DE202010006162U1 - Fixing element for a track superstructure - Google Patents
Fixing element for a track superstructure Download PDFInfo
- Publication number
- DE202010006162U1 DE202010006162U1 DE201020006162 DE202010006162U DE202010006162U1 DE 202010006162 U1 DE202010006162 U1 DE 202010006162U1 DE 201020006162 DE201020006162 DE 201020006162 DE 202010006162 U DE202010006162 U DE 202010006162U DE 202010006162 U1 DE202010006162 U1 DE 202010006162U1
- Authority
- DE
- Germany
- Prior art keywords
- fixing element
- track
- element according
- fixing
- rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/16—Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
- E01B29/20—Moving rails placed on installed sleepers in the plane track
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
Fixierelement für einen Gleisoberbau mit einer auf einem Unterbau aufgebrachten ein- oder mehrlagigen Tragschicht und auf der Tragschicht verlegten Schwellen mit Gleisen, gekennzeichnet dadurch, dass das Fixierelement als Spurhalter in Form eines Flachstahlbandes (1) zwischen zwei Betonschwellen in einem Schwellenfach oder auf einer Holzschwelle angeordnet ist und im Bereich seiner beiden Außenseiten jeweils eine weitgehend rechteckige Rippenplatte (2) aufweist, auf der jeweils zwei in Schienenfußbreite zueinander befindliche Rippen (22) angeordnet sind, die in ihrer Mitte jeweils eine Öffnung für die Aufnahme jeweils einer Befestigungsschraube (4) mit Halteelementen (5; 15) aufweist, wobei die Befestigungsschraube (4) durch eine an sich bekannte mehrfach abgewinkelte, federnd ausgeführte Spannklemme (3) geführt ist und sich die Spannklemme (3) mit ihrem Mittelteil und ihren zwei Endbügeln auf einem Schienenfuß/Isolierwinkel abstützt.Fixing element for a track superstructure with an applied on a substructure single or multi-layer support layer and laid on the support layer sleepers with tracks, characterized in that the fixing arranged as a track holder in the form of a flat steel strip (1) between two concrete sleepers in a sleeper compartment or on a wooden threshold is and in the region of its two outer sides each having a substantially rectangular ribbed plate (2), on each of which two in Schienenfußbreite mutually located ribs (22) are arranged in the middle of each one opening for receiving a respective fastening screw (4) with holding elements (5; 15), wherein the fastening screw (4) is guided by a per se known multi-angled, spring-running tensioning clamp (3) and the tensioning clamp (3) is supported with its central part and its two end brackets on a rail / insulating bracket.
Description
Die Erfindung betrifft ein Fixierelement für einen Gleisoberbau mit einer auf einem Unterbau aufgebrachten ein- oder mehrlagigen Tragschicht und auf der Tragschicht verlegten Schwellen und Gleisen.The The invention relates to a fixing element for a track superstructure with a one or more layers applied to a substructure Base course and sleepers and tracks laid on the base course.
Der klassische, schotterbasierte Gleisoberbau im Eisenbahnbereich ist ein mehr oder weniger bewegliches Gefüge. Dieses Gefüge bewegt sich aufgrund von wechselnden Belastungen aus der Überfahrt von Güter- und/oder Personenzügen in alle Richtungen und muss trotzdem eine gewisse Lagestabilität aufweisen. Die auf den Schwellen befestigten Gleise müssen dabei zulässige Spurweiten einhalten, um eine Gefährdung des Eisenbahnbetriebes durch Entgleisungen auszuschließen. Die zulässigen Spurweiten und die Lage der Gleise werden dabei regelmäßig durch Messzüge und/oder durch manuelle Inspektionen geprüft und gemessen. Werden unzulässige Abweichungen vom zugelassenen Bereich festgestellt, müssen z. B. Spurweitenfehler durch Instandhaltungsmaßnahmen beseitigt werden.Of the classic, ballast-based track superstructure in the railway sector is a more or less mobile structure. This structure moves due to changing loads from the crossing of goods and / or passenger trains in all directions and still has to have a certain positional stability. The tracks mounted on the sleepers must be permitted Maintain track gauges to endanger railway operations Exclude derailments. The permissible gauges and the location of the tracks are doing regular checked by measuring cables and / or by manual inspections and measured. Be inadmissible deviations from the legal Determined area, z. B. Gauge error by Maintenance measures are eliminated.
Sobald die beiden Schienenstränge mittels eines speziellen Befestigungsmaterials (Spannklemmen, Spannschrauben etc.) fest mit den Querschwellen verbunden sind, wird diese rahmenartige Konstruktion als „Gleisjoch” bezeichnet. Im Bereich von Fahrweg-Verzweigungen spricht man in diesem Zusammenhang alternativ von „Weichenjochen”. Die Soll-Spurweiten variieren aus historischen Gründen in verschiedenen regionalen Gebieten; in Deutschland wird beispielsweise eine Spurweite von 1435 mm als „Normalspur” bezeichnet. In der Realität kommt es durch verschiedene Faktoren zu Abweichungen von der Soll-Spurweite. Diese Abweichungen können in beide Richtungen erfolgen, so dass es sowohl Spur-Verengungen wie auch Spur-Erweiterungen gibt. Die einschlägigen Regelwerke der verschiedenen Betreiber der Gleis-Infrastrukturanlagen legen die Toleranzen für derartige Abweichungen fest.As soon as the two rail tracks by means of a special fastening material (Clamps, clamping screws, etc.) firmly connected to the sleepers are, this frame-like construction called a "track yoke". In the area of infrastructure branches one speaks in this connection alternatively from "Weichenjochen". The nominal gauges vary for historical reasons in different regional areas; in Germany, for example, a gauge of 1435 mm referred to as "standard gauge". In reality comes It is due to various factors to deviations from the target gauge. These deviations can be done in both directions, so there are both track constrictions and track extensions. The relevant rules of the various operators track infrastructure facilities set the tolerances for such deviations.
Bei Unterschreitung einer festgelegten Mindest-Spurweite wird eine Berichtigung der Spurweite durch einen korrektiven Eingriff erforderlich. Üblicherweise handelt es sich hierbei um sogenannte „Einzelfehler”, d. h. punktuell auftretende Fehler, die in oftmals manueller Arbeit beseitigt werden, da die Auf- und Abrüstzeiten eine maschinelle Bearbeitung bisweilen zu unflexibel und unwirtschaftlich machen.at Below a specified minimum gauge becomes a correction the gauge required by a corrective intervention. Usually these are so-called "single errors", d. H. occasionally occurring errors, often in manual work be eliminated, since the up and down times a machine Processing sometimes too inflexible and uneconomical.
Zur Überbrückung der Zwischenzeiten bis zur Durchführung derartiger Instandhaltungsmaßnahmen werden bislang Spurstangen eingesetzt. Diese Spurstangen können jedoch nur für eine zeitliche Begrenzung verwendet werden. Dabei ist Voraussetzung, dass mindestens eine Schiene als Führungsschiene eine kraftschlüssige Verspannung aufweist. Spurstangen dürfen maximal nur in zwei aufeinanderfolgenden Schwellenfächern eingebaut werden. Danach müssen mindestens drei aufeinanderfolgende Schwellen mit Spurhaltefähigkeit und kraftschlüssiger Verspannung folgen. Die eingestellte Spurweite muss bei der Spurstange das gleiche Maß, wie das der benachbarten Schwellen aufweisen, um zusätzliche Beanspruchungen der Spurstangen zu vermeiden.To bridge the split times until the implementation of such maintenance measures So far tie rods are used. These tie rods can however, only be used for a time limit. It is a prerequisite that at least one rail as a guide rail having a non-positive tension. turnbuckles are allowed only in two consecutive threshold slots to be built in. After that, at least three consecutive Sleepers with track holding ability and non-positive Follow tension. The set gauge must be at the tie rod the same degree as that of the adjacent thresholds, to avoid additional stress on the tie rods.
Spurstangen dürfen nur in Gleisen und Weichen bis zu einer Geschwindigkeit von Vmax ≤ 80 km/h eingesetzt werden. Sie stellen jeweils ein Hilfsmittel zum sofortigen Herstellen eines betriebssicheren Zustandes dar. Der ordnungsgemäße Zustand des Gleises muss baldmöglichst wiederhergestellt und die Spurstangen zurückgebaut werden.Tie rods may only be used in tracks and switches up to a speed of V max ≤ 80 km / h. They each provide a means to immediately establish a safe operating condition. The proper condition of the track must be restored as soon as possible and the tie rods must be removed.
Nach dem Einbau von Spurstangen sind, in Abhängigkeit von Anlagenzustand, Belastungen und Geschwindigkeit des Verkehrs in mindestens monatlichen Rhythmus regelmäßig Sonderinspektionen durchzuführen. Derartige Sonderinspektionen sind personal-, zeit- und kostenintensiv. Dabei muss auf einen festen Sitz, als auch auf Beschädigung und Risse an den Spurstangen geachtet werden. Beschädigte Spurstangen sind sofort auszutauschen und das Gleis ist bis dahin zu sperren. Der Einsatz der Spurstangen ist max. bis zu 6 Wochen zulässig. Aufgrund der in den letzten Jahren angestiegenen Verkehrsbelastungen sind diese Spurstangen nicht mehr zeitgemäß. Bei vorhandenen Spurstangen sind zudem die Schienenfußhalterungen zu schwach und brechen, wobei ein den Betrieb gefährdender Zustand erreicht wird.To the installation of tie rods are, depending on the condition of the plant, Burdens and speed of traffic in at least monthly Rhythm regularly perform special inspections. Such special inspections are labor-intensive, time-consuming and cost-intensive. It must be on a tight fit, as well as on damage and cracks on the tie rods are respected. damaged Tie rods are replaced immediately and the track is up to then to lock. The use of the tie rods is max. up to 6 weeks allowed. Due to the increased traffic in recent years These tie rods are out of date. at Existing tie rods are also the Schienenfußhalterungen too weak and break, with a more dangerous to the operation State is reached.
Eine
Spurstange besteht konstruktiv aus einer rohrförmigen Hülse
mit Innengewinde sowie zwei unabhängig voneinander in der
Hülse drehbaren Gewindestangen. Sie verfügt an
den beiden aus der Rohrhülse herausdrehbaren Enden der
Gewindestangen über klauenartig geformte Kopfstücke, welche
jeweils am Schienenfuß beider Schienen zum Eingriff gebracht
werden (
Eine erste bekannte Ausführungsart derartiger Kopfstücke sieht vor, dass die Klauen in einer zur Schiene hin offenen U-Form ausgeführt sind und an den jeweils gleisinneren Kanten beider Schienenfüße zum Anschlag gebracht werden. Dies hat nachteilig zur Folge, dass eine solche Vorrichtung ausschließlich zum Auseinanderspreizen der Schienen – also zur Beseitigung von Spurverengungen – eingesetzt werden kann. Ein Einsatz zur Beseitigung von Spurerweiterungen ist jedoch nicht möglich.A first known embodiment of such head pieces provides that the claws in a U-shape open towards the rail are executed and at the respective inner track edges Both rail feet are brought to the stop. This has the disadvantage of the consequence that such a device exclusively for Dismantling the rails - that is to eliminate them of track constrictions - can be used. A mission however, it is not possible to remove track extensions.
Diesen Nachteil soll eine zweite bekannte Ausführungsart beseitigen, bei der die Klauen in einer zur Sohle des Schienenfußes nach oben hin offenen C-Form ausgeführt sind, wobei die Klauen die Schienenfüße jeweils untergreifen und wahlweise die gleisinnere oder die gleisäußere Schienenfuß-Kante umgreifen. Auf diese Weise können zwar sowohl Spreiz- wie auch Zugkräfte vom Spindeltrieb auf die Schienenstränge ausgeübt werden. Als besonders nachteilig hat sich jedoch in der Praxis herausgestellt, dass diese Vorrichtung ausschließlich im Bereich zwischen zwei Schwellen (sog. „Schwellenfächer”) zum Einsatz gebracht werden kann und zudem ein Ausräumen des Schwellenfaches von Schotter (sog. „Auskoffern”) nötig wird. Dies macht die Anwendung dieser Ausführungsform einer Spurhaltestange unflexibel und zeitraubend. Zudem ist insbesondere im Bereich von Weichen der Einsatz dieser bekannten Spurhaltestangen oftmals unmöglich, da Einbauten wie z. B. Radlenker oder Weichenzungen den für die Spurhaltestange benötigten Einbauraum blockieren.This disadvantage is a second known Eliminate embodiment, in which the claws are executed in a sole of the rail foot upwardly open C-shape, the claws engage under the rail feet respectively and optionally surround the track inside or the track outer rail foot edge. In this way, both spreading and tensile forces can be exerted by the spindle drive on the rail tracks. However, it has proven to be particularly disadvantageous in practice that this device can be used exclusively in the area between two thresholds (so-called "threshold compartments") and, moreover, a clearing out of the threshold compartment of ballast (so-called "Auskoffern") becomes necessary. This makes the application of this embodiment of a tracking bar inflexible and time consuming. In addition, the use of these known tracking rods is often impossible, especially in the area of switches, since internals such. B. Radlenker or switch blades block the space required for the lane support rod installation space.
Die
Aus
der
Die
Die
Allen bekannten Fixierelementen ist gemeinsam, dass eine Ausrichtung der Gleise zueinander nur über aufwendige Messungen möglich ist, da diese Vorrichtungen primär nur für ein Gleis und seine Lagefixierung geeignet sind.all Known fixing elements have in common that an orientation of the Tracks to each other only possible through elaborate measurements is because these devices primarily for one Track and its location fixation are suitable.
Der Erfindung liegt die Aufgabe zugrunde, eine stabile Möglichkeit zur Beseitigung von Spurweitenfehlern zu entwickeln, die eine exakte Korrektur der Spurweite in zulässigen Bereichen erweiternd oder einengend vornimmt, wobei die Instandsetzung in einem wirtschaftlich erträglichen Zeitraum geplant und durchgeführt werden kann, ohne in einen sicherheitskritischen Bereich zu gelangen.Of the Invention is the object of a stable way to develop track gauge errors that are exact Widening the gauge in permissible ranges or completing the repair in an economical tolerable period planned and carried out without going into a safety-critical area.
Dies
wird erfindungsgemäß dadurch erreicht, dass
das
Fixierelement als Spurhalter in Form eines Flachstahlbandes zwischen
zwei Betonschwellen in einem Schwellenfach oder auf einer Holzschwelle
angeordnet ist und im Bereich seiner beiden Außenseiten
jeweils eine weitgehend rechteckige Rippenplatte aufweist, auf der
jeweils zwei in Schienenfußbreite zueinander befindliche
Rippen angeordnet sind, die in ihrer Mitte jeweils eine Öffnung
für die Aufnahme jeweils einer Befestigungsschraube mit
Halteelementen aufweist, wobei die Befestigungsschraube durch eine
an sich bekannte mehrfach abgewinkelte, federnd ausgeführte
Spannklemme geführt ist und sich die Spannklemme mit ihrem
Mittelteil und ihren zwei Endbügeln auf einem Schienenfuß abstützt.This is inventively achieved in that
the fixing is arranged as a track holder in the form of a flat steel strip between two concrete sleepers in a sleeper compartment or on a wooden threshold and in the region of its two outer sides each having a substantially rectangular ribbed plate, on each of which two in Schienenfußbreite mutually located ribs are arranged in the middle of each having an opening for receiving in each case a fastening screw with retaining elements, wherein the fastening screw is guided by a per se known multiply angled, spring-running tension clamp and the tension clamp is supported with its central part and its two end brackets on a rail.
Der Spurhalter ist vorzugsweise als Flachstahlband ausgeführt. Dies ermöglicht ohne zusätzliche oder vorbereitende Arbeiten am Gleisoberbau seine problemlose Anordnung im Schwellenfach oder bei Holzschwellen seine direkte Anordnung und Befestigung auf der Schwelle. Bei Holzschwellen müssen allerdings die vorhandenen Rippenplatten vorher ausgebaut und die Schienen hierzu angehoben werden.Of the Spurhalter is preferably designed as a flat steel strip. This allows without additional or preparatory Work on the track superstructure its trouble-free arrangement in the sleeper compartment or at wooden sleepers its direct arrangement and attachment on the Threshold. For wooden sleepers, however, the existing Ribbed plates removed before and raised the rails for this purpose become.
Zwischen Schienenfuß und Spannklemme ist im Bedarfsfall zur Stromabsicherung ein Isolierwinkel anzuordnen.Between Rail foot and tension clamp is in case of need for power protection to arrange an insulating angle.
Der Spurhalter kann einteilig oder zweiteilig ausgeführt werden. Während der einteilige Spurhalter keine variabel einstellbare Spurweiten aufweist, kann der zweiteilige Spurhalter mittels Ausgleichsblechen/Passstück in seiner Spurweite (1435 bis 1450 mm) angepasst werden.Of the Track holder can be made in one or two parts. While the one-piece track holder no variably adjustable Has gauges, the two-piece track holder can by means of compensating plates / fitting be adjusted in its gauge (1435 to 1450 mm).
Der zweiteilige Spurhalter weist an jedem Teil eine Aufwinkelung mit jeweils mindestens einer Bohrung für das Durchführen mindestens einer Verbindungsschraube mit Mutter und Unterlegscheibe auf.Of the two-piece track holder has at each part with an angle in each case at least one bore for performing at least one connecting screw with nut and washer on.
Das Passstück weist mindestens ein offenes Langloch zur Aufnahme mindestens einer Verbindungsschraube auf.The Adapter has at least one open slot for recording at least one connecting screw.
Zwischen dem als Flachstahlband ausgeführten Spurhalter und mindestens einem Aufschweißstück kann zur Höhenjustierung mindestens eine gerade oder schräge Zwischenlage angeordnet sein.Between the designed as a flat steel strip track holder and at least A welding piece can be used for height adjustment be arranged at least one straight or oblique liner.
Der Spurhalter weist in seinem Flachstahlband bei einer Anordnung auf einer Holzschwelle mehrere Bohrungen zum Befestigen und Fixieren auf dem Schwellenkörper auf.Of the Spurhalter has in its flat steel strip in an arrangement a wooden sill several holes for fastening and fixing on the sleeper body.
Vorteile der Erfindung:Advantages of the invention:
- • der Spurhalter fixiert die Gleise im zulässigen Bereich stabil bis zur geplanten Durchführung von Sanierungsmaßnahmen,• The track holder fixes the tracks within the permissible range stable until the planned implementation of remedial measures,
- • es sind keine zusätzlichen Inspektionen und keine Einsatzbegrenzungen notwendig,• there are no additional inspections and no usage limits necessary,
- • der zweiteilige Spurhalter kann verschiedenen Spurweiten in Bereichen von 1435 bis 1450 mm variabel durch eine Verwendung verschiedener Zwischenstücke angepasst werden,• The two-piece track holder can have different gauges in ranges of 1435 to 1450 mm variable by use adapted to different intermediate pieces,
- • der einteilige Spurhalter kann in verschiedenen Breiten in z. B. 5 mm-Schritten hergestellt und eingesetzt werden,• The one-piece track holder can be in different widths in z. B. 5 mm steps are manufactured and used,
- • die Geschwindigkeitsbegrenzung von Vmax ≤ 80 km/h könnte entfallen, nach Prüfung und Zulassung durch das Eisenbahnbundesamt wäre bei beiden Spurhaltern eine Geschwindigkeit von Vmax 160 mit Schwellenfixierung (Holzschwelle) und ohne Schwellenfixierung von Vmax 120 möglich,• the speed limit of V max ≤ 80 km / h could be eliminated, after testing and approval by the German Federal Railway Authority a speed of V max 160 with threshold fixing (wooden threshold) and without threshold fixing of V max 120 would be possible for both track holders,
- • Spurhalter können bereits vor einem Eintreten von Spurweitenfehlern eingesetzt werden,• Spurhalter can already before entering Gauge errors are used,
- • aufgrund seiner geringen Einbauhöhe können Spurhalter bei Betonschwellen ohne ein Ausräumen von Schotter im Schwellenfach und bei Holzschwellen direkt auf der Schwelle angeordnet werden,• due to its low installation height, track holders for concrete sleepers without clearing of ballast in the sleeper compartment and be placed right on the threshold at wooden sleepers,
- • der Einsatz von Stopfmaschinen ist möglich, ohne dass einzelne Schwellen wegen fehlender Verspannung unbearbeitet im Gleisbett verbleiben,• The use of tamping machines is possible without that individual sleepers are unprocessed due to lack of tension remain in the track bed,
- • die Spurhalter sind auch in bestimmten Bereichen einer Weiche und überwiegend auch in Zugbildungsanlagen einsetzbar,• The track holders are also in certain areas a switch and mainly in Zugbildungsungsanlagen used,
- • beide Spurhalter-Ausbildungen sind gegen Strom isoliert,Both track holder formations are insulated against current,
- • eine stufenweise Herstellung der gewünschten Spurweite mittels entsprechend spurregulierender Einlagen bei nicht erforderlichen Isolierwinkeln (Spurplättchen SSP) ist möglich.• a gradual production of the desired gauge by means of appropriate track-regulating deposits when not required Insulating angles (track plate SSP) is possible.
Ausführungsbeispielembodiment
Anhand eines Ausführungsbeispieles soll nachstehend die Erfindung näher erläutert werden.Based an embodiment of the invention below be explained in more detail.
Dabei zeigen:there demonstrate:
Das
als Spurhalter ausgebildete Fixierelement weist als Basisträger
einen Flachstahl
Der
Flachstahl
Über
die Hakenschraube
Die einteilige Form des Spurhalters kann in schrittweiser Abstufung zwischen 1.435 bis 1.450 mm hergestellt werden, sodass immer die jeweils passende Größe für den jeweiligen Gleisabschnitt verwendet werden kann. Die jeweilige abweichende Spurweite von 1435 mm wird auf dem Spurhalter in geeigneter Weise gekennzeichnet.The One-piece shape of the track holder can be gradual be made between 1,435 to 1,450 mm, so always the each appropriate size for each Track section can be used. The respective differing gauge of 1435 mm is suitably marked on the track holder.
Beim
zweiteiligen Spurhalter ist der Flachstahl
Beide
Spurhalterarten lassen sich jedoch auch in Gleisbereichen mit Holzschwellen
verwenden. In diesem Fall erfolgt der Einbau bevorzugt direkt auf
der jeweiligen Holzschwelle, nachdem die dortigen Rippenplatten
vorher entfernt wurden und in der Holzschwelle neue – versetzt
angeordnete – Löcher für die Befestigung
des Spurhalters gebohrt wurden. Die Schienen müssen für
die Entfernung der Rippenplatten der Holzschwelle und das Einführen der
Spurstange leicht angehoben werden. Der Flachstahl
Dadurch ist ein Einsatz des Spurhalters auch für Weichen und zwar im Zwischenschienen- und im Endteilbereich möglich. Im Bereich beweglicher Teile einer Weiche ist der Einsatz des Spurhalters dagegen nicht möglich.Thereby is a use of the track holder for turnouts and indeed in Zwischenschienen- and in Endteilbereich possible. in the Range of moving parts of a switch is the use of the track holder not possible.
Eine
Stromabsicherung erfolgt mittels Zwischenlage
Die
Isolierung des zweiteiligen Spurhalters erfolgt über die
Isoliereinlage
- 11
- Flachstahlflat steel
- 22
- Rippenplatterib plate
- 33
- Spannklemmetension clamp
- 44
- Befestigungs-/HakenschraubeFastening / hook screw
- 55
- Scheibedisc
- 66
- Zwischenlageliner
- 77
- IsolierwinkelIsolierwinkel
- 88th
- Schraubescrew
- 99
- Muttermother
- 1010
- Zwischenblech/PassstückIntermediate plate / spud
- 1111
- Isolierstückinsulating
- 1212
- Isolier-KragenbuchseInsulating collarbush
- 1313
- Scheibedisc
- 1414
- Ausgleichsblechbalance sheet
- 1515
- Muttermother
- 1616
- Zwischenlageliner
- 1717
- Aufbiegung/AufsatzBent-up / top
- 1818
- Aufbiegung/AufsatzBent-up / top
- 1919
- Bohrungdrilling
- 2020
- Bohrungdrilling
- 2121
- Schraublochscrew
- 2222
- Ripperib
- 2323
- LanglochLong hole
ZITATE ENTHALTEN IN DER BESCHREIBUNGQUOTES INCLUDE IN THE DESCRIPTION
Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list The documents listed by the applicant have been automated generated and is solely for better information recorded by the reader. The list is not part of the German Patent or utility model application. The DPMA takes over no liability for any errors or omissions.
Zitierte PatentliteraturCited patent literature
- - DE 202006012284 U1 [0008] - DE 202006012284 U1 [0008]
- - DE 3927251 C2 [0011] - DE 3927251 C2 [0011]
- - DE 4313105 A1 [0012] DE 4313105 A1 [0012]
- - DE 4405679 A1 [0013] DE 4405679 A1 [0013]
- - DE 19620638 A1 [0014] - DE 19620638 A1 [0014]
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE201020006162 DE202010006162U1 (en) | 2010-04-27 | 2010-04-27 | Fixing element for a track superstructure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE201020006162 DE202010006162U1 (en) | 2010-04-27 | 2010-04-27 | Fixing element for a track superstructure |
Publications (1)
Publication Number | Publication Date |
---|---|
DE202010006162U1 true DE202010006162U1 (en) | 2010-07-29 |
Family
ID=42372239
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE201020006162 Expired - Lifetime DE202010006162U1 (en) | 2010-04-27 | 2010-04-27 | Fixing element for a track superstructure |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE202010006162U1 (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4313105A1 (en) | 1993-04-22 | 1994-11-03 | Walter Bau Ag | Method for producing a ballastless track superstructure and a track superstructure produced according to the method |
DE4405679A1 (en) | 1994-02-23 | 1995-08-24 | Weiss Gmbh & Co Leonhard | Fixing for railway tracks on solid bases esp. concrete and asphalt |
DE19620638A1 (en) | 1996-05-22 | 1997-11-27 | Odebrecht Bau Ag | Track superstructure |
DE3927251C2 (en) | 1988-08-18 | 1999-08-12 | Peter Guenter Kuesel | Method and spacer for laying railroad tracks |
DE202006012284U1 (en) | 2006-08-09 | 2006-11-02 | Db Netz Ag | Jig to set the relationship between railway switch point and fixed rails has tubular sleeve with inner threads engaging with two threaded rods |
-
2010
- 2010-04-27 DE DE201020006162 patent/DE202010006162U1/en not_active Expired - Lifetime
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3927251C2 (en) | 1988-08-18 | 1999-08-12 | Peter Guenter Kuesel | Method and spacer for laying railroad tracks |
DE4313105A1 (en) | 1993-04-22 | 1994-11-03 | Walter Bau Ag | Method for producing a ballastless track superstructure and a track superstructure produced according to the method |
DE4405679A1 (en) | 1994-02-23 | 1995-08-24 | Weiss Gmbh & Co Leonhard | Fixing for railway tracks on solid bases esp. concrete and asphalt |
DE19620638A1 (en) | 1996-05-22 | 1997-11-27 | Odebrecht Bau Ag | Track superstructure |
DE202006012284U1 (en) | 2006-08-09 | 2006-11-02 | Db Netz Ag | Jig to set the relationship between railway switch point and fixed rails has tubular sleeve with inner threads engaging with two threaded rods |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE102005013947A1 (en) | Method for height correction of a fixed rail track and fixed rail track | |
LU88479A1 (en) | Cross sleepers for railway track systems | |
DE19837360A1 (en) | Installation procedure for a fixed rail track | |
EP1887136A1 (en) | Device for setting the gauge between rails on a track or switch | |
EP0894897A1 (en) | Process for making a track structure | |
DE102006002375B3 (en) | Method for producing a solid roadway | |
CH715209B1 (en) | Track transition unit between a ballast track section and a ballastless track section. | |
DE202010006162U1 (en) | Fixing element for a track superstructure | |
EP1740771B1 (en) | Device for adjusting a track structure and switches | |
DE10029315A1 (en) | Method for laying railway track uses supports below it at predetermined points which allow height of the track to be adjusted before it is fixed in place | |
EP0460778B1 (en) | Attachment for a railway rail base plate and method for obtaining a switch and a steel Y shaped sleeper | |
DE202014010270U1 (en) | System for straightening a track of a fixed railroad track | |
DE102007045709B3 (en) | Concrete sleeper and method for regulating the position of rails | |
CH712962B1 (en) | Roofing, can be placed next to and between railway tracks. | |
DE202010008526U1 (en) | concrete sleeper | |
DE10236535B4 (en) | Process for the production of a slab track with the traverse method on bridges and other art structures | |
DE19952803C2 (en) | Superstructure for rail-bound public transport vehicles and method and device for its manufacture | |
DE102007025159B4 (en) | Method for replacing roadway crossings, truss box cover and use of a truss box cover | |
DE202004006904U1 (en) | Jig for aligning rail track prior to applying ballast has a base plate with height control spindles and with a horizontal adjuster with a tilt support under the base of the rail | |
DE102009060812B4 (en) | System for straightening a track of a fixed railroad track | |
EP1891271B1 (en) | Lifting and directing tie | |
DE10107116A1 (en) | Railtrack grid aligner for ballast-free track tops uses slides adjusting along support as anchored to trough base to shift rails crossways into re-alignment. | |
DE19620638C2 (en) | Track superstructure | |
EP3792396B1 (en) | Frame for a railway covering for a solid track | |
DE4428163C1 (en) | Method for construction of permanent way in points area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R207 | Utility model specification |
Effective date: 20100902 |
|
R156 | Lapse of ip right after 3 years |
Effective date: 20131101 |