstand auf z. B. aus dem Boden tretende Gewindestümpfe abgestimmt sind und diese aufnehmen. Auf die Verankerung der Gewindestümpfe im Boden wird weiter unten noch eingegangen.In a first embodiment shown in FIGS. 1 to 3, this flange is designed as a fastening angle flange 13 and can have a shape as shown in more detail in FIG. 3; it consists of a cylindrical neck part 13a, with which the flange surrounds the lower foot region of the folded spiral tube 12a flush and is also fastened in a suitable manner, for example by corresponding transverse screw connections, welds or the like, and a radial flange 13b preferably attached to the neck part in the one-piece transition below (in a conventional embodiment), with which the folded spiral tube 12a is attached to the floor. For this purpose, the mounting bracket flange 13 has holes 14 corresponding to its circumference, the spacing of which, for. B. threaded stubs emerging from the ground are coordinated and accommodate them. The anchoring of the threaded stumps in the floor will be discussed further below.

Es ist dann lediglich notwendig, das Wickelfalzrohr 12a mit seinem Befestigungswinkelflansch 13 im Fußbereich auf die Gewindestümpfe aufzusetzen und anschließend durch Aufschrauben von Muttern auf die durch die Bohrungen 14 des Befestigungswinkelflansches durchtretende Gewindestümpfe das Wickelfalzrohr positionsgenau und vor allen Dingen hochgenau in der Vertikalen justiert zu befestigen. Hierzu können Unterlegscheiben, Keile oder sonstige Justiermittel Verwendung finden, soweit dies überhaupt erforderlich ist.It is then only necessary to place the folded spiral-seam tube 12a with its fastening angle flange 13 in the foot area on the threaded stumps and then to screw the nuts onto the threaded stumps passing through the bores 14 of the fastening angle flange to fix the spiral-folded folding tube in a precisely positioned and, above all, highly precisely adjusted vertically. Washers, wedges or other adjustment devices can be used for this, if this is necessary at all.

Das Wickelfalzrohr 12a ist dann nach oben offen und verfügt an seinem oberen Endbereich, der jedoch nicht dem Kopfteil der rohrförmigen Schalungsform entspricht, da dieser Kopfteil von dem noch zu erläuternden Zwischenadapterstück gebildet ist, über einen länglichen Zwischenniveau-Winkelflansch 15, lediglich mit dem Unterschied, daß anstelle der Bohrungen 14 sich über eine vorgegebene Höhe erstreckende Gewindebuchsen 16 vorgesehen sind, bevorzugt ebenfalls gleichmäßig über den Umfang verteilt, wobei mindestens drei, üblicherweise aber vier solcher Gewindebuchsen vorgesehen sind.The folded spiral-seam tube 12a is then open at the top and has an elongated intermediate-level angle flange 15 at its upper end region, which, however, does not correspond to the head part of the tubular form of the formwork, since this head part is formed by the intermediate adapter piece to be explained, with the only difference that that instead of the holes 14 extending over a predetermined height threaded bushings 16 are provided, preferably also distributed uniformly over the circumference, at least three, but usually four such threaded bushings are provided.

Auch der Zwischenniveau-Befestigungswinkelflansch 15 ist durch geeignete Befestigungsmittel am oberen Endbereich des Wickelfalzrohres 12a festgemacht, beispielsweise Schweißen, Querverschrauben oder dergleichen. Von diesem Zwischenniveau-Befestigungsflansch 15 erstrecken sich Abstandselemente, bevorzugt in Form von Gewindestangen 17 nach oben, die in die Gewindebuchsen 16 des Zwischenniveau-Winkelflansches eingeschraubt sind und die als oberen Anschluß gemeinsam ein Deckenniveauelement lagern, vorzugsweise in der Form eines einfachen flachen Kopfrings 18, wie er in Fig. 2 nochmals in Draufsicht dargestellt ist. Dieser Kopfring 18 weist im Anordnungsmuster der Gewindestangen 17 Bohrungen 19 auf, durch welche die Enden der Gewindestangen hindurchtreten - durch untere Stellmuttern 20, die als erstes auf die Gewindestangenenden aufgeschraubt werden, läßt sich der Kopfring 18, wie ohne weiteres einzusehen, in der Höhe justieren, da es problemlos möglich ist, die Stellmuttern 20 so einzustellen, daß mit hoher bzw. höchster Genauigkeit - wenn man beispielsweise optische Einstellgeräte verwendet - bei der größeren Anzahl der vorhandenen Säulen sämtliche Kopfringe durch Manipulation an den Muttern 20 so eingestellt sind, daß sich ein einwandfreies Abziehniveau für das Nivellement entsprechend Oberkante Kopfring der nachfolgend in Form von Ortbeton aufzubringenden nächstfolgenden Decke ergibt.The intermediate-level fastening angle flange 15 is also fastened to the upper end region of the folded spiral-seam tube 12a by suitable fastening means, for example welding, transverse screwing or the like. Spacers, preferably in the form of threaded rods 17, extend upwards from this intermediate-level fastening flange 15, which are screwed into the threaded bushings 16 of the intermediate-level angle flange and, as the upper connection, jointly support a ceiling-level element, preferably in the form of a simple flat head ring 18, as shown in plan view in Fig. 2 again. In the arrangement pattern of the threaded rods 17, this head ring 18 has bores 19 through which the ends of the threaded rods pass - by lower adjusting nuts 20, which are screwed onto the ends of the threaded rod first, the head ring 18 can, as can be easily seen, be adjusted in height , since it is easily possible to adjust the adjusting nuts 20 so that with high or highest accuracy - if one uses optical setting devices, for example - with the larger number of available Columns all head rings are set by manipulation of the nuts 20 so that there is a perfect pull-off level for the leveling corresponding to the top edge of the head ring of the next ceiling to be subsequently applied in the form of in-situ concrete.

Erkennbar sind dabei die Gewindestangen 17 in ihrer Länge so bemessen, daß sie sich noch um ein weiteres Stück über die Kopfring-Oberkante als späteres Ortbeton-Deckenniveau hinaus erstrecken und so dann gleichzeitig wieder die weiter vorn für die Befestigung des nächst folgenden Wickelfalzrohres erforderlichen Gewindestümpfe bilden, welches in Fig. 1 mit 12a' bezeichnet ist.It can be seen that the threaded rods 17 are dimensioned in length so that they extend a further distance beyond the top ring top edge as a later in-situ concrete ceiling level, and so at the same time again form the threaded stumps required further ahead for the attachment of the next spiral duct , which is designated in Fig. 1 with 12a '.

Hier sind, falls erforderlich, noch weitere unterstützende Maßnahmen sinnvoll - um beispielsweise zu verhindern, daß beim Aufbringen der Ortbetondecke Beton durch Zwischenräume fließt, kann es sinnvoll sein, ab Zwischenniveau des oberen Befestigungswinkelflansches 15 eine Schalung vorzusehen, die bei dem dargestellten Ausführungsbeispiel bevorzugt eine (vorgefertigte) Halbschale 21, am besten ebenfalls aus Beton - Filigranhalbschale - sein kann, die mit einem runden oder jedenfalls einem der jeweils vorgesehenen polygonen Umfangsform der Stützenschalung (Wickelfalzrohr) angepaßten Ausschnitt entweder am Zwischenniveaubefestigungsflansch 15 aufsitzt, diesen von außen umgebend, oder auf diesem Niveau durch weitere äußere Hilfsmittel, auf die weiter unten noch eingegangen wird, gehalten ist. Die Halbschale 21 kann also aus einem unteren Topfboden 21a mit dem (zentralen) Ausschnitt für den Durchtritt des Wickelfalzrohres bzw. seines Zwischenniveaubefestigungsflansches bestehen und aus einem sich nach oben erstreckenden Ringzylinder 21b, auf dessen Oberkante in vorteilhafter Weise sofort sich nach einer oder beiden Seiten anschließende Filigranplatten 22 aufliegen können, die für die Herstellung von (Zwischen)Decken aus Ortbeton bei der Gebäudeerstellung bevorzugt Verwendung finden, wie für sich gesehen bekannt.If necessary, further supporting measures are useful here - in order to prevent, for example, concrete from flowing through gaps when the in-situ concrete ceiling is being applied, it may make sense to provide formwork from the intermediate level of the upper fastening angle flange 15, which in the exemplary embodiment shown preferably has a ( prefabricated) half-shell 21, preferably also made of concrete - filigree half-shell - which sits on the intermediate level fastening flange 15, surrounding it from the outside, or at this level, with a round or in any case one cutout that is adapted to the polygonal circumferential shape of the column formwork (spiral folded tube) provided in each case by other external aids, which will be discussed further below. The half-shell 21 can thus consist of a lower pot base 21a with the (central) cutout for the passage of the spiral-seam tube or its intermediate level fastening flange and of an upwardly extending one Ring cylinder 21b, on the upper edge of which filigree plates 22 adjoining one or both sides can advantageously immediately lie, which are preferably used for the production of (intermediate) ceilings from in-situ concrete when building, as is known per se.

Es versteht sich, daß für eine solche Gestaltung, falls erforderlich, was vom Gewicht und der Anzahl der zu lagernden Filigranplatten 22 abhängt, hier noch äußere Lager-, Unterstützungs- und Trägermittel vorgesehen sein können, die allerdings insofern nicht der Positionierung und Anordnung der Stütze bzw. ihrer Schalungsform dienen, sondern die Filigranplatten 22 entsprechend halten. Solche Stützungsmittel können Bockhölzer, Absprießungen, Zwischenstempel, Querträger und dergleichen sein, die in der Zeichnung der Fig. 1 angedeutet und insgesamt mit 23 bezeichnet sind.It goes without saying that for such a design, if necessary, depending on the weight and the number of filigree plates 22 to be stored, external storage, support and support means can also be provided here, but in this respect not the positioning and arrangement of the support or their formwork form, but hold the filigree panels 22 accordingly. Such support means can be timbers, sprouts, intermediate punches, crossbeams and the like, which are indicated in the drawing in FIG. 1 and denoted overall by 23.

Bei der Fertigung kann dann im übrigen so vorgegangen werden, daß, beispielsweise noch vor Anbringen der Gewindestangen 17 in den Gewindehülsen 16 des Zwischenniveaubefestigungswinkelflansches 15 in den nach oben offenen rohrförmigen Hohlraum des Wickelfalzrohres 12a ein bei 24 angedeuteter Bewehrungskorb abgesenkt wird, der sich durchaus auch bis auf die Höhe bzw. in den Bereich des später aufzubringenden Deckenortbeton nach oben erstrecken kann - anschließend können zunächst die jeweils, auch in größerer Anzahl vorhandenen Wickelfalzrohre bis zum Zwischenniveau vor Ort mit Beton aufgefüllt werden, den man zur Aushärtung bringt; dies verleiht diesen "Teilstützen" eine hohe Stabilität bei ohnehin schon vorhandener hochgenauer vertikaler Justierung; anschließend sind die weiter vorn schon geschilderten Manipulationen problemlos durchzuführen, nämlich Anbringen der Gewindestäbe, Auflegen der Filigranplatten, ggf. unter Verwendung von Halbschalen-Schalungen und dergleichen.During manufacture, the rest of the procedure can be such that, for example, before attaching the threaded rods 17 in the threaded sleeves 16 of the intermediate level fastening angle flange 15, a reinforcement cage indicated at 24 is lowered into the tubular cavity of the folded spiral tube 12a which is open to the top, and which can also be lowered to can extend upwards to the height or in the area of the on-site concrete to be applied later - afterwards, each of the folded spiral-seam pipes, which are also available in large numbers, can be filled up to the intermediate level with concrete on site, which is then hardened; this gives these "partial supports" a high stability with already existing high-precision vertical adjustment; Subsequently, the manipulations already described above can be carried out without any problems, namely attaching the threaded rods, laying on the filigree panels, possibly using half-shell formwork and the like.

Man kann den Ortbeton für die Decke in einem aufbringen, wobei auch der Halbschalenbereich innen mit diesem Ortbeton aufgefüllt wird, der dann den nach oben weitergeführten Bewehrungskorb, der bis unten in das Wickelfalzrohr hineinreicht, umgibt.You can apply the in-situ concrete for the ceiling in one, whereby the half-shell area is also filled on the inside with this in-situ concrete, which then surrounds the reinforcement cage, which extends upwards and extends into the folded spiral-seam pipe.

Das Abziehen einer solchen Betondecke ist, wie weiter vorne erwähnt, problemlos durch die vorhandenen (vielfachen) Orientierungsniveaupunkte entsprechend Oberkante Kopfring möglich, wobei nach Erstarren des Deckenortbeton sofort weitergearbeitet werden kann, indem auf die nach oben freistehenden Gewindestümpfe der Gewindestangen 17 erneut die Fußpunkt-Befestigungswinkelflansche der nächstfolgenden Generation von Schalungsformen für Stützen oder Säulen aufgesetzt, vertikal justiert und anschließend weiter bearbeitet werden.As mentioned above, such a concrete ceiling can easily be pulled off using the existing (multiple) orientation level points corresponding to the top edge of the top ring, and once the local cast concrete has solidified, work can be continued immediately by re-attaching the base point mounting angle flanges to the threaded stumps 17 of the threaded rods 17 that stand upwards of the next generation of formwork for supports or columns, adjusted vertically and then further processed.

Eine vereinfachte und daher besonders vorteilhafte Variante vorliegender Erfindung besteht entsprechend der Darstellung der Fig. 4, 5 und 6 darin, daß, bei bevorzugter Beibehaltung eines Wickelfalzrohres als Schalung für eine zu erstellende Stahlbetonsäule, das Wickelfalzrohr 12a', bevorzugt an seinen beiden Endpunkten einen nach außen vorspringenden Ringflansch bildende Umbördelungen aufweist, die im folgenden als oberer Bundkragen 25a bzw. unterer Bundkragen 25b bezeichnet werden.A simplified and therefore particularly advantageous variant of the present invention, as shown in FIGS. 4, 5 and 6, consists in the fact that, with preferred retention of a spiral-seam tube as formwork for a reinforced concrete column to be created, the spiral-seam tube 12a ', preferably one at its two end points has externally projecting ring flange forming flanges, which are referred to below as the upper collar 25a or lower collar 25b.

Der untere Bundkragen 25b dient dabei, vergleichbar mit dem unteren Befestigungswinkelflansch des ersten Ausführungsbeispiels, der Auflage auf unteren tragenden Elementen eines jeweils vorhergehenden Säulenaufbaus, genauer einer vom oberen Kopfbereich des vorhergehenden Säulenaufbaus gebildeten Höheneinstell-Zwischenadaptereinrichtung.The lower collar collar 25b serves, comparable to the lower fastening angle flange of the first exemplary embodiment, to rest on lower supporting elements of a respective previous column structure, more precisely a height adjustment intermediate adapter device formed by the upper head region of the previous column structure.

Zur Erläuterung dieser Variante einer Zwischenadaptereinrichtung, die der Herstellung einer genauen Höhenniveaubezugsgröße auch für das Abziehen einer nachfolgend aufzubringenden Ortbetondecke dient, wird von Fig. 4 ausgegangen.4 is used to explain this variant of an intermediate adapter device, which is used to produce an exact height reference size for the removal of an in-situ concrete ceiling to be subsequently applied.

Das Wickelfalzrohr 12a' verfügt in seinem Kopfbereich über innenliegende Aufnahmen 26, die einer gewindemäßigen Positionierung von Gewindestangen, Schraubbolzen oder Höheneinstellmitteln 17' dienen und beispielsweise in besonders einfacher Weise in Form von Quetschungen des Wickelfalzrohres ausgebildet sein können oder in Form von innen angenieteten Blechwinkeln, etwa in Dreiecksform, die eine oder mehrere nach innen eingedrückte Einstanzungen aufweisen, so daß diese Blechwinkel, von denen in Fig. 4 eine mögliche Ausführungsform dargestellt und mit 27 bezeichnet ist, in der Lage sind, die erwähnten Aufnahmen für die schraubbolzenartigen Verlängerungsstangen 17' zu bilden, die beispielsweise und in vorteilhafter Ausgestaltung sogenannte Torstahlstangen sein können, wie sie als Baustahl am Bau Verwendung finden und durch Kaltwalzung (Reckung) eine hohe Zugfestigkeit aufweisen und hierdurch, nämlich durch die Kaltverformung, an ihrer Oberfläche schräg verlaufende Riefen aufweisen, die mit den Einstanzungen der Aufnahmen 26 eine Art Gewindeverbindung eingehen können.In its head region, the folded spiral-seam tube 12a 'has internal receptacles 26 which are used for the threaded positioning of threaded rods, screw bolts or height-adjusting means 17' and can be designed, for example, in a particularly simple manner in the form of pinches of the spiral-seam fold tube or in the form of sheet metal angles riveted on the inside, for example in a triangular shape, which have one or more indentations pressed inwards, so that these sheet metal angles, of which a possible embodiment is shown in FIG. 4 and is designated by 27, are able to form the aforementioned receptacles for the bolt-like extension rods 17 ' Which, for example and in an advantageous embodiment, can be so-called goal steel rods, as they are used as structural steel in construction and have high tensile strength due to cold rolling (stretching) and, as a result, namely, due to the cold deformation, oblique grooves on their surface have, which can enter into a kind of threaded connection with the punchings of the receptacles 26.

Hierdurch ist es möglich, durch Verdrehen der Höheneinstellstangen 17', wie sie im folgenden bezeichnet werden, an deren oberen Enden befestigte Teller oder Platten 28, nachdem eine solche Schalung einmal errichtet und senkrecht justiert worden ist, auch in der Höhe zu justieren, einfach indem man die Höheneinstellstangen 17' mit ihren am einfachsten durch Schweißung verbundenen Tellern durch Verdrehen in ihrer Höhe solange in den Aufnahmen verstellt werden, bis alle Höheneinstellstangen mit ihrer Oberkante höhengenau mit Hilfe eines geeigneten Einmeßverfahrens auf die Abziehkante der jeweils neu aufzubringenden Ortbetonschicht eingestellt sind.This makes it possible, by rotating the height adjustment rods 17 ', as will be referred to below, to the upper ends of plates or plates 28, once such formwork has been erected and adjusted vertically, to adjust the height simply by one adjusts the height adjustment rods 17 'with their plates, which are most easily connected by welding, by turning their height in the receptacles until all of the height adjustment rods are adjusted in height with their upper edge with the aid of a suitable measuring method to the pull-off edge of the in-situ concrete layer to be newly applied.

Die Teller 28 bilden hierbei dann gleichzeitig die flächigen Aufsetzpunkte für die nächstfolgende Säulenschalung, also für das sich nach oben anschließende, nachfolgende Wickelfalzrohr 12a'', welches, wie die Draufsichtdarstellung der Fig. 6 zeigt, mit seinem unteren abgebördelten Bundkragen 25b auf die Kopfteller 28 der Höheneinstellstangen 17' aufgesetzt und an diese angeheftet wird, beispielsweise durch Verschweißen mit dem nach außen wegstehenden Ringsegment 28a jedes Tellers.The plates 28 then simultaneously form the flat contact points for the next column formwork, i.e. for the subsequent subsequent folded spiral-seam tube 12a ″, which, as the plan view of FIG. 6 shows, with its lower flanged collar 25b onto the head plates 28 the height adjustment rods 17 'are attached and attached to them, for example by welding to the outwardly projecting ring segment 28a of each plate.

Dabei sorgt die vorher vorgenommene, hochgenaue Höhenpositionierung jeder Höheneinstellstange 17' mit dem von ihr getragenen endseitigen Teller 28 dafür, daß gleichzeitig auch die jeweils nächstfolgende rohrförmige Schalungsform präzise in der Vertikalen ausgerichtet ist; sollten sich an dieser, eventuell durch Deformierungen beim Transport oder dergleichen, Ungenauigkeiten in der unteren Bundkragenfläche ergeben, dann läßt sich leicht durch einige Unterlegstücke die vertikale Justierung vornehmen, woraufhin der Bundkragen durch Schweißpunkte an die Teller 28 der so gebildeten Zwischenadaptereinrichtung angeheftet werden kann.The previously performed, highly accurate height positioning of each height adjustment rod 17 'with the end plate 28 carried by it ensures that at the same time the next following tubular formwork form is precisely aligned vertically; should adhere to this, possibly due to deformations during transport or the like, inaccuracies in the lower collar surface result, then the vertical adjustment can easily be carried out by means of some washers, whereupon the collar can be attached to the plates 28 of the intermediate adapter device thus formed by welding spots.

Auf diese Weise gelingt es der Zwischenadaptereinrichtung, gebildet aus den mit inneren Aufnahmen des Wickelfalzrohrs gewindemäßig in Wirkverbindung stehenden Höheneinstellstangen 17' mit oberen Abschlußkopftellern, gleichzeitig präzise Abziehpunkte für eine nachfolgend aufzubringende Ortbeton-Deckenschicht zu bilden als Hilfslehre und ferner die Aufstellpunkte für die nachfolgende Rohrschalung zu realisieren.In this way, the intermediate adapter device, formed from the height adjustment rods 17 'with upper end head plates, which are operatively connected to inner receptacles of the folded spiral tube, simultaneously forms precise pull-off points for an in-situ concrete cover layer to be subsequently applied as an auxiliary gauge and furthermore the installation points for the subsequent pipe formwork realize.

Geht man, wie bei dem dargestellten Ausführungsbeispiel, von drei mit oberen Tellern 28 ausgerüsteten Höheneinstellstangen 17' aus, die gleichmäßig über den Umfang des Wickelfalzrohres verteilt angeordnet sind, dann läßt sich auch problemlos das jeweilige Zentrum des Schalungsrohrs durch eine geeignete Lehre ermitteln, um dann, von diesem ausgehend, die Aufstellinien für den Bundkragen des nachfolgenden Wickelfalzrohres auf den Tellern 28 markieren.If, as in the exemplary embodiment shown, three height adjustment rods 17 'equipped with upper plates 28 are used, which are arranged evenly distributed over the circumference of the spiral seam tube, then the respective center of the formwork tube can also be easily determined by means of a suitable gauge, and then , starting from this, mark the set-up lines for the collar of the following folded spiral-seam tube on the plates 28.

Eine weitere vorteilhafte Ausgestaltung besteht darin, daß, wie weiter vorn schon erwähnt, durch Einbringen eines Bewehrungskorbes 24' die statische und dynamische Festigkeit gegenüber Zug- und Druckeinwirkung entscheidend erhöht werden kann, wobei besonders bevorzugt eine Überlappung der jeweiligen Bewehrungskörbe von in der Vertikalen jeweils übereinandergrenzender Säulen eine sogenannte statische Einbindelänge gewährleistet, durch welche erhebliche Zugeinwirkungen aufgenommen werden können. Mit anderen Worten: ein erstes, in das in Fig. 4 untere Wickelfalzrohr 12a' eingesetzte, einen Bewehrungskorb bildende Stahlgerüst erstreckt sich noch über den oberen Abschluß der von den Höheneinstellstangen 17' getragenen Teller 28 hinaus bis in den unteren Bereich des darauffolgenden Wickelfalzrohres 12a'', wobei, um den Tellern auszuweichen, entsprechende Stahl- oder Eisenarmierungsstäbe nach innen gekröpft verlaufen können. Diese über den Tellerabschluß hinausragende Überstehlänge des Bewehrungskorbs wird von dem unteren Bereich des sich nach oben anschließenden weiteren Wickelfalzrohres 12a' also aufgenommen und ragt in deren eigene Bewehrungskorbanordnung 24'' hinein - und selbstverständlich durch die jeweils mit Bezug auf die Oberkante Teller 28 abgezogene Ortbetonschicht hindurch, so daß sich eine einwandfreie feste statische Verbindung und Einbindung der einzelnen modularen Schalungselemente ergibt, bei gleichzeitig besonders einfachem Aufbau und vereinfachtem Herstellungsverfahren solcher Säulen.A further advantageous embodiment consists in that, as already mentioned above, by introducing a reinforcement cage 24 ', the static and dynamic strength against the effects of tension and pressure can be decisively increased, with an overlap of the respective reinforcement cages being particularly preferred from one another being vertically overlapping Pillars one So-called static integration length is guaranteed, through which considerable tensile influences can be absorbed. In other words: a first steel frame, which is inserted into the lower spiral folding tube 12a 'in FIG. 4 and forms a reinforcement cage, extends beyond the upper end of the plates 28 carried by the height adjustment rods 17' into the lower region of the subsequent spiral folding tube 12a '', in order to avoid the plates, corresponding steel or iron reinforcing bars can run cranked inwards. This protruding length of the reinforcement cage, which protrudes beyond the plate end, is thus absorbed by the lower area of the further folded spiral-seam tube 12a 'and protrudes into its own reinforcement cage arrangement 24''- and of course through the in-situ concrete layer removed with reference to the upper edge of plate 28 , so that there is a perfect static connection and integration of the individual modular formwork elements, with a particularly simple structure and simplified manufacturing process of such columns.

Die Schalung für die Ortbetondecke kann, wie weiter vorne schon erwähnt, durch untere Filigranplatten 22' erfolgen, die in üblicher Weise angeordnet sind, hier kann der obere Bundkragen 25a als Abschluß oder auch Trageelement sinnvoll eingesetzt werden. In der Darstellung der Fig. 4 erkennt man noch oberhalb einer Zwischenisolierschicht 29 eine auf diese aufgebrachte Estrichschicht 30.As already mentioned above, the formwork for the in-situ concrete ceiling can be made by means of lower filigree plates 22 ', which are arranged in the usual way. Here, the upper collar 25a can be used as a closure or as a support element. In the illustration in FIG. 4, a screed layer 30 applied to an intermediate insulating layer 29 can still be seen.

Fig. 5 zeigt in herausgezogener Vergrößerung die die Höheneinstellstange 17' bildende Gewindestange mit oberer tellerförmiger Abschlußplatte 28 und den bevorzugten Verschweißungsbereich 31 zwischen dem überstehenden Tellersegment und dem unteren umbebördelten Bundkragen des Wickelfalzrohres 12a'.Fig. 5 shows in an enlarged view the threaded rod forming the height adjustment rod 17 'with an upper plate-shaped end plate 28 and the preferred ones Welding area 31 between the protruding plate segment and the lower flanged collar of the folded spiral tube 12a '.

Abschließend wird darauf hingewiesen, daß die Ansprüche und insbesondere der Hauptanspruch Formulierungsversuche der Erfindung ohne umfassende Kenntnis des Stands der Technik und daher ohne einschränkende Präjudiz sind. Daher bleibt es vorbehalten, alle in der Beschreibung, den Ansprüchen und der Zeichnung dargestellten Merkmale sowohl einzeln für sich als auch in beliebiger Kombination miteinander als erfindungswesentlich anzusehen und in den Ansprüchen niederzulegen sowie den Hauptanspruch in seinem Merkmalsgehalt zu reduzieren.In conclusion, it is pointed out that the claims and in particular the main claim attempts to formulate the invention without extensive knowledge of the prior art and therefore without restrictive prejudice. It is therefore reserved to consider all the features shown in the description, the claims and the drawing both individually and in any combination with one another as essential to the invention and to lay them down in the claims and to reduce the main content of the main claim.

Claims (20)

Verfahren zur Herstellung von Stützen oder Säulen bei der Erstellung von Gebäuden, Häusern, Anlagen und dergleichen, insbesondere zur gleichzeitigen präzisen Höhenvorgabe (Nivellement) bei der Einbringung von Ortbeton-Deckenschichten, dadurch gekennzeichnet, daß eine Schalungsrohrform (Wickelfalzrohr, Betonrohr) mit einer Fußarmatur am jeweiligen Fußboden eines Geschosses oder in der Fundamentplatte des Gebäudes befestigt und in der Vertikalen einjustiert wird.Process for the production of supports or columns in the construction of buildings, houses, plants and the like, in particular for simultaneous precise height specification (leveling) when introducing in-situ concrete cover layers, characterized in that a formwork tube shape (spiral seam tube, concrete tube) with a foot fitting on each floor of a floor or in the foundation slab of the building and adjusted vertically. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß im Kopfbereich der Schalungsrohrform eine Zwischenadaptereinrichtung gebildet und als genaue Höhenniveaubezugsgröße für das Abziehen einer nachfolgend aufzubringenden Ortbetondecke voreingestellt wird.Method according to Claim 1, characterized in that an intermediate adapter device is formed in the head region of the formwork tube shape and is preset as an accurate reference height for the removal of an in-situ concrete ceiling to be subsequently applied. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß in die in der Vertikalen eingestellte Schalungsrohrform ein Bewehrungskorb (24, 24', 24'') eingebracht wird.A method according to claim 1, characterized in that in the formwork tube shape set in the vertical a reinforcement cage (24, 24 ', 24'') is inserted. Verfahren nach Anspruch 4, dadurch gekennzeichnet, daß der Bewehrungskorb mit einer freien Überstehlänge, die als statische Einbindelänge in den unteren Bereich einer sich nach oben anschließenden, nächstfolgenden Schalungsrohrform hineinragt, in die vorhergehende Schalungsrohrform eingesetzt wird.A method according to claim 4, characterized in that the reinforcement cage with a free projecting length, which projects as a static embedding length in the lower area of a subsequent formwork tube form which follows, is inserted into the previous formwork tube form. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Fußarmatur die Form eines Fußbefestiguns-Winkelflansches (13) aufweist und auf aus dem Fußboden bzw. der Fundamentplatte ragende Gewindestümpfe festgeschraubt und durch Unterlegmittel vertikal justiert wird.A method according to claim 1, characterized in that the foot fitting has the shape of a foot mounting angle flange (13) and is screwed onto threaded stubs protruding from the floor or the foundation plate and adjusted vertically by means of washers. Verfahren nach Anspruch 2, dadurch gekennzeichnet, daß im Bereich der Zwischenadaptereinrichtung eine von Gewindestangen gelagerte Kopfplatte mittels Einstellschrauben (20) mit ihrer Oberkante höhengenau eingestellt wird und so die Abziehebene für die aufzubringende Ortbetondecke bildet, wobei die Gewindestangen im oberen Bereich der Schalungsrohrform von einem Zwischenniveau-Befestigungswinkelflansch (15) getragen werden.A method according to claim 2, characterized in that in the area of the intermediate adapter device, a top plate supported by threaded rods is adjusted in height with its upper edge by means of adjusting screws (20) and thus forms the pull-off plane for the in-situ concrete ceiling to be applied, the threaded rods in the upper region of the formwork tube form from an intermediate level -Fixing angle flange (15) must be worn. Verfahren nach Anspruch 6, dadurch gekennzeichnet, daß die Schalungsrohrform nach Einbringen des Bewehrungskorbs (24) bis zum durch die Höhe des die Gewindestangen (17) tragenden Zwischenniveau-Befestigungswinkelflansches vorgegebenen Zwischenniveau mit Beton aufgefüllt und dieser vor Einleitung weiterer Arbeitsschritte ausgehärtet wird.Method according to claim 6, characterized in that the formwork tube shape after insertion of the reinforcement cage (24) up to the intermediate level predetermined by the height of the intermediate-level fastening angle flange carrying the threaded rods (17) filled with concrete and this is hardened before starting further work steps. Verfahren nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, daß vor dem Aufbringen des Ortbetons für die nach Oberkante Kopfplatte abgezogene Decke die durch die eingeschraubten Gewindestangen gebildete Zwischenadaptereinrichtung durch eine Schalung abgedeckt wird.Method according to one of claims 1 to 7, characterized in that before the application of the in-situ concrete for the ceiling pulled off towards the top edge of the top plate, the intermediate adapter device formed by the screwed-in threaded rods is covered by a formwork. Verfahren nach Anspruch 8, dadurch gekennzeichnet, daß die Schalung zur Abdeckung des Zwischenadapterbereiches nach außen an Filigranplatten für die Ortbeton-Deckenbetonierung anstößt.A method according to claim 8, characterized in that the formwork for covering the intermediate adapter area abuts outward on filigree slabs for in-situ concrete ceiling concrete. Verfahren nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, daß die Zwischenadaptereinrichtung von einer Halbschale umgeben ist, auf welcher seitlich angrenzende Filigranplatten aufliegen oder an diese anstoßen, wobei die Halbschale und/oder die Filigranplatten von später entfernbaren Stützen, Querträgern, Absprießungen, Bockhölzern und dergleichen gelagert und getragen werden.Method according to one of claims 1 to 7, characterized in that the intermediate adapter device is surrounded by a half-shell, on which laterally adjacent filigree plates rest or abut them, the half-shell and / or the filigree plates of supports, cross members, castings, trestles that can be removed later and the like are stored and carried. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Zwischenadaptereinrichtung bildende Höheneinstellstangen mit oberen Abschlußtellern in innere Aufnahmen der Schalungsrohrform eingeschraubt werden, wobei jede Höheneinstellstange (17') mit ihrem Abschlußteller (28) unabhängig voneinander höhengenau eingestellt wird und die Abschlußteller (28) die Abziehkante für die aufzubringende Ortbetondecke bilden und gleichzeitig als Befestigungsauflage für die nächstfolgende Schalungsrohrform dienen.A method according to claim 1 or 2, characterized in that the height adjustment rods forming the intermediate adapter device are screwed into the inner receptacles of the formwork tube shape with upper end plates, each height adjustment rod (17 ') with its end plate (28) being adjusted to exactly the same height and the end plates (28) form the peel edge for the in-situ concrete ceiling to be applied and at the same time serve as a mounting support for the next formwork tube form. Verfahren nach einem der Ansprüche 1 bis 11, dadurch gekennzeichnet, daß die von Höheneinstell-Gewindestangen (17') mit oberen Abschlußtellern (28) gebildete Zwischenadaptereinrichtung gleichzeitig dem höhengenauen Abziehen der aufzubringenden Ortbetondecke dient und die Fußarmatur für eine nächste, sich nach oben anschließende Schalungsrohrform bildet, die durch ihre unabhängige Einjustierbarkeit in der Vertikalen die aufgesetzte Schalungsrohrform justiert und der Befestigung eines umgebördelten Bundkragens der aufgesetzten Schalungsrohrform, beispielsweise durch Verschweißen, dient.Method according to one of claims 1 to 11, characterized in that the intermediate adapter device formed by height-adjusting threaded rods (17 ') with upper end plates (28) serves at the same time for the exact removal of the in-situ concrete ceiling to be applied and the foot fitting for a next formwork pipe form which adjoins at the top forms, which adjusts the attached formwork tube shape due to its independent vertical adjustability and serves to fasten a flanged collar collar of the attached formwork tube shape, for example by welding. Aus einer rohrförmigen hohlen Schalungsform bestehende Vorrichtung zur Herstellung von Stützen oder Säulen für Gebäude, Häuser, Bauanlagen und dergleichen, in welche, gegebenenfalls nach Einbringen eines Bewehrungskorbs, Beton eingegossen wird, gekennzeichnet durch eine untere Fußarmatur (13, 17, 18, 20; 17', 28), mit welcher die Schalungsrohrform (Wickelfalzrohr 12a, 12a', 12a'', Betonrohr) auf der Unterlage (Fußboden, Ortbetonschicht, Fundamentplatte) bei gleichzeitiger vertikaler Ausrichtung befestigt ist.Device consisting of a tubular, hollow formwork for the production of supports or columns for buildings, houses, construction systems and the like, into which concrete is poured, if necessary after inserting a reinforcement cage, characterized by a lower foot fitting (13, 17, 18, 20; 17 ', 28) with which the formwork tube shape (spiral seam tube 12a, 12a', 12a '', concrete tube) is attached to the base (floor, in-situ concrete layer, foundation slab) with simultaneous vertical alignment. Vorrichtung nach Anspruch 13, dadurch gekennzeichnet, daß die Schalungsrohrform als Wickelfalzrohr, Betonrohr, Zementrohr oder dergleichen ausgebildet ist, einen unteren Fußbefestigungsflansch (13) und auf einem vorgegebenen Zwischenniveau einen mittleren Befestigungswinkelflansch (15) aufweist, der der Lagerung und Aufnahme von Einstellmitteln für das Abziehniveau einer aufzubringenden Ortbetondecke dient.Apparatus according to claim 13, characterized in that the formwork tube shape is designed as a spiral seam tube, concrete tube, cement tube or the like, a lower foot mounting flange (13) and has a central fastening angle flange (15) at a predetermined intermediate level, which is used for storing and receiving adjusting means for the pulling level of an in-situ concrete ceiling to be applied. Vorrichtung nach Anspruch 13 oder 14, dadurch gekennzeichnet, daß ab Zwischenniveau die rohrförmige Schalungsform in ein Zwischenadapterstück übergeht, bestehend aus den Höhenniveau-Einstellmitteln für die Ortbetondecke, wobei eine Kopfoberkante durch in Gewinden laufende Einstellmuttern höhenverstellbar ausgebildet ist.Apparatus according to claim 13 or 14, characterized in that from the intermediate level, the tubular form of the form merges into an intermediate adapter piece, consisting of the height-level adjusting means for the in-situ concrete ceiling, an upper edge of the head being height-adjustable by adjusting nuts running in threads. Vorrichtung nach einem der Ansprüche 13 bis 15, dadurch gekennzeichnet, daß der im Zwischenniveaubereich angeordnete Befestigungswinkelflansch (15) Gewindehülsen (17') lagert, in die Gewindestangen (17) eingeschraubt sind, die nach oben über Stellmuttern (20) einen Kopfring (18) einstellbar lagern, dessen Oberkante das Abziehniveau für die Ortbetondecke bestimmt, und wobei die über die Kopfring-Oberkante hinausragenden Gewindestangen-Stümpfe gleichzeitig die Befestigungsgewindemittel für eine jeweilige, sich nach oben anschließende weitere rohrförmige Schalungsform bilden.Device according to one of claims 13 to 15, characterized in that the fastening angle flange (15) arranged in the intermediate level area supports threaded sleeves (17 ') into which threaded rods (17) are screwed, which have a top ring (18) above adjusting nuts (20). adjustable, the upper edge of which determines the level of the pull-off for the in-situ concrete slab, and the threaded rod stubs protruding beyond the upper ring upper edge simultaneously form the fastening thread means for a respective further tubular formwork form which adjoins at the top. Vorrichtung nach einem oder mehreren der Ansprüche 13 bis 16, dadurch gekennzeichnet, daß der Zwischenadapterbereich von einer Schalungsform für die Eindämmung der aufzubringenden Ortbeton-Deckenschicht umgeben ist.Device according to one or more of claims 13 to 16, characterized in that the intermediate adapter area is surrounded by a formwork for the containment of the in-situ concrete cover layer to be applied. Vorrichtung nach Anspruch 17, dadurch gekennzeichnet, daß angrenzend zum bzw. vom Zwischenniveau-Befestigungswinkelflansch (15) getragen bzw. in dessen Höhe von äußeren Lagern oder Befestigungsmitteln gehalten eine Halbschale (21) angeordnet ist, die den Zwischenadapterbereich als nach oben weiterführende Schalungsform umgibt und auf welcher sich seitlich anschließende Filigranplatten aufliegen bzw. an diese anstoßen, die durch eigene Lagermittel abgestützt sind.Apparatus according to claim 17, characterized in that a half-shell (21) is arranged adjacent to or from the intermediate level fastening angle flange (15) or is held at the height thereof by external bearings or fastening means and surrounds the intermediate adapter region as a form of form which continues upwards and on which filigree plates adjoining on the side rest or abut them, which are supported by their own storage means. Vorrichtung nach Anspruch 13, dadurch gekennzeichnet, daß die Fußarmatur (17', 28, 25b) Höheneinstellstangen (17') umfaßt, die in oberen Abschlußtellern (28) enden, innen in Gewindeaufnahmen der Schalungsrohrform höhenverstellbar angeordnet (eingeschraubt) sind und gleichzeitig mit der Oberkante der Abschlußteller (28) die Höhenniveaubezugsgröße für das Abziehen der nachfolgend aufzubringenden Ortbetondecke bilden.Apparatus according to claim 13, characterized in that the foot fitting (17 ', 28, 25b) comprises height adjustment rods (17') which end in upper end plates (28), are arranged in height-adjustable manner (screwed in) in threaded receptacles of the formwork tube shape and, at the same time, with the Form the upper edge of the end plate (28) the height reference for the removal of the in-situ concrete slab to be subsequently applied. Vorrichtung nach Anspruch 19, dadurch gekennzeichnet, daß innere Gewindeaufnahmen für die Höheneinstellstangen (17') an der als Wickelfalzrohr (12a') ausgebildeten Schalungsrohrform von nach innen geringfügig vorspringenden Blechstreifen gebildet sind, die durch Einstanzungen Gewindeführungen aufweisen für die als Torstehlstangen ausgebildeten Höheneinstellstangen und daß das Wickelfalzrohr (12a') mindestens am unteren Ende einen nach außen flanschartig vorspringenden Bundkragen (25a, 25b) aufweist, mit welchem es auf den Abschlußtellern (28) einer vorhergehenden Schalungsrohrform aufsitzt und an diesen, beispielsweise durch Schweißpunkte, befestigt ist.Apparatus according to claim 19, characterized in that internal thread receptacles for the height adjustment rods (17 ') on the formwork tube shape designed as a spiral folding tube (12a') are formed by slightly protruding sheet metal strips which, through stampings, have thread guides for the height adjustment rods designed as gate sticks and that the spiral folded tube (12a ') has at least at the lower end a collar collar (25a, 25b) projecting outward in a flange-like manner, with which it rests on the end plates (28) of a previous formwork tube shape and is attached to this, for example by welding spots.
EP94116052A 1994-03-04 1994-10-12 Method for erecting columns for buildings or similar cut tubular form for realising such method Ceased EP0670400A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CZ942632A CZ263294A3 (en) 1994-03-04 1994-10-25 Process and apparatus for producing supports or poles when erecting buildings

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE19944407191 DE4407191A1 (en) 1994-03-04 1994-03-04 Process for the production of supports or columns in the construction of buildings and. Like. And from a tubular form form existing device for the production of supports or columns
DE4407191 1994-03-04

Publications (1)

Publication Number Publication Date
EP0670400A1 true EP0670400A1 (en) 1995-09-06

Family

ID=6511840

Family Applications (1)

Application Number Title Priority Date Filing Date
EP94116052A Ceased EP0670400A1 (en) 1994-03-04 1994-10-12 Method for erecting columns for buildings or similar cut tubular form for realising such method

Country Status (2)

Country Link
EP (1) EP0670400A1 (en)
DE (1) DE4407191A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1482106A1 (en) * 2003-05-27 2004-12-01 Plakabeton Coffratec S.A. Device for the setting up of concrete shutterings for columns of any section
CN102926532A (en) * 2012-11-15 2013-02-13 中国建筑第八工程局有限公司 Mounting method for templates of box-type steel skeleton inclined column
CN111550082A (en) * 2020-06-16 2020-08-18 四川亿胜建设集团有限公司 Concrete form strutting arrangement for building engineering

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE659676A (en) * 1964-02-12
FR1498285A (en) * 1966-02-24 1967-10-20 New process for molding vertical concrete walls and devices for implementing this process
US4749165A (en) * 1987-04-09 1988-06-07 Thomas Moraca Supporting device for multi-floor column forms
US4790509A (en) * 1987-05-19 1988-12-13 Cardwell William L Tubular concrete form collar
FR2676772A1 (en) * 1991-05-22 1992-11-27 Ricard Coffrages Device for holding column casings in a vertical position

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE7434674U (en) * 1975-05-07 Stalko Metallbau Gmbh & Co Anchoring device for columnar elements
DD137610A1 (en) * 1978-07-03 1979-09-12 Gerhard Irrgang STUETZKONSTRUKTION FOR A DUENWANDIGEN SCHALKOERPER

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE659676A (en) * 1964-02-12
FR1498285A (en) * 1966-02-24 1967-10-20 New process for molding vertical concrete walls and devices for implementing this process
US4749165A (en) * 1987-04-09 1988-06-07 Thomas Moraca Supporting device for multi-floor column forms
US4790509A (en) * 1987-05-19 1988-12-13 Cardwell William L Tubular concrete form collar
FR2676772A1 (en) * 1991-05-22 1992-11-27 Ricard Coffrages Device for holding column casings in a vertical position

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1482106A1 (en) * 2003-05-27 2004-12-01 Plakabeton Coffratec S.A. Device for the setting up of concrete shutterings for columns of any section
CN102926532A (en) * 2012-11-15 2013-02-13 中国建筑第八工程局有限公司 Mounting method for templates of box-type steel skeleton inclined column
CN102926532B (en) * 2012-11-15 2015-04-29 中国建筑第八工程局有限公司 Mounting method for templates of box-type steel skeleton inclined column
CN111550082A (en) * 2020-06-16 2020-08-18 四川亿胜建设集团有限公司 Concrete form strutting arrangement for building engineering
CN111550082B (en) * 2020-06-16 2024-03-08 四川亿胜建设集团有限公司 Concrete form strutting arrangement for building engineering

Also Published As

Publication number Publication date
DE4407191A1 (en) 1995-09-14

Similar Documents

Publication Publication Date Title
DE69302390T2 (en) FRAME FOR A BUILDING
EP2914790B1 (en) Method for producing a tower construction from reinforced concrete
EP3004467B1 (en) Concrete foundation, method for producing a concrete foundation for a wind power tower, and positioning device for positioning jacket pipes in a concrete foundation
DE1903129B2 (en) Device for connecting a beam to a concrete column
DD296526A5 (en) FORMWORK SYSTEM
EP3208405B1 (en) Device and method for assembling tower-like structures from pre-fabricated elements
DE3140287A1 (en) Device for producing concrete walls of storey height
DE1138208B (en) Method and device for setting up multi-storey buildings with a basement
DE3609780A1 (en) Prefabricated shuttering element
EP0670400A1 (en) Method for erecting columns for buildings or similar cut tubular form for realising such method
EP2430245B1 (en) Process for forming a foundation
EP0098962A1 (en) Erecting scaffold for shutterings for circular structures of concrete or the like
DE10007450A1 (en) Mounting bracket system and method for fastening a prefabricated component to a building part using the mounting bracket system
EP0138196A2 (en) Method of erection of buildings consisting of casting materials in particular of concrete and device for carrying out the method
DE2434813A1 (en) PROCEDURE AND SUBSTRUCTURE FOR EATING A FOUNDATION
DE102004010927B4 (en) Method and device for creating, in particular, quarter, half or full cast in-situ concrete stairs
EP0112861A1 (en) Formwork for rotationally symmetric structures.
EP0857834B1 (en) Method and frame for erecting concrete walls
EP0645501B1 (en) Method for the production of prefabricated moduls for the construction of buildings and prefabricated modul
EP0659952B1 (en) Spiral staircase with central tube as well as device with similar staircases
DE9403651U1 (en) Device for the production of supports or columns in the construction of buildings
DE19720637C1 (en) Process for producing a component from reinforced concrete and formwork for carrying out the process
EP4219864A1 (en) Support for temporary arrangement between two building components for dissipating loads into the building components
DE3505592A1 (en) Shuttering for structures which are rotationally symmetrical, in particular cylindrical and conical, e.g. tapering slightly upwards
DE112011103102T5 (en) Mounting frame and method

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB GR IT LI LU NL PT SE

RAX Requested extension states of the european patent have changed

Free format text: SI PAYMENT 941103

17P Request for examination filed

Effective date: 19951128

17Q First examination report despatched

Effective date: 19961031

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN REFUSED

18R Application refused

Effective date: 19980412