EP0244353A1 - Method for manufacturing a recoverable tension member - Google Patents

Method for manufacturing a recoverable tension member Download PDF

Info

Publication number
EP0244353A1
EP0244353A1 EP87810235A EP87810235A EP0244353A1 EP 0244353 A1 EP0244353 A1 EP 0244353A1 EP 87810235 A EP87810235 A EP 87810235A EP 87810235 A EP87810235 A EP 87810235A EP 0244353 A1 EP0244353 A1 EP 0244353A1
Authority
EP
European Patent Office
Prior art keywords
tension member
central
anchored
tension
separation point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP87810235A
Other languages
German (de)
French (fr)
Other versions
EP0244353B1 (en
Inventor
International Ag Vsl
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
VSL International Ltd
Original Assignee
VSL International Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by VSL International Ltd filed Critical VSL International Ltd
Priority to AT87810235T priority Critical patent/ATE49253T1/en
Publication of EP0244353A1 publication Critical patent/EP0244353A1/en
Application granted granted Critical
Publication of EP0244353B1 publication Critical patent/EP0244353B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/02Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
    • E02D5/765Anchorings for bulkheads or sections thereof in as much as specially adapted therefor removable

Definitions

  • the invention is based on a method for producing a tension member to be anchored in the ground or structure and to be subjected to a load, composed of a central link and a plurality of outer links arranged concentrically to the central link, which tension link is intended for use in the ground or structure after use to be largely removed, and a tension member manufactured in this process.
  • excavation pits are often enclosed by slotted or sheet pile walls, which are anchored to the rear using tie rods with tension members.
  • the tension members are anchored in the ground at the grout anchors and are preloaded to a load.
  • the tension members can also be used in the buildings themselves, e.g. is the case with supports of a bridge. There forces can act on the supports during the construction of the bridge, which necessitate temporary reinforcement of them by tension members.
  • the tension members are removed from the ground or structure and can possibly be reused. There are regulations in some countries that the grout anchors must be removed after the construction work has been completed.
  • the principle is egg ner predetermined breaking point applied to the tension member.
  • a cross-section reduction of the tension member is achieved by the predetermined breaking point.
  • This method is mostly limited to rod-shaped steel tension members with a single tension rod. The tension member is torn off over the tensile strength limit in the predetermined breaking point and largely removed from the ground or the structure.
  • DE-OS 30 39 080 describes a recoverable reinforcement element for an anchor.
  • the tension member for a grouted anchor consists of two or more steel bars.
  • the basic idea of this known solution is to embed the spacers between the individual steel bars of the tension member in spread form in the pressing body. By pulling or destroying the detachable spacers, freedom of movement is created for the individual steel bars. After the introduction of a tensile force from the air-side anchoring end while overcoming the shear bond between the steel bars and the pressing body, these are pulled out of the pressing anchor one after the other and thus recovered.
  • DE-PS 26 27 524 describes a grout anchor with a tension member surrounded by a cladding tube.
  • the tension member in the form of a steel wire rope extends through the cladding tube and is slidably disposed therein.
  • the end of the tension member on the earth side is passed through an anchor foot and held by means of a sleeve which is supported against the anchor foot.
  • the basic idea of this solution is that an adhesive is applied as an intermediate layer between the sleeve and the tension member and is pressed through the sleeve onto the tension member.
  • the clamping action of the sleeve is dimensioned so that the maximum tensile force required to pull out the tension member is slightly greater than the force that is exerted on the tension member when in use.
  • the invention specified in claim 1 is based on the object of proposing a method for producing a removable tension member, in which the tension member can be easily manufactured and the load required for removing the tension member can be calculated in advance.
  • a tension member can be used not only in grouted anchors, but also in other areas.
  • a tension member 1 to be anchored in the ground or structure and to be subjected to a load composed of a central link 2 and a plurality of outer links 3 arranged concentrically to the central link 2, which tension link is intended to be largely removed from the soil or structure after use are proceeded as follows: In the area L (see FIG. 1) of the part 1a of the tension member 1 to be anchored, the central member 2 is completely severed.
  • the tension member 1 according to FIG. 1 consists of a steel wire rope.
  • the twisted outer links 3 consisting of wires are spread apart and the central link 2, which is also made of a wire, is completely sawn through the opening thus created.
  • the tension member 1 consists of a central steel rod and a plurality of outer steel rods concentric and parallel to one another around the central steel rod
  • the central member 2 consisting of the central steel rod is sawn through or sheared off before the tension member 1 is put together.
  • a support element 5 is attached around the separation point 4 by pressing.
  • the support element according to FIGS. 1, 3, 4, 5 and 9 consists of a sleeve which is pressed around it in the area L of the part 1a of the tension member 1 to be anchored. 6 and 8, the support element 5, together with two wedge-shaped parts 14 and 15 arranged therein, forms a wedge anchor.
  • the surface of the inner wedge-shaped parts 14 and 15 which is in contact with the tension member 1 is with a toothing 13 provided.
  • an insert 11 is provided between the inner bore of the pressing sleeve and the circumference of the outer members 3, the material of which is harder than the materials of the pressing sleeve 5 and the tension member 1.
  • one or more of the outer links 3 of the tension member 1 is completely severed. In no case, however, are all outer members 3 of the tension member 1 completely severed.
  • the central member 2 is always completely severed. At least one outer member 3 is completely severed in the area L of the part 1a of the tension member 1 to be anchored, approximately in the vicinity of the separation point 4 of the central member 2. Then, as mentioned above, the support element 5 is attached to the tension element 1 in the region of the separation point 4 and the separation point 6 of the outer element 3 by transverse pressing.
  • the position of the separation point 4 of the central member 2 can be determined in the region L of the part la of the tension member 1 to be anchored, depending on the size of the load P to be exerted on the tension member 1 during its removal. If the distance L1 between the separation point 4 of the central member 2 and the end of the area L lying in the direction of the load P to be exerted is smaller than that distance L2 between the Separation point 4 and the end of the area L of the part 1a to be anchored in the opposite direction of the load P to be exerted, then the size of the load P to be exerted is smaller than that load if the distance L2 were smaller.
  • the load P must be kept as small as possible, but larger than the required working load; then one or more of the outer members 3 of the tension member 1 can also be completely severed in the region of the support element 5.
  • the load to be exerted on the tension member 1, at which the assembled tension member 1 can be removed, will be in the following limit range: Required working load ⁇ on the tension member to be removed for the purpose of removing it P ⁇ breaking load of the complete tension member.
  • an abutment 8 is shown, against which the support element 5 is supported with its side facing away from the part 1a to be anchored.
  • This abutment has the same function as the anchor base on a press anchor.
  • 6 to 10 show that the active part of the tension member 1 is arranged in a protective tube 9 and that the intermediate space is filled with a lubricant 10.
  • FIGS. 8 to 10 have an elongated passive part 1a (part to be anchored) of the tension member, which part is still anchored in the concrete body 12 behind the support element 5.
  • clamping sleeves 7 are indicated on the outer steel rods 3, which run concentrically around a central rod and parallel to one another. Through these ferrules 7, the outer steel rods be 3 pressed against the central rod 2 and held together. There is no need for an abutment here because the concrete body 12 provides sufficient support for the support element 5 and the passive part 1a.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Finish Polishing, Edge Sharpening, And Grinding By Specific Grinding Devices (AREA)
  • Mechanical Treatment Of Semiconductor (AREA)
  • Processing Of Stones Or Stones Resemblance Materials (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Sawing (AREA)
  • Folding Of Thin Sheet-Like Materials, Special Discharging Devices, And Others (AREA)
  • Polyurethanes Or Polyureas (AREA)
  • Materials For Medical Uses (AREA)
  • Preliminary Treatment Of Fibers (AREA)
  • Ropes Or Cables (AREA)
  • Springs (AREA)
  • Shaping By String And By Release Of Stress In Plastics And The Like (AREA)

Abstract

In order to make a tension member (1) substantially removable from the ground or from a structure, a central element (2) thereof is completely severed. If the tension member is to be further weakened, at least one outer element (3) is also severed besides the central element. A supporting contrivance (5) is applied to the tension member either around the point of separation (4) of the central element or around both points of separation (4, 6) of the central element and of the outer element. By application of a load, the tension member is torn apart near the point or points of separation so that the major part of the tension member can be pulled out of the ground or structure and, if need be, reused.

Description

Die Erfindung geht aus von einem Verfahren zur Herstellung eines im Erdreich oder Bauwerk zu veran­kernden und einer Last auszusetzenden, aus einem Zen­tralglied und mehreren, konzentrisch zum Zentralglied angeordneten Aussengliedern zusammengestellten Zugglie­des, welches Zugglied dazu bestimmt ist, nach seinem Gebrauch aus dem Erdreich bzw. Bauwerk grösstenteils ausgebaut zu werden, und einem in diesem Verfahren her­gestellten Zugglied.The invention is based on a method for producing a tension member to be anchored in the ground or structure and to be subjected to a load, composed of a central link and a plurality of outer links arranged concentrically to the central link, which tension link is intended for use in the ground or structure after use to be largely removed, and a tension member manufactured in this process.

Für die Konstruktion zum Beispiel von Bauwerken, die sich beispielsweise mehrere Stockwerke tief in den Boden erstrecken, werden häufig Baugruben durch Schlitz- oder Spundwände umschlossen, die mittels Ver­pressanker mit Zuggliedern rückseitig verankert sind. Die Zugglieder werden bei den Verpressankern im Erd­reich verankert und durch Vorspannung einer Last ausge­setzt.For the construction of structures, for example, which extend several floors deep into the ground, excavation pits are often enclosed by slotted or sheet pile walls, which are anchored to the rear using tie rods with tension members. The tension members are anchored in the ground at the grout anchors and are preloaded to a load.

Die Zugglieder können aber auch in den Bauwerken selber Verwendung finden, wie es z.B. bei Stützen einer Brücke der Fall ist. Dort können während des Baues der Brücke auf die Stützen Kräfte wirken, die eine temporä­re Verstärkung derselben durch Zugglieder erforderlich machen.The tension members can also be used in the buildings themselves, e.g. is the case with supports of a bridge. There forces can act on the supports during the construction of the bridge, which necessitate temporary reinforcement of them by tension members.

Nach dem Gebrauch werden die Zugglieder aus dem Erdreich oder Bauwerk entfernt und können eventuell wiederverwendet werden. Es gibt in manchen Ländern Be­stimmungen, dass die Verpressanker nach Beendigung der Bauarbeiten wieder zu entfernen sind.After use, the tension members are removed from the ground or structure and can possibly be reused. There are regulations in some countries that the grout anchors must be removed after the construction work has been completed.

Zum teilweisen oder vollständigen Ausbau der Zug­glieder aus dem Erdreich bzw. dem Bauwerk bieten sich "mechanische", "physikalische", "chemische", oder ande­re Lösungen an."Mechanical", "physical", "chemical" or other solutions are available for the partial or complete removal of the tension members from the ground or the structure.

Beim mechanischen Ausbau wird z.B. das Prinzip ei­ ner Soll-Bruchstelle auf dem Zugglied angewandt. Durch die Soll-Bruchstelle wird eine Querschnittverminderung des Zuggliedes erreicht. Diese Methode beschränkt sich meistens auf stabförmige Stahlzugglieder mit einem ein­zigen Zugstab. Das Zugglied wird durch Ueberspannen über die Zugfestigkeitsgrenze hinaus in der Soll-Bruch­stelle abgerissen und aus dem Erdreich bzw. dem Bauwerk grösstenteils entfernt.In mechanical expansion, for example, the principle is egg ner predetermined breaking point applied to the tension member. A cross-section reduction of the tension member is achieved by the predetermined breaking point. This method is mostly limited to rod-shaped steel tension members with a single tension rod. The tension member is torn off over the tensile strength limit in the predetermined breaking point and largely removed from the ground or the structure.

In der DE-OS 30 39 080 ist ein wiedergewinnbares Bewehrungselement für einen Verpressanker beschrieben. Das Zugglied für einen Verpressanker besteht aus zwei oder mehreren Stahlstäben. Der Grundgedanke dieser be­kannten Lösung liegt darin, durch Anordnung von Ab­standhaltern zwischen den einzelnen Stahlstäben des Zuggliedes diese in gespreizter Form in den Verpress­körper einzubetten. Durch Ziehen oder Zerstören der lösbar eingesetzten Abstandhalter wird ein Bewegungs­freiraum für die einzelnen Stahlstäbe geschaffen. Nach Einleitung einer Zugkraft vom luftseitigen Veranke­rungsende her unter Ueberwindung des Scherverbundes der Stahlstäbe mit dem Verpresskörper werden diese aus dem Verpressanker nacheinander herausgezogen und so wieder gewonnen.DE-OS 30 39 080 describes a recoverable reinforcement element for an anchor. The tension member for a grouted anchor consists of two or more steel bars. The basic idea of this known solution is to embed the spacers between the individual steel bars of the tension member in spread form in the pressing body. By pulling or destroying the detachable spacers, freedom of movement is created for the individual steel bars. After the introduction of a tensile force from the air-side anchoring end while overcoming the shear bond between the steel bars and the pressing body, these are pulled out of the pressing anchor one after the other and thus recovered.

In der DE-PS 26 27 524 ist ein Verpressanker mit einem von einem Hüllrohr umgebenen Zugglied beschrie­ben. Das in Form eines Stahldrahtseiles ausgebildete Zugglied erstreckt sich durch das Hüllrohr und ist da­rin gleitbar angeordnet. Das erdseitige Ende des Zug­gliedes ist durch einen Ankerfuss hindurchgeführt und mittels einer sich gegen den Ankerfuss abstützenden Hülse gehalten. Der Grundgedanke dieser Lösung liegt darin, dass zwischen der Hülse und dem Zugglied ein Haftmittel als Zwischenlage angebracht und durch die Hülse an das Zugglied festgegepresst ist. Die Spannwir­kung der Hülse ist so bemessen, dass die maximale Zug­kraft, die zum Herausziehen des Zuggliedes erforderlich ist, etwas grösser als die Kraft ist, die im Gebrauchs­zustand auf das Zugglied ausgeübt wird.DE-PS 26 27 524 describes a grout anchor with a tension member surrounded by a cladding tube. The tension member in the form of a steel wire rope extends through the cladding tube and is slidably disposed therein. The end of the tension member on the earth side is passed through an anchor foot and held by means of a sleeve which is supported against the anchor foot. The basic idea of this solution is that an adhesive is applied as an intermediate layer between the sleeve and the tension member and is pressed through the sleeve onto the tension member. The clamping action of the sleeve is dimensioned so that the maximum tensile force required to pull out the tension member is slightly greater than the force that is exerted on the tension member when in use.

Die beiden oben erwähnten Druckschriften beschrei­ben nur einen Verpressanker.The two publications mentioned above only describe a grout anchor.

Der Nachteil des ausbaubaren Ankers nach der DE-OS 30 39 080 besteht darin, dass in den Verpressan­ker mit dem Zugglied Abstandhalter eingebaut und nach­her wieder herausgezogen werden müssen, wodurch die Konstruktion des Verpressankers kompliziert und somit verteuert wird.The disadvantage of the removable anchor according to DE-OS 30 39 080 is that spacers have to be installed in the grouting anchor with the tension member and then pulled out again, which complicates the construction of the grouting anchor and thus makes it more expensive.

Bei der DE-PS 26 27 524 ist zwischen der Aussen­fläche des Zuggliedes und der Bohrung der Presshülse ein Haftmittel angeordnet, das so bemessen werden muss, dass auch wirklich die Belastbarkeit zwischen den Gren­zen der Gebrauchslast und Bruchfestigkeit liegt. Der Toleranzbereich ist aber bei der Herstellung sehr ge­ring und jede Ungenauigkeit kann den Unsicherheitsfak­tor der Belastbarkeit des Verpressankers vergrössern.In DE-PS 26 27 524 an adhesive is arranged between the outer surface of the tension member and the bore of the compression sleeve, which must be dimensioned such that the load capacity really lies between the limits of the working load and breaking strength. However, the tolerance range during manufacture is very small and any inaccuracy can increase the uncertainty factor of the load capacity of the grout anchor.

Der im Anspruch 1 angegebenen Erfindung liegt die Aufgabe zugrunde, ein Verfahren zur Herstellung eines ausbaubaren Zuggliedes vorzuschlagen, in welchem das Zugglied einfach hergestellt werden kann und die zum Ausbau des Zuggliedes benötigte Last im voraus bere­chenbar ist. Ein solches Zugglied kann nicht nur bei Verpressankern, sondern auch in anderen Gebieten Ver­wendung finden.The invention specified in claim 1 is based on the object of proposing a method for producing a removable tension member, in which the tension member can be easily manufactured and the load required for removing the tension member can be calculated in advance. Such a tension member can be used not only in grouted anchors, but also in other areas.

Diese Aufgabe wird durch die im kennzeichnenden Teil des Patentanspruches 1 sowie des Patentanspru­ches 5 angegebenen Merkmale gelöst. Es ist von Vor­teil, wenn nebst dem Zentralglied mindestens ein Aus­senglied vollständig durchgetrennt werden kann. Wenn das Aussenglied im Bereich des zu verankernden Teiles des Zuggliedes vollständig durchgetrennt wird, wird an das Zugglied um die Trennstelle des Zentralgliedes so­wie die Trennstelle des Aussengliedes herum ein Stütz­element gepresst.This object is achieved by the features specified in the characterizing part of patent claim 1 and of patent claim 5. It is advantageous if, in addition to the central member, at least one outer member can be completely severed. If the outer member is completely severed in the area of the part of the tension member to be anchored, a support element is pressed against the tension member around the separation point of the central member and the separation point of the outer member.

Die Erfindung wird nachstehend anhand der Zeich­nung beispielsweise näher erläutert. Es zeigen

  • Fig. 1 eine Teilansicht im Schnitt eines aus ei­ner Stahldrahtlitze bestehenden Zuggliedes, dessen Zen­tralglied vollständig durchgetrennt wurde, mit einem um die Trennstelle herum angepressten Stützelement,
  • Fig. 2 einen Querschnitt des Zuggliedes entlang der Linie II-II der Fig. 1,
  • Fig. 3 eine Teilansicht im Schnitt des Zuggliedes nach der Fig. 1, das im Bereich der Trennstelle des Zentralgliedes zerrissen wurde,
  • Fig. 4 eine Teilansicht im Schnitt eines aus einem zentralen Stab und mehreren konzentrisch zu demselben und einander parallel verlaufenden Stahlstäben beste­henden Zuggliedes, dessen Zentral- und ein Aussenglied vollständig durchgetrennt wurden, mit einem um die bei­den Trennstellen herum angepressten Stützelement,
  • Fig. 5 eine Teilansicht im Schnitt des Zuggliedes nach der Fig. 4, das im Bereich der beiden Trennstel­len zerrissen wurde,
  • Fig. 6 eine Teilansicht im Schnitt eines aus einer Stahldrahtlitze bestehenden Zuggliedes, dessen Zentral­glied vollständig durchgetrennt wurde, mit einem um die Trennstelle herum gepressten Stützelement in Form ei­ner Keilverankerung,
  • Fig. 7 eine Teilansicht im Schnitt wie in der Fig. 6, jedoch eines aus einem zentralen Stab und meh­reren konzentrisch zu demselben und einander parallel verlaufenden Stahlstäben bestehenden Zuggliedes,
  • Fig. 8 eine Teilansicht im Schnitt des Zuggliedes nach der Fig. 6, mit einem um die Trennstelle herum ge­pressten Stützelement in Form einer Keilverankerung, wobei der zu verankernde Teil des Zuggliedes verlängert ist,
  • Fig. 9 eine Teilansicht im Schnitt des Zuggliedes nach der Fig. 7, mit einem um die Trennstelle herum gepressten Stützelement in Form einer Hülse, wobei der zu verankernde Teil des Zuggliedes verlängert ist, und
  • Fig. 10 eine Teilansicht im Schnitt des Zuggliedes nach der Fig. 9, mit einem Stützelement in Form einer Keilverankerung.
The invention is explained below with reference to the drawing, for example. Show it
  • 1 is a partial sectional view of a tension member consisting of a steel wire strand, the central member of which has been completely severed, with a support element pressed around the separation point,
  • 2 shows a cross section of the tension member along the line II-II of FIG. 1,
  • 3 is a partial view in section of the tension member of FIG. 1, which was torn in the region of the separation point of the central member,
  • 4 is a partial sectional view of a tension member consisting of a central bar and a plurality of steel bars concentric to the same and parallel to one another, the central and an outer link of which have been completely severed, with a support element pressed around the two separation points,
  • 5 is a partial view in section of the tension member of FIG. 4, which was torn in the region of the two separation points,
  • 6 is a partial sectional view of a tension member consisting of a steel wire strand, the central member of which has been completely severed, with a support element pressed around the separation point in the form of a wedge anchor,
  • 7 is a partial view in section as in FIG. 6, but a tension member consisting of a central rod and a plurality of tension members concentric to the same and parallel steel rods,
  • 8 is a partial view in section of the tension member according to FIG. 6, with a support element pressed around the separation point in the form of a wedge anchor, the part of the tension member to be anchored being extended,
  • Fig. 9 is a partial view in section of the tension member of FIG. 7, with one around the separation point pressed support element in the form of a sleeve, the part of the tension member to be anchored being extended, and
  • Fig. 10 is a partial view in section of the tension member of FIG. 9, with a support element in the form of a wedge anchor.

Beim Herstellen eines im Erdreich oder Bauwerk zu verankernden und einer Last auszusetzenden, aus einem Zentralglied 2 und mehreren, konzentrisch zum Zentral­glied 2 angeordneten Aussengliedern 3 zusammengestell­ten Zuggliedes 1, welches Zugglied dazu bestimmt ist, nach seinem Gebrauch aus dem Erdreich bzw. Bauwerk grösstenteils ausgebaut zu werden, wird wie folgt vor­gegangen: Im Bereich L (siehe Fig. 1) des zu verankern­den Teiles 1a des Zuggliedes 1 wird das Zentralglied 2 vollständig durchgetrennt. Das Zugglied 1 besteht ge­mäss der Fig. 1 aus einem Stahldrahtseil. In diesem Fall werden die gedrillten, aus Drähten bestehenden Aussenglieder 3 auseinandergespreizt und durch die da­durch entstandene Oeffnung das ebenfalls aus einem Draht bestehende Zentralglied 2 vollständig durchge­sägt. Im Fall, dass das Zugglied 1 aus einem zentra­len Stahlstab und mehreren äusseren, um den zentralen Stahlstab konzentrisch und zueinander parallel verlau­fenden Stahlstäben besteht, wird das aus dem zentralen Stahlstab bestehende Zentralglied 2 vor dem Zusammen­stellen des Zuggliedes 1 durchgesägt oder abgeschert.In the manufacture of a tension member 1 to be anchored in the ground or structure and to be subjected to a load, composed of a central link 2 and a plurality of outer links 3 arranged concentrically to the central link 2, which tension link is intended to be largely removed from the soil or structure after use are proceeded as follows: In the area L (see FIG. 1) of the part 1a of the tension member 1 to be anchored, the central member 2 is completely severed. The tension member 1 according to FIG. 1 consists of a steel wire rope. In this case, the twisted outer links 3 consisting of wires are spread apart and the central link 2, which is also made of a wire, is completely sawn through the opening thus created. In the event that the tension member 1 consists of a central steel rod and a plurality of outer steel rods concentric and parallel to one another around the central steel rod, the central member 2 consisting of the central steel rod is sawn through or sheared off before the tension member 1 is put together.

Nach dem vollendeten vollständigen Durchtrennen des Zentralgliedes 2 wird um die Trennstelle 4 herum ein Stützelement 5 durch Umpressen angebracht. Das Stützelement nach den Fig. 1, 3, 4, 5 und 9 besteht aus einer Hülse, die im Bereich L des zu verankernden Tei­les 1a des Zuggliedes 1 um dasselbe angepresst wird. In den Fig. 6 und 8 bildet das Stützeleme 5 zusammen mit zwei darin angeordneten keilförmigen Teilen 14 und 15 eine Keilverankerung. Die am Zugglied 1 anliegende Fläche der inneren keilförmigen Teile 14 und 15 ist mit einer Verzahnung 13 versehen. Gemäss der Fig. 9 ist zwischen der Innenbohrung der Presshülse und dem Um­fang der Aussenglieder 3 eine Einlage 11 vorgesehen, deren Material härter als die Materialien der Press­hülse 5 und des Zuggliedes 1 ist.After the central member 2 has been completely severed, a support element 5 is attached around the separation point 4 by pressing. The support element according to FIGS. 1, 3, 4, 5 and 9 consists of a sleeve which is pressed around it in the area L of the part 1a of the tension member 1 to be anchored. 6 and 8, the support element 5, together with two wedge-shaped parts 14 and 15 arranged therein, forms a wedge anchor. The surface of the inner wedge-shaped parts 14 and 15 which is in contact with the tension member 1 is with a toothing 13 provided. According to FIG. 9, an insert 11 is provided between the inner bore of the pressing sleeve and the circumference of the outer members 3, the material of which is harder than the materials of the pressing sleeve 5 and the tension member 1.

Will man die zum Ausbau des Zuggliedes 1 benö­tigte Last reduzieren, wird eines oder mehrere der äusseren Glieder 3 des Zuggliedes l vollständig durchgetrennt. In keinem Fall werden aber alle Aus­senglieder 3 des Zuggliedes 1 vollständig durchge­trennt. Das Zentralglied 2 wird immer vollständig durchgetrennt. Mindestens ein Aussenglied 3 wird im Bereich L des zu verankernden Teiles 1a des Zugglie­des 1 etwa in der Nähe der Trennstelle 4 des Zentral­gliedes 2 vollständig durchgetrennt. Anschliessend wird um das Zugglied 1 im Bereich der Trennstelle 4 sowie die Trennstelle 6 des Aussengliedes 3 herum, wie oben erwähnt, das Stützelement 5 durch Querpres­sen angebracht.If you want to reduce the load required to remove the tension member 1, one or more of the outer links 3 of the tension member 1 is completely severed. In no case, however, are all outer members 3 of the tension member 1 completely severed. The central member 2 is always completely severed. At least one outer member 3 is completely severed in the area L of the part 1a of the tension member 1 to be anchored, approximately in the vicinity of the separation point 4 of the central member 2. Then, as mentioned above, the support element 5 is attached to the tension element 1 in the region of the separation point 4 and the separation point 6 of the outer element 3 by transverse pressing.

Es ist aber auch möglich, mindestens ein Aus­senglied 3 ausserhalb des Bereiches L des zu veran­kernden Teiles la des Zuggliedes 1 vollständig durch­zutrennen. In diesem Fall wird das Stützelement 5 nur um die Trennstelle 4 des Zentralgliedes 2 herum an das Zugglied 1 durch Umpressen angebracht und die Trennstelle 6 des Aussengliedes 3 bleibt ohne Stütz­element.However, it is also possible to completely cut through at least one outer member 3 outside the region L of the part la of the tension member 1 to be anchored. In this case, the support element 5 is only attached to the tension member 1 by pressing around the separation point 4 of the central member 2 and the separation point 6 of the outer member 3 remains without a support element.

Bei dem in den oben erwähnten Schritten herge­stellten Zugglied 1 ist die Position der Trennstelle 4 des Zentralgliedes 2 je nach Grösse der auf das Zug­glied 1 bei dessen Ausbau auszuübenden Last P im Be­reich L des zu verankernden Teiles la des Zuggliedes 1 festlegbar. Wenn der Abstand L₁ zwischen der Trenn­stelle 4 des Zentralgliedes 2 und dem in Richtung der auszuübenden Last P liegenden Ende des Bereiches L kleiner ist als derjenige Abstand L₂ zwischen der Trennstelle 4 und dem in Gegenrichtung der auszuübenden Last P liegenden Ende des Bereiches L des zu verankern­den Teiles 1a, dann wird die Grösse der auszuübenden Last P kleiner als diejenige Last, wenn der Abstand L₂ kleiner wäre. Die benötigte Maximalgrösse der auszu­übenden Last zum Ausbauen des Zuggliedes 1 wird sich im Grenzbereich, in welchem L₁ = L und L₂ = 0, der Bruchlast des vollständigen Zuggliedes 1 ohne Trenn­stellen nähern. So muss die Last P möglichst klein ge­halten werden, jedoch grösser als die erforderliche Ge­brauchslast; dann können eines oder mehrere der Aussen­glieder 3 des Zuggliedes 1 ebenfalls im Bereich des Stützelementes 5 vollständig durchgetrennt werden.In the tension member 1 produced in the above-mentioned steps, the position of the separation point 4 of the central member 2 can be determined in the region L of the part la of the tension member 1 to be anchored, depending on the size of the load P to be exerted on the tension member 1 during its removal. If the distance L₁ between the separation point 4 of the central member 2 and the end of the area L lying in the direction of the load P to be exerted is smaller than that distance L₂ between the Separation point 4 and the end of the area L of the part 1a to be anchored in the opposite direction of the load P to be exerted, then the size of the load P to be exerted is smaller than that load if the distance L₂ were smaller. The required maximum size of the load to be exerted to remove the tension member 1 will approach the limit in which L₁ = L and L₂ = 0 the breaking load of the complete tension member 1 without separation points. The load P must be kept as small as possible, but larger than the required working load; then one or more of the outer members 3 of the tension member 1 can also be completely severed in the region of the support element 5.

Die auf das Zugglied 1 auszuübende Last, bei wel­cher das zusammengestellte Zugglied 1 ausgebaut werden kann, wird in folgendem Grenzbereich liegen: Erforder­liche Gebrauchslast < auf das Zugglied zwecks dessen Ausbau auszuübende Last P < Bruchlast des vollständi­gen Zuggliedes.The load to be exerted on the tension member 1, at which the assembled tension member 1 can be removed, will be in the following limit range: Required working load <on the tension member to be removed for the purpose of removing it P <breaking load of the complete tension member.

In den Fig. 1, 3, 4, 5, 6 und 7 ist ein Widerla­ger 8 dargestellt, gegen welches sich das Stützele­ment 5 mit seiner dem zu verankernden Teil 1a abgekehr­ten Seite abstützt. Dieses Widerlager hat die gleiche Funktion wie der Ankerfuss bei einem Pressanker. In den Fig. 6 bis 10 ist dargestellt, dass der aktive Teil des Zuggliedes 1 in einem Schutzrohr 9 angeordnet ist und dass der Zwischenraum mit einem Gleitmittel 10 gefüllt ist.1, 3, 4, 5, 6 and 7, an abutment 8 is shown, against which the support element 5 is supported with its side facing away from the part 1a to be anchored. This abutment has the same function as the anchor base on a press anchor. 6 to 10 show that the active part of the tension member 1 is arranged in a protective tube 9 and that the intermediate space is filled with a lubricant 10.

Die Ausführungsformen nach den Fig. 8 bis 10 wei­sen einen verlängerten passiven Teil 1a (zu verankern­den Teil) des Zuggliedes auf, welcher Teil hinter dem Stützelement 5 noch im Betonkörper 12 verankert ist. Ausserhalb des Bereiches L sind an den äusseren Stahl­stäben 3, die konzentrisch um einen Zentralstab und zu­einander parallel verlaufen, Klemmhülsen 7 angedeutet. Durch diese Klemmhülsen 7 werden die äusseren Stahlstä­ be 3 an den Zentralstab 2 angepresst und mit demsel­ben zusammengehalten. Hier erübrigt sich ein Widerla­ger, weil durch den Betonkörper 12 genügend Halt auf das Stützelement 5 und den passiven Teil 1a ausgeübt wird.The embodiments according to FIGS. 8 to 10 have an elongated passive part 1a (part to be anchored) of the tension member, which part is still anchored in the concrete body 12 behind the support element 5. Outside the area L, clamping sleeves 7 are indicated on the outer steel rods 3, which run concentrically around a central rod and parallel to one another. Through these ferrules 7, the outer steel rods be 3 pressed against the central rod 2 and held together. There is no need for an abutment here because the concrete body 12 provides sufficient support for the support element 5 and the passive part 1a.

Durch Anwendung von einer die Zugfestigkeit über­schreitenden Last brechen alle nicht durchgetrennten Aussenglieder eines solchen Zuggliedes im Bereich des Stützelementes, so dass das Zugglied grösstenteils ge­gebenenfalls zwecks seiner Wiederverwendung aus dem Erdreich bzw. Bauwerk entfernt werden kann. Die Grösse der Last wird in Abhängigkeit des Verhältnisses L : L bemessen.By using a load exceeding the tensile strength, all the non-severed outer members of such a tensile member break in the area of the support element, so that the tensile member can be largely removed from the ground or structure for reuse if necessary. The size of the load is measured depending on the ratio L: L.

Claims (8)

1. Verfahren zur Herstellung eines im Erdreich oder Bauwerk zu verankernden und einer Last auszuset­zenden, aus einem Zentralglied (2) und mehreren, kon­zentrisch zum Zentralglied (2) angeordneten Aussenglie­dern (3) zusammengestellten Zuggliedes (1), welches Zugglied dazu bestimmt ist, nach seinem Gebrauch aus dem Erdreich bzw. Bauwerk grösstenteils ausgebaut zu werden, dadurch gekennzeichnet, dass mindestens das Zentralglied (2) des Zuggliedes (1) im Bereich (L) sei­nes zu verankernden Teiles (1a) vollständig durchge­trennt wird, wonach um die Trennstelle (4) des Zug­gliedes (1) herum ein Stützelement (5) umpresst wird.1. A method for producing a tension member (1) which is to be anchored in the ground or structure and to be subjected to a load and which consists of a central link (2) and a plurality of outer links (3) arranged concentrically to the central link (2), which tension link is intended for this purpose to be largely removed from its use from the ground or structure, characterized in that at least the central member (2) of the tension member (1) is completely severed in the region (L) of its part (1a) to be anchored, after which the separation point (4 ) of the tension member (1) around a support element (5) is pressed. 2. Verfahren nach Patentanspruch 1, dadurch ge­kennzeichnet, dass nebst dem Zentralglied (2) mindes­tens ein Aussenglied (3) vollständig durchgetrennt wird.2. The method according to claim 1, characterized in that in addition to the central member (2) at least one outer member (3) is completely severed. 3. Verfahren nach den Patentansprüchen 1 und 2, dadurch gekennzeichnet, dass das Aussenglied (3) im Be­reich (L) des zu verankernden Teiles (1a) des Zugglie­des (1) vollständig durchgetrennt wird, wonach an das Zugglied (1) um die Trennstelle (4) des Zentralglie­des (2) sowie die Trennstelle (6) des Aussengliedes (3) herum ein Stützelement (5) umpresst wird.3. The method according to claims 1 and 2, characterized in that the outer member (3) in the area (L) of the part to be anchored (1a) of the tension member (1) is completely severed, then to the tension member (1) around the separation point (4) of the central member (2) and the separation point (6) of the outer member (3) around a support element (5) is pressed. 4. Verfahren nach Patentanspruch 2, dadurch ge­kennzeichnet, dass das Aussenglied (3) ausserhalb des Bereiches (L) des zu verankernden Teiles (1a) des Zug­gliedes (1) vollständig durchgetrennt ist.4. The method according to claim 2, characterized in that the outer member (3) outside of the area (L) of the part to be anchored (1a) of the tension member (1) is completely severed. 5. Im Verfahren nach Patentanspruch 1 hergestell­tes Zugglied, mit einem im Bereich (L) seines zu ver­ankernden Teiles (1a) vollständig durchgetrennten Zen­tralglied (2) und einem am Zugglied um die Trennstel­le (4) herum gepresstes Stützelement (5), dadurch ge­kennzeichnet, dass die Positon der Trennstelle (4) des Zentralgliedes (2) je nach Grösse der auf das Zug­glied (1) auszuübenden Last (P) im Bereich (L) des zu verankernden Teiles (1a) des Zuggliedes (1) festlegbar ist.5. In the method according to claim 1 produced tension member, with a completely separated central member (2) in the region (L) of its part (1a) to be anchored and a support element (5) pressed on the tension member around the separation point (4), characterized in that that the position of the separation point (4) of the central member (2) can be determined in the region (L) of the part (1a) of the tension member (1) to be anchored, depending on the size of the load (P) to be exerted on the tension member (1). 6. Zugglied nach Patentanpruch 5, dadurch gekenn­zeichnet, dass es aus einem Stahldrahtseil besteht.6. tension member according to claim 5, characterized in that it consists of a steel wire rope. 7. Zugglied nach Patentanspruch 5, dadurch ge­kennzeichnet, dass es aus einem zentralen Stahlstab und mehreren äusseren, um den zentralen Stahlstab kon­zentrisch und zueinander parallel verlaufenden Stahl­stäben besteht.7. tension member according to claim 5, characterized in that it consists of a central steel rod and a plurality of outer, parallel to the central steel rod concentric and parallel steel rods. 8. Zugglied nach Patentanspruch 7, dadurch ge­kennzeichnet, dass die äusseren Stahlstäbe von aussen durch ausserhalb des Bereiches (L) des zu verankernden Teiles (1a) angeordnete Klemmhülsen (7) an den zentra­len Stahlstab angepresst sind.8. tension member according to claim 7, characterized in that the outer steel rods are pressed from the outside by outside of the area (L) of the part to be anchored (1a) arranged clamping sleeves (7) on the central steel rod.
EP87810235A 1986-04-28 1987-04-14 Method for manufacturing a recoverable tension member Expired - Lifetime EP0244353B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT87810235T ATE49253T1 (en) 1986-04-28 1987-04-14 METHOD OF MANUFACTURING A REMOVABLE TENSION MEMBERS.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CH1721/86 1986-04-28
CH1721/86A CH671057A5 (en) 1986-04-28 1986-04-28

Publications (2)

Publication Number Publication Date
EP0244353A1 true EP0244353A1 (en) 1987-11-04
EP0244353B1 EP0244353B1 (en) 1990-01-03

Family

ID=4217048

Family Applications (1)

Application Number Title Priority Date Filing Date
EP87810235A Expired - Lifetime EP0244353B1 (en) 1986-04-28 1987-04-14 Method for manufacturing a recoverable tension member

Country Status (10)

Country Link
US (1) US4884377A (en)
EP (1) EP0244353B1 (en)
JP (1) JPH0617580B2 (en)
KR (1) KR960004407B1 (en)
AT (1) ATE49253T1 (en)
AU (1) AU591271B2 (en)
CH (1) CH671057A5 (en)
DE (1) DE3761317D1 (en)
HK (1) HK93091A (en)
MY (1) MY101729A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0350454A2 (en) * 1988-07-06 1990-01-10 VSL International AG Process for making a tension member adapted to be anchored in the ground
EP0903442A1 (en) 1997-09-19 1999-03-24 Ballast Nedam Funderingstechnieken B.V. Tension member with yielding means

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5230589A (en) * 1992-03-23 1993-07-27 Gillespie Harvey D Mine roof bolt
CA2107826C (en) * 1993-01-28 1999-04-27 Harvey D. Gillespie Mine roof bolt
US5511909A (en) * 1994-06-07 1996-04-30 Jennmar Corporation Cable bolt and method of use in supporting a rock formation
DE19500091C1 (en) * 1995-01-04 1996-04-04 Dyckerhoff & Widmann Ag Predetermined rupture position prodn. on tensile member of insert anchor
DE19732023A1 (en) * 1997-07-25 1999-01-28 Drahtwerk Koeln Gmbh Method of making and removing a strand with a predetermined breaking point
US7823344B2 (en) * 2002-07-04 2010-11-02 Daeyoung PC. Co., Ltd Apparatus and method for releasing tension members for use in anchor method
US6881015B2 (en) 2002-10-16 2005-04-19 Dywidag-Systems International, U.S.A., Inc. Wedge barrel for a mine roof cable bolt
US7690868B2 (en) * 2003-12-02 2010-04-06 Dsi Ground Support Inc. Cable coupler having retained wedges
US7384216B2 (en) * 2004-09-16 2008-06-10 Dywidag-Systems International Usa Cable coupler having retained wedges
US7066688B2 (en) * 2004-08-17 2006-06-27 Dywidag-Systems International Usa Wedge barrel for a twin cable mine roof bolt
US7415746B2 (en) * 2005-12-01 2008-08-26 Sc Solutions Method for constructing a self anchored suspension bridge
US8069624B1 (en) * 2007-10-17 2011-12-06 Sorkin Felix L Pocketformer assembly for a post-tension anchor system
PL2379843T3 (en) * 2008-12-23 2015-04-30 Hani Sabri Mitri Sleeved cable bolt
AU2010336022B2 (en) * 2009-12-23 2014-08-14 Geotech Pty Ltd An anchorage system
CN109972613B (en) * 2019-04-28 2024-02-23 中冶沈勘工程技术有限公司 Recyclable anchoring mechanism and construction method

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2943434A (en) * 1956-03-16 1960-07-05 Bethlehem Steel Corp Splice and method of making the same
US2959436A (en) * 1956-09-13 1960-11-08 William J Duda Terminal and splicing fittings for wire rope and the like
US3356397A (en) * 1965-05-07 1967-12-05 Percy R Bagby Wire rope long splice and method of making
US3355542A (en) * 1966-09-23 1967-11-28 Preformed Line Products Co Preformed helical appliance for linear bodies
US3844697A (en) * 1968-08-27 1974-10-29 H Edwards Tendon anchorage assembly with threaded support member for concrete formwork
US3936256A (en) * 1969-04-16 1976-02-03 Conenco International Limited Tendon anchorage and mounting means
US3921353A (en) * 1972-02-04 1975-11-25 Howlett Machine Works Tendon anchorage assembly and bore mounting apparatus therefor
US3936924A (en) * 1973-09-21 1976-02-10 Yoshio Ichise Releaseable steel cable anchor and method for withdrawing the same
US4069677A (en) * 1975-06-20 1978-01-24 Kabushiki Kaisha Nitto Tekuno Group Anchor and method for constructing same
US4160615A (en) * 1978-03-23 1979-07-10 The International Nickel Company, Inc. Cable rock anchor
DE8002045U1 (en) * 1980-01-26 1980-04-30 Dyckerhoff & Widmann Ag, 8000 Muenchen RECOVERABLE SHUTTERING PART FOR THE ANCHORING AREA OF A TENSION LINK IN A CONCRETE COMPONENT
JPS5736690U (en) * 1980-08-12 1982-02-26
DE3039080C2 (en) * 1980-10-16 1985-03-07 Dyckerhoff & Widmann AG, 8000 München Removable, multi-part tension member for a grouting anchor
US4604003A (en) * 1983-02-22 1986-08-05 Francoeur Ronald A Method and apparatus for retensioning prestressed concrete members

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
PATENT ABSTRACTS OF JAPAN, Band 9, Nr. 92 (M-373)[1815], 20. April 1985; JP-A-59 217 830 (SUZUKI KINZOKU KOGYO K.K.)08-12-1984 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0350454A2 (en) * 1988-07-06 1990-01-10 VSL International AG Process for making a tension member adapted to be anchored in the ground
EP0350454A3 (en) * 1988-07-06 1990-04-18 Vsl International Ag Process for making a tension member adapted to be anchored in the ground
US5113634A (en) * 1988-07-06 1992-05-19 Vsl International Ag Method of producing a tension part anchorable in the earth
EP0903442A1 (en) 1997-09-19 1999-03-24 Ballast Nedam Funderingstechnieken B.V. Tension member with yielding means

Also Published As

Publication number Publication date
DE3761317D1 (en) 1990-02-08
JPS62296013A (en) 1987-12-23
US4884377A (en) 1989-12-05
MY101729A (en) 1992-01-17
AU591271B2 (en) 1989-11-30
KR870010259A (en) 1987-11-30
KR960004407B1 (en) 1996-04-02
JPH0617580B2 (en) 1994-03-09
AU7197787A (en) 1987-10-29
HK93091A (en) 1991-11-29
ATE49253T1 (en) 1990-01-15
EP0244353B1 (en) 1990-01-03
CH671057A5 (en) 1989-07-31

Similar Documents

Publication Publication Date Title
EP0244353B1 (en) Method for manufacturing a recoverable tension member
DE2627524C3 (en) Grouting anchor
DE69918444T2 (en) ground anchor
EP0025856B1 (en) Device for anchoring the end of at least one rod of fibrous composite material used as a tensioning member in prestressed concrete constructions
CH657402A5 (en) CORROSION-PROTECTED TENSIONABLE PRESSURE ANCHOR.
EP0896108B1 (en) Method for installing and tensioning a free tendon, and device for carrying out the method
DE2606095B1 (en) REMOVABLE INJECTOR ANCHOR WITH DESTRUCTIBLE ANCHOR BODY
CH635885A5 (en) Anchorage for structural members in soil or in rock and method of producing this anchorage
DE3838069C2 (en) Transportable reinforcement unit that can be concreted in for prestressing reinforced concrete structures
CH623376A5 (en)
DE3644551C2 (en) Anchoring for a composite tendon
DE2533452A1 (en) TENSIONER FOR STRENGTHENED CONCRETE
EP0350454B1 (en) Process for making a tension member adapted to be anchored in the ground
DE3335141C2 (en)
AT396153B (en) TENSION
DE2932809C2 (en) Device for the end anchorage of at least one prestressed concrete tendon made of fiber composite material
AT380502B (en) METHOD AND DEVICE FOR WIDING RUNWAY PANELS, BRIDGE ROADWAYS OR THE LIKE.
DE2353652A1 (en) EXTENSIBLE INJECTOR ANCHOR WITH DESTROYABLE ANCHOR FOOT
DE2522807A1 (en) CLAMPING ANCHORAGE FOR TENSION LINES, IN PARTICULAR FOR PRE-TENSIONED CONCRETE
DE2449289B2 (en) PRESTRESSED COMPRESSED ANCHOR
DE2161500A1 (en) METHOD OF ASSEMBLY BY PRELOAD
DE2201950A1 (en) TIE ANCHORS FOR ANCHORING COMPONENTS IN EARTH OR ROCKY GROUND
DE2105432C3 (en) Process for the production of a longitudinally prestressed composite pile
DE1634273B2 (en) Grouting anchor
CH690727A5 (en) Sleeve-shaped anchoring element to embed in Betongiessmasse.

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT DE FR GB IT

17P Request for examination filed

Effective date: 19871023

17Q First examination report despatched

Effective date: 19890210

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT DE FR GB IT

REF Corresponds to:

Ref document number: 49253

Country of ref document: AT

Date of ref document: 19900115

Kind code of ref document: T

REF Corresponds to:

Ref document number: 3761317

Country of ref document: DE

Date of ref document: 19900208

ITF It: translation for a ep patent filed

Owner name: UFFICIO TECNICO ING. A. MANNUCCI

ET Fr: translation filed
GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
ITTA It: last paid annual fee
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19960311

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 19960319

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19960325

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 19960430

Year of fee payment: 10

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Effective date: 19970414

Ref country code: AT

Effective date: 19970414

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 19970414

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19971231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19980101

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20050414