DE944362C - Procedure for relocating the overburden, which has been extracted in stages, in open-cast lignite mining - Google Patents

Procedure for relocating the overburden, which has been extracted in stages, in open-cast lignite mining

Info

Publication number
DE944362C
DE944362C DEK6668A DEK0006668A DE944362C DE 944362 C DE944362 C DE 944362C DE K6668 A DEK6668 A DE K6668A DE K0006668 A DEK0006668 A DE K0006668A DE 944362 C DE944362 C DE 944362C
Authority
DE
Germany
Prior art keywords
overburden
stages
conveyor
procedure
open
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEK6668A
Other languages
German (de)
Inventor
Hans-Julius Klitzing
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANS JULIUS KLITZING
Original Assignee
HANS JULIUS KLITZING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANS JULIUS KLITZING filed Critical HANS JULIUS KLITZING
Priority to DEK6668A priority Critical patent/DE944362C/en
Application granted granted Critical
Publication of DE944362C publication Critical patent/DE944362C/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G65/00Loading or unloading
    • B65G65/28Piling or unpiling loose materials in bulk, e.g. coal, manure, timber, not otherwise provided for

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

Verfahren zur Umlagerung des in Stufen abgebauten Deckgebirges im Braunkohlentagebau Zur Freilegung des Kohlenflözes im Braunkohlentagebau ist es bekannt, Abraumförderbrücken zu verwenden, die den in mehreren Abbaustufen von Baggern gelösten Abraum über den Tagebau hinweg unmittelbar zur Halde fördern. Der Brückenträger reicht hierbei von der Baggergutübernahmestelle bis zur oberen Haldenkante, überbrückt also im wesentlichen die ganze Tagebaugrube. Gleiches gilt entsprechend für Kabelbagger.Procedure for the relocation of the overburden mined in stages in the Open pit lignite mining In order to expose the coal seam in lignite opencast mining, it is known To use overburden conveyor bridges, which are solved in several stages of excavation Convey overburden over the open pit directly to the dump. The bridge girder ranges from the dredged material transfer point to the top edge of the dump, bridged essentially the whole open pit. The same applies to cable excavators.

Um eine standfeste Halde zu erhalten und gefährliche Ausbrüche derselben zu vermeiden, ist es bekannt, die Halde nach geologischen Gesichtspunkten aufzubauen, indem die im allgemeinen im oberen Teil des Deckgebirges befindlichen festeren Bodenarten im unteren Teil der Halde, die weniger standfesten Bodenarten im oberen Teil der Halde angeschüttet werden. Dies wird bei den bekannten Abraumförderbrücken dadurch erreicht, daß die in dem von der Gewinnungsstelle bis zur Haldenkrone reichenden Brückenträger angeordneten Bandförderer mit Abzweigstellen versehen oder entsprechend unterteilt sind. Bei Kabelbaggern werden die verschiedenen Bodenarten durch Steuerung des Baggerkübels verteilt. To maintain a stable dump and dangerous eruptions of the same to avoid, it is known to build up the dump according to geological criteria, by the more solid soil types generally located in the upper part of the overburden in the lower part of the heap, the less stable soil types in the upper part of the Dump to be poured. This is the case with the known overburden conveyor bridges achieved that the reaching from the extraction point to the top of the heap Bridge girders arranged belt conveyor provided with branch points or accordingly are divided. In the case of cable excavators, the various types of soil are controlled by means of control of the excavator bucket.

Bei tiefen Tagebauen mit Abbauhöhen von-Ioom und mehr ist der Abstand zwischen der obersten Baggerstufe bis zur Haldenkrone so groß, daß praktisch ein solcher Tagebaugraben nicht mit einem einzigen, die Förderleistung aller Gewinnungsgeräte aufnehmenden Abraumfördergerät überspannt werden kann, weil das Fördergerät zufolge der großen Spannweite und der hohen Leistung unverhältnismäßig schwer werden wird. In deep open-cast mines with mining heights of -Ioom and more, the distance is between the top excavator level to the top of the stockpile so large that practically one such open pit mining not with a single, the conveying capacity of all extraction equipment receiving overburden conveyor device can be spanned because the conveyor device according to the large span and the high performance will be disproportionately difficult.

Ferner muß der Aufbau der Halde nach den er- -wähnten geologischen Gesichtspunkten bei tiefer.Furthermore, the structure of the dump must be based on the geological Points of view at deeper.

Tagebauen mit erhöhter Sorgfalt vorgenommen werden, da bei der großen Höhe der Halde Ausbrüche derselben verheerende Folgen haben würden.Opencast mines should be carried out with increased care, as at large Height of the heap eruptions the same would have devastating consequences.

Es ist bereits eine Abraumförderbrücke bekanntgeworden, bei der unter dem zur Abförderung der Massen der oberen Abraumschicht dienenden Förderbrückenträger in die Brückenstütze noch eine oder mehrere weitere Brücken eingebaut sind, die den Abraum der tiefer liegenden Schichten aufnehmen und zum unteren Teil der Halde fördern. An overburden conveyor bridge has already become known in which under the conveyor bridge girder serving to remove the masses of the upper overburden layer one or more other bridges are built into the bridge support take up the overburden of the deeper layers and to the lower part of the heap support financially.

Eine solche, aus schweren Teilen -bestehende Abraumförderbrücke ist für den Tieftagebau nicht geeignet, da die Hauptbrücke den gesamten Tagebaugraben überspannen muß. Ein Aufbau der Halde nach geologischen Gesichtspunkten ist hierbei nicht möglich.Such an overburden conveyor bridge consisting of heavy parts is Not suitable for underground mining as the main bridge covers the entire open pit must span. A structure of the dump according to geological aspects is here not possible.

Es ist ferner eine den Tagebau überspannende Abraumförderanlage bekanntgeworden, die aus einem Schrapper und einem Kabelbagger besteht, die beide unabhängig voneinander arbeiten können und deren Arbeitsbereiche sich überschneiden. Der Schrapper bringt die von ihm gelösten Abraummassen in den Arbeitsbereich des Kabelbaggers, der sowohl diese Massen als auch die Abraummassen des unteren Teiles der Abraumböschung aufnimmt und zur Halde fördert. Die beiden Geräte fördern also einander zu, so daß die Gesamtleistung der Anlage allein von der Leistungsfähigkeit des Kabelbaggers- bestimmt wird. An overburden conveyor system spanning the opencast mine has also become known, which consists of a scraper and a cable excavator, both of which are independent of each other can work and their work areas overlap. The scraper brings the debris loosened by him in the work area of the cable excavator, which both absorbs these masses as well as the excavated masses of the lower part of the spoil embankment and promotes to the heap. So the two devices promote each other, so that the overall performance the system is determined solely by the performance of the cable excavator.

Zur Gewinnung der freigelegten Kohle ist es bei Tagebauen mit unregelmäßigen Abbaugrenzen und wechselnder Breite bekannt, - zwei-Kabelbagger, deren Arbeitsbereiche sich überschneiden, zu verwenden. Hierzu fördert der eine Kabelbagger die Kohle nach der einen und der andere Kabelbagger nach der anderen Seite des Tagebaues. Dieses Gerät dient also nicht zur Abraumgewinnung, bei der der Abraum nach einer Richtung gefördert wird. To extract the exposed coal, it is used in opencast mines with irregular Dismantling limits and varying widths known - two cable excavators, their work areas overlap, use. To do this, a cable excavator conveys the coal to one side and the other cable excavator to the other side of the mine. So this device is not used for overburden extraction, in which the overburden after a Direction is promoted.

Das Verfahren zur Umlagerung des in Stufen abgebauten- Deckgebirges in Tagebauen besteht nach der Erfindung darin daß mit zwei oder mehreren nebeneinanderliegenden, in ihren Arbeitsbereichen sich überschrieidenden Fördergeräten mit der Maßgabe gearbeitet wird, daß der Abraum -der obersten Stufe der Gewinnungsseite auf der Haldenseite zuunterst und der Abraum der untersten Stufe zuoberst zu liegen kommt. The procedure for relocating the graded overburden in opencast mines, according to the invention, is that with two or more adjacent, in their work areas overlapping conveyors worked with the stipulation that the overburden - the top tier of the extraction side on the dump side at the bottom and the overburden of the lowest tier comes to lie on top.

Mit dem Verfahren nach der Erfindung wird erreicht, daß die bekannten Abraumförderbrücken undKabelbagger auch im Tieftagebau mit Vorteil angewendet werden können, wobei mehrere Fördergeräte mit einer Spannweite benutzt werden können, die wesentlich kleiner ist als der Abstand zwischen der obersten Gewinnungsstufe und der Haldenkrone. Hierbei ergibt sich der weitere Vorteil, daß die bei Tieftagebauen erforderlichen --hohen Förderleistungen auf die selbständigen Abraumfördergeräte verteilt werden, so daß sich die Leistungen der einzelnen Fördergeräte addieren. With the method according to the invention it is achieved that the known Overburden conveyor bridges and cable excavators can also be used to advantage in underground mining can, whereby several conveyors can be used with a span that is much smaller than the distance between the top extraction stage and the top of the dump. This has the further advantage that the underground mines required - high conveying capacities on the independent overburden conveyor devices are distributed so that the performances of the individual conveyors add up.

Ferner wird gleichzeitig mit dem Verfahrerl nach der Erfindung ermöglicht, eine standfeste Halde nach geologischen Gesichtspunkten aufzubauen. Furthermore, at the same time as the method according to the invention, it is made possible to build a stable dump according to geological criteria.

Die Abb. I und 2 zeigen jeweils einen Tieftagebau im Querschnitt. Figs. I and 2 each show an underground mine in cross section.

In den Abbildungen bezeichnet a das Deckgebirge, b das Kohlenflöz und c die Halde. In the figures, a denotes the overburden, b the coal seam and c the dump.

In Abb. I werden die beiden oberen Schnitte a1 und a2 des etwa I80 m starken Deckgebirges a von Baggergeräten di abgetragen und in bekannter Weise mittels Zugbetrieb den Absetzgeräten e zur Anschüttung der oberen Haldenteilecl und c2 zugeführt, Die beiden mittleren Schnittes und a4 werden von den Baggergeräten d2 genommen, die den gewonnenen - Abraum - - der~ Abraumförderbrückef zuführen. Diese ist deckgebirgsseitig auf der Berrne der Bagger d2 und halderuseitig auf einer unteren Haldenberme fahrbar abgestützt. Der von der Förderbrücke f über den Tagebau geförderte Abraum wird zur Anschüttung des Haldenfußes c3- und der Hochhalde c4 benutzt. Zur Anschüttung der letzteren besitzt die Abraum förderbrücke einen frei tragenden Ausleger fl, Die beiden unteren Schnitte a5 und aG des Deckgebirges a werden von den Baggergeräten ds ausgeführt. Der hierbei gewonnene Abraum wird der auf der Berme der Baggergerätes ds deckgebirgsseitig abgestützten Abraumförderbrücke g zugeführt, die auf einem mittleren Haldenabsatz der Halde c fahrbar angeordnet ist. Der von der Förderbrücke g über den Tagebau geförderte Abraum wird zur Anschüttung des Haldenteiles c5- und c6 benutzt. In Fig. I the two upper cuts a1 and a2 of about I80 m strong overburden a removed by excavators di and in a known manner by means of pulling operation, the stripping devices e to fill the upper heap parts cl and c2 fed, the two middle cuts and a4 are supplied by the excavator equipment d2 taken, which feed the - overburden - - the ~ overburden conveyor bridge. This is on the overburden side on the d2 excavator side and on the halderus side on one Lower pile boom supported so that it is mobile. The one from the conveyor bridge f over the opencast mine Funded overburden is used to fill the stockpile base c3- and the high stockpile c4 used. To fill the latter, the overburden conveyor bridge has a free one load-bearing boom fl, the two lower cuts a5 and aG of the overburden a are carried out by the excavator devices ds. The overburden obtained in this way becomes the on the berm of the excavator device on the overburden conveyor bridge supported on the overburden side g supplied, which is arranged to be mobile on a middle stockpile shoulder of the stockpile c is. The overburden conveyed by the conveyor bridge g over the opencast mine is used as an embankment of the stockpile part c5 and c6 are used.

Die Förderbrückè g hat ebenfalls einen frei tragenden Ausleger g1 zum Anschütten der Hochhalde c6. The conveyor bridge g also has a cantilever boom g1 to fill in the high heap c6.

Bei einer derartigen Anlage setzt sich die Gesamtförderleistung aus den Förderleistungen der beiden Förderbrücken g und J zusammen. Etwa im mittleren Teil des Deckgebirges a befindliche standfeste Bodenarten werden zum Aufbau einer standfesten Halde im unteren Teil derselben angeschüttet. In such a system, the total delivery rate is suspended the delivery rates of the two conveyor bridges g and J together. About in the middle Part of the overburden a located stable soil types are used to build a stable heap in the lower part of the same poured.

In dem Tieftagebau nach Abb. 2 sind zwei Kabelbagger f und g in der gleichen Weise mit sich überschneidenden Arbeitsbereichen angeordnet. Der Kabelbagger f trägt den oberen Teil al des Deckgebirges a ab und bringt die gewonnenen Abraummassen im unteren Teil cl, c2 der Halde c unter. In the underground mine according to Fig. 2, two cable excavators f and g are in the arranged in the same way with overlapping work areas. The cable excavator f removes the upper part al of the overburden a and brings the excavated masses obtained in the lower part cl, c2 of the heap c below.

Der Kabelbagger g trägt den unteren Teil a2 des Deckgebirges a ab und schüttet den oberen Teil c2 und c3 der Halde c an. The cable excavator g removes the lower part a2 of the overburden a and pour the upper part c2 and c3 of the heap c.

Claims (1)

PATENTANSPRUCH: Verfahren zur Umlagerung des in Stufen abgebauten Deckgebirges im Braunkohlentagebau, dadurch gekennzeichnet, daß mit zwei oder mehreren nebeneinanderliegenden, in ihren Arbeitsbereichen sich überschneiden den Fördergeräten mit der Maßgabe gearbeitet wird, daß der Abraum der obersten Stufe der Gewinnungsseite auf der Haldenseite zuunterst und der Abraum der untersten Stufe zuoberst zu liegen kommt. PATENT CLAIM: Process for the rearrangement of the degraded in stages Overburden in lignite opencast mining, characterized in that with two or several Adjacent, in their work areas overlap the conveyors it is worked with the proviso that the overburden of the top level of the extraction side on the heap side at the bottom and the spoil from the bottom step on top comes. Angezogene Druckschriften: Deutsche Patentschriften Nr. 428 909, 548 356, 569 610, 534 454, 548 34I, 60I 8I2; Zeitschrift »Braunkohle«, I933, S.508 und 509, Heft 30; He i deb ro ek, Fördertechnik für Massengüter«, Bd. I, S. 98, I30, I3I, 143. Attached publications: German patent specifications No. 428 909, 548 356, 569 610, 534 454, 548 34I, 60I 8I2; "Braunkohle" magazine, 1933, p.508 and 509, issue 30; He i deb ro ek, conveyor technology for bulk goods «, vol. I, p. 98, I30, I3I, 143.
DEK6668A 1950-09-27 1950-09-27 Procedure for relocating the overburden, which has been extracted in stages, in open-cast lignite mining Expired DE944362C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEK6668A DE944362C (en) 1950-09-27 1950-09-27 Procedure for relocating the overburden, which has been extracted in stages, in open-cast lignite mining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEK6668A DE944362C (en) 1950-09-27 1950-09-27 Procedure for relocating the overburden, which has been extracted in stages, in open-cast lignite mining

Publications (1)

Publication Number Publication Date
DE944362C true DE944362C (en) 1956-06-14

Family

ID=7211367

Family Applications (1)

Application Number Title Priority Date Filing Date
DEK6668A Expired DE944362C (en) 1950-09-27 1950-09-27 Procedure for relocating the overburden, which has been extracted in stages, in open-cast lignite mining

Country Status (1)

Country Link
DE (1) DE944362C (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE428909C (en) * 1925-10-08 1926-05-17 Lauchhammer Rheinmetall Akt Ge Abraumfoerderbruecke
DE534454C (en) * 1931-09-26 Wilh Vesper Rolling process for the production of scraper wire, in which a round wire is used as the starting workpiece
DE548356C (en) * 1932-04-12 Adolf Bleichert & Co A G Process for mining lignite in open-cast mines of varying width
DE548341C (en) * 1932-04-15 Mitteldeutsche Stahlwerke Akt Procedure for relocating the overburden in opencast mines
DE569610C (en) * 1933-02-06 Bleichert Transportanlagen G M System for relocating the overburden in the open pit
DE601812C (en) * 1930-06-22 1934-08-24 A T G Allg Transportanlagen Ge Equipment for loosening, conveying and depositing overburden and, if necessary, for dismantling and conveying the usable masses in opencast mines

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE534454C (en) * 1931-09-26 Wilh Vesper Rolling process for the production of scraper wire, in which a round wire is used as the starting workpiece
DE548356C (en) * 1932-04-12 Adolf Bleichert & Co A G Process for mining lignite in open-cast mines of varying width
DE548341C (en) * 1932-04-15 Mitteldeutsche Stahlwerke Akt Procedure for relocating the overburden in opencast mines
DE569610C (en) * 1933-02-06 Bleichert Transportanlagen G M System for relocating the overburden in the open pit
DE428909C (en) * 1925-10-08 1926-05-17 Lauchhammer Rheinmetall Akt Ge Abraumfoerderbruecke
DE601812C (en) * 1930-06-22 1934-08-24 A T G Allg Transportanlagen Ge Equipment for loosening, conveying and depositing overburden and, if necessary, for dismantling and conveying the usable masses in opencast mines

Similar Documents

Publication Publication Date Title
DE202010017762U1 (en) Forming a shaft for an underground mine
DE3246544C2 (en)
DE502034C (en) Equipment for the extraction, conveyance and relocation of overburden in opencast mines
DE3134642C2 (en)
DE944362C (en) Procedure for relocating the overburden, which has been extracted in stages, in open-cast lignite mining
DE574718C (en) Overburden conveyor bridge spanning the opencast mining of lignite or the like
DE562878C (en) Open pit mine for the extraction and relocation of mountain layers
DE456347C (en) Bridge method with bucket wheel excavator for lignite mining
DE693793C (en) Process and device for the removal of powerful rock layers
DE644444C (en) Plant for the extraction and conveyance of overburden in opencast mines
DE1484608A1 (en) Open pit mining equipment
DE572012C (en) Settling system
DD154352A5 (en) BOESCHUNGSBRUECKE
DE719105C (en) Plant for the extraction and conveyance of overburden in opencast mines
DE870678C (en) Schuerfuebelbagger for the separate extraction of different layers
DE938543C (en) Schraembaggergeraet with shield for mining underground natural resources, preferably lignite
DE371594C (en) Device for loosening, loading and conveying waste material
DE3134975C2 (en)
DE607240C (en) Process for the extraction and extraction of coal
DE819986C (en) Process for the extraction and extraction of overburden in opencast mining by means of a conveyor bridge
DE725078C (en) Mobile conveyor shaft
DE424943C (en) Process for depositing the excavated material by means of an excavation conveyor bridge
DE406489C (en) Excavator track and conveyor trackless excavator operation
DE616229C (en) Procedure for opening up opencast mines
DE195651C (en)