DE568245C - Additional suspension or bracing for electrical overhead lines to dampen mechanical vibrations - Google Patents

Additional suspension or bracing for electrical overhead lines to dampen mechanical vibrations

Info

Publication number
DE568245C
DE568245C DEH124600D DEH0124600D DE568245C DE 568245 C DE568245 C DE 568245C DE H124600 D DEH124600 D DE H124600D DE H0124600 D DEH0124600 D DE H0124600D DE 568245 C DE568245 C DE 568245C
Authority
DE
Germany
Prior art keywords
overhead line
auxiliary rope
clamp
rope
auxiliary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEH124600D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FRANZ HEERMEIER
Original Assignee
FRANZ HEERMEIER
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FRANZ HEERMEIER filed Critical FRANZ HEERMEIER
Priority to DEH124600D priority Critical patent/DE568245C/en
Application granted granted Critical
Publication of DE568245C publication Critical patent/DE568245C/en
Expired legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/14Arrangements or devices for damping mechanical oscillations of lines, e.g. for reducing production of sound

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Description

Gegenstand der Erfindung ist eine Zusatzaufhängung bzw. -abspannung für elektrische Freileitungen zur Dämpfung mechanischer Schwingungen. Die Vorrichtung besteht aus einem gespannten Hilfsseil, zwei Klemmen mit beweglichem Abspannpunkt und einer Schellenklemme zur Aufnahme des Hilfsseiles. The invention relates to an additional suspension or bracing for electrical Overhead lines for damping mechanical vibrations. The device consists of a tensioned auxiliary rope, two clamps with movable anchoring point and a clamp clamp to hold the auxiliary rope.

Leitungsseile werden unter Verwendung von Klemmen, gegebenenfalls unter Zwischenschaltung von Isolatorenketten, an Querträgern aufgehängt bzw. abgespannt. Soweit nicht feste Gebäude vorhanden sind, werden die Querträger an Masten befestigt.Cable ropes are made using clamps, if necessary with interconnection by isolator chains, suspended or tensioned on cross members. If there are no permanent buildings, the Cross beams attached to masts.

Der wichtigste und zugleich auch spezifisch am höchsten beanspruchte, demzufolge auch der schwächste Teil der Leitungsanlage ist in jedem Falle das Leitungsseil. Die Erhöhung des Sicherheitsgrades dieses Teiles der Anlage ist als das technisch wichtigste Ziel zu bezeichnen. Die Leitungsseile werden unter Festlegung eines bestimmten Durchhanges zwischen den Stützpunkten aufgehängt. Der Durchhang wird bestimmt unter Beachtung der zulässigen spezifischen Materialbeanspruchung, damit auch im ungünstigsten Falle genügend Sicherheit gegen Bruch gewährleistet ist.The most important and at the same time also specifically the highest stressed, consequently also the weakest part of the line system is in any case the cable. The increase the safety level of this part of the system is to be described as the most important technical goal. The line ropes are suspended between the support points with a certain amount of slack. The slack is determined taking into account the permissible specific material stress, so that sufficient security against breakage is guaranteed even in the worst case.

Der Sicherheitsgrad wird jedoch nur gewährleistet, wenn die spezifische Zugspannung nicht überschritten wird. " Die Untersuchung von gebrochenen Leitungsseilen hat jedoch ergeben, daß ausgesprochene Ermüdungsbrüche stattgefunden haben, die nicht auf eine Überschreitung der spezifischen Zugspannung zurückzuführen sind. Bei den hiernach aufgenommenen Beobachtungen von in Betrieb befindlichen Leitungen wurden Bewegungen der Leitungsseile festgestellt. Das mehr oder weniger starke Bewegen der Leitungsseile ist die Ursache für eine große Anzahl von Betriebsstörungen, da durch die Schwingungen des Leitungsseils das Seil und auch die Isolatoren beschädigt bzw. zerstört werden. Soweit das Leitungsseil in Frage kommt, ist charakteristisch, daß die meisten Drähte des Leitungsseils, wie bereits bemerkt, glatte Brüche — also keinen Fließkegel — wie bei Überbeanspruchung durch Zug zeigten. Bei der Untersuchung der Drähte wurde festgestellt, daß die Bruchstellen grob kristallinische Aussehen hatten. Die Erscheinung ist nur zu erklären, daß sie durch das Bewegen der am meisten beanspruchten Drähte hart und spröde werden und abbrechen, bis schließlich die übrigbleibenden Drähte die Zuglast nicht mehr aushalten können und unter Bildung eines Fließkegels zerreißen. Besonders gefährdet sind Leitungsseile aus Leichtmetallen mit größerem Durchmesser und glatter Oberfläche. The degree of safety is only guaranteed if the specific tensile stress is not exceeded. "The investigation of broken cables has shown, however, that pronounced fatigue fractures have taken place that do not indicate an exceedance the specific tensile stress. With those included below Observations of operating lines revealed movements of the line ropes. That more or Less vigorous movement of the line ropes is the cause of a large number of operational malfunctions, because the vibrations of the line rope damage or destroy the rope and also the insulators. So far the cable in question is characteristic that most of the wires of the Line rope, as already noted, smooth breaks - so no flow cone - as in Showed overuse by tension. When examining the wires it was found that the fractures had a roughly crystalline appearance. The appearance is only to explain that they are tough by moving the most stressed wires and become brittle and break off, until finally the remaining wires take the tensile load can no longer withstand and tear, forming a flow cone. Particularly at risk are cables made of light metals with a larger diameter and a smooth surface.

Die in der Leitungsanlage auftretenden Bewegungen bewirken aber auch, wie bereits bemerk"t, eine Zerstörung der Isolatorenketten, insbesondere bei Hewlettisolatoren der Seil-The movements occurring in the pipeline system also have the effect, as already noted, a destruction of the insulator chains, especially with Hewlett insulators of the rope

schlingen und bei Kappenisolatoren der Klöppel, bzw. kann durch die dauernden Bewegungsbeanspruchungen der elektrische Durchschlag eines Isolatorengliedes eingeleitet werden. Ursprünglich nahm man an, daß die Abspannketten — insbesondere die Leitungen an den Abspannklemmen — besonders gefährdet sind. Dies trifft aber nach den Erfahrungen der Praxis nicht zu. Die Mehrzahlloops and the clapper in the case of cap insulators, or electrical breakdown can occur due to the constant stresses of movement an isolator member are initiated. Originally it was assumed that the guy chains - especially the cables at the tensioning clamps - particularly at risk are. However, based on practical experience, this is not the case. The majority

ίο der Zerstörungen wurde an Tragketten, insbesondere an den Tragklemmen, festgestellt. Die Erhöhung der mechanischen Festigkeit bzw. Sicherheit an den Tragketten und erst anschließend an den Abspannketten ist Zweck und Ziel der Erfindung. An Bewegungen, allgemein als Schwingungen bezeichnet, sind nach dem jetzigen Stande der Untersuchungen zu unterscheiden:ίο the destruction was on suspension chains, in particular at the support clamps. The increase in mechanical strength or safety on the support chains and only subsequent to the guy chains is the purpose and aim of the invention. Movements, in general referred to as vibrations, are to be distinguished according to the current status of the investigations:

a) Schwingungen des Leitungsseiles in vertikaier Richtung, hervorgerufen durch senkrecht auf das Leitungsseil auftreffenden Wind (transversale Schwingungen),a) Vibrations of the cable in vertical direction, caused by vertical wind hitting the cable (transverse vibrations),

b) Schwingungen des Mastes in Leitungsrichtung, hervorgerufen durch senkrecht zur Leitungsrichtung auf den Mast auftreffenden Wind (transversale Schwingungen),b) Vibrations of the mast in the direction of the line, caused by perpendicular to the Direction of the line of wind hitting the mast (transverse vibrations),

c) Schwingungen der Traversen,c) vibrations of the crossbeams,

c1) senkrecht (longitudinal), hervorgerufen durch die Schwingungen a,c 1 ) perpendicular (longitudinal), caused by the vibrations a,

c2) waagerecht (transversal), hervorgerufen durch die Schwingungen a,c 2 ) horizontal (transversal), caused by the vibrations a,

c3) waagerecht (longitudinal), hervorgerufen durch die Schwingungen h, c 3 ) horizontal (longitudinal), caused by the vibrations h,

d) spiralförmige Schwingungen des Leitungsseiles, hervorgerufen durch die Veränderung der Zugspannung infolge Temperaturveränderung. d) spiral vibrations of the cable caused by the change the tensile stress due to temperature change.

In den vorhandenen Leitungsaufhängungen und -abspannungen fallen die End- bzw. Ausgangspunkte der vorgenannten Beanspruchungen annähernd in einem Punkte zusammen. Dieser Punkt liegt innerhalb der Trag- bzw. Abspannklemme. Alle auftretenden Schwingungen treffen ungedämpft auf die Klemme auf bzw. werden durch Reflektion noch innerhalb des Klemmraumes verstärkt. Durch das Zusammenfallen der größten Beanspruchung durch den Leitungszug mit der größten Beanspruchung durch die Schwingungen und die Leitungsverbindungen wird das Leitungsseil an der zentralen Einspannstelle mechanisch über das zulässige Maß beansprucht. Die dauernde Überbeanspruchung bewirkt im Laufe der Zeit den bekannten Bruch des Leitungsseiles. Die Folgen derartiger Brüche sind die Gefährdung der öffentlichen Sicherheit sowie die unvermeidliche Unterbrechung in der Stromlieferung. Zweck der Erfindung ist die Vermeidung derartiger Leitungsbrüche. Erreicht wird dies durch Einbau eines Hilfsseiles beliebigen Werkstoffes, welches mittels Schellenklemme oder ähnlicher Vorrichtung an der vorhandenen Trag- bzw. Abspannklemme angelegt, nicht geklemmt und' durch Klemmen mit beweglichem Abspannpunkt unter Verwendung einer Rohr- bzw. Flacheisenspannvorrichtung zu beiden Seiten der vorhandenen Trag- bzw. Abspannklemme in etwa 30 bis 40 cm Entfernung von dieser mit dem Hauptleitungsseil verspannt wird. Hierdurch werden die auftretenden Seilbeanspruchungen auf das Haupt- und das Hilfsseil verteilt. Die am stärksten belasteten Stellen des Hauptseiles an der Tragbzw. Abspannklemme werden infolgedessen entlastet. Die auftretenden Schwingungen werden durch das gespannte Hilfsseil B an den Hilfsseilklemmen C1 und C2 abgedämpft nach der Trag- bzw. Abspannklemme des Hauptseiles A geleitet. Soweit das HiKsseil B Schwingungen erhält, findet, da das Hilfsseil in der Klemme D nicht festgeklemmt ist, ein Ausgleich der Beanspruchungen statt. Die maximalen Beanspruchungen, die sich bei den bekannten Ausführungen an zwei Stellen ergaben, verteilen sich bei dem Gegenstand der Erfindung auf vier Stellen. Die bei Veränderung der Zugspannung auftretenden Verwindungen des Leitungsseiles werden an den Hilfsseilklemmen abgeflacht und ausgeglichen. Die Klemmschale 3 der Hilfsseilklemme C1 bzw. C2 und die Verbindungslaschen 4', 4" (Abb. III) übernehmen die Verdrehung. Eine Übertragung auf das Hilfsseil B findet nicht statt, da bei Lagerimg des Hilfsseils B gemäß 6 und 7 der Abb. Ill, IHa der eingespleißte Konus infolge der Gleitmöglichkeit die Beanspruchung nicht überträgt. Die Vibration der Isolatorenketten wird, da sich durch die Anbringung des gespannten Hilfsseils eine Abflachung der Schwingungen und Beanspruchungen an der Trag- bzw. Abspannklemme bzw. ein Durchlaufen der Schwingungen durch das nicht geklemmte gespannte Hilfsseil B ergibt, wesentlich vermindert. Bei einem etwaigen Bruch des Hauptseils an der Klemmstelle wird ferner das Seil mit voller Sicherheit festgehalten.In the existing line suspensions and bracing, the end and starting points of the aforementioned stresses coincide approximately at one point. This point lies within the suspension clamp. All vibrations that occur hit the terminal without being dampened or are amplified by reflection within the terminal space. Due to the coincidence of the greatest stress due to the cable run with the greatest stress due to the vibrations and the cable connections, the cable rope at the central clamping point is mechanically stressed beyond the permissible extent. The constant overstressing causes the well-known breakage of the cable over time. The consequences of such breaks are the threat to public safety and the inevitable interruption in the supply of electricity. The purpose of the invention is to avoid such line breaks. This is achieved by installing an auxiliary rope of any material, which is attached to the existing support or tensioning clamp by means of a clamp or similar device, is not clamped and 'by clamping with a movable anchoring point using a pipe or flat iron tensioning device on both sides of the existing support- or tension clamp is braced with the main cable at a distance of about 30 to 40 cm from this. As a result, the rope loads that occur are distributed between the main and auxiliary ropes. The most heavily loaded parts of the main rope on the support or As a result, tension clamps are relieved. The vibrations that occur are attenuated by the tensioned auxiliary rope B at the auxiliary rope clamps C 1 and C 2 to the suspension or tensioning clamp of the main rope A. If the HiKsseil B receives vibrations, the stresses are compensated because the auxiliary rope is not clamped in terminal D. The maximum stresses that resulted in two places in the known designs are distributed over four places in the subject matter of the invention. The twisting of the cable that occurs when the tensile stress changes are flattened and compensated for at the auxiliary cable clamps. The clamping shell 3 of the auxiliary rope clamp C 1 and C 2 and the connecting plates 4 ', 4 "(fig. III) take over the rotation. A transfer to the auxiliary cable B does not take place because at Lagerimg the auxiliary cable B according to Figure 6 and 7 of the Figure . Ill, IHa the spliced-in cone does not transfer the load due to the possibility of sliding. The vibration of the isolator chains is, since the attachment of the tensioned auxiliary rope flattens the vibrations and stresses on the suspension clamp or anchoring clamp or the vibrations run through the not clamped, tensioned auxiliary rope B. In the event of a break in the main rope at the clamping point, the rope is also held securely in place.

Doppelaufhängungen bestehen . bereits bei Leitungen auf Stützisolatoren dergestalt, daß man ein Hilfsseil an einem zweiten Isolator festlegt und mit dem Hauptseil verklemmt. Das HiKsseil zum Halten des Hauptseils wird jedoch im normalen Fall als nicht tragend angenommen, also nicht verspannt. Nur bei Bruch der Leitung soll das HiKsseil beansprucht werden. Bei Leitungen an Hängeisolatoren gibt es ebenfalls Doppelaufhängungen und Abspannungen.There are double suspensions. already in the case of lines on post insulators in such a way that an auxiliary rope is attached to a second insulator and clamped to the main rope. However, the hi-kse rope for holding the main rope is normally assumed to be non-load-bearing, so not tense. The HiKsseil should only be stressed if the line breaks. For cables on suspension insulators there are also double suspensions and guy lines.

Bei derartigen Leitungen verwendet man jedoch keinerlei Hilfsseile, sondern versucht nur, die erhöhte Sicherheit durch Erhöhung der Isolation bzw. Verteilung der Kräfte aufWith such lines, however, no auxiliary ropes are used, but attempts are made only the increased security by increasing the isolation or distribution of forces

zwei Ketten mit einem Punkt für die Leitungsaufhängungen oder Abspannungen zu erreichen. Eine Verlegung bzw. Aufteilung und somit eine Verminderung der größten Beanspruchungen erfolgt bei den vorhandenen Leitungsaufhängungen und Abspannungen nicht. Auch bei jeder beweglichen Klemme wird die Schwingungsbeanspruchung an der Klemme nur gemindert, aber nicht aufgehoben und ίο aufgeteilt in Anbetracht, daß die Leitungen in der Hauptsache die Klemme vertikal belasten. to reach two chains with one point for the cable suspensions or bracing. A relocation or division and thus a reduction in the greatest stresses does not take place with the existing cable suspensions and bracing. The Vibration stress on the terminal is only reduced, but not eliminated and ίο divided, considering that the lines are in the main thing is to load the clamp vertically.

Die Zeichnung stellt eine beispielsweise Ausführungsform der Zusatzaufhängung bzw. -abspannung dar, und zwar zeigen: Abb. I eine Gesamtanordnung, Abb. II einen Querschnitt durch die Hilfsseiltragklemme, The drawing shows an example embodiment of the additional suspension or bracing show, namely: Fig. I an overall arrangement, Fig. II a cross section through the auxiliary rope support clamp,

Abb. III eine Ansicht der Hilfsklemme und ihre Verbindung mit dem Hilfsseil.Fig. III is a view of the auxiliary clamp and its connection to the auxiliary rope.

Die Schnitte IHa, b stellen die verschiedenen Zusatzstücke dar für die Festlegung des Hilfsseils £. Die Hilfsklemmen C1 und C2 sind gleich ausgeführt. Die Bestandteile sind: Nr. 3 Aufsatzklemme für das Hauptseil A, Nr. 3' Feststellkeil,
Nr. 4' 4" Verbindungslaschen, Nr. 5' 5" Drehbolzen,
Nr. 6 Einsatzstück für das Hilfsspannseil, Nr. 6' und 6" Splinte zum Festlegen des Einsatzstückes,
The sections IHa, b represent the various additional pieces for fixing the auxiliary rope £. The auxiliary terminals C 1 and C 2 are designed the same. The components are: No. 3 attachment clamp for the main rope A, No. 3 'locking wedge,
No. 4 '4 "connecting tabs, No. 5'5" pivot bolts,
No. 6 insert for the auxiliary tensioning cable, No. 6 'and 6 "split pins to fix the insert,

Nr. 7 Einspleißkonus für das Hilfsspannseil. No. 7 Splice cone for the auxiliary tensioning rope.

In Abb. III b ist ein weiterer Einsatz, Hilfsseil mit Kausche, dargestellt, welcher ebenfalls an Stelle 6 bis 6', 6" bis 7 in den Bolzen 5" eingebracht werden kann. Die Beweglichkeit ist durch den Bolzen 5', 5" ohne weiteres gegeben. Die im Hauptseil A auftretenden Seilschwingungen werden durch die Bolzen 5' bis 5" z. T. auf das Hilfsseil übertragen.In Fig. III b, another insert, an auxiliary rope with a thimble, is shown, which can also be inserted into the bolt 5 "at points 6 to 6 ', 6" to 7. The mobility is easily given by the bolts 5 ', 5 ". The rope vibrations occurring in the main rope A are controlled by the bolts 5' to 5" z. T. transferred to the auxiliary rope.

Der Einbau der Zusatzaufhängung bzw. -abspannung erfolgt, indem auf der einen Seite das Hilfsseil B mit dem Hauptseil A mittels ♦5 der Hilfsklemme C1 befestigt wird. Das Hilfsseil wird in die Schellenklemme D eingelegt und durch Einsetzen der Splinte Z)1 und Z)2 gegen Herausschnellen gesichert. Das Hilfsseil wird mit der Hilfsklemme C2 verbunden, welche locker um das Hauptseil A liegt. Mit Hilfe einer Spannvorrichtung wird die Hilfsklemme C2 nach außen geschoben, und zwar so weit, daß das Hilfsseil entsprechend gespannt ist. Nunmehr erfolgt die Festlegung der Hilfsklemme C2 mit dem Hauptseil A. Bei Abspannungen wird nur mittels Schellenklemme eine halbe der beschriebenen Zusatzabspannung an der vorhandenen Abspannklemme angebracht. Für Neuanlagen wird zweckmäßig eine besonders ausgebildete Hauptklemme verwendet, dergestalt, daß das Seil wohl in horizontaler Richtung festgelegt wird, sich jedoch um seine eigene Achse nach jeder Richtung drehen kann.The installation of the additional suspension or bracing is done by attaching the auxiliary rope B to the main rope A on one side using the auxiliary clamp C 1. The auxiliary rope is placed in the clamp D and secured against falling out by inserting the split pins Z) 1 and Z) 2. The auxiliary rope is connected to the auxiliary clamp C 2 , which lies loosely around the main rope A. With the help of a tensioning device, the auxiliary clamp C 2 is pushed outward, so far that the auxiliary rope is tensioned accordingly. The auxiliary clamp C 2 is now fixed with the main rope A. In the case of anchoring, only half of the additional anchoring described is attached to the existing anchoring clamp by means of a clamp clamp. For new systems, a specially designed main clamp is expediently used, in such a way that the rope is fixed in the horizontal direction, but can rotate around its own axis in any direction.

Claims (3)

65 Patentansprüche:65 claims: 1. Zusatzaufhängung bzw. -abspannung für elektrische Freileitungen zur Dämpfung mechanischer Schwingungen, dadurch gekennzeichnet, daß an der Freileitung vor und hinter ihrer Trag- bzw. Klemmstelle ein Hilfsseil befestigt ist, das über einen besonderen Tragkörper der Isolatorenkette geführt ist und eine Vorspannung aufweist, derart, daß die Freileitung mechanisch teilweise entlastet ist.1. Additional suspension or bracing for electrical overhead lines for damping mechanical vibrations, characterized in that on the overhead line in front of and behind its support or clamping point an auxiliary rope is attached, which is over a special support body of the isolator chain is guided and has a bias, such that the overhead line mechanically is partially relieved. 2. Zusatzaufhängung bzw. -abspannung nach Anspruch 1, dadurch gekennzeichnet, daß die Befestigung des Hilfsseils an der Freileitung durch an sich bekannte Keil-, Konus- oder Schraubklemmen erfolgt, die mit dem Hilfsseil gelenkig verbunden sind.2. Additional suspension or bracing according to claim 1, characterized in that that the attachment of the auxiliary rope to the overhead line by known wedge, Conical or screw clamps that are hinged to the auxiliary rope. 3. Verfahren zur Anbringung und Vorspannung des Hilfsseils nach Anspruch 1 und 2, dadurch gekennzeichnet, daß das eine Ende des Hilfsseils vor der Trag- bzw. Klemmstelle der Freileitung mittels einer Klemme (C1) an der Freileitung befestigt ist, dann in einen über der Trag- bzw. Klemmstelle der Freileitung angeordneten muldenförmig ausgebildeten Tragkörper (D) eingelegt, durch Einsetzen von Splinten (Z)1, Z)2) gegen Herausschnellen gesichert und darauf die mit dem anderen Ende des Hilfsseils verbundene, auf der Freileitung zunächst lose sitzende Klemme (C2) mittels einer Spannvorrichtung auf der Freileitung so weit verschoben wird, bis das Hilfsseil die erforderliche Vorspannung aufweist, worauf die Festlegung der Klemme (C2) auf der Freileitung erfolgt. ,3. A method for attaching and biasing the auxiliary rope according to claim 1 and 2, characterized in that one end of the auxiliary rope in front of the support or clamping point of the overhead line by means of a clamp (C 1 ) is attached to the overhead line, then into one The trough-shaped supporting body (D) arranged in the support or clamping point of the overhead line is inserted, secured against falling out by inserting split pins (Z) 1 , Z) 2 ) and then the one connected to the other end of the auxiliary rope and initially loosely seated on the overhead line Clamp (C 2 ) is moved by means of a tensioning device on the overhead line until the auxiliary rope has the required pre-tension, whereupon the clamp (C 2 ) is fixed on the overhead line. , Hierzu 1 Blatt Zeichnungen1 sheet of drawings
DEH124600D 1929-12-14 1929-12-14 Additional suspension or bracing for electrical overhead lines to dampen mechanical vibrations Expired DE568245C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEH124600D DE568245C (en) 1929-12-14 1929-12-14 Additional suspension or bracing for electrical overhead lines to dampen mechanical vibrations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEH124600D DE568245C (en) 1929-12-14 1929-12-14 Additional suspension or bracing for electrical overhead lines to dampen mechanical vibrations

Publications (1)

Publication Number Publication Date
DE568245C true DE568245C (en) 1933-01-16

Family

ID=7174673

Family Applications (1)

Application Number Title Priority Date Filing Date
DEH124600D Expired DE568245C (en) 1929-12-14 1929-12-14 Additional suspension or bracing for electrical overhead lines to dampen mechanical vibrations

Country Status (1)

Country Link
DE (1) DE568245C (en)

Similar Documents

Publication Publication Date Title
DE4344537A1 (en) Damping device for galloping on overhead HV lines
DE568245C (en) Additional suspension or bracing for electrical overhead lines to dampen mechanical vibrations
DE482961C (en) Device for damping vibrations in overhead lines
DE2753544C2 (en) Device for attaching overhead lines to a multiple isolator chain
DE2413928A1 (en) CUSHIONING SPACER
DE2934373C2 (en) Device for attaching electrical cables to a multiple insulator chain
DE2816509C2 (en) Protective device against the consequences of an isolator breakage in the case of multiple isolator chains
DE3541195C2 (en) Device for tensioning or holding high-voltage overhead lines
DE3616802C2 (en)
DE543578C (en) Spring fastening for electrical overhead lines on isolator chains
DE2807003C2 (en) Multiple isolator chain
DE3028037C2 (en) Suspension for an aerial cable on an overhead line cable
DE7811354U1 (en) Protection device against the consequences of breaking an isolator in multiple isolator chains
DE630465C (en) Auxiliary device on tensioning clamps for electrical lines
DE102016202788A1 (en) Bundle spacers and overhead line with such
DE945697C (en) Fastening for tensioning device
EP0249956A1 (en) Oscillation damper for electrical lines
DE527487C (en) Bracing of high-voltage lines
DE843437C (en) Thimble, especially for connecting the individual sections of a cable under tension
DE450623C (en) Rope fastening device, in particular as an intermediate harness for conveyor baskets
DE1540630C (en) Current loop at support points for the electrical connection of incoming and outgoing overhead lines
DE1665379C3 (en) Suspension of an electrical overhead line cable
AT39607B (en) Safety anchorage for the catenary wires of electric trams.
DE2909898A1 (en) Clamp and support for overhead power cables - has side spring dampers and central support for cable with two insulator fastenings
DE2935818A1 (en) Y=shaped suspension insulator for overhead power lines - has spacer and blocking plate on downward stem prevent swivel joint in horizontal plane