DE7501933U - HOIST - Google Patents

HOIST

Info

Publication number
DE7501933U
DE7501933U DE19757501933 DE7501933U DE7501933U DE 7501933 U DE7501933 U DE 7501933U DE 19757501933 DE19757501933 DE 19757501933 DE 7501933 U DE7501933 U DE 7501933U DE 7501933 U DE7501933 U DE 7501933U
Authority
DE
Germany
Prior art keywords
load carrier
cables
lifting
cable
suspension device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19757501933
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BBC Brown Boveri AG Switzerland
Original Assignee
BBC Brown Boveri AG Switzerland
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BBC Brown Boveri AG Switzerland filed Critical BBC Brown Boveri AG Switzerland
Publication of DE7501933U publication Critical patent/DE7501933U/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/06Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

Hw/ 'JaHw / 'Yes

BBC Aktiengesellschaft Brown, Boveri & Cie.. -. (Schweiz)BBC Public Company Brown, Boveri & Cie .. -. (Switzerland)

HubwerkHoist

Die vorliegende Erfindung betrifft ein Hubwc λ zun Anheben una Senken von Lasten und Gegenständen, insbesondere von Bestrahlungs- und Materialprüfanlagen über ^ "iable Hubhöhen, wobei zur Höhenveränderung Seilzüge ui. oilrollen vorgesehen sind.The present invention relates to a Hubwc λ initially raising una lowering loads and objects, in particular of irradiation, material testing on ^ "iable lifting heights, are provided wherein oilrollen for height variation ui cables..

Zum Anheben von schweren Lasten» vorwiegend solchen über eine Tonne Oewicht, welche translatori.seh ν ' rotatorisch fiber 1 .ΊηΓ"re Distanzen bewegt, bzw. um grössere Winkelbereiche cedreht werden müssen, wie dies insbesondere bei Hubwerken fir Retratron-Bestrahlungs- und -Materialprüf-For lifting heavy loads »mainly via a ton of weight, which translatori.se ν 'rotatory over 1 .ΊηΓ "re distances moved, or by larger angular ranges must be turned, as is particularly the case with hoists for Retratron irradiation and material testing

7501933 21,10.717501933 21.10.71

anlagen erforderlich wird, werden allgemein derartige Vorrichtungen verwendet, bei welchen die Lasiaufhängevorrichtung an Scheren, Rechteckrohren, Teleskopen und ähnlichen Ausbildungsformen geführt werden, da dadurch ein Schwingen der Last beim Verfahren verhindert wird.systems is required, such devices are generally used, in which the Lasiaaufhangvorrichtung on scissors, rectangular tubes, telescopes and the like Forms of training are performed, as this prevents the load from swinging during the process.

Diese bekannten Anlagen weisen jedoch den Nachteil auf, dass die Höhenverschiebungen relativ eng begrenzt werden und im allgemeinen eine Hubhöhe von 4 m nicht überschreiten. Werden jedoch grössere Hubhöhen erforderlich, so wächst der Konstruktionsaufwand sehr stark an und ergeben sich insbesondere Probleme der Positionierung und der Erhaltung der einmal eingestellten Lage der Materialprüfvorrichtung über längere Zeitspannen.However, these known systems have the disadvantage that the height shifts are relatively narrow and in the generally do not exceed a lifting height of 4 m. However, if greater lifting heights are required, the construction effort increases very strongly and result in particular problems of positioning and maintaining the once set Position of the material testing device over long periods of time.

Es ist Aufgabe der Erfindung, ein Hubwerk zu schaffen, bei welchem die an die Aufhängevorrichtung angehängte Last beim Verfahren nicht ins Schwingen kommt, bei welchem eine einfache Positionierung vorgenommen werden kann und bei welchem die einmal eingestellte Lage der Aufhängelast über längere Zeit unverändert erhalten bleibt.It is the object of the invention to create a lifting mechanism in which the load attached to the suspension device when Method does not start to swing, in which a simple positioning can be carried out and in which the once set position of the suspension load remains unchanged over a longer period of time.

Die vorgenannte Aufgabe wird erfindungsgemäss dadurch gelöst, dass in einem aus den Seilzügen einer Aufhängevor-The aforementioned object is achieved according to the invention by that in one of the cables of a hanging curtain

7501933 21.11.717501933 11/21/71

157/74157/74

richtung und einem Lasträger gebildeten Hubsystem die Seilzüge ein dreidimensionales Fachwerk bilden und zwischen der Aufhängevorrichtung und dem Lasträger angeordnet sind.direction and a load carrier formed lifting system the cables form a three-dimensional framework and are arranged between the suspension device and the load carrier.

Durch die Anordnung eines aus den Seilzügen gebildeten dreidimensionalen Pachwerkes kann die Anhängelast sowohl translatorisch als auch rotatorisch über grössere Distanzen bewegt werden, wobei die Anhängelast vollkommen verwindungs- und verdrehungsfrei bewegt werden kann, ohne Rücksicht auf die Bewegungsrichtung. Die fachwerkartige Ausbildung der Trag- und Zugseilkonstruktion ergibt eine völlige Steifheit derselben, selbst bei ungleichmässiger Belastung des Lastträgers und verhindert ein Kippen derselben.By arranging a three-dimensional one formed from the cables Pachwerkes can move the trailer load both translationally and rotationally over greater distances , whereby the trailer load can be moved completely free of twisting and twisting, regardless of the direction of movement. The truss-like training of the The carrying and pulling rope construction results in a complete rigidity of the same, even with uneven loading of the load carrier and prevents it from tilting.

Gemäss einer vorteilhaften Ausgestaltung des erfindungsgemässen Hubwerks ist zur vertikalen Lageveränderung des Lastträgers eine Zugvorrichtung, welche an vier Vertikalzügen gleichzeitig und gleichmässig angreift, angeordnet, wobei das Hubsystem mit angehängter Last durch das dreidimensionale Fachwerk schwingungsfrei über 360° um die Hubächse verschiebbar und drehbar ist.According to an advantageous embodiment of the inventive The hoist is a pulling device to change the position of the load carrier vertically, which is attached to four vertical pulls attacks simultaneously and evenly, arranged, wherein the lifting system with attached load can be moved vibration-free over 360 ° around the lifting axis through the three-dimensional framework and is rotatable.

Weiterhin sind die vier Seilzüge so angeordnet, dass jederFurthermore, the four cables are arranged so that each

- It - 1'j7/71- It - 1'j7 / 71

Seilzug von der Aufhängevorrichtung aus einmal zur Hubachse parallel läuft und über Umlenkvorrichtungen zwei Fachwerkdiagonalen bildet, und am Lastträger nrfestigt ist. The rope pull from the suspension device runs parallel to the lifting axis and forms two truss diagonals via deflection devices and is fixed to the load carrier.

Die Fachwerkausbildung der Zugseile ergibt eine Steifheit ü^er die gesamte Hubhöhe und, bedingt durch die Anordnung der doppelten Umlenkung jedes Zugseiles, ergibt sich die Wirkung eines Dreifach-Flaschenzuges. Durch die vorstehend erwähnte Seilführung in Verbindung mit Umlenkrollen, welche vorzugsweise an den vier Ecken des Lastträgers angeordnet sind, werden alle zwölf Stränge der Zugseile gleichmässig belastet. Im Ruhezustand des Systei oder nach Einstellung einer bestimmten Position des am Lastträger angehängten Materialprüfgerätes können die Rollen in bekannter We''se blockiert oder abgebremst werden.The half-timbered construction of the traction ropes results in rigidity over the entire lifting height and, due to the arrangement the double deflection of each pull rope results in the effect of a triple block and tackle. Through the above mentioned cable guide in connection with pulleys, which are preferably arranged at the four corners of the load carrier all twelve strands of the pull ropes are evenly loaded. In the idle state of the system or after setting a certain position of the material testing device attached to the load carrier, the roles can be used in a known manner blocked or braked.

In der Zeichnung ist ein Ausführungsbeispiel der Erfindung in perspektivischer Ansicht dargestellt.In the drawing, an embodiment of the invention is shown in a perspective view.

Auf einer Aufhängevorrichtung 1 ist in bekannter Weise eine Windenvorrichtung 3 mit einem Antriebsmotor 3 angeordnet. An der Unterseite der Aufhängevorrichtung sind Umlenkrollen 1I angebracht, über welche Seilzüge 5, 6, 7 und 8 zur Windenvori^ichtung 2 geführt sind. An den Eckpunkten der Aufhängevor-A winch device 3 with a drive motor 3 is arranged in a known manner on a suspension device 1. Deflecting rollers 1 I are attached to the underside of the suspension, through which cables 5, 6, 7 and 8 for Windenvori ichtung ^ 2 are guided. At the corner points of the hanging

1 r.ir.d Durchführungen 9 Γ'-ir die Seilzüge S, 6, 7, n. Λ π einem an den Seil;v"iren S, 6, 7, 8 hangenden Last.tr'ifvr in sind ebenfalls Umlenkrollen Ί ' be ^t und daneben Fixierungen 11 für die Seilzüge 5, 6, 1, ^. 1 r.ir.d bushings 9 Γ'-ir the cables S, 6, 7, n. Λ π one on the cable; v "iren S, 6, 7, 8 hanging load.tr'ifvr in are also pulleys Ί 'be ^ t and next to it fixations 11 for the cables 5, 6, 1 , ^.

Die einzelnen Seilzüge sind in der Zeichnung, zum besseren Verständnis unterschiedlich dargestellt; so ist der Seilzug c-i mi·. <~ . w^v durchgehenden Linie gezeichnet, der Seilzug f) mit e:r."r strichlierten, der Seilzug 7 . ..ner strichpunktierten und der Seilzug 8 mit einer punktierten Linie dargestellt.The individual cables are shown differently in the drawing for better understanding; so the cable pull is c -i mi ·. <~. w ^ v drawn continuous line, the cable f) with e: r. "r dashed lines, the cable 7 ... n dotted and the cable 8 shown with a dotted line.

Die Arbeitsweise des erfindungsgemässen Hubwerkes ist folgende ■The operation of the hoist according to the invention is as follows ■

Beim Anheben des Lastträgers 10 mit einer daran befestigten Last, beispielsweise einer Betatron-Materialp ^age (nicht dargestellt)·, werden die Seilzüge 5, 6, 7, 8 > -.^e vom Antriebsmotor 3 angetriebene Windenvorrichtung 2 aufgespult. Dabei wirken alle vier Seilzüge, und zwar je^er für sich, in der gleichen Weise wie ein Dreifach-Flasr ηζ·;~. Dadurch wird der Lastträger, an dessen Fixpunkten 11 ewtils einer der übei1 die Umlenkrollen *i und 1I1 laufenden Seilzüge 5, 6, 7, 8 fixiert ist, nach oben angehoben. Bei Erreichen derWhen the load carrier 10 is lifted with a load attached to it, for example a betatron material pad (not shown), the winch device 2 driven by the drive motor 3 is wound up. All four cables work, each individually, in the same way as a triple flasr ηζ ·; ~. As a result, the load carrier, at whose fixed points 11 one of the cable pulls 5, 6, 7, 8 running over 1 the pulleys * i and 1 I 1 is fixed, is raised upwards. Upon reaching the

gewünschten Hubhöhe wird der Antriebsmotor 3 abgeschaltet, wordurch die Windenvorrichtung 2 ebenfalls zum Stillstand kommt. Da die einzelnen Seilzüge 5, 6, 7, 8 so angeordnet sind, dass sie zwischen den Aussenkanten der Aufhängevorrichtung 1 und den Aussenkanten des Lastträgers 10 ein Fachwerk bilden, ergibt sich eine starre Einheit, so dass der Lastträger 10 weder pendeln kann, noch eine Verdrehbewegung, Verwindung oder ein Kippen des Lastträgers 10 eintreten kann.desired lifting height, the drive motor 3 is switched off, whereby the winch device 2 also comes to a standstill comes. Since the individual cables 5, 6, 7, 8 are arranged so that they are between the outer edges of the suspension device 1 and the outer edges of the load carrier 10 form a framework, there is a rigid unit, so that the load carrier 10 can neither oscillate nor a twisting movement, twisting or tilting of the load carrier 10 can occur.

Da die fachwerkartige Ausbildung der Seilzüge 5, 6, 7, 8, die auf allen zwölf Strängen (vier Seilzüge mit je drei Strängen)gleichmässig belastet werden, können relativ schwache Zugseile verwendet werden, ohne dass darunter die Steifheit und Verdrehsicherheit des Hubwerkes leidet.Since the truss-like design of the cables 5, 6, 7, 8, that are evenly loaded on all twelve strands (four cables with three strands each) can be relative weak traction ropes can be used without the rigidity and torsional resistance of the hoist being impaired.

Um den Antriebsmotor 3 mit der Windenvorrichtung 2 beim Stillstand des Hubwerkes zu entlasten, ist es angebracht, an den Umlenkrollen 1J und 4' in bekannter Weise Bremsvorrichtungen oder Blockierungen anzubringen, welche sich bei Inbetriebnahme des Hubwerkes selbsttätig lösen.In order to relieve the drive motor 3 with the wind device 2 during standstill of the hoist, it is appropriate to be attached to the deflecting rollers 1 and J 4 'in known manner, brake devices or blockages, which dissolve automatically at start-up of the hoist.

Claims (3)

- 7 - 157/74 Schutzansprüche- 7 - 157/74 claims for protection 1. Hubwerk zum Anheben und Senken von Lasten und Gegenständen,1. Lifting gear for lifting and lowering loads and objects, insbesondere von Bestrahlungs- und Materialprüfanlagen über variable Hubhöhen, vcbei zur Köhenveränderung Seilzüge und Seilrollen vorgesehen sind, dadurch gekennzeichnet, dass in einem aus den Seilzügen (5,6,7,8) einer Aufhängevorrichtung (l) -and einem Lastträger (10) gebildeten Eubsystem die Seilzüge (5,6,7,8) ein dreidimensionales Fachwerk bilden und zwischen der Aufhängevorrichtung (l) und dem Lastträger (IG) angeordnet sind.in particular from irradiation and material testing systems variable lifting heights, for which cable pulls and cable pulleys are provided for changing heights, characterized in that in one from the cables (5,6,7,8) of a suspension device (l) -and a load carrier (10) formed the cables (5,6,7,8) form a three-dimensional framework and between the suspension device (l) and the load carrier (IG) are arranged. 2. Hubwerk nach Anspruch 1, dadurch gekennzeichnet, dass zur vertikalen Lageveränderung des Lastträgers (10) eine Zugvorrichtung (2,3), welche an vier Vertikalzügen gleichzeitig und gleichmässig angreift, angeordnet i'st.2. Hoist according to claim 1, characterized in that a pulling device for the vertical change in position of the load carrier (10) (2,3), which attacks four vertical lines simultaneously and evenly, is arranged. 3. Hubwerk nach Anspruch 1, dadurch gekennzeichnet, dass die vier Seilzüge (,5,6,7,8) so angeordnet sind, dass jeder Seilzug an der Aufhängevorrichtung (l) ein-al zur Hubachse parallel läuft und über Umlenkrollen (4,4') zwei Fachwerkdiagonalen bildet, und an Lastträger (10) befestigt ist. 3. Hoist according to claim 1, characterized in that the four cables (5,6,7,8) are arranged so that each Cable pull on the suspension device (l) to the lifting axis runs parallel and forms two truss diagonals via pulleys (4,4 ') and is attached to the load carrier (10). BBO Aktiengesells:.:-..-.ft Brown, Boveri ί: Cie.BBO Aktiengesells:.: -..-. Ft Brown, Boveri ί: Cie.
DE19757501933 1974-12-20 1975-01-23 HOIST Expired DE7501933U (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH1705574A CH578995A5 (en) 1974-12-20 1974-12-20

Publications (1)

Publication Number Publication Date
DE7501933U true DE7501933U (en) 1976-10-21

Family

ID=4422403

Family Applications (2)

Application Number Title Priority Date Filing Date
DE19757501933 Expired DE7501933U (en) 1974-12-20 1975-01-23 HOIST
DE19752502713 Pending DE2502713A1 (en) 1974-12-20 1975-01-23 Load lifting mechanism - has ropes forming lattice-work assembly between winch mounting and load support

Family Applications After (1)

Application Number Title Priority Date Filing Date
DE19752502713 Pending DE2502713A1 (en) 1974-12-20 1975-01-23 Load lifting mechanism - has ropes forming lattice-work assembly between winch mounting and load support

Country Status (2)

Country Link
CH (1) CH578995A5 (en)
DE (2) DE7501933U (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3209201A1 (en) * 1982-03-13 1983-09-22 Fried. Krupp Gmbh, 4300 Essen Device for damping pendulum load movements on cranes
DK157242B (en) * 1988-01-20 1989-11-27 Schmidt As T Hoist Works Including A Playing Frame And An Aag
FR2643353B1 (en) * 1989-02-17 1991-06-14 Caillard DEVICE FOR AVOIDING THE SWINGING OF A LOAD UNDER A SUPPORT FRAME, ESPECIALLY A GANTRY
DE3925172C2 (en) * 1989-07-26 1994-06-23 Mannesmann Ag Load lifting system
NL9200376A (en) * 1992-02-28 1993-09-16 Croese Eng Consultants PORT CRANE.
US5673804A (en) * 1996-12-20 1997-10-07 Pri Automation, Inc. Hoist system having triangular tension members
DE19703287A1 (en) * 1997-01-30 1998-08-06 Estebanez Eva Garcia Cable guide and cab suspension for bridge crane lifting gear
DE20023016U1 (en) * 1999-11-30 2002-11-14 Tms Produktionssysteme Gmbh & Transport and positioning device of a vehicle of a monorail
DE10132350B4 (en) * 2001-07-04 2005-11-10 Eisenmann Maschinenbau Gmbh & Co. Kg lifting device
CN111170186A (en) * 2020-01-18 2020-05-19 中国石油大学(华东) Oil development location hoisting device

Also Published As

Publication number Publication date
CH578995A5 (en) 1976-08-31
DE2502713A1 (en) 1976-07-01

Similar Documents

Publication Publication Date Title
DE68903630T2 (en) ASSEMBLY METHOD FOR AN ELEVATOR AND SUCH AN ELEVATOR.
DE7501933U (en) HOIST
EP0016451B1 (en) Device for fastening the rollers guiding the cable of a façade lift to a case fixed at the top of a building
EP0941959B1 (en) Crane hoist unit
DE2650697C3 (en) Towing crane for motor vehicles
DE976018C (en) Tower crane with a tower that can be erected around a horizontal axis of the crane carriage
DE1246200B (en) Device for preventing swaying of a load suspended by means of ropes on a crane boom that can be pivoted sideways
DE1926447A1 (en) Device to avoid pendulum and / or rotary movements of loads hanging on a hoist
EP0283789A1 (en) Device for a crane or the like
DE2844187A1 (en) Safety double cable lifting tackle - has two parallel winding drums with lifting cables for two pulleys, crossing diagonally
DE2207228A1 (en) Longitudinally movable load lifting device
DE2101842B2 (en) TOWER CRANE
DE4042003A1 (en) Derrick type crane with pulley block - has cable guide pulleys arranged so that jib is raised by cable which lifts load
DE2502147C2 (en) Building crane, especially with a trolley jib
DE202017106288U1 (en) Four-axis adjustable two-stage lifting device
DE900003C (en) Crane arranged on a wagon
DE2707614A1 (en) High facade working platform - has travelling carriage with single support cable running over offset rollers and counter running catch cable
DE1812805A1 (en) Gantry crane with sliding horizontal jib and cable trolley
DE238033C (en)
CH150394A (en) Working procedures for cable cranes with variable unloading points, especially for transporting concrete on construction sites.
DE1756299C3 (en) Gantry or traveling crane
DE2460090A1 (en) METHOD OF APPLYING LARGE-SCALE PARALLELEPIPEDIC CONTAINERS AND DEVICE FOR CARRYING OUT THIS PROCEDURE
DE1248257B (en) Boom tower crane
DE2150184C (en) Device for pivoting loading trees, in particular ship loading trees
DE524587C (en) Safety device for drum conveyor machines with two travel brakes