DE2345941B2 - Device for the production of large double-shell wall elements made of concrete or the like - Google Patents

Device for the production of large double-shell wall elements made of concrete or the like

Info

Publication number
DE2345941B2
DE2345941B2 DE19732345941 DE2345941A DE2345941B2 DE 2345941 B2 DE2345941 B2 DE 2345941B2 DE 19732345941 DE19732345941 DE 19732345941 DE 2345941 A DE2345941 A DE 2345941A DE 2345941 B2 DE2345941 B2 DE 2345941B2
Authority
DE
Germany
Prior art keywords
shell
frame
turning
production line
production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19732345941
Other languages
German (de)
Other versions
DE2345941C3 (en
DE2345941A1 (en
Inventor
Rudolf 8940 Memmingen Riker
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Stetter 8940 Memmingen GmbH
Original Assignee
Stetter 8940 Memmingen GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Stetter 8940 Memmingen GmbH filed Critical Stetter 8940 Memmingen GmbH
Priority to DE19732345941 priority Critical patent/DE2345941C3/en
Publication of DE2345941A1 publication Critical patent/DE2345941A1/en
Publication of DE2345941B2 publication Critical patent/DE2345941B2/en
Application granted granted Critical
Publication of DE2345941C3 publication Critical patent/DE2345941C3/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C11/00Trolleys or crabs, e.g. operating above runways
    • B66C11/12Trolleys or crabs, e.g. operating above runways having hoisting gear adapted to special load-engaging elements and not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B19/00Machines or methods for applying the material to surfaces to form a permanent layer thereon
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/028Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members for double - wall articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/08Moulds provided with means for tilting or inverting
    • B28B7/085Moulds provided with means for tilting or inverting for making double wall panels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Description

Die Erfindung betrifft eine Vorrichtung zur Herstellung großflächiger zweischaliger Wandelemente aus Beton od. dgl. mit einer Fertigungsbahn, auf der die erste Schale mit aus ihrer Oberseite herausragender Bewehrung betoniert wird, sowie mit einem Hebezeug und einer Wendeeinrichtung zum Abheben von der Fertigungsbahn, Wenden um 180° und Absenken der ersten Schale auf die frisch betonierte zweite Schale.The invention relates to a device for producing large-area double-shell wall elements from Concrete or the like. With a production line on which the first shell with protruding from its top Reinforcement is concreted, as well as with a hoist and a turning device for lifting off the Production line, turning by 180 ° and lowering the first shell onto the freshly concreted second shell.

In der DE-AS 19 62 529 ist eine Vorrichtung der vorerwähnten Art beschrieben, bei der ein schwenkbarer Schalrahmen vorgesehen ist, der Halteelemente in Form von Steckbolzen aufweist, die in den mit Beton auszufüllenden Raum des Schalrahmens hineinragen und für das Entschalen quer zu den Rahmenseiten im Schalrahmen verschieblich sind. Diese Halteelemente verhindern das Herausfallen der zuerst betonierten Schale, wenn diese abgehoben und gewendet sowie auf die frisch betonierte zweite Schale abgesenkt wird.In DE-AS 19 62 529 a device of the aforementioned type is described in which a pivotable Formwork frame is provided, which has retaining elements in the form of socket pins, which are in the with concrete protrude into the space to be filled in the formwork frame and transversely to the frame sides in the for removal of the formwork Formwork frames are movable. These retaining elements prevent the ones concreted first from falling out Shell when it is lifted, turned and lowered onto the freshly concreted second shell.

Zweischalige Wandelemente ergeben vor allem dann besondere Vorteile, wenn sie in verhältnismäßig großen Dimensionen hergestellt werden. Derartige Wandelemente sind vergleichsweise leichter als massive Wandelemente, erfordern aber an der Baustelle die Ausfüllung mit Beton. Das vergleichsweise geringe Gewicht erlaubt aber eine Herstellung in größeren Abmessungen, wodurch die Zahl der an der Baustelle zu bearbeitenden Trennfugen zwischen den einzelnen Bauelementen reduziert werden kann. Es ist klar, daß bei größeren Abmessungen die Schwierigkeiten beim Ausschalen und Wenden der ersten Schale bei der bekannten Vorrichtung zunehmen, da die Schale mittels der Steckbolzen nur an ihren Rändern abgestützt wird.Double-shell wall elements result in particular advantages when they are in relatively large Dimensions are made. Such wall elements are comparatively lighter than massive ones Wall elements, but require filling with concrete at the construction site. The comparatively small one But weight allows production in larger dimensions, which increases the number of at the construction site machining parting lines between the individual components can be reduced. It is clear that in the case of larger dimensions, the difficulties in stripping and turning the first shell at the known device, since the shell is only supported at its edges by means of the socket pins.

is Die Trennung des Schalrahmens von der Unterlage ergibt weiter die Schwierigkeit, daß für jeden neuen Herstellungsvorgang, der mit einem Rüttelvorgang verbunden ist, eine feste Verbindung zwischen dem Schalrahmen und der Unterlage geschaffen werden muß. Dies geschieht in der Regel durch eine Vielzahl von Schraubverbindungen. Das Lösen und Wiederverbinden ist aufwendig und zeitraubend. Außerdem kann die Fertigungsbahn erst nach dem ementen Befestigen des Schalrahmens auf ihr wieder benützt werden.is The separation of the formwork frame from the base further results in the difficulty that for each new manufacturing process, the one with a shaking process is connected, a permanent connection between the formwork frame and the base can be created got to. This is usually done using a large number of screw connections. The loosening and reconnecting is complex and time consuming. In addition, the production line can only be attached after the ementen of the formwork frame can be used again on it.

Bei einem abnehmbaren Schalrahmen ergibt sich weiter das Problem der ausreichenden Dichtheit zwischen der Schalrahmenunterseite und der Oberseite der Unterlage. Diese Dichtheit ist nach dem Abnehmen und Aufsetzen des Schalrahmens wieder herbeizuführen. Die benutzten Dichtmittel sind dabei einem schnellen Verschleiß ausgesetzt.In the case of a removable shuttering frame, there is also the problem of adequate tightness between the underside of the formwork frame and the top of the underlay. This tightness is after removing it and putting the formwork frame back on. The sealants used are one exposed to rapid wear and tear.

Der Erfindung liegt die Aufgabe zugrunde, eine Vorrichtung der eingangs beschriebenen Art dahingehend zu verbessern, daß auch die Herstellung vergleichsweise großer Wandelemente möglich ist, ohne daß die Gefahr wächst, daß beim Ausschalungsvorgang unerwünscht große Belastungen auf die erste Schale einwirken, und daß die Fertigungsbahn, auf der die erste Schale gefertigt wird, möglichst bald wieder benützt werden kann.The invention is based on the object of providing a device of the type described at the outset to improve that the production of comparatively large wall elements is possible, without increasing the risk that undesirably large loads on the first during the stripping process Act shell, and that the production line on which the first shell is manufactured, as soon as possible again can be used.

Zur Lösung dieser Aufgabe ist nach der Erfindung eine Vorrichtung der eingangs beschriebenen Art gekennzeichnet durch einen Aufhängerahmen mit einer Anzahl selbstausgleichender, die erste Schale an ihrer Bewehrung erfassender Haken zum Abheben der Schale von der Fertigungsbahn und durch einen die abgehobene Schale übernehmenden Wenderahmen zum Wenden und Absenken dieser Schale.To solve this problem, according to the invention, a device of the type described at the outset is provided characterized by a suspension frame with a number of self-balancing, the first shell on it Reinforcement gripping hooks for lifting the shell off the production line and through a die lifted shell taking over turning frame for turning and lowering this shell.

Mittels der erfindungsgemäßen Vorrichtung können auch vergleichsweise großflächige Wandelemente geschaffen werden. Die nach oben vorstehenden Armierungen erstrecken sich regelmäßig über die ganze Schale, wodurch es kein Problem bedeutet, eine ausreichende Zahl von Haken vorzusehen, so daß örtliche Überlastungen und Beschädigungen der Schale vermieden werden. Die Fertigungsbahn bzw. die Form, in der die erste Schale gefertigt wird, steht nach dem Ausschalen der ersten Schale sofort wieder zur Verfügung, denn die abgehobene Schale übernimmt der Wenderahmen mit dem das Wenden und Absenken dieser Schale auf die frisch betonierte zweite Schale erfolgt.By means of the device according to the invention, comparatively large-area wall elements can also be created will. The upwardly protruding reinforcements extend regularly over the whole Shell, making it no problem to provide a sufficient number of hooks so that local overloads and damage to the shell can be avoided. The production line or the shape, in which the first shell is manufactured, is available again immediately after the first shell has been stripped Available, because the raised shell is handled by the turning frame with which it is turned and lowered this shell is done on the freshly concreted second shell.

Die Unteransprüche betreffen verschiedene vorteilhafte Ausgestaltungen der erfindungsgemäßen Vorrichtung. The subclaims relate to various advantageous configurations of the device according to the invention.

In der Zeichnung ist ein Ausführungsbeispiel der Erfindung schematisch dargestellt. Es zeigt
F i g. 1 die Draufsicht auf eine Fertigungsanlage mit
An exemplary embodiment of the invention is shown schematically in the drawing. It shows
F i g. 1 shows the top view of a manufacturing plant

einer erfindungsgemäßen Vorrichtung,a device according to the invention,

Fig.2 einen Querschnitt durch die Anlage nach Fig.1,2 shows a cross section through the system according to Fig. 1,

Fig.3, Fig.4 u. Fig.5 eine Seitenansicht, eine Vorderansicht und die Draufsicht einer erfindungsgemäßen Vorrichtung,Fig.3, Fig.4 and Fig.5 a side view, a Front view and top view of a device according to the invention,

F i g. 6 u. F i g. 7 eine Seitenansicht Lad die Draufsicht des Wenderahmens der erfindungsgemäßen Vorrichtung undF i g. 6 and FIG. 7 is a side view and a top view the turning frame of the device according to the invention and

F i g. 8 u. F i g. 9 eine Seitenansicht und die Draufsicht eines mit einem Aufhängerahmen und einem Wenderahmen versehenen Brückenkrans.F i g. 8 and FIG. 9 shows a side view and a top view of a with a hanging frame and a turning frame equipped overhead crane.

In der schematischen Darstellung der F i g. 1 und 2 sind drei Fertigungsbahnen 8 gezeigt, über denen ein Aufhängerahmen and ein Wenderahmen sowohl in der Richtung X als auch in der Richtung Y verschiebbar angeordnet sind. In der Fig.2 ist mit E die Abhebestellung angedeutet F zeigt eine Wendestellung und in der Stellung Gist bereits eine Wendung um 180° durchgeführt. H zeigt die Absenkstellung. Mit / sind in der F i g. 1 die Trennwände zwischen den einzelnen Bauteilen angedeutetIn the schematic representation of FIG. 1 and 2 three production lines 8 are shown, above which a suspension frame and a turning frame are arranged displaceably both in the X direction and in the Y direction. In FIG. 2, the lift-off position is indicated by E. F shows a turning position and in position G a turn by 180 ° has already been carried out. H shows the lowered position. With / are in FIG. 1 indicated the partition walls between the individual components

In den F i g. 3 bis 5 ist gezeigt, daß die an den Trägern 1, 2 bewegliche, Fahrwerksträger 3, 4 aufweisende Laufkatze 5 mit insgesamt vier Hubwinden 6,7,8 und 9 bestückt ist Die Hubwinden 6 und 7 tragen an ihren Seilgehängen 10 den Aufhängerahmen 11, der mit einer Anzahl selbstausgleichender Haken 12 versehen ist.In the F i g. 3 to 5 it is shown that the chassis carriers 3, 4 which are movable on the carriers 1, 2 Trolley 5 with a total of four hoisting winches 6,7,8 and 9 The hoisting winches 6 and 7 carry on their cable hangers 10 the suspension frame 11, which is equipped with a Number of self-balancing hooks 12 is provided.

Die beiden Hubwinden 6 und 7 sind parallel geschaltet, so daß ein gleichmäßiges Abheben der ersten Schale ohne Pendelschwingungen möglich ist. Die beiden Hubwinden 8 und 9 tragen den Wenderahn;en 13. Dieser Wenderahmen besteht im wesentlichen aus einem geschlossenen rechtwinkligen Rohrrahmen mit den Riegeln 15,16,17 und 18. Am Querriegel 16 ist eine um die Achse 19 durch den Motor 20 drehbar angetriebene Traverse 21 gelagert. Parallel zum gegenüberliegenden Querriegel 18 ist ein Führungsträger 22 verfahrbar, zu welchem Zweck der Motor 26 vorgesehen ist Für diese Bewegung sind die Rollen 23 vorgesehen, sowie die Zahnstange 25 und das dazugehörige Ritzel 24. Die Verschiebung erfolgt auf den Längsriegeln 15 und 17.The two hoisting winches 6 and 7 are connected in parallel, so that an even lifting of the first Shell without pendulum oscillations is possible. The two hoisting winches 8 and 9 carry the turning gear 13. This reversible frame consists essentially of a closed rectangular tubular frame with the bars 15,16,17 and 18. On the cross bar 16 is a Supported cross member 21 rotatably driven about axis 19 by motor 20. Parallel to opposite crossbar 18, a guide support 22 can be moved, for which purpose the motor 26 is provided For this movement, the rollers 23 are provided, as well as the rack 25 and the Corresponding pinion 24. The shift takes place on the longitudinal bolts 15 and 17.

Auf der Innenseite des Führungsträgers 22 ist die Traverse 27 gelagert, und beide Traversehen 21 und 27 haben obenliegende Anlagenasen 28 und von unten anstellbare Druckstücke 29.The cross member 27 is mounted on the inside of the guide carrier 22, and both cross members 21 and 27 have overhead contact lugs 28 and pressure pieces 29 that can be adjusted from below.

Wenn die erste Schale mit dem Aufhängerahmen 11 auf eine ausreichende Höhe angehoben ist, wird sie vom Wenderahmen 13 übernommen, und zwar dadurch, daß der Wenderahmen abgesenkt wird, bis die Anlagenasen 28 auf der ersten Schale aufliegen. Daraufhin werden die Druckstücke 29 vorzugsweise pneumatisch angestellt, wodurch die erste Schale im Wenderahmen festgehalten wird.When the first shell with the hanging frame 11 is raised to a sufficient height, it is from Turning frame 13 taken over, in that the turning frame is lowered until the system lugs 28 rest on the first shell. Then the pressure pieces 29 are preferably adjusted pneumatically, whereby the first shell is held in the turning frame.

Nach der Lösung der Haken 12 von der ersten Schalt und nach dem Hochfahren des Aufhängerahmens 11 wird die erste Schale um 180° gewendet und an der vorgesehenen Stelle abgesenkt Das Wenden und das seitliche Verschieben oder Längsverschieben kannAfter releasing the hook 12 from the first switch and after raising the hanging frame 11 the first shell is turned by 180 ° and lowered at the intended place Can move sideways or lengthways

ίο dabei gleichzeitig erfolgen.ίο take place at the same time.

Für die Hubhöhen sind Spindelendschalter 34 oder Zeitsteuergeräte einstell- bzw. fixierbar. Damit ist sichergestellt, daß der Wendevorgang ohne Behinderung möglich ist. Zweckmäßigerweise wird die Traverse 27 gegenüber dem Führungsträger 22 über eine Druckfeder 31 abgestützt, um Beschädigungen an der Schale zu vermeiden. Weiterhin können die Anlagenasen und die Druckstücke mit Gummiauflagen versehen sein. Der Drehwinkel beim Wendevorgang wird durch die Endschalter 33 festgelegt Der Arbeitsablauf folgt somit einer Zwangssteuerung, so daß Bedienungsfehler ausgeschaltet sind. Der Verstellbereich der Traverse 27 entspricht maximal zwei Dritteln der Länge des Wenderahmens 13.Spindle limit switches 34 or time control devices can be set or fixed for the lifting heights. So is ensures that the turning process is possible without hindrance. Appropriately, the traverse 27 is supported against the guide support 22 via a compression spring 31 to prevent damage to the Avoid peel. Furthermore, the system lugs and the pressure pieces can be provided with rubber pads be. The angle of rotation during the turning process is determined by the limit switch 33. The workflow follows thus a forced control, so that operating errors are eliminated. The adjustment range of the traverse 27 corresponds to a maximum of two thirds of the length of the reversible frame 13.

In der Zeichnung sind elektromechanische Antriebe dargestellt Diese können aber auch durch elektropneumatische oder elektrohydraulische Antriebe ersetzt werden.Electromechanical drives are shown in the drawing. These can also be driven by electropneumatic drives or electro-hydraulic drives are replaced.

In der Darstellung der F i g. 8 und 9 ist die Benützung eines vorhandenen Brückenkrans für die erfindungsgemäße Vorrichtung gezeigt. Während normalerweise die Hubwinde 40 auf einfachen Dreiradfahrwerken 41 abgestützt wird, ist es für die Zwecke der Erfindung vorteilhaft, das Fahrwerk der Laufkatze mit einem vergrößerten Radstand auszubilden und die angesetzten Fahrwerksträger 42 durch Querträger 43 zu einem Rahmen zu verbinden. Mit der Hubwinde 40 der Laufkatze wird der Träger 44 der vier Hubwinden gehoben und gegen den Querträger 43 arretiert Die Arbeitsweise des Anhebens, Wendens, Transportierens und Absenkens einer Schale erfolgt in gleicher Weise, wie im Zusammenhang mit den Darstellungen der F i g. 1 bis 7 beschrieben.In the illustration of FIG. 8 and 9 is the use of an existing overhead crane for the inventive Device shown. While normally the hoist winch 40 on simple tricycle trolleys 41 is supported, it is advantageous for the purposes of the invention, the chassis of the trolley with a to form enlarged wheelbase and the attached chassis beams 42 by cross members 43 to form one Connect frame. With the hoisting winch 40 of the trolley, the carrier 44 of the four hoisting winches lifted and locked against the cross member 43 The operation of lifting, turning, transporting and lowering of a shell takes place in the same way as in connection with the illustrations of F i g. 1 to 7.

Damit nach der Kuppelung der Zusatzausrüstung gemäß der Erfindung mit dem Brückenkran der Seilzug entlastet werden kann, sind mechanische Arretierungen vorgesehen, die aus Bohrungen 45, die die Halterungsteile durchdringen, sowie darin eingreifenden, durch den Stellmotor 46 angetriebenen und von unten steuerbaren Steckersicherungen 47 bestehen.So that after the coupling of the additional equipment according to the invention with the bridge crane, the cable pull can be relieved, mechanical locks are provided, which consist of bores 45, the mounting parts penetrate, as well as engaging therein, driven by the servomotor 46 and controllable from below Connector fuses 47 exist.

Hierzu 4 Blatt ZeichnungenFor this purpose 4 sheets of drawings

Claims (7)

Patentansprüche:Patent claims: 1. Vorrichtung zur Herstellung großflächiger zweischaliger Wandelemente aus Beton od. dgl. mit einer Fertigungsbahn, auf der die erste Schale mit aus ihrer Oberseite herausragender Bewehrung betoniert wird, sowie mit einem Hebezeug und einer Wendeeinrichtung zum Abheben von der Fertigungsbahn, Wenden um 180° und Absenken der ersten Schale auf die frisch betonierte zweite Schale, gekennzeichnet durch einen Aufhängerahmen (11) mit einer Anzahl selbstausgleichender, die erste Schale an ihrer Bewehrung erfassender Haken (12) zum Abheben der Schale von der Fertigungsbahn und durch einen die abgehobene Schale übernehmenden Wenderahmen (13) zum Wenden und Absenken dieser Schale.1. Device for the production of large-area double-shell wall elements made of concrete or the like. With a production line on which the first shell with reinforcement protruding from its upper side is concreted, as well as with a hoist and a turning device for lifting off the production line, Turn by 180 ° and lower the first shell onto the freshly concreted second shell, characterized by a suspension frame (11) with a number of self-balancing, the The first shell on its reinforcement gripping hooks (12) for lifting the shell from the production line and through a shell that has been lifted off accepting turning frame (13) for turning and lowering this shell. 2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß der Aufhängerahmen (11) und der Wenderahmen (13) unabhängig voneinander heb- und senkbar an einer Laufkatze (5) hängen.2. Apparatus according to claim 1, characterized in that the suspension frame (11) and the Reversible frame (13) can be raised and lowered independently of one another on a trolley (5). 3. Vorrichtung nach Anspruch 2, gekennzeichnet durch einen von der Laufkatze getragenen Träger (44), auf dem Hubwinden (6, 7, 8, 9) für den Aufhängerahmen und den Wenderahmen angeordnet sind.3. Apparatus according to claim 2, characterized by a carrier carried by the trolley (44), arranged on the hoisting winches (6, 7, 8, 9) for the hanging frame and the turning frame are. 4. Vorrichtung nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß der Wenderahmen (13) einen horizontalen Rechteckrahmen aufweist, der auf der Innenseite seiner einander gegenüberliegenden Querriegel (16,18) je eine Traverse (21,27) trägt, die je um eine horizontale Mittelachse (19) verschwenkbar sind und die die Enden der ersten Schale ergreifen.4. Device according to one of claims 1 to 3, characterized in that the turning frame (13) has a horizontal rectangular frame on the inside of its opposite Cross bar (16,18) each carries a cross member (21,27), each around a horizontal central axis (19) are pivotable and which grip the ends of the first shell. 5. Vorrichtung nach Anspruch 4, dadurch gekennzeichnet, daß der Abstand der beiden Traversen (21, 27) voneinander veränderbar ist.5. Apparatus according to claim 4, characterized in that the distance between the two cross members (21, 27) can be changed from one another. 6. Vorrichtung nach Anspruch 4 oder 5, dadurch gekennzeichnet, daß die eine Traverse (27) an einem Führungsträger (22) gelagert ist der mit Hilfe einer Zahnstange (25) und eines motorbetriebenen Ritzels (24) entlang den Längsriegeln (15, 17) des Wenderahmens (13) verfahrbar ist.6. Apparatus according to claim 4 or 5, characterized in that the one traverse (27) on one The guide carrier (22) is mounted with the aid of a toothed rack (25) and a motor-driven pinion (24) can be moved along the longitudinal bars (15, 17) of the turning frame (13). 7. Vorrichtung nach Anspruch 6, gekennzeichnet durch eine Druckfeder (31) zwischen dem Führungsträger (22) und der zugehörigen Traverse (27).7. Apparatus according to claim 6, characterized by a compression spring (31) between the guide support (22) and the associated traverse (27).
DE19732345941 1973-09-12 1973-09-12 Device for the production of large double-shell wall elements made of concrete or the like Expired DE2345941C3 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19732345941 DE2345941C3 (en) 1973-09-12 1973-09-12 Device for the production of large double-shell wall elements made of concrete or the like

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19732345941 DE2345941C3 (en) 1973-09-12 1973-09-12 Device for the production of large double-shell wall elements made of concrete or the like

Publications (3)

Publication Number Publication Date
DE2345941A1 DE2345941A1 (en) 1975-03-27
DE2345941B2 true DE2345941B2 (en) 1978-10-12
DE2345941C3 DE2345941C3 (en) 1979-06-07

Family

ID=5892348

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19732345941 Expired DE2345941C3 (en) 1973-09-12 1973-09-12 Device for the production of large double-shell wall elements made of concrete or the like

Country Status (1)

Country Link
DE (1) DE2345941C3 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3101292A1 (en) * 1981-01-16 1982-07-29 Sommer Maschinenfabrik GmbH, 8300 Landshut Turning device for a production system for producing concrete slabs

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2432371A1 (en) * 1978-08-04 1980-02-29 Chaudronnerie Entr Indle METHODS AND FACILITIES FOR THE SERIAL MANUFACTURE OF ELONGATED REINFORCED CONCRETE ELEMENTS SUCH AS POSTS
FR2517288A1 (en) * 1981-12-02 1983-06-03 Michel Bernard Mould for prefabricated concrete sections - has pivoting cradle with grips which are operated by rams inside frame
FR2590516B1 (en) * 1985-11-28 1989-03-10 Mathieu Roland VERSATILE PLANT FOR THE MANUFACTURE OF MOLDED PRODUCTS, PARTICULARLY CONCRETE PRODUCTS
IE20050139A1 (en) * 2004-03-15 2005-11-02 Eden Res And Dev Company Ltd Apparatus and a method for manufacturing a twin leaf reinforced concrete panel element
FR2989614B1 (en) * 2012-04-19 2016-01-08 Ossabeton Systemes CHAIN AND METHOD FOR MANUFACTURING PREFABRICATED PANELS FOR THE CONSTRUCTION OF BUILDINGS
CN111704039A (en) * 2020-07-17 2020-09-25 江西速升智能装备有限公司 Opening for converting large-scale parts between first-floor workshop and second-floor workshop

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3101292A1 (en) * 1981-01-16 1982-07-29 Sommer Maschinenfabrik GmbH, 8300 Landshut Turning device for a production system for producing concrete slabs

Also Published As

Publication number Publication date
DE2345941C3 (en) 1979-06-07
DE2345941A1 (en) 1975-03-27

Similar Documents

Publication Publication Date Title
DE3244468C2 (en)
DE2159714C3 (en) Device for separating aerated concrete elements which are delimited by horizontal cuts and which stick together to form a stack after hardening
DE2422135B2 (en) DEVICE FOR MANIPULATING A NUCLEAR REACTOR FUEL ELEMENT IN A FUEL ELEMENT STORAGE POOL CONTAINING WATER
DE2345941C3 (en) Device for the production of large double-shell wall elements made of concrete or the like
DE1808989C3 (en) Device for the production of monolithic reinforced concrete room cells with one open side pointing downwards, in particular prefabricated garages, under the corridor
DE1684263B1 (en) Device for lifting ceilings of buildings using the lifting ceiling method
DE2759530B1 (en) Device for the production of concrete beams
DE2458486C3 (en) Dismountable formwork and system for the production of a molded concrete block for hydraulic engineering
DE2845960C2 (en) System for the treatment of goods in treatment baths, especially for metal cleaning systems, electroplating systems or the like.
DE2400790C2 (en) Process and device for the production of room cells made of reinforced concrete, e.g. prefabricated garages
DE2430009C2 (en) Method and device for demoulding large panels made of reinforced concrete
DE1962529A1 (en) Device for the production of multi-layer concrete slabs
DE2417805C2 (en) Formwork core for the production of reinforced concrete room cells that are open on one side
DE1288767B (en) Mobile pouring device
DE1584742B1 (en) Method and device for producing large panels made of concrete or the like.
DE2252087C3 (en) Formwork for the horizontal production of reinforced concrete room cells, in particular prefabricated garages, which have a floor and an open face, and a method for introducing concrete into the formwork
DE2551675A1 (en) Insertion of die in pressure deformation machine - by means of carrier having rails for car suspending die and all carried by crane
DE3101292C2 (en) Turning device for a production plant for the manufacture of concrete slabs
DE1584742C (en) Method and device for producing large panels from concrete or the like
DE2258525A1 (en) TURNING DEVICE FOR DOUBLE WALL PANELS
DE2808644C3 (en) Device for pouring concrete construction elements
DE2623502B2 (en) System for handling and providing clamping plates and / or casting molds
DE2400390A1 (en) Formwork for prefabricated concrete cell - has inner core and outer panels supported on tilting arm
DE2204785C3 (en) Process and plant for the production of large panels from reinforced concrete
DE8118905U1 (en) WORKING DEVICE FOR MOLDING AND DEFORMING CONCRETE ELEMENTS

Legal Events

Date Code Title Description
C3 Grant after two publication steps (3rd publication)
EHJ Ceased/non-payment of the annual fee