DE1831188U - FAST-RUNNING STACKING DEVICE. - Google Patents

FAST-RUNNING STACKING DEVICE.

Info

Publication number
DE1831188U
DE1831188U DE1959K0034092 DEK0034092U DE1831188U DE 1831188 U DE1831188 U DE 1831188U DE 1959K0034092 DE1959K0034092 DE 1959K0034092 DE K0034092 U DEK0034092 U DE K0034092U DE 1831188 U DE1831188 U DE 1831188U
Authority
DE
Germany
Prior art keywords
lifting
stacking
drive
links
pulse generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE1959K0034092
Other languages
German (de)
Inventor
Hermann Kronseder
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE1959K0034092 priority Critical patent/DE1831188U/en
Publication of DE1831188U publication Critical patent/DE1831188U/en
Expired legal-status Critical Current

Links

Landscapes

  • Automatic Assembly (AREA)

Description

MUMM KUNSIMIM, Neutraubling"Berlinerstr. 57 Akten%, : K 34 092/81 < 6m sehnelloll lded Btzpelwrrlzht, g 1. 7t b Pat.Da/11 na #ind Verriehtxxgen % um oelbettiitigen Stapeln von Kistens Ballon tMd oMMtttn ftptH'ahigwn Gegenatitaden bekamtt, v<lch< ! <wei zu beiden Seiten der Bahn$ d » t zu stapelnden Guteßp in einen Gestell gelührte auf-und ab. gehende Nubglieder aufwetigen. Sie dienen daaup einzeln wahllos auf einen Zxbringerb « i ankommende beispielsweise Kisten zu Stapel aufeinanderzu- xdtiehtwn, M) bt di<M an eine weitere ? Syd<Minriehtung abzugeben, von w< au. die.. 81,.,.. hkarr.. Te. Baad abeeao.... und.. Lagerplatz able. etst vordta, Dient bekannten Verriehtunen worden mit hydraulischen oder pneunatisehen Arbeitszylinde angetrieben und weisen eiM das Stapelgerät unterlaufende und durchlaufende yerdereinriehtung, etwa Kistentransportketten aut, welche während der Betriebezeit dauernd und kontinuierlich laufen, Der Raum in der Vorrichtung,weleher für dM Anfeehiehten de « Stapels bestimmt iet, wird dn den vier Betten dtreh JihrMtgeleieten begrenz, welche an der Auelaufeeite derVerrichtwngem, naeh weleher der fertige Stapel austranspertiert wird, auf- klappbar gestaltet sind. Die Höhe den zu bildenen Stapels kann bei diesen Z VerriohtMtgenirbesti'wt wordendurch dasAnbringenTen hydraulisch, pneu- matisch oder elektriseh betriebenen Tastgliedem. Die Arbeitsweise der verbe- ehrielnen EAwlebtyn iSt folgende : trd dureh die kontinuierlich laufen- de ySrdereiariehtung eine Kiste in die Vorrichtung eingebracht, so setzt diese ventittels A ug v iihler-oder Tazielesente dle, in Ausgang. tell wmter der Xintranspertebene der Kistensich befindlichenHubglieder nach eben in Bewegung, wobei die KisteninHochlage durchvorhervon derKiste zurückgedrängte und nach Passieren der Kiste wieder einklinkende Arretierzunge- aebel gehalten wird und die Hubglieder wieder in Ausgangstellung zurückkehren. Brst wenn die Bubglieder sieh wieder in Ausgangstellung befinden, kann die nächste Kiste einlaufen und die Arbeit beginnt von vorne, solange bis die verbentizwtbare Hehe des Kistenstapels erreicht ist und die Hubglieder nur eine halbe Hubbewegung ausfahren um die in Hochlage gehaltenen Kisten mit zu ubemehaten und so dann den ganzen Stapel auf das Förderglied absetzen, wo- beidurch eine von Kistenntaptl aus gesteuerte Autenatie die Auslautschinen Sffnet. MMMJWKMWSNMB, Wtraublinz, Berlinerstr. 57 AkteM./K 34 092/81 e Cat lohnelll..,.. a. 8tapelY8rriohiUDI18. T. SI Naufa. sunl Te. 22. 3. 81 U j tL I 1 Pat.hin Weiter tot b*ka=tp die Ki » ten in liothlage duroh g#gonginnig angetri#beng mitt018Keppgw) tbtKe vwrbumd<tne vo& beidenSeiten angreitende KlemtbMket » hol to*" Alle die#* V. rrtokt...... 1. 4 le1. tUDg. be. ohräDkt. weil während den Bücklaufee der Ilubglieder kostbare Arbeitszeit-rerloren geht und zusätzlich erst die Kinten eiatr « opertiort werden kii » en, wenn sich die Hubglieder in Ausgang «- ., el1...'8f1.'.., al.. 41, 11."... lang'.. Einlaut g, hindert. ind od. r gesperrt bleiben bin die Kubglieder in der unteren Ausgangstellung sich be- finden. % *den sind Verriehtungen mit pnenmatioch betriebenen Arbeitezylindern etwaM trige, wril derea Xylixtder-führungen bei jedesmaligen Arbeitehab ertt au lhmtk gebra ht werben mM, wa« bei Ameeluß dieser Vorrichtumgen an die in Brauereien wnd « enet Nbliehen Kompreeaeranlagen znfolge der nicht allzu hoch ... pannte.'r. al.,.... i88it der großen Zylinder-querschnitte meist der Fall totIm tUwiMf Mmwieht xind alM pneut&titeh angetrieben* Einrichtungen dem direkt» torteth angetriebenen unterlegen. Be wird daher anr w aentliehen Brhöhung, gegebenenfalls Verdoppelung der eietung von aelbatatig arbeitenden Stapelgeräten nsnerangegeNaB verge- sohlagen die « den zu etapelnden Gegenständen angreifenden Hubglieder an, mmStptlrithimng paral<H vwrlaufenden endlos<nTrieb< ; n zu befextigen und es MMpMrdMN dß n<m j<n) ilw an d<n* dwm Stapel zugekehrten Seite der send- losen Triebe die Habglieder mit den Stapolgut inßerührung kommen, Die Hub- glioder Fellz 11*n Glietera der Triebe beweglich angeordnet sein und Mhr<mgeteile, wie etwa in Xnrven gleitende oder laufende Rollenaufweisen, welcht die an den etwa alt Ketten auegebildeten Triebgliedem gelenkig an- geordneten Endglieder während der rbeitaleiatung, also beim Hochheben Ton Totenbe<tw. dee Stapele, abetützen und beim Rücklauf uBerhalb dea Be- reichen der zu stapelnden Güter diese in die entsprechende Bahn lenken. Weitere Binaelheiten der Neuerung wollen den a* Schluß der Beschreibung folgendenSehntaanepruehen entnemaen werden. HBNMANN KBONStBER Neutraubling, Berlineretr. 57 Aktenz K 34 092/81 e Sz Soell lax nde Xtazlverriehtmg lff T. 1959 Neafg 22. 3. 61 MI' », 0 Neuerung ist in den anliegenden Zeieburugen in einem Ausfüh=ngebei- spieldtufgewtellt, and awar « igent Mg, 1 winem xehtmtitehea QuersMhnitt durch die Stapelvorriehtung und .. ar re. ht. iakeli,.. der F6rderrrichtung der ankommenden Kieten. Pig. 2 « iM Drauteieht, teilv<ia< i* Sohnitt und schematische Dar- atell » g der igw 3 <tino Binelheit bwimAatrieb der ausMhwenkbaren Flihrumgaleisten <m 4<r Stapolaunlandf<*ite. Fig. 4 Die Verriegelangx-ax Am<lStt<vorriehtung für die einsehwenk- baren Pftrimgeleinteas Fig. 5 eine Bimlauf*perre für die B Kisten, teile in der Ansieht, teile in sohnitt. ) Ptg. 6 einen, von « der Antriebokette befindlichen Rollen 30 ange- triebe. DtnmMthebel 28 zur Bewegung der aus. uachwenkenden undeia » schwenkend » Führungeleinten. Pig. 7 Dramtwieht ad Fig. 4 IN der in Fig. l wiedergegebenen lrnktionsxituation ist der Zeitpunkt g<halt<m, ia velothtm xieh zufolge der durch. eine eben in die Vorrichtung eiatramxp<rtt<nrte Xixtw <md dMtit erfolgte Betätigung des Inpulagebera 10 die mgaufenden Trieb, * 2, 30 4 « &-ei den daran angelenkten liubgliedern 1 aieh in Bewegamg geaetat haben. Die untehalb der Kiste befindliche. Hub- glieder 1 haben « iah dem KieteHboden bereits genähert und die über da. uterFten EiX, dn obobn 8tapelrest hochhaltendet Glieder nahem « ich d « 8ehentelpnnM ihrer Behn, nM bei fortlaufen ihrer Bewegung die bisher in Heehlage gehaltene Kiot*7 bezw* den darüber befindlichen Stapelrent auf HRRMANN nRSMBMN, M<mtMHnt, B<rliMyr. S ? Aktenz. : Je 34 092/81. ca Oskaell j « fende Stapel-verrieht=g 18. 7. 59 Neutannung 22.3.61 II I. r Pat.Dn/H die M u terat befindliche Kiate aufzuaetzon, mzw. zu ubergeben. Die um- laufenden Trieb* bestehen beispielsweise aus Ketten 2, Kettenrädern 3 und den WelltMt 4. Ea aind in dem dargeatellten Auaführungabeiapiel zwischen je zwei auf zwei übereinander angeordneten Wellen und Kettenrädern angeordnet Ketten 9 « den Ketten 2 gelenkig angeordnet ; Hubglieder 1 bei- xplelsweise w ale Achze wn KetteRelsen der stisehen den KetieOolsen betindlishe Anloakangem schwenkbar angeordnet. Die Hubglieder 1 entsprechen in ilfer Quertern etwa ein « Winkelprotil und besitzen oberhalb ihren An- lenknngepMdEtee eine Verl&ngernng l", welche sich bei laufen der Kettentriebe und somit der Hubglieder unmittelbar von dem oberen Scheitel- punkt der Hmegliederbahn gegen Anxehlägejt künfig Ablenkung genannt, 9 legen und <e den Reetteil dee Hnbgliedee aus dem Bereich der Kisten eehwenken, Sehließlich weieen die Bnbglieder noh unten nach der Seite bemeragende rratzen l* anft welehe Mm Anheben der Kisten bestimmt sind und werden mittele daran angeordneten Bollen 5 währenddes Hubvorgangea an den lxrvenotüek « 6 abgentützt und beim Räcklauf an der Außennette der Vor- riehtnng an den Knrren T ae geführt, daß sie sich beim Hubbeginn in einer fanktienegereehten Stelinng befinden und durch unvorhergesehene Dewegumgen keinen Schaden anriehten können. Bine Klappe 8 am oberen Ende des Kurven- etHekee < dtmt dazu, bei rückläutiger Bewegung dee Kettentriebes, dieae iet notwendig wenn der Stapel komplett ist, und der Kettentrieb in entgegen- geeetzter Riehtnng betrieben worden mnB, die Rollen und somit die Hubglieder nicht in Richtung zur Kiete vordringen zn lassen, aondern an der Außenseite der Knnrenat&oke < abgleiten laNI* Diese Anordnung iat nicht unbedingt not- wong, aie iat lediglich dann ven Nutzen wenn ein Impulsgeber versagen aollte und die aehen außerhalb des Kiatenbereicha befindliche obe » Pratze zu- felge einea zn-weit-laufena der Kette noehmals hereimachwenken sollte Dem Bek gleiehen Xweck dient die auf der unterenWelle 4 drehbar angeordnete undmittola Federn gegen das untere Kurvenende dea Kurvenstückes 6 gehaltene Klappe St. Dieaaffnet aieh wenn bei verkehrtlaufen der Vorrichtung die Rolle an der AnBonaeite doa Karwonstickea 8 läuft und läßt die Rolle nach \ mSMINN BMßStZDBR, Wtraublixg, BerliMrxtr. 57 Akte. t K 34 092/81. pa Sehn.ll laut.. t. Stapolvorriehtual18. 7. 59 Neufassung22. 3. 81 Pat.DU/11 unten am Bad des Kurvenstüekes antreten um sieh dann wieder gegen das lade de « Kurvenstückes M legen, damit bei der nächsten Stapel arbeit beim Hottgehen die Bubglieder wieder auf der ganzen Länge ihrer Bahn ordnungege- mg£ abgestützt sind. Bin Impulsgeber 11 reicht mittels eine. nur in einer Brekriehtung wirksam werdenden Hebels 11'in den Bereich der Umlaufbahn von am den Ketten 2 befestigten Beizen 30 und hat die Aufgabe die Stromver- eergang für den ntriebemeter 13 der laufenden Hubglieder zu unter- brechen und die Anlage etillzneetzen, wenn die von unten nach eben ange- hebens Kiste « ieh in einer Hohe befindet, daß die nächst nachfolgende Ki- « te einlaufen kannt In dieeer Stellnng bleibt dann die Vernichtung stehen bin die näehete Kiete eingelaufen iet und « ich das Arbeitaepiel wiederholen ! <annt J&ie Impulegeber 12 eind der Sicherheit halber doppelt angeordnet. Ihnen fällt die Aufgabe zur bei Erreichen der vorbentiwuten Stapelhöhe die Wtroztverworgung für den Atriebxmoter der umlaufenden Hubglieder zu unter- brechen und mit Bilfe der vergezehenen timkehrachütze den Motor in entgegen- gesetzter Drehriohtmg wieder anlaufen zu lanaeng aodaß der fertige Stapel auf die erderglteder 90 abgeeenkt wird. Bei dieeer umgekehrten Arbeits- richtung der umlaufenden Triebe 2 werden zwar die Hebel 111 von den Bolzen 80 aus der Bahn der Belzen verdrängt, aber aie können bei dieser Bewe- gungeriehtung die Impulzgeber 11 nicht beeinflußen. Ist der fertige Stapel auf die Transpertglieder 20 abgesenkt, und haben sich die Hubglieder nach unten genügend von der untereten Kizte wieder distanziert, so gelangen je 1 Bolzen 31 an die wiederum in deppelter Ausführung vorhandenen Impulshebel 23', welche nun von dieser rüokläufigen Arbeitsbewegung angesprochen, die Impulsgeber 23 betätigen und somit den Rücklauf der Ketten beenden. Wenn nun der fertige \ gtapel sich auf den Traaupertgliedern 2 befindet, muß dieser die Vorrichtung verlassen. Xu diesem Zwecke werden die ausschwenkbaren Führungsleisten 22 an der Auslauf seife der Verriehtung aus dem Bereich der Kistenhebel geschwenkt aedaß dieser auf den FUrderketten 20 die Vorrichtung verlassen kann. Die Be- tätigung dieser ausschwenkbaren Führungsleisten 22 kann auf verschiedene Art erfolgen. x N XBONSEDR, Neuiraibling Berlinr#ir 67 Aktenz. s K 34 dna/81 Gz SehMU lemf « B4$ StapelvwrriehtMtg 16. 7 59 Neufasaung22.3.61 Pat.Du/H Mt. 2 2 « <tM Anwydnang für d<n Schwnkantrieb dieser Führungsitixten » the » tiosk &Mtdexttt. Der Impulageber 23 besitzt außel/den zur juter- brtehnung der rtLtkläiLigen BeweVmg erforderlichen Kontaktpaar noch ein » eiten Kontaktpaarg welches eine beliebige Hub. oder Schubvorriehtung 94 direkt eder j) tire<M bei Betätigung mit Energie versorgt. ieser BMttrieb tcMtn wewel ein Blektromaet oder eine elektrohyclraulineht Nabeinheit eder ein Preßlnittylinder « ein, dessen Preßluftzufuhr durch den Stremimpwtle er ein MgMtventil geöffnet wird. Bim « weitere AusführungsmNgliehkeit des Sohwenkantriebes der führung- leiste 22 ist im Fjg. 3, 4, e und 7 wiedergegeben* Es kann also bei. spielsweise anstelle einer indirekten elektriseh gesteuerten Verschwenk- barkeit der Führungsleisten 22 auch eine von den Gliedern der Stapel- v rrlohteg tireltt be*&tigX » ohische trlebseAnxichtung f die Bhr<mg) Bl<ix <Mt 23 vwrgeHKhen ein. Zu di t. <n « m week eind die Schwenk*. aeh « & 22'dxy MhrmgNitiwtwa 22 weiter nach unten durchgeführt und werden mittel% *tat* gegeltrieben 27 von einem Daumenheb. l 28 gegen denDmek einer Peder 29 während de « Leerhubee der Triebglieder 2 direkt ibtr einen MilMtmer 30, weleher letsterer eieh an den Ketten 2 be- findet in 8ehließ« Hlnng t<'dreht< Cm in dieser Stellung, in welcher die Fahrnngaleietea 22 den Anetritt der neu einzntranaportierenden Xixten vereehent fixiert M werden, iet eine Sperrklinke 31 vorne- ewhen, welehe mittele Feder 31'in Sperrstellung gehalten wird. Dieee aerrklinke 81 hält je einen der an den Wellen 22'befestigen Hebel M solange fest, eis der Stapel bis M seiner verbestimmten Höhe auf- gesehiehtet wnd nnot beim Btteklauf der Hubglieder 2 auf da# Förderglied 20 abgesenkt wird. ei diesem Absenken drückt nun der Boden der untersten Xtote auf den Hebel 32j, welche bei BetiLtigungeriehtung senkrecht von eben die Sperrklinken geen den Drek der Federn 3l* nach unten ver- drängt umso die Nebel 2210 freigibt. Zufolge der gespannten Dreh- feder 29 oftenen sieh nun die Führungsleisten 22 schlagartig und der Stapel kann auf den Ferdergliedern die Einrichtung verlassen. Erst Wenn der Kastenstapel den Impulsgeber 21 passiert ; betätigt er diesen IERIANN KMNSBMm, Weutraualing, Berlinerstr. 57 Aktenz. t K 34 092/81-pa Sahnell laufende Stapelverriehtung 16. 7. 59 Neufaaaung vom 22 3. 61 Pat.Du/lI und « w wird der Itcwrhub der Verriehtung, welcher wie vor beschrieben, das Schließen der uhrung leieten 22 herbeiführt. Die nun wiederum einlaufenden Kiaten kennen den Nebel 32 zufolge seiner gelenkigen An- rdJlug geg X t k iver Peder32t imerhalb der Sperrklinke 31 % *weit vern » h"ak" bin er unter der Förderbahn vernenkt ist. Er Wird zieh jedemul infolge der Wirk « g der Feder 32'nach dem Hochheben der Kitten wieder amx der Vereenkung erheben und nach Fertigstellung eine « $*apele, weleher dann eieh eenkrecht Ton oben auf dieaen Hebel senkt wiederum die SperrHinke 31 aus der Sperrstellung zu verdrängen. Bamit nun währt den Austranepertee einea fertigenStapels aus der Vor- richtung keine nenen Kisten in die Vorrichtung gelangen könnet iet eiBe Anlaufsperre angeordnet. Sie beateht im wesentlichen aus einemSperr- arm14, welcher in der Einzahl oder auch je zu beiden Seiten vorhanden aein kann und über eine Butzchkapplung 16, 15, 17 von der Triebewelle 4 angetrieben wird, SeinanXage wird durch Ansehläge 19 und einen an aeiner Wabe befindliehenVeraprung 18 begrenzt. Während dea Stapel- vergangea dreht lieh beiapielaweise die innig. 5 dargestellt. Welle 4 entgegen dem Ohrzeigersinn und hält somit den Sperrarm 14 zufolge der WntacMcapplung l B, 1$, 17 in Beehlage, wobei der Vor sprang 18 sich an den rechten Anaehlag 19 legt. Ist nun die vorbestimmte Stapelhöhe erreicht und wird durch betätigen der Impulsgeber 12 durch die oberste Kiste den Stapeln der Büoklaui, d. h. die Drehrichtungnumkehr der Welle 4 veranlaßt, ae kann aich der Ausehlag 14 des Sperrarmes 14 zwischen dieunterate Kiate dea Stapela und die zum Eintransport in die Vor- riehtang anstehende Kiaten achieben. ieaea ist besonders dadurch lichs daß dl Utn oi oitlg it Lelgten bunden sind und sich daher die übrigen Ki tenbreiten voneinander distanzieren und hier ein Hohlraum zwiaehen zwei Kiaten jeweils verhanden ist, Rat nun zufolge der beim Ab- aenken dea fertigen Stapel einoetzanden weiteren Fuuktionen der fertige Stapel die Verriehtung verlaaaen, ae wird wie aehon beschrieben ein Leerhub derVertriebglieder einaetzen, demzufolge nun die Welle 4 in Big. s NaOtAMf KRONSZDM, Nentranbling, Berlinerstr. 57 Aktenzs K 34092 l 81e X Sehnell lanfemde Stapelvorriehtnng 16. 7. 59 Neufassung vom 22 3, 61 Pat.Du/H entgegen dem Uhrzeigersinn gedreht wird und so den sperrarm 14 samt An- xehlag 14'wiedy hoehhebt and den Eintransport der anstehenden Kiste freigabe. Die Butsehkupplung in der Nabe des Sperrarmes 14 kann beliebig aus- geführt ftta, in Figt N iet ein eibbelag 1S eine Mitnehmeracheibe 16 und eine eppelte Tellerfeder 17 vorgeeehen. Ein Anschlag 19'begrenzt die Sperratatnng Aew Sperrarae « 14, eeaaB dieeer nieht zu weit nach unten schwenken kann. t Die <ang) tge)) tMe VerriehtnNg ermSgliohbew kontinrliche « Stapeln ohne den der Hubglieder, welche bei den bekannten torrichi der Leix begrenzrng fuhrt, und ansieh Zeitvergeudung ist. Oego » W ; er den Imk » aten Einriehtungen mit pneunatisch angetriebenen Hub- gliedern bringt die erfludimgegmäße Vorrichtung eine Leistungssteigerung von mehr als SO %. Der FerKthritt wird besonders offensichtlich durch den Umstand, daß die bohrer auf awm Markt befindliehen Flaschenabfüll-und Ver<" sehließkolennen nunmehr mit je einem Kastenatapler zusammenarbeiten können, wogegen bisher für jede Xolone 2 Stapler notwendig waren. MUMM KUNSIMIM, Neutraubling "Berlinerstr. 57 Files%,: K 34 092/81 <6m sehnelloll lded Btzpelwrrlzht, g 1. 7t b Pat.Da / 11 na #ind Verriehtxxgen% about oil-bedding stacks of boxes balloon tMd oMMtttn ftptH'ahigwn counteratitades received, v <lch <! <white on both sides The track $ d »t led up and down to be stacked in a rack. increasing walking Nub links. They serve daaup individually at random on one Zxbringerb «i incoming crates, for example, stacked on top of one another. xdtiehwn, M) bt di <M to another? To hand in Syd <Minriehtung, from w < ouch the .. 81,., .. hkarr .. Te. Baad abeeao .... and .. storage place able. etst before, It is used with hydraulic or pneumatic locks Working cylinder driven and indicate that the stacker is underflowing and continuous yerdereinriehtung, such as crate transport chains, which The room in the Device which is intended for the attachment of the stack is used the four beds around the year limit, which are on the Auelaufeeite the execution according to which soon the finished stack is discharged. are designed to be foldable. The height of the stack to be formed can with these Z Damage to it was made by attaching hydraulic, pneumatic mechanically or electrically operated feeler elements. The working method of the Honest EAwlebtyn IS the following: trd through the continuously running If you put a box into the device, it will set it ventittels A ug v iihler- or Tazielesente dle, in exit. tell The lifting members are located in the Xintranspert plane of the crates just in motion, with the boxes in the upright position through in front of the box The locking tongue is pushed back and engages again after passing through the box. aebel is held and the lifting elements return to their starting position. When the jib links are back in their starting position, the enter the next box and the work starts over until the Verbentizwtbare Hehe of the crate stack is reached and the lifting elements only extend half a lifting movement around the boxes that are held in the raised position to ubemehaten and then deposit the whole stack on the conveyor link, where- both by an authenacy controlled by Kistenntaptl the Auslautschinen Opens. MMMJWKMWSNMB, Wtraublinz, Berlinerstr. 57 FilesM./K 34 092/81 e Cat lohnelll .., .. a. 8tapelY8rriohiUDI18. T. SI Naufa. sunl te. March 22, 81 U j tL I 1 Pat. Out Next dead b * ka = tp the ki »th in liothlage duroh g # gonginnig driven mitt018Keppgw) tbtKe vwrbumd <tne from & both sides approaching KlemtbMket »Get to *" All the # * V. rrtokt ...... 1. 4 le1. tUDg. be. ohräDkt. because during the Bücklaufee the members of the group lose valuable working time and, in addition, only the Children can be "operated" when the lifting links are in the "exit" ., el1 ... '8f1.' .., al .. 41, 11. "... lang '.. Einlaut g, prevents. ind or. r remain locked when the cubic links are in the lower starting position Find. % * den are interlocks with mechanically operated working cylinders aboutM trige, wril derea Xylixtder guides every time I work lhmtk brewed advertise mM, what if Ameeluss these devices to the in Breweries need compressor systems as a result of the fact that they are not too high ... panned.'r. al., .... i88 usually the case with the large cylinder cross-sections totIm tUwiMf Mmweht xind alM pneut & titeh driven * facilities dem directly »torteth powered inferior. It is therefore advisable to increase the brewing rate, possibly doubling the Rental of self-contained stacking devices. the lifting links attacking the objects to be stacked lay on the sole, mmStptlrithimng paral <H vwrlaufenden endless <nDrive <; n to be attached and es MMpMrdMN dß n <m j <n) ilw an d <n * dwm stack facing side of the sending loose shoots the limbs come into contact with the stacked goods, the lifting glioder Fellz 11 * n Glietera of the shoots be movably arranged and Several parts, such as having sliding or running rollers in Xnrven, which articulated the drive links formed on the old chains orderly end links during work, i.e. when lifting the tone Dead person the stack, support and when returning outside the loading If there are enough goods to be stacked, they should be directed into the appropriate path. Further binary aspects of the innovation want the a * conclusion of the description be removed from the following tendon tests. HBNMANN KBONStBER Neutraubling, Berlineretr. 57 file K 34 092/81 e Sz Soell lax nde Xtazlverriehtmg lff T. 1959 Neafg 22. 3. 61 MI ' », 0 innovation is included in the attached witness arches in one execution spieldtufgewtellt, and awar «igent Mg, 1 winem xehtmtitehea QuersMhnitt through the stacking device and .. ar re. ht. iakeli, .. the direction of conveyance of the incoming quarries. Pig. 2 «on the drawing board, partly with sons and schematic diagrams atell »g der igw 3 <tino Binelheit bwimAattrieb the swing-out Flihrumgaleisten <m 4 <r Stapolaunlandf <* ite. Fig. 4 The interlocking x-ax Am <lStt <device for the barbarous Pftrimgeleinteas Fig. 5 a pumice lock for the B boxes, part in view, share in son. ) Ptg. 6 a roller 30 located on the drive chain shoots. DtnmMthebel 28 for moving the out. uwenkenden undeia »swinging» guides. Pig. 7 Dramtwehl ad Fig. 4 IN the action situation shown in FIG. 1 is the point in time g <halt <m, ia velothtm xieh according to the through. one straight into the device eiatramxp <rtt <nrte Xixtw <md dWith the activation of the Inpulagebera 10 the running shoots, * 2, 30 4 «& -ei the links linked to them 1 Also have acted in movement. The one below the box. Lifting Members 1 have already approached the KieteHboden and those over there. At the bottom, the rest of the pile holds up limbs close to me d «8ehentelpnnM their Behn, nM with continuation of their movement the hitherto Kiot * 7 held in secret and the staple rent above it HRRMANN nRSMBMN, M <mtMHnt, B <rliMyr. S? File : 34 092/81 each. approx Oskaell j «fende stacks-locked = g 18. 7. 59 New drawing 22.3.61 II I. r Pat.Dn / H the maternal kiate to be raised, mzw. to hand over. The um- running drive * consist, for example, of chains 2, sprockets 3 and the WelltMt 4. Ea aind in the illustrated example between two shafts and sprockets on two superposed shafts arranged chains 9 ″ the chains 2 arranged in an articulated manner; Lifting links 1 As a rule, axles wn chain racks that stand up to the ketieOolsen Betindlishe Anloakangem arranged pivotably. The lifting members 1 correspond in ilfer transversal angled profile and have lenknngepMdEtee an extension l ", which is during the run of the Chain drives and thus the lifting links directly from the upper apex point of the Hmegliederbahn against Anxehlägejt future called diversion, 9 and place the reed part of the links from the area of the boxes Eehwenken, finally the braces whiten below to the side Remaining rratzen runs which mm lifting the boxes are intended and are by means of balls 5 arranged thereon during the lifting processa to the lxrvenotüek «6 worn and when the back run on the outer chain of the front Note on the knob that it is in one at the start of the stroke fan share stelinng are and by unforeseen dewegumgen cannot do any harm. Bine flap 8 at the upper end of the curve etHekee <dtmt to this, with reverse movement of the chain drive, which iet necessary when the stack is complete and the chain drive in the opposite direction Geeetzt Rrichtnng been operated mnB, the rollers and thus the lifting members do not allow it to penetrate in the direction of the ridge, but rather on the outside der Knnrenat & oke <slide laNI * This arrangement is not necessarily wong, aie is only useful when a pulse generator fails aollte and close the claws outside the kiatenbereicha. rim a zn-far-runa of the chain should still swing in The one that is rotatably arranged on the lower shaft 4 is used for the same purpose undmittola springs held against the lower end of the curve of the curve piece 6 Klappe St. Dieaaffnet even if the device goes wrong The roll at the AnBonaeite doa Karwonstickea 8 runs and the roll slackens \ mSMINN BMßStZDBR, Wtraublixg, BerliMrxtr. 57 acts. t K 34 092/81. pa Sehn.ll loud .. t. Stapolvorriehtual18. 7. 59 New version22. 3. 81 Pat.DU / 11 line up at the bottom of the curve piece and then look against that again Load the curve piece M so that the next batch work with The members of the boy walk back in order along the entire length of their path. mg £ are propped up. A pulse generator 11 is sufficient by means of a. only in one Brekriehtung effective lever 11 'in the area of the orbit of on the pickling 30 attached to the chains 2 and has the task of power supply output for the drive meter 13 of the running lifting links break and disconnect the system if the lift box "I am at a height that the next following child What could have come in? In this position, the destruction then stops I ran in the sewn rope and I repeat the work game ! <annt J & ie pulse generator 12 and arranged twice for the sake of safety. You have the task of when the previous stack height is reached Wtroztverwaltungs for the Atriebxmoter to underneath the revolving lifting links. break and with Bilfe the forgiven Timkehrachütze the engine in the opposite direction set Drehriohtmg start again to lanaeng so that the finished stack to which the earth 90 is deflected. With these reverse working direction of the revolving drives 2 are the levers 111 from the bolts 80 ousted from the path of the Belzen, but this movement The impulse generator 11 is not affected by non-sequencing. The finished stack is on the transpertglieder 20 lowered, and the lifting members down sufficiently distanced from the lower part again, 1 bolt 31 will get there to the impulse lever 23 'which is again present in a deppelter design, which Now addressed by this retrograde work movement, the pulse generator 23 actuate and thus end the return of the chains. If now the finished \ If the stack is on the trailing members 2, this must be the device leaving. For this purpose, the swiveling guide strips 22 at the soap outlet the interlocking swiveled out of the area of the box lever so that this can leave the device on the conveyor chains 20. Thieves- operation of these swiveling guide strips 22 can be done in various ways take place. x N XBONSEDR, Neuiraibling Berlinr # ir 67 files. s K 34 dna / 81 Gz SehMU lemf «B4 $ StapelvwrriehtMtg 16. 7 59 New filling 22.3.61 Pat.Du / H Mt. 2 2 «<tM Anwydnang for the swivel drive of these leadership positions »The» tiosk & Mtdexttt. The impulse transmitter 23 has outside / the to the juter- expansion of the actual movement required contact pair »Eiten contact pair which any hub. or push mechanism 94 directly each j) tire <M supplied with energy when actuated. his BMttrieb tcMtn wewel a Blektromaet or an elektrohyclraulineht Hub unit each one press cylinder, whose compressed air supply through the Stremimpwtle he is opened a MgMtventil. In the case of further options for the swivel drive of the guide Bar 22 is shown in FIG. 3, 4, e and 7 reproduced * So it can be at. for example, instead of an indirect, electrically controlled swiveling availability of the guide strips 22 also one of the members of the stack v rrlohteg tireltt be * & tigX »ohische trlebseAnxichtung f die Bhr <mg) Bl <ix <Mt 23 vwrgeHKhen ein. To di t. <n «m week and the pan *. aeh «&22'dxy MhrmgNitiwtwa 22 carried out further down and are geared by means of% * tat * 27 by a thumb lift. l 28 against DenDmek a Peder 29 during the idle stroke of the drive links 2 directly ibtr a MilMtmer 30, which is the last one to be attached to the chains 2 finds in 8ehlass "Hlnng t <'rotates <Cm in this position, in which the Fahrnnngaleietea 22 the arrival of the new arrivals Xixten must be fixed M, iet a pawl 31 at the front Ewhen which central spring 31 'is held in the locking position. Dieee The pawl 81 holds one of the levers attached to the shafts 22 ' M as long as the pile is up to M its predetermined height. Seen wnd nnot when the lifting members 2 are running on the conveyor member 20 is lowered. During this lowering, the bottom of the lowest presses Xtote on the lever 32j, which when activated is vertical from just the pawls geen the Drek of the springs 3l * downwards urges all the more fog releases 2210. As a result of the tensioned spring 29 open now see the guide strips 22 suddenly and the Stack can leave the facility on the spring links. First When the stack of boxes passes the pulse generator 21; he presses this IERIANN KMNSBMm, Weutraualing, Berlinerstr. 57 file. t K 34 092/81-pa Sahnell running stacking racks 16. 7. 59 Neufaaaung from 22 3. 61 Pat.Du / lI and «w will be the stroke of the interlocking, which, as described above, the closing of the clock leieten 22 brings about. Now in turn incoming cats know the nebula 32 due to its articulated rdJlug against X tk iver Peder32t inside the pawl 31 % * far vern »h" ak "am it is vernekt under the conveyor. He will pull each time as a result of the action of the spring 32 'after the lifting of the Raise the kitten again amx the inclination and after completion a « $ * apele, which then lowers a perpendicular tone on top of the lever again to displace the locking pawl 31 from the locking position. The Austranepertee now lasts in a finished batch from the no boxes can get into the device Start lock arranged. It essentially consists of a blocking arm14, which is present in the singular or on both sides aein can and via a Butzchkapplung 16, 15, 17 from the drive shaft 4 is powered, SeinanXage is powered by 19 and a on a honeycomb enclosure 18 is limited. During the stacking past the lent atapielaweise turns the dearly. 5 shown. Wave 4 counterclockwise and thus holds the locking arm 14 according to the WntacMcapplung l B, $ 1, 17 in Beehlage, whereby the Vor jumped 18 itself the right Anaehlag 19 puts. Is now the predetermined stack height reached and is achieved by pressing the pulse generator 12 through the top Box of the stacks of the Büoklaui, ie the reversal of the direction of rotation of the shaft 4 causes ae can aich the Ausehlag 14 of the locking arm 14 between the lower part of the Kiate dea Stapela and the Richtang achieben upcoming kiaten. ieaea is special by it Lichs that the Utn oi oitlg with Lelgten are bound and therefore themselves distance the remaining Ki tenbreiten from each other and here a cavity two kiaten each is negotiated, advice now according to the departure Aenken dea finished stacks einoetzanden other functions of the finished Stack the interlocking, ae is as described aehon Apply the idle stroke of the distribution members, so that the shaft 4 is now in Big. s NaOtAMf KRONSZDM, Nentranbling, Berlinerstr. 57 files K 34092 l 81e X Sehnell lanfemde stacking device 16. 7. 59 New version of 22 3, 61 Pat.Du / H is rotated counterclockwise and thus the locking arm 14 including the xehlag 14'wiedy lifts and transports the pending crate release. The Butsehkupplung in the hub of the locking arm 14 can be configured as desired. guided ftta, in FIG pasted disc spring 17. A stop 19 'limits the locking action Aew locking gear «14, eeaaB which you cannot swing down too far. t The <ang) tge)) tMe VerriehtnNg allows for continual stacking without that of the lifting elements, which are known from the known torrichi who leads Leix to a limited extent, and is a waste of time. Oego »W; he gives the beekeeping units with pneumatically driven lifting break down brings the erfludimgegmäß device an increase in performance of more than SO%. The FerKthritt is particularly evident through the The fact that the drills are on the awm market for bottling and packaging sehiesskolennen can now work with one box forklift each, whereas up to now 2 forklifts were necessary for each Xolone.

Claims (1)

HEBMMMKBOtSNBM, NettMMi&g, Berlinerstr. ST AktM. : K 34 092/ale Gm Behell laiSexd Stapelsorrlchtt 16* 7. 59 Neudassung vom 22. 34 el - <i I I 1, Tat.Du/H
Sehtz&ntprüche
1.) Vorrichtung zum selbsttätigen Stapeln von Kisten, nllen, oder sonstigen stapelfähigen Gegenstanden, welche der Vorrichtung mittelsTransporlieder zugeführt werden, wobei die Vorrichtung mit Habgliedern zum Anheben der einzelnen zu stapelnden Gegen- stände und zum Absenken der fertigen Stapel auf die Transports glieder, wie mit einer beweglicheaabsperrung der Stapelaus- lautseite Gad mit, TOD da. su atapelnden Gegenständen oder und von fertigen Stapeln zu betätigenden Impulagebern zum Einleiten den jtwei14 nächsten folgenden Arbeitzgangen ausgestattet ist, da. durch gekennzeichnet, daß die an den zu stapelndenGegenständen angreifenden Hubglieder (l) an, zur Stapelrichtung parallel ver- laufenden endlosen Trieben (2, 3, 4) befestigt sind und nur je- weil. an der dem Stapel zugekehrten Seite der endlosen Triebe (2, 3, 4) mit dem Stapelgut in Berührung kommend angeordnet sind.
2.) Vorrichtun4 nach Anspruch 1 dadurch gekennzeichnet, daß die Hub-" glieder (1) an denTriebgliedern (2) beweglich angeordnet sind und Führungsteile etwa Rollen (s) in Kurven (6, 7, 8) eingreifend, auf- weisen und letztere dergestalt angeordnet sind, daß die Hubglieder (1) bei Babbeginn zu beiden Seiten unter das Stapelgut greifen, die Pratzen (I') in den Hubgliedern (1) sich nach zurücklegen ein- es vorbentiMtbaren Hubwegez zich auf die nächst von unte, nach- folge. dlDll. te. legen können, bei Erreichen des oberen Scheitel- punkten der Triebe ( ?, 3, 4) zwischen den einkelnen Stapelsticken herausgezegen w rden and beim Rüeklauf entgegen der Stapelrichtung aus dem Bereieh der zu stapelnden Cuter gezogen bleiben.
NBNN M KRQNSEDER, Neutraubling, Derlinerstr. 57 Aktens. t K 34 092/81 e Ga Sehrnell laufende Stapelvorriehtung 16, 7, 59 Neufassung vom ot 3 B1 Pat.Du/H
8.) Verriohtang nach Anspruch 1 bin 2, dadurch gekennzeiclmet, daß im
Bereiche der oberen Scheitelpunkte der Triebe (2,3,4) je na eine Ablenkung (9) derart angeordnet it, daß die oberenEnden (elf/) der Hubglieder (1), kurz von passieren der oberen Scheitalpunkte niedergedrückt werden und dabei die Pratzeh (1') der Hubglieder (1)Mieehen den einzeinen Stapelatüken herausgezogen werden.
4.) Verriohtung mach Anspruch 1 bis 3, dadurch gekennzeichnet, daß im Bereiehe dew vom dem MhMMenden Stapelgütern zu durchlaufenden Teile. der Verrichtungi. aneich bekannter Weise Impulsgeber (10) zur Einleitung dee näehwjenden Arbeitahube und im Bereiche der von dem umlaufenden Hubglieder (1) zu durchlaufenden Bahn Impulegeber (11) zur Unterbrechung der Ilubbewegung und im oberen
Bereiche des Stapeln Impulsgeber (12) zur Umkehrung der Hubbewegung und sämtliche Impulsgeber direkt oder über Relais auf das Antriebsmittel, etwa einem Elektromotor (13) einwirkend angeordnet sind.
Nt) Verrichtung nach Anspruch 1 bis 4, dadurch gekennzeichnet, daß an zwei gegenüberliegenden Wellen (4) gegen den Widerstand einer Nutsehkupplnng (18, 16, 17) t f diesen drehbar angeordnet ist dergestalt, daß der Sperrhebel (14) während den Stapel vorganges unter der Wirkung der Butochkapplung mit seinem flebeleaunatz (18)
gegen einen fêsten Anschlag (19) gehalten wird und somit den Zugang für die Stapelgitter offen Mit, jedoch bei rückläufiger Hubbewegung, alse beim Absenken des fertigen Stapels auf die Forderglieder (20) in dei@ Bahn der ankommenden Stapelgüter geschwenkt wird und dort solange verbleibt bis der auslaufende Stapel einen Impulsgeber (12) betätigt und hierdurch einen Leerhub einleitet wodurch die Sperrhebel (14) den Einlauf dir die Stapelgutes freigeben. HERMANN KRONSEDER, Neutraublingg Berlinerstr. 57 Aktenz. i X 34 092/81 e Ga Sehnell laufeBde StapelTerrichtumg 16. 7.59 Neufassung 22. 3. 61 Pat.Du/H
6.) Vorrichtung nach Anspruch 1 bis 5, dadurch gekennzeichnet, daß an der Aualaufaeite der Verrichtung zu beidenSeiten je eine Aus- lanfsperre etwa über die ganze Offnungahohe reichende Klappe (22) mit einem unter demßinliuß eine. Impulgeber (23) stehenden An- triebemittele etwa einee elektrisehen Hubantriebes (24) angeordnet sind und zwischen den Relais (25) des Impulsgebera (23) und dem elektriaehen Hubantrieb (24) ein die Arbeitarichtung des lluban. triebes (24) nmeKhrender Impulsgeber (26) derart angeordnet ist, daß nach einer durch den Impulsgeber (22) eingeleiteten bewegung der Klappen (22) der nun aus der Vorrichtung auf den Fördergliedern (26) auslaufende fertige Stapel durch Berühren de « ! mateuerimpulegebere(26)daaSe tließen der Klappen (22) ein- leitet.
7.) Vorrichtung nach Ansprueh 1 bis 5, dadurch gel : ennzeichue, t, daß die Wellen (au') der Klappen (22) über einen Winkeltrieb (. 7) uEdeinem Daumenhebel (28) jegen den Druek etier Feder (29) während des Leer- hube« der Triebglieder (2) direkt über einen Mitnehmer (30) mit den Xettenr&deM (3) kraftxehlüßig in Verbindung stellen und im rereiche der Schließstellung der Klappen (22) eine Sperrklinkenanordnung (31) dergentalt angeordnet ist, dall beim Absenken des fertigen Stapelt auf die parderllteder (ao) ein Hebel (32) die Sperrklinken (aus der Sperrwtellung verdrangt, die Klappen (33) unter demDruck der Feder (29) offenen und der Stapel auf den Fördergliedern die Vor- richtung verlassen kann und durch passieren dez Itçnlsgeherß den Leerhub den Triebes (2, 3, 4) mit den Hubgliedern (1) einleitet und somit da « Schließen der Klappen (22) veranlaßt
HEBMMMKBOtSNBM, NettMMi & g, Berlinerstr. ST AktM. : K 34 092 / ale Gm Behell laiSexd Stapelsorrlchtt 16 * 7. 59 New version from 22. 34 el - <i II 1, Tat. You / H
See you
1.) Device for automatic stacking of boxes, nllen, or other stackable objects which the device are fed by means of transport members, the device with links to lift the individual counterparts to be stacked stands and for lowering the finished stacks onto the transport elements, as with a movable barrier of the stack lock loud side Gad with, DEATH there. su stacking objects or and of finished stacks to be actuated impulse transmitters to initiate is equipped for the two next following working gears, since. characterized in that the objects to be stacked attacking lifting links (l), parallel to the stacking direction running endless shoots (2, 3, 4) are attached and only each because. on the side of the endless shoots facing the pile (2, 3, 4) are arranged coming into contact with the stacked goods.
2.) Vorrichtun4 according to claim 1, characterized in that the hub " members (1) are movably arranged on the drive members (2) and Guide parts such as rollers (s) engaging in curves (6, 7, 8), have and the latter are arranged such that the lifting members (1) Reach under the stacked goods on both sides at the beginning of the baby cycle, the claws (I ') in the lifting links (1) move it can be foreseen to the next from the bottom, to the next episode. dlDll. te. be able to lay, when reaching the upper apex points of the shoots (?, 3, 4) between the single pile stitches Were pulled out when returning against the stacking direction Remain pulled out of the area of the stacking cutters.
NBNN M KRQNSEDER, Neutraubling, Derlinerstr. 57 file. t K 34 092/81 e Ga Very fast stacking device 16, 7, 59 New version from ot 3 B1 Pat.Du / H
8.) Verriohtang according to claim 1 bin 2, characterized gekennzeiclmet that in the
Areas of the upper apex of the shoots (2,3,4) each with a deflection (9) arranged in such a way that the upper ends (eleven /) of the lifting members (1) are pressed down shortly after passing the upper apex and thereby the claws ( 1 ') of the lifting links (1) The individual stackable items can be pulled out.
4.) Verriohtung make claim 1 to 3, characterized in that im Raise the stacked goods to be passed through by the MhMMenden Parts. the performance i. as is known, pulse generator (10) to introduce the next working hood and in the area the path to be traversed by the revolving lifting element (1) Pulse generator (11) to interrupt the ilub movement and in the upper
Areas of the stacking pulse generators (12) for reversing the lifting movement and all pulse generators arranged to act directly or via relays on the drive means, such as an electric motor (13) are.
Nt) execution according to claim 1 to 4, characterized in that an two opposite shafts (4) against the resistance of one Nutsehkupplnng (18, 16, 17) tf this is rotatably arranged such that the locking lever (14) during the stacking process under the effect of the butoch cap with its flebeleaunatz (18)
is held against a fixed stop (19) and thus the access for the stacking grids is open the outgoing stack actuates a pulse generator (12) and thereby initiates an idle stroke, whereby the locking levers (14) release the infeed of the stacked goods. HERMANN KRONSEDER, Neutraublingg Berlinerstr. 57 file. i X 34 092/81 e Ga Sehnell running stacking platform 16.759 new version 22.3.61 Pat.Du / H
6.) Device according to claim 1 to 5, characterized in that on the build-up side of the job on both sides lanfsperre about the entire opening-high flap (22) with one under the influence of one. Pulse generator (23) pending drive means about an electric lifting drive (24) arranged are and between the relay (25) of the pulse generator (23) and the electric lifting drive (24) in the working direction of the lluban. drive (24) measuring pulse generator (26) is arranged in such a way that that after one initiated by the pulse generator (22) movement of the flaps (22) from the device to the Conveyor links (26) expiring finished stacks by touching the «! mateuer impulegebere (26) allow the flaps (22) to directs.
7.) Device according to claims 1 to 5, characterized in that the gel: ennzeichue, t that the Shafts (au ') of the flaps (22) via an angle drive (. 7) uEdeinem Thumb lever (28) against the pressure spring (29) during the emptying lift «the drive links (2) directly via a driver (30) with the Xettenr & deM (3) connect with power and in the range the closed position of the flaps (22) a pawl arrangement (31) which is arranged so that when the finished stack is lowered on the parderllteder (ao) a lever (32) the pawls (from displaced from the locking position, the flaps (33) under the pressure of the Spring (29) open and the stack on the conveyor links the front direction and pass through dez Itçnlsgeherß initiates the idle stroke of the drive (2, 3, 4) with the lifting members (1) and thus causes the flaps (22) to close
DE1959K0034092 1959-12-24 1959-12-24 FAST-RUNNING STACKING DEVICE. Expired DE1831188U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE1959K0034092 DE1831188U (en) 1959-12-24 1959-12-24 FAST-RUNNING STACKING DEVICE.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1959K0034092 DE1831188U (en) 1959-12-24 1959-12-24 FAST-RUNNING STACKING DEVICE.

Publications (1)

Publication Number Publication Date
DE1831188U true DE1831188U (en) 1961-05-10

Family

ID=32973605

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1959K0034092 Expired DE1831188U (en) 1959-12-24 1959-12-24 FAST-RUNNING STACKING DEVICE.

Country Status (1)

Country Link
DE (1) DE1831188U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1235810B (en) * 1964-05-08 1967-03-02 Kema Keramikmaschinen Veb Device for automatic unstacking of pallet stacks
DE3100003A1 (en) * 1980-01-09 1982-03-04 Grünzweig + Hartmann und Glasfaser AG, 6700 Ludwigshafen Process and apparatus for the stacking of stackable material, especially of mineral-fibre boards in a production line
DE3529071A1 (en) * 1984-08-14 1986-02-27 Baumer di Mario Gambetti, Castelfranco Emilia, Modena DEVICE FOR STACKING PACKING UNITS
DE4127612A1 (en) * 1991-08-21 1993-02-25 Focke & Co Method of arranging groups of packets - uses vertical conveyor in collecting station area to move pack rows rhythmically upwards
DE4416218A1 (en) * 1994-05-07 1995-11-09 Sanpack Lagertech Gmbh Method for removal and stacking of pallets from and into stack

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1235810B (en) * 1964-05-08 1967-03-02 Kema Keramikmaschinen Veb Device for automatic unstacking of pallet stacks
DE3100003A1 (en) * 1980-01-09 1982-03-04 Grünzweig + Hartmann und Glasfaser AG, 6700 Ludwigshafen Process and apparatus for the stacking of stackable material, especially of mineral-fibre boards in a production line
DE3529071A1 (en) * 1984-08-14 1986-02-27 Baumer di Mario Gambetti, Castelfranco Emilia, Modena DEVICE FOR STACKING PACKING UNITS
DE4127612A1 (en) * 1991-08-21 1993-02-25 Focke & Co Method of arranging groups of packets - uses vertical conveyor in collecting station area to move pack rows rhythmically upwards
DE4127612B4 (en) * 1991-08-21 2004-04-29 Focke Gmbh & Co. Kg Device for forming an ordered packing group
DE4127612B8 (en) * 1991-08-21 2004-09-23 Focke & Co. (Gmbh & Co.) Device for forming an ordered packing group
DE4416218A1 (en) * 1994-05-07 1995-11-09 Sanpack Lagertech Gmbh Method for removal and stacking of pallets from and into stack

Similar Documents

Publication Publication Date Title
DE2124984C3 (en) Device for the automatic packing of several containers in a box
DE4006888A1 (en) INDIVIDUAL PRODUCT EXTENSION SLIDE
DE1289776B (en) Conveyors, especially for containers
DE1831188U (en) FAST-RUNNING STACKING DEVICE.
DE2405940A1 (en) DEVICE FOR UNLOADING CONTAINERS STACKED ON PALLETS
DE846373C (en) Conveyor device on extrusion presses for plastic ceramic masses
DE1108145B (en) Device for the automatic loading of stacking plates with layers of piece goods stacked in layers
CH428559A (en) Device on an inclined roller conveyor to control the discharge of the goods conveyed on the conveyor
DE285450C (en)
DE1116599B (en) Device for breaking down a stack of pieces
DE1208690B (en) Machine for loading piles of newspapers onto a stand
DE2725102C3 (en) Device for irradiating piece goods
DE145549C (en)
DE459522C (en) Box feeder
DE397032C (en) Process for loading and unloading drying chambers
DE2723782A1 (en) Palletised barrel loading mechanism - has grab with separate mechanisms for barrels and intermediate pallets accommodating them
DE387128C (en) Device for automatic loading of cable car cars while they are moving
DE1114143B (en) Device for stacking objects assembled in layers on a stacking plate
DE3317715C2 (en)
DE2314007A1 (en) DEVICE FOR TAKING PLATE-SHAPED OBJECTS FROM A STACK
DE472207C (en) Device for automatic piston supply for machines for melting the support frames into the pistons of electric light bulbs
DE19906604A1 (en) Automatic stacker for stacking containers with vertical stacking space
DE1719734U (en) CONVEYOR BELT.
DE180216C (en)
AT237519B (en) Device for discharging goods located on an inclined roller conveyor