DE3248717A1 - Method and device for lowering a star-shaped anchorage for floating structures in deep water - Google Patents

Method and device for lowering a star-shaped anchorage for floating structures in deep water

Info

Publication number
DE3248717A1
DE3248717A1 DE19823248717 DE3248717A DE3248717A1 DE 3248717 A1 DE3248717 A1 DE 3248717A1 DE 19823248717 DE19823248717 DE 19823248717 DE 3248717 A DE3248717 A DE 3248717A DE 3248717 A1 DE3248717 A1 DE 3248717A1
Authority
DE
Germany
Prior art keywords
strands
sinker
marked
barge
coupling point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19823248717
Other languages
German (de)
Inventor
Horst 2000 Hamburg Poppe
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Blohm and Voss GmbH
Original Assignee
Blohm and Voss GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Blohm and Voss GmbH filed Critical Blohm and Voss GmbH
Priority to DE19823248717 priority Critical patent/DE3248717A1/en
Publication of DE3248717A1 publication Critical patent/DE3248717A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/22Handling or lashing of anchors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/24Anchors
    • B63B21/26Anchors securing to bed
    • B63B2021/262Anchors securing to bed by drag embedment

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

In a method of lowering a heavy star-shaped anchorage for a floating structure in deep water, provision is made for the anchors to first of all be put down on the sea bed with sectional anchor lines in lengths of 1.1 to 1.5 times the water depth and for them to be marked by buoys, then for two opposite anchors to each be drawn simultaneously into the sea bed and for the coupling point for the structure to be marked, then for sinker lines to be fastened to the sectional anchor lines and to be paid out and for the inner ends of the sinker lines to be marked by buoys around the coupling point, and finally for the structure to be floated into position at the coupling point and to be connected to the sinker lines. <IMAGE>

Description

Verfahren und Vorrichtung zum Ausbringen einer sternförmigenMethod and device for applying a star-shaped

Verankerung für schwimmende Bauwerke in tiefem Wasser Die Erfindung betrifft ein Verfahren und eine Vorrichtung zum Ausbringen einer sternförmigen Verankerung für ein schwimmen des Bauwerk in tiefem Wasser ab 150 m bis etwa 500 m. Dabei handelt es sich um Bauwerke, die nicht mit Winden ausgerüstet sind, da solche Winden für Verankerungszwecke aufwendig sind und bei dem normalen, vi eljährigem Arbeitsbetrieb des Bauwerkes praktisch selten benötigt werden. Der Erfindung liegt daher die Aufgabe zugrunde, die Verankerung ohne Winden an Bord des Bauwerkes durchzuführen. Die Lösung dieser Aufgabe mit Hilfsfahrzeugen ist Gegenstand der Erfindung, und zwar unter Anwendung nachfolgender Lösungsprinzipien: 1. Da keine Winden zum Aufbringen der Rückstellkraft gegen den durch Wellen, Wind und Strömung verursachten einseitigen Versatz des Bauwerkes vorhanden sind, muß diese Kraft durch das Gewicht der Ankerstränge aufgebracht werden. Mit zunehmendem Versatz hebt der Strang mehr und mehr ab. Das freihängende Strangende wird länger und somit schwerer. Die entsprechende Rückstellkraft entsteht auf diese Weise. Bei großen Bauwerken und großen Wassertiefen führt dieses Prinzip zu besonders schweren Ankersträagen.Anchoring for floating structures in deep water The invention relates to a method and a device for applying a star-shaped anchorage for swimming the structure in deep water from 150 m to about 500 m These are structures that are not equipped with winches, as such winches are used for Anchoring purposes are expensive and in the normal, four-year operation of the building are seldom needed in practice. The invention is therefore the object based on anchoring without winches on board the structure. The solution this task with auxiliary vehicles is the subject of the invention, namely below Application of the following solution principles: 1. Since there are no winches to apply the Restoring force against the one-sided caused by waves, wind and currents If the structure is offset, this force must be due to the weight of the anchor strands be applied. As the offset increases, the strand lifts off more and more. That free-hanging strand ends become longer and therefore heavier. The corresponding restoring force arises in this way. This leads to large structures and great water depths Principle for particularly heavy anchor beams.

2. Sollten als Festpunkt am-Grund Anker eingesetzt werden, sind diese in den Grund einzuziehen. Nur so ist garantiert, daß die erforderliche Haltekraft der Anker tatsächlich erreicht wird. Die vorgenannten Prinzipien führen zu neuen Lösungswegen beim Ausbringen der Verankerung, wie in den Ansprüchen beschrieben. Die Erfindung wird nachstehend anhand von zeichnerisch dargestellten Beispielen näher erläutert.2. Should anchors be used as a fixed point on the ground, these are to move into the ground. This is the only way to guarantee that the required holding force the anchor is actually reached. The above principles lead to new ones Possible solutions when deploying the anchorage, as described in the claims. The invention is illustrated below with the aid of graphically illustrated examples explained in more detail.

Es zeigen: Fig. 1 eine Barge als das wesentlichste Hilfsfahrzeug zum Ausbringen der Verankerung gemäß der Erfindung im Aufriß, Fig.2-4 das Ausbringen der Anker und der Teilankerstränge und deren Markierung durch Bojen gemäß der Erfindung, Fig. 5-10 dasAusbringender Ankerstränge und das Einschwimmen des Bauwerkes gemäß der Erfindung, Fig.llu.12 das Einziehen der Ankerstränge in das Bauwerk gemäß der Erfindung und Fig. 13-16 das Austauschen eines bereits ausgebrachten Ankerstranges gegen einen anderen.They show: Fig. 1 a barge as the most essential auxiliary vehicle for Deployment of the anchorage according to the invention in elevation, Fig.2-4 deployment the anchor and the part anchor strands and their marking by buoys according to the invention, Fig. 5-10 the application of the anchor strands and the floating of the structure according to of the invention, Fig.llu.12 pulling the anchor strands into the structure according to the Invention and FIGS. 13-16 the replacement of an anchor strand that has already been deployed against another.

Bei Wassertiefen von 150 m bis 550 m ist eine große Barge 2 von ca. 35 x 120 m nötig. Die Barge 2 muß mit zwei kräftigen Winden 10 ausgestattet sein. An den beiden Schmalseiten der Barge 2 ist jeweils eine große Umlenkrolle 11 vorhanden.At water depths of 150 m to 550 m, a large barge 2 of approx. 35 x 120 m necessary. The barge 2 must be equipped with two powerful winches 10. On the two narrow sides the barge 2 is each a large pulley 11 available.

Hilfswinden 10' sind in ausreichender Menge angeordnet(s.Fig.l) Das Auslegen und Einziehen der Anker 4 ist in Fig. 2-4 dargestellt. Die Anker 4 werden einzeln an einem Bojenseil 7' über die Heckrolle eines Ankerzielschiffes 3 auf den Grund 6 abgelegt. Teilankerstränge 5 werden gleichzeitig von der Barge 2 aus mit zum Grund 6 abgelassen.Auxiliary winches 10 'are arranged in sufficient quantity (see Fig. 1) Laying out and pulling in the anchor 4 is shown in Fig. 2-4. The anchors 4 will be individually on a buoy rope 7 'over the stern roller of an anchor target ship 3 on the Reason 6 filed. Partial anchor strands 5 are simultaneously from the barge 2 with drained to reason 6.

Nachdem alle Anker mit den Teilsträngen 5, die in der Länge der 1,1- bis 1,5-fachen Wassertiefe entsprechen, sternförmig auf genaue Position abgelegt sind, wird die Barge 2 zwischen zwei sich gegenüberliegende Anker 4 eingeschwommen. Von den beiden Winden 10 der Barge 2 werden Seile 13 an die jeweiligen Teilstränge 5 gekuppelt. Die Winden 15 ziehen nun die beiden Anker 4 mit der erforderlichen Kraft (gewünschte max.After all anchors with the sub-strands 5, which are in the length of the 1,1- up to 1.5 times the water depth, stored in a star shape at the exact position are, the barge 2 is floated between two opposing anchors 4. From the two winches 10 of the barge 2 ropes 13 are attached to the respective partial strands 5 coupled. The winches 15 now pull the two anchors 4 with the required Force (desired max.

Haltekraft der Anker) in den Grund 6. Nachdem die Anker 4 in den Grund 6 eingegriffen haben, werden die Teilstränge 5 auf den Grund 6 abgelegt. Ihre Enden werden durch Bojen 7 für das spätere Aufnehmen beim Ausbringen der Gesamtstränge 5 markiert. Dieser Vorgang wiederholt sich bei allen sternförmig ausgelegten Ankern. Zum Ausbringen der schweren Gesamtankerstränge 12 wird die Barge 2 mit den in einzelnen Längen unterteilten Strängen 12 beladen (Fig. 1) Das Ausbringen der Stränge 12 geschieht wie folgt: Die Barge 2 wird vor Ort geschleppt.Holding force of the anchor) in the ground 6. After the anchor 4 in the ground 6 have intervened, the partial strands 5 are deposited on the ground 6. Your ends are secured by buoys 7 for later picking up when deploying the entire strands 5 marked. This process is repeated for all star-shaped anchors. To deploy the heavy overall anchor strands 12, the barge 2 with the individual Load lengths of subdivided strands 12 (FIG. 1) The strands 12 are discharged as follows: The barge 2 is towed on site.

Das Ende eines Hilfsstranges 8 wird an das Ende eines Teilstrangs 5 der vom Grund 6 über das Bojenseil 7' aufgenommen wird, gekoppelt. Die Barge 2 wird bei gleichzeitigem Auslegen des Hilfsstranges 8 über die Bargenwinde 10 zum gegenüberliegenden Teilstrang 5 verschleppt (bei sehr tiefem Wasser bzw. sehr schweren Strängen kann es nötig sein, das Gewicht des Hilfsstranges 8 durch Auftriebskörper 9 zu reduzieren). Dieser Teilstrang 5 wird mit dem Gesamtankerstrang 12 der auf Deck der Barge 2 ausgelegt ist, verbunden.The end of an auxiliary strand 8 is attached to the end of a partial strand 5, which is picked up from the bottom 6 via the buoy rope 7 ', coupled. The barge 2 becomes when laying out at the same time of the auxiliary line 8 via the barge winch 10 dragged to the opposite branch line 5 (in very deep water resp. very heavy strands, it may be necessary to carry the weight of the auxiliary strand 8 through To reduce buoyancy 9). This partial strand 5 is with the entire anchor strand 12, which is laid out on the deck of the barge 2, connected.

Nun zieht sich die Barge 2 am Hilfsstrang 8 bei gleichmäßigem Auslegen des Gesamtstranges 12 zurück. Hierbei wird der Gesamtstrang 12 in die korrekte Richtung ausgelegt. Der erstgenannte Teilstrang 5 wird mit dem nun auszulegenden zweiten Gesamtstrang 12 verbunden und unter Verwendung eines Hilfsstranges 8, der an den bereits ausgelegten Gesamtstrang 12 gekoppelt ist, ausgelegt. Nachdem beide Gesamtstränge 12 aus-, gelegt sind, werden die Enden durch Bojen 7 zur Aufnahme durch das Bauwerk 1 markiert. Das, Einziehen der Ankerstränge 12 ins Bauwerk 1 ist in Fig. 11 u. 12 dargestellt. Das Bauwerk wird in Position geschleppt. Von der bauwerkseitigen Strangbefestigung hängt ein Hilfsseil 8 herab. Von der bereits genannten Barge 2 wird ein Ankerstrang 12 am Bojenseil 7' aufgenommen und mit dem Hilfsseil 8 verbunden. Das andere Ende des Hilfsseils 8 wird auf die Winde i0 der Barge 2 gebracht.Now the barge 2 pulls itself on the auxiliary line 8 when laid out evenly of the entire strand 12 back. Here, the entire strand 12 is in the correct direction designed. The first-mentioned sub-strand 5 is combined with the second, which is now to be laid out Entire strand 12 connected and using an auxiliary strand 8, which is attached to the already laid out entire strand 12 is coupled, laid out. After both total strands 12 are laid out, the ends are supported by buoys 7 to be taken up by the structure 1 marked. The drawing in of the anchor strands 12 into the structure 1 is shown in FIGS. 11 and 12 shown. The structure is towed into position. From the string fastening on the building side an auxiliary rope 8 hangs down. An anchor line is used from the already mentioned barge 2 12 on the buoy rope 7 ′ and connected to the auxiliary rope 8. The other end of the auxiliary rope 8 is brought to the winch i0 of the barge 2.

Die Winde 10 zieht nun den Ankerstrang 12 in das Bauwerk 1 ein, wo er mit Hilfe von Stoppern 17 gehalten wird. Dieses Verfahren wird bei allen Ankerseilen, jeweils kreuzweise, angewendet. Auf diese Weise ist besonders den wechselnden Umweltbelastungen Rechnung getragen. Die Risiken, daß durch aufkommenden Sturm das Bauwerk beim Verankern außer Kontrolle gerät, sind gering, da die Ankerstränge unabhängig vom Bauwerk installiert werden. Das Einhängen der Strange ins Bauwerk vor Schleppen kann somit sehr einfach und schnell durchgeführt werden. Das Austauschen der Stränge 12 wird wie folgt durchgeführt (s.Fig. 13-16): Die Barge 2 wird unter das Bauwerk 1 geschleppt. Über einen Hilfsstrang 8 wird das auszuwechselnde Strangende in einer zum Vorgang nach Fig. 11 u. 12 umgekehrten Reihenfolge auf den Grund 6 abgesenkt. Die Barge 2 nimmt dann Länge um Länge des Stranges 12 auf und wird dabei in Richtung des Ankers 4 gezogen. Um diesen Vorgang kontrolliert vornehmen zu können, bleibt die Barge 2 durch ein Hilfsseil 8 mit dem Bauwerk 1 in Verbindung. Nachdem der auszuwechselnde Strang 12 auf der Barge 2 abgelegt wurde, ist das Ende des verbleibenden Teilstrangs 5 durch eine Boje 7 zu markieren. Das Einhängen des neuen Strangs geschieht in entgegengesetzter Reihenfolge. Bei allen vorgenannten Verfahren kann auf Taucher verzichtet werden.The winch 10 now pulls the anchor line 12 into the structure 1, where it is held with the aid of stoppers 17. This procedure is used for all anchor ropes, each applied crosswise. This way it is especially the changing environmental pressures Taken into account. The risks of that by upcoming storm that The structure gets out of control when anchored, because the anchor strands are independent be installed by the structure. The hanging of the strands in the structure before towing can thus be carried out very quickly and easily. Replacing the strands 12 is carried out as follows (see Fig. 13-16): The barge 2 is placed under the structure 1 towed. About an auxiliary line 8, the end of the line to be replaced is in a 11 and 12, the sequence is reversed and lowered onto the bottom 6. The barge 2 then takes on length by length of the strand 12 and is in the direction of the anchor 4 pulled. In order to be able to carry out this process in a controlled manner, remains the barge 2 is connected to the structure 1 by an auxiliary rope 8. After the to be replaced Line 12 was deposited on the barge 2, is the end of the remaining partial line 5 to be marked by a buoy 7. The hanging of the new strand happens in the opposite direction Series. In all of the above procedures, divers can be dispensed with.

Die Kosten werden somit gering gehalten.The costs are thus kept low.

Bezug@zeichenliste vom 29.12.1982 Bezugszahl: Bezeichnung 1 Bauwerk 2 Barge 3 Schlepper, Ankerziehschiff oder anderes Hilfsschiff Anker 4' eingezogener Anker 5 Teilankerstrang 6 Meeresboden 7 Boje 7' Bojenseil oder Bojenstander @8 Hilfsstrang 9 Auftriebskörper 10 Winde auf 2 10' Hilfswinde 11 Umlenkrolle Ankerstrang 12' in vorge -12 fertigter Länge Seil bzw. Kette 13' in vor -13 gefertigter Länge Sinkerstrang 14' in vorge -14 fertigter Länge Lagerplatz für 12 - 14 @@ 15 bzw. 12' - 14' 16 Kupplungspunkt für 1 17 Stopper für Ankerstränge auf dem Bauwerk 1 18 19 20 21 ¼ 22 23 24 25 -26 M Bezugsza@l. Bezeichnung: 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52Reference @ character list from 12/29/1982 Reference number: Designation 1 building 2 barge 3 tugs, anchor pulling ship or other auxiliary ship anchor 4 'retracted Anchor 5 Partial anchor rope 6 Seabed 7 Buoy 7 'Buoy rope or buoy stand @ 8 Auxiliary rope 9 float 10 winch on 2 10 'auxiliary winch 11 pulley anchor rope 12' in pre-12 finished length of rope or chain 13 'in pre-13 finished length of sinker strand 14 'in pre-14 finished length storage space for 12 - 14 @@ 15 or 12' - 14 '16 Coupling point for 1 17 stoppers for anchor lines on the structure 1 18 19 20 21 ¼ 22 23 24 25 -26 M reference number. Designation: 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52

Claims (2)

P a t e n t a n s p r ü c h e Verfahren zum Ausbringen einer schweren, sternförmigen Verankerung für ein schwimmendes Bauwerk in tiefem Wasser, dadurch gekennzeichnet, daß zunächst a) die Anker mit Teilankersträngen in Langen von 1,1 bis 1,5 der Wassertiefe auf den Meeresgrund abgelegt und durch Bojen markiert werden, dann b) jeweils zwei sich gegenüber liegende Anker gleichzeitig in den Grund eingezogen werden und der Kupplungspunkt für das Bauwerk markiert wird, anschließend c) Sinkerstränge an den.Teilankersträngen befestigt und ausgelegt und die inneren Enden der Sinkerstränge durch Bojen um den Kupplungspunkt herum markiert und schließlich d) das Bauwerk auf den Kupplungspunkt eingeschwommen und mit den Sinkersträngen verbunden wird. P a t e n t a n s p r ü c h e Method for spreading a heavy, star-shaped anchorage for a floating structure in deep water, thereby characterized that initially a) the anchors with part anchor strands in lengths of 1.1 up to 1.5 of the water depth are deposited on the sea bed and marked by buoys, then b) two opposing anchors pulled into the ground at the same time and the coupling point for the structure is marked, then c) Sinker strands attached and laid out on the part anchor strands and the inner ends of the sinker strands marked by buoys around the coupling point and finally d) the structure is floated to the coupling point and connected to the sinker lines. 2. Vorrichtung zur Durchführung des Verfahrens nach Anspruch 1, dadurch gekennzeichnet, daß für die einzelnen Arbeitsvorgänge eine fahr- und steuerbare Barge (2) von ca. 120 m Länge und 35 m Breite mit zwei starken Winden (10), Rollen (11) an jeder Schmalseite der Barge (2)und mehreren Hilfswinden (10') sowie Lagerplätzen (15) für Seile, Stränge, Ketten und Sinkerstränge und schließlich Hilfsschiffe und Schlepper (3) vorgesehen sind, deren Funktion aus der Beschreibung im einzelnen hervorgeht. 2. Apparatus for performing the method according to claim 1, characterized characterized in that a drivable and controllable one for the individual work processes Barge (2) approx. 120 m long and 35 m wide with two strong winches (10), rollers (11) on each narrow side of the barge (2) and several auxiliary winches (10 ') and storage spaces (15) for ropes, cords, chains and sinker cords and finally Auxiliary ships and tractor (3) are provided, their function from the description in detail emerges.
DE19823248717 1982-12-31 1982-12-31 Method and device for lowering a star-shaped anchorage for floating structures in deep water Withdrawn DE3248717A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19823248717 DE3248717A1 (en) 1982-12-31 1982-12-31 Method and device for lowering a star-shaped anchorage for floating structures in deep water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19823248717 DE3248717A1 (en) 1982-12-31 1982-12-31 Method and device for lowering a star-shaped anchorage for floating structures in deep water

Publications (1)

Publication Number Publication Date
DE3248717A1 true DE3248717A1 (en) 1984-07-05

Family

ID=6182213

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19823248717 Withdrawn DE3248717A1 (en) 1982-12-31 1982-12-31 Method and device for lowering a star-shaped anchorage for floating structures in deep water

Country Status (1)

Country Link
DE (1) DE3248717A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0438258A2 (en) * 1990-01-15 1991-07-24 Petroleo Brasileiro S.A. - Petrobras Method for the casting of anchors and mooring of platforms, and an anchor casting unit
WO1997008046A1 (en) * 1995-08-22 1997-03-06 A.P. Møller A ship and a method adapted to generate tensile stresses in a pull line extended between the ships and an object to which a pull is to be applied

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0438258A2 (en) * 1990-01-15 1991-07-24 Petroleo Brasileiro S.A. - Petrobras Method for the casting of anchors and mooring of platforms, and an anchor casting unit
EP0438258A3 (en) * 1990-01-15 1991-11-27 Petroleo Brasileiro S.A. Petrobras Method for the casting of anchors and mooring of platforms, and an anchor casting unit
EP0612655A2 (en) * 1990-01-15 1994-08-31 Petroleo Brasileiro S.A. - Petrobras Method for the casting of anchors and mooring of platforms, and an anchor casting unit
EP0612655A3 (en) * 1990-01-15 1994-11-09 Petroleo Brasileiro Sa Method for the casting of anchors and mooring of platforms, and an anchor casting unit.
WO1997008046A1 (en) * 1995-08-22 1997-03-06 A.P. Møller A ship and a method adapted to generate tensile stresses in a pull line extended between the ships and an object to which a pull is to be applied
US6044787A (en) * 1995-08-22 2000-04-04 A. P. Moller Ship and a method adapted to generate tensile stresses in a pull line extended between the ships and an object to which a pull is to be applied

Similar Documents

Publication Publication Date Title
DE2450173A1 (en) CHAIN STOPPER AND METHOD OF HANDLING A COMBINED ROPE AND CHAIN ANCHOR LINE
DE2336181C2 (en) SIMPLE BUOY ANCHOR
DE3150066A1 (en) STOPPING DEVICE ON A WATER VEHICLE FOR SECURING A BUOYLINE
DE2814852A1 (en) QUICK RELEASE ANCHORING SYSTEM FOR SHIPS AND THE LIKE
DE2747063C3 (en) Method and device for storing a pipeline laid on the seabed
DE3113225C2 (en) Method and laying cable for laying a pipeline on the seabed
DE2746486A1 (en) IMPROVEMENTS TO EQUIPMENT FOR CONNECTING TANKER SHIPS TO SEA BORING PILLARS OR THE LIKE.
DE2746658A1 (en) IMPROVEMENTS TO THE EQUIPMENT USED TO CONNECT THE TANKER SHIPS TO THE SEA BORING POWERS
DE2921890B1 (en) O Takeover facility
DE3043755A1 (en) PERMANENT ANCHORING OF FLOATING CONSTRUCTIONS
DE2656959A1 (en) ANCHORABLE SWIMMING PLATFORM
DE3430163A1 (en) LOCKING BETWEEN TWO TOW LINE GUIDE BOLTS
DE2911570A1 (en) CARRIER DEVICE FOR EQUIPMENT MOVED WHILE SUBMERGED
DE3248717A1 (en) Method and device for lowering a star-shaped anchorage for floating structures in deep water
DE2458694A1 (en) SINGLE POINT ANCHORING DEVICE AND METHOD FOR MAKING IT OPERATIONAL
DE2044499B2 (en) Arrangement for supporting a string of pipeline connected to an underwater wellhead and method for its construction
DE2644971C2 (en)
EP3802305B1 (en) Floating platform for fastening a floating wind turbine on a bed of a body of water
EP0046547B1 (en) Method and means for mooring a ship to a structure
DE2414857A1 (en) DEVICE FOR MOORING BOATS
EP0099938B1 (en) Under-water supporting construction and its installation in deep waters for self raising sea platforms
DE2517707C3 (en) Marker buoy arrangement
DE4214019A1 (en) Lifting boat out of water - uses inflatable bodies, which are fastened to hull
DE2250135A1 (en) METHOD AND EQUIPMENT FOR INSTALLING UPWARD PIPE TO A SUBMERGED LINE
DE2224095A1 (en) Method and apparatus for containing and recovering spilled oil

Legal Events

Date Code Title Description
8139 Disposal/non-payment of the annual fee