DE3703487A1 - Concrete wall erection method - transfers bottom shuttering panels to top as wall is raised - Google Patents
Concrete wall erection method - transfers bottom shuttering panels to top as wall is raisedInfo
- Publication number
- DE3703487A1 DE3703487A1 DE3703487A DE3703487A DE3703487A1 DE 3703487 A1 DE3703487 A1 DE 3703487A1 DE 3703487 A DE3703487 A DE 3703487A DE 3703487 A DE3703487 A DE 3703487A DE 3703487 A1 DE3703487 A1 DE 3703487A1
- Authority
- DE
- Germany
- Prior art keywords
- formwork
- wall
- vertical
- building
- panels
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
- E04G11/28—Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
- E04G11/22—Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Moulds, Cores, Or Mandrels (AREA)
Abstract
Description
Die Erfindung betrifft ein Verfahren zur Herstellung von Bauwerkswänden aus Beton oder dergleichen gemäß Oberbe griff des Anspruchs 1 und ein Schalungssystem gemäß Ober begriff des Anspruchs 5.The invention relates to a method for producing Building walls made of concrete or the like according to Oberbe handle of claim 1 and a formwork system according to Ober Concept of claim 5.
Ein derartiges Verfahren und eine derartige Vorrichtung eines Schalungssystems sind beispielsweise aus der DE 35 21 066 A1 bekannt. Dieses unter dem Begriff "Gleitver fahren" bekannte Verfahren bzw. das für dieses Verfahren bestimmte "Gleitschalungssystem" ist dadurch charakteri siert, daß ein an Kletterstangen emporgehobenes Gleitge rüst mit einer Schalungshaut für die zu erstellende Beton wand fest verbunden ist. Aufgrund dieser Verbindung können die Schalhaut einschließlich des Gleitgerüstes als Einheit mit dem Höherziehen der Betonwand kontinuierlich über eine entsprechende Hubeinrichtung in die Höhe gleiten.Such a method and device a formwork system are for example from DE 35 21 066 A1 known. This under the term "Gleitver drive "known method or that for this method certain "slipform system" is characteristic siert that a glide lifted on climbing poles equips with a formwork skin for the concrete to be created wall is firmly connected. Because of this connection can the formlining including the sliding frame as a unit with raising the concrete wall continuously over a slide the appropriate lifting device up.
Obwohl dieses bekannte Gleitschalungssystems in mancher Hinsicht Verbesserungen gebracht hat die z.B. beim kon tinuierlichen Erstellen von turmähnlichen Bauwerken gese hen werden kann aber auch in einer Reduzierung der erfor derlichen Gerüstvorrichtungen ist das bekannte System im Hinblick auf eine höhere Flexibilität beim Höherziehen des Bauwerkes noch verbesserungsbedürftig.Although this well-known slipform system in some Has brought improvements in terms of e.g. at the con continuous creation of tower-like structures but can also be achieved by reducing the required scaffolding devices is the known system in the With a view to greater flexibility when hoisting the Building still in need of improvement.
Hierbei wird unter dem Begriff "Höherziehen" des Bauwerkes oder der Betonwand der zunehmende Baufortschritt der ent sprechenden Wand in Richtung der zu erstellenden Gesamt höhe verstanden. Das bekannte System und das Verfahren ist jedoch auch im Hinblick auf arbeitsrechtliche Auflagen, wie z.B. einem Nachtbauverbot oder dem Verbot von Wochen endarbeit, problematisch geworden. Dies liegt darin be gründet, daß das strenge Gleitverfahren einen kontinuier lichen und permanenten Schichtbetrieb erfordert um den strengen Qualitätserfordernissen gerade bei Hochbauten gerecht zu werden.Here is under the term "hoisting" of the building or the concrete wall the increasing construction progress of the ent speaking wall towards the total to be created understood height. The known system and method is but also with regard to labor law requirements, such as. a night-time ban or the ban on weeks finish, become problematic. This is it establishes that the strict sliding procedure is continuous and permanent shift operation is essential strict quality requirements, especially for buildings to meet.
Andererseits kann die Herstellung von Decken Tür- und Fensteröffnungen bei dem bekannten Gleitsystem nur im Rah men einer erschwerten Herstellung realisiert werden. Teil weise kann es auch zu Rissebildungen führen so daß eine verminderte Festigkeit und geringere Oberflächenqualität möglich erscheint. Das Ein- und Anbringen der Bewehrung sowie das Betonieren der Wand wird teilweise unökonomisch durchgeführt.On the other hand, the manufacture of ceilings door and Window openings in the known sliding system only in the frame difficult production. Part wise it can also lead to cracks forming a reduced strength and lower surface quality appears possible. The installation and installation of the reinforcement as well as concreting the wall is sometimes uneconomical carried out.
Ausgehend von dieser Problematik liegt daher der vorlie genden Erfindung die Aufgabe zugrunde ein gattungsgemä ßes Verfahren und ein gattungsgemäßes Schalungssystem so zu konzipieren, daß dieses bei hoher Arbeitsflexibilität eine qualitative Verbesserung für die zu erstellende Bau werkswand mit sich bringt, wobei beispielsweise Deckenein bindungen oder die Erstellung von Öffnungen in der Wand erleichtert werden soll, aber bisherige Vorteile weitgehend beibehalten werden können.Based on this problem, therefore, is available the present invention the task of a generic ßes procedure and a generic formwork system so to conceive that this with high work flexibility a qualitative improvement for the construction to be created brings factory wall with, for example, ceiling bindings or the creation of openings in the wall should be facilitated, but previous advantages largely can be maintained.
Diese Aufgabe wird erfindungsgemäß bei einem Verfahren der vorgenannten Art durch die Merkmale des kennzeichnenden Teils des Anspruchs 1 und bei einem entsprechenden Scha lungssystem durch die Merkmale des kennzeichnenden Teils des Anspruchs 5 gelöst.This object is achieved in a method of aforementioned type by the characteristics of the characteristic Part of claim 1 and a corresponding Scha system by the characteristics of the characteristic part of claim 5 solved.
Die Grundidee sieht daher im Prinzip die Kombination der bereits bisher bekannten Gleitschalung und einer Kletter schalung derart vor, daß die Vorteile dieser beiden Scha lungssysteme im neuen System vereint werden können und da bei die vorausgehend genannten Nachteile vermieden werden.The basic idea therefore sees in principle the combination of already known slipform and climbing formwork in such a way that the advantages of these two Scha systems can be combined in the new system and there to avoid the disadvantages mentioned above.
Generell wird dabei bei der Erfindung eine Trennung zwi schen der gleitend anhebbaren Gerüst- oder Stützkonstruk tion einerseits und der Schalung bzw. Schalhaut anderer seits durchgeführt, wobei letztere gemäß der Erfindung stationär gehalten wird. Hierbei beinhaltet der Begriff "stationär", daß die Schalhaut gegenüber der erstellten Betonwand stationär verankert ist, während das Gleitgerüst kontinuierlich über die Hubeinrichtung und die in der Re gel mittig in der Betonwand vorgesehenen Kletterstangen in die Höhe angehoben wird. Dieses stationäre Anbringen der Schalhaut erfolgt jedoch nur temporär und über eine be stimmte Höhenerstreckung im oberen Bereich der zu erstellen den Bauwerkswand. Hierdurch kann nach ausreichender Ver festigung der Betonwand die vertikal unterste Schalungsta fel demontiert werden und als neue oberste Schalungstafel wiederverwendet werden.Generally, a separation between the sliding scaffold or support structure tion on the one hand and the formwork or formlining of others carried out on the part, the latter according to the invention is kept stationary. Here the term includes "stationary" that the formlining compared to the created Concrete wall is anchored stationary while the sliding scaffold continuously via the lifting device and in the re in the middle of the concrete wall in the concrete wall the height is raised. This stationary attachment of the Formwork skin, however, is only temporary and be agreed to create height extension in the upper area of the the building wall. As a result, after sufficient ver consolidation of the concrete wall the vertically lowest formwork disassembled and as a new top formwork panel be reused.
Die Fixierung der Schalung und Schalungstafeln vorzugsweise über Queranker durch die Betonwand hindurch gestattet es zum Beispiel, Aussparungsrahmen für Tür- und Fensteröffnun gen Deckenauflager und sonstige Wanddurchdringungen unge stört einzumessen und an der Schalung anzubringen, so daß derartige Konstruktionen mit hoher Präzision und Scharf kantigkeit erstellt werden können.Fixing the formwork and formwork panels preferably It allows through cross anchors through the concrete wall for example, recess frames for door and window openings against ceiling supports and other wall penetrations interferes with measuring and attaching to the formwork, so that such constructions with high precision and sharpness angularity can be created.
Bei der Auslegung der jeweiligen Schalungstafeln in verti kaler Richtung mit etwa 0,5 m bis 2 m, vorzugsweise aber 1 m, können betoniert Tiefen erreicht werden, bei denen weder eine Entmischung des Frischbetons noch eine Brückenbildung entstehen kann, da der eingebrachte Beton einwandfrei durchgerüttelt werden kann. Es werden dadurch Wandoberflä chen erzielt, die im Aussehen und in der Struktur diejeni gen der üblichen Kletterschalung übertreffen. Auch kann man erwarten daß die Betonfestigkeiten und Haftspannungen der Armierungsstäbe in Folge des Ruhezustandes der Scha lung während der gesamten Erstarrungszeit völlig unge stört bleiben.When designing the respective formwork panels in verti cal direction with about 0.5 m to 2 m, but preferably 1 m, concrete depths can be reached at which neither segregation of the fresh concrete still bridging can arise because the concrete brought in perfectly can be shaken. This will result in wall surfaces achieved in terms of appearance and structure surpass the usual climbing formwork. You can too expect the concrete strengths and adhesive tensions the reinforcing bars as a result of the Scha development during the entire solidification period stay bothered.
Ein weiterer Vorteil dieser kombinierten Gleit-Kletter- Schalung kann darin gesehen werden, daß die Arbeiten auch jederzeit, und damit auch täglich oder über das Wochenen de, unterbrochen werden können. Hierdurch können z.B. Decken, Treppenläufe oder sonstige Anschlüsse ungestört und mit größter Genauigkeit gefertigt werden. Das Gleit gerüst hat den Vorzug, daß man mit einem minimalen Gerüst aufwand auskommt, so daß letzten Endes allein ein Leiter gang erforderlich wäre, der noch in Fällen, in denen vor gefertigte Treppenläufe vorhanden sind, ebenfalls einge spart werden kann.Another advantage of this combined gliding and climbing Formwork can be seen in the fact that the work too at any time, and therefore also daily or over the weekend de, can be interrupted. This can e.g. Ceilings, stairs or other connections undisturbed and manufactured with the greatest accuracy. The glide scaffold has the advantage that one with a minimal scaffold effort comes out, so that ultimately a leader alone would be required in cases where before manufactured staircases are also available can be saved.
Zudem hat das System den Vorteil, daß es wirklich kranun abhängig arbeiten kann, da einerseits die Aufwärtsbewegung mit eigenen Antriebsmitteln, wie mechanische oder hydrau lische Heber erfolgt und andererseits auch die erforder lichen Material- und Personenförderungseinrichtungen mit gehoben werden können.The system also has the advantage that it is really sick can work dependent because on the one hand the upward movement with own drive means, such as mechanical or hydraulic lift takes place and on the other hand also the required material and people conveyor systems can be lifted.
Zur Erhöhung der stationären Befestigung einzelner, ver tikaler Schalungstafeln gegeneinander wird zweckmäßiger weise nicht nur eine Querverankerung der Schalungstafeln in der Bauwerkswand vorgesehen, sondern die auf der Außen fläche der Schalhaut befestigbaren vertikalen Träger wer den miteinander kraft- oder formschlüssig verkeilt. Das Gewicht der temporär stationär gehaltenen Schalung wird hierdurch über einen größeren vertikalen Wandabschnitt ge tragen, so daß gerade im neu betonierten Wandbereich zu hohe Krafteinleitungen vermieden werden.To increase the stationary attachment of individual, ver tical formwork panels against each other is more appropriate not only a transverse anchorage of the formwork panels provided in the building wall, but the one on the outside surface of the formwork skin fastenable vertical beams wedged to each other with a positive or positive fit. The Weight of the formwork, which is temporarily stationary thereby ge over a larger vertical wall section wear so that especially in the newly concreted wall area high force transmission can be avoided.
In ähnlicher Weise erfolgt auch die horizontale, beidsei tige Abstützung des Gleitgerüstes zweckmäßigerweise in einem Höhenbereich der Betonwand, der bereits verfestigt ist.The horizontal, both, is done in a similar way term support of the sliding scaffold conveniently in a height area of the concrete wall that is already solidifying is.
Die Vertikalstützen der Schalungstafeln sind geeigneter weise Vierkantrohre. Dies ermöglicht einerseits eine hohe Gewichtsersparnis bei der Gesamtschalung und andererseits ein gutes Gleiten von etwa horizontal verlaufenden Ab stützeinrichtungen des Gleitgerüstes auf der schalungsab gewandten Fläche der Vierkantrohre.The vertical supports of the formwork panels are more suitable wise square tubes. On the one hand, this enables a high Weight saving in the entire formwork and on the other hand a good gliding of approximately horizontal ab supporting devices of the sliding scaffold on the formwork section facing surface of the square tubes.
Die Vertikalstützen können jedoch auch als Rundeisen oder Vierkanthölzer ausgebildet sind. Die Vierkantrohre ermög lichen jedoch eine gute Handhabung der durch entsprechende Mauerstärken geführten Queranker. Um die Handhabung der Verankerung und deren Lösung relativ einfach zu gestalten, werden vorzugsweise größere, längliche Öffnungen in den Außenflächen der Vierkanteisen vorgesehen. Darüber hinaus erlauben die Vierkantrohre auch einen formschlüssigen Ein satz mit darüber angeordneten Rohren, wobei eine Art Steck verbindungen entstehen kann, die sogar miteinander verkeilt oder verschraubt werden können.The vertical supports can also be used as round bars or Square timbers are formed. The square tubes allow However, good handling by appropriate Wall anchors guided cross anchors. To handle the Anchoring and its solution relatively easy to design are preferably larger, elongated openings in the External surfaces of the square iron are provided. Furthermore the square tubes also allow a form-fitting connection set with pipes arranged above, whereby a kind of plug connections can arise that are even wedged together or can be screwed.
Das Gleitgerüst weist üblicherweise zwei gegenüberliegende Joche auf, die über einen Kranzträger oder eine Traverse miteinander verbunden sind. Über eine Hubeinrichtung, die am Kranzträger angreift und die in Längsrichtung einer in der Betonwand einbetonierten Kletterstange bewegbar ist, wird das gesamte Gleitgerüst kontinuierlich emporgehoben. Arbeitsbühnen und Hängeplattformen können entsprechend den Erfordernissen am Gleitgerüst vorgesehen sein. Als geeig nete Höhe für die einzelne Schalungstafel dürfte etwa 1 m zweckmäßig sein da bei dieser Vertikalerstreckung noch eine gute Handhabung der einzelnen Schalungstafeln und auch ein guter Einbetoniervorgang gewährleistet ist. Die Horizontalerstreckung kann etwa 5 m oder mehr Meter betra gen. Schalungstafeln mit anderen Abmessungen von z.B. 0,5 bis 1,5 m Höhe oder 4 bis 8 m Länge sind denkbar. Ins gesamt gesehen dürften vier Schalungsfelder übereinander einen optimalen Arbeitsablauf und eine hervorragende Wand qualität gewährleisten. Hierbei könnte ein oberster Wand streifen von etwa 1 m in einem Betonierschritt gefüllt werden, während gleichzeitig ein Höhenbereich von etwa 3 m eingeschalt ist. Die untersten Schalungsfelder können bei dem System nach dem Lösen der betreffenden Verankerungen und Steckverbindungen sowie ggf. dem Entfernen der 1 m lan gen Teilstücke der Vertikalträger aus der Schalhaut ent fernt werden, wobei dies z.B. seitlich erfolgen kann. Die Schalungstafeln können anschließend gereinigt werden und als oberste Schalungstafeln neu montiert werden.The sliding frame usually has two opposite Yokes on top of a wreath beam or cross beam are interconnected. Via a lifting device that attacks the wreath carrier and the one in the longitudinal direction the concrete wall of the concrete climbing pole is movable, the entire sliding scaffold is continuously raised. Working platforms and hanging platforms can be used according to the Requirements on the sliding scaffold should be provided. As suitable nete height for the individual formwork panel should be about 1 m be expedient because of this vertical extension good handling of the individual formwork panels and a good concreting process is also guaranteed. The Horizontal extension can be about 5 m or more meters Formwork panels with other dimensions, e.g. 0.5 to 1.5 m in height or 4 to 8 m in length are conceivable. Ins in total, four formwork fields should be on top of each other an optimal workflow and an excellent wall ensure quality. This could be a top wall strips of about 1 m filled in one concreting step be, while at the same time a height range of about 3 m is switched on. The lowest formwork fields can be at the system after releasing the relevant anchorages and plug connections and, if necessary, removing the 1 m lan sections of the vertical beams from the formwork skin be removed, e.g. can be done laterally. The Formwork panels can then be cleaned and can be reassembled as top formwork panels.
Das Verfahren und das System der Takt-Gleitschaltung verbindet die Vorteile der einzelnen Schalungsarten, wo bei über den kombinatorischen Effekt hinaus qualitative Verbesserungen bei der Erstellung der Bauwerkswand und betriebsmittelsparende Gerüst- und Schalungskonstruktionen erreicht werden und diese Aspekte primär im Hochbau zum Tragen kommen. Zusätzlich wird aber auch eine höhere Betriebs sicherheit gerade im Vergleich mit einer reinen Kletterscha lung bei der Takt-Gleitschalung erreicht, da alle tragenden und stützenden Teile nur einmal zusammengebaut werden und in diesem Zustand nach oben geführt werden. Die verbesserte Be triebssicherheit resultiert aber auch daraus, daß allein das Eigengewicht der Schaltafeln in der Betonwand verankert wird, wobei dies nicht im Frischbetonbereich erfolgt, und das weitere Gerüstgewicht von den Kletterstangen aufgenommen wird.The clock slip circuit method and system combines the advantages of individual types of formwork where with qualitative beyond the combinatorial effect Improvements in the construction of the building wall and resource-saving scaffolding and formwork constructions can be achieved and these aspects primarily in building construction Come wear. In addition, however, there is also a higher operating safety especially in comparison with a pure climbing scha achieved with the tactile sliding formwork, since all load-bearing and supporting parts are assembled and in only once in this state. The improved Be drive safety also results from the fact that only that The dead weight of the formwork panels is anchored in the concrete wall, this is not done in the fresh concrete area, and the other Scaffolding weight is absorbed by the climbing poles.
Die Erfindung wird nachstehend anhand eines schematischen Ausführungsbeispiels in zwei Figuren noch näher erläutert. Es zeigen:The invention is described below using a schematic Embodiment explained in more detail in two figures. Show it:
Fig. 1 einem Vertikalschnitt im Bereich einer Krone einer Bauwerkswand mit montiertem Gleitgerüst und ver ankerter Schalung und Fig. 1 shows a vertical section in the area of a crown of a building wall with an assembled sliding frame and anchored formwork and
Fig. 2 eine Draufsicht auf das Beispiel nach Fig. 1, wobei im mittleren Bereich längs der Linie A-A eine obere Arbeitsbühne dem Blick auf eime untere Hängebühne freigibt und im untersten Bereich der Fig. 2 zur besserem Verdeutlichung auch die Hänge bühne entfernt ist. Fig. 2 is a plan view of the example of FIG. 1, with an upper work platform in the central area along line AA exposing the view of a lower suspended platform and the lower stage in FIG. 2 for clarity, the suspended platform is removed.
Das Ausführungsbeispiel nach Fig. 1 zeigt den vertikalen Aufriß durch eine Takt-Gleitschalung 1. Auf beiden Seiten einer vertikal aufragenden Betonwand 10 sind weitgehend symmetrisch zwei Joche 5, 6 vorgesehen die kopfseitig über einen Kranzträger 7 starr verbunden sind. In der Mit te der Betonwand 10 ist in Längsrichtung eine Kletter stange 12 einbetoniert. Eine Hubeinrichtung 8, üblicher weise hydraulischer Art, ist mit dem Kranzträger 7 be festigt und gegenüber der Kletterstange 12 höhenbeweglich ausgelegt.The exemplary embodiment according to FIG. 1 shows the vertical elevation through a clock sliding formwork 1 . On both sides of a vertically projecting concrete wall 10 , two yokes 5, 6 are provided largely symmetrically , which are rigidly connected on the head side by means of a ring carrier 7 . In the te with the concrete wall 10 a climbing rod 12 is concreted in the longitudinal direction. A lifting device 8 , usually hydraulic type, is fastened to the wreath carrier 7 and designed to be movable in height with respect to the climbing pole 12 .
An den Jochen 5, 6 ist beidseitig eine obere Arbeitsbühne 3 und im unteren Bereich eine Hängebühne 4 als Arbeitsplatt form vorgesehen.On the yokes 5 , 6 , an upper work platform 3 and a suspended platform 4 is provided as a work platform on both sides.
Im Ausführungsbeispiel sind im oberen Bereich der Beton wand 10 drei vertikal übereinander gesetzte und aneinander grenzende Schaltafeln 21, 22 und 23 angebracht. Diese Schal tafeln 21 bis 23 sind über die an ihrer Außenseite befestig ten Vertikalträger 25 mit Querankern 11 die etwa horizon tal verlaufen, in der Betonwand 10 verankert. Kopfseitig ist mit unterbrochenem Linienzug ein oberstes Schalungsfeld mit den Schalungstafeln 24 dargestelt, das sozusagen gerade montiert wird. Die Arbeitsbühne 3 befindet sich zweckmäßi gerweise etwa auf der Höhe der Wandkrone 13, so daß ein gu ter Zugang zu dem an oberster Stelle zu montierenden Scha lungsfeld besteht. Im Ausführungsbeispiel nach Fig. 1 ist der oberste Wandstreifen von etwa 1 m Höhe noch nicht ein betoniert.In the embodiment, in the upper area of the concrete wall 10 three vertically stacked and adjacent formwork panels 21 , 22 and 23 are attached. These scarf panels 21 to 23 are anchored on the outside of their vertical supports 25 with transverse anchors 11 which extend approximately horizontally, anchored in the concrete wall 10 . An uppermost formwork field with the formwork panels 24 is shown on the head side with a broken line of lines, which is, so to speak, being assembled. The working platform 3 is expediently approximately at the height of the wall crown 13 , so that there is good access to the field to be mounted at the top. In the embodiment of FIG. 1, the top wall strip of about 1 m in height is not yet concreted.
Der Abstützbereich 9 der Joche 5, 6 gegenüber den Vertikal stützen 24 ist so gewählt, daß dies im verfestigten Wandbe reich geschieht. Im Beispiel ist dies etwa im unteren Be reich der oberen, verankerten Vertikalstütze. Die Abstützung des Gleitgerüstes kann dabei über horizontale Querträger oder auch über Abstützrollen erfolgen, wobei horizontale Quer träger wegen der günstigen Lastverteilung auf eine Mehrzahl von Vertikalträgern bevorzugt werden. The support area 9 of the yokes 5 , 6 with respect to the vertical supports 24 is selected so that this happens rich in the solidified Wandbe. In the example, this is in the lower area of the upper, anchored vertical support. The support of the sliding scaffold can be done via horizontal cross beams or support rollers, horizontal cross beams are preferred because of the favorable load distribution on a plurality of vertical beams.
Die Draufsicht nach Fig. 2 zeigt das Ausführungsbeispiel der Takt-Gleitschalung 1 nach Fig. 1 in drei vertikalen Bereichen. Gleiche Bezugszeichen entsprechen dabei den gleichen Einrichtungen. Der horizontale Abstand zwischen den einzelnen Querankern 11 bzw. den Vertikalstützen 25 kann etwa 60 cm betragen. Der Abstand zwischen benachbar ten Jochen kann auf etwa 2,5 m eingestellt werden.The top view according to FIG. 2 shows the exemplary embodiment of the cycle sliding formwork 1 according to FIG. 1 in three vertical areas. The same reference numerals correspond to the same devices. The horizontal distance between the individual cross anchors 11 or the vertical supports 25 can be approximately 60 cm. The distance between adjacent yokes can be set to approximately 2.5 m.
Üblicherweise werden die gegenüber liegenden Vertikal stützen 25, die z.B. als Vierkantrohre ausgebildet sind, jeweils über einen Queranker 11 in der Betonwand verankert. Für diese Verankerung sind Mauerstärken z.B. aus Kunst stoff vorgesehen, durch die ein entsprechendes Spann- bzw. Abstandseisen hindurchgeführt ist, das beidseitig mit den Vertikalstützen verschraubt oder anderweitig befestigt wird.The opposite vertical supports 25 , which are designed, for example, as square tubes, are usually anchored in the concrete wall via a transverse anchor 11 . For this anchoring, wall thicknesses, for example made of plastic, are provided, through which a corresponding tensioning or spacing iron is passed, which is screwed to the vertical supports on either side or otherwise fastened.
Da ein formschlüssiger Ineinandergriff der vertikal über einander angeordneten Vertikalstützen 25 möglich ist, kann es ausreichen, daß in vertikaler Richtung nur jede zweite etwa 1 m lange Vertikalstütze mit der Betonwand 10 veran kert wird.Since a positive interlocking of the vertically arranged vertical supports 25 is possible, it may be sufficient that only every second approximately 1 m long vertical support is anchored with the concrete wall 10 in the vertical direction.
In horizontaler Richtung kann die Betonwand 10 entsprechend den jeweiligen Erfordernissen eingeschalt werden, wobei dies vorzugsweise um das gesamte, beispielsweise turmarti ge Bauwerk herum erfolgt. Die Arbeitsplattformen der Hänge bühnen 4 sind etwas von der Betonwand 10 beabstandet und reichen in vertikaler Richtung unter die untersten Schal tafeln 21 herunter. Hierdurch ist der leichte Zugang zu den untersten Schalttafeln und deren Demontage sicherge stellt.In the horizontal direction, the concrete wall 10 can be switched on according to the respective requirements, this preferably being done around the entire, for example tower-like structure. The work platforms of the slopes stage 4 are slightly spaced from the concrete wall 10 and extend in the vertical direction under the bottom scarf panels 21 down. This ensures easy access to the lowest switchboards and their disassembly.
Die Erfindung ermöglicht mit dieser Konzeption eine mini male Gerüstkonzeption bei verbesserten Schalungsmöglich keiten mit der temporär stationär gehaltenen Kletterscha lung.With this concept, the invention enables a mini Male scaffolding design with improved formwork options with the temporarily stationary climbing scha lung.
Claims (13)
daß zunächst über eine bestimmte Höhenerstreckung im wesentlichen in vertikaler und ggf. in horizontaler Richtung mehrere aneinander angrenzende Schalungsfel der vorgesehen werden,
daß die Schalungsfelder temporär stationär gehalten werden und
zum Höherziehen der Bauwerkswand das oder die unteren Schalungsfelder nach oben umgesetzt werden.1. A method for the production of building walls made of concrete or the like, in which a sliding scaffold slides with climbing the building wall over climbing poles and a formwork for the building wall is brought, characterized in that
that initially a plurality of formwork panels adjacent to one another are provided over a certain vertical extent essentially in the vertical and possibly in the horizontal direction,
that the formwork fields are temporarily stationary and
to raise the wall of the building, the lower formwork field or fields are implemented upwards.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE3703487A DE3703487A1 (en) | 1987-02-05 | 1987-02-05 | Concrete wall erection method - transfers bottom shuttering panels to top as wall is raised |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE3703487A DE3703487A1 (en) | 1987-02-05 | 1987-02-05 | Concrete wall erection method - transfers bottom shuttering panels to top as wall is raised |
EP88111337A EP0350525B1 (en) | 1988-07-14 | 1988-07-14 | Method for producing building-walls and a shuttering system |
Publications (1)
Publication Number | Publication Date |
---|---|
DE3703487A1 true DE3703487A1 (en) | 1988-08-18 |
Family
ID=8199118
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE3703487A Withdrawn DE3703487A1 (en) | 1987-02-05 | 1987-02-05 | Concrete wall erection method - transfers bottom shuttering panels to top as wall is raised |
DE8888111337T Expired - Fee Related DE3867233D1 (en) | 1988-07-14 | 1988-07-14 | METHOD FOR PRODUCING CONSTRUCTION WALLS AND SHUTTERING SYSTEM. |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE8888111337T Expired - Fee Related DE3867233D1 (en) | 1988-07-14 | 1988-07-14 | METHOD FOR PRODUCING CONSTRUCTION WALLS AND SHUTTERING SYSTEM. |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP0350525B1 (en) |
AT (1) | ATE70879T1 (en) |
DE (2) | DE3703487A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108286332A (en) * | 2018-03-12 | 2018-07-17 | 上海建工建集团有限公司 | A kind of concrete of crossing soars aloft beam from climbing monoblock type bylinder system and construction method |
CN110905191A (en) * | 2019-12-27 | 2020-03-24 | 荆门市佰思机械科技有限公司 | Automatic climbing system of climbing formwork device |
CN110939266A (en) * | 2019-12-15 | 2020-03-31 | 荆门市佰思机械科技有限公司 | Climbing system of mold overturning device |
US11136769B2 (en) * | 2017-06-02 | 2021-10-05 | James Zitting | System and method for automating vertical slip forming in concrete construction |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT397404B (en) * | 1992-06-12 | 1994-04-25 | Rund Stahl Bau Gmbh & Co | DEVICE FOR BUILDING CONSTRUCTION WALLS |
EP2101015A3 (en) * | 2008-03-12 | 2014-06-11 | Rund-Stahl-Bau Gesellschaft M.B.H. | Method for manufacturing a wall of a construction structure |
CN108316647A (en) * | 2018-02-11 | 2018-07-24 | 中铁十二局集团有限公司 | Multifunction scaffold and its application method for subway side wall |
DE102019204713A1 (en) * | 2019-04-03 | 2020-10-08 | Hünnebeck GmbH | Formwork system for the production of concrete walls |
CN113530217B (en) * | 2021-05-27 | 2022-09-16 | 中国水利水电第五工程局有限公司 | Slip form platform for beam slab concrete structure construction |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE557473C (en) * | 1931-02-12 | 1932-08-24 | Hochtief Akt Ges Fuer Hoch Und | Method of manufacturing reinforced concrete chimneys with rigid iron inserts |
FR1411731A (en) * | 1964-06-23 | 1965-09-24 | Equipment for building concrete walls, particularly high-rise | |
DE1943365A1 (en) * | 1969-08-26 | 1971-03-11 | Siemens Bauunion Gmbh | Formwork for creating structures made of concrete |
FR2339037A1 (en) * | 1976-01-23 | 1977-08-19 | Proco Projets Procedes Const | Climbing concrete formwork guide system - uses auxiliary guides on supports on structure already hardened and main guides supported by struts and braces |
SE397378B (en) * | 1976-02-20 | 1977-10-31 | Ahlgren Nils H | PROCEDURE FOR CASTING CONCRETE CONSTRUCTIONS |
FR2535768B1 (en) * | 1982-11-09 | 1985-10-04 | Gen Ind Entreprise | CLIMBING FORMWORK SYSTEM WITH VARIABLE GEOMETRY FOR THE EXECUTION OF CONCRETE SAILS |
AT396277B (en) * | 1983-10-14 | 1993-07-26 | Rund Stahl Bau Gmbh & Co | METHOD FOR ESTABLISHING CONSTRUCTION BODIES IN PARTICULAR CONSTRUCTION OF CASTABLE MATERIALS, AND DEVICE SYSTEM FOR IMPLEMENTING THE METHOD |
-
1987
- 1987-02-05 DE DE3703487A patent/DE3703487A1/en not_active Withdrawn
-
1988
- 1988-07-14 AT AT88111337T patent/ATE70879T1/en active
- 1988-07-14 EP EP88111337A patent/EP0350525B1/en not_active Expired - Lifetime
- 1988-07-14 DE DE8888111337T patent/DE3867233D1/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11136769B2 (en) * | 2017-06-02 | 2021-10-05 | James Zitting | System and method for automating vertical slip forming in concrete construction |
CN108286332A (en) * | 2018-03-12 | 2018-07-17 | 上海建工建集团有限公司 | A kind of concrete of crossing soars aloft beam from climbing monoblock type bylinder system and construction method |
CN110939266A (en) * | 2019-12-15 | 2020-03-31 | 荆门市佰思机械科技有限公司 | Climbing system of mold overturning device |
CN110905191A (en) * | 2019-12-27 | 2020-03-24 | 荆门市佰思机械科技有限公司 | Automatic climbing system of climbing formwork device |
Also Published As
Publication number | Publication date |
---|---|
EP0350525B1 (en) | 1991-12-27 |
EP0350525A1 (en) | 1990-01-17 |
ATE70879T1 (en) | 1992-01-15 |
DE3867233D1 (en) | 1992-02-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2756255A1 (en) | METHOD OF MANUFACTURING REINFORCED CONCRETE BRIDGES AND REINFORCED CONCRETE BRIDGES | |
DE2166992A1 (en) | STEEL BEAM CEILING CONSTRUCTION | |
DE3703487A1 (en) | Concrete wall erection method - transfers bottom shuttering panels to top as wall is raised | |
DE902188C (en) | Sliding circuit for concrete structures | |
DE3036539C2 (en) | Device for the production of wall elements for the full assembly of houses | |
AT410343B (en) | METHOD FOR PRODUCING A TOWER-LIKE CONSTRUCTION | |
DE2759088A1 (en) | CLIMBING FORMWORK FOR CREATING A STRAIGHT OR CURVED REINFORCED CONCRETE WALL | |
DE10007450A1 (en) | Mounting bracket system and method for fastening a prefabricated component to a building part using the mounting bracket system | |
DE2213924A1 (en) | Method and device for the production of multi-storey buildings with a reinforced concrete skeleton | |
AT412359B (en) | FORMWORK | |
DE2752303A1 (en) | DOUBLE-SIDED SHAPING WALL | |
DE4318012C2 (en) | Device for erecting building walls | |
EP0480295B1 (en) | Set for the construction of private or holiday homes | |
EP0515724A1 (en) | Method and prefabricated module for the fabrication of structures and buildings | |
DE4239057C2 (en) | Process and prefabricated module for the production of structures and buildings | |
EP0123193B1 (en) | Method for the erection of large diameter rotationally symmetric concrete constructions, and shuttering for carrying out the method | |
EP0104262A1 (en) | Composite self-supporting slab - product - method - device - application | |
DE2636168A1 (en) | Frame integrated prefabricated component assembly building - has lost template frame for wall, ceiling and concrete type mass insertion | |
DE1434466A1 (en) | Method for erecting tall concrete structures, e.g. of high-rise residential buildings | |
DE2035372A1 (en) | Method and form for forming a shell of construction or structural parts made of concrete or reinforced concrete | |
EP0099090A2 (en) | Method of erecting a concrete cover shaped as a dome, cone or pyramid for high and low rise structures | |
DE1266948B (en) | Climbing formwork for concreting tower-like structures | |
DE9105949U1 (en) | Prefabricated module for the production of structures and buildings | |
DE3445155A1 (en) | Process for producing a flight of stairs | |
DE2451134A1 (en) | High rise concrete skeleton building sliding formwork erection - with verticals to storey height, and ceiling formwork retained until load bearing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8130 | Withdrawal |