DE2709643A1 - Screw clamp connecting two formwork rails - has rail stems clamped between yoke shank and screw in other shank - Google Patents

Screw clamp connecting two formwork rails - has rail stems clamped between yoke shank and screw in other shank

Info

Publication number
DE2709643A1
DE2709643A1 DE19772709643 DE2709643A DE2709643A1 DE 2709643 A1 DE2709643 A1 DE 2709643A1 DE 19772709643 DE19772709643 DE 19772709643 DE 2709643 A DE2709643 A DE 2709643A DE 2709643 A1 DE2709643 A1 DE 2709643A1
Authority
DE
Germany
Prior art keywords
yoke
screw
clamping device
clamping
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19772709643
Other languages
German (de)
Inventor
Karl Rampf
Erwin Schmucker
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
RAMPF KG FORMEN GmbH AND Co
Original Assignee
RAMPF KG FORMEN GmbH AND Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by RAMPF KG FORMEN GmbH AND Co filed Critical RAMPF KG FORMEN GmbH AND Co
Priority to DE19772709643 priority Critical patent/DE2709643A1/en
Publication of DE2709643A1 publication Critical patent/DE2709643A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B7/00Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections
    • F16B7/04Clamping or clipping connections
    • F16B7/044Clamping or clipping connections for rods or tubes being in angled relationship
    • F16B7/048Clamping or clipping connections for rods or tubes being in angled relationship for rods or for tubes without using the innerside thereof
    • F16B7/0493Clamping or clipping connections for rods or tubes being in angled relationship for rods or for tubes without using the innerside thereof forming a crossed-over connection
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/04Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements
    • E04G17/042Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements being tensioned by threaded elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/26Connections between parts of the scaffold with separate coupling elements for use with specially-shaped scaffold members
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B2/00Friction-grip releasable fastenings
    • F16B2/02Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening
    • F16B2/06Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action
    • F16B2/065Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action using screw-thread elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2424Clamping connections other than bolting or riveting
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2439Adjustable connections, e.g. using elongated slots or threaded adjustment elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2448Connections between open section profiles

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The clamping device for connecting two intersecting T or I-sectioned steel profile rails, with cross-stems on a parallel surface, is esp. suitable for formwork used in prefabricated concrete component production. Use is made of a screw clamp, comprising a yoke (5) with guideway attachment (6) and one or more screws. The adjacent rail cross-stems protrude into the yoke, and are clamped between a yoke shank and the screw thread into the other yoke shank. The guiding attachment grips round the cross-stem of one of the rails. The yoke may incorporate a groove (9, 14) on each of two surfaces (8, 13) at right angles to each other, each groove accommodating one of the cross-stems.

Description

Klemmvorrichtung zur Verbindung zweier Profil- Clamping device for connecting two profile

stahlschienen Die Erfindung betrifft eine Klemmvorrichtung zur Verbindung zweier mit den Querstegen parallelflächig angeordneter, sich kreuzender T- oder I-Profilstahlschienen, insbesondere für Schalungen zur Herstellung von Betonfertigteilen. Ein häufiger und problematischer Anwendungsfall solcher Klemmvorrichtungen ist z.B. gegeben, wenn die einen Profilstahlschienen vertikal stehen und die anderen horizontal daran befestigt werden sollen, wobei eine stufenlose Verstellbarkeit sowohl in der Höhe als auch in Schienenlängsrichtung gefordert wird. steel rails The invention relates to a clamping device for connection two with the transverse webs arranged parallel to each other, intersecting T or I-profile steel rails, in particular for formwork for the production of precast concrete parts. A frequent and problematic application of such clamping devices is e.g. given if the one profile steel rails stand vertically and the other should be attached horizontally, with a stepless adjustability is required both in height and in the longitudinal direction of the rail.

Bekannte Klemmvorrichtungen für diesen Zweck verwenden sogenannte Halfeneisen. Das sind querschnittlich C-förmige Schienen, die an der einen Profilstahlschiene parallellaufend angeschweißt sind und deren offene Seite der anderen Profilstahlschiene zugekehrt ist. In den Halfeneisen sind je eine Gewindebohrung aufweisende Gleitsteine verschiebbar angeordnet. Die Klemmverbindung erfolgt mit Hilfe von Spannpratzen, die mit den Gleitsteinen verschraubt werden.Known clamping devices for this purpose use so-called Halfeneisen. These are cross-sectionally C-shaped rails that are attached to one profile steel rail are welded parallel running and their open side of the other profile steel rail is facing. In each of the halves there are sliding blocks with a threaded hole arranged displaceably. The clamp connection is made with the help of clamping claws, which are screwed to the sliding blocks.

Diese bekannten Klemmvorrichtungen sind jedoch verhältnismäßig teuer. Immerhin sind Halfeneisen von der Länge der Hälfte des verwendeten Profilstahlschienen-Materials sowie Gleitsteine und Spannpratzen erforderlich. Die Arbeit mit diesen Klemmvorrichtungen ist umständlich und zwar nicht nur hinsichtlich der Ersteinrichtung, welche das Anschweißen der Halfeneisen an den Profilstahlschiencn erforderlich macht. Auch das Nachstellen ist umständlich, weil die horizontalen Schienen zunächst mit Hilfe entsprechend vieler Hilfspersonen provisorisch befestigt werden müssen. Dann werden die Spannpratzen angelegt und festgeschraubt.However, these known clamping devices are relatively expensive. After all, half irons are half the length of the profile steel rail material used as well as sliding blocks and clamping claws required. Working with these clamps is cumbersome and not only with regard to the initial setup, which the Welding the Halfeneisen to the Profilstahlschiencn makes necessary. Even readjusting is cumbersome because the horizontal rails initially with the help correspondingly many auxiliary persons must be temporarily attached. Then will the clamping claws applied and screwed tight.

Sehr häufig gehen einzelne Spannpratzen und Gleitsteine verloren.Individual clamping claws and sliding blocks are very often lost.

Der Erfindung liegt die Aufgabe zugrunde, eine Klemmvorrichtung vorzuschlagen, mit der einfacher gearbeitet werden kann, die abgesehen von den verwendeten Schrauben keine verlierbaren Teile aufweist und die außerdem billiger ist.The invention is based on the object of proposing a clamping device, that is easier to work with than that of the The screws used have no parts that can be lost and they are also cheaper is.

Diese Aufgabe wird durch eine Klemmvorrichtung der einleitend näher bezeichneten Art erfindungsgemäß dadurch gelöst, daß eine Schraubzwinge vorgesehen ist, bestehend aus einem Joch mit Führungsansatz und wenigstens einer Klemmschraube, daß die einander benachbarten Querstege in das Joch hineinragen und zwischen einem Jochschenkel und der in den anderen Jochschenkeln eingeschraubten Klemmschraube eingespannt sind und daß der Führungsansatz den Quersteg einer der Profilstahlschienen umgreift.This task is made closer to the introductory part by means of a clamping device designated type solved according to the invention in that a screw clamp is provided consists of a yoke with a guide and at least one clamping screw, that the adjacent transverse webs protrude into the yoke and between one Yoke legs and the clamping screw screwed into the other yoke legs are clamped and that the guide approach the crosspiece of one of the profile steel rails encompasses.

Durch das zuletzt erwähnte Merkmal wird die Schraubzwinge an einer Profilstahlschiene verschiebbar und unverlierbar geführt, vorzugsweise an der vertikal stehenden Profilstahlschiene. Außer der in den Jochschenkel eingeschraubten Klemmschraube oder den Klemmschrauben sind somit keine verlierbaren Teile vorhanden.The last mentioned feature is the screw clamp on a Profile steel rail slidably and captively guided, preferably on the vertical standing profile steel rail. Except for the clamping screw screwed into the yoke leg or the clamping screws there are no parts that can be lost.

Es ist möglich - und dies ist als besonderer arbeitstechnischer Vorteil zu werten - durch leichtes Anziehen der Klemmschraube oder, wenn zwei Klemmschrauben vorgesehen sind, durch Festziehen einer der beiden Klemmschrauben die Schraubzwinge in der erforderlichen Höhe festzulegen und dann die zu befestigende horizontale Profilstahlschiene in die Joche der vorbefestigten Schraubzwingen einzulegen, wodurch wenigstens das Gewicht der Schienen schon getragen wird. Die Klemmschrauben können dann der Reihe nach vollends festgezogen werden, wobei die durch den Führungsansatz gegebene Führung der Schraubzwinge an der einen Profilstahlschiene ein Verdrehen der Schraubzwinge verhindert.It is possible - and this is a particular technical advantage to be assessed - by slightly tightening the clamping screw or, if two clamping screws are provided, the screw clamp by tightening one of the two clamping screws to be fixed at the required height and then the horizontal to be fastened Insert profile steel rail into the yokes of the pre-attached screw clamps, whereby at least the weight of the Splints is already worn. The clamping screws can then be fully tightened in sequence, using the guide approach given guidance of the screw clamp on one profile steel rail a twisting the screw clamp prevents.

Im Gegensatz dazu haben bekannte Spannpratzen die Tendenz, sich beim Festziehen der Klemmschraube zu verdrehen, so daß sie mit der anderen Hand gesichert werden müssen.In contrast, known clamping claws have the tendency to move when Tighten the clamp screw, twist it so that it is secured with the other hand Need to become.

Hinsichtlich einer zweckmäßigen Ausbildung der Schraubzwinge im einzelnen wird vorgeschlagen, daß das Joch an zwei zueinander senkrecht stehenden Flächen je eine Nut aufweist und jede Nut einen der benachbarten Querstege, d.h. also einen Quersteg jeder der beteiligten Profilstahlschienen, aufnimmt. Das Joch hat vorzugsweise die Außenkontur eines Quaders, jedoch kommt es darauf im einzelnen nicht an. Wenn zwei Klemmschrauben verwendet werden, ist jeder Nut eine zugeordnet und die Nuten können dann in der zu den beiden erwähnten Flächen parallelen Richtung einen Abstand haben. Die sich dadurch ergebende Nutentrennwand bestimmt dementsprechend den Abstand der Profilstahlschienen.With regard to an expedient design of the screw clamp in detail it is proposed that the yoke on two mutually perpendicular surfaces each has one groove and each groove has one of the adjacent crossbars, i.e. one Cross web of each of the profile steel rails involved. The yoke preferably has the outer contour of a cuboid, but it does not matter in detail. if If two clamping screws are used, one is assigned to each groove and the grooves can then have a distance in the direction parallel to the two surfaces mentioned to have. The resulting groove partition determines the distance accordingly the profile steel rails.

In Weiterbildung der Erfindung wird jedoch vorgeschlagen, die Nuten so auszuführen, daß die Profilstahlschienen mit ihren Querstegen unmittelbar flach aufeinanderliegen. Das bedeutet, daß die Nuten in der zu den Nutenwänden senkrechten Richtung ohne Abstand aneinanderstoßen, d.h. einen gemeinsamen Nutinnenraum bilden, und daß auf derjenigen Seite des Joches, die der dem Führungsansatz zugeordneten Profilstahlschiene zugewandt ist, eine einzige Klemmschraube vorgesehen ist. Die Nuten bilden damit insgesamt einen Ausschnitt von stufenweise unterschiedlicher Breite. Dasselbe gilt, wenn die Nuten einander teilweise durchdringen. Im Endergebnis wird mit diesem speziellen Vorschlag erreicht, daß die unmittelbar aneinanderliegenden Profilstahlschienen zusammengespannt werden, während der einleitend erläuterte Grundgedanke der Erfindung auch die Möglichkeit offen läßt, jede Profilstahlschiene mit einer eigenen Klemmschraube in den Jochkörper einzuklemmen.In a further development of the invention, however, it is proposed that the grooves to be carried out in such a way that the profile steel rails are immediately flat with their crosspieces lie on one another. This means that the grooves are perpendicular to the groove walls Direction abut each other without a gap, i.e. a common groove interior form, and that on that side of the yoke that is assigned to the guide approach Profile steel rail is facing, a single clamping screw is provided. the Grooves thus overall form a section that is gradually different Broad. The same applies when the grooves partially penetrate one another. In the end result is achieved with this special proposal that the directly adjacent Profile steel rails are clamped together, while the basic idea explained in the introduction the invention also leaves the possibility open, each profile steel rail with a clamp your own clamping screw in the yoke body.

Ein Zusammenspannen der aneinanderliegenden Querstege setzt auch voraus, daß die Klemmschraube so angeordnet ist, daß ihre Achse die beiden Nuten bzw. die von den beiden Nuten gebildete gemeinsame Aussparung an der Stelle durchsetzt, an der die Nuten einander kreuzen. Um nun der Gefahr des Abrutschens der Schraubzwinge besonders wirksam zu begegnen, wird weiter vorgeschlagen, daß das Joch in der Nähe des Randes des einen Quersteges einen auf der Außenfläche des anderen, vom Führungsansatz umgriffenen Querstegs aufliegenden Stützvorsprung aufweist und daß die Klemmschraube zwischen diesem Stützvorsprung und dem Rand der den einen Quersteg aufnehmenden Nut angeordnet ist. Dadurch ergeben sich insgesamt drei Berührungspunkte bzw.Clamping the adjacent crosspieces also requires that the clamping screw is arranged so that its axis the two grooves or the common recess formed by the two grooves penetrated at the point on which the grooves cross each other. In order to avoid the risk of the screw clamp slipping To counteract particularly effective, it is further proposed that the yoke in the vicinity of the edge of one crossbar one on the outer surface of the other, from the guide approach encompassed transverse web has resting support projection and that the clamping screw between this support projection and the edge of the one transverse web receiving Groove is arranged. This results in a total of three points of contact or

Berührungszonen zwischen der Schraubzwinge und den beiden beteiligten Profilstahlschienen, die in Richtung derjenigen Profilstahlschiene gegeneinander versetzt sind, an der die Schraubzwinge geführt ist. Dies wird anhand der Zeichnung noch näher erläutert. Der Vorteil ist, daß die Berührungslinie, an welcher der eine Jochschenkel auf der Innenseite des einen Querstegs aufliegt, besonders weit zum Längssteg der betreffenden Profilstahlschiene hin vorgeschoben ist.Zones of contact between the screw clamp and the two involved Profiled steel rails, which in the direction of those profiled steel rails against each other are offset on which the screw clamp is guided. This is based on the drawing explained in more detail. The advantage is that the line of contact at which the one Yoke leg rests on the inside of a crossbar, particularly far to the Longitudinal web of the section steel rail in question is advanced.

Der Führungsansatz kann an das Joch angeschweißt oder sonstwie angesetzt sein, vorzugsweise ist er jedoch mit dem Joch aus einem Stück gefertigt. Um die Schraubzwinge nicht nur am Ende der Profilstahlschiene in diese einfügen zu können, sondern an jeder Stelle, wird weiter vorgeschlagen, den Führungsansatz winkelförmig auszubilden. Damit wird dann zumindest erreicht, daß sich die Schraubzwinge beim Festziehen der Klemmschraube nicht dreht. Eine unverlierbare Gleitführung kann zusätzlich erreicht werden, wenn wenigstens ein Spannstift oder dgl. vorgesehen ist, der den freien Schenkel des winkelförmigen Führungsansatzes durchsetzt und in das Profilinnere hineinragt.The guide approach can be welded to the yoke or otherwise attached but it is preferably made in one piece with the yoke. To the To be able to insert screw clamp not only at the end of the profile steel rail into this, but at each point, it is further suggested that the guide approach be angular to train. This then at least ensures that the screw clamp when Tightening the clamping screw does not turn. A captive sliding guide can also Can be achieved if at least one dowel pin or the like. Is provided that the free leg of the angular guide approach penetrated and into the profile interior protrudes.

Ein Ausführungsbeispiel der Erfindung wird nachfolgend anhand der Zeichnung näher erläutert. Im einzelnen zeigt Fig. 1 eine räumliche Anwendungsskizze, Fig. 2 eine Draufsicht der Klemmvorrichtung in natürlicher Größe, Fig. 3 einen Schnitt III-III der Vorrichtung nach Fig. 2, Fig. 4 bis Fig. 6 drei Ansichten der bei der Vorrichtung verwendeten Schraubzwinge und Fig. 7 einen Schnitt VII-VII gemäß Fig. 4.An exemplary embodiment of the invention is described below with reference to FIG Drawing explained in more detail. In detail shows Fig. 1 shows a spatial Application sketch, FIG. 2 a top view of the clamping device in natural size, 3 shows a section III-III of the device according to FIG. 2, FIGS. 4 to 6 three Views of the screw clamp used in the device and FIG. 7 shows a section VII-VII according to FIG. 4.

Fig. 1 zeigt ausschnittweise in schematischer Darstellung zwei vertikale I-Profilstahlschienen 1, an denen eine Schalwand 2 befestigt und abgestützt werden soll. Zur Abstützung dienen etwas größere horizontale I-Profilstahlschienen 3, welche in ihrer Längsrichtung und in der Höhe stufenlos verstellbar sein sollen.Fig. 1 shows a fragmentary schematic representation of two vertical I-profile steel rails 1, on which a formwork wall 2 is attached and supported target. Slightly larger horizontal I-profile steel rails 3, which should be continuously adjustable in their longitudinal direction and in height.

Hierzu dienen Schraubzwingen 4, von denen in den übrigen Figuren jeweils eine in natürlicher Größe dargestellt ist.For this purpose, screw clamps 4 are used, each of which is shown in the other figures one is shown in natural size.

Die einzelne Schraubzwinge 4 ist im Beispiel aus einem etwa quaderförmigen Stück Stahl mittels Zerspanung hergestellt. Sie gliedert sich in ein Joch 5 und einen Führungsansatz 6, die etwa im Bereich der Schnittlinie VII-VII funktionell voneinander zu trennen sind. In die gemäß Fig. 4 oben liegende Fläche 8 dieses einstückigen Körpers ist eine Rechtecknut 9 eingeschnitten mit einer Schräge 10 an einem ihrer oberen Ränder. Diese Rechtecknut 9 nimmt die untere Häflte des Quersteges 11 der in Fig. 1 gezeigten I-Profilstahlschiene 3 auf, deren Mittelsteg mit 12 bezeichnet ist.The individual screw clamp 4 is in the example from an approximately cuboid Piece of steel made by machining. It is divided into a yoke 5 and a guide approach 6, which is functional approximately in the area of the section line VII-VII are to be separated from each other. In the surface 8 located at the top according to FIG. 4, this one-piece Body is a rectangular groove 9 cut with a slope 10 on one of them upper margins. This rectangular groove 9 takes the lower Haflte of the crosspiece 11 of the I-profile steel rail 3 shown in FIG. 1, the center web of which is designated by 12 is.

Eine zu der Fläche 8 senkrechte Fläche 13 des Joches 5 weist eine durchgehende Rechtecknut 14 auf. In dieser Rechtecknut 14 ragt eine Hälfte eines Quersteges 15 der vertikal stehenden I-Profilstahlschiene 1 hinein (Fig. 2). Die beiden Nuten 9 und 14 gehen in der zu den beiden Flächen 8 und 13 parallelen Richtung, die gleichzeitig die Achsrichtung einer Klemmschraube 16 ist, unmittelbar aneinander über, so daß sich ein für den guten Sitz dieser Schraubzwinge sehr wichtiger Stützvorsprung 17 ergibt, dessen durch eine halbrunde Nut 18 in zwei Bereiche getrennte Stützfläche 19 einen Teil der Innenwand der Rechtecknut 14 bildet und sich von außen her auf den Quersteg 15 der Profilstahlschiene 1 auflegt (Fig. 3).A surface 13 of the yoke 5 perpendicular to the surface 8 has a continuous rectangular groove 14. In this rectangular groove 14 one half protrudes Crossbar 15 of the vertically standing I-profile steel rail 1 into it (Fig. 2). the both grooves 9 and 14 go in the direction parallel to the two surfaces 8 and 13, which is at the same time the axial direction of a clamping screw 16, directly to one another over, so that there is a very important support projection for the good fit of this screw clamp 17 results, the support surface of which is separated into two areas by a semicircular groove 18 19 forms part of the inner wall of the rectangular groove 14 and extends from the outside the crosspiece 15 of the steel profile rail 1 is placed (Fig. 3).

Der Führungsansatz 6 hat die Form eines rechten Winkels, dessen freier Schenkel durch die Rechtecknut 9 tief eingeschnitten ist, so daß ein sich in Richtung der Profilstahlschiene 1 erstreckender Führungslappen 20 gebildet wird. Dieser legt sich am anderen Rand des Quersteges 15 an und verhindert dadurch ein Verdrehen der Schraubzwinge beim Festziehen der Klemmschraube 16. Bei der Erstausrüstung der hier als Beispiel gewählten Schalung wird der Schraubzwingenkörper über die Profilstahlschiene 1 gesteckt, so daß deren Quersteg 15 in die Rechtecknut 14 eingreift und dann werden zwei Spannstifte 21 in entsprechend bemessene Bohrungen der Führungslappen 20 eingesetzt und mit dem Hammer eingeschlagen, so daß diese Spannstifte an der Innenseite des Quersteges 15 vorbei in die I-Profilstahlschiene eingreifen und somit im Zusammenwirken mit der Rechtecknut 14 die Schraubzwinge an dieser Profilstahlschiene verschiebbar und unverlierbar führen.The guide approach 6 has the shape of a right angle, its free Leg is deeply cut through the rectangular groove 9, so that one is in the direction the profile steel rail 1 extending guide tabs 20 is formed. This lays at the other edge of the crosspiece 15 and thereby prevents twisting of the Screw clamp when tightening the clamping screw 16. When first fitting this here The formwork chosen as an example is the screw clamp body over the profile steel rail 1 inserted so that the crosspiece 15 engages in the rectangular groove 14 and then two dowel pins 21 are inserted into correspondingly dimensioned bores in the guide tabs 20 and hit it with the hammer, so that these dowel pins on the Engage the inside of the transverse web 15 over into the I-profile steel rail and thus in cooperation with the rectangular groove 14, the screw clamp on this profile steel rail guide movable and captive.

Die Klemmschraube 16 hat eine gehärtete Spitze 22 und wird nach dem Festziehen mittels einer Kontermutter 23 gesichert. Infolge des Führungsansatzes kann die Schraubzwinge beim Festziehen jedenfalls aus der Profilstahlschiene 1 nicht herausspringen. Bei der Betrachtung der Fig. 3 wird ferner deutlich, daß infolge des Stützvorsprungs 17 das Joch 5 sich beim Festziehen der Klemmschraube 16 nach links neigt, so daß der in Fig.3 mit 24 bezeichnete Schenkel des Joches sehr weit innen und ganz in der Nähe des Mittelsteges 12 auf den Quersteg 11 der I-Profilstahlschiene 3 drückt. Hierdurch wird eine sichere Klemmverbindung bewirkt und ein Herausfallen der I-Profilstahlschiene 3 auch dann verhindert, wenn die Klemmschraube 16 noch nicht fest angezogen ist.The clamping screw 16 has a hardened tip 22 and is after Tightening secured by means of a lock nut 23. As a result of the leadership approach the screw clamp cannot be pulled out of the profile steel rail 1 when it is tightened jump out. When looking at Fig. 3 it is also clear that as a result of the support projection 17, the yoke 5 after tightening the clamping screw 16 tends to the left, so that the leg of the yoke designated by 24 in FIG. 3 is very wide inside and very close to the central web 12 on the cross web 11 of the I-profile steel rail 3 presses. This creates a secure clamping connection and prevents it from falling out the I-profile steel rail 3 prevents even if the clamping screw 16 is still is not tightened securely.

Claims (8)

Ansprüche 1J) Klemmvorrichtung zur Verbindung zweier mit den Querstegen parallelflächig angeordneter, sich kreuzender T- oder I-Profilstahlschienen, insbesondere für Schalungen zur Herstellungen von Betonfertigteilen, dadurch gekennzeichnet, daß eine Schraubzwinge (4) vorgesehen ist, bestehend aus einem Joch (5) mit Führungsansatz (6) und wenigstens einer Klemmschraube (16), daß die einander benachbarten Querstege (11, 15) in das Joch hineinragen und zwischen einem Jochschenkel und der in den anderen Jochschenkel eingeschraubten Klemmschraube eingespannt sind und daß der Führungsansatz (6) den Quersteg (15) einer der Profilstahlschienen (1) umgreift. Claims 1J) clamping device for connecting two with the transverse webs T- or I-profile steel rails arranged parallel to one another, in particular for formwork for the production of precast concrete parts, characterized in that, that a screw clamp (4) is provided, consisting of a yoke (5) with a guide attachment (6) and at least one clamping screw (16) that the adjacent crosspieces (11, 15) protrude into the yoke and between one yoke leg and the in the other yoke legs screwed clamping screw are clamped and that the Guide approach (6) engages around the crosspiece (15) of one of the sectional steel rails (1). 2. Klemmvorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß das Joch (5) an zwei zueinander senkrecht stehenden Flächen (8, 13) je eine Nut (9, 14) aufweist und jede Nut einen der einander benachbarten Querstege (11, 15) aufnimmt.2. Clamping device according to claim 1, characterized in that the Yoke (5) on two mutually perpendicular surfaces (8, 13) each have a groove (9, 14) and each groove receives one of the adjacent transverse webs (11, 15). 3. Klemmverrichtung nach Anspruch 2, dadurch gekennzeichnet, daß die Nuten (9, 14) in der zu beiden Flächen (8, 13) parallelen Richtung ohne Abstand aneinanderstoßen oder einander teilweise durchdringen und daß auf derjenigen Seite des Joches eine Klemmschraube (16) vorgesehen ist, die der dem Führungsansatz zugeordneten Profilstahlschiene (1) zugewandt ist.3. clamping device according to claim 2, characterized in that the Grooves (9, 14) in the direction parallel to both surfaces (8, 13) without spacing butt against one another or partially penetrate one another and that on that side of the yoke a clamping screw (16) is provided, which is assigned to the guide attachment Profile steel rail (1) is facing. 4. Klemmvorrichtung nach Anspruch 3, dadurch gekennzeichnet, daß die Achse der Klemmschraube (16) beide Nuten (9, 14) durchsetzt.4. Clamping device according to claim 3, characterized in that the Axis of the clamping screw (16) passes through both grooves (9, 14). 5. Klemmvorrichtung nach Anspruch 4, dadurch gekennzeichnet, daß das Joch in der Nähe des Randes des einen Querstegs (11) einen auf der Außenfläche des anderen, vom Führungsansatz (6) umgriffenen Querstegs (15) aufliegenden Stützvorsprung (17) aufweist und daß die Klemmschraube (16) zwischen diesem Stützvorsprung und dem Rand der den einen Quersteg aufnehmenden Nut (9) angeordnet ist.5. Clamping device according to claim 4, characterized in that the Yoke near the edge of a cross web (11) one on the outer surface of the other, by the guide attachment (6) encompassed cross web (15) resting support projection (17) and that the clamping screw (16) between this support projection and the edge of the groove (9) receiving a transverse web is arranged. 6. Klemmvorrichtung nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß der Führungsansatz (6) mit dem Joch (5) aus einem Stück gefertigt ist.6. Clamping device according to one of the preceding claims, characterized characterized in that the guide extension (6) is made in one piece with the yoke (5) is. 7. Klemmvorrichtung nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß der Führungsansatz (6) winkelförmig ausgebildet ist.7. Clamping device according to one of the preceding claims, characterized characterized in that the guide extension (6) is angular. 8. Klemmvorrichtung nach Anspruch 7, dadurch gekennzeichnet, daß wenigstens ein Spannstift (21) vorgesehen ist, der den freien Schenkel (20) des Führungsansatzes durchsetzt und in das Profilinnere hineinragt.8. Clamping device according to claim 7, characterized in that at least a dowel pin (21) is provided, which the free leg (20) of the guide attachment interspersed and protrudes into the profile interior.
DE19772709643 1977-03-05 1977-03-05 Screw clamp connecting two formwork rails - has rail stems clamped between yoke shank and screw in other shank Withdrawn DE2709643A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19772709643 DE2709643A1 (en) 1977-03-05 1977-03-05 Screw clamp connecting two formwork rails - has rail stems clamped between yoke shank and screw in other shank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19772709643 DE2709643A1 (en) 1977-03-05 1977-03-05 Screw clamp connecting two formwork rails - has rail stems clamped between yoke shank and screw in other shank

Publications (1)

Publication Number Publication Date
DE2709643A1 true DE2709643A1 (en) 1978-09-07

Family

ID=6002856

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19772709643 Withdrawn DE2709643A1 (en) 1977-03-05 1977-03-05 Screw clamp connecting two formwork rails - has rail stems clamped between yoke shank and screw in other shank

Country Status (1)

Country Link
DE (1) DE2709643A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1983001800A1 (en) * 1981-11-20 1983-05-26 Allan Glassbrook Building construction method and device
ES2263365A1 (en) * 2005-01-07 2006-12-01 Hidroelectrica Del Cadi, S.A. Connection device for beams has two connection portions each having wings for receiving beam and applying pressure to beam
WO2017080858A1 (en) * 2015-11-12 2017-05-18 Siemens Aktiengesellschaft Fastening clamp

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1983001800A1 (en) * 1981-11-20 1983-05-26 Allan Glassbrook Building construction method and device
ES2263365A1 (en) * 2005-01-07 2006-12-01 Hidroelectrica Del Cadi, S.A. Connection device for beams has two connection portions each having wings for receiving beam and applying pressure to beam
WO2017080858A1 (en) * 2015-11-12 2017-05-18 Siemens Aktiengesellschaft Fastening clamp

Similar Documents

Publication Publication Date Title
DE2618442C2 (en) Support for a railing or the like
DE2437724A1 (en) DOWELING DRILLING JIG FOR TWO FACE-SIDED WORKPIECES TO BE DOWELED TO EACH OTHER
CH695482A5 (en) Method for joining overlapping ends of parallel wooden beams with a clamping jig with angled guides for drilling and securing of screw connectors
DE2712696A1 (en) PINESTANDING SCREW
DE2847006B1 (en) AOuter tensioning device for surgical purposes
DE3105180A1 (en) DOWELING TOOL
EP1348514B1 (en) Carriage system
DE3430808A1 (en) Abutment device
DE2709643A1 (en) Screw clamp connecting two formwork rails - has rail stems clamped between yoke shank and screw in other shank
CH624174A5 (en) Adjustable suspension for doors.
DE3700619C2 (en)
DE2613673A1 (en) Clamping device with supporting body on arm - has faces in same plane as mounting support surface to give accurate positioning
DE4138967A1 (en) Clamp for forming 'T' shape joints in timber beams - two sectioned clamp with one section sliding over the first to form an opposite shoulder to that on the first section
DE3533355C2 (en)
DE2533417A1 (en) Clamp for perpendicular pipes - has guide bolted for direct clamping to one pipe and indirectly via wedge faces to other pipe
DE2642186C3 (en) Cutting tools, in particular for lathes
EP0641940A2 (en) Joint assembly for profiled elements
DE2045044A1 (en) Fastening device that can be moved continuously and horizontally
DE2340037A1 (en) CLAMPING DEVICE FOR CONNECTING A PROFILE BAR OR FITTING PART WITH A PROFILE BAR RUNNING TRANSVERSE TO THE CLAMPING DIRECTION, HAVING TWO OPPOSITE GROOVES
DE2205794C3 (en) Detachable clamping device for Y-connections in catenary structures
DE2552983C3 (en) Connection of two wall-to-wall adjacent housings that can be established from the outside
DE3247505A1 (en) Suspension means for the load-bearing frame of a counter-ceiling
DE2323054B2 (en) Device for fastening grooved plates or the like for receiving control cams on machine tools or on presetting devices
DE10000102A1 (en) Stop device on sawing and milling tables has clamping device as wedge mounted on guide rail fixed on stop insertable from above into guide groove of base part
DE1944775C3 (en) Device for connecting crossing ropes of a planar structure or the like

Legal Events

Date Code Title Description
8139 Disposal/non-payment of the annual fee