EP0298391A1 - Building crane with a turning mast head constructed as a transport and assembly unit - Google Patents

Building crane with a turning mast head constructed as a transport and assembly unit Download PDF

Info

Publication number
EP0298391A1
EP0298391A1 EP88110546A EP88110546A EP0298391A1 EP 0298391 A1 EP0298391 A1 EP 0298391A1 EP 88110546 A EP88110546 A EP 88110546A EP 88110546 A EP88110546 A EP 88110546A EP 0298391 A1 EP0298391 A1 EP 0298391A1
Authority
EP
European Patent Office
Prior art keywords
rope
tower
mast head
luffing
transport
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP88110546A
Other languages
German (de)
French (fr)
Other versions
EP0298391B1 (en
Inventor
Werner Bantle
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MAN GHH Logistics GmbH
Original Assignee
MAN GHH Krantechnik GmbH
MAN GHH Logistics GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MAN GHH Krantechnik GmbH, MAN GHH Logistics GmbH filed Critical MAN GHH Krantechnik GmbH
Publication of EP0298391A1 publication Critical patent/EP0298391A1/en
Application granted granted Critical
Publication of EP0298391B1 publication Critical patent/EP0298391B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/82Luffing gear

Definitions

  • the invention relates to a spire designed as a transport and assembly unit of an overhead rotating construction crane, the jib of which can be luffed in and out by means of a rope pulling-in device, with one or more rope pulleys which are arranged at the top of the spire and serve to deflect the luffing rope.
  • a top-rotating construction crane which has a spire, a jib and a counter-jib, in which the jib is swiveled in and out with a rope pull-in mechanism (luffing mechanism) which is arranged on the counter-jib or in the machine house located behind the spire .
  • the invention is therefore based on the object to design a spire of the type mentioned in such a way that the tower head of the construction crane can be assembled or disassembled at the construction site in a relatively short time.
  • the rope pulling device provided with the luffing rope is fastened to a carrier of the tower top, that the luffing rope over the deflection roller or deflection rollers at the top of the tower top and one or more further deflection rollers mounted in a carrier to the top of the tower The spire is guided and fastened there, and that the support of the deflection rollers is firmly but releasably connected to the spire.
  • the luffing rope is already mechanically reeved in the manufacturing plant and the tower tip is transported to the construction site with the roller block attached to it.
  • the assembly or disassembly of the tower head at the construction site is relatively simple and time-saving.
  • the top of the tower has a lower part 1a, a rotating frame 1b with rotating mechanism and a mast piece 1c, which is inclined in the direction of a counterjib 2 and is constructed in a half-timbered construction.
  • the mast section 1c is provided in its lower region with a horizontal support 3 which runs between the upper and lower longitudinal spars 4a, 4b and is firmly connected to them.
  • the boom pull-in mechanism 5 is fastened, which essentially consists of a cable drum 6 and its motor drive.
  • a seesaw rope 7 is fastened, which, with multiple rope reeving, is guided to a fixed point 11 at the top of the tower top by - for example four - guide rollers 8 at the top of the tower tip 1 and further - for example four - guide rollers 9.
  • the deflection rollers 8, 9 are each mounted on a common horizontal axis and supported on their axes in corresponding recesses in their supporting structure.
  • the supporting structure of the deflection rollers 8 and the pull-in mechanism 5 are connected to the top of the tower both in the case of transport and assembly and in the operating state of the crane.
  • the support structure 10 together with deflection rollers 9 - the so-called roller block - is fixed, but detachably, in the case of transport and assembly of the tower top via bolt-hole connections on a cross member 17 of the upper longitudinal spars 4a.
  • the roller block 9, 10 In the operating state of the construction crane mounted on the construction site, the roller block 9, 10, after it has been detached from the top of the tower 1, is fixedly but detachably connected to the main guying 12 of the boom 13 pivoted about a horizontal axis on the top of the tower 1.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Jib Cranes (AREA)

Abstract

According to the invention, the luffing gear (5) for the luffing rope (7) is combined with the mast head (1) to form a unit so that it can be assembled at the building site with a mobile crane as a self-contained unit. The luffing rope (7), coming from the luffing gear (5), runs over deflection pulleys (8) at the tip of the mast head (1), then over deflection pulleys (9) of a pulley block (9, 10) connected to the mast head (1), and finally to a fixed point (11) at the mast head. The invention serves to accelerate and facilitate the erection of building cranes. <IMAGE>

Description

Die Erfindung bezieht sich auf eine als Transport- und Montageeinheit ausgebildete Turmspitze eines oben drehenden Baukrans, dessen Ausleger mittels Seileinziehwerk ein- und auswippbar ist, mit einer oder mehreren, an der Spitze der Turmspitze angeordneten, der Umlenkung des Wippseils dienenden Seilrollen.The invention relates to a spire designed as a transport and assembly unit of an overhead rotating construction crane, the jib of which can be luffed in and out by means of a rope pulling-in device, with one or more rope pulleys which are arranged at the top of the spire and serve to deflect the luffing rope.

Es ist ein oben drehender, eine Turmspitze, einen Ausleger und einen Gegenausleger aufweisender Baukran bekannt, bei dem das Ein- und Auswippen des Auslegers mit einem Seileinziehwerk (Wippwerk) erfolgt, das auf dem Gegenausleger bzw. im sich hinter der Turmspitze befindlichen Maschinenhaus angeordnet ist. Bisher wurden für den Turmkopf die Turmspitze, der Gegenausleger/Maschinenhaus und der im Betriebszustand des Krans an der Hauptabspannung des Auslegers befestige Rollenblock als getrennte Einheiten zum Kranaufstellungort transportiert. Da das Auslegereinziehwerk am Gegenausleger, Umlenkrollen an der Turmspitze und der Rollenblock an der Hauptabspannung angeordnet sind, konnte das Einscheren des Wippseils nicht im Herstellerwerk, sondern nur manuell an der Baustelle vorgenommen werden. Die manuelle Seileinscherung an der Baustelle ist jedoch anstrengend und erhöht die Montagezeit. Der Erfindung liegt daher die Aufgabe zugrunde, eine Turmspitze der eingangs genannten Art so zu gestalten, daß der Turmkopf des Baukrans an der Baustelle in relativ kurzer Zeit montiert bzw. demontiert werden kann.A top-rotating construction crane is known, which has a spire, a jib and a counter-jib, in which the jib is swiveled in and out with a rope pull-in mechanism (luffing mechanism) which is arranged on the counter-jib or in the machine house located behind the spire . So far, the tower top, the counter jib / machine house and the roller block attached to the main guying of the boom in the operating state of the tower were transported as separate units to the crane installation site. Since the jib pull-in mechanism is arranged on the counter jib, deflection rollers on the top of the tower and the roller block on the main guying, the rocking rope could not be reeved in at the manufacturer's plant, but only manually at the construction site. However, manual rope reeving at the construction site is exhausting and increases the assembly time. The invention is therefore based on the object to design a spire of the type mentioned in such a way that the tower head of the construction crane can be assembled or disassembled at the construction site in a relatively short time.

Diese Aufgabe wird erfindungsgemäßdadurch gelöst, daß das mit dem Wippseil versehene Seileinziehwerk an einem Träger der Turmspitze befestigt ist, daß das Wippseil über die Umlenkrolle bzw. Umlenkrollen an der Spitze der Turmspitze und eine oder mehrere, in einem Träger gelagerte, weitere Umlenkrollen zur Spitze der Turmspitze geführt und dort befestigt ist, und daß der Träger der Umlenkrollen mit der Turmspitze fest, jedoch lösbar, verbunden ist.This object is achieved according to the invention in that the rope pulling device provided with the luffing rope is fastened to a carrier of the tower top, that the luffing rope over the deflection roller or deflection rollers at the top of the tower top and one or more further deflection rollers mounted in a carrier to the top of the tower The spire is guided and fastened there, and that the support of the deflection rollers is firmly but releasably connected to the spire.

Bei der erfindungsgemäßen Turmspitze mit integriertem Einziehwerk werden das Wippseil bereits im Herstellerwerk maschinell eingeschert und die Turmspitze mit dem an ihr fixierten Rollenblock zur Baustelle transportiert. Die Montage bzw. Demontage des Turmkopfes an der Baustelle ist relativ einfach und zeitsparend.In the case of the tower top according to the invention with an integrated retracting mechanism, the luffing rope is already mechanically reeved in the manufacturing plant and the tower tip is transported to the construction site with the roller block attached to it. The assembly or disassembly of the tower head at the construction site is relatively simple and time-saving.

In der Zeichnung ist ein Ausführungsbeispiel der Erfindung schematisch dargestellt. Es zeigt:

  • Figur 1 eine Seitenansicht auf die Turmspitze im Montagezustand,
  • Figur 2 eine Ansicht auf die Turmspitze im Montagezustand, in Richtung des Pfeiles A nach Figur 1 gesehen, und
  • Figur 3 eine Seitenansicht auf den Turmkopf eines oben drehenden Baukrans im Betriebszustand. N/RP 07a.8961
In the drawing, an embodiment of the invention is shown schematically. It shows:
  • FIG. 1 shows a side view of the spire in the assembled state,
  • Figure 2 is a view of the spire in the assembled state, seen in the direction of arrow A of Figure 1, and
  • Figure 3 is a side view of the tower head of an overhead rotating construction crane in the operating state. N / RP 07a.8961

Die Turmspitze weist ein Unterteil 1a, einen Drehrahmen 1b mit Drehwerk und ein in Richtung eines Gegenauslegers 2 schräg stehendes, in Fachwerkbauweise ausgeführtes Maststück 1c auf. Das Maststück 1c ist in seinem unteren Bereich mit einem waagrechten Träger 3 versehen, der zwischen den oberen und unteren Längsholmen 4a, 4b verläuft und mit diesen fest verbunden ist. Auf dem Träger 3 ist das Ausleger-Einziehwerk 5 befestigt, das im wesentlichen aus einer Seiltrommel 6 und derem motorischen Antrieb besteht. Auf der Seiltrommel 6 ist ein Wippseil 7 befestigt, das unter mehrfacher Seileinscherung über - beispielsweise vier-- Umlenkrollen 8 an der Spitze der Turmspitze 1 und weitere - beispielsweise vier - Umlenkrollen 9, zu einem Festpunkt 11 an der Spitze der Turmspitze geführt ist. Die Umlenkrollen 8, 9 sind je auf einer gemeinsamen waagrechten Achse gelagert und über ihre Achsen in entsprechenden Ausnehmungen ihrer Tragkonstruktion abgestützt. Die Tragkonstruktion der Umlenkrollen 8 und das Einziehwerk 5 sind sowohl im Transport- und Montagefall als auch im Betriebszustand des Krans mit der Turmspitze verbunden.The top of the tower has a lower part 1a, a rotating frame 1b with rotating mechanism and a mast piece 1c, which is inclined in the direction of a counterjib 2 and is constructed in a half-timbered construction. The mast section 1c is provided in its lower region with a horizontal support 3 which runs between the upper and lower longitudinal spars 4a, 4b and is firmly connected to them. On the carrier 3, the boom pull-in mechanism 5 is fastened, which essentially consists of a cable drum 6 and its motor drive. On the cable drum 6, a seesaw rope 7 is fastened, which, with multiple rope reeving, is guided to a fixed point 11 at the top of the tower top by - for example four - guide rollers 8 at the top of the tower tip 1 and further - for example four - guide rollers 9. The deflection rollers 8, 9 are each mounted on a common horizontal axis and supported on their axes in corresponding recesses in their supporting structure. The supporting structure of the deflection rollers 8 and the pull-in mechanism 5 are connected to the top of the tower both in the case of transport and assembly and in the operating state of the crane.

Die Tragkonstruktion 10 samt Umlenkrollen 9 - der sogenannte Rollenblock - ist im Transport- und Montagefall der Turmspitze über Bolzen-Lochverbindungen an einem Querträger 17 der oberen Längsholme 4a fest, aber lösbar, fixiert. - Im Betriebszustand des an der Baustelle montierten Baukrans ist der Rollenblock 9,10, nachdem er von der Turmspitze 1 gelöst worden ist, mit der Hauptabspannung 12 des um eine waagrechte Achse schwenkbar an der Turmspitze 1 angelenkten Auslegers 13 fest, jedoch lösbar, verbunden.The support structure 10 together with deflection rollers 9 - the so-called roller block - is fixed, but detachably, in the case of transport and assembly of the tower top via bolt-hole connections on a cross member 17 of the upper longitudinal spars 4a. - In the operating state of the construction crane mounted on the construction site, the roller block 9, 10, after it has been detached from the top of the tower 1, is fixedly but detachably connected to the main guying 12 of the boom 13 pivoted about a horizontal axis on the top of the tower 1.

Die im Herstellerwerk fertig montierte Turmspitze - d. h. das Maststück 1c mit integriertem Einziehwerk mit Wippseil, den Umlenkrollen 8, dem eingescherten Rollenblock 9, 10, der Gegenauslegerabspannung 16, dem Drehrahmen 1b und dem Unterteil 1a - wird in an sich bekannter Weise auf das letzte Turmstück des Baukrans gesetzt und dort verbolzt. Anschließend werden der Gegenausleger 2 und der Wippausleger 13 montiert sowie die Gegengewichte 14 hochgezogen und eingehängt. Sodann werden die den Rollenblock 9, 10 mit dem Maststück 1c verbindenden Bolzen 15 gelöst und der Rollenblock 9, 10 wird mittels eines Autokrans von der Turmspitze zu der Hauptabspannung 12 des Auslegers 13, unter gleichzeitigen Abspulen des Wippseils 7 von der Seiltrommel 6, gezogen und mitder Hauptabspannung 12 verbolzt.The tower top fully assembled in the manufacturer's plant - ie the mast piece 1c with integrated pull-in mechanism with rocker rope, the Deflection pulleys 8, the reeved roller block 9, 10, the counter jib guying 16, the rotating frame 1b and the lower part 1a - are placed in a manner known per se on the last tower section of the construction crane and bolted there. Then the counter jib 2 and the luffing jib 13 are mounted and the counterweights 14 are pulled up and suspended. Then the bolts 15 connecting the roller block 9, 10 to the mast piece 1c are loosened and the roller block 9, 10 is pulled by means of a mobile crane from the top of the tower to the main guy 12 of the jib 13, while simultaneously unwinding the seesaw rope 7 from the rope drum 6 bolted to the main guy 12.

Claims (2)

1. Als Transport- und Montageeinheit ausgebildete Turmspitze eines oben drehenden Baukrans, dessen Ausleger mittels Seileinziehwerk ein- und auswippbar ist, mit einer oder mehreren, an der Spitze der Turmspitze angeordneten, der Umlenkung des Wippseils dienenden Seilrollen, dadurch gekennzeichnet, daß das mit dem Wippseil (7) versehene Seileinziehwerk (5) an einem Träger (3) der Turmspitze (1) befestigt ist, daß das Wippseil (7) über die Umlenkrolle bzw. Umlenkrollen (8) an der Spitze der Turmspitze (1) und eine oder mehrere, in einem Träger (10) gelagerte, weitere Umlenkrollen (9) zur Spitze der Turmspitze geführt und dort befestigt ist, und daß der Träger (10) der Umlenkrollen (9) mit der Turmspitze (1) fest, jedoch lösbar, verbunden ist.1. As a transport and assembly unit formed tower top of a top-rotating construction crane, the boom of which can be swiveled in and out by means of a rope retractor, with one or more arranged at the top of the tower top, serving to deflect the seesaw rope, characterized in that the with The luffing rope (7) provided with the rope pull-in mechanism (5) is attached to a carrier (3) of the tower top (1), that the luffing rope (7) via the deflection roller or deflection rollers (8) at the top of the tower top (1) and one or more , further deflection rollers (9) mounted in a carrier (10) are guided to the top of the tower top and fastened there, and that the carrier (10) of the deflection rollers (9) is firmly but releasably connected to the tower top (1). 2. Mit der Turmspitze nach Anspruch 1 versehener Baukran, dadurch gekennzeichnet, daß der Träger (10) der Umlenkrolle bzw. Umlenkrollen (9) von der Turmspitze gelöst und mit der Hauptabspannung (12) des Auslegers (13) verbunden wird.2. Provided with the spire according to claim 1, characterized in that the carrier (10) of the deflecting roller or deflecting rollers (9) is detached from the spire and is connected to the main guying (12) of the boom (13).
EP19880110546 1987-07-04 1988-07-01 Building crane with a turning mast head constructed as a transport and assembly unit Expired - Lifetime EP0298391B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE8709267U 1987-07-04
DE8709267U DE8709267U1 (en) 1987-07-04 1987-07-04 Tower tip of a rotating construction crane designed as a transport and assembly unit

Publications (2)

Publication Number Publication Date
EP0298391A1 true EP0298391A1 (en) 1989-01-11
EP0298391B1 EP0298391B1 (en) 1991-10-09

Family

ID=6809747

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19880110546 Expired - Lifetime EP0298391B1 (en) 1987-07-04 1988-07-01 Building crane with a turning mast head constructed as a transport and assembly unit

Country Status (2)

Country Link
EP (1) EP0298391B1 (en)
DE (1) DE8709267U1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2706882A1 (en) * 1993-06-22 1994-12-30 Potain Sa
FR2892405A1 (en) * 2005-10-26 2007-04-27 Potain Soc Par Actions Simplif Luffing crane mounting method for construction site, involves using auxiliary hoist with cable to realize cabling operation of lifting block with lifting cable, mounting operation of temporary sling and mounting operation of tie rod line
DE102007009402A1 (en) * 2007-02-23 2008-08-28 Wolffkran Ag Luffing jib tower crane
ES2344493A1 (en) * 2007-08-03 2010-08-27 Linden Comansa, S.L . Improvements in folding boom cranes (Machine-translation by Google Translate, not legally binding)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2756551B1 (en) * 1996-12-03 1999-01-15 Potain Sa METHOD AND DEVICE FOR MOUNTING THE TIE RODS OF TOWER CRANE BOOMS
DE102007019747B4 (en) 2007-04-20 2009-02-05 Wilbert Turmkrane Gmbh Luffing crane with transport bracket for roller blocks
DE102012019248A1 (en) * 2012-09-28 2014-04-03 Liebherr-Werk Biberach Gmbh Tower Crane
DE202017000243U1 (en) * 2017-01-16 2018-04-18 Liebherr-Werk Nenzing Gmbh Boom adjustment device for a working device

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL98241C (en) *
GB191415558A (en) * 1914-02-18 1915-02-18 Charles Wolfe Blue Improvements in and relating to Tower Derricks.
GB322574A (en) * 1928-10-01 1929-12-12 Caswell Cranes & Erection Ltd Improvements in and connected with tower cranes
FR1051231A (en) * 1951-08-23 1954-01-14 Lifting gear
DE1188783B (en) * 1962-08-10 1965-03-11 Hilgers A G Climbing crane
DE2217379A1 (en) * 1972-04-11 1973-11-08 Hans Tax TOWER CRANE
FR2229253A7 (en) * 1973-05-09 1974-12-06 Tornborg Et Lundberg Ab
DE3226211A1 (en) * 1981-12-21 1983-07-14 Liebherr-Werk Biberach Gmbh, 7950 Biberach Tower tip with counter-jib
DE3510116A1 (en) * 1984-04-25 1985-10-31 Liebherr-Werk Biberach Gmbh, 7950 Biberach Tower crane slewing at the top

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL98241C (en) *
GB191415558A (en) * 1914-02-18 1915-02-18 Charles Wolfe Blue Improvements in and relating to Tower Derricks.
GB322574A (en) * 1928-10-01 1929-12-12 Caswell Cranes & Erection Ltd Improvements in and connected with tower cranes
FR1051231A (en) * 1951-08-23 1954-01-14 Lifting gear
DE1188783B (en) * 1962-08-10 1965-03-11 Hilgers A G Climbing crane
DE2217379A1 (en) * 1972-04-11 1973-11-08 Hans Tax TOWER CRANE
FR2229253A7 (en) * 1973-05-09 1974-12-06 Tornborg Et Lundberg Ab
DE3226211A1 (en) * 1981-12-21 1983-07-14 Liebherr-Werk Biberach Gmbh, 7950 Biberach Tower tip with counter-jib
DE3510116A1 (en) * 1984-04-25 1985-10-31 Liebherr-Werk Biberach Gmbh, 7950 Biberach Tower crane slewing at the top

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2706882A1 (en) * 1993-06-22 1994-12-30 Potain Sa
EP0635450A1 (en) * 1993-06-22 1995-01-25 Potain Method and device for mounting the jibs of tower cranes
FR2892405A1 (en) * 2005-10-26 2007-04-27 Potain Soc Par Actions Simplif Luffing crane mounting method for construction site, involves using auxiliary hoist with cable to realize cabling operation of lifting block with lifting cable, mounting operation of temporary sling and mounting operation of tie rod line
EP1780165A1 (en) * 2005-10-26 2007-05-02 Potain Method and device for the assembly of a crane with a lifting jib
CN1955102B (en) * 2005-10-26 2010-07-21 马尼托沃克起重机集团(法国)公司 Method and device for the assembly of a crane with a lifting jib
AU2006233182B2 (en) * 2005-10-26 2011-08-04 Manitowoc Crane Group France Luffing jib crane erection process and system
KR101330716B1 (en) 2005-10-26 2013-11-26 매니토웍 크레인 그룹 프랑스 Luffing jib crane erection process and system
DE102007009402A1 (en) * 2007-02-23 2008-08-28 Wolffkran Ag Luffing jib tower crane
ES2344493A1 (en) * 2007-08-03 2010-08-27 Linden Comansa, S.L . Improvements in folding boom cranes (Machine-translation by Google Translate, not legally binding)

Also Published As

Publication number Publication date
EP0298391B1 (en) 1991-10-09
DE8709267U1 (en) 1987-08-20

Similar Documents

Publication Publication Date Title
DE3504546C2 (en)
DE10303555B4 (en) Method for craneless mounting of a rotor blade of a wind energy plant
EP1894883B1 (en) Crane vehicle
DE102009056245B4 (en) Wind turbine with lifting device
EP1815136A2 (en) Device and method for mounting and/or dismantling a component of a wind turbine
EP2426077A1 (en) Crane
WO2015039876A1 (en) Device and method for handling, mounting or demounting components of a wind turbine
DE2525867A1 (en) CRANE
EP0298391B1 (en) Building crane with a turning mast head constructed as a transport and assembly unit
DE3108455A1 (en) CRANE
WO2015158713A1 (en) Mobile crane device and method for the temporary assembly of such a crane device
DE2838239C2 (en) Guyed tower structure
DE102010060639A1 (en) Working platform system for complete inspection of rotor blades of wind power plants, has carrier device comprising movable suspension device, and working platform containing approximate horizontal position even during irregular loading
DE202011001850U1 (en) crane
DE3340845C1 (en) Lattice boom crane with main boom that can be dismantled
DE2064468C3 (en) Luffing crane
EP2655243B1 (en) Jib bracing system for a tower crane
DE3042287A1 (en) Heavy-duty telescopic crane jib - has fly jib attached by pivot pins to main jib and gantry
DE3307892C2 (en) Tower crane with jib and counter jib
DE849605C (en) Tower crane
DE3315888A1 (en) Crane for transferring cargo from one ship to another
WO2001094249A1 (en) Method and device for mounting a wind turbine
DE102020006544A1 (en) Process and equipment for erecting, equipping and operating inland wind turbines of great height and power
EP4019452B1 (en) Load transport system for transporting a load in a working area
DE943319C (en) Jib crane with changeable outreach, especially for construction work

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): BE CH GB LI NL SE

17P Request for examination filed

Effective date: 19890221

17Q First examination report despatched

Effective date: 19900212

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: MAN GHH LOGISTICS GMBH

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): BE CH GB LI NL SE

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
EAL Se: european patent in force in sweden

Ref document number: 88110546.4

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 19980611

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 19980723

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 19980731

Year of fee payment: 11

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY

Effective date: 19990702

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990731

BERE Be: lapsed

Owner name: MAN GHH LOGISTICS G.M.B.H.

Effective date: 19990731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20000201

EUG Se: european patent has lapsed

Ref document number: 88110546.4

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee

Effective date: 20000201

REG Reference to a national code

Ref country code: CH

Ref legal event code: PUE

Owner name: MAN GHH LOGISTICS GMBH TRANSFER- MAN AKTIENGESELLS

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20030701

Year of fee payment: 16

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20030827

Year of fee payment: 16

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040701

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040731

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040731

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20040701

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL