DE19726652A1 - Shuttering for straight prefabricated concrete steps, with top and bottom landing - Google Patents

Shuttering for straight prefabricated concrete steps, with top and bottom landing

Info

Publication number
DE19726652A1
DE19726652A1 DE19726652A DE19726652A DE19726652A1 DE 19726652 A1 DE19726652 A1 DE 19726652A1 DE 19726652 A DE19726652 A DE 19726652A DE 19726652 A DE19726652 A DE 19726652A DE 19726652 A1 DE19726652 A1 DE 19726652A1
Authority
DE
Germany
Prior art keywords
formwork
frame
stair
platform
shuttering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
DE19726652A
Other languages
German (de)
Inventor
Horst Witte
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AVERMANN MASCHINENFABRIK GmbH
Original Assignee
AVERMANN MASCHINENFABRIK GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AVERMANN MASCHINENFABRIK GmbH filed Critical AVERMANN MASCHINENFABRIK GmbH
Priority to DE19726652A priority Critical patent/DE19726652A1/en
Publication of DE19726652A1 publication Critical patent/DE19726652A1/en
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/06Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/22Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units
    • B28B7/225Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units for making stairs or stair units comprising more than one step
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/06Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
    • E04G13/062Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall for stairs or steps
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F2011/0203Miscellaneous features of stairways not otherwise provided for
    • E04F2011/0205Stairways characterised by the use of specific materials for the supporting structure of the treads
    • E04F2011/021Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass
    • E04F2011/0212Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass mainly of concrete
    • E04F2011/0214Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass mainly of concrete cast in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The top (14) and bottom (20) landings are joined to the step part (2) which has a metal frame (1) to which are joined shuttering elements (13,19) for the top and bottom landings by means of turning knuckles (12,21). The shuttering covers (10,16,23) for the metal frames are preferably made of sheet metal. An adjustable holder (15) is positioned between the step's frame and the top landing frame. The top part (17) of the steps' shuttering is rounded, and the adjacent part (18) of the top shuttering is hollowed out and grips over the rounded part.

Description

Die Erfindung betrifft eine Schalungsvorrichtung gemäß des Oberbegriffes des Anspruches 1.The invention relates to a formwork device according to the preamble of Claim 1.

Eine derartige Schalungsvorrichtung ist in der Praxis bekannt geworden. Diese bekannten Schalungsvorrichtungen für gerade Fertigbetontreppen zum Betonieren in Einbaulage weisen für den Treppenbereich ein Gestell aus Metall auf, an welches Schalungselemente für das Unter- und Oberpodest aus Holz anschließend zum Einschalen für das Ober- und Unterpodest Schalungselemente angesetzt werden. Diese Ausgestaltung für die Schalung für gerade Treppen mit Laufseite und Ober- und Unterpodest ist nur in aufwendiger Weise herzustellen, weil in mühsamer und zeitraubender Arbeit der Schalungsbelag für das Unter- und Oberpodest mittels Hilfsgerüst an das Metallgestell für den Treppenbereich angesetzt werden muß.Such a formwork device has become known in practice. This known formwork devices for straight concrete stairs for concreting In the installed position have a frame made of metal for the stair area Formwork elements for the lower and upper pedestal made of wood Formwork for the upper and lower platform formwork elements. This design for the formwork for straight stairs with running side and top and sub-pedestal can only be produced in a complex manner, because in laborious and time-consuming work using the formwork covering for the lower and upper pedestal Auxiliary scaffolding must be attached to the metal frame for the stair area.

Der Erfindung liegt die Aufgabe zugrunde, hier auf einfache Weise Abhilfe zu schaffen, um eine Schalung für gerade Treppen mit Laufseite und Ober- und Unterpodest zum Betonieren dieser Treppen in Einbaulage zu schaffen, die relativ schnell und einfach hergerichtet werden kann.The invention has for its object to remedy this in a simple manner create a formwork for straight stairs with running side and top and Sub-platform for concreting these stairs in the installation position to create the relative can be prepared quickly and easily.

Diese Aufgabe wird durch die kennzeichnenden Merkmale des Patentanspruches 1 gelöst. Infolge dieser Maßnahmen wird erstmalig eine Sonderschalung für gerade Treppen mit Laufseite und Ober- und Unterseite in Stahlblechbelag für Treppen, die in Einbaulage betoniert werden, geschaffen. Diese neuartige Sonderschalung zeichnet sich noch dadurch aus, daß nicht nur die Unterseite der Lauffläche, sondern auch die Schalung für das Ober- und Unterpodest in einem Metallgerüst ausgeführt sind. Hierdurch wird die Grundvoraussetzung dafür geschaffen, daß bei einer Neigungsverstellung der Laufseite die Schalungselemente für das Ober- und Unterpodest mit geneigt werden können, ohne daß an Ober- und Unterpodest in mühsamer Weise Schalungen aus Holz mit zusätzlichen Einlagen oder Dichtungen hergestellt werden müssen.This object is achieved by the characterizing features of patent claim 1 solved. As a result of these measures, special formwork is being made for straight for the first time Stairs with running side and top and bottom in sheet steel covering for stairs that be concreted in the installed position. This new special formwork is characterized by the fact that not only the underside of the tread, but also the formwork for the upper and lower pedestals in a metal frame are executed. This creates the basic requirement for the fact that the formwork elements for the top and  Lower platform can also be inclined without the upper and lower platforms in tediously formwork made of wood with additional inlays or seals have to be manufactured.

Als besonders vorteilhaft hat sich herausgestellt, daß die Schalungsbeläge für die Gestelle aus Metall, vorzugsweise aus Blech gefertigt sind. Hierdurch wird eine lange Lebensdauer der Schalungsvorrichtung erreicht.It has been found to be particularly advantageous that the formwork coverings for the Racks made of metal, preferably made of sheet metal. This will create a long service life of the formwork device reached.

Auch eine einfache Neigungsverstellung, auch für das Unter- und Oberpodest, wird durch die kennzeichnenden Merkmale des Patentanspruches 1 erreicht. Mittels dieser Maßnahme wird eine einfache Anordnung der Schalungen für das Unter- und Oberpodest an der Schalungsvorrichtung erreicht.A simple tilt adjustment, also for the lower and upper pedestals, is also possible achieved by the characterizing features of claim 1. Means this measure is a simple arrangement of the formwork for the lower and Upper platform reached on the formwork device.

Eine gute Abdichtung zwischen der Treppenschalung und der Oberpodestschalung wird durch die kennzeichnenden Merkmale des Anspruches 4 erreicht.A good seal between the stair formwork and the upper platform formwork is achieved by the characterizing features of claim 4.

Eine einfache Anordnung des Schalungsgestells für das Unterpodest an dem Treppenschalungsgestell wird durch die kennzeichnenden Merkmale des Anspruches 5 erreicht.A simple arrangement of the formwork frame for the lower platform on the Stair formwork frame is characterized by the characteristic features of the Claim 5 reached.

Um das Schalungsgestell für unterschiedlich lange Treppen, d. h, für eine unterschiedliche Anzahl von Treppenstufen einsetzen zu können, ist vorgesehen, daß die Drehgelenke in Längsrichtung des Treppengestelles verstellbar und in verschiedenen Höhen lagen festsetzbar sind. Hierdurch ist es möglich, das Schalungsgestell für das Unterpodest entsprechend an dem Schalungsgerüst für die Treppenschalung anzuordnen.Around the formwork frame for stairs of different lengths. h, for one it is planned to be able to use different numbers of stairs, that the swivel joints in the longitudinal direction of the stair frame adjustable and in different heights can be set. This makes it possible to Formwork frame for the lower platform corresponding to the formwork framework for the To arrange stair formwork.

Um einen sicheren Abschluß des Schalungsbelages des Unterpodestgestelles für alle Neigungen des Treppengestelles sicherzustellen, ist vorgesehen, daß der Schalungsbelag des Unterpodestgestelles in dessen Längsrichtung verschiebbar ist.To secure the formwork covering of the lower platform for To ensure all inclinations of the stair rack, it is provided that the Formwork covering of the lower platform frame is displaceable in its longitudinal direction.

Um unterschiedliche Neigungen von Treppen verwirklichen zu können, ist vorgesehen, daß das Treppengestell auf einem Untergestell im Steigungswinkel mittels einer einstellbaren Haltevorrichtung einstellbar angeordnet ist.To be able to realize different inclinations of stairs, is provided that the stair frame on a base frame at an incline is adjustable by means of an adjustable holding device.

Weitere Einzelheiten der Erfindung sind der Beispielsbeschreibung und den Zeichnungen zu entnehmen. Hierbei zeigenFurther details of the invention are the example description and the Take drawings. Show here

Fig. 1 die Schalungsvorrichtung in Seitenansicht mit Einzelheit X der oberen Gelenkausbidung und Fig. 1, the formwork device in side view with detail X of the upper joint and

Fig. 2 die Schalungsvorrichtung in Draufsicht. Fig. 2, the formwork device in plan view.

Die Schalungsvorrichtung ist als Sonderschalung für gerade Fertigbetontreppen großer Breite ausgebildet. Die Schalungsvorrichtung weist das aus Metall bestehende Gestell 1 für den Treppenbereich 2 auf. Dieses Schalungsgestell 1 ist auf einem Untergestell 3 mittels der Gelenkanordnung 4 der Stütze 5 in unterschiedlichen Neigungen einstellbar. Die Stütze 5 ist in unterschiedliche Positionen an dem Unterpodestgesell 4 mittels der Einstellschraube 6 und den mit der Einstellschraube 6 im Abstand zueinander angeordneten Befestigungselementen 7 einstellbar. An dem Schalungsgestell 1 für den Treppenbereich 2 sind verschiedene Halterungsvorrichtungen 8 zu befestigen, mittels derer in bekannten Weise die Treppenstufenschalungen 9 zu befestigen sind.The formwork device is designed as special formwork for straight concrete stairs of large width. The formwork device has the metal frame 1 for the staircase area 2 . This formwork frame 1 is adjustable on a base frame 3 by means of the joint arrangement 4 of the support 5 in different inclinations. The support 5 can be adjusted in different positions on the lower platform 4 by means of the adjusting screw 6 and the fastening elements 7 arranged at a distance from one another with the adjusting screw 6 . Various mounting devices 8 are to be fastened to the formwork frame 1 for the staircase area 2 , by means of which the staircase formwork 9 are to be fastened in a known manner.

Der Schalungsbelag 10 für den Treppenbereich 2 ist aus Blech gefertigt.The formwork covering 10 for the stair area 2 is made of sheet metal.

An der Oberseite 11 des Treppengestelles 1 ist mittels der Drehgelenke 12 das Schalungsgestell 13 für das Oberpodest 14 angelenkt. Zwischen dem Treppengestell 1 und dem Oberpodestgestell 13 ist die einstellbare Halterungsvorrichtung 15 angeordnet, so daß entsprechend der Neigung des Treppengestelles 1 die Oberpodestschalung 13 horizontal ausgerichtet werden kann. Der Schalungsbelag 16 für die Oberpodestschalung 13 ist ebenfalls aus Blech gefertigt. Der obere Bereich 17 der Treppenschalung 1 ist abgerundet ausgebildet. Der der Treppenschalung 1 benachbarte Bereich 18 der Oberpodestschalung 13 ist ausgehöhlt ausgebildet und übergreift die Abrundung 17 der Treppenschalung 1, wie dies die Einzelheit X in Fig im größeren Maßstab zeigt. Hierdurch ergibt dich eine gute Abdichtung zwischen Treppenschalung 1 und Oberpodestschalung 13. On the top 11 of the stair frame 1 , the formwork frame 13 for the upper platform 14 is articulated by means of the swivel joints 12 . Between the frame 1 and the upper staircase pedestal frame 13, the adjustable mounting device 15 is arranged such that the upper landing formwork can be aligned horizontally 13 corresponding to the inclination of the staircase rack. 1 The formwork covering 16 for the upper platform formwork 13 is also made of sheet metal. The upper area 17 of the stair formwork 1 is rounded. Of the staircase formwork 1 adjacent area 18 of the upper landing formwork 13 is formed hollow and fits over the rounded portion 17 of the staircase formwork 1, as shown in the detail X in Fig on a larger scale. This results in a good seal between the stair formwork 1 and the upper platform formwork 13 .

Das Schalungsgestell 19 für das Unterpodest 20 ist ebenfalls mittels Drehgelenke 21 am Treppengestell 1 mittels der verstellbaren Halterungen 22 angeordnet. Der Schalungsbelag 23 für die Unterpodestschalung 19 ist aus Blech hergestellt. Die Halterungen 22 können in Längsrichtung des Treppengestelles 1 in unterschiedlichen Positionen an dem Treppengestell 1 befestigt werden. Hierdurch können unterschiedlich lange Treppen, beziehungsweise Treppen mit einer unterschiedlichen Stufenanzahl mit der Schalung hergestellt werden. Desweiteren ist zwischen dem Treppengestell 1 und dem Unterpodestgestell 19 eine einstellbare Halterungsvorrichtung 24 angelenkt, so daß das Unterpodestgestell 19 entsprechend der jeweiligen Neigung der Treppenschalung 1 in horizontaler Lage ausgerichtet werden kann. Der Schalungsbelag 23 ist mittels der Einstellschraube 25 in Längsrichtung des Schalungsgestelles 19 verschiebbar, um einen guten Anschluß an den Schalungsbelag 10 der Treppenschalung 1 zu erreichen.The formwork frame 19 for the lower platform 20 is also arranged by means of swivel joints 21 on the stair frame 1 by means of the adjustable brackets 22 . The formwork covering 23 for the sub-platform formwork 19 is made of sheet metal. The brackets 22 can be secured to the stairway frame 1 in different positions in the longitudinal direction of the stair rack. 1 In this way, stairs of different lengths, or stairs with a different number of steps, can be produced with the formwork. Furthermore, an adjustable holding device 24 is articulated between the step frame 1 and the lower platform frame 19 , so that the lower platform frame 19 can be aligned in a horizontal position according to the respective inclination of the step formwork 1 . The formwork covering 23 can be displaced in the longitudinal direction of the formwork frame 19 by means of the adjusting screw 25 in order to achieve a good connection to the formwork covering 10 of the stair formwork 1 .

Claims (8)

1. Schalungsvorrichtung für gerade Fertigbetontreppen mit einem Treppenstufenbereich sowie einem mit diesem verbundenen Unter- und einem Oberpodest, wobei ein aus Metall bestehendes Gestell für den Treppenbereich vorgesehen ist, an welches sich Schalungselemente für das Unter- und Oberpodest anschließen, dadurch gekennzeichnet, daß die Schalungselemente (13, 19 ) für das Unter- und Oberpodest (14, 20) ebenfalls als aus Metall bestehende Schalungsgestelle ausgebildet sind, daß die Schalungselemente (13, 19) für das Unter- und Oberpodest (14, 20) an dem Schalungsgestell (1) für den Treppenbereich (2) mittels Drehgelenke (12, 21) befestigt sind.1. Formwork device for straight prefabricated concrete stairs with a stair tread area and an associated lower and an upper platform, wherein a metal frame is provided for the stair area, to which formwork elements for the lower and upper platform connect, characterized in that the formwork elements (13, 19) for the lower and upper pedestals ( 14 , 20 ) are also designed as formwork frames made of metal such that the formwork elements ( 13 , 19 ) for the lower and upper pedestals ( 14 , 20 ) on the formwork frame ( 1 ) for the stair area ( 2 ) by means of swivel joints ( 12 , 21 ). 2. Schalungsvorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die Schalungsbeläge (10, 16, 23) für die Gestelle (1, 13, 19) aus Metall, vorzugsweise Blech gefertigt sind.2. Formwork device according to claim 1, characterized in that the formwork coverings ( 10 , 16 , 23 ) for the frames ( 1 , 13 , 19 ) are made of metal, preferably sheet metal. 3. Schalungsvorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß das Schalungsgestell (13) für das Oberpodest (14) an der Oberseite (11) des Treppengestelles (1) mittels Drehgelenke (12) angelenkt ist, daß zwischen dem Treppengestell (1) und dem Oberpodestgestell (13 ) eine einstellbare Halterungsvorrichtung (15) angeordnet ist.3. Formwork device according to claim 1, characterized in that the formwork frame ( 13 ) for the upper platform ( 14 ) on the top ( 11 ) of the stair frame ( 1 ) by means of swivel joints ( 12 ) is articulated that between the stair frame ( 1 ) and the An adjustable mounting device ( 15 ) is arranged on the upper platform frame (13). 4. Schalungsvorrichtung nach Anspruch 3, dadurch gekennzeichnet, daß der obere Bereich (17) der Treppenschalung (1) abgerundet ausgebildet ist, daß der der Treppenschalung (1) benachbarte Bereich (18) der Oberschalung (13) ausgehöhlt ausgebildet ist und die Abrundung (17) der Treppenschalung (1) übergreift.4. A shuttering device according to claim 3, characterized in that the upper region (17) is rounded of the staircase formwork (1), that the the staircase formwork (1) adjacent to region (18) of the upper mold (13) is hollowed out and the rounding ( 17 ) overlaps the stair formwork ( 1 ). 5. Schalungsvorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß das Schalungsgestell (19) für das Unterpodest (20) mittels Drehgelenke (21) am Treppengestell (1) angelenkt ist, daß zwischen dem Treppengestell (1) und dem Unterpodestgestell (19) eine einstellbare Halterungsvorrichtung (24) angeordnet ist.5. Formwork device according to claim 1, characterized in that the formwork frame ( 19 ) for the lower platform ( 20 ) by means of swivel joints ( 21 ) on the stair frame ( 1 ) is articulated in that an adjustable between the stair frame ( 1 ) and the lower platform frame ( 19 ) Bracket device ( 24 ) is arranged. 6. Schalungsvorrichtung nach Anspruch 5, dadurch gekennzeichnet, daß die Drehgelenke (21) in Längsrichtung des Treppengestelles (1) verstellbar und in verschiedenen Höhenpositionen festsetzbar sind.6. Formwork device according to claim 5, characterized in that the rotary joints ( 21 ) in the longitudinal direction of the stair frame ( 1 ) are adjustable and can be fixed in different height positions. 7. Schalungsvorrichtung nach Anspruch 5, dadurch gekennzeichnet, daß der Schalungsbelag (23) des Unterpodestgestelles (19) in dessen Längsrichtung verschiebbar ist.7. Formwork device according to claim 5, characterized in that the formwork covering ( 23 ) of the lower platform frame ( 19 ) is displaceable in its longitudinal direction. 8. Schalungsvorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß das Treppengestell (1) auf einem Untergestell (3) im Steigungswinkel mittels einer einstellbaren Haltevorrichtung (5, 6, 7) einstellbar angeordnet ist.8. Formwork device according to claim 1, characterized in that the stair frame ( 1 ) on an underframe ( 3 ) is arranged at an incline by means of an adjustable holding device ( 5 , 6 , 7 ).
DE19726652A 1997-06-24 1997-06-24 Shuttering for straight prefabricated concrete steps, with top and bottom landing Ceased DE19726652A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19726652A DE19726652A1 (en) 1997-06-24 1997-06-24 Shuttering for straight prefabricated concrete steps, with top and bottom landing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19726652A DE19726652A1 (en) 1997-06-24 1997-06-24 Shuttering for straight prefabricated concrete steps, with top and bottom landing

Publications (1)

Publication Number Publication Date
DE19726652A1 true DE19726652A1 (en) 1999-01-07

Family

ID=7833405

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19726652A Ceased DE19726652A1 (en) 1997-06-24 1997-06-24 Shuttering for straight prefabricated concrete steps, with top and bottom landing

Country Status (1)

Country Link
DE (1) DE19726652A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2279656A1 (en) * 2004-06-08 2007-08-16 Constructora Eshor, S.L. Support for inclined slabs and stairs includes horizontals having free ends that are angled to connect to corresponding horizontal forged components
CN109162450A (en) * 2018-07-22 2019-01-08 绿山高科建设科技有限公司 A kind of easy to carry and installation adjustable type stairway is laid with mold
CN109518953A (en) * 2018-11-21 2019-03-26 李启伟 A kind of stair template support device facilitating adjusting
CN110145122A (en) * 2019-05-31 2019-08-20 南通华新建工集团有限公司 A kind of spiral stairway mould plate supporting device
CN110485732A (en) * 2019-08-23 2019-11-22 贵州正业工程咨询顾问有限公司 A kind of adjustable stair pour device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2279656A1 (en) * 2004-06-08 2007-08-16 Constructora Eshor, S.L. Support for inclined slabs and stairs includes horizontals having free ends that are angled to connect to corresponding horizontal forged components
CN109162450A (en) * 2018-07-22 2019-01-08 绿山高科建设科技有限公司 A kind of easy to carry and installation adjustable type stairway is laid with mold
CN109162450B (en) * 2018-07-22 2020-09-29 广东博智林机器人有限公司 Adjustable stair laying mold convenient to carry and install
CN109518953A (en) * 2018-11-21 2019-03-26 李启伟 A kind of stair template support device facilitating adjusting
CN109518953B (en) * 2018-11-21 2021-02-19 安徽天驰建工集团有限公司 Stair template support device convenient to adjust
CN110145122A (en) * 2019-05-31 2019-08-20 南通华新建工集团有限公司 A kind of spiral stairway mould plate supporting device
CN110145122B (en) * 2019-05-31 2021-01-01 天长市市政建筑有限责任公司 Spiral stair template supporting device
CN110485732A (en) * 2019-08-23 2019-11-22 贵州正业工程咨询顾问有限公司 A kind of adjustable stair pour device

Similar Documents

Publication Publication Date Title
DE19726652A1 (en) Shuttering for straight prefabricated concrete steps, with top and bottom landing
DE3043990A1 (en) SCREEN WALL FOR THE PRODUCTION OF WALLS OR THE LIKE
DE3916590C2 (en)
DE3220918C2 (en)
EP0389932A1 (en) Support structure for grandstands
DE3922927C2 (en)
DE3543535C1 (en) Securing means for the wall-side ends of the tread boards of a stairway
DE29801000U1 (en) Mountable railing for installation in stairs and / or platforms
DE10305145B4 (en) Scaffold stairway module
DE19801044C2 (en) Cladding system for a bathtub, preferably a bathtub
DE2504762C3 (en) Working platform for bracket scaffolding
DE19600992A1 (en) Support frame and work platform for installation of tapered concrete roof
DE19808770A1 (en) Shuttering for straight flights of concrete stairs
DE7714713U1 (en) JUST FINISHED STAIRS
DE1930677C (en) Staircase that can be adjusted to suit different slopes
DE1866424U (en) PRE-FABRICATED ROOF FOR WEATHER PROTECTION HALLS.
DE10313029B3 (en) Height-adjustable shower cubicle or shower wall supported by base rail provided by profile rail fitted over U-shaped rail to allow its relative vertical adjustment
DD218133B1 (en) ADJUSTABLE TRACK WITH STUETZE
DE3201798A1 (en) Central crossbeam stair for any desired flights
DE2735335A1 (en) Staircase with cantilevered metal steps - has steps vertically and laterally adjustable between top and bottom landings
DE29706931U1 (en) Protection device for a printing machine
DE19817227A1 (en) Stairs and fittings and longwall arrangement for a staircase
DE19926592A1 (en) Adjustable bracket for scaffolding consists of two advancing units connected onto the vertical framework of an existing scaffolding
DE2302561A1 (en) HEIGHT-ADJUSTABLE SUPPORTING CONSTRUCTION FOR STRENGTHENED STRUCTURES
DE8323920U1 (en) RAILING SUPPORT FOR PROTECTIVE RAILINGS ON CONSTRUCTION, IN PARTICULAR FOR STAIRWAY RAILINGS

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
8131 Rejection