EP0272473B1 - Process for supporting retaining walls - Google Patents

Process for supporting retaining walls Download PDF

Info

Publication number
EP0272473B1
EP0272473B1 EP87117271A EP87117271A EP0272473B1 EP 0272473 B1 EP0272473 B1 EP 0272473B1 EP 87117271 A EP87117271 A EP 87117271A EP 87117271 A EP87117271 A EP 87117271A EP 0272473 B1 EP0272473 B1 EP 0272473B1
Authority
EP
European Patent Office
Prior art keywords
wall
cavities
retaining wall
pillar
retaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP87117271A
Other languages
German (de)
French (fr)
Other versions
EP0272473A2 (en
EP0272473A3 (en
Inventor
Kurt G. Dipl.-Ing. Ross
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to AT87117271T priority Critical patent/ATE65564T1/en
Publication of EP0272473A2 publication Critical patent/EP0272473A2/en
Publication of EP0272473A3 publication Critical patent/EP0272473A3/en
Application granted granted Critical
Publication of EP0272473B1 publication Critical patent/EP0272473B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0275Retaining or protecting walls characterised by constructional features cast in situ

Definitions

  • the invention relates to a method for intercepting retaining walls with the soil behind them by subsequent attachment of spaced-apart reinforcement ribs which extend essentially perpendicular to the retaining wall, as is known from AT-B-217 676.
  • a disadvantage of this measure is that the reinforcing ribs forming the supporting pillars on the front of the wall often interfere. On the one hand, space is required, which is often not available there because paths or roads lead along the retaining wall; on the other hand, the appearance of the retaining wall is significantly changed by the supporting pillars.
  • the object of the invention is therefore to provide a statically verifiable method of the type mentioned, with which retaining walls to be renovated can be intercepted, the measures to be carried out on the back of the wall being connected with as little effort as possible and the front of the wall should remain unaffected.
  • reinforcing ribs as pillar reserves are connected by a toothing with the irregular wall back facing the ground to form a monolithic unit and that corresponding cavities are made on the back of the wall and then filled with cement-bound pillar material.
  • the pillar reserves formed in this way which are spaced apart and occupy a relatively small cross-sectional area in relation to the total area of the retaining wall, form an intimate connection and a monolithic unit with the retaining wall by interlocking with the irregular back of the wall.
  • the pillar reserves exert a supporting effect on the retaining wall that is comparable to the supporting effect of a supporting pillar arranged on the front side of the wall.
  • the principle is based on reinforcing the ribs of free wall lengths and reducing the earth pressure by absorbing frictional forces on the rib surfaces (pillar surfaces) created by increasing the area.
  • the recording of the earth pressure can be verified with the help of soil parameters and represents a statically determinable system that can do without the constructive solution provided in AT-PS 217 676.
  • the static system is achieved by a "single-field beam effect" of pillars and pillars and the spacing of the pillars is kept so small that the remaining space does not allow tensile stress on the masonry.
  • the dimensions of the pillar reserves are relatively small and are limited to the minimum static size.
  • the cavities are filled in by blowing in gravel and mortar is injected by injecting cement suspension.
  • the reinforcing ribs are thus made of concrete, which has sufficient tensile strength even without reinforcement, in particular at the connection point to the rear of the wall, in order to transmit the required supporting forces to the retaining wall.
  • the cavities are rinsed out by one or more flushing bores and drain bores reaching through the retaining wall and the back of the wall is cleaned by means of high-pressure water jets before the pillar material is introduced into the cavities.
  • the required work on the back of the wall can be carried out with very minor interventions on the retaining wall that do not change the appearance of the retaining wall.
  • a retaining wall 1 consisting, for example, of old masonry, which according to its cross-section cannot be regarded statically as a heavyweight wall, supports the soil behind it. If necessary, the retaining wall 1 can be renovated in the usual way from the front side 3, in particular by pressing out the Masonry with mortar and by grouting.
  • pillar reserves 4 which form reinforcing ribs, have been attached to the rear of the retaining wall 1 at statically determinable intervals.
  • the pillar reserves can be trapezoidal, for example.
  • the pillar depth increases from a pillar crown 5 to the pillar foot 6 with a constant width.
  • other pillar shapes can also be selected, for example triangular shapes.
  • the pillar crown 5 is preferably below the surface of the earth.
  • the cavity 7 corresponding to the pillar cross-section (FIG. 3) is produced on the rear wall 8 in that one or more flushing holes 9 are made from the front wall 3 through the flushing nozzles 10 will be introduced.
  • one or more drain holes 10 are provided at the foot of the retaining wall 1.
  • the soil on the back of the wall 8 is flushed out in the statically determined area and transported out through the drain holes 10a until the cavity 7 is formed in the desired shape.
  • the back of the wall 8 is completely cleaned by water jets 11 (FIG. 4) which are directed against the back of the wall 8 by a rinsing nozzle 12.
  • the pillar material is then introduced into the cavity 7.
  • a gravel filling 14 can first be blown into the cavity through a larger opening 13, which is then mortared by the injection of cement suspension by means of an injection lance 15.
  • the pillar reserves 4 made of concrete after setting together with the retaining wall 1 form a monolithically uniform structure which is sufficiently stiff to absorb the earth pressure of the existing soil.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Retaining Walls (AREA)
  • Mounting Of Bearings Or Others (AREA)
  • Separation, Sorting, Adjustment, Or Bending Of Sheets To Be Conveyed (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Shaping Of Tube Ends By Bending Or Straightening (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Paper (AREA)
  • Crystals, And After-Treatments Of Crystals (AREA)

Abstract

On the rear side of the retaining walls (1) to be reconstructed, a plurality of pillar retreats (4) arranged at a distance from one another are constructed in the earth behind the retaining walls (1), which pillar retreats (4) are connected to the retaining walls (1) to form a monolithic unit. Cavities are scoured out on the rear side (8) of the wall and filled with gravel and a cement suspension. <IMAGE>

Description

Die Erfindung betrifft ein Verfahren zum Abfangen von Stützmauern mit dahinter anstehendem Erdreich durch nachträgliche Anbringung von im Abstand zueinander angeordneten, sich im wesentlichen senkrecht zur Stützmauer erstreckenden Verstärkungsrippen, wie aus der AT-B-217 676 bekannt.The invention relates to a method for intercepting retaining walls with the soil behind them by subsequent attachment of spaced-apart reinforcement ribs which extend essentially perpendicular to the retaining wall, as is known from AT-B-217 676.

Es ist bereits seit sehr langer Zeit bekannt, Stützmauern, hinter denen Erdreich ansteht, durch als Stützpfeiler oder Pfeiler-Vorlagen ausgebildete Verstärkungsrippen zu stützen, die an der Mauervorderseite, d.h. der dem Erdreich abgekehrten Seite, in Abständen angebracht werden. Obwohl die Festigkeit einer solchen Stützmauer mit davorstehenden Verstärkungsrippen statisch nicht nachweisbar ist, haben die über Jahrhunderte reichenden Erfahrungen gezeigt, daß auf diese Weise eine sehr wesentliche Stützwirkung erreicht wird. Die Anbringung derartiger Stützpfeiler vor der Mauer ist deshalb eine bereits sehr alte Maßnahme, um Stützmauern abzufangen, die sich wegen nicht ausreichender Schwergewichtswirkung zur Vorderseite hin neigen.It has been known for a very long time to support retaining walls, behind which there is soil, by means of reinforcing ribs designed as supporting pillars or pillar templates, which ribs on the front side of the wall, i.e. the side facing away from the ground, be placed at intervals. Although the strength of such a retaining wall with reinforcing ribs in front of it cannot be demonstrated statically, experience over centuries has shown that a very essential supporting effect is achieved in this way. The installation of such pillars in front of the wall is therefore a very old measure to intercept retaining walls that lean towards the front due to insufficient heavy weight effects.

Nachteilig an dieser Maßnahme ist, daß die die Stützpfeiler bildenden Verstärkungsrippen an der Mauervorderseite oftmals stören. Einerseits wird Platz beansprucht, der oftmals dort nicht zur Verfügung steht, weil an der Stützmauer Wege oder Strassen entlangführen; andererseits wird das Aussehen der Stützmauer durch die Stützpfeiler wesentlich verändert.A disadvantage of this measure is that the reinforcing ribs forming the supporting pillars on the front of the wall often interfere. On the one hand, space is required, which is often not available there because paths or roads lead along the retaining wall; on the other hand, the appearance of the retaining wall is significantly changed by the supporting pillars.

Deshalb wurden andere Maßnahmen zur Sanierung von Stützmauern entwickelt. Bei einem bekannten Verfahren (DE-OS 34 o8 461) wird entlang der gesamten Stützmauer an der Mauerrückseite ein Hohlraum durch Ausspülen erzeugt, der anschließend durch Einpressen einer Mörtelmasse verfüllt wird, die nach dem Abbinden einen mit der Stützmauer zusammenhängenden Mauerwerkskörper bildet, der eine vollständige Schwergewichtsmauer darstellt, deren Standfestigkeit auch statisch nachweisbar ist.Therefore, other measures for the renovation of retaining walls were developed. In a known method (DE-OS 34 o8 461), a cavity is created along the entire retaining wall on the back of the wall by rinsing, which is then filled in by pressing in a mortar mass which, after setting, forms a masonry body connected to the retaining wall, which is complete Heavyweight wall, the stability of which is also statically verifiable.

Der hierfür erforderliche Aufwand an Arbeit und an Mörtelmasse ist verhältnismäßig groß und vollzieht sich allein nach dem Prinzip der Schwergewichtsmauer. In vielen Fällen reicht es auch aus, einzelne im Abstand angeordnete Verstärkungsrippen an der Mauervorderseite vorzusehen, wie die zahlreichen und teilweise sehr alten Beispiele von Stützmauern zeigen.The work and mortar mass required for this is relatively large and takes place solely on the principle of the heavyweight wall. In many cases it is also sufficient to provide individual, spaced-apart reinforcement ribs on the front of the wall, as the numerous and sometimes very old examples of retaining walls show.

Es ist auch bekannt (AT-B-217 676), an der Mauerrückseite von zu sanierenden Stützmauern senkrechte, im Abstand zueinander stehende Trennwände zu errichten, um den Erddruck zu verringern. Diese Trennwände werden bei dem bekannten Verfahren dadurch gebildet, daß nacheinander in vielen benachbarten Bereichen des Erdreichs Injektionen vorgenommen werden. Damit diese von den Injektionen erfassten Bereiche zur Bildung einer Trennwand einen Zusammenhang bekommen, werden Anker von der Stützmauer her in diese Bereiche vorgetrieben.It is also known (AT-B-217 676) to erect vertical, spaced-apart partition walls on the rear side of retaining walls to be renovated in order to reduce the earth pressure. In the known method, these dividing walls are formed in that injections are carried out successively in many neighboring regions of the earth. Anchors are driven from the retaining wall into these areas so that these areas covered by the injections are related to the formation of a partition.

Obwohl es fraglich erscheint, ob mit derartigen Injektionen in das Erdreich wirksame Trennwände aufgebaut werden können, ist zumindest festzustellen, daß die Wirkung dieser Trennwände nicht darin besteht, die Stützmauer abzufangen, sondern im wesentlichen nur darin, in dem dahinter anstehenden Erdreich durch Unterteilung eine Silowirkung zu erreichen, wodurch der Erddruck soweit gemindert wird, daß die Stützmauer dem Erddruck wieder standhalten kann, insbesondere nachdem sie in üblicher Weise von der Vorderseite durch Verfugen und Ausspritzen saniert wurde.Although it appears questionable whether effective partition walls can be built with such injections into the ground, it can at least be stated that the effect of these partition walls is not to intercept the retaining wall, but essentially only to create a silo effect in the soil behind it by subdivision to reach, causing the earth pressure so far is reduced that the retaining wall can withstand the earth pressure again, especially after it has been renovated in the usual way from the front by grouting and spraying.

Aufgabe der Erfindung ist es daher, ein statisch nachweisbares Verfahren der eingangs genannten Gattung zu schaffen, mit dem zu sanierende Stützmauern abgefangen werden können, wobei die an der Mauerrückseite vorzunehmenden Maßnahmen mit möglichst geringem Aufwand verbunden sein sollen und wobei die Mauervorderseite unbeeinträchtigt bleiben soll.The object of the invention is therefore to provide a statically verifiable method of the type mentioned, with which retaining walls to be renovated can be intercepted, the measures to be carried out on the back of the wall being connected with as little effort as possible and the front of the wall should remain unaffected.

Diese Aufgabe wird erfindungsgemäß dadurch gelöst, daß die Verstärkungsrippen als Pfeiler-Rücklagen durch Verzahnung mit der dem Erdreich zugekehrten unregelmäßigen Mauerrückseite zu einer monolithischen Einheit Verbunden werden und daß an der Mauerrückseite den vorgesehenen Pfeilerquerschnitten entsprechende Hohlräume hergestellt und anschließend mit zementgebundenem Pfeilermaterial verfüllt werden.This object is achieved in that the reinforcing ribs as pillar reserves are connected by a toothing with the irregular wall back facing the ground to form a monolithic unit and that corresponding cavities are made on the back of the wall and then filled with cement-bound pillar material.

Die so gebildeten Pfeiler-Rücklagen, die im Abstand zueinander ausgeführt werden und eine im Verhältnis zur Gesamtfläche der Stützmauer nur verhältnismäßig kleine Querschnittsfläche einnehmen, bilden mit der Stützmauer durch Verzahnung mit der unregelmäßigen Mauerrückseite eine innige Verbindung und eine monolithische Einheit. An der Verbindungsstelle zur Stützmauer üben die Pfeiler-Rücklagen eine Stützwirkung auf die Stützmauer aus, die vergleichbar mit der Stützwirkung eines an der Mauervorderseite angeordneten Stützpfeilers ist. Das Prinzip beruht auf der Rippenverstärkung freier Mauerlängen sowie der Abminderung des Erddruckes durch Aufnahme von Reibungskräften an den durch Flächenvermehrung zusätzlich geschaffenen Rippenflächen (Pfeilerflächen).The pillar reserves formed in this way, which are spaced apart and occupy a relatively small cross-sectional area in relation to the total area of the retaining wall, form an intimate connection and a monolithic unit with the retaining wall by interlocking with the irregular back of the wall. At the connection point to the retaining wall, the pillar reserves exert a supporting effect on the retaining wall that is comparable to the supporting effect of a supporting pillar arranged on the front side of the wall. The principle is based on reinforcing the ribs of free wall lengths and reducing the earth pressure by absorbing frictional forces on the rib surfaces (pillar surfaces) created by increasing the area.

Die Aufnahme des Erddruckes kann so mit Hilfe von Bodenkennwerten nachgewiesen werden und stellt ein statisch bestimmbares System dar, das auf die in der AT-PS 217 676 vorgesehene Konstruktiv-Lösung verzichten kann.The recording of the earth pressure can be verified with the help of soil parameters and represents a statically determinable system that can do without the constructive solution provided in AT-PS 217 676.

Im Gegensatz zur Schwergewichtsmauer wird das statische System durch eine "Einfeld-Balkenwirkung" von Pfeiler und Pfeiler erreicht und die Abstände der Pfeiler so klein gehalten, daß der verbleibende Zwischenraum keine Zugbeanspruchung des Mauerwerks zuläßt. Die Abmessungen der Pfeiler-Rücklagen sind dabei verhältnismäßig klein und beschränken sich auf das statische Mindestmaß.In contrast to the heavyweight wall, the static system is achieved by a "single-field beam effect" of pillars and pillars and the spacing of the pillars is kept so small that the remaining space does not allow tensile stress on the masonry. The dimensions of the pillar reserves are relatively small and are limited to the minimum static size.

Die Hohlräume werden dabei durch Einblasen von Kies-Körnung verfüllt und durch Einpressen von Zementsuspension vermörtelt. Die Verstärkungsrippen bestehen somit aus Beton, der auch ohne Bewehrungen eine ausreichende Zugfestigkeit, insbesondere an der Verbindungsstelle zur Mauerrückseite aufweist, um die erforderlichen Stützkräfte auf die Stützmauer zu übertragen.The cavities are filled in by blowing in gravel and mortar is injected by injecting cement suspension. The reinforcing ribs are thus made of concrete, which has sufficient tensile strength even without reinforcement, in particular at the connection point to the rear of the wall, in order to transmit the required supporting forces to the retaining wall.

Gemäß einer bevorzugten Ausgestaltung des Verfahrens ist vorgesehen, daß die Hohlräume jeweils durch eine oder mehrere durch die Stützmauer reichende Spülbohrungen und Ablaufbohrungen ausgespült und die Mauerrückseite mittels Hochdruck-Wasserstrahlen gereinigt wird, bevor das Pfeilermaterial in die Hohlräume eingebracht wird. Auf diese Weise lassen sich mit sehr geringen, das Aussehen der Stützmauer nicht verändernden Eingriffen an der Stützmauer die erfoderlichen Arbeiten an der Mauerrückseite ausführen.According to a preferred embodiment of the method it is provided that the cavities are rinsed out by one or more flushing bores and drain bores reaching through the retaining wall and the back of the wall is cleaned by means of high-pressure water jets before the pillar material is introduced into the cavities. In this way, the required work on the back of the wall can be carried out with very minor interventions on the retaining wall that do not change the appearance of the retaining wall.

Weitere vorteilhafte Ausgestaltungen des Erfindungsgedankens sind Gegenstand weiterer Unteransprüche.Further advantageous embodiments of the inventive concept are the subject of further dependent claims.

Die Erfindung wird nachfolgend an einem Ausführungsbeispiel näher erläutert, das in der Zeichnung darstellt ist. Es zeigt:

  • Fig. 1 eine Stützmauer mit dahinter angeordneter Pfeiler-Rücklage im Schnitt,
  • Fig. 2 die Stützmauer nach Fig. 1 im Grundriß und
  • Fig. 3-6 die einzelnen Verfahrensschritte zur Herstellung der in den Fig. 1 und 2 gezeigten Pfeiler-Rücklagen an der Stützmauer.
The invention is explained in more detail below using an exemplary embodiment which is illustrated in the drawing. It shows:
  • 1 is a retaining wall with a pillar reserve arranged behind it in section,
  • Fig. 2, the retaining wall of FIG. 1 in plan and
  • Fig. 3-6 the individual process steps for producing the pillar reserves shown in Figs. 1 and 2 on the retaining wall.

Eine beispielsweise aus altem Mauerwerk bestehende Stützmauer 1, die nach ihrem Querschnitt statisch nicht als Schwergewichtsmauer anzusehen ist, stützt das dahinter anstehende Erdreich 2. Wenn erforderlich, kann die Stützmauer 1 in üblicher Weise von der Vorderseite 3 her saniert worden sein, insbesondere durch Auspressen des Mauerwerks mit Mörtel und durch Verfugen.A retaining wall 1 consisting, for example, of old masonry, which according to its cross-section cannot be regarded statically as a heavyweight wall, supports the soil behind it. If necessary, the retaining wall 1 can be renovated in the usual way from the front side 3, in particular by pressing out the Masonry with mortar and by grouting.

Um zu erreichen, daß die Stützmauer dem Erddruck des dahinter anstehenden Erdreichs 2 standhält, sind an der Rückseite der Stützmauer 1 in statisch bestimmbaren Abständen Pfeiler-Rücklagen 4 angebracht worden, die Verstärkungsrippen bilden. Wie man aus Fig. 1 erkennt, können die Pfeiler-Rücklagen beispielsweise trapezförmig sein. Von einer Pfeilerkrone 5 nimmt die Pfeilertiefe bei gleichbleibender Breite bis zum Pfeilerfuß 6 hin zu. Stattdessen können auch andere Pfeilerformen gewählt werden, beispielsweise Dreieckform. Vorzugsweise liegt die Pfeilerkrone 5 unterhalb der Erdoberfläche. Es ist aber auch möglich, die Pfeiler-Rücklage 4 bis zur Oberfläche des hinter der Stützmauer 1 anstehenden Erdreichs 2 hochzuführen. In diesem Fall ist es besonders einfach, den zur Bildung der Pfeiler-Rücklagen 4 erforderlichen Hohlraum an der Mauerrückseite herzustellen und mit dem Pfeilermaterial zu verfüllen.In order to ensure that the retaining wall withstands the earth pressure of the soil 2 behind it, pillar reserves 4, which form reinforcing ribs, have been attached to the rear of the retaining wall 1 at statically determinable intervals. As can be seen from Fig. 1, the pillar reserves can be trapezoidal, for example. The pillar depth increases from a pillar crown 5 to the pillar foot 6 with a constant width. Instead, other pillar shapes can also be selected, for example triangular shapes. The pillar crown 5 is preferably below the surface of the earth. However, it is also possible to raise the pillar reserve 4 up to the surface of the soil 2 behind the retaining wall 1. In this case, it is particularly easy To create the pillar reserves 4 necessary cavity on the back of the wall and fill with the pillar material.

Bei dem dargestellten Ausführungsbeispiel, bei dem die Pfeilerkrone 5 unterhalb der Erdoberfläche liegt, wird der dem Pfeilerquerschnitt entsprechende Hohlraum 7 (Fig. 3) an der Mauerrückseite 8 dadurch hergestellt, daß von der Mauervorderseite 3 eine oder mehrere Spülbohrungen 9 ausgeführt werden, durch die Spüldüsen 10 eingeführt werden. Am Fuß der Stützmauer 1 werden eine oder mehrere Ablaufbohrungen 10 vorgesehen.In the illustrated embodiment, in which the pillar crown 5 lies below the surface of the earth, the cavity 7 corresponding to the pillar cross-section (FIG. 3) is produced on the rear wall 8 in that one or more flushing holes 9 are made from the front wall 3 through the flushing nozzles 10 will be introduced. At the foot of the retaining wall 1, one or more drain holes 10 are provided.

Mit den Spüldüsen 10 wird das Erdreich an der Mauerrückseite 8 in dem statisch bestimmten Bereich ausgespült und durch die Ablaufbohrungen 10a heraustransportiert, bis der Hohlraum 7 in der gewünschten Form entstanden ist. Durch Wasserstrahlen 11 (Fig. 4), die von einer Spüldüse 12 gegen die Mauerrückseite 8 gerichtet werden, wird die Mauerrückseite 8 vollständig gereinigt. Dann wird das Pfeilermaterial in den Hohlraum 7 eingebracht. Hierzu kann beispielsweise durch eine größere Öffnung 13 zunächst eine Kiesfüllung 14 in den Hohlraum eingeblasen werden, die dann durch das Einpressen von Zementsuspension mittels einer Injektionslanze 15 vermörtelt wird.With the flushing nozzles 10, the soil on the back of the wall 8 is flushed out in the statically determined area and transported out through the drain holes 10a until the cavity 7 is formed in the desired shape. The back of the wall 8 is completely cleaned by water jets 11 (FIG. 4) which are directed against the back of the wall 8 by a rinsing nozzle 12. The pillar material is then introduced into the cavity 7. For this purpose, for example, a gravel filling 14 can first be blown into the cavity through a larger opening 13, which is then mortared by the injection of cement suspension by means of an injection lance 15.

Die nach dem Abbinden aus Beton bestehenden Pfeiler-Rücklagen 4 bilden zusammen mit der Stützmauer 1 ein monolithisch einheitliches Gebilde, das ausreichend steif ist, um den Erddruck des anstehenden Erdreichs aufzunehmen.The pillar reserves 4 made of concrete after setting together with the retaining wall 1 form a monolithically uniform structure which is sufficiently stiff to absorb the earth pressure of the existing soil.

Claims (4)

  1. Method for supporting retaining walls (1) with earth (2) in place behind them by later fitting of strengthening ribs arranged at intervals from each other, extending essentially perpendicularly to the retaining wall (1), characterised in that the strengthening ribs as support buttresses (4) are linked by indentation with the irregular rear side (8) of the wall turned towards the earth (2) to a monolithic unit and that, on the rear side (8) of the wall, cavities (7) corresponding to the buttress cross-sections foreseen are produced and then filled with cement-bonded buttress material.
  2. Method according to Claim 1, characterised in that the cavities (7) are filled with gravel grains (14) and are mortared by the injection of cement suspension.
  3. Method according to Claim 1, characterised in that the cavities (7) are in each case flushed out through one or more flushing holes (9) and drain holes (10a) extending through the retaining wall (1) and the rear side (8) of the wall is cleaned by means of water jets (11) before the buttress material is introduced into the cavities (7).
  4. Method according to Claim 3, characterised in that the buttress material is brought into the cavities (7) through holes in the retaining wall (1).
EP87117271A 1986-12-24 1987-11-24 Process for supporting retaining walls Expired - Lifetime EP0272473B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT87117271T ATE65564T1 (en) 1986-12-24 1987-11-24 PROCEDURE FOR RETAINING WALLS.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE3644399 1986-12-24
DE19863644399 DE3644399A1 (en) 1986-12-24 1986-12-24 METHOD FOR INTERCEPTING SUPPORT WALLS

Publications (3)

Publication Number Publication Date
EP0272473A2 EP0272473A2 (en) 1988-06-29
EP0272473A3 EP0272473A3 (en) 1988-11-30
EP0272473B1 true EP0272473B1 (en) 1991-07-24

Family

ID=6317165

Family Applications (1)

Application Number Title Priority Date Filing Date
EP87117271A Expired - Lifetime EP0272473B1 (en) 1986-12-24 1987-11-24 Process for supporting retaining walls

Country Status (5)

Country Link
EP (1) EP0272473B1 (en)
AT (1) ATE65564T1 (en)
DE (2) DE3644399A1 (en)
ES (1) ES2024480B3 (en)
GR (1) GR3002773T3 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1553230A2 (en) 2004-01-10 2005-07-13 Kurt G. Ross Method for rehabilitating retaining walls
CN108396605A (en) * 2018-02-12 2018-08-14 中交第二公路勘察设计研究院有限公司 Underlie buried cave dwelling road structure and construction method

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL194007C (en) * 1992-07-27 2001-04-03 Aannemingsbedrijf Cultuurweg B Monolith sheet pile stabilization.
DE102006018692A1 (en) * 2006-04-21 2007-10-25 Ross, Kurt G., Dipl.-Ing. Method for securing retaining walls
CN110106914A (en) * 2019-06-06 2019-08-09 长沙学院 A kind of gravity retaining wall bracing means and method
KR102671507B1 (en) 2019-08-30 2024-06-03 에이치엘만도 주식회사 Electric brake system and control method thereof
KR20220011961A (en) 2020-07-22 2022-02-03 주식회사 만도 Electric brake system and control method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2233872A (en) * 1936-07-27 1941-03-04 California Talc Company Means and method for solidifying underground structures
US2187324A (en) * 1937-09-15 1940-01-16 Benjamin J Many Method of and means for repairing masonry structures
DE1634431A1 (en) * 1967-07-25 1970-06-25 Kunz Alfred & Co Procedure for restoring the load-bearing capacity of foundation bodies that have become damaged
NL7904070A (en) * 1979-05-23 1980-11-25 Henricus Fredericus Josephus M Damaged embankment gap sealing method - by covering gap with flexible skin and injecting light mortar behind skin from water side
EP0151389B1 (en) * 1984-01-11 1990-07-25 Stump Bohr GmbH Method and apparatus for constructing building elements in the soil like piles, injection anchorages, cut-off walls or similar

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1553230A2 (en) 2004-01-10 2005-07-13 Kurt G. Ross Method for rehabilitating retaining walls
DE102004001559B4 (en) * 2004-01-10 2014-07-03 Bau-Sanierungstechnik Gmbh Method for intercepting retaining walls
CN108396605A (en) * 2018-02-12 2018-08-14 中交第二公路勘察设计研究院有限公司 Underlie buried cave dwelling road structure and construction method

Also Published As

Publication number Publication date
DE3644399A1 (en) 1988-07-07
ES2024480B3 (en) 1992-03-01
EP0272473A2 (en) 1988-06-29
GR3002773T3 (en) 1993-01-25
ATE65564T1 (en) 1991-08-15
EP0272473A3 (en) 1988-11-30
DE3771682D1 (en) 1991-08-29

Similar Documents

Publication Publication Date Title
DE2944385A1 (en) METHOD FOR PRODUCING SLOT WALLS
EP0234175B1 (en) Building set for the erection of walls
DE3215153A1 (en) Retaining structure and method of producing a retaining structure
EP0272473B1 (en) Process for supporting retaining walls
DE68904949T2 (en) Methods and components for the construction of underground garages.
DE102008018382A1 (en) Method for securing retaining walls
EP0290941B1 (en) Method for securing retaining walls
AT397415B (en) METHOD FOR PRODUCING UNDERGROUND CONSTRUCTIONS BY LID CONSTRUCTION
DE2062998A1 (en) Method for the full connection of a concrete body to an irregularly shaped surface using elastic formwork
DE3638664A1 (en) Method of constructing a sheet pile wall
AT395990B (en) NOISE PROTECTION WALL
DE1634589A1 (en) Network for consolidating the ground in the vicinity of already existing structures or for holding the ground in zones which are exposed to landslides, and method for producing such a network
AT330677B (en) METHOD FOR MANUFACTURING UNDERGROUND WALLS MANUFACTURED BY THE DIAPHRAGM METHOD, AND THE FINISHED PART AND DAM PART FOR PERFORMING THE METHOD
DE2252599A1 (en) PROCESS FOR PRODUCING UNDERGROUND WALLS FROM CASTABLE, CURING MATERIAL, IN PARTICULAR CONCRETE, AND FORMWORK FOR CARRYING OUT THIS PROCESS
DE4302986C2 (en) Process for the production of a structure in the form of a cover with precast reinforced concrete piles
DE2548298C2 (en) Method and cavity formwork wall for building a cavity wall
EP1553230B1 (en) Method for rehabilitating retaining walls
DE3837850C2 (en) Blackboard and formwork block
DE3201601A1 (en) Method of placing sheet pile walls or the like in the earth by flushing and also a construction element for carrying out the method
DE2649132A1 (en) Noise screening wall slab - has reinforced concrete perforated panel inset in load bearing rear frame with edge ribs
DE3931316C2 (en) Process for producing a shoring or retaining wall for terrain cuts
AT390290B (en) Method of producing a slope protective structure, and slope protective structure produced according to this method
DE19834476C1 (en) Shuttering for moulding concrete walls has shutter panels with positioning tubes for anchor stakes
DE1634589C3 (en) Pile grid made of concrete piles
DE3810970A1 (en) Method of constructing a sheeting or retaining wall for land cuttings

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE CH DE ES FR GB GR IT LI LU NL

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH DE ES FR GB GR IT LI LU NL

17P Request for examination filed

Effective date: 19881126

17Q First examination report despatched

Effective date: 19900608

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE ES FR GB GR IT LI LU NL

REF Corresponds to:

Ref document number: 65564

Country of ref document: AT

Date of ref document: 19910815

Kind code of ref document: T

REF Corresponds to:

Ref document number: 3771682

Country of ref document: DE

Date of ref document: 19910829

ITF It: translation for a ep patent filed

Owner name: STUDIO TORTA SOCIETA' SEMPLICE

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)
ET Fr: translation filed
REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2024480

Country of ref document: ES

Kind code of ref document: B3

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
REG Reference to a national code

Ref country code: GR

Ref legal event code: FG4A

Free format text: 3002773

EPTA Lu: last paid annual fee
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LU

Payment date: 19961101

Year of fee payment: 10

Ref country code: GB

Payment date: 19961101

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GR

Payment date: 19961106

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 19961108

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 19961119

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19961126

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 19961127

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 19961129

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 19961130

Year of fee payment: 10

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19971124

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19971124

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19971124

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19971125

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19971130

Ref country code: GR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19971130

Ref country code: FR

Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY

Effective date: 19971130

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19971130

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19971130

BERE Be: lapsed

Owner name: ROSS KURT G.

Effective date: 19971130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19980601

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 19971124

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee

Effective date: 19980601

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 19981212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20051124

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20061123

Year of fee payment: 20