DE3841224A1 - Combined gas turbine/steam turbine power station - Google Patents

Combined gas turbine/steam turbine power station

Info

Publication number
DE3841224A1
DE3841224A1 DE19883841224 DE3841224A DE3841224A1 DE 3841224 A1 DE3841224 A1 DE 3841224A1 DE 19883841224 DE19883841224 DE 19883841224 DE 3841224 A DE3841224 A DE 3841224A DE 3841224 A1 DE3841224 A1 DE 3841224A1
Authority
DE
Germany
Prior art keywords
steam
heating
turbine
heat exchanger
gas turbine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19883841224
Other languages
German (de)
Inventor
Konrad Goebel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Priority to DE19883841224 priority Critical patent/DE3841224A1/en
Publication of DE3841224A1 publication Critical patent/DE3841224A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K17/00Using steam or condensate extracted or exhausted from steam engine plant
    • F01K17/02Using steam or condensate extracted or exhausted from steam engine plant for heating purposes, e.g. industrial, domestic
    • F01K17/025Using steam or condensate extracted or exhausted from steam engine plant for heating purposes, e.g. industrial, domestic in combination with at least one gas turbine, e.g. a combustion gas turbine
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K23/00Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
    • F01K23/02Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
    • F01K23/06Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
    • F01K23/10Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
    • F01K23/103Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle with afterburner in exhaust boiler
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/14Combined heat and power generation [CHP]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/16Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

It is preferred for a steam generator (2) to be connected to the gas turbine (1). In order to produce heating heat for a consumer circuit (III; IIIa, b, c), a hot water heat exchanger (5) is connected downstream of the steam generator (2) in the turbine exhaust path (22A) and/or provision is made for at least one water heat exchanger (10) which can be heated by the bleed (extraction) steam (e) of the steam turbine (3), and/or a heating condenser (4) which can be heated by the condensation steam (h) of the steam turbine (3) is arranged, or else a condenser (4K) fitted with a cooling tower cooler or a fresh water cooler. <IMAGE>

Description

Die Erfindung bezieht sich auf ein kombiniertes Gasturbinen- Dampfturbinen-Kraftwerk zum Betrieb mit einem Brennstoff wie Kohlegas, Erdgas und/oder Heizöl, mit einer Gasturbine und einer Dampfturbine. Ein solches Kraftwerk, das auch als GUD- Kraftwerk bezeichnet wird, ist zum Beispiel aus der Literatur­ stelle mit dem Titel "Brennstoffe einsparen" von Rudolf Wiesner in "Maschinenmarkt" vom 22. Juni 1986, Seiten 11 bis 14, be­ kannt.The invention relates to a combined gas turbine Steam turbine power plant for operation with a fuel such as Coal gas, natural gas and / or heating oil, with a gas turbine and a steam turbine. Such a power plant, also known as a GUD Kraftwerk is referred to, for example, from the literature with the title "Saving Fuels" by Rudolf Wiesner in "Maschinenmarkt" from June 22, 1986, pages 11 to 14, be knows.

Ein kombiniertes Gasturbinen-Dampfturbinen-Kraftwerk (GUD-HKW) sollte neben Strom auch Heizwärme erzeugen. An ein solches GUD- HKW würde man folgende Anforderungen stellen:A combined gas turbine-steam turbine power plant (GUD-HKW) should generate heat as well as electricity. To such a GUD HKW would have the following requirements:

  • 1. Das Heizkraftwerk soll wirtschaftlich arbeiten. Hierbei ist zu berücksichtigen, daß ein zeitlich (tageszeitlich, monatlich, jahreszeitlich) unterschiedlicher und häufig auch zeitlich ge­ geneinander verschobender Bedarf an Strom und Heizwärme, insbe­ sondere in regionalen Netzen, auftritt. Solche Netze sind aus­ geprägt in mittleren und kleineren Städten mit autarker Versor­ gung. Das Heizkraftwerk wird wirtschaftlich einge­ setzt werden können, wenn das Verhältnis von Wärmeerzeugung zu Stromerzeugung (Strom-Kennziffer) im praktischen Betrieb in möglichst weiten Grenzen ausgefahren werden kann. Das heißt, dieses Verhältnis sollte in den Bedarfsgrenzen "hoher Strombe­ darf bei gleichzeitig niedriger Heizwärmeabnahme" und "niedri­ ger Strombedarf mit gleichzeitig hoher Heizwärmeabnahme" flexi­ bel steuerbar sein.1. The thermal power station should work economically. Here is to take into account that a time (daily, monthly, seasonally) different and often also ge mutually shifting demand for electricity and heating, esp especially in regional networks. Such networks are out coined in medium and small towns with self-sufficient supply supply. The thermal power station is turned on economically can be set if the ratio of heat generation to Electricity generation (electricity code) in practical operation in limits can be extended as far as possible. This means, this ratio should be within the limits of "high electricity" may at the same time low heating consumption "and" low low electricity demand with high heating consumption "flexi be controllable.
  • 2. Die Heizwärme-Tagesbelastung mit ihren Belastungsspitzen sollte ohne Zuhilfenahme von zusätzlichen Reserve-Heizwärme­ erzeugern ausgefahren werden können. 2. The daily heating load with its peak loads should be done without the help of additional reserve heating producers can be extended.  
  • 3. Die Heizwärmeerzeugung sollte bei Stillstand der stromerzeu­ genden Aggregate sichergestellt bleiben.3. The heating should be generated when the electricity is at a standstill aggregates remain ensured.
  • 4. Die Umwelt-Wärmebelastung sollte so niedrig wie möglich sein. Nach Möglichkeit sollten keine Kühltürme eingesetzt werden; ein nur geringer Frischwasserbedarf wird angestrebt.4. The environmental heat load should be as low as possible. If possible, no cooling towers should be used; a only a low fresh water requirement is aimed for.
  • 5. Es soll auch eine reine Stromerzeugung ohne Erzeugung oder Auskopplung von Heizwärme möglich sein.5. There should also be a pure electricity generation without generation or Coupling of heating energy may be possible.

Der Erfindung liegt die Aufgabe zugrunde, ein kombiniertes Gas­ turbinen-Dampfturbinen-Kraftwerk der eingangs genannten Art, das mit einem Brennstoff wie Kohlegas, Erdgas und/oder Heizöl betrieben wird, mit verhältnismäßig geringem Aufwand so auszu­ gestalten, daß es im praktischen Einsatz Heizwärme erzeugen kann. Im Normalbetrieb soll eine gekoppelte Strom- und Heizwär­ meerzeugung möglich sein. Darüber hinaus sollen Ausgestaltungen angegeben werden, mit denen ein vielseitiger, flexibler Betrieb möglich ist, der die oben unter Nr. 1 bis 5 aufgelisteten An­ forderungen berücksichtigt.The invention has for its object a combined gas turbine-steam turbine power plant of the type mentioned at the outset, with a fuel such as coal gas, natural gas and / or heating oil is operated, so with relatively little effort design that it generate heat in practical use can. In normal operation, a coupled electricity and heating heating sea production may be possible. In addition, refinements be specified with which a versatile, flexible operation is possible, the of the above listed under Nos. 1 to 5 requirements taken into account.

Nach einer ersten Ausführung wird diese Aufgabe erfindungsgemäß dadurch gelöst, daß an die Gasturbine ein an sich bekannter Dampferzeuger angeschlossen ist, und daß dem Dampferzeuger im Turbinenabgasweg ein Heißwasser-Wärmetauscher, vorzugsweise mit Zusatzfeuerung, zur Erzeugung von Heizwärme nachgeschaltet ist.After a first execution, this object is achieved according to the invention solved in that a known to the gas turbine Steam generator is connected, and that the steam generator in Turbine exhaust gas path, preferably with a hot water heat exchanger Additional firing, downstream for the generation of heating energy.

Nach einer zweiten Ausführung ist vorgesehen, daß zusätzlich ein oder mehrere vom Entnahmedampf der Dampfturbine beheizbare(r) Wasser-Wärmetauscher zur Erzeugung von Heizwärme vorgesehen ist/sind.According to a second embodiment it is provided that an additional or more that can be heated by the steam turbine extraction steam Water heat exchanger provided for the generation of heating energy is / are.

Bei der zweiten Ausführung ist es zweckmäßig, wenn der oder die vom Entnahmedampf beheizbaren Wasser-Wärmetauscher parallel zum vom Turbinenabgas beaufschlagbaren Heißwasser-Wärmetauscher angeordnet ist/sind. In the second embodiment, it is useful if the or water heat exchanger heated by the extraction steam parallel to the Hot water heat exchanger that can be acted upon by the turbine exhaust gas is / are arranged.  

Insbesondere kann vorgesehen sein, daß der Dampfturbine ein mit Kühlturm- oder Frischwasserkühlung ausgestatteter Kondensator nachgeschaltet ist.In particular, it can be provided that the steam turbine with a Cooling tower or fresh water cooling condenser is connected downstream.

Nach einer dritten Ausführung wird die genannte Aufgabe erfin­ dungsgemäß dadurch gelöst, daß ein vom Abdampf der Dampfturbine beheizbarer Heizkondensator zur Erzeugung von Heizwärme vorgesehen ist.After a third execution, the stated task is invented solved according to the invention in that one of the steam turbine heatable heating condenser for generating heat is provided.

Bevorzugt kommen also zwei Varianten für die Heizwärmeerzeugung in Betracht: Verwendung einer Entnahme-Dampfturbine mit Heiz­ kondensator oder Verwendung einer Entnahme-Kondensationsturbine.So there are preferably two variants for heating energy generation considered: use of a steam extraction turbine with heating condenser or use of an extraction condensation turbine.

Auch die dritte Ausführung kann kombiniert mit der ersten und/ oder zweiten Ausführung eingesetzt werden. Dabei ist es von Vorteil, wenn der Heizkondensator parallel zum Heißwasser-Wär­ metauscher und/oder parallel zum Wasser-Wärmetauscher angeord­ net ist. Es kann also hierbei ein vorzugsweise geschlossener Heizwärme-Auskopplungs-Wasserkreislauf eingesetzt werden, in welchem angeordnet sindThe third version can also be combined with the first and / or second version can be used. It is from Advantage if the heating condenser parallel to the hot water heat Metauscher and / or arranged parallel to the water heat exchanger is not. So it can be a preferably closed one Heat extraction water cycle are used in which are arranged

  • - der Heißwasser-Wärmetauscher (= Gasturbinen-Abhitze-Wasser­ wärmetauscher);- The hot water heat exchanger (= gas turbine waste heat water heat exchanger);
  • - parallel dazu der vom Entnahmedampf beheizte Wasser-Wärme­ tauscher; und- In parallel, the water heat heated by the extraction steam exchanger; and
  • - wiederum parallel dazu der Heizkondensator.- again the heating condenser in parallel.

Insbesondere mit den aufgezeigten verschiedenen Kombinationen der drei Ausführungen ist ein flexibler, vielseitiger Betrieb möglich.Especially with the different combinations shown The three versions are flexible, versatile operation possible.

Weitere Ausgestaltungen können umfassenFurther configurations can include

  • - eine Kohlegas-, Erdgas- oder Heizöl-Zusatzfeuerung, vor­ zugsweise mit Frischluftgebläse, für den Heißwasser-Wärme­ tauscher;- an additional coal gas, natural gas or heating oil firing preferably with fresh air blower, for hot water heat exchanger;
  • - einen Turbinenabgas-Bypass, einmündend vor dem Heißwasser- Wärmetauscher; - a turbine exhaust gas bypass, opening in front of the hot water Heat exchangers;  
  • - eine Umsteuerung des Gasturbinenabgasmassenstromes vom Ab­ hitzedampferzeuger auf den rauchgasbeheizten Wasser-Wärme­ tauscher;- A reversal of the gas turbine exhaust gas mass flow from Heat steam generator on the flue gas heated water heat exchanger;
  • - einen Kaltwasser-Bypass zur Regelung gewünschter Heißwasser- Vorlauftemperaturen;- a cold water bypass to control the desired hot water Flow temperatures;
  • - einen Heißwasser-Speicher;- a hot water tank;
  • - einen Kaltwasser-Ausgleichs- und Massenstrom-Regelspeicher; und/oder- A cold water compensation and mass flow control memory; and or
  • - einen Wasser-Wärmetauscher zur Heizwärmeübergabe in das Heiz­ wärmeversorgungsnetz.- A water heat exchanger for transferring heat to the heating heat supply network.

Bevorzugte Ausführungsbeispiele der Erfindung werden im folgen­ den anhand von drei Figuren näher erläutert. Es zeigen:Preferred embodiments of the invention will follow that explained in more detail with reference to three figures. Show it:

Fig. 1 ein kombiniertes Gasturbinen-Dampfturbinen-Kraftwerk, bei dem zur Wärmeauskopplung in Parallelschaltung ein im Gas­ turbinen-Abgasweg angeordneter Heißwasser-Wärmetauscher, ein vom Entnahmedampf beheizter Wasser-Wärmetauscher und - als erste Variante - ein vom Turbinenabdampf beheizter Heizkondensator angeordnet sind; Figure 1 is a combined gas turbine-steam turbine power plant, in which a hot gas heat exchanger arranged in the gas turbine exhaust gas path for heat extraction in parallel connection, a water heat exchanger heated by the extraction steam and - as a first variant - a heating condenser heated by the turbine exhaust steam are arranged;

Fig. 2 ein kombiniertes Gasturbinen-Dampfturbinen-Kraftwerk ent­ sprechend Fig. 1, bei dem jedoch - als zweite Variante - ein Kondensator mit Kühlturm- oder Frischwasserküh­ lung vorgesehen ist; und Fig. 2 shows a combined gas turbine-steam turbine power plant accordingly Figure 1, but in which - as a second variant - a condenser with cooling tower or fresh water cooling is provided; and

Fig. 3 eine Alternativlösung zur in Fig. 1 und 2 gezeigten ge­ meinsamen Heißwasser-Leitung, bei der mehrere Verbraucher über Ventile bedarfsgerecht gesteuert werden können. Fig. 3 shows an alternative solution to the ge common hot water line shown in Figs. 1 and 2, in which several consumers can be controlled via valves as needed.

Nach Fig. 1 ist ein kombiniertes Gasturbinen-Dampfturbinen- Kraftwerk 1 über ein Heizwärme-Auskopplungssystem II zwecks Einspeisung von Heizwärme an ein Heizwärme-Versorgungsnetz oder Verbrauchernetz III angeschlossen. Das kombinierte Gasturbinen- Dampfturbinen-Kraftwerk I besteht aus drei herkömmlichen Kraft­ werks-Hauptteilen, und zwar einem Gasturbosatz 1, einem unbe­ feuerten Abhitze-Dampferzeuger 2 und einem Dampfturbosatz 3. According to FIG. 1, a combined gas turbine-steam turbine power plant 1 is connected via a heating heat decoupling system II for the purpose of feeding in heating energy to a heating heat supply network or consumer network III. The combined gas turbine-steam turbine power plant I consists of three conventional power plant main parts, namely a gas turbine set 1 , a non-fired waste heat steam generator 2 and a steam turbine set 3 .

Der Gasturbosatz 1 umfaßt in bekannter Weise die eigentliche Gasturbine 1 a mit Brennkammer 1 b und den Generator 1 c. Über einen Luftverdichter 1 d wird der Brennkammer 1 b Druckluft 1 zugeführt. In der Brennkammer 1 b wird ein Brennstoff b wie Kohlegas, Heizöl oder Erdgas unter Zuhilfenahme der verdichte­ ten Luft 1 verbrannt. Das von der Brennkammer 1 b der Gasturbine 1 a zugeführte Verbrennungsgas v kann zum Beispiel eine ISO- Temperatur von beispielsweise 1150°C und höher besitzen. Am Ausgang der Gasturbine 1 a, das heißt am Eingang einer Abgas­ leitung 22, besitzt das Verbrennungsgas v noch eine relativ hohe Temperatur, zum Beispiel von 600°C und höher, und damit einen relativ hohen Wärmeinhalt. Die Abgasleitung 22, in der zum Beispiel ein Druck von 1 at herrscht, verzweigt sich vor­ liegend in eine Turbinenabgas-Hauptleitung 22 A und eine Tur­ binenabgas-Bypassleitung 22 B.The gas turbine set 1 comprises in a known manner the actual gas turbine 1 a with combustion chamber 1 b and the generator 1 c . Compressed air 1 b is fed to the combustion chamber 1 b via an air compressor 1 d . In the combustion chamber 1 b , a fuel b such as coal gas, heating oil or natural gas is burned with the aid of the compressed air 1 . The combustion gas v fed from the combustion chamber 1 b to the gas turbine 1 a can have, for example, an ISO temperature of, for example, 1150 ° C. and higher. At the output of the gas turbine 1 a , that is, at the input of an exhaust gas line 22 , the combustion gas v still has a relatively high temperature, for example 600 ° C. and higher, and thus a relatively high heat content. The exhaust line 22 , in which there is a pressure of 1 at, for example, branches before lying in a turbine exhaust main line 22 A and a turbine exhaust bypass line 22 B.

Der unbefeuerte Abhitze-Eindruck-Dampferzeuger 2 ohne Dampf- Zwischenerhitzung liegt in der Turbinenabgas-Hauptleitung 22 A, und zwar hinter einer Umsteuerungsklappe 8, die nach Bedarf geöffnet oder geschlossen werden kann. Der Dampferzeuger 2 umfaßt in bekannter Weise in Serie einen Überhitzer 2 a, einen Verdampfer 2 b und einen Economizer 2 c. Er umfaßt weiter eine Dampftrommel 2 d und eine Umwälzpumpe 2 e. In an sich bekannter Weise wird Speisewasser w aus einem Speisewasserbehälter 21 A mittels einer Speisewasserpumpe 22 B durch den Economizer 2 c gepumpt und hierbei auf Verdampfungstemperatur aufgeheizt. Der aus der Verdampferheizfläche 2 d abgegebene Sattdampf s gelangt in die Trommel 2 d und von dort in die Überhitzer­ heizfläche 2 a. Der Frischdampf h wird dem Dampfturbosatz 3 zugeleitet.The unfired waste heat impression steam generator 2 without steam reheating lies in the turbine exhaust main line 22 A , namely behind a reversing flap 8 , which can be opened or closed as required. The steam generator 2 comprises a superheater 2 a , an evaporator 2 b and an economizer 2 c in a known manner in series. It further comprises a steam drum 2 d and a circulation pump 2 e . In a manner known per se, feed water w is pumped from a feed water container 21 A by means of a feed water pump 22 B through the economizer 2 c and is heated to the evaporation temperature. The d discharged from the evaporator 2 saturated steam s enters the drum 2 d and then heating surface in the superheater 2 a. The live steam h is fed to the steam turbine set 3 .

Anstelle des beispielhaft beschriebenen Dampferzeugers 2 können auch andere Dampferzeuger vorgesehen werden, z.B. ein Zwangs­ durchlauf-Dampferzeuger. Instead of the steam generator 2 described by way of example, other steam generators can also be provided, for example a forced-flow steam generator.

Die Turbinenabgas-Hauptleitung 22 A führt über die Umsteuerungs­ klappe 8, den Dampferzeuger 2, eine Absperr- und Steuerklappe 27 und im folgenden zu beschreibende Bauelemente 6 und 5 zu einem Hauptkamin, der durch ein Dreieck 45 symbolisiert ist. Und die Turbinenabgas-Bypassleitung 22 B führt über eine Schließklappe (Austritts-Bypass-Klappe) 9, die den Durchtritt von Abgas zu­ läßt oder unterbindet, zu einem Bypasskamin, der durch ein Drei­ eck 46 symbolisiert ist. Vor dem Kamin 46 ist noch eine Schließ­ klappe 29 angeordnet.The turbine exhaust main line 22 A leads over the reversing flap 8 , the steam generator 2 , a shut-off and control flap 27 and components 6 and 5 to be described below to a main chimney, which is symbolized by a triangle 45 . And the turbine exhaust gas bypass line 22 B leads via a closing flap (outlet bypass flap) 9 , which allows or prevents the passage of exhaust gas, to a bypass chimney, which is symbolized by a triangle 46 . In front of the fireplace 46 a closing flap 29 is arranged.

Der Frischdampf h wird über eine Leitung 58 der Dampfturbine 3 a des Dampfturbosatzes 3 zugeführt. Dessen Generator ist mit 3 c bezeichnet. Es handelt sich hier speziell um eine Entnahme-Dampf­ turbine 3 a mit zugeordnetem Heizkondensator 4. Entnahmedampf e kann über ein steuerbares Entnahmedampfventil 11 in eine Ent­ nahmedampf-Leitung 60 eingespeist werden. Nach Wunsch kann auch Frischdampf h aus der Leitung 58 über die Leitung 61 und ein steuerbares Stützventil als Druck-Reduzier-Ventil 12 in die Entnahmedampf-Leitung 60 gegeben werden. Der von der Dampftur­ bine 3 a abgegebene Niederdruckdampf oder Abdampf k wird direkt in den Heizkondensator 4 überführt. Wie später noch deutlich wird, werden die Ventile 11, 12 von einem Temperatursensor 64 gesteuert, der die Wasservorlauftemperatur in einer Leitung 24 mißt, die als "gemeinsame Heißwasser-Vorlaufleitung" bezeichnet wird.The live steam h is fed via a line 58 to the steam turbine 3 a of the steam turbine set 3 . Its generator is designated 3 c . This is specifically a withdrawal steam turbine 3 a with an associated heating condenser 4 . Extraction steam e can be fed via a controllable extraction steam valve 11 into an extraction steam line 60 . If desired, live steam h can also be fed from line 58 via line 61 and a controllable support valve as pressure reducing valve 12 into the extraction steam line 60 . Of bine 3 a given low pressure steam or exhaust steam from the Dampftur k is transferred directly to the heating capacitor. 4 As will become clear later, the valves 11 , 12 are controlled by a temperature sensor 64 which measures the water supply temperature in a line 24 which is referred to as a "common hot water supply line".

An das GUD-Kraftwerk I ist das Heizwärme-Auskopplungssystem angeschlossen, das die Entnahme von Heizwärme gestattet und vor­ liegend im geschlossenen Kreislauf arbeitet. Dieses umfaßt den erwähnten, vom Abdampf k gespeisten Heizkondensator 4 und einen sekundärseitig parallel dazu angeordneten, turbinenabgas- oder rauchgasbeheizten Wasser-Wärmetauscher 5, der hier mit ein­ gebauter Zusatzfeuerung 6, zum Beispiel für einen Brennstoff b′ wie Erdgas, ausgerüstet ist. Diese Zusatzfeuerung 6 wird vorzugsweise mit einem Frischluftgebläse 7 und/oder mit Turbinen­ gas als Verbrennungsluft versorgt. Das Frischluftgebläse 7 kann auch fehlen. Der Heißwasser-Wärmetauscher 5 ist am Ende der Turbinenabgas-Hauptleitung 22 A kurz vor dem Hauptkamin 45 angebracht. Im Strömungsweg vor dem Heißwasser-Wärmetauscher 5 befindet sich eine Absperr- und Steuerklappe 27.At the GUD power plant I, the heating decoupling system is connected, which allows the removal of heating and works before lying in a closed circuit. This includes the mentioned, fed from the exhaust steam k heating condenser 4 and a secondary side arranged in parallel, turbine exhaust gas or flue gas-heated water heat exchanger 5 , which is equipped here with a built-in additional combustion 6 , for example for a fuel b 'such as natural gas. This additional firing 6 is preferably supplied with a fresh air blower 7 and / or with gas turbine as combustion air. The fresh air blower 7 may also be missing. The hot water heat exchanger 5 is attached to the end of the turbine exhaust main line 22 A just before the main chimney 45 . A shut-off and control flap 27 is located in the flow path in front of the hot water heat exchanger 5 .

Weiterhin ist eine Turbinenabgas-Umsteuerleitung 23 mit darin angeordneter Umsteuerklappe 28 vorgesehen. Diese Umsteuerlei­ tung 23 verbindet die Bypassleitung 22 B einerseits mit der Hauptleitung 22 A andererseits. Insbesondere zweigt sie hinter der Bypassklappe 9 und vor der Schließklappe 29 ab und mündet vor der Absperr- und Steuerklappe 27 und damit vor dem Heißwas­ ser-Wärmetauscher 5 samt Zusatzfeuerung 6. Sind die Klappen 8 und 29 geschlossen und sind die Klappen 9, 28 und 27 geöffnet, so ist der Heißwasser-Wärmetauscher 5 direkt mit dem Gasturbinen-Abgasaustritt 22 verbunden. Die Rückströmung von Turbinengas in den Dampferzeuger 2 wird durch eine geeignete Rückschlagklappeneinrichtung unterbunden (nicht eingezeichnet).Furthermore, a turbine exhaust gas reversing line 23 with a reversing flap 28 arranged therein is provided. This Umsteuerlei device 23 connects the bypass line 22 B on the one hand with the main line 22 A on the other. In particular, it branches off behind the bypass flap 9 and in front of the closing flap 29 and opens in front of the shut-off and control flap 27 and thus in front of the hot water heat exchanger 5 together with additional firing 6 . If the flaps 8 and 29 are closed and the flaps 9 , 28 and 27 are open, the hot water heat exchanger 5 is connected directly to the gas turbine exhaust outlet 22 . The backflow of turbine gas into the steam generator 2 is prevented by a suitable check valve device (not shown).

Bei der Entnahme von Heizwärme wird im Heizkondensator 4 der Turbinenabdampf k in Speisewasser (Kondensat) umgewandelt. Der primärseitige Ausgang des Heizkondensators 4 ist über eine Kondensatpumpe 20 und eine Verbindungsleitung 20 V, in der noch ein oder mehrere Speisewasser-Vorwärmer liegen kann/können, an den Speisewasserbehälter 21 A angeschlossen.When heat is removed, the turbine exhaust k is converted into feed water (condensate) in the heating condenser 4 . The primary-side output of the heating condenser 4 is connected to the feed water tank 21 A via a condensate pump 20 and a connecting line 20 V , in which one or more feed water preheaters may / may also be located.

Im System II ist neben dem vom Kondensationsdampf k gespeisten Heizkondensator 4 und dem vom Turbinenabgas v gespeisten Heiß­ wasser-Wärmetauscher 5 ein Wasser-Wärmetauscher 10 vorgesehen. Dieser ist primärseitig an die Entnahmedampfleitung 60 ange­ schlossen und kann so vom Entnahmedampf e der Dampfturbine 3 a, aber auch, und zwar über das Ventil 12, vom Heißdampf h des Dampferzeugers 2 geheizt werden. Sein primärseitiger Ausgang ist gleichfalls an die Verbindungsleitung 20 V angeschlossen. Der Wasser-Wärmetauscher 10 ist sekundärseitig parallel zum Sekundärteil des Heizkondensators 4 und parallel zum Sekundärteil des Heißwasser-Wärmetauschers 5 geschaltet. In system II, in addition to the heating condenser 4 fed by the condensation steam k and the hot water heat exchanger 5 fed by the turbine exhaust gas v , a water heat exchanger 10 is provided. This is connected on the primary side to the extraction steam line 60 and can thus be heated by the extraction steam e of the steam turbine 3 a , but also via valve 12 , from the superheated steam h of the steam generator 2 . Its primary-side output is also connected to the 20 V connecting line. The water heat exchanger 10 is connected on the secondary side in parallel to the secondary part of the heating condenser 4 and in parallel to the secondary part of the hot water heat exchanger 5 .

Statt eines einzigen Wasser-Wärmetauschers 10 können mehrere solcher Wasser-Wärmetauscher vorhanden sein, die entnahmedampf­ beheizt sind.Instead of a single water heat exchanger 10 , a plurality of such water heat exchangers can be provided, which are heated by extraction steam.

Der Heizkondensator 4 und die Wärmetauscher 5 und 10 geben Wasser der Temperatur T 4, T 5 bzw. T 10 in eine gemeinsame Heiß­ wasser-Vorlaufleitung 24 ab. Kaltwasser wird für alle drei Bau­ elemente 4, 5 und 10 einer gemeinsamen Kaltwasser-Rücklauflei­ tung 25 entnommen. An der Heißwasser-Vorlaufleitung 24 sind Heißwasserspeicher 14 und an der Kaltwasser-Rücklaufleitung 25 sind Kaltwasserspeicher 15 angeordnet.The heating condenser 4 and the heat exchanger 5 and 10 give water of the temperature T 4 , T 5 and T 10 in a common hot water supply line 24 . Cold water is taken for all three construction elements 4 , 5 and 10 from a common cold water return line 25 . Hot water stores 14 are arranged on the hot water supply line 24 and cold water stores 15 are arranged on the cold water return line 25 .

Die Rücklaufleitung 25 und die Vorlaufleitung 24 sind über eine Bypassleitung 26, in der ein steuerbares Ventil 13 liegt, mit­ einander verbunden. Das Ventil 13 wird von einem Temperatursen­ sor 66, der an oder in der Vorlaufleitung 24 angeordnet ist, gesteuert. Durch geregelte Beimischung von Kaltwasser in die Heißwasser-Vorlaufleitung 24 kann die Vorlauf- oder Mischtempe­ ratur T v , die sich aus T 4, T 5 und/oder T 10 ergibt, auf einem vor­ gegebenen (einstellbaren) Wert festgehalten oder nach einem Pro­ gramm geführt werden. Die Vorlauftemperatur des Heißwassers ist also durch Einspeisung aus der Rücklaufleitung 25 veränderbar.The return line 25 and the flow line 24 are connected to one another via a bypass line 26 in which a controllable valve 13 is located. The valve 13 is controlled by a Temperatursen sensor 66 , which is arranged on or in the flow line 24 . Through controlled admixture of cold water in the hot water supply line 24 , the flow or mixing temperature T v , which results from T 4 , T 5 and / or T 10 , can be held at a given (adjustable) value or according to a program be performed. The flow temperature of the hot water can thus be changed by feeding it in from the return line 25 .

Vorlaufpumpen 67, 68, 69 und 70 fördern das Kaltwasser von der Rücklaufleitung 25 in den Heizkondensator 4, in die Wär­ metauscher 5 und 10 sowie in den Kaltwasser-Bypass 26.Flow pumps 67 , 68 , 69 and 70 convey the cold water from the return line 25 into the heating condenser 4 , into the heat exchangers 5 and 10 and into the cold water bypass 26 .

Die Leitungen 24 und 25 sind vorliegend über einen Übergabe- Wasserwärmetauscher 16 miteinander verbunden, so daß ein ge­ schlossener Kreislauf für das die Heizwärme transportierende Medium Wasser entsteht. Prinzipiell ist ein solcher geschlos­ sener Kreislauf nicht erforderlich. Der Übergabe-Wasserwärme­ tauscher 16 gehört sekundärseitig dem Verbrauchernetz III an. Über diesen Wärmetauscher 16 wird die von den Bauelementen 4, 5 und/oder 10 gelieferte Heizwärme in das Verbrauchernetz III übertragen. Die Sekundärseite des Wärmetauschers 16 ist über eine Wasservorlaufpumpe 18 mit einem Wärmeverbraucher 19 oder einer Anzahl solcher Verbraucher verbunden. Dabei kann es sich um Haushalte und/oder um Industrieverbraucher handeln.The lines 24 and 25 are in the present case connected to one another via a transfer water heat exchanger 16 , so that a closed circuit is formed for the medium which transports the heating heat water. In principle, such a closed circuit is not necessary. The transfer water heat exchanger 16 is on the secondary side of the consumer network III. The heat supplied by the components 4 , 5 and / or 10 is transferred into the consumer network III via this heat exchanger 16 . The secondary side of the heat exchanger 16 is connected to a heat consumer 19 or a number of such consumers via a water supply pump 18 . This can be households and / or industrial consumers.

Die dargestellte Einrichtung ist äußerst vielseitig und flexi­ bel, wie sich in einzelnen aus der folgenden Beschreibung ver­ schiedener Betriebsarten ergibt. Hervorzuheben ist, daß man mit dem Gasturbosatz 1 Strom erzeugen kann, ohne daß Heizwärme abgegeben werden muß, daß dieses auch für den Kombibetrieb gilt (solange die im Heizkondensator 4 erzeugte Heizwärme in die noch aufnahmefähigen Speicher 14 gegeben werden kann), daß am Heizkondensator 4 kein aufwendiger Kühlturm für die Kondensa­ tion des Turbinenabdampfes k erforderlich, daß (z. B. für indu­ strielle Verbraucher 19) auch im Jahresdurchschnitt trotz un­ terschiedlicher Anforderungen an die Stromabgabe eine bestimmte Wärmegrundleistung zur Verfügung gestellt werden kann, daß eine weitgehende zeitliche Abkopplung zwischen Strom- und Heizwärme­ erzeugung möglich ist, daß also z. B. Strombedarfsspitzen mit oder ohne Heizwärmeerzeugung gedeckt werden können, etc.The device shown is extremely versatile and flexible, as can be seen in detail from the following description of various operating modes. It should be emphasized that one can generate electricity with the gas turbine set 1 without having to give off heat, that this also applies to the combined operation (as long as the heat generated in the heating condenser 4 can be added to the still receivable memory 14 ) that the heating condenser 4 No complex cooling tower for the condensation of the turbine exhaust steam k required that (e.g. for industrial consumers 19 ) a certain basic heat output can be made available, even on an annual average, despite different requirements for the power output, that an extensive temporal decoupling between electricity - And heat generation is possible, that is, for. B. peak demand can be covered with or without heating, etc.

In Fig. 2 ist eine Ausführungsform dargestellt, die weitgehend derjenigen von Fig. 1 entspricht. Hier wird ein Dampfturbosatz 3 mit Entnahme-Kondensations-Turbine 3 a verwendet, deren Konden­ sationsdampf k nicht einem Heizkondensator 4, sondern einem Kondensator 4 K mit Kühlturm oder Frischwasserkühlung zugeführt wird. Es können eine einzige oder mehrere Dampfentnahme(n) vor­ gesehen sein. Der primärseitige Ausgang des Kondensators 4 K ist hier über die Verbindungsleitung 20 V und die Föderpumpe 20 an den Wasserspeicher 21 A angeschlossen. FIG. 2 shows an embodiment which largely corresponds to that of FIG. 1. Here, a steam turbine set 3 with extraction-condensation turbine 3 a is used, the condensation steam k is not supplied to a heating condenser 4 , but a condenser 4 K with a cooling tower or fresh water cooling. A single or multiple steam extraction (s) can be seen. The primary-side output of the condenser 4 K is connected here to the water reservoir 21 A via the connecting line 20 V and the feed pump 20 .

Die in Fig. 2 gezeigte Ausführung ist von Vorteil, wenn auch 100% Strom erzeugt werden soll, ohne daß Heizwärme geliefert werden soll (reiner Stromerzeugungsbetrieb). Hier ist im Kombibetrieb Stromerzeugung sowohl durch die Gas- als auch durch die Dampfturbine 1 c bzw. 3 c ohne Heizwärmeerzeugung möglich. The embodiment shown in FIG. 2 is advantageous if 100% electricity is also to be generated without heating energy being to be supplied (pure electricity generation operation). Here, in combined operation, electricity can be generated by both the gas and steam turbines 1 c and 3 c without generating heat.

Welche von den beiden Dampfturbinenarten nach Fig. 1 oder 2 gewählt wird, hängt von den Gegebenheiten der Heizwärmeversor­ gung ab. Die Entnahme-Dampfturbine 3 c mit Heizkondensator 4 ge­ mäß Fig. 1 ist dann vorteilhaft, wenn für das Versorgungsnetz III eine jahresdurchschnittliche Grund-Wärmeleistung ganzjährig zu erzeugen ist. Eine reine Stromerzeugung ohne Heizwärmeerzeu­ gung ist zeitlich unbeschränkt im Alleinbetrieb der Gastur­ bine 1 c möglich. Eine reine Stromerzeugung ist im Kombibetrieb auch ohne Heizwärmeabgabe in das Versorgungsnetz III möglich, jedoch ist diese zeitlich beschränkt. Mit der Entnahme-Konden­ sationsturbine 3 c nach Fig. 2 ist dagegen ein zeitlich unbe­ schränkter reiner Stromerzeugungsbetrieb ohne Heizwärmeerzeu­ gung möglich.Which of the two steam turbine types according to Fig. 1 or 2 is selected depends on the conditions of Heizwärmeversor supply. The extraction steam turbine 3 c with heating condenser 4 according to FIG. 1 is advantageous if an annual average basic thermal output can be generated all year round for the supply network III. A pure electricity generation without heating heat generation is possible for an unlimited period in the sole operation of the gas turbine 1 c . Generating electricity in combination mode is also possible without supplying heat to the supply network III, but this is limited in time. With the removal condensate turbine 3 c of FIG. 2, however, a time-unlimited pure power generation operation without heating generation is possible.

In Fig. 3 ist eine Alternativlösung zur gemeinsamen Heißwas­ ser-Vorlaufleitung 24 dargestellt. Hier ist eine flexible Be­ triebsweise bei der Versorgung von beispielsweise drei Heiz­ versorgungsnetzen 40, IIIa, 41, IIIb und 42, IIIc möglich. Dazu sind die Bauelemente 4, 5 und 10 über steuerbare Ventile 51, 52, 53 und 54 mit den Bauelementen 4, 5 und 10 verkoppelt. Durch geeignete Steuerung dieser Ventile 51 bis 54 kann jeder Verbraucher IIIa, IIIb, IIIc von jedem Bauelement 4, 5 und/oder 10 und jeder Kombination derselben mit Wärme versorgt werden. Mit 40, 41, 42 sind die Wasservorlaufpumpen für die Wärmetau­ scher 5, 10 sowie für den Kondensator 4 bezeichnet.In Fig. 3, an alternative solution to the common hot water supply line 24 is shown. Here, a flexible mode of operation is possible when supplying, for example, three heating supply networks 40 , III a , 41 , III b and 42 , III c . For this purpose, components 4 , 5 and 10 are coupled to components 4 , 5 and 10 via controllable valves 51 , 52 , 53 and 54 . By suitable control of these valves 51 to 54 , each consumer III a , III b , III c can be supplied with heat by any component 4 , 5 and / or 10 and any combination thereof. With 40 , 41 , 42 , the water flow pumps for the Wärmetau shear 5 , 10 and for the condenser 4 are designated.

Im folgenden sollen einige Betriebsarten der Varianten I und II nach Fig. 1 bis 2 näher erläutert werden:Some operating modes of variants I and II according to FIGS. 1 to 2 are to be explained in more detail below:

Variante I: Entnahmedampfturbine 3 a mit Heizkondensator 4 (vergleiche Fig. 1)Variant I: Extraction steam turbine 3 a with heating condenser 4 (see FIG. 1)

1. Stromerzeugung mit Gasturbosatz 1 im Alleinbetrieb; Dampf­ turbosatz 3 nicht in Betrieb; Teilstromerzeugung; Heizwärme­ erzeugung Null;
Abgasweg: Klappe 8 geschlossen; Klappe 28 geschlossen; Klap­ pen 9 und 29 geöffnet.
1. Power generation with gas turbine set 1 in sole operation; Steam turbo set 3 not in operation; Partial power generation; Heat generation zero;
Exhaust gas path: flap 8 closed; Flap 28 closed; Flaps 9 and 29 open.

2. Gasturbosatz 1 im Heizbetrieb; Dampfturbosatz 3 nicht in Betrieb; Teilstromerzeugung;
Heizwärmeerzeugung in fünf Betriebsarten: Für das Kontrol­ lieren von Strom- zu Wärmeleistung
2. Gas turbine set 1 in heating mode; Steam turbine set 3 not in operation; Partial power generation;
Heating energy generation in five operating modes: For controlling electricity to heat output

  • a) Heizwärmeerzeugung nur im rauchgasbeheizten Wasser-Wärme­ tauscher 5 ohne Zusatzfeuerung 6.a) Heating heat generation only in the flue gas-heated water heat exchanger 5 without additional firing 6 .
  • b) Heizwärmeerzeugung nur im rauchgasbeheizten Wasser-Wärme­ tauscher 5 mit Zusatzfeuerung 6. Es ergibt sich eine er­ höhte Wärmeleistung gegenüber a). Der Brenner der Zusatz­ feuerung 6 kann in technisch bewährter Weise hierbei auch mit lufthaltigem Turbinenabgas v betrieben werden.
    Abgasweg zu a) und b): Klappen 8 und 29 geschlossen; Klap­ pen 9, 27 und 28 geöffnet.
    b) Heating heat generation only in the flue gas-heated water heat exchanger 5 with additional firing 6 . There is an increased heat output compared to a). The burner of the additional combustion 6 can also be operated in a technically proven manner with air-containing turbine exhaust gas v .
    Exhaust gas path to a) and b): flaps 8 and 29 closed; Flaps 9 , 27 and 28 open.
  • c) Heizwärmeerzeugung allein mit Dampferzeuger 2 als unbe­ feuerter Abhitze-Dampferzeuger. Heizdampf h gelangt über das Druck-Reduzierventil 12 auf den entnahmedampfbeheiz­ ten Wasser-Wärmetauscher 10, der mit einem Kondensatkühler ausgerüstet ist.
    Abgasweg zu c): Klappen 8, 28 und 29 geöffnet; Klappen 9 und 27 geschlossen.
    c) heating heat generation with steam generator 2 alone as an un-fired waste heat steam generator. Heating steam h passes through the pressure reducing valve 12 to the entahmedampfbeheiz th water heat exchanger 10 , which is equipped with a condensate cooler.
    Exhaust gas path to c): flaps 8 , 28 and 29 open; Flaps 9 and 27 closed.
  • d) Heizwärmeerzeugung mit Dampferzeuger 2 und rauchgasbeheiz­ tem Wasser-Wärmetauscher 5 ohne Zusatzfeuerung 6. Erhöhung der Heizwärmeleistung gegenüber c).d) heating heat generation with steam generator 2 and flue gas-heated water heat exchanger 5 without additional firing 6 . Increase in thermal output compared to c).
  • e) Heizwärmeerzeugung mit Dampferzeuger 2 und rauchgasbeheiz­ tem Wasser-Wärmetauscher 5 mit Zusatzfeuerung 6. Hier ergibt sich die maximale Heizwärmeleistung bei Allein­ betrieb des Gasturbosatzes 1, also eine weitere Erhöhung der Wärmeleistung gegenüber d).
    Abgasweg zu d) und e): Klappen 9, 28 und 29 geschlossen; Klappen 8 und 27 geöffnet.
    e) Heating energy generation with steam generator 2 and flue gas-heated water heat exchanger 5 with additional firing 6 . This gives the maximum heat output when gas turbine set 1 is operated alone, i.e. a further increase in heat output compared to d).
    Exhaust gas path to d) and e): flaps 9 , 28 and 29 closed; Flaps 8 and 27 open.

3. Stromerzeugung mit Gas- und Dampfturbosatz 1, 3 im Vollast- Stromerzeugungsbetrieb;
Heizwärmeerzeugung in vier Betriebsarten:
3. Power generation with gas and steam turbine set 1 , 3 in full load power generation operation;
Heating energy generation in four operating modes:

  • a) Heizwärmeerzeugung nur im Heizkondensator 4. Dampfentnah­ meventile 11 und 12 geschlossen.
    Abgasweg zu a): Klappen 8, 28 und 29 geöffnet; Klappen 9 und 27 geschlossen.
    a) Heating heat generation only in the heating condenser 4 . Steam extraction valves 11 and 12 closed.
    Exhaust gas path to a): flaps 8 , 28 and 29 open; Flaps 9 and 27 closed.
  • b) Heizwärmeerzeugung im entnahmedampfbeheizten Wasser-Wärme­ tauscher 10 und im Heizkondensator 4. Mit über das Ventil 11 geregelter Beaufschlagung des Wasser-Wärmetauschers 10 mit Entnahmedampf e sinkt der Dampfdurchfluß in der Dampfturbine 3 a in Richtung zum Heizkondensator 4. Im Grenzfall, nämlich bei voll geöffnetem Ventil 11 und da­ mit bei voller Entnahmedampfmenge für den Heizkondensator 10, durchströmt die Dampfturbine 3 a nur noch die erfor­ derliche Kühldampfmenge für die Endbeschaufelung. Der Heizkondensator 10 wird nur noch mit relativ kleiner Kühl­ dampfmenge beaufschlagt. Gleichzeitig sinkt mit zunehmen­ der Beaufschlagung des Wasser-Wärmetauschers 10 die Lei­ stung des Dampfturbosatzes 3 an den Generatorklemmen.
    Mit zunehmender Beaufschlagung des Wasser-Wärmetauschers 10 mit Entnahmedampf (Ventil 11 zunehmend geöffnet) erhöht sich kontinuierlich die Wärmeleistung im Heizkreislauf, weil der Entnahmedampf e einen höheren Wärmewert (höhe­ rer Druck und höhere Temperatur) als der reine Heizkon­ densatordampf k hat. Die Wärmeleistung ist gegenüber der Betriebsart a) vergrößert und erzielt ihr Maximum bei voller Beaufschlagung des Wasser-Wärmetauschers 10.
    Abgasweg wie bei a).
    b) heating heat generation in the extraction steam-heated water heat exchanger 10 and in the heating condenser 4 . When the water heat exchanger 10 is subjected to extraction steam e via the valve 11, the steam flow in the steam turbine 3 a decreases in the direction of the heating condenser 4 . In the borderline case, namely with the valve 11 fully open and since with a full amount of extraction steam for the heating condenser 10 , the steam turbine 3 a only flows through the required amount of cooling steam for the final blading. The heating condenser 10 is only subjected to a relatively small amount of cooling steam. At the same time decreases with increasing the exposure to the water heat exchanger 10, the performance of the steam turbine set 3 at the generator terminals.
    With increasing exposure to the water heat exchanger 10 with extraction steam (valve 11 increasingly open), the heat output in the heating circuit increases continuously because the extraction steam e has a higher heat value (higher pressure and temperature) than the pure heating condenser steam k . The heat output is increased compared to the operating mode a) and reaches its maximum when the water heat exchanger 10 is fully loaded.
    Exhaust gas path as in a).
  • c) Heizwärmeerzeugung mit Gasturbinenabgas v.
    Heißwasser-Wärmetauscher 5 ohne Zusatzfeuerung 6 in Kombi­ nation mit Betriebsart a) oder variabel mit Betriebsart b). Durch die Einschaltung des Wärmetauschers 5 wird die Heiz­ wärmeleistung gegenüber a) und b) wesentlich erhöht. Strom- und Heizwärmeerzeugung erzielen ohne Einschaltung der Zu­ satzfeuerung 6 ihre Höchstwerte. Sie sind jeweils varia­ bel nach den Betriebsarten a) oder b).
    Abgasweg zu c): Klappen 8 und 27 geöffnet; Klappen 9 und 28 geschlossen.
    c) heating heat generation with gas turbine exhaust gas v .
    Hot water heat exchanger 5 without additional firing 6 in combination with operating mode a) or variable with operating mode b). By switching on the heat exchanger 5 , the heating output compared to a) and b) is significantly increased. Electricity and heat generation achieve their maximum values without switching on the auxiliary firing 6 . They are variable according to the operating modes a) or b).
    Exhaust gas path to c): flaps 8 and 27 open; Flaps 9 and 28 closed.
  • d) Maximale Heizwärmeerzeugung.
    Durch Einschaltung der Zusatzfeuerung 6 wird die Heizwär­ meleistung gegenüber dem Fall c) nochmals erhöht. Die Heizwärmeleistung erreicht bei diesem Betriebsfall d) ihr absolutes Maximum bei gleichzeitig voller Beaufschlagung des Wasser-Wärmetauschers 10 mit Entnahmedampf e über das Ventil 11.
    Abgasweg zu d): wie unter c).
    d) Maximum heat generation.
    By switching on the additional firing 6 , the heating power is increased compared to the case c). The heating output in this operating case d) reaches its absolute maximum with simultaneous full exposure to the water heat exchanger 10 with extraction steam e via the valve 11 .
    Exhaust gas route to d): as under c).

4. Reiner Stromerzeugungsbetrieb (also ohne Heizwärmeabgabe in das Versorgungsnetz III).
Der reine Stromerzeugungsbetrieb ohne Heizwärmeerzeugung bzw. Heizwärmeabgabe in das Versorgungsnetz III kann mit diesem Kraftwerkstyp in zwei Betriebsarten erfolgen:
4. Pure power generation operation (i.e. without supplying heat to the supply network III).
With this type of power plant, the pure power generation operation without generating or delivering heating heat to the supply network III can take place in two operating modes:

  • a) mit dem Gasturbosatz 1 im Alleinbetrieb ohne Heizwärme­ erzeugung.
    Abgasweg: Klappen 9 und 29 geöffnet; Klappen 8 und 28 ge­ schlossen. Dieser Betriebsfall a) ist besonders für die Abdeckung von regionalen Lastspitzen geeignet.
    a) with the gas turbine set 1 in sole operation without heating heat generation.
    Exhaust gas path: flaps 9 and 29 open; Flaps 8 and 28 closed ge. This operating case a) is particularly suitable for covering regional peak loads.
  • b) mit der Gas- und Dampfturbine in Teillast bis Vollast. Die hierbei anfallende Heizwärme im Heizkondensator 4 wird in die Heißwasserspeicher 14 geleitet. Dieser Be­ trieb ist zeitlich begrenzt und von der gewählten Spei­ cherkapazität der Heißwasserspeicher 14 abhängig.
    Abgasweg: Klappen 8, 28 und 29 geöffnet; Klappen 27 und 9 geschlossen.
    b) with the gas and steam turbine in partial load to full load. The resulting heat in the heating condenser 4 is conducted into the hot water tank 14 . This operation is limited in time and dependent on the selected storage capacity of the hot water storage 14 .
    Exhaust gas path: flaps 8 , 28 and 29 open; Flaps 27 and 9 closed.

5. Heizwärmeabgabe in das Versorgungsnetz III ohne Stromerzeu­ gung.
Die Versorgung des Heiznetzes III bleibt erhalten, wenn Gas- und Dampfturbosatz 1, 3 nicht in Betrieb sind, zum Bei­ spiel aus Revisionsgründen oder wenn zeitlich kein Strom­ bedarf besteht.
5. Heat output in the supply network III without electricity generation.
The supply of the heating network III is retained when the gas and steam turbine set 1 , 3 are not in operation, for example for reasons of revision or when there is no time requirement for electricity.

Die Versorgung kann nach drei Betriebsarten erfolgen:The supply can take place in three operating modes:

  • a) mit Hilfe des rauchgasbeheizten Wasser-Wärmetauschers 5, dessen Befeuerung 6 mit einem Frischluftgebläse 7 betrie­ ben wird (nicht gezeigt).
    Abgasweg: Klappe 27 geschlossen;
    a) with the help of the flue gas-heated water heat exchanger 5 , the firing 6 with a fresh air blower 7 is operated (not shown).
    Exhaust gas path: flap 27 closed;
  • b) wie im Fall a) bei gleichzeitiger Wärmeentnahme aus den Heißwasserspeichern 14; dies ergibt eine relativ große Heißwasser-Versorgungsmenge;b) as in case a) with simultaneous removal of heat from the hot water tanks 14 ; this results in a relatively large supply of hot water;
  • c) mit alleiniger Entnahme von Heizwärme aus den Heißwasser­ speichern 14; dies ergibt die kleinste Heizwärme-Versor­ gungsmenge.c) save with the sole removal of heating from the hot water 14 ; this results in the smallest amount of heating energy supply.
Variante II: Entnahme-Kondensations-Dampfturbine (vergleiche Fig. 2).Variant II: extraction-condensation steam turbine (see Fig. 2).

1. Stromerzeugung mit Gasturbosatz 1 im Alleinbetrieb; Teil­ stromerzeugung; Betriebsarten: Heizwärmeerzeugung Null wie unter Fall I/1a) und b).1. Power generation with gas turbine set 1 in sole operation; Part of electricity generation; Operating modes: heating heat zero as in case I / 1a) and b).

2. Stromerzeugung mit Gasturbosatz 1 im Alleinbetrieb; Teil­ stromerzeugung; Betriebsarten: Heizwärme-Erzeugung wie unter Fall I/2a) bis e). 2. Power generation with gas turbine set 1 in sole operation; Part of electricity generation; Operating modes: Heating energy generation as in case I / 2a) to e).

3. Stromerzeugung mit Gas- und auch Dampfturbosatz mit Heiz­ wärme-Erzeugung:3. Electricity generation with gas and steam turbine with heating heat generation:

  • a) Heizwärme-Erzeugung im entnahmedampfbeheizten Wasser-Wär­ metauscher 10 mit geregelter Beaufschlagung des Wasser- Wärmetauschers 10 von Null-Dampfentnahme bis zur maxima­ len Dampfentnahme;
    Abgasweg: wie unter I/3a) und b);
    a) heating heat-generation in the extraction steam heated water Wär exchanger 10 with controlled loading of the water heat exchanger 10 of zero extraction steam to the steam extraction maxima len;
    Exhaust gas route: as under I / 3a) and b);
  • b) Heizwärmeerzeugung mit Turbinenabgas in Kombination mit a) im Wasser-Wärmetauscher 5 ohne Zusatzfeuerung 6; Abgasweg wie unter I/3c);b) heating heat generation with turbine exhaust gas in combination with a) in the water heat exchanger 5 without additional firing 6 ; Exhaust gas path as under I / 3c);
  • c) maximale Heizwärmeerzeugung; Betriebsart wie unter I/3d).c) maximum heat generation; Operating mode as under I / 3d).

4. Reiner Stromerzeugungsbetrieb ohne Heizwärmeerzeugung. Zwei Betriebsarten:4. Pure electricity generation without heating. Two Operating modes:

  • a) mit Gasturbosatz 1 im Alleinbetrieb;
    Abgasweg wie unter I/4a);
    a) with gas turbine set 1 in sole operation;
    Exhaust gas path as under I / 4a);
  • b) mit Gas- und Dampfturbosatz im Kombinationsbetrieb. Dies erfolgt ohne Heizwärmeerzeugung im Unterschied zu I/4b).b) with gas and steam turbine set in combination operation. This unlike I / 4b).

5. Heizwärmeabgabe in das Versorgungsnetz III ohne Stromerzeu­ gung; Betriebsart wie unter I/5a) bis c).5. Heat output in the supply network III without electricity gung; Operating mode as under I / 5a) to c).

Aus diesen Angaben über die verschiedenen Betriebsarten wird deutlich, daß das GuD-Kraftwerk in seinen verschiedenen Ausge­ staltungen für die Strom- und Heizwärmeerzeugung sehr flexibel einsetzbar ist.This information about the different operating modes becomes clearly that the combined cycle power plant in its various versions events for electricity and heating generation very flexible can be used.

Claims (15)

1. Kombiniertes Gasturbinen-Dampfturbinen-Kraftwerk zum Betrieb mit einem Brennstoff wie Kohlegas, Erdgas und/oder Heizöl, mit einer Gasturbine (1) und einer Dampfturbine (3), dadurch gekennzeichnet, daß an die Gasturbine (1) ein an sich bekannter Dampferzeuger (2) angeschlossen ist, und daß dem Dampferzeuger (2) im Turbinenabgasweg (22 A) ein Heißwasser- Wärmetauscher (5), vorzugsweise mit Zusatzfeuerung (6), zur Erzeugung von Heizwärme nachgeschaltet ist.1. Combined gas turbine-steam turbine power plant for operation with a fuel such as coal gas, natural gas and / or heating oil, with a gas turbine ( 1 ) and a steam turbine ( 3 ), characterized in that a known steam generator to the gas turbine ( 1 ) ( 2 ) is connected, and that the steam generator ( 2 ) in the turbine exhaust gas path ( 22 A ) is followed by a hot water heat exchanger ( 5 ), preferably with additional firing ( 6 ), for generating heat. 2. Gasturbinen-Dampfturbinen-Kraftwerk nach Anspruch 1, da­ durch gekennzeichnet, daß mindestens ein vom Entnahmedampf (e) der Dampfturbine (3) beheizbarer Wasser- Wärmetauscher (10) zur Erzeugung von Heizwärme vorgesehen ist.2. Gas turbine-steam turbine power plant according to claim 1, characterized in that at least one of the extraction steam ( s ) of the steam turbine ( 3 ) heatable water heat exchanger ( 10 ) is provided for generating heat. 3. Gasturbinen-Dampfturbinen-Kraftwerk nach Anspruch 2, da­ durch gekennzeichnet, daß der vom Entnah­ medampf (e) beheizbare Wasser-Wärmetauscher (10) sekundärseitig parallel zum vom Turbinenabgas (v) beaufschlagbaren Heißwasser- Wärmetauscher (5) angeordnet ist.3. Gas turbine steam turbine power plant according to claim 2, characterized in that the from the Entnah medampf ( e ) heatable water heat exchanger ( 10 ) is arranged on the secondary side parallel to the hot water heat exchanger ( 5 ) acted upon by the turbine exhaust gas ( v ). 4. Gasturbinen-Dampfturbinen-Kraftwerk nach Anspruch 3, da­ durch gekennzeichnet, daß der Dampfturbi­ ne (3) ein mit Kühlturm oder Frischwasserkühlung versehener Kondensator (4 K) nachgeschaltet ist.4. Gas turbine steam turbine power plant according to claim 3, characterized in that the Dampfturbi ne ( 3 ) with a cooling tower or fresh water cooling capacitor ( 4 K ) is connected downstream. 5. Kombiniertes Gasturbinen-Dampfturbinen-Kraftwerk zum Betrieb mit einem Brennstoff wie Kohlegas, Erdgas und/oder Heizöl, mit einer Gasturbine (1) und einer Dampfturbine (3), insbesondere nach einem der Ansprüche 1, 2 und/oder 3, dadurch ge­ kennzeichnet, daß ein vom Abdampf (k) der Dampf­ turbine (3) beheizbarer Heizkondensator (4) zur Erzeugung von Heizwärme vorgesehen ist. 5. Combined gas turbine-steam turbine power plant for operation with a fuel such as coal gas, natural gas and / or heating oil, with a gas turbine ( 1 ) and a steam turbine ( 3 ), in particular according to one of claims 1, 2 and / or 3, thereby ge indicates that a heating condenser ( 4 ) which can be heated by the exhaust steam ( k ) of the steam turbine ( 3 ) is provided for generating heat. 6. Gasturbinen-Dampfturbinen-Kraftwerk nach Anspruch 5 und ei­ nem der Ansprüche 1 bis 3, dadurch gekenn­ zeichnet, daß der Heizkondensator (4) sekundärsei­ tig parallel zum Heißwasser-Wärmetauscher (5) und/oder parallel zum Wasser-Wärmetauscher (10) angeordnet ist.6. Gas turbine steam turbine power plant according to claim 5 and egg nem of claims 1 to 3, characterized in that the heating condenser ( 4 ) secondary side parallel to the hot water heat exchanger ( 5 ) and / or parallel to the water heat exchanger ( 10 ) is arranged. 7. Gasturbinen-Dampfturbinen-Kraftwerk nach einem der Ansprü­ che 1 bis 3, 5 oder 6, dadurch gekennzeich­ net, daß die in dem Wärmetauscher (5 und/oder 10) und/oder in dem Heizkondensator (4) erzeugte Heizwärme in einen geschlos­ senen Heizkreislauf (24, 25) einspeisbar ist, aus welchem die Heizwärme in ein Heizwärme-Versorgungsnetz (III) über mindestens einen Wärmetauscher (16) übertragbar ist.7. Gas turbine steam turbine power plant according to one of claims 1 to 3, 5 or 6, characterized in that the heat generated in the heat exchanger ( 5 and / or 10 ) and / or in the heating condenser ( 4 ) in a closed Senen heating circuit ( 24 , 25 ) can be fed, from which the heating energy in a heating supply network (III) via at least one heat exchanger ( 16 ) can be transferred. 8. Gasturbinen-Dampfturbinen-Kraftwerk nach einem der Ansprü­ che 1 bis 6, ausgenommen Anspruch 4, dadurch ge­ kennzeichnet, daß die in dem Wärmetauscher (5 und/oder 10) und/oder in dem Heizkondensator (4) erzeugte Heiz­ wärme in ein Heizwärme-Versorgungsnetz (40, IIIa; 41, IIIb; 42, IIIc) einspeisbar ist.8. Gas turbine steam turbine power plant according to one of claims 1 to 6, except claim 4, characterized in that the heat generated in the heat exchanger ( 5 and / or 10 ) and / or in the heating condenser ( 4 ) in a heat Heating heat supply network ( 40 , III a ; 41 , III b ; 42 , III c ) can be fed. 9. Gasturbinen-Dampfturbinen-Kraftwerk nach Anspruch 8, da­ durch gekennzeichnet, daß die Heizwärme- Versorgungsnetze (40, IIIa; 41, IIIb und/oder 42, IIIc) über Ventile (51 bis 54) miteinander verkoppelt sind (Fig. 3).9. Gas turbine steam turbine power plant according to claim 8, characterized in that the heating energy supply networks ( 40 , III a ; 41 , III b and / or 42 , III c ) are coupled together via valves ( 51 to 54 ) ( Fig . 3). 10. Gasturbinen-Dampfturbinen-Kraftwerk nach einem der Ansprü­ che 7 bis 9, dadurch gekennzeichnet, daß die Vorlauftemperatur (T v ) des Heißwassers vom Wärmetau­ scher (5 und/oder 10) und/oder vom Heizkondensator (4) durch Einspeisung von Kaltwasser aus dem Rücklauf (25) des zur Ver­ sorgung des Verbrauchernetzes (III; 40, IIIa; 41, IIIb; 42, IIIc) vorgesehenen Wärmetauschers (16) über einen steuerbaren Bypass (26) veränderbar ist.10. Gas turbine steam turbine power plant according to one of claims 7 to 9, characterized in that the flow temperature ( T v ) of the hot water from the heat exchanger ( 5 and / or 10 ) and / or from the heating condenser ( 4 ) by feeding in cold water from the return line ( 25 ) of the heat exchanger ( 16 ) provided for the supply of the consumer network (III; 40 , III a ; 41 , III b ; 42 , III c ) can be changed via a controllable bypass ( 26 ). 11. Gasturbinen-Dampfturbinen-Kraftwerk nach einem der Ansprü­ che 1 bis 10, dadurch gekennzeichnet, daß mindestens ein Druck-Reduzierventil (12) vorgesehen ist, über das im Alleinbetrieb der Gasturbine (1) der im Dampf­ erzeuger (2) erzeugte Dampf in mindestens einen Wasser-Wärme­ tauscher (10) einspeisbar ist, der im Betrieb der Dampfturbine (3) von deren Entnahmedampf (e) beheizbar und der zur Erzeugung von Heizwärme vorgesehen ist.11. Gas turbine steam turbine power plant according to one of claims 1 to 10, characterized in that at least one pressure reducing valve ( 12 ) is provided, via which the steam generator ( 2 ) generates steam in the steam generator ( 2 ) when the gas turbine ( 1 ) is operated alone At least one water-heat exchanger ( 10 ) can be fed in, which can be heated by the extraction steam ( e ) during the operation of the steam turbine ( 3 ) and which is provided for generating heat. 12. Gasturbinen-Dampfturbinen-Kraftwerk nach einem der Ansprü­ che 7 bis 11, dadurch gekennzeichnet, daß die Wasserumlaufmenge im Heizkreislauf (24, 25) durch die Anordnung mindestens eines Kaltwasserspeichers (15) veränderbar ist.12. Gas turbine steam turbine power plant according to one of claims 7 to 11, characterized in that the amount of water circulating in the heating circuit ( 24 , 25 ) can be changed by the arrangement of at least one cold water reservoir ( 15 ). 13. Gasturbinen-Dampfturbinen-Kraftwerk nach einem der Ansprü­ che 7 bis 12, dadurch gekennzeichnet, daß zur Speicherung von Heizwärme im geschlossenen Heizkreis­ lauf (24, 25) mindestens ein Heißwasserspeicher (14) vorgesehen ist.13. Gas turbine steam turbine power plant according to one of claims 7 to 12, characterized in that at least one hot water tank ( 14 ) is provided for storing heat in the closed heating circuit ( 24 , 25 ). 14. Gasturbinen-Dampfturbinen-Kraftwerk nach einem der Ansprü­ che 1 bis 13, dadurch gekennzeichnet, daß der Abgasweg aufgeteilt ist in eine Hauptleitung (22 A) und eine Bypassleitung (22 B), welche Leitungen (22 A, 22 B) durch ei­ nen Bypass (23) miteinander verbunden sind.14. Gas turbine steam turbine power plant according to one of claims 1 to 13, characterized in that the exhaust gas path is divided into a main line ( 22 A ) and a bypass line ( 22 B ), which lines ( 22 A , 22 B ) by egg NEN bypass ( 23 ) are interconnected. 15. Gasturbinen-Dampfturbinen-Kraftwerk nach Anspruch 14, dadurch gekennzeichnet, daß im Abgas­ weg (22 A, 22 B) der Gasturbine (1) Steuerklappen (8, 9, 27, 28, 29) angeordnet sind.15. Gas turbine steam turbine power plant according to claim 14, characterized in that in the exhaust gas path ( 22 A , 22 B ) of the gas turbine ( 1 ) control flaps ( 8 , 9 , 27 , 28 , 29 ) are arranged.
DE19883841224 1988-12-07 1988-12-07 Combined gas turbine/steam turbine power station Withdrawn DE3841224A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19883841224 DE3841224A1 (en) 1988-12-07 1988-12-07 Combined gas turbine/steam turbine power station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19883841224 DE3841224A1 (en) 1988-12-07 1988-12-07 Combined gas turbine/steam turbine power station

Publications (1)

Publication Number Publication Date
DE3841224A1 true DE3841224A1 (en) 1990-06-13

Family

ID=6368656

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19883841224 Withdrawn DE3841224A1 (en) 1988-12-07 1988-12-07 Combined gas turbine/steam turbine power station

Country Status (1)

Country Link
DE (1) DE3841224A1 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4040699A1 (en) * 1990-04-27 1991-10-31 Siemens Ag Combined gas and steam turbine plant - comprises combustion chamber and waste heat steam producer
DE19545668A1 (en) * 1995-12-07 1997-06-12 Asea Brown Boveri Method for operating a gas turbine group combined with a waste heat steam generator and a steam consumer
DE19626372C1 (en) * 1996-07-02 1997-11-27 Saarbergwerke Ag Method and device for improving the efficiency in steam power plants
DE19720881A1 (en) * 1997-05-17 1998-11-19 Asea Brown Boveri Combined heat and power station with conversion turbines
EP1426564A1 (en) * 2002-11-21 2004-06-09 Siemens Aktiengesellschaft Method and device for controlling the output of a combined heat and power plant
CN103452611A (en) * 2013-09-05 2013-12-18 上海电气电站设备有限公司 Combined-cycle combined heat and power system
CN104848526A (en) * 2015-06-02 2015-08-19 西安长庆科技工程有限责任公司 Small integral heat supply system for supplying heat to oilfield stations
DE102014004287A1 (en) * 2014-03-26 2015-10-01 Vattenfall Europe Powerconsult Gmbh Method for power regulation of gas and steam cogeneration plants with counter-pressure steam turbine (s) for full participation in the primary and secondary control while controlling the heat load
CN111472856A (en) * 2020-04-07 2020-07-31 山东华电节能技术有限公司 Low-pressure cylinder zero-power heat supply system of wet cooling unit and working method
IT202200000296A1 (en) * 2022-01-11 2023-07-11 Nuovo Pignone Tecnologie Srl Heat damper for a waste heat recovery unit and waste heat recovery unit comprising a heat damper

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1201612B (en) * 1962-06-01 1965-09-23 Siemens Ag Gas turbine heating plant
DE3225140A1 (en) * 1982-07-06 1984-01-12 Brown, Boveri & Cie Ag, 6800 Mannheim METHOD FOR THE OPERATION OF A STEAM POWER PLANT EQUIPPED WITH A FLUIDIZED LIFE BURNER, IN PARTICULAR HEATING POWER PLANT

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1201612B (en) * 1962-06-01 1965-09-23 Siemens Ag Gas turbine heating plant
DE3225140A1 (en) * 1982-07-06 1984-01-12 Brown, Boveri & Cie Ag, 6800 Mannheim METHOD FOR THE OPERATION OF A STEAM POWER PLANT EQUIPPED WITH A FLUIDIZED LIFE BURNER, IN PARTICULAR HEATING POWER PLANT

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
DE-Z.: VGB-Kraftwerkstechnik, Jahrgang 61, Heft 11, Nov. 1981, S. 895-902 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4040699A1 (en) * 1990-04-27 1991-10-31 Siemens Ag Combined gas and steam turbine plant - comprises combustion chamber and waste heat steam producer
DE19545668A1 (en) * 1995-12-07 1997-06-12 Asea Brown Boveri Method for operating a gas turbine group combined with a waste heat steam generator and a steam consumer
US5799481A (en) * 1995-12-07 1998-09-01 Asea Brown Boveri Ag Method of operating a gas-turbine group combined with a waste-heat steam generator and a steam consumer
DE19626372C1 (en) * 1996-07-02 1997-11-27 Saarbergwerke Ag Method and device for improving the efficiency in steam power plants
DE19720881A1 (en) * 1997-05-17 1998-11-19 Asea Brown Boveri Combined heat and power station with conversion turbines
US7055328B2 (en) 2002-11-21 2006-06-06 Siemens Aktiengesellschaft Method and device for regulating the power output of a combined-cycle power station
EP1426564A1 (en) * 2002-11-21 2004-06-09 Siemens Aktiengesellschaft Method and device for controlling the output of a combined heat and power plant
CN103452611A (en) * 2013-09-05 2013-12-18 上海电气电站设备有限公司 Combined-cycle combined heat and power system
DE102014004287A1 (en) * 2014-03-26 2015-10-01 Vattenfall Europe Powerconsult Gmbh Method for power regulation of gas and steam cogeneration plants with counter-pressure steam turbine (s) for full participation in the primary and secondary control while controlling the heat load
CN104848526A (en) * 2015-06-02 2015-08-19 西安长庆科技工程有限责任公司 Small integral heat supply system for supplying heat to oilfield stations
CN104848526B (en) * 2015-06-02 2017-07-04 西安长庆科技工程有限责任公司 A kind of small-sized integrated integrated heating system for station in oilfield heat supply
CN111472856A (en) * 2020-04-07 2020-07-31 山东华电节能技术有限公司 Low-pressure cylinder zero-power heat supply system of wet cooling unit and working method
IT202200000296A1 (en) * 2022-01-11 2023-07-11 Nuovo Pignone Tecnologie Srl Heat damper for a waste heat recovery unit and waste heat recovery unit comprising a heat damper
WO2023135026A1 (en) * 2022-01-11 2023-07-20 Nuovo Pignone Tecnologie - S.R.L. Heat damper for a waste heat recovery unit and waste heat recovery unit comprising a heat damper

Similar Documents

Publication Publication Date Title
EP0778397B1 (en) Method of operating a combined power plant with a waste heat boiler and a steam user
DE69927925T2 (en) Recovery of waste heat in an organic energy converter by means of an intermediate liquid circuit
DE102008037410B4 (en) Combined cycle and method using supercritical steam
EP2462378B1 (en) Method for operating a forced-flow steam generator operating at a steam temperature above 650°c and forced-flow steam generator
EP2538040B1 (en) Combined heat and power device and associated method
EP0591163B1 (en) Combined gas and steam turbine plant
DE4126037A1 (en) GAS AND STEAM TURBINE POWER PLANT WITH A SOLAR HEATED STEAM GENERATOR
DE4312072A1 (en) Steam power plant with ballast gas turbine
WO2008067855A2 (en) Method and apparatus for increasing the performance and efficiency of an orc power plant process
DE19846225A1 (en) Gas and steam turbine plant
EP0515911B1 (en) Method of operating a gas and steam turbine plant and corresponding plant
DE3841224A1 (en) Combined gas turbine/steam turbine power station
EP1390606B2 (en) Device for cooling coolant in a gas turbine and gas and steam turbine with said device
DE19837251C1 (en) Fossil-fuel burning gas and steam-turbine installation for power generation
DE10144841C1 (en) Solar energy steam and gas turbine power plant for electricity generation has steam turbine coupled to steam generator utilizing gas turbine exhaust gas and solar-heated steam generator
DE4126038A1 (en) Gas and steam turbine plant with solar heated steam generator - has additional combustion chamber in exhaust gas line from gas turbine
DE4126036A1 (en) Gas and steam turbine plant with solar heated system generator - with generator connected to heat exchanger in h.p. steam line from waste heat steam generator
EP0199902A1 (en) Combined hot air and steam plant
EP0709561B1 (en) Power plant
DD296733A5 (en) DEHUIT STEAM GENERATORS FOR A GAS AND STEAM TURBINE POWER PLANT
WO2003104629A1 (en) Gas turbine group
EP1050667A1 (en) Combined power plant with auxiliary burner
DE19720789A1 (en) Steam generation procedure
EP2659099B1 (en) Power generation device
EP0050687A1 (en) Hot-air turbines steam power plant

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
8139 Disposal/non-payment of the annual fee