DE19831026A1 - Supporting cable structure for roofs etc has tensile or compression element mounted across and between two pretensioned cables which are connected to common pretension element to take up forces to balance out outside loads - Google Patents

Supporting cable structure for roofs etc has tensile or compression element mounted across and between two pretensioned cables which are connected to common pretension element to take up forces to balance out outside loads

Info

Publication number
DE19831026A1
DE19831026A1 DE1998131026 DE19831026A DE19831026A1 DE 19831026 A1 DE19831026 A1 DE 19831026A1 DE 1998131026 DE1998131026 DE 1998131026 DE 19831026 A DE19831026 A DE 19831026A DE 19831026 A1 DE19831026 A1 DE 19831026A1
Authority
DE
Germany
Prior art keywords
rope
ropes
load
force
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE1998131026
Other languages
German (de)
Other versions
DE19831026B4 (en
Inventor
Fritz Gartner
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JOSEF GARTNER GMBH, 89423 GUNDELFINGEN, DE
Original Assignee
Josef Gartner and Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Josef Gartner and Co filed Critical Josef Gartner and Co
Priority to DE1998131026 priority Critical patent/DE19831026B4/en
Publication of DE19831026A1 publication Critical patent/DE19831026A1/en
Application granted granted Critical
Publication of DE19831026B4 publication Critical patent/DE19831026B4/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/04Frames for doors, windows, or the like to be fixed in openings
    • E06B1/36Frames uniquely adapted for windows
    • E06B1/38Frames uniquely adapted for windows for shop, show, or like large windows
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/885Curtain walls comprising a supporting structure for flush mounted glazing panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/14Suspended roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

A tensile or compression element (10) is mounted across and between two pretensioned cables (2, 4) to transfer external loads to the cables whereby an increase in the cable force by a certain amount in one cable causes a reduction of the cable force by a corresponding amount in the other cable. The cables are connected to a common pretension element (14) which takes up the transverse forces so that the increase in one cable force and reduction in the other are mutually eliminated in the active line of the pretension force. Two cables can be arranged symmetrical relative to each other so that the active lines of the cable forces run symmetrical to the active line of the pretension force.

Description

Die Erfindung betrifft eine tragende Seilkonstruktion mit zumindest zwei zu­ sammenwirkenden vorgespannten Seilen.The invention relates to a load-bearing rope construction with at least two interacting pre-tensioned ropes.

Bekannte Seilkonstruktionen, die insbesondere zum Tragen von Fassaden und Dachelementen verwendet werden, weisen üblicherweise vorgespannte Seile auf. Die Seile werden meist über Vorspannelemente, die Federelemente enthal­ ten, vorgespannt, um Längenänderungen der Seile beispielsweise aufgrund thermisch er Ausdehnung bei Temperaturänderungen kompensieren zu können.Known rope constructions, especially for carrying facades and Roof elements are used, usually have pre-tensioned ropes on. The ropes are mostly over pre-tensioning elements that contain spring elements ten, pre-stressed to change the length of the ropes, for example thermal expansion to compensate for temperature changes.

Diese bekannten Anordnungen haben den Nachteil, daß, wenn das Seil über eine äußere Last belastet wird, die Seilkraft zunimmt, so daß es zu einer Ausdehnung des Federelementes in dem Vorspannelement kommt, was somit zu einer Län­ genänderung des Seiles führt. Derartige äußere Lasten können beispielsweise durch Windlasten, die auf an der Seilkonstruktion befestigte Fassadenelemente wirken, hervorgerufen werden. Längenänderungen bei einer derartigen Lastein­ wirkung sind jedoch unerwünscht, da sie zu einer Verformung und somit auch zu einer eingeschränkten Tragfähigkeit der gesamten Seilkonstruktion führen können.These known arrangements have the disadvantage that if the rope has a external load is loaded, the rope force increases, causing it to expand of the spring element in the biasing element, which thus leads to a length changes in the rope. Such external loads can, for example due to wind loads on facade elements attached to the rope construction act, are caused. Changes in length with such a load Effect are undesirable, however, because they lead to deformation and thus lead to a limited load-bearing capacity of the entire rope construction can.

Es ist Aufgabe der Erfindung, eine tragende Seilkonstruktion zu schaffen, bei der eine Längenänderung von Vorspannelementen aufgrund äußerer Lasten, die auf die Seilkonstruktion wirken, unterbunden werden kann.It is an object of the invention to provide a load-bearing rope construction in which a change in length of pretensioning elements due to external loads the rope construction work, can be prevented.

Die Aufgabe wird durch eine tragende Seilkonstruktion mit den im Anspruch 1 angegebenen Merkmalen gelöst. Vorteilhafte Ausführungsformen ergeben sich aus den Unteransprüchen. The task is performed by a load-bearing rope construction with the in claim 1 specified features solved. Advantageous embodiments result from the subclaims.  

Die tragende Seilkonstruktion gemäß der Erfindung umfaßt zumindest zwei zusammenwirkende vorgespannte Seile, wobei zwischen den Seilen zumindest ein sich im wesentlichen quer zu den Seilen erstreckendes Zug- oder Druck­ element angeordnet ist. Vorteilhafterweise sind hier mehrere Zug- oder Druck­ elemente angeordnet, welche die beiden Seile miteinander verbinden. An diesen Zug- oder Druckelementen sind vorteilhafterweise die zu tragenden Elemente, insbesondere Fassaden- oder Dachelemente, derart befestigt, daß äußere Lasten, die durch diese Elemente verursacht werden oder auf diese wirken, auf die Zug- oder Druckelemente übertragen werden. Die Zug- oder Druckelemente über­ tragen dann die Kräfte, die quer zu den Seilen wirken, auf die Seile. Die zwei zusammenwirkenden Seile verlaufen derart, daß sie sich zumindest abschnitts­ weise einander annähern oder voneinander entfernen. Das heißt, sie verlaufen schräg oder vorteilhafterweise konkav oder konvex zueinander. Durch diese Anordnung wird erreicht, daß die äußeren Lasten, die über die Zug- oder Druck­ elemente auf die Seile übertragen werden, eine Erhöhung der Seilkraft um einen bestimmten Betrag in dem einen Seil und eine Verringerung der Seilkraft um einen entsprechenden Betrag in dem anderen Seil bewirken. Dies geschieht dadurch, daß beide Seile vorgespannt sind und schräg bzw. gekrümmt aufein­ ander zu oder voneinander weg verlaufen. Die äußeren Lasten werden über die Zug- oder Druckelemente gleichmäßig in beide Seile eingeleitet. Dadurch, daß sich die Seile einander annähern bzw. voneinander entfernen, d. h. schräg bzw. gekrümmt zueinander verlaufen, wirkt eine Komponente der Seilkraft aufgrund der Vorspannung in dem einen Seil entgegengesetzt zu der über die Zug- oder Druckelemente eingeleiteten Kraft, während in dem anderen Seil eine entspre­ chende Komponente der Seilkraft in Richtung der über die Zug- oder Druck­ elemente eingeleiteten Kraft wirkt. Dies bewirkt, daß sich aufgrund der äußeren Last die Seilkraft in dem einen Seil erhöht, während sie sich in dem anderen Seil verringert. Die Seile sind mit zumindest einem gemeinsamen Vorspannelement verbunden, das die Vorspann kraft in den beiden Seilen erzeugt und in der Lage ist, Querkräfte aufzunehmen. Das Vorspannelement nimmt die Querkräfte derart auf, daß sie beispielsweise über eine Führung direkt auf ein Auflager oder ein anschließendes Seil übertragen werden. Auf diese Weise wird verhindert, daß ein Vorspannelement, das vorzugsweise aus einem Federelement besteht, welches keinerlei Querkräfte aufnehmen bzw. übertragen kann, bei Einwirkung einer äußeren Last auf die beiden Seile verdreht wird, so daß die Vorspannkraft wieder mit den beiden Seilkräften im Gleichgewicht ist. Dadurch, daß die Querkräfte über eine separate Führung übertragen werden, wirken auf das Vorspannelement nur noch diejenigen Komponenten der Seilkraft, die in Richtung der Wirkungslinie des Vorspannelementes bzw. der Vorspannkraft wirken. Da beide Seile mit einem gemeinsamen Vorspannelement verbunden sind und derart geführt wer­ den, daß sich die Befestigungspunkte der beiden Seile nur parallel zueinander in Richtung der Vorspannkraft bewegen können, heben sich die Erhöhung der Seilkraft in dem einen Seil und die Verringerung der Seilkraft in dem anderen Seil in Richtung der Wirkungslinie der Vorspann kraft gegenseitig auf. Auf diese Weise wird der Einfluß einer äußeren Last auf das Vorspannelement kompen­ siert. Es kommt somit beim Einwirken einer äußeren Last auf die Seilkonstruktion nicht mehr zu einer Auslenkung des Vorspannelementes, die zu einer Längen­ änderung der Seile führen würde, da sich die Komponenten der Kraftänderungen der Seilkräfte in Richtung der Wirkungslinie der Vorspann kraft des Vorspann­ elementes gegenseitig aufheben. Somit bleibt der Befestigungspunkt bzw. die Befestigungsebene der beiden Seile auch bei Einwirkung einer äußeren Last in ihrer Lage unverändert.The load-bearing rope construction according to the invention comprises at least two interacting pre-tensioned ropes, at least between the ropes a pull or push extending substantially across the ropes element is arranged. Advantageously, there are several pull or push here arranged elements that connect the two ropes. On this Pulling or pushing elements are advantageously the elements to be carried, in particular facade or roof elements, fastened in such a way that external loads, caused by or acting on these elements or printing elements are transferred. The tension or compression elements over then bear the forces acting across the ropes on the ropes. The two interacting ropes run such that they at least cut wise approach or distance from each other. That is, they get lost obliquely or advantageously concave or convex to one another. Through this Arrangement is achieved that the external loads over the tensile or compressive elements are transferred to the ropes, an increase in rope strength by one certain amount in the one rope and a decrease in rope strength by effect a corresponding amount in the other rope. this happens in that both ropes are pretensioned and inclined or curved on each other run towards or away from each other. The external loads are over the Tension or compression elements are evenly introduced into both ropes. As a result of that the ropes approach or move away from each other, d. H. oblique or are curved to one another, a component of the rope force acts due to the pre-tension in the one rope opposite to that over the tension or Pressure elements introduced force, while in the other rope one corresponds Compatible component of the rope force in the direction of the pull or push elements introduced force acts. This causes that due to the outside Load the rope force in one rope increases while it is in the other rope decreased. The ropes have at least one common pretensioning element connected, which creates the pretension force in the two ropes and able is to absorb lateral forces. The biasing element takes the lateral forces in this way on that, for example, via a guide directly to a support or a subsequent rope can be transferred. This prevents a Preload element, which preferably consists of a spring element, which  cannot absorb or transmit any transverse forces when exposed to a external load on the two ropes is twisted so that the pretension again is in balance with the two rope forces. Because the lateral forces are transmitted via a separate guide act on the biasing element only those components of the rope force that are in the direction of the line of action of the biasing element or the biasing force. Since both ropes with are connected to a common biasing element and performed in such a way that the attachment points of the two ropes are only parallel to each other in Can move in the direction of the preload, increase the Rope strength in one rope and decrease in rope strength in the other rope towards each other in the direction of the line of action. To this In this way the influence of an external load on the prestressing element will be compensated siert. This means that an external load acts on the rope construction no more to a deflection of the biasing element, which leads to a length change in the ropes would result because the components of the force changes the rope forces in the direction of the line of action of the leader force of the leader cancel each other out. Thus, the attachment point or the Fastening level of the two ropes even when exposed to an external load their position unchanged.

Vorteilhafterweise sind zwei zusammen wirkende Seile symmetrisch zueinander angeordnet, so daß die Wirkungslinien der Seilkräfte symmetrisch zur Wirkungs­ linie der Vorspannkraft verlaufen. Auf diese Weise kann gleicht sichergestellt werden, daß die Änderungen der Seilkraft in Richtung der Wirkungslinie der Vorspannkraft beim Einleiten einer äußeren Kraft gleich groß sind, so daß sie sich gegenseitig aufheben.Advantageously, two ropes acting together are symmetrical to each other arranged so that the lines of action of the rope forces symmetrical to the action line of preload. This way, equals can be ensured be that the changes in the rope force in the direction of the line of action of the Preload force when introducing an external force are the same, so that they cancel each other out.

Weiter bevorzugt kreuzen sich zwei zusammenwirkende Seile vorzugsweise zumindest in der Nähe eines Auflagers der Seilkonstruktion. So wird der Abstand der beiden Seile nicht zu groß, obwohl die beiden Seile sich einander annähernd oder voneinander entfernend verlaufen. Auf diese Weise kann eine kompakte Bauform der gesamten Seilkonstruktion beibehalten werden. More preferably, two interacting ropes preferably cross at least in the vicinity of a support of the rope construction. So is the distance of the two ropes not too big, although the two ropes are close to each other or run away from each other. In this way, a compact Design of the entire rope construction can be retained.  

Zwei zusammenwirkende Seile treffen vorzugsweise zumindest an einem Aufla­ ger der Seilkonstruktion in einem Punkt zusammen. Dies ermöglicht eine kom­ pakte Ausgestaltung des Auflagers bzw. eines eventuell an diesem vorgesehe­ nen Vorspannelementes. Ferner reduziert sich die Zahl der einzelnen Befesti­ gungspunkte für die einzelnen Seile.Two interacting ropes preferably meet at least on one support of the rope construction in one point. This enables a com compact design of the support or one possibly provided on this nen biasing element. The number of individual fasteners is also reduced points for the individual ropes.

Vorzugsweise sind zwei zusammenwirkende Seile an zumindest einem Auflager voneinander beabstandet. Diese Anordnung ist insbesondere dann zu bevor­ zugen, wenn die beiden Seile sich in ihrem Verlauf aneinander an nähern oder kreuzen. So können die beiden Seile beispielsweise konkav zueinander verlaufen oder sich ausgehend von dem Auflager erst aneinander annähern, dann kreuzen und anschließend wieder voneinander entfernen. Dabei wird der genaue Verlauf der beiden Seile zueinander durch die zwischen ihnen angeordneten Zug- oder Druckelemente vorgegeben bzw. fixiert.Preferably two interacting ropes are on at least one support spaced from each other. This arrangement is then particularly before pull when the two ropes approach each other in their course or cross. For example, the two ropes can be concave to one another or first approach each other from the support, then cross and then separate from each other again. The exact course of the two ropes to each other by the pull or arranged between them Print elements specified or fixed.

Das Vorspannelement ist vorteilhafterweise zwischen freien Enden der Seile und einem Auflager der Seilkonstruktion angeordnet. Dies ermöglicht eine einfache Befestigung des Vorspannelementes an einem tragenden Bauteil, so daß leicht eine zuverlässige parallele Führung der Befestigungspunkte der beiden Seile an dem Vorspannelement geschaffen werden kann, und Querkräfte sicher auf das tragende Bauteil übertragen werden können. Weiterhin kann das Vorspann­ element beispielsweise in eine Ausnehmung in einer Wand oder einem anderen tragenden Bauteil integriert werden, so daß es den optischen Eindruck der Seilkonstruktion nicht stört, was insbesondere bei Glasfassaden wünschenswert sein kann.The biasing element is advantageously between free ends of the cables and a support of the rope structure arranged. This enables easy Attachment of the biasing element to a load-bearing component so that it is easy reliable parallel guidance of the attachment points of the two ropes the biasing element can be created, and shear forces on the load-bearing component can be transferred. Furthermore, the opening credits element, for example, in a recess in a wall or another load-bearing component are integrated so that it gives the visual impression of Rope construction does not interfere, which is particularly desirable for glass facades can be.

Vorteilhafterweise werden an dem Auflager, an dem die Seile beabstandet voneinander sind, die Seilkräfte über ein Hebelsystem auf das gemeinsame Vorspannelement übertragen. So ist es möglich, die beiden Seile an dem Aufla­ ger auch weiter voneinander zu beabstanden und trotzdem eine sichere parallele Führung der Angriffspunkte der beiden Seile zu gewährleisten, so daß sich die Änderungen der Seilkräfte aufgrund einer größeren Last gegenseitig aufheben. Advantageously, on the support on which the ropes are spaced are from each other, the rope forces on a lever system on the common Transfer preload element. So it is possible to attach the two ropes to the support even further apart from each other and still a safe parallel Ensure guidance of the points of attack of the two ropes, so that the Cancel changes in rope forces due to a larger load.  

Weiter bevorzugt ist das Vorspannelement zwischen jeweiligen freien Enden von jeweils zumindest zwei zusammenwirkenden Seilen angeordnet. Diese Kon­ struktion ermöglicht die Anordnung des Vorspannelementes entfernt von den Auflagerpunkten der Seilkonstruktion, beispielsweise in der Mitte zweier zu­ sammenwirkender vorgespannter Seile. So ergeben sich flexible Gestaltungsmög­ lichkeiten der erfindungsgemäßen Seilkonstruktion, die an den jeweiligen Anwen­ dungsfall angepaßt werden können.The prestressing element is further preferred between respective free ends of each arranged at least two interacting ropes. This con structure allows the biasing element to be located away from the Support points of the rope construction, for example in the middle of two interacting pre-tensioned ropes. This results in flexible design options the rope construction according to the invention, which is applied to the respective user case can be adapted.

Die freien Enden sind vorzugsweise im Bereich des Vorspannelementes be­ abstandet voneinander und die Seilkräfte werden über ein Hebelsystem auf das gemeinsame Vorspannelement übertragen. Diese Ausgestaltung ermöglicht die Anordnung des Vorspannelementes zwischen den jeweiligen freien Enden von jeweils zumindest zwei zusammenwirkenden Seilen auch außerhalb eines Kreu­ zungspunktes der beiden Seile, an einer Stelle, an der die beiden Seile vonein­ ander beabstandet verlaufen. Dadurch ergeben sich weitere Gestaltungsmöglich­ keiten für die Seilkonstruktion.The free ends are preferably in the area of the prestressing element spaced from each other and the rope forces are applied to the common biasing element transmitted. This configuration enables Arrangement of the biasing element between the respective free ends of at least two cooperating ropes each outside of a cross point of the two ropes, at a point where the two ropes separate other spaced. This creates further design options for rope construction.

Vorzugsweise weist das Vorspannelement zumindest ein Federelement auf. Durch ein Federelement, beispielsweise durch eine Schraubenfeder, eine Tel­ lerfeder oder ein Tellerfederpaket, kann sehr einfach die erforderliche Vorspann­ kraft auf die Seile aufgebracht werden, und es können Längenänderungen der Seile, beispielsweise aufgrund von thermischer Ausdehnung, durch das Vor­ spannelement kompensiert werden. Weiterhin sind derartige Federelemente sehr kostengünstig zu fertigen, wodurch sich die Herstellungskosten des Vorspann­ elementes verringern.The biasing element preferably has at least one spring element. By a spring element, for example by a coil spring, a tel lerfeder or a disc spring package, can easily the required preload force are applied to the ropes, and changes in length of the Ropes, for example due to thermal expansion, through the fore clamping element can be compensated. Furthermore, such spring elements are very inexpensive to manufacture, which increases the manufacturing cost of the leader reduce element.

Vorzugsweise trägt die Seilkonstruktion Fassadenelemente, die an den Zug- oder Druckelementen befestigt sind. Die erfindungsgemäße Seilkonstruktion eignet sich insbesondere für Fassaden- oder Dachkonstruktionen, da hier äußere Lasten möglichst ohne Verformung der Konstruktion aufgenommen werden sollen. Gerade im Bereich von Glasfassaden werden häufig Seilkonstruktionen bevor­ zugt, da sie wesentlich filigraner wirken als eine Tragkonstruktion aus festen Pfosten und Riegeln. Preferably, the rope construction carries facade elements attached to the train or Pressure elements are attached. The rope construction according to the invention is suitable is particularly suitable for facade or roof constructions, since external loads are involved here if possible without deformation of the construction. In the area of glass facades in particular, rope constructions are often used pulls because they look much more delicate than a supporting structure made of solid Posts and transoms.  

Nachfolgend werden Ausführungsbeispiele der erfindungsgemäßen tragenden Seilkonstruktion unter Bezugnahme zu beiliegenden Figuren beschrieben. In diesen zeigt:The following are exemplary embodiments of the load-bearing according to the invention Rope construction described with reference to the accompanying figures. In this shows:

Fig. 1A bis 1C schematische Darstellungen verschiedener Ausführungsformen der erfindungsgemäßen Seilkonstruktion, Figs. 1A to 1C are schematic representations of various embodiments of the cord construction according to the invention,

Fig. 2 eine schematische Schnittansicht eines Vorspannelementes für die erfin­ dungsgemäße tragende Seilkonstruktion, Fig. 2 is a schematic sectional view of a biasing member for the dung OF INVENTION modern load-bearing rope construction,

Fig. 3 eine schematische Schnittansicht einer Fassadenkonstruktion unter Verwendung der erfindungsgemäßen tragenden Seilkonstruktion und Fig. 3 is a schematic sectional view of a facade construction using the load-bearing rope construction according to the invention and

Fig. 4 eine schematische Schnittansicht eines Vorspannelementes für die erfin­ dungsgemäße tragende Seilkonstruktion. Fig. 4 is a schematic sectional view of a biasing element for the inventive rope construction.

Fig. 1A zeigt eine erste Ausführungsform der erfindungsgemäßen tragenden Seilkonstruktion. Zwei Seile 2, 4 bilden ein Paar von zusammenwirkenden Seilen, die zwischen zwei festen Auflagern 6 und 8 gespannt sind. Die beiden Seile 2, 4 verlaufen konvex zueinander, d. h. das obere Seil 2 in Fig. 1A wölbt sich nach oben, während sich das untere Seil 4 nach unten wölbt. Diese Wölbung wird durch zwischen den Seilen 2, 4 angeordnete Druckstäbe 10 erreicht. Die beiden Seile 2, 4 sind an dem ersten Auflager 6 in einem gemeinsamen Punkt 12 fest angebracht. An dem zweiten Auflager 8 sind die beiden Seile 2, 4 mittels eines Vorspannelementes 14 befestigt. Dabei treffen sich die beiden Seile 2, 4 in einem Punkt 17, an dem die beiden Seile 2, 4 an einem gemeinsamen Vorspann­ element 14 befestigt sind, welches fest an dem zweiten Auflager 8 angebracht ist. Das Vorspannelement 14 enthält eine Feder, welche die beiden Seile 2, 4 gemeinsam vorspannt. Dabei ist das Vorspannelement 14 derart ausgestaltet, daß eine Bewegung des Punktes 16 nur entlang der Längsachse des Vorspann­ elementes 14 möglich ist. Die Längsachse des Vorspannelementes 14 verläuft entlang der Symmetrieachse der in Fig. 1A gezeigten Seilkonstruktion, d. h. durch die Punkte 12 und 16. Über die Druckstäbe 10 kann nun auf die beiden Sei­ le 2, 4 eine äußere Last aufgebracht werden. Beispielsweise können an den Druckstäben 10 Fassadenelemente befestigt werden, die sich parallel zu der Symmetrieachse durch die Punkte 12, 16 erstrecken. Wirkt nun beispielsweise eine Drucklast, in Fig. 1A von oben, auf die Druckstäbe 10, so verringert sich die durch die Vorspannkraft des Vorspannelementes 14 hervorgerufene Seilkraft in dem Seil 2 und erhöht sich die durch das Vorspannelement 14 in dem Seil 4 hervorgerufene Seilkraft. Aufgrund der symmetrischen Anordnung erhöht sich die Seilkraft in dem Seil 4 um denselben Betrag, um den sich die Seilkraft in dem Seil 2 verringert. Dies führt dazu, daß sich die Komponenten der Seilkraftände­ rungen in den Seilen 2 und 4 in Längsrichtung des Vorspannelementes 14, d. h. entlang der Achse durch die Punkte 12, 16, aufheben, so daß die über die Druckstäbe 10 eingeleiteten äußeren Lasten keinen Einfluß auf die Feder des Vorspannelementes 14 haben, wodurch der Punkt 16 in seiner Lage im wesentli­ chen unverändert bleibt, und die Länge der Seile 2, 4, abgesehen von einer eventuellen elastischen Dehnung der Seile, konstant gehalten werden kann. Die Komponenten der Seilkräfte senkrecht zur Längsachse des Vorspann­ elementes 14 werden, wie später beschrieben, direkt auf das Auflager 8 über­ tragen, ohne daß es zu einer Lageänderung des Vorspannelementes 14 und des Punktes 16 kommt. Fig. 1A shows a first embodiment of the load-bearing rope construction according to the invention. Two ropes 2 , 4 form a pair of interacting ropes, which are stretched between two fixed supports 6 and 8 . The two cables 2 , 4 are convex to one another, ie the upper cable 2 in FIG. 1A arches upwards, while the lower cable 4 curves downwards. This curvature is achieved by means of pressure rods 10 arranged between the ropes 2 , 4 . The two ropes 2 , 4 are firmly attached to the first support 6 at a common point 12 . The two cables 2 , 4 are fastened to the second support 8 by means of a pretensioning element 14 . The two ropes 2 , 4 meet at a point 17 at which the two ropes 2 , 4 are fastened to a common pretensioning element 14 which is fixedly attached to the second support 8 . The pretensioning element 14 contains a spring which pretensions the two cables 2 , 4 together. In this case, the biasing member 14 is configured such that a movement of the point 16 only along the longitudinal axis of the biasing member 14 is possible. The longitudinal axis of the pretensioning element 14 runs along the axis of symmetry of the cable construction shown in FIG. 1A, ie through points 12 and 16 . An external load can now be applied to the two sides 2 , 4 via the pressure rods 10 . For example, 10 facade elements can be attached to the pressure rods, which extend through points 12 , 16 parallel to the axis of symmetry. If, for example, a pressure load acts on the pressure rods 10 from above in FIG. 1A, the rope force in the rope 2 caused by the pretensioning force of the pretensioning element 14 decreases and the rope force caused in the rope 4 by the pretensioning element 14 increases. Due to the symmetrical arrangement, the rope force in the rope 4 increases by the same amount by which the rope force in the rope 2 decreases. This leads to the fact that the components of the rope force changes in the ropes 2 and 4 in the longitudinal direction of the pretensioning element 14 , ie along the axis through the points 12 , 16 , cancel each other out, so that the external loads introduced via the compression rods 10 have no influence on the Have spring of the biasing element 14 , whereby the point 16 remains unchanged in its position Chen wesentli, and the length of the ropes 2 , 4 , apart from a possible elastic expansion of the ropes, can be kept constant. The components of the cable forces perpendicular to the longitudinal axis of the biasing element 14 will, as described later, directly to the support 8 , without causing a change in position of the biasing element 14 and the point 16 .

Fig. 1B zeigt eine zweite mögliche Ausführungsform der erfindungsgemäßen tragenden Seilkonstruktion. Auch hier verlaufen zwei Seile 2, 4 zwischen zwei festen Auflagern 6 und 8. Dabei sind die beiden Seile an dem ersten festen Auflager 6 jeweils in einem Punkt befestigt. Die beiden Befestigungspunkte 18 der beiden Seile 2, 4 an dem Auflager 6 sind voneinander beabstandet an­ geordnet. Ausgehend von dem Auflager 6 verlaufen die beiden Seile zunächst symmetrisch zu der Längsachse der Seilkonstruktion aufeinander zu und schnei­ den sich dann in einem ersten Kreuzungspunkt 20. Anschließend verlaufen die beiden Seile 2, 4 zunächst in der Weise, daß sie sich voneinander entfernen und dann wieder einander annähern und in einem zweiten Kreuzungspunkt 22 erneut schneiden. Zwischen den beiden Kreuzungspunkten 20 und 22 verlaufen die beiden Seile 2, 4 somit wiederum in einer konvexen Form symmetrisch zuein­ ander. Diese Form wird auch hier durch zwischen den beiden Seilen 2, 4 an­ geordnete Druckstäbe 10 erzeugt. Die Druckstäbe 10 verlaufen wie auch in Fig. 1A im wesentlichen quer zur Erstreckungsrichtung der Seile 2, 4 und sind mit beiden Seilen 2, 4 fest verbunden. Im Anschluß an den Kreuzungspunkt 22 entfernen sich die beiden Seile 2, 4 wieder voneinander und sind dann an einem gemeinsamen Vorspannelement 14 befestigt. Das hier gezeigte Vorspann­ element 14 weist zwei Federelemente auf, die miteinander gekoppelt sind. Die beiden Seile 2, 4 sind in zwei voneinander beabstandeten Punkten 24, 26 an dem Vorspannelement 14 befestigt. Dabei ist das Vorspannelement 14 derart ausgestaltet, daß sich die beiden Befestigungspunkte 24, 26 nur gemeinsam und parallel zueinander in der Längsrichtung der beiden Federelemente des Vorspann­ elementes 14, d. h. entlang der Symmetrieachse der Seilkonstruktion durch die Kreuzungspunkte 20 und 22, bewegen kann. Dabei werden nur die Seilkraft­ komponenten in Richtung der Längsachse des Vorspannelementes 14, d. h. entlang der Achse durch die Kreuzungspunkte 20 und 22, auf die Federelemente übertragen. Die Seilkraftkomponenten senkrecht zu dieser Längsachse werden durch eine spezielle Ausgestaltung des Vorspannelementes 14 direkt auf das feste Auflager 8 übertragen, so daß eine Lageänderung des Vorspannelemen­ tes 14 und der Befestigungspunkte 24, 26 der Seile 2, 4 aufgrund der Seil­ kraftkomponenten senkrecht zur Längsachse des Vorspannelementes 14 verhin­ dert wird. Wie bereits anhand von Fig. 1A erläutert, bewirkt eine äußere Last, die über die Druckstäbe 10 in Richtung der Druckstäbe 10 auf die beiden Seile 2, 4 übertragen wird, daß sich die Seilkraft in dem unteren Seil 4 erhöht, während sie sich in dem oberen Seil 2 um einen entsprechenden Betrag verrin­ gert. Dies bewirkt, daß sich die Änderungen der beiden Seilkräfte in den Sei­ len 2, 4 in Richtung der Längsachse des Vorspannelementes 14 an diesem aufheben, so daß es keinen Einfluß der äußeren Last, die über die Druckstäbe 10 auf die Seile 2, 4 übertragen wird, auf das Vorspannelement 14 in dessen Längsrichtung gibt. Somit führt eine äußere Last nicht zu einer Änderung der Stauchung bzw. Dehnung der Federelemente des Vorspannelementes 14, und die Befestigungspunkte 24, 26 verändern, da sie sich nur parallel zueinander bewegen können, im wesentlichen ihre Lage nicht. Fig. 1B shows a second possible embodiment of the load-bearing rope construction according to the invention. Here, too, two ropes 2 , 4 run between two fixed supports 6 and 8 . The two ropes are attached to the first fixed support 6 at one point. The two attachment points 18 of the two ropes 2 , 4 on the support 6 are spaced apart from one another. Starting from the support 6 , the two ropes initially run towards each other symmetrically to the longitudinal axis of the rope construction and then intersect at a first crossing point 20 . Subsequently, the two ropes 2 , 4 initially run in such a way that they move away from one another and then approach each other again and cut again at a second crossing point 22 . Between the two intersection points 20 and 22 , the two ropes 2 , 4 thus again run symmetrically to each other in a convex shape. This shape is also generated here between the two ropes 2 , 4 to ordered pressure rods 10 . As in FIG. 1A, the pressure bars 10 run essentially transversely to the direction of extension of the cables 2 , 4 and are firmly connected to both cables 2 , 4 . Following the crossing point 22 , the two cables 2 , 4 move away from each other again and are then attached to a common pretensioning element 14 . The biasing element 14 shown here has two spring elements which are coupled together. The two cables 2 , 4 are fastened to the pretensioning element 14 at two spaced apart points 24 , 26 . The biasing element 14 is designed such that the two attachment points 24 , 26 can only move together and parallel to each other in the longitudinal direction of the two spring elements of the biasing element 14 , ie along the axis of symmetry of the rope construction through the crossing points 20 and 22 . Only the cable force components in the direction of the longitudinal axis of the biasing element 14 , ie along the axis through the intersection points 20 and 22 , are transmitted to the spring elements. The rope force components perpendicular to this longitudinal axis are transferred by a special design of the biasing element 14 directly to the fixed support 8 so that a change in position of the Vorspannelemen tes 14 and the fastening points 24, 26 of the cables 2, 4 because of the rope force components perpendicular to the longitudinal axis of the biasing member 14 is prevented. As already explained with reference to FIG. 1A, an external load, which is transmitted via the pressure rods 10 in the direction of the pressure rods 10 to the two cables 2 , 4 , causes the cable force in the lower cable 4 to increase as it increases in the upper rope 2 reduced by a corresponding amount. This causes the changes in the two rope forces in the Be len 2 , 4 in the direction of the longitudinal axis of the biasing element 14 on this cancel, so that there is no influence of the external load that is transmitted via the pressure rods 10 to the cables 2 , 4 , on the biasing element 14 in the longitudinal direction. Thus, an external load does not lead to a change in the compression or expansion of the spring elements of the prestressing element 14 , and the attachment points 24 , 26 essentially do not change their position since they can only move parallel to one another.

Fig. 1C zeigt eine dritte Ausführungsform der erfindungsgemäßen tragenden Seilkonstruktion. Der Verlauf der beiden Seile 2, 4, ausgehend von dem ersten Auflager 6, entspricht im wesentlichen dem Verlauf der beiden Seile 2, 4 in Fig. 1B. Das heißt, die beiden Seile 2, 4 sind beabstandet voneinander an zwei Punkten 18 an dem festen Auflager 6 angebracht, verlaufen dann durch einen ersten Kreuzungspunkt 20 und anschließend, wie auch in Fig. 1B, konvex zueinander, bis zu einem zweiten Kreuzungspunkt 22. In Fig. 1C enden die beiden Seile 2, 4 in dem gemeinsamen Kreuzungspunkt 22, an dem das Vor­ spannelement 15 angreift. Das Vorspannelement 15 ist an seinem anderen, dem zweiten Auflager 8 zugewandten Ende an einem Punkt 28 mit zwei weiteren Seilen 30 und 32 verbunden, die sich ausgehend von dem Punkt 28 voneinander entfernen und beabstandet voneinander an dem zweiten Auflager 8 befestigt sind. Das Vorspannelement 14 ist somit zwischen zwei Paaren von zusammen­ wirkenden Seilen 2, 4 bzw. 30, 32 angeordnet. Zwischen den beiden Seilen 2, 4 sind wiederum Druckstäbe 10 angeordnet, an denen beispielsweise Fassaden- oder Dachelemente angebracht sein können, und über die äußere Lasten im wesentlichen quer zu den Seilen 2, 4 in diese eingeleitet werden. Auch hier führt diese Krafteinleitung zu einer Erhöhung der Seilkraft in dem Seil 4 und einer entsprechenden Verringerung der Seilkraft in dem Seil 2. Die Änderungen der Komponenten der Seilkräfte in den Seilen 2, 4 in Längsrichtung des Vorspann­ elementes 15, d. h. entlang der Symmetrieachse des Systems durch die Punkte 20, 22 und 28, heben sich auch hier in dem Punkt 22 im wesentlichen auf. Somit gibt es keinen Einfluß dieser Kraftänderungen auf das Vorspannelement 15 in dessen Längsrichtung, so daß die Federelemente in dem Vorspannelement 15 unbeeinflußt bleiben und die Lage des Punktes 22 im wesentlichen konstant bleibt. Somit kann eine Änderung der Seillänge aufgrund äußerer Lasten 10, abgesehen von einer eventuellen elastischen Dehnung der Seile 2, 4, weitgehend ausgeschlossen werden. Fig. 1C shows a third embodiment of the load-bearing rope construction according to the invention. The course of the two ropes 2 , 4 , starting from the first support 6 , essentially corresponds to the course of the two ropes 2 , 4 in FIG. 1B. That is, the two cables 2 , 4 are attached to the fixed support 6 at a distance from one another at two points 18 , then run through a first crossing point 20 and then, as also in FIG. 1B, convexly to one another up to a second crossing point 22 . In Fig. 1C, the two ropes 2 , 4 end in the common crossing point 22 at which the tensioning element 15 engages. The pretensioning element 15 is connected at its other end facing the second support 8 at a point 28 to two further ropes 30 and 32 , which depart from the point 28 and are attached to the second support 8 at a distance from one another. The pretensioning element 14 is thus arranged between two pairs of ropes 2 , 4 and 30 , 32 acting together. Between the two ropes 2 , 4 there are in turn pressure rods 10 , to which, for example, facade or roof elements can be attached and via which external loads are introduced into the ropes 2 , 4 essentially transversely. Here, too, this introduction of force leads to an increase in the rope force in the rope 4 and a corresponding decrease in the rope force in the rope 2 . The changes in the components of the rope forces in the ropes 2 , 4 in the longitudinal direction of the pretensioning element 15 , ie along the axis of symmetry of the system through points 20 , 22 and 28 , also cancel each other out at point 22 . Thus, there is no influence of these changes in force on the biasing element 15 in its longitudinal direction, so that the spring elements in the biasing element 15 remain unaffected and the position of the point 22 remains essentially constant. A change in the rope length due to external loads 10 , apart from a possible elastic expansion of the ropes 2 , 4 , can thus be largely ruled out.

Fig. 1 zeigt nur drei Ausführungsbeispiele von einer Vielzahl möglicher Seilkon­ struktionen gemäß der Erfindung. Der genaue Verlauf der Seile kann vielfältig variiert werden, solange sichergestellt ist, daß sich Änderungen der Seilkräfte aufgrund äußerer Lasten in Richtung der Federelemente an den Verbindungs­ punkten mit diesen im wesentlichen aufheben, so daß die Federelemente der Vorspannelemente 14, 15 nicht durch Änderungen der Seilkräfte aufgrund äußerer Lasten beeinflußt werden. Beispielsweise ist es möglich, mehr als zwei Seile anzuordnen. So können bei entsprechender Anordnung beispielsweise auch drei oder vier Seile eingesetzt werden. Weiterhin müssen die beiden Seile nicht in einer konvexen Form zueinander v;erlaufen, sie können beispielsweise auch in einer konkaven Form oder einfach schräg zueinander verlaufen. Wenn die beiden Seile konkav zueinander verlaufen, können beispielsweise auch reine Zugelemen­ te zwischen den beiden Seilen angeordnet werden, in dem Fall, daß eine äußere Last nicht als Druck sondern als Zug auf diese Zugelemente eingeleitet wird, beispielsweise bei einer unterhalb der Seilkonstruktion hängenden Deckenkon­ struktion. Fig. 1 shows only three embodiments of a variety of possible Seilkon structures according to the invention. The exact course of the ropes can be varied in many ways, as long as it is ensured that changes in the rope forces due to external loads in the direction of the spring elements at the connection points cancel them essentially, so that the spring elements of the biasing elements 14 , 15 are not caused by changes in the rope forces be influenced due to external loads. For example, it is possible to arrange more than two ropes. For example, three or four ropes can also be used with an appropriate arrangement. Furthermore, the two ropes do not have to run in a convex shape with respect to one another, for example they can also run in a concave shape or simply at an angle to one another. If the two ropes are concave to each other, for example, pure Zugelemen te can be arranged between the two ropes, in the event that an external load is not initiated as a pressure but as a train on these tension elements, for example, with a ceiling construction hanging below the rope construction .

Fig. 2 zeigt eine schematische Schnittansicht eines Vorspannelementes 14 für die erfindungsgemäße tragende Seilkonstruktion. Hierbei handelt es sich um ein Vorspannelement zur Anbringung an einer Wand bzw. einem tragenden Bau­ teil 34. Die beiden Seile 2, 4 werden an den beiden Ösen 36, 38 an dem Vor­ spannelement 14 befestigt. Dabei liegen die beiden Ösen 36, 38 sehr nahe beieinander, so daß die beiden Seile 2, 4 nahezu in einem Punkt an dem Vor­ spannelement 14 angreifen. Die beiden Ösen 36, 38 sind an einer Zugstange 40 angebracht. Die Zugstange 40 ist in einer Hülse 42 derart geführt, daß sie sich nur entlang ihrer Längsachse 44 bewegen kann. Die Zugstange 40 wirkt auf eine Druckfeder 46, die hier als Schraubenfeder ausgebildet ist, jedoch auch ein anderes Federelement, beispielsweise ein Tellerfederpaket sein kann. Die Hül­ se 42 ist mittels Schrauben 48 fest mit der Wand 34 verbunden. Die Feder 46 stützt sich an ihrem einen Ende an einem Absatz 50 der Zugstange 40 und mit ihrem anderen Ende an einem Absatz 52 an der Hülse 42 ab. Die Feder 46 erzeugt eine Vorspannkraft FV, die in Richtung der Längsachse 44 des Vorspann­ elementes 14 in Richtung des Pfeils in Fig. 2 wirkt. Die aufgrund dieser Vor­ spannkraft FV erzeugten Seilkräfte FS2 und FS4 wirken in Richtung der Pfeile in Fig. 2, ausgehend von den Ösen 36 und 38. Das Vorspannelement 14 ist sym­ metrisch zu seiner Längsachse 44 ausgebildet. Wirkt nun eine äußere Last auf die Seilkonstruktion, wie anhand von Fig. 1 beschrieben, erhöht sich die Seilkraft FS4, während sich die Seilkraft FS2 um einen entsprechenden Betrag verringert. Aufgrund der symmetrischen Anordnung heben sich die Änderungen der Kompo­ nenten der Seilkräfte FS2 und FS4 in Richtung der Längsachse 44 bzw. entlang der Wirkungslinie der Vorspannkraft FV auf. Somit gibt es keinen Einfluß der Seil­ kraftänderungen aufgrund einer äußeren Last auf die Feder 46. Die Feder wird also nicht aufgrund der äußeren Last-weiter gestaucht, was eine Verlagerung der Ösen 36 und 38 in Fig. 2 nach rechts und damit eine Längung der an den Ösen 36 und 38 angebrachten Seile bewirken würde. Die Kraftkomponenten der Seilkräfte FS2 und FS4 senkrecht zur Längsachse 44 werden durch die parallele Führung der Zugstange 40 in der Hülse 42 direkt auf die Hülse 42 und somit auf die Wand 34 übertragen, ohne daß es zu einer Lageänderung des Vorspannele­ mentes 14 kommen kann. Somit kann auch ein Einfluß dieser Kraftkomponenten senkrecht zur Längsachse 44 auf die Feder 46 ausgeschlossen werden. Fig. 2 is a schematic sectional view showing a biasing member 14 for the inventive load-bearing rope construction. This is a prestressing element for attachment to a wall or a load-bearing construction part 34 . The two ropes 2 , 4 are attached to the two eyelets 36 , 38 on the pre-tensioning element 14 . The two eyelets 36 , 38 are very close to each other, so that the two ropes 2 , 4 attack at almost one point on the pre-tensioning element 14 . The two eyelets 36 , 38 are attached to a pull rod 40 . The pull rod 40 is guided in a sleeve 42 such that it can only move along its longitudinal axis 44 . The pull rod 40 acts on a compression spring 46 , which is designed here as a helical spring, but can also be another spring element, for example a plate spring assembly. The sleeve 42 is fixedly connected to the wall 34 by means of screws 48 . The spring 46 is supported at one end on a shoulder 50 of the pull rod 40 and at its other end on a shoulder 52 on the sleeve 42 . The spring 46 generates a biasing force F V , which acts in the direction of the longitudinal axis 44 of the biasing element 14 in the direction of the arrow in Fig. 2. The rope forces F S2 and F S4 generated due to this pre-tension force F V act in the direction of the arrows in FIG. 2, starting from the eyelets 36 and 38 . The biasing element 14 is formed symmetrically to its longitudinal axis 44 . If an external load now acts on the rope construction, as described with reference to FIG. 1, the rope force F S4 increases , while the rope force F S2 decreases by a corresponding amount. Due to the symmetrical arrangement, the changes in the components of the rope forces F S2 and F S4 cancel each other in the direction of the longitudinal axis 44 or along the line of action of the pretensioning force F V. Thus, there is no influence of the rope force changes due to an external load on the spring 46th The spring is therefore not further compressed due to the external load, which would cause the eyelets 36 and 38 in FIG. 2 to be displaced to the right and thus to elongate the ropes attached to the eyelets 36 and 38 . The force components of the rope forces F S2 and F S4 perpendicular to the longitudinal axis 44 are transmitted by the parallel guidance of the pull rod 40 in the sleeve 42 directly to the sleeve 42 and thus to the wall 34 , without there being a change in position of the preload element 14 . An influence of these force components perpendicular to the longitudinal axis 44 on the spring 46 can thus also be excluded.

Fig. 3 zeigt nun eine schematische Schnittansicht der erfindungsgemäßen Seilkonstruktion am Beispiel einer Fassadenkonstruktion. Die Seilkonstruktion in Fig. 3 umfaßt zwei Seile 2, 4, die im wesentlichen so verlaufen, wie anhand von Fig. 1B beschrieben. Zwischen den beiden Seilen und an den Knotenpunkten 20 und 22 sind Druckstäbe 10 angeordnet, welche die beiden Seile 2, 4 miteinander verbinden und Fassadenelemente 54 tragen. Das Vorspannelement 14, das hier unten angeordnet ist, ist hier abweichend von dem zuvor beschriebenen Vor­ spannelement ausgestaltet. Da die beiden Seile 2, 4 im Bereich des Vorspann­ elementes 14 voneinander beabstandet sind, weist das Vorspannelement 14 eine Hebelkonstruktion auf, welche die beiden Seilkräfte der beiden Seile 2, 4 symme­ trisch auf ein gemeinsames, hier nicht gezeigtes Federelement übertragen. Die Funktionsweise dieser Fassadenkonstruktion unter Verwendung der erfindungs­ gemäßen Seilkonstruktion entspricht der anhand von Fig. 1B beschriebenen. Im Anschluß an den Knoten 20 können die beiden Seile 2, 4 entweder fest an einer weiteren Wand oder einem tragenden Bauteil befestigt sein, oder es kann sich beispielsweise auch der in Fig. 3 gezeigte Verlauf der beiden Seile 2, 4 wie­ derholen, so daß es im Verlauf der beiden Seile 2, 4 mehr als zwei Kreuzungs­ punkte gibt und die Seile in Form zweier spiegelsymmetrischer Wellen zueinander verlaufen. Wenn nun äußere Lasten, wie beispielsweise Windlasten, auf die Fassadenelemente 54 wirken, werden diese über die Druckstäbe 10 im wesentli­ chen quer zu den beiden Seilen 2, 4 auf diese übertragen, was in einem der Seile 2, 4 zu einer Erhöhung der Seilkraft und in dem andern zu einer Ver­ ringerung der Seilkraft führt, wobei sich jedoch die Komponenten der Seilkraft in Längsrichtung der Konstruktion, d. h. entlang der Achse durch die Knotenpunkte 20, 22, an dem Vorspannelement 14 aufheben. Die Anbindung der Fassaden­ elemente 54 an die Druckstäbe 10 ist vorteilhafterweise derart ausgestaltet, daß sie sowohl Zug- als auch Druckkräfte übertragen kann, da auf eine derartige Fassade beispielsweise Windkräfte sowohl als Sog als auch als Druck wirken können. Fig. 3 are a schematic sectional view showing the cable construction of the invention the example of a facade construction. The rope construction in FIG. 3 comprises two ropes 2 , 4 which run essentially as described with reference to FIG. 1B. Pressure rods 10 are arranged between the two cables and at the nodes 20 and 22 , which connect the two cables 2 , 4 to one another and carry facade elements 54 . The biasing element 14 , which is arranged here below, is designed differently from the previously described Before tensioning element. Since the two cables 2, 4 in the area of the biasing are element 14 spaced from each other, the biasing member 14 is a lever construction, which transmitted the two cable forces of the two cables 2, 4 sym metrically to a common, not shown here, spring element. The operation of this facade construction using the rope construction according to the Invention corresponds to that described with reference to Fig. 1B. Following the knot 20 , the two ropes 2 , 4 can either be firmly attached to another wall or a load-bearing component, or the course of the two ropes 2 , 4 shown in FIG. 3 can be repeated, so that there are more than two crossing points in the course of the two ropes 2 , 4 and the ropes run in the form of two mirror-symmetrical waves to each other. If now external loads, such as wind loads, act on the facade elements 54 , these are transmitted across the compression rods 10 in cross-sections to the two ropes 2 , 4 , which in one of the ropes 2 , 4 increase the rope force and in the other leads to a reduction in the rope force, but the components of the rope force in the longitudinal direction of the construction, ie along the axis through the nodes 20 , 22 , cancel each other out on the prestressing element 14 . The connection of the facade elements 54 to the pressure rods 10 is advantageously designed such that it can transmit both tensile and compressive forces, since wind forces such as wind and pressure can act on such a facade.

Fig. 4 zeigt eine weitere Ausführungsform für ein Vorspannelement 15 für die erfindungsgemäße Seilkonstruktion. Das hier gezeigte Vorspannelement 15 ist vorgesehen zur Anordnung zwischen zwei Paaren von zusammenwirkenden Seilen, entspricht ansonsten aber im wesentlichen dem in Fig. 2 gezeigten Vor­ spannelement 14. Auf der rechten Seite weist es wiederum zwei Ösen 36 und 38 auf, an denen zwei erste Seile 2, 4 befestigt werden können. An seiner linken Seite wird das Vorspannelement 15 nicht an einem tragenden Bauteil befestigt, sondern weist zwei weitere Ösen 56 und 58 auf, die spiegelsymmetrisch zu den ersten beiden Ösen 36 und 38 ausgebildet sind und an denen ein weiteres Paar von Seilen 30, 32 befestigt werden kann. Die beiden Ösen 56 und 58 sind fest mit der Hülse 42 verbunden, in der die Zugstange 40 mit dem Absatz 50, wie anhand von Fig. 2 beschrieben, derart geführt wird, daß sie sich nur entlang der Längsachse 44 in der Hülse 42 bewegen kann. Die Anordnung der Feder 46 entspricht der anhand von Fig. 2 beschriebenen. Auch hier können sich aufgrund der parallelen Führung der Zugstange 40 in der Hülse 42 und der Ösen 36 und 38 bzw. 56 und 58 entlang der Längsachse 44 des Federelementes 15 die zuvor beschriebenen Änderungen der Seilkräfte in Richtung des Feder 46 derart auf­ heben, daß kein Einfluß einer äußeren Last auf die Feder 46 auftritt. Fig. 4 shows another embodiment of a biasing member 15 for the inventive cable construction. The biasing element 15 shown here is provided for arrangement between two pairs of interacting ropes, but otherwise corresponds essentially to the pre-tensioning element 14 shown in FIG. 2. On the right side, it again has two eyelets 36 and 38 , to which two first ropes 2 , 4 can be attached. On its left side, the pretensioning element 15 is not fastened to a supporting component, but has two further eyelets 56 and 58 , which are mirror-symmetrical to the first two eyelets 36 and 38 and to which a further pair of ropes 30 , 32 are fastened can. The two eyelets 56 and 58 are fixedly connected to the sleeve 42 , in which the pull rod 40 with the shoulder 50 , as described with reference to FIG. 2, is guided such that it can only move in the sleeve 42 along the longitudinal axis 44 . The arrangement of the spring 46 corresponds to that described with reference to FIG. 2. Here, too, due to the parallel guidance of the pull rod 40 in the sleeve 42 and the eyelets 36 and 38 or 56 and 58 along the longitudinal axis 44 of the spring element 15, the changes in the cable forces in the direction of the spring 46 described above are such that none Influence of an external load on the spring 46 occurs.

BezugszeichenlisteReference list

22nd

Seil
rope

44th

Seil
rope

66

Auflager
In stock

88th

Auflager
In stock

1010th

Druckstab
Pressure rod

1212th

Punkt
Point

1414

Vorspannelement
Preloading element

1515

Vorspannelement
Preloading element

1616

Punkt
Point

1818th

Befestigungspunkt
Attachment point

2020th

Kreuzungspunkt
Crossing point

2222

Kreuzungspunkt
Crossing point

2424th

Befestigungspunkt
Attachment point

2626

Befestigungspunkt
Attachment point

2828

Punkt
Point

3030th

Seil
rope

3232

Seil
rope

3434

tragendes Bauteil
load-bearing component

3636

Öse
eyelet

3838

Öse
eyelet

4040

Zugstange
pull bar

4242

Hülse
Sleeve

4444

Längsachse
Longitudinal axis

4646

Feder
feather

4848

Schraube
screw

5050

Absatz
paragraph

5252

Absatz
paragraph

5454

Fassadenelement
Facade element

5656

Öse
eyelet

5858

Öse
eyelet

Claims (11)

1. Tragende Seilkonstruktion mit zumindest zwei zusammenwirkenden vorgespannten Seilen (2, 4), bei welcher
zwischen den Seilen (2, 4) zumindest ein sich im wesentlichen quer zu den Seilen erstreckendes Zug- oder Druckelement (10) derart angeordnet ist, daß sich die Seile (2, 4) zumindest abschnittweise einander annähern oder voneinander entfernen,
äußere Lasten über das Zug- oder Druckelement (10) auf die Seile (2, 4) übertragen werden, wodurch eine Erhöhung der Seilkraft um einen be­ stimmten Betrag in dem einen Seil (4) und eine Verringerung der Seilkraft um einen entsprechenden Betrag in dem anderen Seil (2) bewirkt wird, und
die Seile (2, 4) mit zumindest einem gemeinsamen Vorspannelement (14; 15), das eine Vorspannkraft erzeugt und Querkräfte aufnimmt, verbunden sind, um die Erhöhung der Seilkraft in dem einen Seil (4) und die Verringe­ rung der Seilkraft in dem anderen Seil (2) in Richtung der Wirkungslinie der Vorspannkraft gegenseitig aufzuheben.
1. Load-bearing rope construction with at least two interacting pre-tensioned ropes ( 2 , 4 ), in which
at least one pulling or pushing element ( 10 ), which extends essentially transversely to the ropes, is arranged between the ropes ( 2 , 4 ) in such a way that the ropes ( 2 , 4 ) approach or move away from one another at least in sections,
external loads on the tension or pressure element ( 10 ) on the ropes ( 2 , 4 ) are transmitted, thereby increasing the rope force by a certain amount in the one rope ( 4 ) and reducing the rope force by a corresponding amount in the another rope ( 2 ) is effected, and
the ropes ( 2 , 4 ) are connected to at least one common pretensioning element ( 14 ; 15 ), which generates a pretensioning force and absorbs transverse forces, in order to increase the rope force in one rope ( 4 ) and reduce the rope force in the other To lift each other rope ( 2 ) in the direction of the line of action of the pretensioning force
2. Tragende Seilkonstruktion nach Anspruch 1, bei welcher zwei zusammen­ wirkende Seile (2, 4) symmetrisch zueinander angeordnet sind, so daß die Wirkungslinien der Seilkräfte symmetrisch zu der Wirkungslinie der Vor­ spannkraft verlaufen.2. Load-bearing rope construction according to claim 1, in which two cooperating ropes ( 2 , 4 ) are arranged symmetrically to one another, so that the lines of action of the rope forces are symmetrical to the line of action of the pre-tension force. 3. Tragende Seilkonstruktion nach Anspruch 1 oder 2, bei welcher sich zwei zusammenwirkende Seile (2, 4) vorzugsweise zumindest in der Nähe eines Auflagers (6) der Seilkonstruktion kreuzen.3. Load-bearing rope construction according to claim 1 or 2, in which two interacting ropes ( 2 , 4 ) preferably cross at least in the vicinity of a support ( 6 ) of the rope construction. 4. Tragende Seilkonstruktion nach einem der vorangehenden Ansprüche, bei welcher zwei zusammenwirkende Seile (2, 4) zumindest an einem Aufla­ ger (6) der Seilkonstruktion in einem Punkt (12) zusammentreffen.4. Load-bearing rope construction according to one of the preceding claims, in which two interacting ropes ( 2 , 4 ) at least on a Aufla ger ( 6 ) of the rope construction meet at a point ( 12 ). 5. Tragende Seilkonstruktion nach einem der vorangehenden Ansprüche, bei welcher zwei zusammenwirkende Seile (2, 4) an zumindest einem Aufla­ ger (6) voneinander beabstandet sind.5. Load-bearing rope construction according to one of the preceding claims, in which two cooperating ropes ( 2 , 4 ) on at least one Aufla ger ( 6 ) are spaced apart. 6. Tragende Seilkonstruktion nach einem der vorangehenden Ansprüche, bei welcher das Vorspannelement (14) zwischen freien Enden der Seile (2, 4) und einem Auflager (8) der Seilkonstruktion angeordnet ist.6. Load-bearing rope construction according to one of the preceding claims, in which the prestressing element ( 14 ) is arranged between free ends of the ropes ( 2 , 4 ) and a support ( 8 ) of the rope construction. 7. Tragende Seilkonstruktion nach Anspruch 5 und 6, bei welcher an dem Auflager (8), an dem die Seile (2, 4) beabstandet voneinander sind, die Seilkräfte über ein Hebelsystem auf das gemeinsame Vorspannelement (14) übertragen werden.7. Load-bearing cable construction according to claim 5 and 6, in which on the support ( 8 ) on which the cables ( 2 , 4 ) are spaced apart, the cable forces are transmitted to the common pretensioning element ( 14 ) via a lever system. 8. Tragende Seilkonstruktion nach einem der vorangehenden Ansprüche, bei welcher das Vorspannelement (15) zwischen jeweiligen freien Enden von jeweils zumindest zwei zusammenwirkenden Seilen (2, 4, 30, 32) an­ geordnet ist.8. Load-bearing rope construction according to one of the preceding claims, in which the prestressing element ( 15 ) is arranged between respective free ends of at least two interacting ropes ( 2 , 4 , 30 , 32 ). 9. Tragende Seilkonstruktion nach Anspruch 8, bei welchem die freien Enden im Bereich des Vorspannelementes (15) beabstandet voneinander sind und die Seilkräfte über ein Hebelsystem auf das gemeinsame Vorspann­ element (15) übertragen werden.9. supporting cable construction according to claim 8, wherein the free ends in the area of the biasing member (15) spaced from each other and the rope forces of a lever system on the common biasing element (15) to be transferred. 10. Tragende Seilkonstruktion nach einem der vorangehenden Ansprüche, bei welcher das Vorspannelement (14; 15) zumindest ein Federelement (46) aufweist.10. Load-bearing cable construction according to one of the preceding claims, in which the prestressing element ( 14 ; 15 ) has at least one spring element ( 46 ). 11. Tragende Seilkonstruktion nach einem der vorangehenden Ansprüche, welche Fassadenelemente (54) trägt, die an den Zug- oder Druckelemen­ ten (10) befestigt sind.11. Load-bearing cable construction according to one of the preceding claims, which carries facade elements ( 54 ) which are attached to the Zug- or Druckelemen th ( 10 ).
DE1998131026 1998-07-10 1998-07-10 Carrying rope construction Expired - Fee Related DE19831026B4 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE1998131026 DE19831026B4 (en) 1998-07-10 1998-07-10 Carrying rope construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1998131026 DE19831026B4 (en) 1998-07-10 1998-07-10 Carrying rope construction

Publications (2)

Publication Number Publication Date
DE19831026A1 true DE19831026A1 (en) 2000-01-20
DE19831026B4 DE19831026B4 (en) 2005-09-01

Family

ID=7873671

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1998131026 Expired - Fee Related DE19831026B4 (en) 1998-07-10 1998-07-10 Carrying rope construction

Country Status (1)

Country Link
DE (1) DE19831026B4 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1288383A1 (en) * 2001-09-04 2003-03-05 Leonhardt, Andrä und Partner Beratende Ingenieure VBI GmbH Spatial support structure
CN100353013C (en) * 2006-07-07 2007-12-05 贵州大学 Large-span large-cantilever roofing cable-stayed type double-layer prestressed steel grid roof structure
CN100353014C (en) * 2006-07-07 2007-12-05 贵州大学 Large-span periphery triangular pyramid simple-supporting and inside folding prestressed steel grid structure
CN114412032A (en) * 2022-03-08 2022-04-29 安徽鑫盛铝业有限公司 Resistance to compression type aluminum plate curtain wall subassembly convenient to installation is fixed

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102009005456B4 (en) 2009-01-21 2011-02-24 Josef Gartner Gmbh Fixing anchor for fixing a facade to a building

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29613270U1 (en) * 1995-08-03 1996-09-19 Pagitz, Elisabeth, Mag., Friesach Guy knot

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3300274A1 (en) * 1983-01-07 1984-07-19 Gerhard 2106 Bendestorf Post Log cabin with superposed wall planks or boards forming the cabin walls and corner columns forming the cabin corners

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29613270U1 (en) * 1995-08-03 1996-09-19 Pagitz, Elisabeth, Mag., Friesach Guy knot

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
DE Lit: Büttner, Hampe, Bauwerk Tragwerk Tragstruktur S. 283-288 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1288383A1 (en) * 2001-09-04 2003-03-05 Leonhardt, Andrä und Partner Beratende Ingenieure VBI GmbH Spatial support structure
DE10143339A1 (en) * 2001-09-04 2003-04-03 Leonhardt Andrae Und Partner B Spatial structure arrangement
CN100353013C (en) * 2006-07-07 2007-12-05 贵州大学 Large-span large-cantilever roofing cable-stayed type double-layer prestressed steel grid roof structure
CN100353014C (en) * 2006-07-07 2007-12-05 贵州大学 Large-span periphery triangular pyramid simple-supporting and inside folding prestressed steel grid structure
CN114412032A (en) * 2022-03-08 2022-04-29 安徽鑫盛铝业有限公司 Resistance to compression type aluminum plate curtain wall subassembly convenient to installation is fixed
CN114412032B (en) * 2022-03-08 2023-07-07 安徽鑫盛铝业有限公司 Compression-resistant aluminum plate curtain wall assembly convenient to install and fix

Also Published As

Publication number Publication date
DE19831026B4 (en) 2005-09-01

Similar Documents

Publication Publication Date Title
EP1832690B1 (en) Building element for heat insulation
DE9100099U1 (en) Support bar connected to a profile bar by screws
CH628942A5 (en) BY MEANS OF SPRINGS AGAINST A VERTICAL CARRIER OF A TRENCH CONVERSION DEVICE OF SUPPORTABLE SLIDING SHOE.
EP1954897B1 (en) Connection node for a three-dimensional framework, in particular for a geodesic structure
EP2920384B1 (en) Fastening element for the fixing of fastening points and/or static loads on metal profiles
EP3586614B1 (en) Connection system for modular furniture or exhibition stands
DE19831026A1 (en) Supporting cable structure for roofs etc has tensile or compression element mounted across and between two pretensioned cables which are connected to common pretension element to take up forces to balance out outside loads
EP1098043A1 (en) Building element for the sound dampened connection of building parts
DE202005017667U1 (en) connecting device
EP3144448B1 (en) Mounting plate for attaching an element to a wall
DE19530572C2 (en) Building support structure
EP3211146B1 (en) Connection assembly for constructive timber structure
EP3121356B1 (en) Assembly of a hinge on a hollow chamber profile
DE102020125078B3 (en) Telescopic arrangement for attachment to a hollow profile of a frame or sash of a door or a window
DE10036157A1 (en) Device to support facade elements; has bracket element fixed to building and bracket element fixed to facade element and to support unit on first element with height adjustment and ball
DE2909898C2 (en) Device for attaching overhead lines to a multiple isolator chain
EP4339383A1 (en) Connection assembly for force-transmitting connection of a first force-absorbing construction part to a second force-absorbing construction part, and construction
EP4276267A1 (en) Seal, especially for sliding doors or sliding doors
DE202023104888U1 (en) Assembly element for timber and building construction
DE10164750B4 (en) Fastening element for an insulating element
DE10216918B4 (en) clevis
DE2734438A1 (en) HV rod insulator for tensile loads - has core made of rectangular section glass reinforced plastics
EP4145651A1 (en) Cantilever arm for a cable support system supported at the end on one side
DE2601022A1 (en) COUPLING DEVICE FOR TRANSFER OF FORCES WITH LOW HEAT TRANSFER
EP1151695A1 (en) Brace construction to stabilise a shelf unit as well as an extrusion for use in such a case

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
8127 New person/name/address of the applicant

Owner name: JOSEF GARTNER GMBH, 89423 GUNDELFINGEN, DE

8364 No opposition during term of opposition
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee

Effective date: 20150203