DE602004009896T2 - soil structure - Google Patents

soil structure Download PDF

Info

Publication number
DE602004009896T2
DE602004009896T2 DE200460009896 DE602004009896T DE602004009896T2 DE 602004009896 T2 DE602004009896 T2 DE 602004009896T2 DE 200460009896 DE200460009896 DE 200460009896 DE 602004009896 T DE602004009896 T DE 602004009896T DE 602004009896 T2 DE602004009896 T2 DE 602004009896T2
Authority
DE
Germany
Prior art keywords
steel
preventing
adjacent
blocks
flanges
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE200460009896
Other languages
German (de)
Other versions
DE602004009896D1 (en
Inventor
Mitsushiro Kanazawa-shi Tokuno
Fumihiro Ishikawa-shi Saito
Kazutoshi Kanazawa-shi Tsuda
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Eco Japan Co Ltd
Asahi Kasei Engineering Corp
Asahi Engineering Co Ltd Fukuoka
ASAHI ENGINEERING
Original Assignee
Asahi Engineering Co Ltd Osaka
Eco Japan Co Ltd
Asahi Engineering Co Ltd Fukuoka
ASAHI ENGINEERING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asahi Engineering Co Ltd Osaka, Eco Japan Co Ltd, Asahi Engineering Co Ltd Fukuoka, ASAHI ENGINEERING filed Critical Asahi Engineering Co Ltd Osaka
Publication of DE602004009896D1 publication Critical patent/DE602004009896D1/en
Application granted granted Critical
Publication of DE602004009896T2 publication Critical patent/DE602004009896T2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/22Pavings made of prefabricated single units made of units composed of a mixture of materials covered by two or more of groups E01C5/008, E01C5/02 - E01C5/20 except embedded reinforcing materials
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges
    • E01D15/133Portable or sectional bridges built-up from readily separable standardised sections or elements, e.g. Bailey bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/10Load-carrying floor structures formed substantially of prefabricated units with metal beams or girders, e.g. with steel lattice girders
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/292Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being wood and metal
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Wood Science & Technology (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Bridges Or Land Bridges (AREA)

Description

HINTERGRUND DER ERFINDUNGBACKGROUND OF THE INVENTION

Bereich der ErfindungField of the invention

Die vorliegende Erfindung betrifft eine Bodenstruktur, wie eine auf einem Fluss oder einem Boden gebaute Bodenplattenbrückenstruktur, eine Plattenstruktur aus jeweiligen Ebenen, wie zum Beispiel ein Stahlrahmengebäude und ein eisenverstärktes Betongebäude, eine Straßenbettstruktur, die auf einer oberen Oberfläche einer Unterbodenstruktur ausgebildet ist, eine Straßenbettstruktur, die auf eine Bodenfläche gelegt wird, oder Ähnliches.The The present invention relates to a floor structure such as a a floor or slab floor slab structure, a plate structure of respective planes, such as a Steel frame building and an iron-reinforced concrete building, one Roadbed structure those on an upper surface an underbody structure is formed, a road bed structure, on a floor surface is laid, or the like.

Technischer HintergrundTechnical background

Die Patentschrift 1 zeigt eine Brückenstruktur, bei der Stahlträger, jeder bestehend aus einem oberen Flansch, einem unteren Flansch und einem Steg parallel zueinander angebracht sind, eine Eisenversteifung angebracht ist und Beton zwischen die angrenzenden Stahlträger eingebracht ist, d. h. in einen Raum, der von oberen und unteren Flanschen der angrenzenden Stahlträger und des Stegs definiert wird. Der eisenverstärkte Beton und der Steg sind durch einen PC Stahlträger fest miteinander verbunden, welcher in Richtung der Breite der Brücke den stahlverstärkten Beton und den Steg durchdringt.The Patent Document 1 shows a bridge structure, at the steel girders, each consisting of an upper flange, a lower flange and a web are mounted parallel to each other, an iron reinforcement is attached and concrete inserted between the adjacent steel beams is, d. H. in a room made up of upper and lower flanges adjacent steel beams and the bridge is defined. The reinforced concrete and the bridge are through a PC steel beam firmly connected to each other, which in the direction of the width of the bridge the steel-reinforced Concrete and the pier penetrates.

Diese Brückenstruktur basiert auf der Konstruktionsidee, dass die Widerstandsfähigkeit einer Brücke gegenüber einer Aktivkraft wie derjenigen von Fahrzeugen durch einen eisenverstärkten Beton getragen wird, der zwischen die angrenzenden Stahlträger eingefügt ist.These bridge structure based on the design idea that the resilience a bridge across from an active force such as that of vehicles supported by an iron-reinforced concrete which is inserted between the adjacent steel girders.

Darüber hinaus wird die Struktur der Wandplatten der jeweiligen Ebenen des konventionellen Stahlrahmengebäudes dadurch ausgebildet, dass eine Bodenplatte durch Trägerelemente getragen wird und die Struktur der Wandplatten der jeweiligen Ebenen des eisenverstärkten Betongebäudes normalerweise mit einem monolithischen Beton ausgebildet wird. In ähnlicher Weise wird bei der Straßenbettstruktur, die vorübergehend auf eine obere Oberfläche einer Unterbodenstruktur gelegt wird, eine Methode angewandt, bei der Eisenplatten von Trägerelementen getragen werden. Bei einer Baustelle, bei der Lastkraftwagen und schwere Maschinen öfters ein- und ausfahren, wird typischerweise eine Methode angewandt, bei der Eisenplatten lediglich auf eine Bodenfläche gelegt werden, um vorübergehend einen Unterbau auszubilden.Furthermore the structure of the wall panels of the respective levels of the conventional steel frame building thereby becomes formed such that a bottom plate is supported by support elements and the structure of the wall panels of the respective levels of the iron reinforced concrete building normally is formed with a monolithic concrete. In similar Way is in the road bed structure, the temporary on an upper surface an underbody structure is applied, a method applied the iron plates of carrier elements be worn. At a construction site, in the truck and heavy machinery often and extend, a method is typically used in which Iron plates are merely placed on a floor surface to temporarily to build a substructure.

Es sei erwähnt, dass sich die oben erwähnte „Patentschrift 1" auf die japanische Patentanmeldungsoffenlegungsschrift Nr. H08-253912 bezieht.It should be noted that the above-mentioned "Patent Document 1" refers to the Japanese Patent Application Laid-open Publication No. H08-253912 refers.

Die WO 01/31142 bezieht sich auf einen Holzrost langer schmaler, paralleler Stäbe, die durch kurze, beabstandete Abstandselemente auf Abstand gehalten werden.The WO 01/31142 refers to a wooden grid of long, narrow, parallel bars spaced by short, spaced-apart spacers.

Probleme, die durch die Erfindung gelöst werdenProblems that are solved by the invention

Jedoch ist die Brücke, die in der oben erwähnten Patentschrift 1 gezeigt ist, eine Struktur, bei der der Zusammenschluss durch Stahlträger erreicht wird und der eisenverstärkte Beton an der Baustelle eingebracht wird, jedoch wird keine einheitliche Struktur, bei der die Stahlträger einzeln abgenommen und wieder verwendet werden können, in Betracht gezogen.however is the bridge, those in the above mentioned Patent Document 1, a structure in which the merger through steel beams is achieved and the iron-reinforced Concrete is introduced at the construction site, but no uniform structure, at the steel beams individually removed and reused.

Deshalb ist die konventionelle Technik nicht als Bodenstruktur für vorübergehend gebaute Brücken oder Ähnliches geeignet. Zum Zeitpunkt eines Abbaus fallen umfangreiche Arbeiten zum Abnehmen und hohe Abbaukosten an. Darüber hinaus fällt dabei eine große Menge Abfall an, welcher der Umwelt schadet. Zusätzlich sind der Formzusammenbauprozess, der Prozess zum Anbringen der Stäbe und der Betoneinfügeprozess notwendig, was zu höheren Aufbaukosten führt.Therefore Conventional technology is not temporary as a soil structure built bridges or similar suitable. At the time of dismantling fall extensive work for losing weight and high mining costs. In addition, it falls a big Amount of waste that harms the environment. In addition, the mold assembly process, the process of attaching the bars and the concrete insertion process necessary, resulting in higher Construction costs leads.

Andererseits sind in der oben erwähnten Straßenbettstruktur viele schwere Eisenplatten notwendig, die verlegt und wieder eingeholt werden müssen, eine Stufe und ein Spalt sind zwischen den angrenzenden Eisenplatten ausgebildet und dadurch werden übermäßige Gehgeräusche erzeugt. Daher lässt sich die konventionelle Struktur nur schwer als originale Bodenstruktur hinsichtlich Stärke und Erscheinungsbild bezeichnen.on the other hand are in the above-mentioned roadbed structure many heavy iron plates necessary, which are laid and recovered Need to become, a step and a gap are between the adjacent iron plates trained and thereby excessive Gehgeräusche be generated. Therefore lets the conventional structure is difficult to establish as original soil structure in terms of strength and appearance.

Außerdem, falls eine Wandplatte durch inneres Einfügen von Beton in ein Betongebäude ausgebildet wird, ist ein komplizierter Form-Zusammenbau Prozess erforderlich und es erfordert viel Zeit und Arbeit, die vielen Buchsen anzubringen und zu entfernen. Wenn erwogen wird, dass eine zusätzliche Härtung des Betons etc. erforderlich ist, erhöht sich der Zeitrahmen des Gesamtaufbaus und auch die Gesamtkonstruktionskosten.in addition, if a wall plate is formed by inserting concrete inside a concrete building A complex mold assembly process is needed and it takes a lot of time and labor to attach the many jacks and remove. When it is considered that an additional hardening of concrete, etc., the time frame of the Overall structure and also the total construction costs.

Darüber hinaus ist es in einem Stahlrahmengebäude üblich, dass die Kraft durch einen Querbalken getragen wird, der horizontal zwischen einer Bodenplatte und einem Trägerelement aufgelegt wird. Jedoch ist hier Durchbiegung und Knarzen wahrscheinlich. Außerdem ist viel Zeit und Arbeit zum Aufbau eines Querträgers, einer Bodenplatte und einer Deckenplatte erforderlich.Furthermore it is common in a steel frame building that the force is carried by a crossbeam, which is horizontal between a bottom plate and a carrier element is hung up. However, here deflection and creaking is likely. Furthermore is a lot of time and work to build a cross member, a floor plate and a ceiling tile required.

ZUSAMMENFASSUNG DER ERFINDUNGSUMMARY OF THE INVENTION

Aufgabe der ErfindungObject of the invention

Es ist daher eine Aufgabe der Erfindung, eine Brückenbodenstruktur in einer Bodenplattenbrücke, eine Bodenstruktur in einem Stahlrahmengebäude, eine Bodenstruktur und ein eisenverstärktes Gebäude, eine Bodenstruktur auf einer oberen Oberfläche einer Unterbodenstruktur und eine auf einen Unterboden gelegte Bodenstruktur zu schaffen, die in der Lage sind, die oben erwähnten Problemen zu lösen.It is therefore an object of the invention, a bridge floor structure in one Floor slab bridge, a floor structure in a steel frame building, a floor structure and an iron reinforced building, one Soil structure on an upper surface of an underbody structure and to create a soil structure laid on an underbody, who are able to solve the problems mentioned above.

Mittel zum Lösen der AufgabeMeans for releasing the task

Eine Bodenstruktur gemäß der vorliegenden Erfindung wird durch Anspruch 1 definiert.A Soil structure according to the present invention is defined by claim 1.

In einer Bodenstruktur, die H-förmig gestalteten Stahl verwendet, weist die Bodenstruktur weiterhin einen linken Verschiebungen verhindernden Block auf, der an einen Raum angepasst ist, der zwischen den oberen und unteren Flanschen und dem Steg der linksseitig angrenzenden Stahlträger definiert ist, und einen rechten Verschiebungen verhindernden Block, der an einen Raum angepasst ist, der zwischen den oberen und unteren Flanschen und dem Steg der rechtsseitig angrenzenden Stahlträger definiert ist, wobei die beidseitig gegenüberliegenden Seitenflächen der linken und rechten Verschiebungen verhindernden Blöcke zwischen den benachbarten Stahlträgern unter Druck aneinander angedrückt werden, wodurch die einzelnen Stahlträger daran gehindert werden, abwärts verschoben zu werden, aufgrund eines Oberflächendrucks und einer Reibverbindung zwischen den unter Druck aneinander anliegenden Oberflächen.In a soil structure that is H-shaped designed steel, the soil structure continues to have a left displacements preventing block on to a room adjusted between the upper and lower flanges and the web of the left side adjacent steel beam is defined, and a right shifts preventing block adapted to a room is between the upper and lower flanges and the bridge is defined on the right side adjacent steel beam, wherein the on both sides opposite side surfaces of the left and right shifts preventing blocks between the adjacent steel girders be pressed against each other under pressure, causing the individual steel beams be prevented from going downhill due to a surface pressure and a frictional connection between the surfaces in contact with each other under pressure.

Als eine weitere Ausführungsform, die H-förmigen Stahl verwendet, beinhaltet die Bodenstruktur darüber hinaus einen linken Verschiebungen verhindernden Block, der an einen Raum angepasst ist, der zwischen den oberen und unteren Flanschen und dem Steg des an der linken Seite angrenzenden Stahlträgers definiert ist, und einen rechten Verschiebungen verhindernden Block, der an einen Raum angepasst ist, der zwischen den oberen und unteren Flanschen und dem Steg der an der rechten Seite angrenzenden Stahlträger definiert ist, wobei die beidseitig gegenüberliegenden seitlichen Oberflächen der linken und rechten Verschiebungen verhindernden Blöcke unter Druck zwischen den angrenzenden Stahlträgern gegeneinander angedrückt werden, wobei ein beidseitig eingreifender konkaver und konvexer Teil oder ein Stufenteil an den beiden unter Druck anliegenden Oberflächen ausgebildet ist und dabei die einzelnen Stahlträger daran hindert, abwärts verschoben zu werden.When another embodiment, the H-shaped ones Steel used includes the soil structure beyond a left displacement preventing block that is adjacent to a room adjusted between the upper and lower flanges and the Bridge of the adjacent on the left side steel beam defined and a right shift inhibiting block that is on a room is fitted between the upper and lower flanges and the web of the steel beam adjacent to the right side is, with the opposite sides lateral surfaces of the left and right shifts preventing blocks below Pressure between the adjacent steel beams are pressed against each other, a two-sided concave and convex part or a step portion formed on the two pressure-bearing surfaces while preventing the individual steel beams from moving downwards to become.

Vorzugsweise sind die linken und rechten Verschiebungen verhindernden Blöcke aus Holz oder leichgewichtigem zellularem Beton oder steif geschäumtem Harz ausgebildet.Preferably are the left and right shifts preventing blocks Wood or lightweight cellular concrete or rigid foamed resin educated.

Die Bodenstruktur ist wirkungsvoll als Verschiebemechanismus gegen eine Aktivkraft, falls eine Bodenstruktur durch das parallele Anbringen der Stahlträger ausgebildet ist.The Soil structure is effective as a displacement mechanism against a Active force, if a soil structure by the parallel attachment of the steel beams is trained.

Die vorher vorbereiteten linken und rechten Verschiebungen verhindernden Blöcke werden an jeden Stahlträger angepasst und zwei solche Blöcke werden lediglich gegeneinander angedrückt, während die Stahlträger parallel zueinander angebracht werden. Dadurch kann der vertikale Verschiebungseffekt gegen die Aktivkraft aufrechterhalten werden.The previously prepared left and right shifts preventing blocks be attached to every steel beam adapted and become two such blocks just pressed against each other, while the steel beams be mounted parallel to each other. This allows the vertical Displacement effect against the active power can be maintained.

Die Bodenstruktur kann auf einfache Weise zusammengebaut werden, indem Stahlträger verwendet werden und Kosteneinsparungen können dadurch erreicht werden.The Soil structure can be easily assembled by steel beams can be used and cost savings can be achieved.

Darüber hinaus kann die Bodenstruktur als eine einheitliche Struktur ausgebildet werden, wobei Demontage und Wiederverwendung möglich sind.Furthermore For example, the floor structure may be formed as a unitary structure be disassembled and reused.

Kurzbeschreibung der FigurenBrief description of the figures

1: stellt keinen Teil der Erfindung dar und ist eine Schnittansicht einer Bodenstruktur, die ein erstes Beispiel zeigt, welches einen Verschiebungen verhindernden Abstandhalter verwendet. 1 does not form part of the invention and is a sectional view of a floor structure showing a first example using a displacement preventing spacer.

2: stellt keinen Teil der Erfindung dar und ist eine Schnittansicht einer Bodenstruktur, die ein zweites Beispiel zeigt, welches einen Verschiebungen verhindernden Abstandhalter verwendet. 2 does not form part of the invention and is a sectional view of a floor structure showing a second example using a displacement preventing spacer.

3: stellt keinen Teil der Erfindung dar und ist eine Schnittansicht einer Bodenstruktur, die ein drittes Beispiel zeigt, welches einen Verschiebungen verhindernden Abstandhalter verwendet. 3 does not form part of the invention and is a sectional view of a floor structure showing a third example using a displacement preventing spacer.

4: stellt keinen Teil der Erfindung dar und ist eine Schnittansicht einer Bodenstruktur, die ein viertes Beispiel zeigt, welches einen Verschiebungen verhindernden Abstandhalter verwendet. 4 does not form part of the invention and is a sectional view of a floor structure showing a fourth example using a displacement preventing spacer.

5: ist eine Schnittansicht einer Bodenstruktur, die das erste Beispiel zeigt, das einen Verschiebungen verhindernden Block gemäß der Erfindung verwendet. 5 Fig. 10 is a sectional view of a floor structure showing the first example using a displacement preventing block according to the invention.

6: ist eine Schnittansicht einer Bodenstruktur, die das zweite Beispiel zeigt, welches einen Verschiebungen verhindernden Block gemäß der Erfindung verwendet. 6 Fig. 10 is a sectional view of a floor structure showing the second example using a displacement preventing block according to the invention.

7: ist eine Schnittansicht einer Bodenkonstruktion, die das dritte Beispiel zeigt, welches einen Verschiebungen verhindernden Block gemäß der Erfindung verwendet. 7 is a sectional view of a floor construction showing the third example using a displacement preventing block according to the invention.

8: ist eine Schnittansicht, die einen beispielhaften Steg zum Verbinden des Verschiebungen verhindernden Blocks an dem Stahlträger in den jeweils oben erwähnten Beispielen veranschaulicht. 8th FIG. 1 is a sectional view illustrating an exemplary land for connecting the displacement preventing block to the steel beam in each of the above-mentioned examples.

9(A) ist eine Schnittansicht, die ein Beispiel zeigt, bei dem ein mehrschichtiges Holz als Verschiebungen verhindernder Block verwendet wird. 9 (A) Fig. 10 is a sectional view showing an example in which a multilayer wood is used as the displacement preventing block.

9(B) ist eine Schnittansicht, die ein weiteres Beispiel zeigt, bei dem ein Rohrbauteil als Verschiebungen verhindernder Block verwendet wird. 9 (B) Fig. 13 is a sectional view showing another example in which a pipe member is used as the displacement preventing block.

10(A) ist eine Seitenansicht in axialer Richtung eines Stahlträgers einer Bodenstruktur, die den oben erwähnten Verschiebungen verhindernden Abstandhalter verwendet. 10 (A) Fig. 10 is a side view in the axial direction of a steel beam of a floor structure using the above-mentioned shims preventing spacers.

10(B) ist eine Seitenansicht in axialer Richtung eines Stahlträgers einer Bodenstruktur, die den oben erwähnten Verschiebungen verhindernden Block verwendet. 10 (B) Fig. 10 is a side view in the axial direction of a steel beam of a floor structure using the above-mentioned displacement preventing block.

Ausführliche Beschreibung der FigurenDetailed description of the figures

Ausführungsformen einer Bodenstruktur gemäß der vorliegenden Erfindung werden im Folgenden mit Bezug auf die 5 bis 10 beschrieben.Embodiments of a floor structure according to the present invention will be described below with reference to FIGS 5 to 10 described.

Die Bodenstrukturen, die in den 1 bis 10 gezeigt sind, zeigen eine Brückenbodenstruktur in einer Bodenplattenbrücke, eine Bodenstruktur in einem Stahlrahmengebäude und einem eisenverstärkten Betongebäude, eine Bodenstruktur an einer oberen Oberfläche einer Unterbodenstrukur und eine Bodenstruktur, die auf eine Bodenfläche gelegt wird, bei der eine Vielzahl Stahlträger 4, jeder aufweisend einen oberen Flansch 2 an dem oberen Ende des Stegs 1 und einen unteren Flansch 3 an dem unteren Ende, parallel zueinander angebracht sind und eine Bodenfläche auf dem oberen Flansch 2 ausgebildet wird.The soil structures in the 1 to 10 show a bridge floor structure in a floor slab bridge, a floor structure in a steel frame building and an iron reinforced concrete building, a floor structure on an upper surface of a Unterbodenstrukur and a floor structure which is placed on a floor surface, in which a variety of steel beams 4 each having an upper flange 2 at the top of the bridge 1 and a lower flange 3 at the lower end, parallel to each other, and a bottom surface on the upper flange 2 is trained.

Der Stahlträger 4 wird durch das Verschweißen des oberen Flansches 2, der sich symmetrisch in die linke und rechte Richtung erstreckt, an das obere Ende des Stegs 1 gebildet und durch das Verschweißen des unteren Flansches 3, der sich symmetrisch in die linke und rechte Richtung erstreckt, an das untere Ende des Stegs 1, so dass der resultierende Stahlträger 4 eine H-Form darstellt. Vorzugsweise wird ein H-förmiger Mehrzweckstahl, wie in dem japanischen Industriestandard spezifiziert, so wie er ist verwendet.The steel beam 4 is made by welding the top flange 2 which extends symmetrically in the left and right direction, to the upper end of the bridge 1 formed and by welding the lower flange 3 which extends symmetrically in the left and right directions, to the lower end of the bridge 1 so that the resulting steel beam 4 represents an H-shape. Preferably, an H-shaped multi-purpose steel as specified in the Japanese Industrial Standard is used as it is.

Falls die Bodenstruktur eine Bodenplattenbrücke ist, werden die gegenüberliegenden Enden des Stahlträgers 4 (Bodenstruktur), d. h. die gegenüberliegenden Enden der unteren Flansche 3, zwischen den Stützen 5 in hängender Weise getragen. In diesem Fall bildet der Stahlträger 4 einen Hauptträger.If the floor structure is a floor tile bridge, the opposite ends of the steel girder become 4 (Soil structure), ie the opposite ends of the lower flanges 3 , between the columns 5 worn in a hanging way. In this case, the steel beam forms 4 a main carrier.

Im Falle eines Gebäudes werden die gegenüberliegenden Enden des Stahlträgers 4 (der Bodenstruktur), d. h. die gegenüberliegenden Enden des unteren Flansches 3, zwischen den vertikalen Wänden auf eine hängende Weise getragen, um dadurch eine Wandplatte aus den jeweiligen Ebenen zu bilden. Falls ein Straßenbett auf einer Bodenfläche ausgebildet wird, wird der Stahlträger 4 (Bodenstruktur) mit dem unteren Flansch 3 auf eine Bodenfläche gelegt. Zudem wird der Stahlträger (Bodenstruktur) mit dem unteren Flansch 3 auf ein im Unterboden eingebautes Gerüst gelegt, und die Bodenfläche wird in jedem dargestellten Fall auf dem oberen Flansch 2 ausgebildet.In the case of a building, the opposite ends of the steel girder become 4 (the bottom structure), ie the opposite ends of the lower flange 3 , supported between the vertical walls in a suspended manner to thereby form a wall plate from the respective planes. If a road bed is formed on a floor surface, the steel girder becomes 4 (Soil structure) with the lower flange 3 placed on a floor surface. In addition, the steel beam (floor structure) with the lower flange 3 placed on a scaffold installed in the subfloor, and the bottom surface in each case illustrated on the upper flange 2 educated.

Bei einem gewöhnlichen Aufbau, der in den 1 bis 4 gezeigt ist, ist in der Bodenstruktur ein Verschiebungsabstandhalter 6 zwischen die oberen und/oder die unteren Flansche 3 der angrenzenden Stahlträger eingefügt, ein Kraft aufnehmendes Teil 7 des Verschiebungen verhindernden Abstandhalters 6 wird mit den angrenzenden oberen Flanschen 2 und/oder mit den angrenzenden unteren Flanschen 3 in Eingriff gebracht, um eine Aktivkraft aufzunehmen, die auf die einzelnen Stahlträger 4 aufgebracht wird, um zu verhindern, dass die einzelnen Stahlträger 4 abwärts verschoben werden. Das heißt, die Aktivkraft, die auf die einzelnen Stahlträger 4 aufgebracht wird, wird auf die angrenzenden Stahlträger 4 über die Verschiebungen verhindernden Abstandhalter 6 aufgebracht, so dass die Kraft auf die Gesamtheit aufgebracht und verteilt wird.In an ordinary construction, in the 1 to 4 is shown in the soil structure is a displacement spacers 6 between the upper and / or lower flanges 3 the adjacent steel beam inserted, a force-absorbing part 7 of the displacement-preventing spacer 6 comes with the adjacent upper flanges 2 and / or with the adjacent lower flanges 3 engaged to absorb an active force acting on the individual steel girders 4 is applied to prevent the individual steel beams 4 be moved down. That is, the active power acting on the individual steel girders 4 is applied to the adjacent steel beams 4 about the displacements preventing spacers 6 applied so that the force is applied to the whole and distributed.

In einem ersten Beispiel, wie in den 1 und 2 gezeigt, weist die Bodenstruktur ferner einen Verschiebungen verhindernden Abstandhalter 6 auf, der zwischen die oberen Flansche 2 und die unteren Flansche 3 der angrenzenden Stahlträger 4 eingefügt ist. Der Verschiebungen verhindernde Abstandhalter 6 beinhaltet ein linkes Anpassteil 8, das zwischen die oberen und unteren Flansche 2, 3 der angrenzenden linksseitigen Stahlträger 4 angepasst ist, ein rechtes Anpassteil 9, das zwischen die oberen und unteren Flanschen 2, 3 der angrenzenden rechtsseitigen Stahlträger 4 angepasst ist, ein oberes Einfügeteil 10, das zwischen die oberen Flansche 2 der angrenzenden Stahlträger 4 eingefügt ist, und ein unteres Einfügeteil 11, das zwischen die angrenzenden unteren Flansche 3 eingefügt ist.In a first example, as in the 1 and 2 As shown, the floor structure further includes a displacement preventing spacer 6 on, between the upper flanges 2 and the lower flanges 3 the adjacent steel girder 4 is inserted. The displacements preventing spacers 6 includes a left fitting part 8th between the upper and lower flanges 2 . 3 the adjacent left-sided steel girder 4 adjusted, a right fitting part 9 between the upper and lower flanges 2 . 3 the adjacent right-sided steel girder 4 adapted, an upper insert part 10 between the upper flanges 2 the adjacent steel girder 4 is inserted, and a lower insertion part 11 that between the adjacent lower flanges 3 is inserted.

Ein linkseitiger oberer Stufenteil 12, ausgebildet an einem Sperrteil zwischen dem oberen Einfügeteil 10 und dem linken Anpassteil 8, steht mit einer unteren Oberfläche des oberen Flansches 2 des linksseitigen Stahlträgers 4 in Eingriff und ein linksseitiger unterer Stufenteil 13, ausgebildet an einem Sperrteil zwischen dem oberen Einfügeteil 10 und dem linken Anpassteil 8, steht in Eingriff mit einer oberen Oberfläche des unteren Flansches 3 des linksseitigen Stahlträgers 4.A left side upper step part 12 formed on a locking part between the upper insertion part 10 and the left fitting part 8th , stands with egg ner lower surface of the upper flange 2 of the left-side steel girder 4 engaged and a left side lower step part 13 formed on a locking part between the upper insertion part 10 and the left fitting part 8th is engaged with an upper surface of the lower flange 3 of the left-side steel girder 4 ,

Gleichzeitig steht ein rechtsseitiger oberer Stufenteil 14, der an einem Sperrteil zwischen dem oberen Einfügeteil 10 und dem rechten Anpassteil 9 ausgebildet ist, mit einer unteren Oberfläche des oberen Flansches 2 des rechtsseitigen Stahlträgers 4 in Eingriff und ein rechtsseitiger unterer Stufenteil 15, ausgebildet an einem Sperrteil zwischen dem oberen Einfügeteil 10 und dem rechten Anpassteil 9, steht in Eingriff mit einer oberen Oberfläche des unteren Flansches 3 des rechtsseitigen Stahlträgers 4. Infolge dieser Eingriffsverbindungen werden die einzelnen Stahlträger 4 daran gehindert, nach unten verschoben zu werden.At the same time there is a right-sided upper step part 14 which is at a locking part between the upper insertion part 10 and the right fitting part 9 is formed with a lower surface of the upper flange 2 the right-sided steel beam 4 engaged and a right-sided lower step part 15 formed on a locking part between the upper insertion part 10 and the right fitting part 9 is engaged with an upper surface of the lower flange 3 the right-sided steel beam 4 , As a result of these engagement connections, the individual steel beams 4 prevented from being moved down.

In einem zweiten Beispiel, wie in 2 gezeigt, ist der Verschiebungen verhindernde Abstandhalter 6 an einem oberen Ende des oberen Einfügeteils 10 mit einem oberen Eingriffsteil 18 versehen, welches mit den oberen Oberflächen des oberen Flansches 2 der angrenzenden Stahlträger 4 in Eingriff steht, und der Verschiebungen verhindernde Abstandhalter 6 ist an einem unteren Ende des unteren Einfügeteils 11 mit einem unteren Eingriffsteil 19 angeordnet, welches mit den unteren Oberflächen der unteren Flansche 3 der angrenzenden Stahlträger 4 in Eingriff steht.In a second example, as in 2 Shown is the shims preventing spacers 6 at an upper end of the upper insertion part 10 with an upper engaging part 18 provided with the upper surfaces of the upper flange 2 the adjacent steel girder 4 engaged and the displacement preventing spacers 6 is at a lower end of the lower insertion part 11 with a lower engaging part 19 arranged, which with the lower surfaces of the lower flanges 3 the adjacent steel girder 4 engaged.

Das heißt, der Verschiebungen verhindernde Abstandhalter 6 ist an der linken und rechten Seite des oberen Einfügeteils 10 mit oberen Eingriffsnuten 16 versehen. Die oberen Flansche 2 der angrenzenden Stahlträger 4 werden mit den linken und rechten oberen Eingriffsnuten 16 in Eingriff gebracht und halten dadurch die oberen Flansche 2 zurück. Daher ist der Kraft aufnehmende Teil 7 durch das Paar der oberen Stufenteile 12, 14 ausgebildet, welche die linken und rechten oberen Eingriffsnuten 16 bilden.That is, the displacements preventing spacers 6 is on the left and right sides of the upper insertion part 10 with upper engagement grooves 16 Mistake. The upper flanges 2 the adjacent steel girder 4 be with the left and right upper engagement grooves 16 engaged and thereby hold the upper flanges 2 back. Therefore, the force-absorbing part 7 through the pair of upper tier parts 12 . 14 formed, which the left and right upper engagement grooves 16 form.

Ebenso ist der Verschiebungen verhindernde Abstandhalter 6 an der linken und rechten Seite des unteren Einfügeteils 11 mit unteren Eingriffsnuten 17 versehen. Die unteren Flansche 3 der angrenzenden Stahlträger 4 werden mit den linken und rechten unteren Eingriffsnuten 17 in Eingriff gebracht und halten dadurch die unteren Flansche 3 zurück. Daher ist der Kraft aufnehmende Teil 7 durch das Paar der oberen Stufenteile 13, 15 ausgebildet, die die linken und rechten Eingriffsnuten 17 definieren.Likewise, the displacements preventing spacers 6 on the left and right side of the lower insertion part 11 with lower engagement grooves 17 Mistake. The lower flanges 3 the adjacent steel girder 4 be with the left and right lower engagement grooves 17 engaged and thereby hold the lower flanges 3 back. Therefore, the force-absorbing part 7 through the pair of upper tier parts 13 . 15 formed, which the left and right engagement grooves 17 define.

In einem dritten Beispiel, wie in 3 gezeigt, ist der Verschiebungen verhindernde Abstandhalter 6 in einen oberen Verschiebungen verhindernden Abstandhalter 6', der zwischen den oberen Flanschen 2 der angrenzenden Stahlträger 4 eingefügt ist, und einen unteren Verschiebungen verhindernden Abstandhalter 6'', der zwischen den unteren Flanschen 3 der angrenzenden Stahlträger 4 eingefügt ist (in anderen Worten, der Abstandhalter 6 wird durch getrennte Bauteile gebildet), aufgeteilt. Die Kraft aufnehmenden Teile 7 der entsprechenden Verschiebungen verhindernden Abstandhalter 6', 6'' werden mit den angrenzenden oberen Flanschen 2 und den angrenzenden unteren Flanschen 3 in Eingriff gebracht, um eine Aktivkraft aufzunehmen, die auf die einzelnen Stahlträger 4 aufgebracht wird, so dass die einzelnen Stahlträger 4 daran gehindert werden, sich nach unten zu verschieben. Das heißt, dass die Kraft, die auf die einzelnen Stahlträger 4 aufgebracht wird, auf die angrenzenden Stahlträger 4 über die Verschiebungsabstandhalter 6', 6'' übertragen wird und die Kraft auf die Gesamtkonstruktion verteilt wird.In a third example, as in 3 Shown is the shims preventing spacers 6 in an upper displacement preventing spacers 6 ' that is between the upper flanges 2 the adjacent steel girder 4 is inserted, and a lower displacement preventing spacers 6 '' that is between the lower flanges 3 the adjacent steel girder 4 is inserted (in other words, the spacer 6 is formed by separate components), divided. The force absorbing parts 7 the corresponding displacements preventing spacers 6 ' . 6 '' be with the adjacent upper flanges 2 and the adjacent lower flanges 3 engaged to absorb an active force acting on the individual steel girders 4 is applied so that the individual steel beams 4 be prevented from moving down. That is, the force acting on the individual steel girders 4 is applied to the adjacent steel beams 4 over the displacement spacers 6 ' . 6 '' is transferred and the force is distributed to the overall construction.

Noch genauer, wie in 3 gezeigt, sind die oberen Eingriffsnuten 16 an den linken und rechten Teilen des oberen Einfügeteiles 10 des oberen Verschiebungen verhindernden Abstandhalters 6' ausgestaltet und die oberen Flansche 2 der angrenzenden Stahlträger 4 werden jeweils mit den Eingriffsnuten 16 in Eingriff gebracht. Daher ist der Kraft aufnehmende Teil 7 durch das Paar der oberen Stufenteile 12, 14 ausgebildet, welche die linken und rechten oberen Eingriffsnuten 16 definieren.Even more accurate, as in 3 shown are the upper engagement grooves 16 on the left and right parts of the upper insert 10 of the upper displacement preventing spacer 6 ' designed and the upper flanges 2 the adjacent steel girder 4 are each with the engagement grooves 16 engaged. Therefore, the force-absorbing part 7 through the pair of upper tier parts 12 . 14 formed, which the left and right upper engagement grooves 16 define.

Das heißt, dass die oberen Eingriffsteile 18, welche die oberen Eingriffsnuten 16 des oberen Verschiebungsabstandhalters 6' definieren, mit den oberen Oberflächen der oberen Flansche 2 der angrenzenden Stahlträger 4 in Eingriff stehen und die unteren Eingriffsteile 19 auf ähnliche Weise jeweils mit den unteren Oberflächen der oberen Flansche 2 der angrenzenden Stahlträger 4 in Eingriff stehen und der Kraft aufnehmende Teil 7 gegen die Aktivkraft wird durch die Stufenteile 12, 14, welche an dem Sperrteil zwischen dem oberen Eingriffsteil 18, welches die obere Eingriffsnut 16 ausbildet, und dem oberen Einfügeteil 10 ausgebildet sind, und die Stufenteile 12, 14, welche an dem Sperrteil zwischen dem unteren Eingriffsteil 19 und dem oberen Einfügeteil 10 ausgebildet werden, ausgebildet, so dass die einzelnen Stahlträger 4 daran gehindert werden, nach unten verschoben zu werden.That means that the upper engaging parts 18 which the upper engagement grooves 16 of the upper displacement spacer 6 ' define with the upper surfaces of the upper flanges 2 the adjacent steel girder 4 engaged and the lower engaging parts 19 similarly, with the lower surfaces of the upper flanges, respectively 2 the adjacent steel girder 4 engage and the force receiving part 7 against the active power is through the stage parts 12 . 14 , which at the locking part between the upper engagement part 18 , which the upper engagement groove 16 and the upper insert part 10 are formed, and the step parts 12 . 14 , which at the locking part between the lower engaging part 19 and the upper insert part 10 be formed, formed, so that the individual steel beams 4 be prevented from being moved down.

Gleichermaßen werden die oberen Eingriffsnuten 17 an den linken und rechten Teilen der unteren Einfügeteile 11 des unteren Verschiebungen verhindernden Abstandhalters 6'' ausgebildet und die unteren Flansche 3 der angrenzenden Stahlträger 4 werden jeweils mit den Eingriffsnuten 17 in Eingriff gebracht. Daher wird der Kraft aufnehmende Teil 7 durch das Paar der oberen Stufenteile 13, 15 ausgebildet, welche die linken und rechten unteren Eingriffsnuten 17 definiert.Likewise, the upper engagement grooves become 17 at the left and right parts of the lower insertion parts 11 of the lower displacement preventing spacer 6 '' trained and the lower flanges 3 the adjacent steel girder 4 are each with the engagement grooves 17 engaged. Therefore, the force-absorbing part becomes 7 through the pair of upper tier parts 13 . 15 formed, which the left and right lower Ein griffsnuten 17 Are defined.

Das heißt, dass die oberen Eingriffsteile 18, welche die unteren Eingriffsnuten 17 der unteren Verschiebungsabstandhalter 6'' definieren, mit den oberen Oberflächen der unteren Flansche 3 der angrenzenden Stahlträger 4 in Eingriff gebracht werden. Die unteren Eingriffsteile 19 werden in ähnlicher Weise jeweils mit den unteren Oberflächen der unteren Flansche 3 der angrenzenden Stahlträger 4 in Eingriff gebracht. Der Kraft aufnehmende Teil 7 gegen die Aktivkraft wird durch die Stufenteile 13, 15, die an dem Sperrteil zwischen dem oberen Eingriffsteil 18, das die untere Eingriffsnut 17 ausbildet, und dem unteren Einfügeteil 11 ausgebildet sind, und die Stufenteile 13, 15, die an dem Zwischensperrteil zwischen dem unteren Eingriffsteil 19 und dem unteren Einfügeteil 10 ausgebildet sind, ausgebildet, so dass die einzelnen Stahlträger 4 daran gehindert werden, sich nach unten zu verschieben.That means that the upper engaging parts 18 , which are the lower engagement grooves 17 the lower displacement spacer 6 '' define with the upper surfaces of the lower flanges 3 the adjacent steel girder 4 be engaged. The lower engaging parts 19 are similarly each with the lower surfaces of the lower flanges 3 the adjacent steel girder 4 engaged. The force absorbing part 7 against the active power is through the stage parts 13 . 15 at the locking part between the upper engaging part 18 that the lower engagement groove 17 forms, and the lower insert part 11 are formed, and the step parts 13 . 15 at the intermediate locking part between the lower engaging part 19 and the lower insert part 10 are formed, formed, so that the individual steel beams 4 be prevented from moving down.

In einem vierten Beispiel, wie in 4 gezeigt, beinhaltet ein Verschiebungen verhindernder Abstandhalter 6 ein oberes Einfügeteil 10, welches zwischen den oberen Flanschen 2 der angrenzenden Stahlträger 4 eingefügt ist, und ein unteres Einfügeteil 11, welches zwischen den angrenzenden unteren Flanschen 3 eingefügt ist. Der Verschiebungen verhindernde Abstandhalter 6 ist an einem oberen Ende mit einem oberen Eingriffsteil 18 versehen, welches mit den oberen Oberflächen der oberen Flansche 2 der angrenzenden Stahlträger 4 in Eingriff steht. Der Verschiebungen verhindernde Abstandhalter 6 ist an einem unteren Ende davon mit einem unteren Eingriffsteil 19 versehen, welches mit den unteren Oberflächen des unteren Flansches 3 der angrenzenden Stahlträger 4 in Eingriff steht.In a fourth example, as in 4 includes a displacement preventing spacer 6 an upper insert part 10 which is between the upper flanges 2 the adjacent steel girder 4 is inserted, and a lower insertion part 11 which is between the adjacent lower flanges 3 is inserted. The displacements preventing spacers 6 is at an upper end with an upper engaging part 18 provided with the upper surfaces of the upper flanges 2 the adjacent steel girder 4 engaged. The displacements preventing spacers 6 is at a lower end thereof with a lower engaging part 19 provided with the lower surfaces of the lower flange 3 the adjacent steel girder 4 engaged.

Folglich wird das Kraft aufnehmende Teil 7 durch die Stufenteile 12, 14 ausgebildet, die an dem Sperrteil zwischen dem oberen Einfügeteil 10 und dem oberen Eingriffsteil 18 ausgebildet sind. Das Kraft aufnehmende Teil 7 wird durch die Stufenteile 13, 15 ausgebildet, welche an dem Sperrteil zwischen dem unteren Einfügeteil 11 und dem unteren Eingriffsteil 19 ausgebildet sind.Consequently, the force becomes the receiving part 7 through the step parts 12 . 14 formed on the locking part between the upper insertion part 10 and the upper engagement part 18 are formed. The force absorbing part 7 gets through the stages parts 13 . 15 formed, which on the locking part between the lower insertion part 11 and the lower engaging part 19 are formed.

Infolge dieses Aufbaus wird die Aktivkraft, die auf die einzelnen Stahlträger 4 aufgebracht wird, durch den Kraft aufnehmenden Teil 7 aufgenommen, so dass die einzelnen Stahlträger 4 daran gehindert werden, sich nach unten zu verschieben. D. h., dass die auf die einzelnen Stahlträger 4 aufgebrachte Aktivkraft durch den Abstandhalter 6 auf die angrenzenden Stahlträger 4 übertragen wird und dadurch die Belastung auf die Gesamtheit übertragen und verteilt wird.As a result of this construction, the active force acting on the individual steel beams 4 is applied by the force-absorbing part 7 added so that the individual steel beams 4 be prevented from moving down. That is, that on the individual steel beams 4 Applied active force through the spacer 6 on the adjacent steel beams 4 transferring and distributing the burden to the whole.

Gemäß der Erfindung, wie in den 5 bis 8 gezeigt, weist eine Bodenstruktur, die den H-förmigen Stahl verwendet, ferner einen linken Verschiebungen verhindernden Block 20a, der an einen Raum angepasst ist, der zwischen den oberen und unteren Flanschen 2, 3 und dem Steg 1 der angrenzenden linksseitigen Stahlträger 4 definiert wird, und einen rechten Verschiebungen verhindernden Block 20b auf, der an einen Raum angepasst ist, der zwischen den oberen und unteren Flanschen 2, 3 und dem Steg 1 der angrenzenden rechtsseitigen Stahlträger 4 definiert wird. Das heißt, jeder Stahlträger 4 weist einen linken und rechten Verschiebungen verhindernden Block 20a, 20b auf.According to the invention, as in the 5 to 8th As shown, a floor structure using the H-shaped steel also has a left displacement preventing block 20a , which is adapted to a space between the upper and lower flanges 2 . 3 and the jetty 1 the adjacent left-sided steel girder 4 is defined, and a right shift preventing block 20b which is adapted to a space between the upper and lower flanges 2 . 3 and the jetty 1 the adjacent right-sided steel girder 4 is defined. That is, every steel beam 4 has a left and right shift preventing block 20a . 20b on.

Während die Stahlträger 4 parallel zueinander angeordnet sind, werden die beidseitig einander gegenüberliegenden Seitenflächen 21 der linken und rechten Verschiebungen verhindernden Blöcke 20a, 20b zwischen den angrenzenden Stahlträgern 4 gegeneinander angedrückt. Die einzelnen Stahlträger 4 werden aufgrund eines Oberflächendruckes und einer Reibverbindung zwischen den gegeneinander angedrückten Oberflächen 21 daran gehindert, sich nach unten zu verschieben.While the steel beams 4 are arranged parallel to each other, the mutually opposite side surfaces 21 the left and right shifts preventing blocks 20a . 20b between the adjacent steel girders 4 pressed against each other. The individual steel beams 4 are due to a surface pressure and a frictional connection between the pressed surfaces against each other 21 prevented from moving down.

Zudem, wie in 7 gezeigt, werden bei einer Bodenstruktur, die H-förmig gestalteten Stahl verwendet, beidseitig gegenüberliegende Seitenflächen 21 der linken und rechten Verschiebungen verhindernden Blöcke 20a, 20b zwischen den angrenzenden Stahlträgern 4 gegeneinander gedrückt und ein beidseitig eingreifender konkaver Teil 22 und ein konvexer Teil 23 oder ein Stufenteil sind an den beiden gegeneinander angedrückten Oberflächen 21 ausgebildet, wodurch die einzelnen Stahlträger 4 daran gehindert werden, nach unten verschoben zu werden.In addition, as in 7 As shown, in a floor structure using H-shaped steel, side surfaces are opposite to each other 21 the left and right shifts preventing blocks 20a . 20b between the adjacent steel girders 4 pressed against each other and a two-sided engaging concave part 22 and a convex part 23 or a step part are on the two against each other pressed surfaces 21 formed, whereby the individual steel beams 4 be prevented from being moved down.

Die linken und rechten Verschiebungen verhindernden Blöcke 20a, 20b sind jeweils an ihrer oberen Oberfläche und ihrer unteren Oberfläche von einer unteren Oberfläche des oberen Flansches 2 und einer oberen Oberfläche des unteren Flansches 3 begrenzt. Eine seitliche Oberfläche (die den gegeneinander angedrückten Oberflächen gegenüberliegenden Oberflächen) des linken und rechten Verschiebungen verhindernden Blocks 20a, b werden durch die Seitenflächen des Stegs 1 begrenzt und in diesem Zustand sind die linken und rechten Verschiebungen verhindernden Blöcke 20a, b an die linke und rechte Seite des Stegs 1 angepasst.The left and right shifts prevent blocks 20a . 20b are each at their upper surface and their lower surface from a lower surface of the upper flange 2 and an upper surface of the lower flange 3 limited. A lateral surface (the surfaces opposite the abutted surfaces) of the left and right displacement preventing block 20a , b be through the side surfaces of the bridge 1 limited and in this state, the left and right shifts are preventing blocks 20a , b to the left and right sides of the bridge 1 customized.

In dem in 5 gezeigten Beispiel werden linke und rechte Verschiebungen verhindernde Blöcke 20a, b, die alle die gleiche Größe aufweisen, verwendet. Die Blöcke 20a, b sind an einen linksseitigen Raum angepasst, der von den oberen und unteren Flanschen 2, 3 und des Stegs 1 jedes Stahlträgers 4 definiert wird. Sie sind zudem an einen rechtsseitigen Raum angepasst, der von den rechtsseitigen oberen und unteren Flanschen 2, 3 und des Stegs 1 jedes Stahlträgers 4 definiert wird.In the in 5 For example, left and right shifts are inhibiting blocks 20a , b, which are all the same size used. The blocks 20a , b are adapted to a left-sided space, from the upper and lower flanges 2 . 3 and the jetty 1 every steel girder 4 is defined. They are also adapted to a right-sided space, from the right-side upper and lower flanges 2 . 3 and the jetty 1 every steel girder 4 is defined.

In den linken und rechten Verschiebungen verhindernden Blöcken 20a, b, wie in 8 gezeigt, kann ein Bolzen 24 durch die linken und rechten Verschiebungen verhindernden Blöcke 20a, b eingeführt und die gegenüberliegenden Enden des Bolzens 24 können durch Muttern 26 in den Zugangslöchern 25 angezogen werden, die an den gegenüberliegenden Seitenflächen 21 der linken und rechten Verschiebungen verhindernden Blöcken 20a, b ausgebildet sind, so dass die Stahlträger 4 und die linken und rechten Verschiebungen verhindernden Blöcke 20a, b ineinander integriert sind.In the left and right shifts preventing blocks 20a , b, as in 8th shown, can be a bolt 24 through the left and right shifts preventing blocks 20a , b and the opposite ends of the bolt 24 can by nuts 26 in the access holes 25 be attracted to the opposite side surfaces 21 the left and right displacements preventing blocks 20a , b are formed so that the steel beams 4 and the left and right shifts prevent blocks 20a , b are integrated into each other.

Die Stahlträger 4 inklusive der linken und rechten Verschiebungen verhindernden Blöcke 20a, b sind parallel angeordnet, so dass die Verschiebungen verhindernden Blöcke 20a, b gegeneinander gedrückt werden.The steel beams 4 including the left and right shifts preventing blocks 20a , b are arranged in parallel so that the displacement preventing blocks 20a , b pressed against each other.

In 5 werden die Verschiebungen verhindernden Blöcke 20a, b, welche eine gleiche Größe aufweisen, von den jeweiligen Stahlträgern 4 getragen und die Verschiebungen verhindernden Blöcken 20a, b können von dem Endteil des oberen Flansches 2 oder von den Endteilen des oberen Flansches 2 und des unteren Flansches 3 vorstehen, so dass sie einer anliegenden Eingriffsverbindung unterliegen.In 5 become the displacement-preventing blocks 20a , b, which have an equal size, of the respective steel beams 4 worn and the shifts preventing blocks 20a , b can from the end part of the upper flange 2 or from the end parts of the upper flange 2 and the lower flange 3 protrude so that they are subject to an engaging engagement connection.

Andererseits, wie in 6 gezeigt, ist ein Verschiebungen verhindernder Block 20a, der über ein Endteil des oberen Flansches 2 oder über ein Ende des oberen Flansches 2 und des unteren Flansches 3 vorspringen kann, an den Raum (erster Raum) angepasst und wird von diesem getragen, der an der linken Seite (oder rechten Seite) jedes Stahlträgers 4 ausgebildet ist. Ein vorspringender Teil eines anderen Verschiebungen verhindernden Blockes 20b, der dem oben erwähnten Block 20a benachbart ist, kann in den Raum (zweiter Raum) eindringen, der von der rechten Seite (linken Seite) des Stahlträgers 4 ausgebildet wird, um an den zweiten Raum angepasst zu sein und von ihm getragen zu werden.On the other hand, as in 6 is a shift-inhibiting block 20a , which has an end portion of the upper flange 2 or over one end of the upper flange 2 and the lower flange 3 can project, adapted to the room (first room) and is supported by this, on the left side (or right side) of each steel girder 4 is trained. A projecting part of another shift-inhibiting block 20b , the block mentioned above 20a adjacent, can penetrate into the room (second room), that of the right side (left side) of the steel girder 4 is formed to be adapted to the second room and to be carried by him.

Daher ist der vorstehende Teil des Verschiebungen verhindernden Blockes 20a eines der angrenzenden Stahlträger 4 an den Raum des eindringenden Verschiebungen verhindernden Blocks 20b der anderen angrenzenden Stahlträger 4 angepasst, d. h. zwischen den oberen und unteren Flansch 2, 3 eingepasst, während die gegenüberliegenden Seitenflächen 21 der zwei Verschiebungen verhindernden Blöcke 20a, b gegeneinander anliegen. Diese anliegende Seitenfläche 21 kann die Form einer Verschiebungen verhindernden Oberfläche unter dem Effekt der Druck-Reib-Verbindung, die in 5 gezeigt ist, oder die Form einer Verschiebungen verhindernden Oberfläche mit dem Effekt der konkaven und konvexen Eingriffsverbindung, wie in 7 gezeigt, annehmen. Zudem sind bei diesen Verschiebungen verhindernden Blöcken 20a, b wie in 8 gezeigt, die Blöcke 20a, b mit den Stahlträgern über die Bolzen 24 verbunden.Therefore, the above part is the displacement preventing block 20a one of the adjacent steel beams 4 to the space of the intruding displacement preventing block 20b the other adjacent steel girder 4 adjusted, ie between the upper and lower flange 2 . 3 fitted while the opposite side surfaces 21 of the two shifts preventing blocks 20a , b against each other. This adjacent side surface 21 can be the shape of a displacement-preventing surface under the effect of pressure-friction connection, in 5 or the shape of a displacement preventing surface having the effect of the concave and convex engaging connection as shown in FIG 7 shown, accept. In addition, in these shifts preventing blocks 20a , b as in 8th shown the blocks 20a , b with the steel beams over the bolts 24 connected.

Vorzugsweise sind die linken und rechten Verschiebungen verhindernden Blöcke 20a, b aus Holz oder leichtgewichtigem zellularem Beton oder steif geschäumtem Harz gebildet, so dass die Blöcke 20a, b im Gewicht reduziert werden können.Preferably, the left and right shifts are inhibiting blocks 20a , b made of wood or lightweight cellular concrete or rigid-foamed resin, so that the blocks 20a , b in the weight can be reduced.

In der in 9(A) gezeigten Alternative wird Holz, beispielsweise makelloses Holz oder ein geschichtetes Holz, beispielsweise rechteckige Holzsäulen, laminiert, um ein rechteckiges geschichtetes Holzbauteil auszubilden. Die dadurch entstehenden Holzbauteile werden als linke und rechte Verschiebungen verhindernde Blöcke 20a, b verwendet.In the in 9 (A) As shown, wood, such as flawless wood or a layered wood, such as rectangular wooden columns, is laminated to form a rectangular laminated wood component. The resulting wooden components are as left and right shifts preventing blocks 20a , b used.

In der Alternative, die in 9(B) gezeigt ist, bestehen die linken und rechten Verschiebungen verhindernden Blöcke 20a, b aus einem aus Metall hergestellten Rohr, beispielsweise einem Stahlrohr, einem aus synthetischem Harz hergestellten Rohr oder einem aus Beton hergestellten Rohr.In the alternative, the in 9 (B) is shown, the left and right shifts are preventing blocks 20a , b, of a pipe made of metal, for example a steel pipe, a pipe made of synthetic resin or a pipe made of concrete.

Der Verschiebungen verhindernden Abstandhalter 6, der zwischen die Flansche eingefügt ist, wie in den 1 bis 4 gezeigt, und die linken und rechten Verschiebungen verhindernden Blöcke 20a, b, wie in den 5 bis 9 gezeigt, sind integral mit den entsprechenden Stahlträgern 4 über einen anziehenden Drahtstab 27 festgezogen.The displacement-preventing spacers 6 which is inserted between the flanges, as in the 1 to 4 and the left and right shifts prevent blocks 20a , b, as in the 5 to 9 shown are integral with the corresponding steel beams 4 over an attractive wire rod 27 tightened.

D. h., dass jeder Verschiebungen verhindernde Abstandhalter 6 und der Steg 1 mit einem Durchgangsloch 28 versehen sind, das in Richtung der Breite des Bodens verläuft (Richtung der Anordnung der Stahlträger), und jeder der linken und rechten Verschiebungen verhindernden Blöcke 20a, b und der Steg 1 sind gleichermaßen mit einem Durchgangsloch versehen, das in Richtung der Breite des Bodens verläuft (Richtung der Anordnung der Stahlträger). Ein lang gestreckter Anzugsdrahtstab 27 kann in das Durchgangsloch 28 eingeführt werden und Muttern 29 sind auf die gegenüberliegenden Enden des anziehenden Drahtstabes 27 aufgesetzt und angezogen, so dass der Verschiebungen verhindernde Abstandhalter 6 oder die linken und rechten Verschiebungen verhindernden Blöcke 20a, b und die gesamten Stahlträger 4 integral festgezogen sind.D. h., That any displacements preventing spacers 6 and the jetty 1 with a through hole 28 are provided, which extends in the width direction of the bottom (direction of the arrangement of the steel beams), and each of the left and right shifts preventing blocks 20a , b and the jetty 1 are equally provided with a through hole that extends in the direction of the width of the bottom (direction of the arrangement of steel beams). An elongated suit wire rod 27 can into the through hole 28 are introduced and nuts 29 are on the opposite ends of the attracting wire rod 27 put on and tightened, so that the displacements preventing spacers 6 or the left and right shifts preventing blocks 20a , b and all steel beams 4 are tightened integrally.

Der anziehende Drahtstab 27 kann aus einem Stahldraht oder einem makellosen Stahlstab bestehen.The attractive wire rod 27 can consist of a steel wire or a flawless steel rod.

Daher ist der Verschiebungen verhindernde Abstandhalter 6 zwischen den oberen Flanschen 2 und/oder zwischen den unteren Flanschen 3 jedes angrenzenden Stahlträgers 4 unter Druck angezogen und steht in engem Kontakt mit den Endstücken der Flansche 2, 3.Therefore, the displacement preventing spacers 6 between the upper flanges 2 and / or between the lower flanges 3 every adjacent steel girder 4 tightened under pressure and is in close contact with the end pieces of the flanges 2 . 3 ,

Gleichermaßen sind die linken und rechten Verschiebungen verhindernden Blöcke 20a, b an die linke und rechte Seitenfläche des Stegs 1 jedes angrenzenden Stahlträgers 4 unter Druck angezogen und liegen an diesen in engem Kontakt an. Gleichzeitig werden die gegenüberliegenden Seitenflächen 21 der linken und rechten Verschiebungen verhindernden Blöcke 20a, b gegeneinander gedrückt.Likewise, the left and right shifts are blocking blocks 20a , b to the left and right side surfaces of the bridge 1 every adjacent steel girder 4 tightened under pressure and are in close contact with these. At the same time, the opposite side surfaces 21 the left and right shifts preventing blocks 20a , b pressed against each other.

Wie in 10(A) gezeigt, sind die Verschiebungen verhindernden Abstandhalter 6 in Axialrichtung der Stahlträger 4 beabstandet oder kontinuierlich mit beidseitig direktem Kontakt in Axialrichtung der Stahlträger 4 angebracht.As in 10 (A) Shown are the shims preventing spacers 6 in the axial direction of the steel beams 4 spaced or continuous with direct contact on both sides in the axial direction of the steel beams 4 appropriate.

Gleichermaßen, wie in 10(B) gezeigt, sind die linken und rechten Verschiebungen verhindernden Blöcke 20a, b in Axialrichtung der Stahlträger 4 beabstandet oder durchgehend mit beidseitig direktem Kontakt in Axialrichtung der Stahlträger 4 angebracht.Equally, as in 10 (B) Shown are the left and right shifts preventing blocks 20a , b in the axial direction of the steel beams 4 spaced or continuous with direct contact on both sides in the axial direction of the steel beams 4 appropriate.

Der obere Flansch 2 und der untere Flansch 3 des Stahlträgers 4, der hier verwendet wird, kann aus einer Struktur bestehen, die sich mit gleicher Breite erstreckt, oder aus einer Struktur, bei der der obere Flansch 2 kurz und der obere Flansch 3 lang in der Breite dimensioniert ist.The upper flange 2 and the lower flange 3 of the steel beam 4 used here may consist of a structure that extends with equal width, or of a structure in which the upper flange 2 short and the upper flange 3 long dimensioned in width.

In dieser Bodenstruktur ist die obere Oberfläche des oberen Flansches 2 des Stahlträgers 4 direkt als eine Bodenfläche ausgebildet oder ein Belag 30 aus Beton oder Asphalt oder Ähnlichem wird auf die obere Oberfläche des oberen Flansches 2 aufgetragen und seine obere Oberfläche als eine Bodenfläche ausgeformt. In der Alternative ist ein Bodenzusammenbau auf dem oberen Flansch 2 der Bodenstruktur aufgebaut, indem ein Querbalken und eine Bodenplatte verwendet wird, wodurch eine Bodenfläche auf dem oberen Flansch 2 geformt wird.In this floor structure is the upper surface of the upper flange 2 of the steel beam 4 formed directly as a bottom surface or a covering 30 made of concrete or asphalt or the like is applied to the upper surface of the upper flange 2 applied and its upper surface formed as a bottom surface. In the alternative, a bottom assembly is on the top flange 2 the floor structure is constructed by using a crossbar and a bottom plate, whereby a bottom surface on the upper flange 2 is formed.

Wirkung der ErfindungEffect of the invention

Die vorliegende Erfindung ist äußerst wirksam als eine Verschiebungen verhindernde Vorrichtung gegen eine Aktivkraft, bei der eine Bodenstruktur durch parallel angebrachte Stahlträger ausgebildet wird. Das heißt, dass die Stahlträger parallel zueinander angebracht sind und der Verschiebungen verhindernden Abstandhalter passgenau zwischen die Stahlträger eingefügt ist. Dadurch können die einzelnen Stahlträger wirksam daran gehindert werden, nach unten verschoben zu werden, was andernfalls aufgrund der Aktivkraft passieren würde.The present invention is extremely effective as a displacement preventing device against an active force, in which a soil structure formed by parallel mounted steel beams becomes. This means, that the steel beams are mounted parallel to each other and prevent the displacement Spacer is inserted precisely between the steel beams. This allows the single steel beam be effectively prevented from being pushed down which would otherwise happen due to the active power.

Gleichermaßen sind die linken und rechten Verschiebungen verhindernden Blöcke vorausgehend an jeden Stahlträger angepasst und zwei derartige Stahlblöcke sind parallel zueinander angebracht und lediglich gegeneinander angedrückt. Dadurch kann ein vertikaler Verschiebungseffekt gegen die Aktivkraft auf geeignete Weise erreicht werden.Equally are the left and right shifts precede preventing blocks to every steel beam adapted and two such steel blocks are parallel to each other attached and only pressed against each other. This can be a vertical Displacement effect against the active force achieved in a suitable manner become.

Zudem kann in jedem der obigen Fälle eine Bodenstruktur auf einfache Weise durch die Verwendung von Stahlträgern aufgebaut und eine Kostenreduzierung erreicht werden.moreover can in any of the above cases a floor structure constructed in a simple way by the use of steel beams and a cost reduction can be achieved.

Darüber hinaus kann die Bodenstruktur in jedem der obigen Fälle in einer zusammenhängenden Struktur ausgebildet werden, wobei Demontage und Wiederverwendung möglich sind.Furthermore The soil structure in each of the above cases can be in a coherent structure be formed, disassembly and reuse are possible.

Claims (3)

Bodenstruktur enthaltend eine Vielzahl parallel angeordneter Stahlträger (4), wobei jeder Stahlträger einen Steg (1), einen an einem oberen Ende des Stegs angeordneten oberen Flansch (2) und einen an einem unteren Ende des Stegs angeordneten unteren Flansch (3) beinhaltet und eine Bodenfläche auf dem oberen Flansch (2) ausgebildet ist, wobei die Bodenstruktur ferner einen linken Verschiebungen verhindernden Block (20a), der an einen Raum angepasst ist, der zwischen den oberen und unteren Flanschen und dem Steg an der linken Seite eines Stahlträgers (4) der angrenzenden Stahlträger definiert ist, und einen rechten Verschiebungen verhindernden Block (20b) aufweist, der an einen Raum angepasst ist, der zwischen den oberen und unteren Flanschen und dem Steg an der rechten Seite des Stahlträgers (4) definiert ist, wodurch die beidseitig gegenüberliegenden Seitenflächen (21) der linken und rechten Verschiebungen verhindernden Blöcke (20a, 20b) zwischen den angrenzenden Stahlträgern (4) gegeneinander angedrückt werden, wobei die einzelnen Stahlträger (4) aufgrund eines Oberflächendruckes und einer Reibverbindung zwischen den unter Druck anliegenden Oberflächen (21) daran gehindert werden, sich nach unten zu verschieben.Floor structure comprising a plurality of parallel steel beams ( 4 ), each steel girder comprising a bridge ( 1 ), an upper flange (located at an upper end of the web) ( 2 ) and arranged at a lower end of the web lower flange ( 3 ) and a bottom surface on the upper flange ( 2 ), wherein the bottom structure further comprises a left displacement preventing block ( 20a ), which is adapted to a space between the upper and lower flanges and the web on the left side of a steel girder ( 4 ) of the adjacent steel girder is defined, and a right displacement preventing block ( 20b ), which is adapted to a space between the upper and lower flanges and the web on the right side of the steel beam ( 4 ), whereby the side surfaces ( 21 ) of the left and right shifts preventing blocks ( 20a . 20b ) between the adjacent steel girders ( 4 ) are pressed against each other, wherein the individual steel beams ( 4 ) due to a surface pressure and a frictional connection between the surfaces under pressure ( 21 ) are prevented from moving down. Bodenstruktur nach Anspruch 1, worin die Reibverbindung durch einen an den beiden gegeneinander angedrückten Oberflächen (21) ausgebildeten ineinander eingreifenden konkaven (22) und konvexen (23) Teil oder einen Stufenteil bereitgestellt ist.A floor structure according to claim 1, wherein the frictional connection is provided by one of the two mutually pressed surfaces ( 21 ) formed interlocking concave ( 22 ) and convex ( 23 ) Part or a step part is provided. Bodenstruktur nach Anspruch 1 oder 2, worin die linken und rechten Verschiebungen verhindernden Blöcke (20a, 20b) aus Holz oder leichtgewichtigem zellulärem Beton oder steifem geschäumtem Harz ausgebildet sind.A soil structure according to claim 1 or 2, wherein the left and right displacements prevent blocks (Fig. 20a . 20b ) are formed of wood or lightweight cellular concrete or rigid foamed resin.
DE200460009896 2004-05-26 2004-05-26 soil structure Expired - Lifetime DE602004009896T2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP20040253102 EP1600558B1 (en) 2004-05-26 2004-05-26 Floor structure

Publications (2)

Publication Number Publication Date
DE602004009896D1 DE602004009896D1 (en) 2007-12-20
DE602004009896T2 true DE602004009896T2 (en) 2008-09-11

Family

ID=34930341

Family Applications (2)

Application Number Title Priority Date Filing Date
DE200460009896 Expired - Lifetime DE602004009896T2 (en) 2004-05-26 2004-05-26 soil structure
DE200460026937 Expired - Lifetime DE602004026937D1 (en) 2004-05-26 2004-05-26 soil structure

Family Applications After (1)

Application Number Title Priority Date Filing Date
DE200460026937 Expired - Lifetime DE602004026937D1 (en) 2004-05-26 2004-05-26 soil structure

Country Status (2)

Country Link
EP (2) EP1803852B1 (en)
DE (2) DE602004009896T2 (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070289813A1 (en) * 2006-06-07 2007-12-20 Bothwell Timothy B Scaffold plank with end connector and method of making the same
US9822493B2 (en) 2014-09-19 2017-11-21 Quality Mat Company Industrial mats having side protection
US9714487B2 (en) 2014-09-23 2017-07-25 Quality Mat Company Industrial mats with lifting elements
US10273639B2 (en) 2014-09-19 2019-04-30 Quality Mat Company Hybrid industrial mats having side protection
US9663903B2 (en) 2014-09-23 2017-05-30 Quality Mat Company Industrial mats having plastic or elastomeric side members
US9863098B2 (en) 2014-09-23 2018-01-09 Quality Mat Company Hybrid crane mat with lifting elements
US20160258115A1 (en) 2014-09-23 2016-09-08 Joe Penland, Jr. Industrial mats having cost effective core structures
US9617693B1 (en) 2014-09-23 2017-04-11 Quality Mat Company Lifting elements for crane mats
US10753050B2 (en) 2014-09-23 2020-08-25 Quality Mat Company Industrial mats having cost effective core structures
US9845576B2 (en) 2014-09-23 2017-12-19 Quality Mat Company Hybrid crane mat utilizing various longitudinal members
WO2017151242A1 (en) * 2016-02-29 2017-09-08 Quality Mat Company Industrial mats having cost effective core support structures
MX2017012177A (en) * 2015-03-25 2018-06-19 Quality Mat Co Mat construction with environmentally resistant core.
US10273638B1 (en) 2018-03-26 2019-04-30 Quality Mat Company Laminated mats with closed and strengthened core layer
JP7265343B2 (en) * 2018-11-09 2023-04-26 株式会社竹中工務店 steel building
KR102178271B1 (en) * 2020-04-23 2020-11-12 이성우 Modular Paneled Structure, Combined with Means of Preventing Splice Opening and Disconnection

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR777125A (en) * 1934-08-11 1935-02-12 Slab floor with sheet piles and special spacers
US2112949A (en) * 1935-10-09 1938-04-05 Herbert H Bunker Slab
JPS57137509A (en) * 1981-02-18 1982-08-25 Nitsukai Giken Kk Construction of concrete bridge beam
JPH08253912A (en) 1995-03-16 1996-10-01 Nippon Steel Corp Bride structure
SE515069C2 (en) * 1999-10-25 2001-06-05 Lage Olofsson Scaffolding beam of wood

Also Published As

Publication number Publication date
EP1803852A1 (en) 2007-07-04
DE602004026937D1 (en) 2010-06-10
EP1600558A1 (en) 2005-11-30
DE602004009896D1 (en) 2007-12-20
EP1803852B1 (en) 2010-04-28
EP1600558B1 (en) 2007-11-07

Similar Documents

Publication Publication Date Title
DE602004009896T2 (en) soil structure
AT511220B1 (en) CEILING ELEMENT FOR THE EDUCATION OF BUILDING COVERS
EP0040815B1 (en) Site-assembled composite beam
EP3752688B1 (en) Method for producing composite floors, and composite floor
DE202006015693U1 (en) Wood-concrete connecting unit for use in building construction, has slab and support units connected with each other by connection unit that is embedded in slab unit, where slab unit is made of concrete and support unit is made of wood
EP1669505B1 (en) Steel-concrete composite joist with fire-resistant support for ceiling elements
DE60007842T2 (en) PANEL, ASSEMBLING SUCH PANELS AND USE TO TAKE HEAVY LOADS
EP2927383A1 (en) Formwork for walls which are to be built
EP0811731B1 (en) Ceiling construction and element
EP3985189A1 (en) Connector for two workpieces
EP1293606B1 (en) Daywork shuttering device
DE102005038996A1 (en) Composite floor element
WO2021023324A1 (en) Steel installation part for buildings for replacing a predetermined region of a reinforced concrete component providing for receiving loads
DE3235707C2 (en) Beam or ribbed ceiling
DE202005006228U1 (en) Roof construction for buildings, especially industrial buildings with large widths, comprises bottom and top booms in the form of I-shaped supports with two boom flanges, and node elements with two flat node flange plates
DE102017206316B3 (en) An element
DE9409626U1 (en) Balcony construction
DE202006007405U1 (en) Shear reinforcement unit e.g. anchor rail, for reinforced concrete slab e.g. reinforced concrete cover, has vertical bar provided with recesses that proceed into adjacent recesses in horizontal bar interrupted by adjacent recesses
EP3546666A1 (en) Wood concrete compound construction set
DE102014104722A1 (en) Formwork for walls to be built
EP1227198A2 (en) Composite steel floor
DE102016118014A1 (en) Trusses, in particular roof trusses for a hall
DE202009000604U1 (en) Cover of high load capacity
DE19827670B4 (en) Natural stone support and balconies made therewith
EP4299861A1 (en) Assembly and method for post-reinforcing a component with at least one discontinuity area

Legal Events

Date Code Title Description
8364 No opposition during term of opposition