EA200801405A1 - Способ оптимизации добычи в масштабе месторождения - Google Patents
Способ оптимизации добычи в масштабе месторожденияInfo
- Publication number
- EA200801405A1 EA200801405A1 EA200801405A EA200801405A EA200801405A1 EA 200801405 A1 EA200801405 A1 EA 200801405A1 EA 200801405 A EA200801405 A EA 200801405A EA 200801405 A EA200801405 A EA 200801405A EA 200801405 A1 EA200801405 A1 EA 200801405A1
- Authority
- EA
- Eurasian Patent Office
- Prior art keywords
- fluid
- flow rates
- equations
- wells
- optimization
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 2
- 238000005457 optimization Methods 0.000 title abstract 2
- 238000000605 extraction Methods 0.000 title 1
- 239000012530 fluid Substances 0.000 abstract 5
- 230000001419 dependent effect Effects 0.000 abstract 1
- 230000001747 exhibiting effect Effects 0.000 abstract 1
- 238000004088 simulation Methods 0.000 abstract 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Feedback Control In General (AREA)
Abstract
Раскрыт (24) способ усовершенствования распределения дебитов текучей среды по нескольким скважинам, соединенным посредством текучей среды по меньшей мере с одним подземным пластом-коллектором. Формируют целевую функцию и уравнения системы, в которых используют штрафы за нарушения ограничений, ассоциированные с мягкими ограничениями. Мягкими ограничениями являются ограничения, которые, при необходимости, могут быть нарушены для получения допустимых решений для оптимизации целевой функции и уравнений системы. Тогда дебиты текучей среды распределяют по скважинам (30) в соответствиии с определением, полученным при оптимизации целевой функции, и уравнениями системы. Дебиты текучей среды по скважинам (30), в частности, проявляющие сходные характеристики текучей среды, могут быть зависимы друг от друга. Первоначальные дебиты компонентов (нефти, газа, воды) и давления в скважине (30) могут быть определены при первоначальном прогоне моделирования.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/US2005/042470 WO2007058662A1 (en) | 2005-11-21 | 2005-11-21 | Method for field scale production optimization |
Publications (2)
Publication Number | Publication Date |
---|---|
EA200801405A1 true EA200801405A1 (ru) | 2009-12-30 |
EA014140B1 EA014140B1 (ru) | 2010-10-29 |
Family
ID=38048944
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EA200801405A EA014140B1 (ru) | 2005-11-21 | 2005-11-21 | Способ оптимизации добычи в масштабе месторождения |
Country Status (8)
Country | Link |
---|---|
EP (1) | EP1955253A4 (ru) |
CN (1) | CN101361080B (ru) |
AU (1) | AU2005338352B2 (ru) |
BR (1) | BRPI0520693A2 (ru) |
CA (1) | CA2630411C (ru) |
EA (1) | EA014140B1 (ru) |
NO (1) | NO20082622L (ru) |
WO (1) | WO2007058662A1 (ru) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8682589B2 (en) * | 1998-12-21 | 2014-03-25 | Baker Hughes Incorporated | Apparatus and method for managing supply of additive at wellsites |
US7379853B2 (en) | 2001-04-24 | 2008-05-27 | Exxonmobil Upstream Research Company | Method for enhancing production allocation in an integrated reservoir and surface flow system |
US8504335B2 (en) | 2008-04-17 | 2013-08-06 | Exxonmobil Upstream Research Company | Robust optimization-based decision support tool for reservoir development planning |
CN102007485B (zh) | 2008-04-18 | 2014-06-25 | 埃克森美孚上游研究公司 | 储层开发计划的基于markov决策过程的决策支持工具 |
WO2009131761A2 (en) | 2008-04-21 | 2009-10-29 | Exxonmobile Upstream Research Company | Stochastic programming-based decision support tool for reservoir development planning |
EP2811107A1 (en) * | 2013-06-06 | 2014-12-10 | Repsol, S.A. | Method for selecting and optimizing oil field controls for production plateau |
BR112016018454A2 (pt) | 2014-03-12 | 2018-06-26 | Landmark Graphics Corp | método e sistema de simulação de produção de fluido, e, meio de armazenamento legível por computador. |
BR112016018520A2 (pt) * | 2014-03-12 | 2017-08-08 | Landmark Graphics Corp | Método e sistema de simulação de produção de fluido, e, meio de armazenamento legível por computador |
EP3134705B1 (en) * | 2014-04-22 | 2019-06-19 | Blast Motion Inc. | Initializing an inertial sensor using soft constraints and penalty functions |
CN108229713B (zh) * | 2016-12-09 | 2021-11-12 | 中国石油化工股份有限公司 | 断块油藏多层合采方案优化设计方法 |
CN108729911A (zh) * | 2017-04-24 | 2018-11-02 | 通用电气公司 | 用于资源生产***的优化装置、***和方法 |
WO2019152912A1 (en) * | 2018-02-02 | 2019-08-08 | Schlumberger Technology Corporation | Method for obtaining unique constraints to adjust flow control in a wellbore |
WO2020046392A1 (en) * | 2018-08-31 | 2020-03-05 | Halliburton Energy Services, Inc. | Sparse deconvolution and inversion for formation properties |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5305209A (en) * | 1991-01-31 | 1994-04-19 | Amoco Corporation | Method for characterizing subterranean reservoirs |
WO1999057418A1 (en) * | 1998-05-04 | 1999-11-11 | Schlumberger Evaluation & Production (Uk) Services | Near wellbore modeling method and apparatus |
US6980940B1 (en) * | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
WO2001079892A1 (en) * | 2000-04-14 | 2001-10-25 | Lockheed Martin Corporation | Method of determining boundary interface changes in a natural resource deposit |
EA004518B1 (ru) * | 2000-09-12 | 2004-06-24 | Шлюмбергер Текнолоджи Б.В. | Оценка многопластовых коллекторов |
US7379853B2 (en) * | 2001-04-24 | 2008-05-27 | Exxonmobil Upstream Research Company | Method for enhancing production allocation in an integrated reservoir and surface flow system |
US7487133B2 (en) * | 2002-09-19 | 2009-02-03 | Global Nuclear Fuel - Americas, Llc | Method and apparatus for adaptively determining weight factors within the context of an objective function |
AU2003276456A1 (en) * | 2002-11-15 | 2004-06-15 | Schlumberger Technology B.V. | Optimizing well system models |
US7337660B2 (en) * | 2004-05-12 | 2008-03-04 | Halliburton Energy Services, Inc. | Method and system for reservoir characterization in connection with drilling operations |
US7809537B2 (en) * | 2004-10-15 | 2010-10-05 | Saudi Arabian Oil Company | Generalized well management in parallel reservoir simulation |
-
2005
- 2005-11-21 EP EP05849297.6A patent/EP1955253A4/en not_active Withdrawn
- 2005-11-21 EA EA200801405A patent/EA014140B1/ru not_active IP Right Cessation
- 2005-11-21 CN CN2005800525117A patent/CN101361080B/zh not_active Expired - Fee Related
- 2005-11-21 AU AU2005338352A patent/AU2005338352B2/en not_active Ceased
- 2005-11-21 BR BRPI0520693-6A patent/BRPI0520693A2/pt not_active IP Right Cessation
- 2005-11-21 CA CA2630411A patent/CA2630411C/en active Active
- 2005-11-21 WO PCT/US2005/042470 patent/WO2007058662A1/en active Application Filing
-
2008
- 2008-06-12 NO NO20082622A patent/NO20082622L/no not_active Application Discontinuation
Also Published As
Publication number | Publication date |
---|---|
BRPI0520693A2 (pt) | 2009-06-13 |
NO20082622L (no) | 2008-08-13 |
AU2005338352B2 (en) | 2012-05-24 |
AU2005338352A1 (en) | 2007-05-24 |
EA014140B1 (ru) | 2010-10-29 |
CA2630411A1 (en) | 2007-05-24 |
EP1955253A4 (en) | 2016-03-30 |
EP1955253A1 (en) | 2008-08-13 |
CA2630411C (en) | 2015-04-21 |
CN101361080A (zh) | 2009-02-04 |
CN101361080B (zh) | 2011-12-14 |
WO2007058662A1 (en) | 2007-05-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EA200801405A1 (ru) | Способ оптимизации добычи в масштабе месторождения | |
NO20073485L (no) | Fremgangsmate, system og programlagringsutstyr for optimalisering av verdi-innstillinger i instrumenterte bronner ved hjelp av adjungert gradient-teknikk og reservoarsimulering | |
Zhou | A critical review of groundwater budget myth, safe yield and sustainability | |
EA201300683A1 (ru) | Способ усовершенствования модели коллектора и повышения отдачи трещиноватых пластов | |
NO20053858D0 (no) | Fremgangsmate for modellering av produksjonen til et oljereservoar | |
EA201070207A1 (ru) | Способ управления добычей из нефтегазоносного коллектора в режиме реального времени | |
NO20100603L (no) | System og fremgangsmate for utforelse av oljefeltoperasjoner | |
NO20061871L (no) | Karakterisering av konnektivitet i reservoarmodeller ved hjelp av baner med minst motstand | |
WO2007089829A3 (en) | Methods, systems, and computer-readable media for fast updating of oil and gas field production models with physical and proxy simulators | |
WO2010011727A3 (en) | Valvetrain oil control system and oil control valve | |
ATE523801T1 (de) | Verfahren zur modellierung einer porösen geologischen umgebung mit durch diese verlaufendem frakturennetz | |
GB2476764A (en) | Fully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations | |
MY143983A (en) | System and method for producing fluids from a subterranean formation | |
CN109948272A (zh) | 基于井间连通性的调堵动态预测方法和*** | |
NO20131083A1 (no) | Hybrid, lokal ikke-avstemmende metode for flerfasestrømningssimuleringer i heterogent sprukne medier | |
EA200900038A1 (ru) | Способ и потокоотклоняющие устройства в машинах для извлечения энергии | |
CN106285621A (zh) | 基于多因素决策海上油田老区新井产能的方法 | |
Fattah et al. | New Inflow Performance Relationship for solution-gas drive oil reservoirs | |
EA200970281A1 (ru) | Способ оптимизации добычи, используемый в системе добычи нефти и/или газа | |
RU2006137425A (ru) | Способ разработки нефтяной залежи многозабойными скважинами | |
Rosa et al. | Optimizing the location of platforms and manifolds | |
Satapona et al. | Groundwater flow modeling in the Malioboro, Yogyakarta, Indonesia | |
Fattah et al. | New inflow performance relationship for solution-gas drive oil reservoirs | |
EA201170159A1 (ru) | Определение местоположения неработающих продуктивных пластов углеводородов | |
Kistak | Development of an Artificial Neural Network for dual lateral horizontal wells in gas reservoirs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | Lapse of a eurasian patent due to non-payment of renewal fees within the time limit in the following designated state(s) |
Designated state(s): AM BY KG MD TJ |
|
MM4A | Lapse of a eurasian patent due to non-payment of renewal fees within the time limit in the following designated state(s) |
Designated state(s): AZ |
|
MM4A | Lapse of a eurasian patent due to non-payment of renewal fees within the time limit in the following designated state(s) |
Designated state(s): KZ TM RU |