Process for the production of structures from a post work with walling

Info

Publication number
DE350448C
DE350448C DE1919350448D DE350448DD DE350448C DE 350448 C DE350448 C DE 350448C DE 1919350448 D DE1919350448 D DE 1919350448D DE 350448D D DE350448D D DE 350448DD DE 350448 C DE350448 C DE 350448C
Authority
DE
Germany
Prior art keywords
walling
post
structures
posts
production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE1919350448D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of DE350448C publication Critical patent/DE350448C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

Verfahren zur Herstellung von Bauten aus einem Pfostenwerk mit Ummauerung. Die Erfindung betrifft ein Verfahren zur Herstellung von Bauten aus einem Pfostenwerk mit Ummauerung, bei denen das Mauerwerk in erheblichem Maße mittragend ist und das Holzgerüst im wesentlichen nur das Gerippe für die Bildungder Umfassungsmauerunghergibt. Die Eigenart einer gemischten Bauweise aus Holz und Stein nach der Erfindung liegt darin, daß zunächst hölzerne Pfosten von quadratischem Ouerschnitt in gleichen Abständen Voneinander aufgestellt und im Fußboden und Deckenhöhe durch sich lireuzende, dicht übereinanderliegende Zangenpaare in beiden Richtungen miteinander verbunden werden; hierauf werden die Umfassungswände durch Hochführen von je zwei die Pfosten einschließenden Wandschalen aus lauter gleichen Mauersteinen mit Durchbindern hergestellt, und es wird hierbei dafür gesorgt, daß in den senkrecht aufeinanderfolgenden Mauersteinschichten einzelne Durchbinder abwechselnd auf der' einen und auf der anderen Querseite der Pfosten dicht an diese gelegt werden.Process for the production of structures from a post work with walling. The invention relates to a method for producing buildings from a post structure with walling, in which the masonry is to a considerable extent load-bearing and that Wooden framework essentially only provides the framework for the formation of the surrounding walling. The peculiarity of a mixed construction of wood and stone according to the invention lies in that initially wooden posts with a square cross-section at equal intervals From each other set up and in the floor and ceiling height by itself licking, tightly stacked pairs of pincers in both directions with each other get connected; the enclosing walls are then raised by two each the wall shells enclosing the posts are made of nothing but identical bricks with tie-throughs produced, and it is hereby ensured that in the perpendicularly successive Layers of masonry stone alternately on one and on the other the other transverse side of the post must be placed close to it.

Mittels dieser Bauweise ist es möglich, durch schnellen Aufbau eines einfachen und doch in sich sehr f esten Holzgerüstes und durch das Ummauern mit gewöhnlichen 4Zauersteinen ohne Hilfe von Zimmermannsarbeit billige und doch genügend tragfähige Bauwerke zu schaffen, bei denen die Hölzer, soweit sie ummauert werden, doch hinreichend von Luft umspült und dadurch gegen Stocken geschützt werden. Da weiterhin bei einem nach dieser Bauweise hergestellten Bauwerk das Mauerwerk der Umfassungsmauern mitträgt, so kann das Holzgerüst aus verhältnismäßig schwachen Hölzern aufgebaut werden und erfordert trotz der doppelten Zangen wenig Holz. Die zweiseitige doppelte Fassung der Pfosten ergibt aber gleichwohl bei einfachster Verbindung durch Nageln oder Verschrauben ein durchaus steifes Raumgebilde.With this construction it is possible to quickly build a simple and yet very solid wooden scaffolding and by walling with it Ordinary 4 brick without the help of carpentry cheap and yet sufficient to create stable structures in which the timbers, as far as they are walled, but are sufficiently surrounded by air and thus protected against stagnation. There continue to be the masonry of a structure manufactured according to this construction method If the surrounding walls are supported, the wooden framework can be relatively weak Can be built in wood and requires little wood despite the double tongs. the two-sided double version of the post results nevertheless with the simplest Connection by nailing or screwing is a very rigid spatial structure.

Auf der Zeichnung ist die neue Bauweise in einem Beispiel veranschaulicht, und zwar gibt die Abb. Z eine Ansicht auf den Teil eines Bauwerkes während der Aufmauerung der Umfassungsmauern wieder; die Abb. 2 ist eine Ansicht auf die Abb. z in Richtung des Pfeiles 2, jedoch vor Ummauerung des Holzgerüstes, und die Abb.3 ein Grundriß nach III-III der Abb. r, die Abb.4 zeigt eine Ecke des Bauwerkes während der Ummauerung des Gerüstes im Schaubild.The drawing shows the new construction in an example, namely the Fig. Z gives a view of the part of a building during the masonry the enclosing walls again; Fig. 2 is a view of Fig. z in the direction of the arrow 2, but before the walling of the wooden scaffolding, and Fig. 3 is a plan according to III-III of Fig. r, Fig. 4 shows a corner of the building during the walling of the framework in the diagram.

Bei dem Aufbau eines Bauwerkes -nach der Erfindung geht man derart vor, daß man auf einem Sockel von beliebigem Stoff in gleichen Abständen voneinander senkrechte, quadratische Pfosten a von der Höhe des herzustellenden Bauwerkes aufstellt und alsdann diese Pfosten in Fußboden- und Deckenhöhe durch dicht übereinanderliegende, sich kreuzende Zang<@npaare b von rechteckigem Querschnitt verbindet. Die Zangen b werden an die Pfosten a entweder angenagelt oder angeschraubt. Die Pfosten a tragen gleichzeitig das in üblicher Weise ausgebildete Dachgerüst.In the construction of a building - according to the invention one proceeds in such a way that one sets up vertical, square posts a from the height of the building to be produced at equal distances from one another on a base of any material and then these posts at floor and ceiling height by lying one above the other , intersecting Zang <@npaare b connects with a rectangular cross-section. The pliers b are either nailed or screwed to the post a. At the same time, the posts a carry the roof structure, which is designed in the usual way.

Nachdem das Holzgerüst entsprechend der Abb. 2 aufgestellt ist, werden die Umfassungsmauern aus Ziegelsteinen oder aus Platten aus anderem Stoff errichtet, wie dies am besten die Abb, q. erkennen läßt. Zwischen je zwei aneinanderstoßenden Ziegelsteinen c werden Durchbinder e angeordnet, und der Abstand der Pfosten a voneinander ist so gewählt, daß in den senkrecht aufeinanderfolgenden Mauersteinschichten die Durchbinder abwechselnd auf der einen und der arideren Querseite der Pfosten dicht anliegen, wie dies beispielsweise bei den Durchbindern e1, e2 in der Abb. q. erkennbar ist.After the wooden scaffolding has been set up as shown in Fig. 2 the enclosing walls are made of bricks or slabs of other material, as best the fig, q. reveals. Between every two adjoining Bricks c are arranged by girders e, and the distance between the posts a from each other is chosen so that in the vertically successive brick layers the Alternating tie-throughs on one and the other transverse side of the posts are tight abut, as is the case with the tie-throughs e1, e2 in Fig. q. recognizable is.

Nachdem die Umfassungsmauern hochgeführt sind oder auch während der Aufmauerung können die in üblicher Weise ausgebildeten Fußböden auf die Zangen b verlegt werden.After the enclosing walls are raised or during the Masonry can be trained in the usual way floors on the pliers b be relocated.

Die innerhalb des Bauwerkes gewünschten nichttragenden Zwischenwände werden zwischen den in Richtung der Zwischenwand liegenden Pfosten a in beliebiger Weise und aus beliebigem Stoff ausgeführt und können beispielsweise derart hergestellt werden, daß Ziegel flach aufeinander aufgemauert werden, wodurch halbsteinstarke Wände entstehen.The non-load-bearing partition walls desired within the structure are between the post a lying in the direction of the partition wall in any Way and made of any material and can for example be made in this way be that bricks are built flat on top of each other, making half-stone strong Walls are created.

Claims (1)

PATENT-ANSPRUCI3: Verfahren zur Herstellung von Bauten aus einem Pfostenwerk mit Ummauerung, dadurch gekennzeichnet, daß hölzerne Pfosten von quadratischem Querschnitt in gleichen Abständen voneinander aufgestellt und in Fußboden- und Deckenhöhe durch sich kreuzende, dicht übereinanderliegende Zangenpaare in beiden Richtungen miteinander verbunden werden, worauf die Umfassungswände durch Hochführen von je zwei die Pfosten einschließenden Wandschalen aus lauter gleichen Mauersteinen mit Durchbindern hergestellt und dabei in den aufeinanderfolgenden Schichten einzelne Durchbinder abwechselnd auf der einen und auf der anderen Querseite der Pfosten dicht an diese gelegt werden.PATENT-ANSPRUCI3: Process for the production of structures from a post work with walling, characterized in that wooden posts of square cross-section set up at equal distances from each other and at floor and ceiling height crossing, tightly stacked pairs of pliers in both directions with each other are connected, whereupon the enclosing walls by bringing up two of the posts enclosing wall shells made of nothing but identical bricks with tie-throughs and alternating individual throughbinders in the successive layers on one and the other transverse side of the post are placed close to them.
DE1919350448D 1919-09-30 1919-09-30 Process for the production of structures from a post work with walling Expired DE350448C (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE350448T 1919-09-30

Publications (1)

Publication Number Publication Date
DE350448C true DE350448C (en) 1922-03-21

Family

ID=6262110

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1919350448D Expired DE350448C (en) 1919-09-30 1919-09-30 Process for the production of structures from a post work with walling

Country Status (1)

Country Link
DE (1) DE350448C (en)

Similar Documents

Publication Publication Date Title
DE3003446A1 (en) Prefabricated concrete load bearing wall or ceiling construction - involves casting concrete in row of hollow boxes with linked cavities
DE350448C (en) Process for the production of structures from a post work with walling
DE905060C (en) Process for erecting buildings made of straw clay and the like like
WO2016058573A1 (en) Producing supporting structures from a plurality of individual, easy-to-handle, compatible and modular supporting structure elements, for wooden buildings that are prefabricated in the dry and self-assembly mode of construction
DE812368C (en) Buildings (house, factory, etc.) made of prefabricated composite concrete panels
DE2310312A1 (en) BUILDING MANUFACTURED USING PREFABRICATED LARGE-FORMAT COMPONENTS
DE834446C (en) Process for the production of walls from prefabricated components
EP0186109A2 (en) Building element for the construction of buildings as well as an abutment element and method of building pillars and walls with such building elements
DE817503C (en) Process for the production of reinforced concrete components such as ceilings, roofs, beams and the like. Like., in structures and building bodies to carry out the process
DE29722703U1 (en) Dry masonry with ledge connection
DE806392C (en) Truss construction with prefabricated panels
DE881869C (en) Process for the erection of walls made of straw clay and. like
DE3213953A1 (en) Wall bond system
DE3200209C1 (en) High building, in particular for dwelling houses, office buildings or the like of the cross-wall construction type
DE721195C (en) Structure that can be dismantled
DE804957C (en) Permanent formwork for walls
DE601651C (en) Load-bearing wall made of a weatherproof outer shell, an insulating inner shell and a concrete filling
DE2801601A1 (en) Universal interlocking demountable wall building blocks - are plugged together, pref. with alternating large and small serrated corner blocks
DE3704444A1 (en) METHOD FOR RAISING WALLS AND KIT FOR CARRYING OUT THE METHOD
AT166104B (en)
AT332062B (en) TRANSPORTABLE BUILDING
DE804246C (en) Process for the creation of exterior walls of buildings
DE811284C (en) Hollow block skeleton construction
AT222307B (en) Procedure for erecting structures in bulk construction and formwork for this
DE20003130U1 (en) Solid wood climate wall