BR0203994B1
(pt)
|
2001-02-05 |
2011-10-04 |
|
método e aparelho adaptado para continuamente otimizar sistemas de rede de reservatório, poço e superfìcie.
|
AU2002346499A1
(en)
*
|
2002-11-23 |
2004-06-18 |
Schlumberger Technology Corporation |
Method and system for integrated reservoir and surface facility networks simulations
|
US7096172B2
(en)
*
|
2003-01-31 |
2006-08-22 |
Landmark Graphics Corporation, A Division Of Halliburton Energy Services, Inc. |
System and method for automated reservoir targeting
|
US7200540B2
(en)
*
|
2003-01-31 |
2007-04-03 |
Landmark Graphics Corporation |
System and method for automated platform generation
|
EP1745612A4
(de)
*
|
2004-05-11 |
2011-03-16 |
Trimble Planning Solutions Pty Ltd |
Weganalysesystem
|
US7627461B2
(en)
*
|
2004-05-25 |
2009-12-01 |
Chevron U.S.A. Inc. |
Method for field scale production optimization by enhancing the allocation of well flow rates
|
CN100489558C
(zh)
*
|
2004-06-07 |
2009-05-20 |
埃克森美孚上游研究公司 |
用于求解隐式储层仿真矩阵的方法
|
CA2570058C
(en)
|
2004-06-25 |
2013-07-30 |
Shell Canada Limited |
Closed loop control system for controlling production of hydrocarbon fluid from an underground formation
|
US7809537B2
(en)
*
|
2004-10-15 |
2010-10-05 |
Saudi Arabian Oil Company |
Generalized well management in parallel reservoir simulation
|
US7373285B2
(en)
*
|
2004-12-01 |
2008-05-13 |
Bp Corporation North America Inc. |
Application of phase behavior models in production allocation systems
|
US7596480B2
(en)
*
|
2005-04-14 |
2009-09-29 |
Saudi Arabian Oil Company |
Solution method and apparatus for large-scale simulation of layered formations
|
AU2006344398B2
(en)
*
|
2005-10-06 |
2011-05-19 |
Logined B.V. |
Method, system and apparatus for numerical black oil delumping
|
AU2005338352B2
(en)
*
|
2005-11-21 |
2012-05-24 |
Chevron U.S.A., Inc. |
Method for field scale production optimization
|
WO2007084611A2
(en)
*
|
2006-01-20 |
2007-07-26 |
Landmark Graphics Corporation |
Dynamic production system management
|
US10260329B2
(en)
*
|
2006-05-25 |
2019-04-16 |
Honeywell International Inc. |
System and method for multivariable control in three-phase separation oil and gas production
|
US8571688B2
(en)
*
|
2006-05-25 |
2013-10-29 |
Honeywell International Inc. |
System and method for optimization of gas lift rates on multiple wells
|
US8352227B2
(en)
*
|
2006-10-30 |
2013-01-08 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
CA2664409C
(en)
*
|
2006-10-31 |
2016-08-23 |
Exxonmobil Upstream Research Company |
Modeling and management of reservoir systems with material balance groups
|
US8078444B2
(en)
*
|
2006-12-07 |
2011-12-13 |
Schlumberger Technology Corporation |
Method for performing oilfield production operations
|
US8190458B2
(en)
*
|
2007-01-17 |
2012-05-29 |
Schlumberger Technology Corporation |
Method of performing integrated oilfield operations
|
US7946127B2
(en)
*
|
2007-02-21 |
2011-05-24 |
Honeywell International Inc. |
Apparatus and method for optimizing a liquefied natural gas facility
|
US8775141B2
(en)
*
|
2007-07-02 |
2014-07-08 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
US8892221B2
(en)
*
|
2007-09-18 |
2014-11-18 |
Groundswell Technologies, Inc. |
Integrated resource monitoring system with interactive logic control for well water extraction
|
US20090076632A1
(en)
*
|
2007-09-18 |
2009-03-19 |
Groundswell Technologies, Inc. |
Integrated resource monitoring system with interactive logic control
|
WO2009056992A2
(en)
*
|
2007-11-01 |
2009-05-07 |
Schlumberger Canada Limited |
Reservoir fracture simulation
|
US7668707B2
(en)
*
|
2007-11-28 |
2010-02-23 |
Landmark Graphics Corporation |
Systems and methods for the determination of active constraints in a network using slack variables and plurality of slack variable multipliers
|
CA2702965C
(en)
*
|
2007-12-13 |
2014-04-01 |
Exxonmobil Upstream Research Company |
Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid
|
CN101903805B
(zh)
*
|
2007-12-21 |
2013-09-25 |
埃克森美孚上游研究公司 |
沉积盆地中的建模
|
US20090198505A1
(en)
*
|
2008-02-05 |
2009-08-06 |
Peter Gipps |
Interactive path planning with dynamic costing
|
EP2151540A1
(de)
*
|
2008-06-16 |
2010-02-10 |
Bp Exploration Operating Company Limited |
Verfahren und Vorrichtung zur Konfiguration von Öl und/oder Gasbeförderungsystem
|
EP2161406A1
(de)
*
|
2008-09-03 |
2010-03-10 |
BP Exploration Operating Company Limited |
Verfahren und Vorrichtung zur Konfiguration eines Öl- und/oder Gasbeförderungsystems
|
BRPI0915280A2
(pt)
*
|
2008-06-16 |
2016-02-16 |
Bp Exploration Operating |
método e aparelho para configurar um sistema de produção de óleo e/ou gás
|
US8670966B2
(en)
*
|
2008-08-04 |
2014-03-11 |
Schlumberger Technology Corporation |
Methods and systems for performing oilfield production operations
|
WO2010039325A1
(en)
*
|
2008-09-30 |
2010-04-08 |
Exxonmobil Upstream Reseach Company |
Method for solving reservoir simulation matrix equation using parallel multi-level incomplete factorizations
|
CN102165413A
(zh)
*
|
2008-09-30 |
2011-08-24 |
埃克森美孚上游研究公司 |
自适应迭代求解器
|
US9228415B2
(en)
|
2008-10-06 |
2016-01-05 |
Schlumberger Technology Corporation |
Multidimensional data repository for modeling oilfield operations
|
US8301426B2
(en)
*
|
2008-11-17 |
2012-10-30 |
Landmark Graphics Corporation |
Systems and methods for dynamically developing wellbore plans with a reservoir simulator
|
US8972231B2
(en)
*
|
2009-01-30 |
2015-03-03 |
Chevron U.S.A. Inc. |
System and method for predicting fluid flow in subterranean reservoirs
|
AU2014201894B2
(en)
*
|
2009-04-20 |
2016-10-06 |
David Randolph Smith |
Method and apparatus to enhance oil recovery in wells
|
AU2010239363B2
(en)
*
|
2009-04-20 |
2014-01-16 |
David Randolph Smith |
Method and apparatus to enhance oil recovery in wells
|
EP2465073A4
(de)
*
|
2009-08-12 |
2014-09-03 |
Exxonmobil Upstream Res Co |
Optimierte richtlinien für bohrlochmanagement
|
US9134454B2
(en)
|
2010-04-30 |
2015-09-15 |
Exxonmobil Upstream Research Company |
Method and system for finite volume simulation of flow
|
US8463586B2
(en)
|
2010-06-22 |
2013-06-11 |
Saudi Arabian Oil Company |
Machine, program product, and computer-implemented method to simulate reservoirs as 2.5D unstructured grids
|
CA2805446C
(en)
|
2010-07-29 |
2016-08-16 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
CA2803066A1
(en)
|
2010-07-29 |
2012-02-02 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
CA2803315A1
(en)
|
2010-07-29 |
2012-02-02 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
US9058445B2
(en)
|
2010-07-29 |
2015-06-16 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
US8386227B2
(en)
|
2010-09-07 |
2013-02-26 |
Saudi Arabian Oil Company |
Machine, computer program product and method to generate unstructured grids and carry out parallel reservoir simulation
|
US8433551B2
(en)
|
2010-11-29 |
2013-04-30 |
Saudi Arabian Oil Company |
Machine, computer program product and method to carry out parallel reservoir simulation
|
WO2012039811A1
(en)
|
2010-09-20 |
2012-03-29 |
Exxonmobil Upstream Research Company |
Flexible and adaptive formulations for complex reservoir simulations
|
US8805660B2
(en)
|
2010-12-13 |
2014-08-12 |
Chevron U.S.A. Inc. |
Method and system for coupling reservoir and surface facility simulations
|
US8972232B2
(en)
*
|
2011-02-17 |
2015-03-03 |
Chevron U.S.A. Inc. |
System and method for modeling a subterranean reservoir
|
US20120215364A1
(en)
*
|
2011-02-18 |
2012-08-23 |
David John Rossi |
Field lift optimization using distributed intelligence and single-variable slope control
|
CA2843929C
(en)
|
2011-09-15 |
2018-03-27 |
Exxonmobil Upstream Research Company |
Optimized matrix and vector operations in instruction limited algorithms that perform eos calculations
|
US9946986B1
(en)
|
2011-10-26 |
2018-04-17 |
QRI Group, LLC |
Petroleum reservoir operation using geotechnical analysis
|
US9767421B2
(en)
*
|
2011-10-26 |
2017-09-19 |
QRI Group, LLC |
Determining and considering petroleum reservoir reserves and production characteristics when valuing petroleum production capital projects
|
US20130110474A1
(en)
*
|
2011-10-26 |
2013-05-02 |
Nansen G. Saleri |
Determining and considering a premium related to petroleum reserves and production characteristics when valuing petroleum production capital projects
|
WO2013126074A1
(en)
*
|
2012-02-24 |
2013-08-29 |
Landmark Graphics Corporation |
Determining optimal parameters for a downhole operation
|
US9863228B2
(en)
*
|
2012-03-08 |
2018-01-09 |
Schlumberger Technology Corporation |
System and method for delivering treatment fluid
|
US9803457B2
(en)
|
2012-03-08 |
2017-10-31 |
Schlumberger Technology Corporation |
System and method for delivering treatment fluid
|
AU2013274731B2
(en)
*
|
2012-06-15 |
2016-08-25 |
Landmark Graphics Corporation |
Systems and methods for optimizing facility limited production and injection in an integrated reservoir and gathering network
|
RU2014145478A
(ru)
*
|
2012-06-15 |
2016-08-10 |
Лэндмарк Графикс Корпорейшн |
Система и способ для определения рабочих параметров системы из нескольких резервуаров с гетерогенными флюидами, соединенных с общей сборной сетью
|
US9031822B2
(en)
|
2012-06-15 |
2015-05-12 |
Chevron U.S.A. Inc. |
System and method for use in simulating a subterranean reservoir
|
AU2013274733A1
(en)
*
|
2012-06-15 |
2014-10-02 |
Landmark Graphics Corporation |
Methods and systems for gas lift rate management
|
US10036829B2
(en)
|
2012-09-28 |
2018-07-31 |
Exxonmobil Upstream Research Company |
Fault removal in geological models
|
US10012071B2
(en)
|
2013-07-11 |
2018-07-03 |
Laurie Sibbald |
Differential method for equitable allocation of hydrocarbon component yields using phase behavior process models
|
US20150337631A1
(en)
*
|
2014-05-23 |
2015-11-26 |
QRI Group, LLC |
Integrated production simulator based on capacitance-resistance model
|
WO2016018723A1
(en)
|
2014-07-30 |
2016-02-04 |
Exxonmobil Upstream Research Company |
Method for volumetric grid generation in a domain with heterogeneous material properties
|
US9951601B2
(en)
|
2014-08-22 |
2018-04-24 |
Schlumberger Technology Corporation |
Distributed real-time processing for gas lift optimization
|
US10443358B2
(en)
|
2014-08-22 |
2019-10-15 |
Schlumberger Technology Corporation |
Oilfield-wide production optimization
|
AU2015339883B2
(en)
|
2014-10-31 |
2018-03-29 |
Exxonmobil Upstream Research Company |
Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
|
CA2963416A1
(en)
|
2014-10-31 |
2016-05-06 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
|
FR3054705B1
(fr)
*
|
2016-07-29 |
2018-07-27 |
Veolia Environnement-VE |
Outil de gestion de multiples ressources en eau
|
US10303819B2
(en)
*
|
2016-08-25 |
2019-05-28 |
Drilling Info, Inc. |
Systems and methods for allocating hydrocarbon production values
|
US11263370B2
(en)
|
2016-08-25 |
2022-03-01 |
Enverus, Inc. |
Systems and methods for allocating hydrocarbon production values
|
US10839114B2
(en)
|
2016-12-23 |
2020-11-17 |
Exxonmobil Upstream Research Company |
Method and system for stable and efficient reservoir simulation using stability proxies
|
CN108729911A
(zh)
*
|
2017-04-24 |
2018-11-02 |
通用电气公司 |
用于资源生产***的优化装置、***和方法
|
GB2573694B
(en)
*
|
2017-06-14 |
2022-03-30 |
Landmark Graphics Corp |
Modeling geological strata using weighted parameters
|
US11466554B2
(en)
|
2018-03-20 |
2022-10-11 |
QRI Group, LLC |
Data-driven methods and systems for improving oil and gas drilling and completion processes
|
US11506052B1
(en)
|
2018-06-26 |
2022-11-22 |
QRI Group, LLC |
Framework and interface for assessing reservoir management competency
|
US12007732B2
(en)
|
2019-07-12 |
2024-06-11 |
Johnson Controls Tyco IP Holdings LLP |
HVAC system with building infection control
|
US11078773B2
(en)
|
2018-12-03 |
2021-08-03 |
Saudi Arabian Oil Company |
Performing continuous daily production allocation
|
US11714393B2
(en)
|
2019-07-12 |
2023-08-01 |
Johnson Controls Tyco IP Holdings LLP |
Building control system with load curtailment optimization
|
US11226600B2
(en)
*
|
2019-08-29 |
2022-01-18 |
Johnson Controls Tyco IP Holdings LLP |
Building control system with load curtailment optimization
|
WO2021026311A1
(en)
*
|
2019-08-07 |
2021-02-11 |
Drilling Info, Inc. |
Systems and methods for allocating hydrocarbon production values
|