DE1877213U - CLIMBING FORMWORK DEVICE FOR CONCRETING TOWER-LIKE STRUCTURES. - Google Patents

CLIMBING FORMWORK DEVICE FOR CONCRETING TOWER-LIKE STRUCTURES.

Info

Publication number
DE1877213U
DE1877213U DEB52510U DEB0052510U DE1877213U DE 1877213 U DE1877213 U DE 1877213U DE B52510 U DEB52510 U DE B52510U DE B0052510 U DEB0052510 U DE B0052510U DE 1877213 U DE1877213 U DE 1877213U
Authority
DE
Germany
Prior art keywords
formwork
mast
climbing
concreting
bad
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEB52510U
Other languages
German (de)
Inventor
Josef Boessner
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DEB52510U priority Critical patent/DE1877213U/en
Publication of DE1877213U publication Critical patent/DE1877213U/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/22Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

Patentanwalt ^ ^ ί« · ' ^f?fSi Bad AiMinf (ObbJ. |. Klcnendulnag?- JfTPatent Attorney ^ ^ ί «· '^ f? FSi Bad AiMinf (ObbJ. |. Klcnendulnag? - JfT

WaliaCn nt „—SrÜ^ilBauweAe^^O.^Ö.. Β525ΐα (T- W:|l:WaliaCn nt "—SrÜ ^ ilBauweAe ^^ O. ^ Ö .. Β525ΐα (T- W: | l:

Mönchen i.A. ι/ο üJj!-To.7I.ß?rMonks iA ι / ο üJj ! -To.7I.ß? R

Josef B δ s υ η e r, Bad AIaUBg9 Oberbayern Josef B δ s υ η e r, Bad AIaUBg 9 Upper Bavaria

g sun, Betonieren tiarmartiger Bauwerke, g sun, concreting tiarmike structures,

.Die Erfindung bc;tr:xf1; eine Klettersohalungseinricntang zum .The Invention bc; tr : xf1; a climbing facility for

turni6ri::l^ä^ Bauwar^e mit rechteckigem der ■3Π Q\iy.v..:r.hr.:A J*-t· sit ß:*/;.;:·■:■ ^-ifiÄ/iaial ^^m Bauwerk iiy rüo.ttci-Oii/jeiA od?5r q''.act.;-a fei sehen höh.' .:·π. Mittel-■/.■.■aKt;. au dGi.JBi--;.i Ua;.-cv:·^ linde ?::?:-a".^. ^ 'den Ssit-eüxlächon dec Bauv/srkca hin crot^ockuiide,, lii^.^e.-^-w^ctallbaAe 2r&ßmitte3. 55ur lösbaren VQTc.xj-<yyr.:uri. äys '-Uti^.ilcir.ais-a vorgea3h>?n ε.«.ηάΡ weiter mit eln^i,; nr " u«rü Mutter >rt.·?■'·· vertikal· vf>rschiebtar angeordneten ManiielniaFr^ an dev. über läugenverstellbare Mittel die Innennaha}v:c% aufgehängt ist, und mit Auslegern am oberen Ende des Mittelmastes,, an denen die Außens^halung iturni6ri :: l ^ ä ^ Bauwar ^ e with a rectangular der ■ 3Π Q \ iy.v ..: r.hr.:A J * -t · sit ß: * /;.;: · ■: ■ ^ -ifiÄ / iaial ^^ m building iiy rüo.ttci-Oii / jeiA od? 5r q &quot;.act.; - a fei see height. ' .: · Π. Middle ■ /. ■. ■ act ; . au dGi.JBi - ;. i Ua; .- cv: · ^ linde? ::?: - a ". ^. ^ 'den Ssit-eüxlächon dec Bauv / srkca hin crot ^ ockuiide ,, lii ^. ^ e .- ^ - w ^ ctallbaAe 2r & ßmitte3. 55ur solvable VQTc.xj- <yyr.:uri. äys' -Uti ^ .ilcir.ais-a vorgea3h>? n ε. «. ηά Ρ continue with eln ^ i ,; no "u« rü Mutter> rt. ·? ■ '·· vertically · vf> rschicktar arranged ManiielniaFr ^ an dev. The inner neara} v: c% is suspended by means that can be adjusted, and with brackets at the upper end of the central mast, on which the outer posture i

höhenverstellbar aufgehängt ist. iis suspended adjustable in height . i

2i3 i et bereits el*».« jaö-iterachalungseinrichtuiag bekannitf bei der ;2i3 i et already el * ».« Jaö-iterachalungseinrichtuiag bekanni tf at the;

habenν Mittel usd Mantelaaiit einen runden oder sechseckigen Querschnitt/ ;ν means usd mantle laaiit have a round or hexagonal cross-section /;

■ ■ ' ' ■+.-·■■- ■ ■ '' ■ + .- · ■■ - jj

wählend sich von dem ManteXmast die Ausleger radial nach allen : Seiten erstrecken, Die Schalungsha-it bei dieser bekannten " ; ■ ■ ■'/;■-.:■'■:. \'\; choosing from the ManteXmast, the booms extend radially to all: sides, the formwork hold-it in this known "; ■ ■ ■ '/; ■ - .: ■' ■ :. \ '\;

37*. ΙΜΚ imH^i 37 *. ΙΜΚ imH ^ i vIfvIf

Bad AiWhif (Obb.). | fdcttcnduOwm«· If vorrichtung znm Betonteres tamunqetr H Bauwerke. 13. 3. 63. B 52510, CT- K: ÜBad AiWhif (Obb.). | fdcttcnduOwm «· If device znm more concrete tamunqetr H Buildings. 13. 3. 63. B 52510, CT- K: Ü

Z. 4) -"'■■" ' . 'iLine 4) - "'■■"'. 'i

Schalongeeinrichtiuag besteht aus einzelnen gekrüonten Schal tafeln, »eiche durch Abdeckbleche miteinander verbunden sind, so daS eine durchgehende Hingfläche entsteht. Die bekannte Oetterschalungseinrichtung gestattet jedotsh nicht die Herstellung von Bauwerken' salt quadratischem oder rechteckigen Querschnitte . Schalongeeinrichtiuag consists of individual crowned Formwork panels, »oak connected to one another by cover plates so that a continuous surface is created. the known Oetterschalungseinrichtung does not allow jedotsh the manufacture of structures' salt square or rectangular cross-sections.

Siel cer Erfindung ist die Schaffung einer Kletterschalungseiariehtung der obaagenecziten Art, welche die Herstellung ' urmartiger- 3suwerke Eit rechteckigem, oder quadratischem Querschnitt gestattetr Hierzu sieht die Erfindung vor, daß ac unteren Bilde des Kittel mast es und am Ilanttlciast auf allen vier Seiten parallel su den Seitenflächen» horizontal und übereinander nach einer Seite offene Iragrohre befestigt sind β in denen Tragstangen gleitend und feststellbar angeordnet sind» weluhe sich bis zur Wandung des Bauwerkes bzw, zur Xnnenschalung erstrecken, wobei die Tragstangen an der Innenschalung gelenkig angebracht sind, und daS Innen- und Außenschalung während des Betonierens in an sich bekannter Weise durch Abstandshalter miteinander verbunden sind«Siel cer invention is the creation of a climbing formwork of the obaagenecziten kind, which allows the production of 'primeval-3suwerke Eit rectangular or square cross-section . To this end, the invention provides that ac lower images of the smock mast it and on the Ilanttlciast on all four sides parallel the side surfaces »horizontally and one on top of the other are fastened Iragrohre open to one side, in which support rods are sliding and lockable» which extend to the wall of the building or to the inner formwork, whereby the support rods are articulated on the inner formwork, and the inner and outer formwork are connected to one another by spacers in a known manner during concreting «

Innen-und Außenschalung bestehen vorzugsweise aus ebenen Sohaltafelns wobei die benachbarten Vertikalkanten zweier nebeneinander»liegender Schaltafeln über doppelwandige Eckstücke miteinander verbunden sind, in deren zusammenklemmöaren Doppelwänden die Schal.-tafelränder lösbar gelagert sind? Inner and outer formwork are preferably made of flat Sohaltafeln s with the adjacent vertical edges of two adjacent "lying shuttering panels are connected together via double-walled corner pieces, the Schal. panel edges are detachably mounted in the double walls zusammenklemmöaren?

J57e. IM»;: 187721V f<*ef Barnaul j Bad AiMiBg (ObM. | Klettendutopr- \f iromdrtueg zum Betonieren tnnoansjcer · jBattwerke? 13. 3. 63.. B 52510, (Γ. H; j ■. J57e. IM »;: 187721V f <* ef Barnaul j Bad AiMiBg (ObM. | Klettendutopr- \ f iromdrtueg for concreting tnnoansjcer · j Battwerke? 13. 3. 63 .. B 52510, (Γ. H; j ■.

Weitere Vorteile und Einzelheiten der Erfindung ergeben eich aus der folgenden Beschreibung der Kletterschalungseinrichtung gemäß der Erfindung anhand der Zeichnung; in dieser zeigen Further advantages and details of the invention emerge from the following description of the climbing formwork device according to the invention with reference to the drawing; in this show

Figo 1 eine teilweise geschnittene Seitenansicht der BLetter-Figo 1 is a partially sectioned side view of the BLetter-

schalungscinrichtung gemäß der Erfindung im Betrieb - an einem bereits teilweise fertiggestellten Bauwerk, shuttering device according to the invention in operation - on an already partially completed structure,

j Pig»1a eine vergrößerte teilweise geschnittene Seitenansicht, welche die Anbringung der Tragrohre am Mantelmast im einzelnen veranschaulicht; nach Linie 1a - la der Figure 1a shows an enlarged, partially sectioned side view which illustrates in detail the attachment of the support tubes to the jacketed mast; after line 1a - la der

1,1,

?, Fig* 2 einen. Querschnitt nach Linie 2 - 2 in Pig» 1f. ? , Fig * 2 a. Cross-section along line 2 - 2 in Pig » 1 f .

Fig« 3 einen vergrößerten Ausschnitt des Eckbereiches der Schalungen entsprechend dem Kreis 3 in Fig» 2f 3 shows an enlarged section of the corner area of the formwork corresponding to circle 3 in FIG. 2 f

Fig. 4 eine teilweise geschnittene Seitenansicht von drei nebeneinander arbeitenden Kletterschalungseinrichtungen gemäß der Erfindung zur Errichtung einee Brückenpfeilers mit Zwischenwänden und4 shows a partially sectioned side view of three climbing formwork devices according to the invention working side by side for erecting a bridge pillar with partition walls and

■ . ■ ■ . ν■. ■ ■. ν

Fig* 5 einen Schnitt nach Linie 5 - 5 in Figo 4.FIG. 5 shows a section along line 5 - 5 in FIG. 4.

teilweise Nach Fig» 1 ist ein koachsial zu dem bereits/fertiggestelltenpartially According to Fig. 1, a is coaxial to the already / completed

Bauwerk 12 angeordneter Mittelmast 11 über sich am unteren EndeStructure 12 arranged central mast 11 above itself at the lower end

O/ OO / O

IS7721V ϊοκί Obb) | KletIS7721V ϊοκί Obb) | Klet

37e, 11/03. , 37e, 11/03. ,

Bad AiWing (ObbJ. j Kiettroduhmrt vorrichtung zum Betonieren tursunigcr Battwerke. 13. 3. 63. B 52510. (T.Bad AiWing (ObbJ. J Kiettroduhmrt device for concreting tursunigcr Battwerke. 13. 3. 63. B 52510. (T.

2. *)'■■■■ ■'' __„ 2. *) '■■■■ ■''__"

erstreckende Tragmittel 11a, 11b in der Betonwand verankert. Wie auch aus Figo 2 zu erkennen ist, ist über dem Hittelmast 11 ein sogenannter Mantelmast 14 in der Weise angeordnet, daß er auf dem Mittelmast in vertikaler Sichtung verschoben werden kann«, Diese verschiebbare Lagerung kann ZoB» durch am Mantelmast angebrachte und auf dem Mittelmast laufende Rollen 38 vermittelt werden» !Die Höhe des Mantelmastes ist wesatlich geringer als die des Mittelmastes 11.extending support means 11a, 11b anchored in the concrete wall. As can also be seen from Figo 2, it is above the central mast 11 a so-called jacketed mast 14 is arranged in such a way that it is displaced on the central mast in a vertical sighting can be «, This sliding storage can ZoB» by Rollers 38 attached to the jacketed mast and running on the central mast are conveyed "! The height of the jacketed mast is essentially lower than that of the central mast 11.

An dem Mantelmast sind auf allen vier Seiten parallel zu den Seitenflächen, horizontal und übereinander nach einer Seite offene Tragrohre 14a befestigt* Bei der dargestellten Kletterschalungseinrichtung sind drei Gruppen von Tragrohren übereinander angeordnet ο Es ist jedoch klar, daß je nach den besonderen Bedürfnissen mehr oder weniger Tragrohrgruppen vorgesehen sein können»On the jacketed mast are on all four sides parallel to the side surfaces, horizontally and one above the other to one side open support tubes 14a attached * With the climbing formwork device shown three groups of support tubes are arranged one above the other ο It is clear, however, that depending on the more or fewer support tube groups can be provided for special needs »

Auf der offenen Seite können sich die Tragrohre bis über die Außenberandung des Mantelmastes erstrecken9 wie das in Pig«, 1 dargestellt ist„ Die in der dazu senkrechten Richtung am Mittelmast befestigten Tragrohre brauchen sich dagegen gemäß Pig« 2 überhaupt nicht oder nur um ein geringes Stück über die Aussenberandung des Mantelmaates hinaus erstrecken» _On the open side, the support tubes can extend beyond the outer edge of the jacketed mast 9, as shown in Pig ", 1" The support tubes attached to the central mast in the perpendicular direction, on the other hand, need not at all or only slightly, according to Pig "2 Extend part beyond the outer edge of the coat mate »_

In ähnlicher Weise sind am unteren Ende des Mittelmastes 11 zwei Gruppen von Tragrohren lia parallel zu den Seitenflächen,In a similar way, at the lower end of the central mast 11, there are two groups of support tubes lia parallel to the side surfaces,

ilil

15772π. W Banner.i ObW | Kdl1 15772 π. W Banner.i ObW | Kdl1

iettetiettet

j Bad Aiblfcg (Obh-J. | Klettetsduleass-1| i Bauwerke. 13. 3. 63.. B 52510. CT- » i- j Bad Aiblfcg (Obh-J. | Klettetsduleass-1 | i Buildings. 13. 3. 63 .. B 52510. CT- » i-

- 5 horizontal und übereinander befestigt,- 5 fixed horizontally and one above the other,

Figo 1a zeigt die erfindungsgemäße Anbringung der Tragrohre 14a im einzelnen am Beispiel des Mantelmastes 14οFigo 1a shows the attachment of the support tubes 14a according to the invention in detail using the example of the jacketed mast 14 o

beiat

In den Tragrohren 14a bzw« 11 a sind gleitend und feststellbar / Tragstangen Hb? 14b angeordnet 9 welche sich bis zur Betonwandung des Bauwerkes 12 bsw., bis zur Innenschalung 16 erstrecken» In the support tubes 14a and 11a are sliding and lockable / support rods Hb? 14b arranged 9 which extend up to the concrete wall of the building 12, for example, up to the inner formwork 16 »

Y/ährend die 2ragstangen 11b an in den Beton eingegossenen Abstandshaltern 57 befestigt sind und auf diese Weise den Mittelmast 11 haltern, sind die Tragstangen 14b des Mantelmastes mit ihren Enden gelenkig mit der Innenschalung 16 verbunden» Die Innenschalung kann somit relativ zu den Tragstangen 14b um eine horizontale in der Schaltafelebene liegende Achse geschwenkt werden., Am oberen Ende des Mantelmastes 14 sowie unterhalb des Mitteiniastes 11 können Arbeitsbühnen 31 bzw« 32 vorgesehen seirioY / hile 2ragstangen 11b are secured to the cast in the concrete spacers 57 and holders in this way the center pole 11, the support rods 14b of the jacket mast pivotally connected with their ends to the inner formwork 16 »The inner formwork can therefore 14b relative to the support rods to a horizontal axis lying in the plane of the panel can be pivoted. At the upper end of the jacketed mast 14 and below the central mast 11, working platforms 31 or 32 can be provided

In der Nähe des oberen Endes des M^ttelmastes 11 sind sich nach aussen erstreckende Ausleger 15 befestigt, welche dazu dienen den Mantelmast über !Seile 39 und die Außenschalung 17 über Seile 40 zu tragen« Die Seile 39» 40 gehören entweder zu einem Flaschenzug oder enthalten eine Winde 36 , um eine Höhenverstellung der Außenschalung ...bsv*. des Mant el maste s herbeiführen zu kömisno β : -In the vicinity of the upper end of the M ^ ttelmastes 11 outwardly extending brackets 15 are attached, which serve to carry the jacket mast over! Ropes 39 and the outer formwork 17 over ropes 40. "The ropes 39" 40 either belong to a block and tackle or contain a winch 36 to adjust the height of the outer formwork ... bsv *. of the Mant el maste s bring about to kömisno β : -

,/c, / c

J37c H/63. 16772». Josef Bö*nter.if I Bad Aibling (Obb.). | KlettenduW*-Jf ', verrichtung ium betonieren tunnarajttr i S Bauwerke. 13. 3. 63. B 52 JIO. (T- »:« Iz. 4) .»J37c H / 63. 16772 ». Josef Bö * nter.if I Bad Aibling (Obb.). | KlettenduW * -Jf ', performing ium concreting tunnarajttr i S buildings. 13. 3. 63. B 52 JIO. (T- »:« Iz. 4). »

■Die AußenBdialung 17 kann auf ihrer Außenseite Arbeitsbühnen 35 aufweisen und die gleiche Höhe wie die Innenschalung haben; sie ist jedoch vorzugsweise doppelt so hoch, wie die Innenschalung um einen abgeschlossenen Innenraum zu schaffeno Die Innen- und Außenschalung I6f 17 bestehen aus ebenen Schaltafeln v welche vorzugsweise aus lösbar miteinander verbundenen C-Profileisen 16as. 17a (Pi£e3) aufgebaut sind* An ihren Vertikalkanten sind nebeneinanderlegende Schaltafeln nicht direkt miteinander verbunden sondern über Sckstücke 18 bsw„ 19° Die Ecketüoke 18S «9 haben dan z.we3k, die bei Querschnittsänderungen mit der Höhe erforderlichen TJafangsänderimgen der Schalungen auszugleichen*The outside construction 17 can have working platforms 35 on its outside and have the same height as the inside formwork; however, it is preferably twice as high as the inner formwork in order to create a closed interior o The inner and outer formwork I6 f 17 consist of flat formwork panels v which are preferably made of releasably connected C-profile iron 16a s . 17a (Pi £ e3) are built * On their vertical edges, formwork panels placed side by side are not directly connected to one another, but rather via corner pieces 18 or " 19 ° The corner pieces 18 S " 9 then have to compensate for the changes in cross-section with the height of the formwork *

Die Eckstücke 18„ 19 '. stehen aus je zv.'ei Vfinkelblechen 20» 21 öKw, 22j, 23,deren Abstand so gehalten visedt daß die eigentlichen Schalungshäute I6bf ;?b gerade dasswischen pausen» An den ait dem Beton 24 in Berünrung könnenden Winkelblechen sind sioh etwa in der T;inkelhalbierenden von der Betoneeite weg erstr ds Bolzen 27» 28 angeschwelsst ;der sonstwie befestigte Die Bolzen 27,?28 erstrecken sich durch Bohrungen der beiden V/inkelbleche 20» 23 und deren Verstärkungen 25 9 25, Auf die Bolaen 27, 28 sind Flügelmuttern 29? 30 aufgeschraubt, mittels derer die beiden Winkelbleohe 2O9 21 bzw,, 22, 23 mit den dazwischen liegenden Schalungshäuten 16b 9 17b verklemmt werden könnenοThe corner pieces 18 '19'. are from each zv.'ei Vfinkelblechen 20 »21 OEKW, 22j, 23, whose distance vised kept as t that the real formwork skins i6b f;? b just that wipe breaks" To the ait the concrete 24 itself being able in Berünrung angle plates are SiOH about in T; inkelhalbierenden angeschwelsst of the Betoneeite away erstr ds bolt 27 "28; the otherwise fastened bolts 27, 28 of the two V / inkelbleche 20» 23 and the reinforcements 25 9 25 to extend through bores the Bolaen 27, 28? are wing nuts 29 ? 30 screwed on, by means of which the two Winkelbleohe 2O 9 21 or ,, 22, 23 can be clamped with the formwork skins 16b 9 17b in between o

Die Arbeitsvrelse der iiletterschalungseinrichtung gemäß der Erfindung ist wie folgt;The work of the toilet shuttering device according to Invention is as follows;

ο/ οο / ο

37*:;:ϊϊ/ßfei 1577213^ί lceei Β&βββ.ί| Bad Aibling (Obb.). I Kletteodialtmji»-J * Tonkhtung mm Betonieren nunqtr, Bauwerke. 13. 3. 63. B 52 510. CT. H:37 * :; : ϊϊ / ßfei 1577213 ^ ί lceei Β & βββ. ί | Bad Aibling (Obb.). I Kletteodialtmji »-J * Tonkhtung mm Concreting nunqtr, buildings. 13.3. 63. B 52 510. CT. H:

der Iiittelmiu3t 11 in der Wandung des Bauwerkes 12 über die Tragrohre 11a und die Tragstengen 11b genau mit der Turrasii ttelachse ausgerichtet befestigt werden ist* wird der Mciitelffiast 14 durch entsprechende Einstellung der Winden 36 an den als nächsten zu betonierenden Abschnitt gebracht. Alsdann werden die Tragstangen 14b 9 welche die Innenschalung tragen, ausgespr ei stable die gev/ünschte läge der Innensohalung IS erreicht isto Ss ist zu beachten, daß durch Ausfahren der Tragstangen 14b nicht nur der Abstand der Innenschalung von der Surnirnittelaehae geändert werden kanne sondern auch deren Eeigunf? relativ·' sur Sus!iamitt6lachseo Auf diese V/eise können mit der erfinctungsgemäßen Kletterschalungseinrichtung rechteckip;3 Bauwerke mit beliebigen Änderungen des Querschnittes entlang dor Höhe hergestellt verden»the middle element 11 is fastened in the wall of the structure 12 via the supporting tubes 11a and the supporting bars 11b exactly aligned with the turret axis * the medium-load 14 is brought to the next section to be concreted by setting the winches 36 accordingly. Shall then the supporting rods 14b 9 supporting the inner formwork, ausgespr ei stable the GeV / ünschte would be the Innensohalung IS is reached o Ss is to be noted that by extending the support rods 14b not only the distance between the inner formwork may be changed by the Surnirnittelaehae e but also their suitability? relative · 'sur Sus ! iamitt6lachseo In this way, with the climbing formwork device according to the invention, rectangular 3 structures can be produced with any changes in the cross-section along the height.

Nach Ausspreis;uiig und Justierung der Innenschalung )7 werden die Tragstangen 14b in den Tragrohr en Ha durch geeignete FeststellDiittel 15 festgelegt» Si^ey.fijJ.xj.After price; uiig and adjustment of the inner formwork) 7 the support rods 14b fixed in the support tube en Ha by suitable locking means 15 »Si ^ ey.fijJ.xj.

wird die Außensahalung 1? durch Verstellung der Seile in die richtige Lage gebracht und über Abstandshalter 37 mit der Irmanschalung \ferbundeno Bevor die Einfüllung des Betons erfolgen kann? müsean noch öle Muttern 29y 30 angezogen werden, um die Eckstücke fest kit den bsnachbarten Schalungshäuten su verklemmen«. Das mit dem Beton 24 (Figo 3) in Verbindung stehende Winlr.elb3 seil ist an der Übergangsstelle su der ^ Sehalungshaut voraugsv/eise abgeschrägt» Die bisher beschrie=·; Arbeitsgänge können auch in anderer Reihenfolge ausworden-So kann beispielsweise auch die Außenschaluagis the exterior cladding 1? brought by adjustment of the cables in the correct position and with the Irmanschalung \ f o erbunden Before the filling can be done of the concrete by means of spacers 37? Nuts 29 and 30 still have to be tightened to clamp the corner pieces firmly to the adjacent formwork skins «. The standing with the concrete 24 (Figo 3) in conjunction Winlr.elb3's rope at the transition point below the ^ Sehalungshaut voraugsv / else bevelled "The previously beschrie = ·; Operations can also be carried out in a different order - for example, the external shuttering can also be used

aaaij37c, 11/03. 1877213. Josef Bösncr. S=] Bad AiWing (Obb.). | KlettmAahmp-aaaij37c, 11/03. 1877213. Josef Bösncr. S =] Bad AiWing (Obb.). | Velcro

JSiJ Bauwerke. 13. 3. 63. B 52510. (T. 14: JSiJ structures. 13. 3. 63. B 52510. (T. 14 :

- o -- j - o - j

liunmehr wird der Beton eingefüllt«, Vor Einfüllen des Betonsund5 vorzugsweise noch vor dem Hochziehen der Schalungen kann gegebenenfalls noch eine Elsenbewehrung 41 in den Schalungazwisehenraum gebracht werden« iTach erfolgter Abbindung des Betons werden die Schalungshäute mittels der Seile 39» 40 zum nächsten Bstonierungsabschnitt hochgezogen, wo sie von neuem Justiert und festgelegt werden«Instead, the concrete is poured in ", before the concrete is poured in and 5, preferably before the formwork is pulled up, an Elsen reinforcement 41 can also be placed in the intermediate formwork space. where they are readjusted and determined "

Dieses Arbeitsspiel geht weiter, bis der Mantelnast das obere Erde des Mittelmaste3 11 erreicht hat, worauf der Mantelmast über die Tragstanger; 14b und die Schalungen 16« 17 an der Bauwerksspitze verankert wird, die Tragstangen 11b desThis work cycle continues until the jacket branch joins the upper one Earth of the middle mast3 has reached 11, whereupon the jacketed mast over the support rods; 14b and the formwork 16 «17 on the Building tip is anchored, the support rods 11b of the

werde» von der Eauv/erks-v/and gelöst/und der Mittelraastwill »from the Eauv / erks-v / and / and the Mittelraast

durch geeignete Winden nach obsn geetossen wird, bis die Unterseite des Mantulmastes relativ sum Mittelmast 11. wieder die unterste Stellung erreicht ha"üo Danach wird der Mittelmast wieder an der Bauv/erfcsspitze verankert und die schrittweise Betonierung durch absatzweises Hochziehen des Mantelmastes wird fortgesetzte Die Höhe de3 Mittelmastes beträgt im allgemeinen ein in etwa ganszahliges Vielfaches der Höhe des Mantelmastesby suitable winches after obsn is poured until the bottom of the mantul mast relative to the middle mast 11th again lowest position reached ha "üo Then the middle mast anchored again to the top of the building and the step-by-step concreting is carried out by lifting the jacketed mast step by step continued The height of the central mast is generally an approximately integer multiple of the height of the jacketed mast

Der -vertikale Abstand der Tragstangen 11b ist vorzugsweise gleich dem vertikalen Abstand der oberen und unteren Tragstangen 14b des Mantelmastes ο AuX diese Weise können die Abstandshalter nach jpGhrücken des Mj_ttelmastes 11 zur Halterung desselben herangezogen wardeno The vertical distance between the support rods 11b is preferably equal to the vertical distance between the upper and lower support rods 14b of the jacketed mast ο In this way, the spacers can be used to hold the Mj_ttelmastes 11 o

Cr/ ΟCr / Ο

J37e, 11/03. 1877213. ioitt Bfemer { Bad Aibling (ObbJ. | ldemtsduliisg$- !vorridituRC zum Betonieren tunnaniect i Bauwerke. 13. 3. 63.. B 52510. CT. H. IZ. 4)J37e, 11/03. 1877213. ioitt Bfemer {Bad Aibling (ObbJ. | Ldemtsduliisg $ -! VorridituRC for concreting tunnaniect i buildings. 13. 3. 63 .. B 52510. CT. H. IZ. 4)

Die einzelnen Schaltafeln können gegebenenfalls selbstverständlich durch Querträger 33 und Vertikalträger 34 auf der von dem Beton abgev/ondten Seite verstärkt sein»The individual formwork panels can of course be used if necessary be reinforced by cross beams 33 and vertical beams 34 on the side facing away from the concrete »

Pur den Fall, daß die Schalungshäute aus C-Profileisen 16a, 17a aufgebaut sind» ist bei dem Rand-C-Profileisen der eine äußere Schenkel weggelassen, so daß ä*e Stege 1Si)9ITb des Profileisens in den Zwischenraum zwischen den· . ..." Winkelblechen der Eckstücke 18, 19 eintreten &b*nnen. .·*In the event that the formwork skins are made of C-profile iron 16a, 17a, one outer leg is left out of the edge C-profile iron, so that the webs 1Si) 9 ITb of the profile iron enter the space between the ·. ... "the angle plates of the corner pieces 18, 19 enter & b * nnen.. · *

Die Figuren 4 und 5 zeigen die Anwendung von drei Klettersehalungaeinrichtungen gemäß der Erfindung zur Errichtung eines hohlen Brückenpfeilers mit zwei Zwischenwänden 12»o Xn diesem Fall sind die Mittelmaste 11 zwecks genauer Ausrichtung und zur Bildung eines stabilen Aufbauee durch Verbindungsträger 42 miteinander verbunden. Bei den beiden äußeren Kletterschalungseinrichtungen nach den Figuren 4 und 5 fällt eine Seite der Außenschalung weg, während bei der mittleren Kletterschalungseinrichtung zwei Seiten der Außenschalung in Fortfall kommeno An den Zwischenwänden 12' ergänzen sich nämlich die Innenschalungen benachbarter Einrichtungen zu einer gemeinsamen Schalung, welche den eingeführten Beton aufnehmen kann*Figures 4 and 5 show the use of three Klettersehalungaeinrichtungen according to the invention for the construction of a hollow bridge pillar with two intermediate walls 12 »o Xn this case, the middle masts 11 for accurate alignment and to form a stable Aufbauee connected together by connecting support 42nd In the two outer climbing formwork devices according to Figures 4 and 5, one side of the outer formwork is omitted, while in the middle climbing formwork device two sides of the outer formwork are omitted Can hold concrete *

Bei der Kletterschalungseinrichtung nach den Figuren 4 und 5 kann die Außenschalung 17 auf der langen Seite aus mehreren Abschnitten aufgebaut seins welche durch Bleche 17e überbrückt sind ο Ia die einseinen Schaltafeln können Bach Bedarf eich nach oben verjüngende C-Profileisen eingesetzt werden, wie das in Fig» 4 angedeutet isto ' „/„In the climbing formwork device according to the figures 4 and 5 the outer casing can be constructed 17 on the long side of several sections s which ο Ia are bridged by metal sheets 17e, the one a formwork panels can Bach needs calibration upwardly tapered C-profile bars are used as the in Fig »4 indicated isto '" / "

Π/03. 1S77213. Josef Boswer. »fe Abl (Obb) | Kldl^Π / 03. 1S77213. Josef Boswer. »Fe Abl (Obb) | Kldl ^

^^ Π/. 17213. Josef Boswer.Π /. 17213. Josef Boswer.

j Bad Aibling (Obb.). | Klettendulaojo-; % vorrichtung zum Betonieren tunnartiecr i t Bauwerke. 13. 3. 63. B 52510. (T. Η;Ιj Bad Aibling (Obb.). | Velcro dulaojo; % device for concreting tunnartiecr i t structures. 13. 3. 63. B 52510. (T. Η; Ι

!z *) s ! z *) s

ίοίο

Sie einzelnen KXettersohaLungseinrichtungen bei den Figuren 4 und 5 sind außer durch die Verbindungsträger 42 in Betonierungsstellung auch noch durch die Abstandshalter 37 in den Zwischenwänden 12' und über die AußenBchalung verbundeneThe individual KXetterohaLungseinrichtung in Figures 4 and 5 are not only connected by the connecting beams 42 in the concreting position but also by the spacers 37 in the partition walls 12 'and via the outer formwork

Der wesentliche Vorteil der erfindungsgemäßen Anbringung der Tragrohre 1la, 14a besteht darin» daß die gesamte Breite des Mantelmastes für die Tragrohre zur Verfügung steht, so daß einerseits eine sichere und saubere Führung der Tragstangen 11b und 14b gewährleistet ist, während andererseits der Innenraum des Mittelmsstes Ii frei bleibt, so daS dieser Raum für denThe main advantage of the inventive attachment of the support tubes 1la, 14a is "that the entire width of the jacketed mast is available for the support tubes, so that on the one hand a safe and clean guidance of the support rods 11b and 14b is guaranteed, while on the other hand the interior of the middle section Ii remains free, so that this space for the

werden kann Material- und Personentransport &u8gei>u*zt/o Die besondere Ausbildung der Eckatücke gewährleistet überdies einen einfachen und sicheren Ausgleich von Umfangsänderungen, wobei durch die Ausgleichsstücke auf der Oberfläche des fertigen Betons sogut wie keine Spuren hinterlassen werden»can be material and passenger transport &u8gei> u * zt / o The special design of the corner pieces also ensures a simple and safe compensation of changes in circumference, with the compensation pieces leaving almost no traces on the surface of the finished concrete »

,Ansprüche:,Expectations:

Claims (1)

J37e, 11/03. 1S77213. Josef Bosnier.! ._ Bad Aibling (Obb.). | KlettersduIenR*. IfJgJ37e, 11/03. 1S77213. Josef Bosnian.! ._ Bad Aibling (Obb.). | KletterduIenR *. IfJg /17 Q jQhelt vorrichtung ium Betonieren turmjrtigcr ·nfi I/ J JjJ I», Bauwerke." 13. 3. 63. B 52510. (T. H. »f¥./ 17 Q jQhelt device for concreting turmjrtigcr · nfi I / J JjJ I », Buildings." 13. 3. 63. B 52510. (TH »f ¥. Ansprüche:Expectations: Kletterschalungseierichtung zum Betonleren turmartiger Bauwerke mit rechteckigem oder quadratischem Querschnitt mit einem koachsial zum Bauwerk angeordneten, rechteckigen oder quadratischen hohlen Mittelmaat, an dessen untere \ Ende sich zu den Seitenflächen des Bauwerkes hin erstreckende, längentcerstellbare Tragmittel zur lösbaren Verankerung des Mittelmastes vorgesehen sind ο weiter mit einem auf dem Mittelmast vertikal verschiebbar angeordneten Mantelmast, an dem über längenverstellbare Mittel die Innenschalung augehängt istρ und Eit Auslegern am oberen Ende des Mittelmaetes, an denen die Außenschalung höhenverstellbar aufgehängt ist, dadurch gekennzeichnet, daß am unteren Ende des Mittelcastes (11) und am Mantel— mast (14) auf allen Seiten parallel zu den Seitenflächen, horizontal und übereinander nach einer Seite offene Tragrohre (11a, Ha) befestigt sind, in denen Tragstangen (11b, 14b) gleitend "nd feststellbar angeordnet sind, welche sich bis zur Wandung des Bauwerkes (12) büw„ ble zur Innenschalung erstrecken, wobei die Tragstangen an der Innenschalung gelenkig angebracht sind, und daß Innenschalung (16) und Außenschalung (17) während der Betonierung in an sich bekannter Weise durch Abstandshalter (37) miteinander verbunden sindoKletterschalungseierichtung to Betonleren tower-like structures with a rectangular or square cross section with a coaxially arranged to the building, or square hollow Mittelmaat, down extending längentcerstellbare support means are provided for the detachable anchoring of the center pole at its lower \ end to the side faces of the building rectangular ο further comprising on the central mast, vertically displaceable jacket mast, on which the inner formwork is suspended via length-adjustable means and Eit booms at the upper end of the central dimension, on which the outer formwork is suspended in a height-adjustable manner, characterized in that at the lower end of the central cast (11) and on the jacket- mast (14) on all sides parallel to the side surfaces, horizontally and one above the other to one side open support tubes (11a, 14b) are attached, in which support rods (11b, 14b) are sliding "and lockable, which extend up to the wall of the structure (12) büw " ble extend to the inner formwork, the support rods being hinged to the inner formwork, and that the inner formwork (16) and outer formwork (17) are connected to one another in a known manner by spacers (37) during concreting »yi- ι*«**. 1 *?7 213. 't—s* P-"'-~*r. ] Bad AibHng (Obb.)TT Kicttendulung*·' ' vorridiiung suss Betonteres turmartiger i rUuvrerkc 13. 3. 63. B 52510. (J. W: I Z-4) " Yi- ι *" **. 1 *? 7 213. 't — s * P - "' - ~ * r.] Bad AibHng (Obb.) TT Kicttendulung * · '' vorridiiung suss Beterteres tower-like i rUuvrerkc 13. 3. 63. B 52510. (J . W: I Z-4) Kletterachalungseinrichtung nach Anspruch 1, dadurch gekennzeichnet, daß Innen« und Außenechalung (16P17) aus ebenen Schaltafeln (16a, 16b, 17a, 17b) Climbing shuttering device according to claim 1, characterized in that the inner and outer shuttering (16 P 17) consist of flat formwork panels (16a, 16b, 17a, 17b) er bestehen, wobei die benachbarten Vertikalkanten zwei/neben einanderliegender Schaltafeln über doppelwandige Eckstücke (18* 19) miteinander verbunden sind, in deren zusammenklemmbaren Doppelwänden die Schaltafelränder lösbar gelagert sind che exist, the adjacent vertical edges of two / adjacent formwork panels are connected to one another via double-walled corner pieces (18 * 19), in whose clampable double walls the panel edges are releasably mounted c 3» Kletterschalungseinrichtung nach Anspruch 2„ dadurch gekennzeichnet, daß die Eckstücke (18S19) aus zwei 3 »climbing formwork device according to claim 2, characterized in that the corner pieces (18 S 19) consist of two stärkestrength etwa im Abstand der Schalungshaut/angeordneten Winkelblechen (20, 21 bzwo 22,23) bestehen^ welche durch an dem mit dem Beton (24) in Berührung kommenden Winkelblech (219 22) befestigte r sich etwa entlang der vjlnkelhalbierenden von der Betonseite weg durch Verstärkungen (25,26) der anderen Winkelbleche (20, 23) erstreckende Bolzen( 27» 28), auf die Muttern (29» 30) aufgeschraubt sind, miteinander lösbar verbunden sind·approximately at the distance of the formwork skin / arranged angle plates (20, 21 or 22, 23) exist ^ which are fastened to the angle plate (21 9 22) that comes into contact with the concrete (24) and run roughly along the bisector away from the concrete side Bolts (27 »28) extending through reinforcements (25,26) of the other angle plates (20, 23), onto which nuts (29» 30) are screwed, are detachably connected to one another. A* Kletterschalungseinrichtung nach den Ansprüchen 1 bis 3? dadurch gekennzeichnet,- daß am unteren Ende des Mittelmastes (11) und am Mantelmast (14) wenigstens zwei Gruppen von Tragrohren (I1ap14£) befestigt sind, wobei die Gruppen aus je zwei übereinanderliegenden, nach entgegengesetzten Enden offenen Tragrohren auf jeder Seitenfläche d■'·;:' Haste bestehen» A * climbing formwork device according to claims 1 to 3? characterized in that - that at the lower end of the central mast (11) and on the jacket mast (14) at least two groups of support tubes (I1a p 14 £) are attached, the groups of two superposed, opposite ends open support tubes on each side surface d ■ '· ;:' Have to pass » l37e, 11/05, 1877213. Josef BöeacT. I Bad AiUiBg (Obb.). I Kiettendulangv- -. Torikhtung zum Betonieren turo»?ni$rr J \ Bauwerke. 13.3.63. B 52510. (Γ. 14:l37e, 11/05, 1877213. Josef BöeacT. I Bad AiUiBg (Obb.). I Kiettendulangv- -. Torikhtung for concreting turo »? Ni $ rr J \ buildings. 13.3.63. B 52510. (Γ. 14: 5β Kletterschalungseinrichtung nach Anspruch A9 dadurch gekennzeichnet, daß am Mantelmaet (14) drei übereinanderliegende Tragrohrgruppen vorgesehen sind·5β climbing formwork device according to claim A 9, characterized in that three support tube groups are provided on the casing length (14) 6p Kletterschalungseinrichtung nach den Ansprüchen 1 bis 5» dadurch gekennzeichnet, daß auf der Oberseite des Mantelmastes (H) und an der Unterseite des Mittelmastes (11) Arbeitsbühnen (31 r 32) befestigt sind.,6p climbing formwork device according to claims 1 to 5 »characterized in that mounted on the top of the cladding mast (H) and at the bottom of said central mast (11) platforms (31 r 32)., 7ο Kletterschalungseinrichtung nach den Ansprüchen 1 bis 6, dadurch gekennzeichnet, daß an der Außenschalung (17) Arbeitsbühnen (35) befestigt7ο climbing formwork device according to claims 1 to 6, characterized in that working platforms (35) are attached to the outer formwork (17) Kletterschalungseinrichtung nach den Ansprüchen 1 bis ?9 dadurch gekennzeichnet, daß die Schaltafeln (I6a,b; 17apb) durch Quer- und Vertikalträger (33»34) verstärkt sind οClimbing formwork device according to claims 1 to? 9 characterized in that the formwork panels (I6a, b; 17a p b) are reinforced by transverse and vertical beams (33 »34) ο 9ο Kletterschalungseinrichtung nach den Ansprüchen 1 bis 89 dadurch gekennzeichnet9 daß der Mantelmast (14) über Winden (36) an den Auslegern (15) des Mittelmastes (11) aufgehängt isto 9ο climbing formwork device according to claims 1 to 8 9 9 characterized in that the jacket mast (14) is suspended above winches (36) on the arms (15) of the central mast (11) o 10o Kletterschalungseinrichtung nach den Ansprüchen 1 bis 9» dadurch gekennzeichnet, daß die Schalungshäute (Ίβ,,Ι?) aus miteinander lösbar verbundenen C-=Profileisen (I6a?17a) aufgebaut sind und daß bei den £and~<2~Profileisen10o climbing formwork device according to claims 1 to 9 »characterized in that the formwork skins (Ίβ ,, Ι?) = From detachably interconnected C- profile bars (I6a? 17a) are constructed and that in the £ and ~ <2 ~ profile bars 0/00/0 ■> > "■"· ■""""■'■" iac·· >>"■" · ■ """" ■ '■ "iac ·· J37e. 11/03. 1*772». Ioscf Boss»*, feg; i Bad Aiblinx (Obb.). | Kfctcndtafaass-1^ \ Torriditung zum Betonieren turmarttco: |M { Bauwerke. 13. 3. 63. B 52510. CT-HiIp;J37e. 11/03. 1 * 772 ». Ioscf Boss »*, feg; i Bad Aiblinx (Obb.). | Kfctcndtafaass-1 ^ \ Torrid line for concreting turmarttco: | M { structures. 3/13/63. B 52510. CT-HiIp; - 14 -- 14 - p 17b) ein Schenkel weggelassen ist, so daß deren
Stege ungehindert in die doppelwand igen Eckstücke (18, 19)
eindringen können»
p 17b) one leg is omitted so that their
Bridges unhindered in the double-walled corner pieces (18, 19)
can penetrate »
-fc > *· ■ ■ .-fc> * · ■ ■.
DEB52510U 1963-03-13 1963-03-13 CLIMBING FORMWORK DEVICE FOR CONCRETING TOWER-LIKE STRUCTURES. Expired DE1877213U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEB52510U DE1877213U (en) 1963-03-13 1963-03-13 CLIMBING FORMWORK DEVICE FOR CONCRETING TOWER-LIKE STRUCTURES.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEB52510U DE1877213U (en) 1963-03-13 1963-03-13 CLIMBING FORMWORK DEVICE FOR CONCRETING TOWER-LIKE STRUCTURES.

Publications (1)

Publication Number Publication Date
DE1877213U true DE1877213U (en) 1963-08-08

Family

ID=33138852

Family Applications (1)

Application Number Title Priority Date Filing Date
DEB52510U Expired DE1877213U (en) 1963-03-13 1963-03-13 CLIMBING FORMWORK DEVICE FOR CONCRETING TOWER-LIKE STRUCTURES.

Country Status (1)

Country Link
DE (1) DE1877213U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2410877A1 (en) * 1973-03-07 1974-09-12 Hans Heinrich Schmidt METHOD AND DEVICE FOR THE PROGRESSIVE ERECTION OF A WALL MADE OF CEMENT MATERIAL OR THE LIKE
DE102007026020A1 (en) * 2007-06-04 2008-12-11 Doka Industrie Gmbh Self-climbing system and method for concreting a beam and / or assembling a finished part by means of a self-climbing system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2410877A1 (en) * 1973-03-07 1974-09-12 Hans Heinrich Schmidt METHOD AND DEVICE FOR THE PROGRESSIVE ERECTION OF A WALL MADE OF CEMENT MATERIAL OR THE LIKE
DE102007026020A1 (en) * 2007-06-04 2008-12-11 Doka Industrie Gmbh Self-climbing system and method for concreting a beam and / or assembling a finished part by means of a self-climbing system

Similar Documents

Publication Publication Date Title
DE1255695B (en) Method and device for the construction of multi-span bridges or similar structures in sections
AT394077B (en) DEVICE ON A FORMWORK FOR THE INSTALLATION OF A WALL
DE1283484B (en) Procedure for building high-rise buildings and formwork to carry out the procedure
DE1584525B1 (en) Battery formwork
DE2109088C3 (en) Spatial component for the formation of loadbearing structures and supporting structures that are multiple times the largest edge length of the component with regard to their extension
DE2361133A1 (en) FRAMEWORK CRANE
AT501248B1 (en) DEVICE FOR CREATING PARTICULARLY QUARTERLY, HALF OR FULLY-ENVELOPED LOCAL TREPPES
DE3043990A1 (en) SCREEN WALL FOR THE PRODUCTION OF WALLS OR THE LIKE
DE2125422C3 (en) Climbing formwork for erecting tower-like reinforced concrete structures
DE1877213U (en) CLIMBING FORMWORK DEVICE FOR CONCRETING TOWER-LIKE STRUCTURES.
DE2759088A1 (en) CLIMBING FORMWORK FOR CREATING A STRAIGHT OR CURVED REINFORCED CONCRETE WALL
DE2510015C2 (en) Device and method for the sectional production of the individual fields of the superstructure of pier bridges or similar structures
DE102004060653B4 (en) Formwork arrangement and method for constructing a formwork arrangement
DE102011010042A1 (en) Three boom for e.g. displacing tombs, has leg divided into two leg sections, which are guided into each other and provided with adjusting device that mechanically continuously telescopes total leg length under load
DE3443451C1 (en) Apparatus for installing a support
DE2462066A1 (en) Climbing formwork for reinforced concrete - has height adjustable climbing frame and formwork plates swivel mounted around axis
DE256870C (en)
DE2607574C2 (en) Process for the production of arched structures
DE2157669A1 (en) PROCEDURE AND DEVICE FOR ASSEMBLING A STRUCTURE, IN PARTICULAR A GENTLE CRANE
DE2725114A1 (en) EQUIPMENT FOR THE PRODUCTION OF CURVED CONSTRUCTIONS FROM REINFORCED CONCRETE CONCRETE IN THE WAY OF A CLIMBING PROCESS
DE2817745A1 (en) Mobile covering with assembled framework - has hinged connecting pieces with sliding shoes or rollers at base assigned to ground anchors
DE1534461C3 (en) Device for the construction of multi-span bridges or similar structures in sections
DE2228353C3 (en) Device for the sectional production of reinforced concrete superstructures of bridges or the like supported at large distances
DE2134631C3 (en) Collapsible shoring, especially for tents
AT371873B (en) METHOD FOR SETTING UP A HALL-SHAPED MULTIPURPOSE TENT