DE2541024A1 - Scraper for loose material tips - has rake pivotably mounted between rope carrier and end of stationary jib - Google Patents

Scraper for loose material tips - has rake pivotably mounted between rope carrier and end of stationary jib

Info

Publication number
DE2541024A1
DE2541024A1 DE19752541024 DE2541024A DE2541024A1 DE 2541024 A1 DE2541024 A1 DE 2541024A1 DE 19752541024 DE19752541024 DE 19752541024 DE 2541024 A DE2541024 A DE 2541024A DE 2541024 A1 DE2541024 A1 DE 2541024A1
Authority
DE
Germany
Prior art keywords
rake
stationary
arms
cable car
embankment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19752541024
Other languages
German (de)
Inventor
Bernhard Klein
Hans Zimmer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pohlig Heckel Bleichert Vereinigte Maschinenfabriken AG
Original Assignee
Pohlig Heckel Bleichert Vereinigte Maschinenfabriken AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pohlig Heckel Bleichert Vereinigte Maschinenfabriken AG filed Critical Pohlig Heckel Bleichert Vereinigte Maschinenfabriken AG
Priority to DE19752541024 priority Critical patent/DE2541024A1/en
Publication of DE2541024A1 publication Critical patent/DE2541024A1/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G65/00Loading or unloading
    • B65G65/02Loading or unloading machines comprising essentially a conveyor for moving the loads associated with a device for picking-up the loads
    • B65G65/06Loading or unloading machines comprising essentially a conveyor for moving the loads associated with a device for picking-up the loads with endless scraping or elevating pick-up conveyors

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The banking equipment is for lifting difficult flowing loose goods from a tip in a storage room and includes a bridge traversing the room across the tip, and with a goods lifting scraper. In the middle of the bridge is mounted a stationary jib and along the top of the bridge moves a rope carriage. Between the end of the jib and the rope carriage is located a rake. The swinging rake (1) which is of a rigid construction is attached to top end of the jib (2) by two pivotably mounted top arms (4) and to the rope carriage (3) by two pivotably mounted bottom arms (5). The rope carriage (3) is during its movement along the bridge activating a swinging movement of the rake (1) across the whole surface of the tip.

Description

Böschungsräumgerät zur Entnahme von Schüttgut, insbesondere schwer rieselfähigem Schüttgut, aus einer in einer Halle od. dgl. angeordneten Halde Die Erfindung bezieht sich auf ein Böschungsräumgerät zur Entnahme von Schüttgut, insbesondere schwer rieselfähigem Schüttgut, aus einer in einer Halle od. dgl. angeordneten Halde, mit einer eine Aufnahmevorrichtung, wie einen Entspeicherungskratzer umfassenden, quer zur Halde verfahrbaren Brücke, einem auf dieser in Längsrichtung verfahrbaren Seilwagen, einem mittig und ortsfest auf der Brücke verlagerten Ausleger und einem zwischen Auslegerende und Seilwagen angeordneten Rechen. Embankment clearing device for removing bulk material, especially heavy pourable bulk material, from a dump or dump arranged in a hall The invention relates to an embankment clearing device for removing bulk material, in particular difficult-to-flow bulk material one in a hall or the like. arranged heap, with a receiving device, such as a removal scraper comprehensive, transversely to the heap movable bridge, one on this in the longitudinal direction movable cable car, a boom positioned centrally and stationary on the bridge and a rake arranged between the end of the boom and the cable car.

Es sind Vorrichtungen zur homogenisierten Rückverladung beispielsweise aus den DT-Gbm 6 92 9 und 70,21 551 bekannt, bei denen zwischen Seilwagen und Spitze des Auslegers vorgesehene Streifelemente angeordnet sind, die als Seile, Ketten, teleskopierbare Räumarme od. dgl. ausgestaltet sind. Sie sind nicht allzu gut geeignet für eine Entnahme von grobkörnigem Schüttgut und schwere Betriebsbedingungen, wie sie beispielsweise bei schwer rieselfähigem Schüttgut oder gefrorener Halde auftreten.There are devices for homogenized back loading, for example from DT-Gbm 6 92 9 and 70.21 551 known, where between the cable car and the tip the jib provided strip elements are arranged as ropes, chains, Telescopic clearing arms or the like. Are designed. They aren't all that well suited for the removal of coarse-grained bulk material and severe operating conditions, such as they occur, for example, with difficult-to-flow bulk material or frozen stockpiles.

Eine weitere Lösung ist aus der DT-OS 21 55 355 bekannt, nach der im Haldenoberflächenbereich ein starrer Rechen zwischen Ausleger und Seilwagen vorgesehen ist. Dabei war jedoch die Ausgestaltung des starren Rechens im einzelnen nicht der eigentliche Gegenstand.Another solution is known from DT-OS 21 55 355, according to which A rigid rake is provided between the boom and the cable car in the area of the pile surface is. However, the design of the rigid rake in detail was not that actual subject.

Der Erfindung liegt die Aufgabe zugrunde, Mängel der bekannten Geräte zu vermeiden und Böschungsräumgeräte der eingangs gekennzeichneten Gattung so auszugestalten, daß sie auch relativ schwere bzw. schwerere Geräte mit intensiven relativ schnellen Bewegungswegen im gesamten Haldenoberflächenbereich vorsehen, bei denen auch gegebenenfalls das Verhältnis des Hallenquerschnittes zum Haldenquerschnitt mit Hinblick auf Nutzungseffekt günstiger ist.The invention is based on the problem of eliminating shortcomings in the known devices to avoid and to design embankment clearing devices of the type identified at the beginning in such a way that that they are also relatively heavy or heavier devices with intense, relatively fast Provide movement paths in the entire heap surface area, including where necessary the ratio of the hall cross-section to the heap cross-section with regard to the use effect is cheaper.

Das geschieht erfindungsgemäß dadurch, daß dieser als in sich beweglicher starrer Schwenkrechen ausgestaltet ist, der zei obere am Auslegerende ortsfest und schwenkbar verlagerte Arme und zwei mit diesen gelenkig verbundene am Seilwagen ortsfest und schwenkbar verlagerte untere Arme umfaßt, wobei der in an sich bekannter Weise hin- und herverfahrbare Seilwagen Schwenkbewegungen des Rechens im Bereich der gesamten Haldenoberfläche auslöst.This is done according to the invention in that this is more mobile in itself rigid swivel rake is designed, the top two at the boom end stationary and pivotally displaced arms and two articulated with these on the cable car includes stationary and pivotably displaced lower arms, the one known per se Way reciprocating cable car swiveling movements of the rake in the area triggers the entire pile surface.

Bei einer weiteren Variante der Erfindung ist vorgesehen, daß der in sich bewegliche starre Schwenkrechen zwei am Seilwagen ortsfest und schwenkbar verlagerte Schenkel aufweist, die mit zwei unteren Armen und zwei oberen Armen gelenkig verbunden sind und die unteren Arme in einem Gelenkpunkt am Ausleger ende ortsfest und schwenkbar verlagert sind.In a further variant of the invention it is provided that the Rigid swivel rake movable in itself, stationary and pivotable on the cable car has displaced legs that are articulated with two lower arms and two upper arms are connected and the lower arms are stationary in a hinge point on the boom and are pivotably displaced.

Eine andere Ausgestaltung der Erfindung sieht vor, daß der in sich bewegliche starre Schwenkrechen als Schere ausgebildet ist, welche gelenkig miteinander verbundene Schrägarme aufweist und mit dem oberen Ende am Auslegerende und mit seinem unteren Ende am Seilwagen ortsfest und schwenkbar verlagert ist.Another embodiment of the invention provides that the in itself movable rigid swivel rake is designed as scissors, which are articulated with one another having connected sloping arms and with the upper end at the boom end and with his The lower end of the cable car is fixed and pivoted.

Hierbei ist zweckmäßigerweise der in sich bewegliche starre Schwenkrechen zur intensiven Bewegung des Schüttgutes an seinen Armen bzw. Schenkeln ait in vorgegebenen Abständen angeordneten Quer rechen versehen.In this case, the rigid swivel rake, which is movable in itself, is expedient for intensive movement of the bulk material on its arms or thighs ait in given Provide spaced cross rakes.

Weitere Vorteile und Merkmale der Erfindung folgen aus der nachstehenden Beschreibung von in der Zeichnung dargestellten Ausführungsbeispielen. Is zeigen: Fig. 1 eine bevorzugte Ausführung des Gerätes, in der Vorderansicht, Fig. 2 hierzu eine Seitenansicht, Fig. 3 eine Variante des Gerätes, in der Vorderansicht, Fig. 4 hierzu eine Seitenansicht, Fig. 5 eine weitere Ausgestaltung des Gerätes und Fig. 6 hierzu eine Seitenansicht.Further advantages and features of the invention follow from the following Description of the exemplary embodiments shown in the drawing. Is show: Fig. 1 shows a preferred embodiment of the device, in the front view, Fig. 2 in this regard a side view, FIG. 3 a variant of the device, in the front view, FIG. 4 shows a side view of this, FIG. 5 shows a further embodiment of the device and FIG. 6 a side view of this.

Das Böschungsräumgerät ist mit einer eine Aufnahmevorrichtung, wie einen Entspeicherungskratzer unfassenden Brücke versehen, auf der ein in Längsrichtung auf einer Fahrbahn hin- und herverfahrbarer Seilwagen 3 angeordnet ist. Mittig und ortsfest ist an der Brücke ein heb- und senkbarer Ausleger 2 verlagert.The embankment clearing device is with a receiving device, such as provided a bridge that encompasses the removal of storage, on which a longitudinal is arranged on a roadway back and forth movable cable car 3. Middle and A boom 2 that can be raised and lowered is stationary on the bridge.

Zwischen dem Ende des Auslegers 2 und dem hin- und herverfahrbaren Seilwagen 3 ist ein Rechen angeordnet, der als in sich beweglicher, starrer Schwenkrechen 1 ausgestaltet ist. Bei einer relativ einfachen Ausführungsform weist er zwei obere an Ausleterende 2 ortsfest und schwenkbar verlagerte obere Arme 4 und zwei mit diesen gelenkig verbundene untere Arme 5 auf. Der hin- und herverfahrbare Seilwagen 3 löst Schwenkbewegungen des Rechens im Bereich der gesamten Haldenoberfläche aus.Between the end of the boom 2 and the reciprocable Cable car 3 is a rake arranged as a movable, rigid swivel rake 1 is designed. In a relatively simple embodiment, it has two upper ones at Ausleterende 2 stationary and pivotably displaced upper poor 4 and two lower arms 5 articulated therewith. The movable back and forth Cable car 3 triggers pivoting movements of the rake in the area of the entire pile surface the end.

Bei einer weiteren Ausgestaltung, bei der der Ausleger 2 wesentlich kürzer sein kann, weist der in sich bewegliche starre Schwenkrechen 1 zwei am Seilwagen 3 ortsfest und schwenkbar verlagerte Schenkel 8 auf, die mit zwei unteren Armen 9, die untereinander und mit zwei oberen Armen 10 verbunden sind, auf. Die unteren Arme 9 sind in einem Gelenkpunkt 11 am Auslegerende 2, die Schenkel 8 am Seilwagen 3 ortsfest und schwenkbar verlagert, der an der Brücke in Längsrichtung relativ schnell hin- und herverfahrbar vorgesehen ist.In a further embodiment in which the boom 2 is essential can be shorter, has the movable rigid swivel rake 1 two on the cable car 3 fixed and pivotably displaced legs 8, with two lower arms 9, which are connected to one another and to two upper arms 10. The lower Arms 9 are in a hinge point 11 at the end of the boom 2, the legs 8 on the cable car 3 stationary and pivotably displaced, the one on the bridge in the longitudinal direction relative is provided so that it can be moved back and forth quickly.

Eine andere Variante des in sich beweglichen starren Schwenkrechens 1 mit intensiven Bewegungen innerhalb des Rechens und intensiven Bewegungswegen innerhalb des Haldenoberflächenbereiches sieht vor, daß dieser als Schere 12 ausgebildet ist, welche gelenkig miteinander verbundene Schrägarme 13 aufweist und mit dem oberen Ende am Auslegerende 2 und mit seinem unteren Ende am Seilwagen 3 ortsfest und schwenkbar verlagert und mittels des Seilwagens 3 im Haldenbereich hin- und herverschwenkbar ist.Another variant of the rigid swivel rake that moves in itself 1 with intensive movements within the rake and intensive movement paths within the heap surface area it is provided that it is designed as a pair of scissors 12 is, which has articulated sloping arms 13 and with the upper End at the boom end 2 and with its lower end on the cable car 3 stationary and pivotable relocated and can be swiveled back and forth in the dump area by means of the cable car 3 is.

Dabei kann der Schwenkrechen 1 an seinen Armen 4, 5, 9, 10, 13 und den Schenkeln 8 mit in vorgegebenen Abständen angeordneten Querrechen 6 ausgestattet sein, die mit Zähnen bestückt sein können.The swivel rake 1 on its arms 4, 5, 9, 10, 13 and the legs 8 equipped with transverse rakes 6 arranged at predetermined intervals which can be equipped with teeth.

Die Haldenoberfläche wird hierbei auch bei schwierigem Schüttgut durch Bewegungen innerhalb des Rechenbereiches aufgelockert und das Fördergut zum Abrieseln in den Bereich des Aufnahmegerätes gebracht.The heap surface is here through even with difficult bulk material Movements within the computing area are loosened up and the conveyed material trickles down brought into the area of the recording device.

Bei Anordnung der Halde in einer Halle kann die Halle mit Hinblick auf Auslegerlänge bzw. oberen Ende des Rechens, wesentlich geringer sein. So ergibt beispielsweise gegenüber bekannten am Auslegerende angeordneten starren Rechen beispielsweise bei einer Haldenfußbreite von 40 m eine Längenminderung des Auslegers um 8 m, wodurch die Hallenhöhe um ca. 5 m kleiner sein könnte. Der Aufwand wäre dabei wesentlich geringer.When the stockpile is arranged in a hall, the hall can with regard to on the boom length or the upper end of the rake, be significantly less. So results for example compared to known arranged at the end of the boom rigid rakes, for example, a length reduction with a stockpile base width of 40 m of the boom by 8 m, whereby the hall height could be reduced by approx. 5 m. Of the The effort would be considerably less.

Claims (5)

Betr.: Böschungsräumgerät zur Ent-Re: embankment clearing device for nahme von Schüttgut, insbesondere schwer rieselfähigem Schüttgut, aus einer in einer Halle od. dgl. angeordneten Halde Patentansprüche 0) Böschungsräumgerät zur Entnahme von Schüttgut, insbesondere schwer rieselfähigem Schüttgut, aus einer in einer Halle od. acceptance of bulk goods, especially difficult-to-flow bulk goods, from a dump arranged in a hall or the like. Claims 0) Embankment clearing device for the removal of bulk goods, especially difficult-to-flow bulk goods, from a in a hall or dgl. angeordneten Halde, mit einer eine Aufnahmevorrichtung, wie einen Entspeicherungskratzer umfassenden, quer zur Halde verfahrbaren Brücke, einem auf diesem in Längsrichtung verfahrbaren Seilwagen, einem mittig und ortsfest an der Brücke verlagerten Ausleger und einem zwischen Ausleger ende und Seilwagen angeordneten Rechen, dadurch gekennzeichnet, daß dieser als in sich beweglicher starrer Schwenkrechen (t) ausgestaltet ist, der zwei obere am Auslegerende (2) ortsfest und schwenkbar verlagerte Arme (4) und zwei mit diesen gelenkig verbundene am Seilwagen (3) ortsfest und schwenkbar verlagerte untere Arme (5) umfaßt, wobei der in an sich bekannter Weise hin- und herverfahrbare Seilwagen (3) Schwenkbewegungen des Rechens (1) im Bereich der gesamten Haldenoberfläche auslöst. Like. Arranged heap, with a receiving device, such as a bridge that encompasses a removal scraper and can be moved across the heap, a on this longitudinally movable cable car, one in the middle and stationary the bridge and a jib positioned between the end of the jib and the cable car Rake, characterized in that it is a rigid swivel rake that is movable in itself (t) is designed, the two upper ones at the boom end (2) stationary and pivotable displaced arms (4) and two with these articulated on the cable car (3) stationary and pivotally displaced lower arms (5), wherein the one known per se Way back and forth movable cable car (3) pivoting movements of the rake (1) in the Area of the entire pile surface triggers. 2. Böschungsräumgerät nach Anspruch i dadurch gekennzeichnet, daß der in sich bewegliche starre Schwenkrechen (1) zwei am Seilwagen (3) ortsfest und schwenkbar verlagerte Schenkel (8) aufweist, die mit zwei unteren Armen (9) und zwei oberen Armen (10) gelenkig verbunden sind und die unteren Arme (9) in einem Gelenkpunkt (11) am Auslegerende (2) ortsfest und schwenkbar verlagert sind. 2. embankment clearing device according to claim i, characterized in that the rigid swivel rake (1), which is movable in itself, is stationary and two on the cable car (3) has pivotably displaced legs (8) with two lower arms (9) and two upper arms (10) are articulated and the lower arms (9) in one Articulation point (11) at the end of the boom (2) are displaced in a stationary and pivotable manner. 3. Böschungsräumgerät nach Anspruch i, dadurch gekennzeichnet, daß der in sich bewegliche starre Schwenkrechen (i) als Schere (12) ausgebildet ist, welche gelenkig miteinander verbundene Schrägarme (13) aufweist und mit dem oberen Ende am Auslegerende (2) und mit seinem unteren Ende am Seilwagen (3) ortsfest und schwenkbar verlagert ist.3. embankment clearing device according to claim i, characterized in that the rigid swivel rake (i), which is movable in itself, is designed as scissors (12), which has hingedly interconnected sloping arms (13) and with the upper End at the boom end (2) and with its lower end on the cable car (3) stationary and is pivotably displaced. 4. Böschungsräumgerät nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß der in sich bewegliche starre Schwenkrechen (1) zur intensiven Bewegung des Schüttgutes an seinen Armen (4, 5, 9, 10, 13) bzw. Schenkeln (8) mit in vorgegebenen Abständen angeordneten Querrechen (6) versehen ist.4. embankment clearing device according to one of claims 1 to 3, characterized in that that the rigid swivel rake (1) is movable in itself for the intensive movement of the Bulk material on its arms (4, 5, 9, 10, 13) or legs (8) with in predetermined Spaced transverse rake (6) is provided. 5. Böschungsräumgerät nach Anspruch 4, dadurch gekennzeichnet, daß die Querrechen (6) mit Zähnen bestückt sind.5. embankment clearing device according to claim 4, characterized in that the cross rakes (6) are equipped with teeth. LeerseiteBlank page
DE19752541024 1975-09-15 1975-09-15 Scraper for loose material tips - has rake pivotably mounted between rope carrier and end of stationary jib Pending DE2541024A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19752541024 DE2541024A1 (en) 1975-09-15 1975-09-15 Scraper for loose material tips - has rake pivotably mounted between rope carrier and end of stationary jib

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19752541024 DE2541024A1 (en) 1975-09-15 1975-09-15 Scraper for loose material tips - has rake pivotably mounted between rope carrier and end of stationary jib

Publications (1)

Publication Number Publication Date
DE2541024A1 true DE2541024A1 (en) 1977-03-17

Family

ID=5956483

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19752541024 Pending DE2541024A1 (en) 1975-09-15 1975-09-15 Scraper for loose material tips - has rake pivotably mounted between rope carrier and end of stationary jib

Country Status (1)

Country Link
DE (1) DE2541024A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2943746A1 (en) * 1979-10-30 1981-05-14 Bühler-Miag GmbH, 3300 Braunschweig Inclined raking arms on conveyor bridge - loosen inclined end face of oblong slag heap for removal
FR2603567A1 (en) * 1986-09-06 1988-03-11 Kloeckner Humboldt Deutz Ag Scraper device fastened onto a portal by scissor-type articulations
CN102502280A (en) * 2011-10-31 2012-06-20 华电重工股份有限公司 Method and device for preventing scrapers of scraper reclaimer from deforming
CN103029997A (en) * 2012-12-27 2013-04-10 岳立辉 Scraper loader

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2943746A1 (en) * 1979-10-30 1981-05-14 Bühler-Miag GmbH, 3300 Braunschweig Inclined raking arms on conveyor bridge - loosen inclined end face of oblong slag heap for removal
FR2603567A1 (en) * 1986-09-06 1988-03-11 Kloeckner Humboldt Deutz Ag Scraper device fastened onto a portal by scissor-type articulations
CN102502280A (en) * 2011-10-31 2012-06-20 华电重工股份有限公司 Method and device for preventing scrapers of scraper reclaimer from deforming
CN103029997A (en) * 2012-12-27 2013-04-10 岳立辉 Scraper loader

Similar Documents

Publication Publication Date Title
EP0236845B1 (en) Elevator, especially for discharging ships
DE1533841B1 (en) Removal device for lining blast furnaces or similar furnaces
DE1219399B (en) Device for picking up and removing bulk goods from a storage location
DE2541024A1 (en) Scraper for loose material tips - has rake pivotably mounted between rope carrier and end of stationary jib
DE2430008C2 (en) Backhoe excavator
DE2236785C2 (en) Trolley jib
DE7529129U (en) BOESCHUNGSRAEUMGERAET FOR THE REMOVAL OF SCHUETTGUT, IN PARTICULAR HEAVY RIESELABLE SCHUETTGUT, FROM A IN A HALL OR DGL. ARRANGED HALE
DE3509364A1 (en) LIFEWAY FOR JUMPER CRANES, ESPECIALLY WITH TELESCOPIC BOOM
DE1233329B (en) Bulk goods unloading system for ships
DE2627522C2 (en) Embankment clearer
DE560577C (en) Stacking device, especially for piece goods with a movable or rotating bridge
DE1431753C3 (en)
DE3026850A1 (en) CRANE
DE571444C (en) Loading device with platform for the wagons
DE936859C (en) Boom for bucket wheel excavators, loading belts or the like.
DE3130510A1 (en) "CONTINUOUSLY DELETING DEVICE FOR SCHUETTGUT"
DE2431114A1 (en) CIVIL ENGINEERING MACHINE, IN PARTICULAR SHOVEL LOADER
DE2705705B1 (en) Device for reloading bulk waste heaps
DE465749C (en) Weaners
DE688981C (en) Removal scratches
DE1531002A1 (en) Portal scraper for bulk goods
DE3412829A1 (en) FOURDERGUT-CHARGER
DE934347C (en) Device for transporting away the debris that arises when driving floats and hewing up in mining
DE463968C (en) Floating crane
DE463966C (en) Shore double crane

Legal Events

Date Code Title Description
OHJ Non-payment of the annual fee