DE1809326C3 - Method of making a tunnel or adit - Google Patents

Method of making a tunnel or adit

Info

Publication number
DE1809326C3
DE1809326C3 DE19681809326 DE1809326A DE1809326C3 DE 1809326 C3 DE1809326 C3 DE 1809326C3 DE 19681809326 DE19681809326 DE 19681809326 DE 1809326 A DE1809326 A DE 1809326A DE 1809326 C3 DE1809326 C3 DE 1809326C3
Authority
DE
Germany
Prior art keywords
tunnel
piles
ridge
ground
tunnels
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19681809326
Other languages
German (de)
Other versions
DE1809326A1 (en
Inventor
Anton Dipl.-Ing. 8000 Muenchen Frank
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Held & Francke Bauaktiengesellschaft 8000 Muenchen
Original Assignee
Held & Francke Bauaktiengesellschaft 8000 Muenchen
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Held & Francke Bauaktiengesellschaft 8000 Muenchen filed Critical Held & Francke Bauaktiengesellschaft 8000 Muenchen
Priority to DE19681809326 priority Critical patent/DE1809326C3/en
Priority to AT1210468A priority patent/AT298551B/en
Publication of DE1809326A1 publication Critical patent/DE1809326A1/en
Application granted granted Critical
Publication of DE1809326C3 publication Critical patent/DE1809326C3/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

Die Erfindung betrifft ein Verfahren zum Her- gegenüberliegenden Seitenstollen gerichtete Pfahle im stellen eines TuLeIs oder Stollens, insbesondere in Erdreich hergestellt werden, ie gemeinsam ein raumdurch Bauwerke belasteten Bodenschichten, bei dem liches Stabwerk bilden. Diese,Ausfuhrungsform des zunächst zu beiden Seiten des Tunnels Seitenstollen Verfahrens ist dann zweckmäßig wenn die Bodenaufgefahren werden, in die eine Stahlbetonfüllung 3 schicht über dem Tunnel oder Stollen besonders stark eingebracht wird, worauf im Firstvortrieb die First- belastet ist, z. B. durch Schienenverkehr od. dgl
bögen derart eingesetzt werden, daß sie ihren Nach der Erfindung können ferner ausgehend von Kämpferdruck an die Betonbalken in den Seiten- den seitlichen Begrenzungsflachen des Tunnels oder Stollen abgeben, und .anschließend der restliche Aus- Stollens Honzontalzuganker oder HonzontalpfahIe bruch als Vollausbruch unter den Firstbögen erfolgt, xo eingebracht werden, die zusammen mit den Vertikal-
The invention relates to a method for opposite side tunnels directed piles in the construction of a tunnel or tunnel, in particular in the ground, ie together form a soil layer that is spatially loaded by structures, in which the lichen framework. This, embodiment of the first on both sides of the tunnel side tunnel method is useful when the ground is driven into which a reinforced concrete 3 layer is placed over the tunnel or tunnel particularly strong, whereupon the ridge is loaded in the ridge drive, z. B. by rail transport or the like
Arches are used in such a way that they can also, based on combat pressure, give off the concrete beams in the lateral boundary surfaces of the tunnel or tunnel, and then the rest of the excavation tunnel Honzontalzuganker or HonzontalpfahIe breaks as a full break under the ridge arches , xo, which together with the vertical

Ein solches Verfahren ist bereits bekannt und wird pfählen ein honzontalverankertes Stabwerk bilden,Such a method is already known and piles will form a horizontally anchored framework,

als deutsche Kernbauweise bezeichnet. Es leidet unter Diese Ausführungsform des Verfahrens biete m derreferred to as German core construction. It suffers from this embodiment of the method

dem Nachteil, daß das Gewölbe über dem Tunnel Horizontalrichtung eine vergrößerte Sicherung derthe disadvantage that the vault over the tunnel has an increased security of the horizontal direction

auf in nächster Nähe vorhandenen tragfähigen Bau- Stabwände die den Tunnelmnewaum begrenzen,on load-bearing structural bar walls that are in the immediate vicinity that delimit the tunnel space,

grund angewiesen ist, weil über das Gewölte und i5 Schließlich können die seitlichen Begrerizungsflachenreason is required because over the arched and i 5 Finally, the lateral limiting surfaces

die ausbetonierten Seitenstolkn eine erhebliche Be- des Tunnels oder Stollens mit einer Spntebetonschichtthe concreted-in side stolkn a considerable amount of the tunnel or adit with a concrete layer

lastung unmittelbar auf den Baugrund übertragen versehen werden, die gegebenenfalls die Embnngungs-load are transferred directly to the subsoil, which, if necessary,

wird. Bei schwierigen Baugrundverhältnissen und Zonen der Zuganker verstärkt.will. The tie rods are reinforced in difficult subsoil conditions and zones.

insbesondere dort, wo der tragfähige Baugrund tiefer Nachstehend wird die Erfindung an Hand derespecially where the stable subsoil is deeper

liegt, ist das bekannte Verfahren nicht ohne Bedenken 20 Zeichnung näher erläutert, die einen Querschnittis, the known method is not explained in more detail without hesitation 20 drawing showing a cross section

oder gar nicht anwendbar. Bekannt ist ferner die durch einen Tunnel zeigt. .or not applicable at all. Also known is the one that shows through a tunnel. .

Stuttgarter Bauweise, die im Prinzip der deutschen Auf der Geländeoberseite befindet sich eine Gleis-Stuttgart construction, which is based on the principle of German On the top of the site there is a track

Kernbauvveise gleicht, bei der jedoch die Seitenstollen anlage i, bestehend aus vier nebeneinanderliegendenThe core construction method is the same, but with the side tunnel system i, consisting of four adjacent ones

im oberen Bereich des Tunnelquerschnitts angeordnet Gleisen. Die Herstellung des Tunnels beginnt mitTracks arranged in the upper area of the tunnel cross-section. The construction of the tunnel begins with

sind. Diese Bauweise ist ebenfalls nur dann mit Erfolg *5 dem Auffahren von Seltenstollen -, deren Abstandare. This type of construction is also only successful * 5 when driving up rare tunnels - their spacing

anwendbar, wenn seitlich vom Tunnelquerschnitt in sich bestimmt aus der Breite des endgu tigen TunnelsApplicable if to the side of the tunnel cross-section is determined from the width of the final tunnel

unmittelbarer Nähe tragfähiger Baugrund zur Ver- Von diesen Seitenstollen 2 aus werden Wurzelpfahle 3In the immediate vicinity of load-bearing subsoil, from these side tunnels 2, root piles 3

fügung steht, der die Belastung durch die Betonbalken in mehreren Reihen gebohrt, wobei die AnordnungFügung stands that the load through the concrete beams drilled in several rows, with the arrangement

in den Seitenstollen voll aufnehmen kann. so getroffen ist, daß die Wurzelpfahle 3 eme Stabwandcan fully accommodate in the side tunnels. is made so that the root pile 3 eme rod wall

Der Erfindung liegt die Aufgabe zugrunde, die Do bilden. Die Zeichnung zeigt lediglich lotrecht geMöglichkeit zur Anwendung eines Verfahrens der bohrte Wurzelpfähle 3. Es ware jedoch durchaus eingangs angegebenen Art auch dann zu schaffen, möglich, diese lotrechten Pfahle durch schräg nach wenn der Baugrund im Bereich des Tunnels nicht außen geführte Pfähle zu erganzen Zur seitlichen ausreichend tragfähig ist. Verankerung der Wurzelpfähle 3 sind Anker 5 yorge-The invention is based on the object that Do form. The drawing only shows the possibility of being perpendicular to use a method of the drilled root piles 3. It would, however, be entirely At the beginning it is also possible to create these perpendicular stakes by obliquely following if the building ground in the area of the tunnel does not have to be supplemented with external piles to the side is sufficiently stable. Anchoring the root piles 3 are anchors 5 yorge-

Die Lösung dieser Aufgabe besteht erfindungs- 35 sehen, die Horizontalkräfte an die Bodenschichten gemäß darin, daß nach dem Auffahren der Seiten- außerhalb der Wurzelpfähle 3 abgeben. Von den stollen und vor dem Einbringen der Stahlbetonfüllung Seitenstollen 2 können ferner nach außen gerichtete in jedem der Seitenstollen von diesen aus nach unten Würzelpfähle 4 gebohrt oder hergestellt werden die gerichtete Wurzelpfähle im Erdreich hergestellt die Aufgabe haben, den durch die Firstbogen 7 erwerden, die eine Stabwand bilden. Der technische 40 zeugten Kämpferdruck mit aufnehmen. Diese Maß-Fortschritt dieses Verfahrens beruht auf der kombi- nähme verhindert mit Sicherheit bei besonders großen nierten Anwendung von Seitenstollen und Wurzel- Belastungen ein seitliches Versetzen der beitenpfählen. Die Seitenstollen können nämlich vor ihrer stollen 2. Nach der Herstellung der Pfahle 3 und 4 Auffüllung mit Stahlbeton als Arbeitsraum für das werden die Seitenstollen 2 mit Stahlbeton ausgefüllt, Bohren der Wurzelpfähle dienen, die eine tragende 45 so daß biegefeste Balken 6 besonders großer Ab-Pfahlwand bilden, die bis in den tragfähigen Bau- messungen entstehen. Nach der Ausfüllung der grund herunterreicht. Nach dem Bohren der Wurzel- Seitenstollen 2 erfolgt zunächst ein Firstvortrieb im pfähle und dem Ausfüllen der Seitenstollen mit Stahl- Teilausbruch innerhalb des Raumes 9, wobei nut beton entsteht ein funktionell zusammenwirkendes fortschreitendem Teilausbruch die Montage der Tragsystem aus der als durchlaufender Träger wir- 50 Firstbögen 7 erfolgt, die sich gegen vorbereitete Aufkenden Stahlbetonfüllung und den Wurzelpfählen, so lager 8 in den Betonbalken 6 abstutzen. Mit dem daß eine zu starke Belastung einzelner Wurzelpfähle Einbau der Firstbögen 7 wird das Bauwerk im vermieden wird. Es hat sich bereits erwiesen, daß wesentlichen tragsicher, so daß der Vollausbruch im das neue Verfahren hinsichtlich der Kosten sehr Tunnelraum 10 mit fortschreitendem Einbau der wettbewerbsfähig ist und daß es sehr elastisch ver- 55 Firstbögen 7 erfolgen kann. Sobald die aus den schiedenen Baugrundverhältnissen angepaßt werden Wurzelpfählen 3 entstandene Pfahlwand frei wird, kann. wird sie mit einer Spritzbetonschicht 13 versehen.The solution to this problem consists, according to the invention, of the horizontal forces acting on the soil layers according to the fact that after driving up the side outside of the root piles 3 deliver. Of the tunnel and before the introduction of the reinforced concrete filling side tunnel 2 can also be directed outwards in each of the side tunnels from these downward root piles 4 are drilled or produced directed root piles in the ground have the task of getting through the ridge arch 7, which form a bar wall. The technical 40 witnessed fighter pressure with taking up. This measure progress This process is based on the combination of being prevented with safety in the case of particularly large ones ned use of side tunnels and root loads, a lateral shifting of the two piles. This is because the side tunnels can be opened in front of their 2. After piles 3 and 4 have been made Filled with reinforced concrete as a work space for the side tunnels 2 are filled with reinforced concrete, Drilling of the root piles are used, which are a load-bearing 45 so that rigid beams 6 particularly large ab-pile wall that arise up to the stable building measurements. After completing the reason reaches down. After the root side tunnels 2 have been bored, a ridge is first driven in the piles and filling the side tunnels with partial steel excavation within the space 9, with groove concrete creates a functionally interacting progressive partial breakout the assembly of the Support system from which we 50 ridge arches 7 are carried out as a continuous support, which are against prepared Aufkenden Reinforced concrete filling and the root piles, so bearing 8 in the concrete beam 6 brace. With the that excessive loading of individual root piles installation of the ridge arches 7 is the structure in the is avoided. It has already been shown to be essentially reliable, so that the full breakout in the the new method in terms of costs very tunnel space 10 with progressive installation of the is competitive and that it can be done very elastically. As soon as the different ground conditions are adapted to the root piles 3 resulting pile wall is free, can. it is provided with a layer of shotcrete 13.

Nach einem weiteren Merkmal der Erfindung Danach können die Einbauten 14,15 vorgenommenAccording to a further feature of the invention, the internals 14, 15 can then be made

werden von den Seitenstollen aus vor dem Einbringen werden.will be made from the side tunnels prior to placement.

der Stahlbetonfüllung seitlich nach außen gerichtete 60 In Fällen besonderer Belastung, besonders bei Wurzelpfähle im Erdreich hergestellt, die zusätzlich starken Erschütterungen, kann oberhalb der Firstzur Aufnahme des Kämpferdruckes dienen. Bei einer bögen 7 ein Injektionsschirm 11 durch Injektionen weiteren Ausführungsform der Erfindung werden gebildet werden. In diesen Injektionsschirm können über den Firstbögen zur Verfestigung des Bodens zusätzlich Pfähle 12 eingebohrt werden, die allerdings in bekannter Weise Injektionen durchgeführt, die zur 65 vor dem Einbringen des Stahlbetons in die Seiten-Bildung einer verfestigten Schicht dienen. Ferner stollen 2 hergestellt werden müssen,
können aus den Seitenstollen vor dem Einbringen Der Injektionsschirm 11 kann auch durch eine der Stahlbetonfüllung schräg nach oben, und zum Bodenvereisung ersetzt werden.
the steel concrete filling laterally outward particular 60 I n cases stress produced particularly in root piles in the ground, which in addition to strong vibrations, may be used above the Firstzur receiving the fighter pressure. In the case of an arch 7, an injection screen 11 by injections further embodiment of the invention will be formed. Additional piles 12 can be drilled into this injection screen above the ridge arches to consolidate the ground, but these are injected in a known manner, which serve to form a consolidated layer before the reinforced concrete is introduced into the side. Furthermore, studs 2 must be made,
The injection screen 11 can also be replaced by one of the reinforced concrete filling at an angle upwards and for freezing the ground.

Claims (6)

Patentansprüche:Patent claims: 1. Verfahren zum Herstellen eines Tunnels oder Stollens, insbesondere in durch Bauwerke belasteten Bodenschichten, bei d.-m zunächst zu beiden Seiten des Tunnels Seitenstollen aufgefahren werden, in die eine Stahibetonfüllung eingebracht wird, worauf im Firstvortrieb die Firstbögen derart eingesetzt werden, daß sie ihren Kämpferdruck an die Betonbalken in den Seitenstollen abgeben, und anschließend der restliche Ausbruch als Voilausbruch unter den Firstbögen erfolgt, dadurch gekennzeichnet, daß nach dem Auffahren der Seitenstollen und vor dem Einbringen der Stahibetonfüllung in jedem der Seitenstollen von diesen aus nach unten gerichtete Wurzelpfähle im Erdreich hergestellt werden, die eine Stabwand bilden.1. A method for creating a tunnel or adit, especially in those loaded with structures Soil layers, at d.-m, side tunnels were initially excavated on both sides of the tunnel into which a steel concrete filling is introduced, whereupon the ridge arches in the ridge drive are used in such a way that they apply their fighting pressure to the concrete beams in the side tunnels and then the rest of the outbreak as a voile outbreak under the ridge arches takes place, characterized in that after driving up the side tunnels and before the introduction of the steel concrete filling in each of the side tunnels directed downwards from these Root piles are made in the ground, which form a bar wall. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß von den Seitenstollen aus vor dem Einbringen der Stahibetonfüllung seitlich ao nach außen gerichtete Wurzelpfähle im Erdreich hergestellt werden, die zusätzlich zur Aufnahme des Kämpferdruckes dienen.2. The method according to claim 1, characterized in that from the side cleats in front the introduction of the steel concrete filling laterally ao outwardly directed root piles in the ground are produced, which also serve to absorb the fighter pressure. 3. Verfahren nach Anspruch 1 oder 2, dadurch3. The method according to claim 1 or 2, characterized gekennzeichnet, daß über den Firstbögen zur Verfestigung des Bodens in bekannter Weise Injektionen durchgeführt werden, die zur Bildung einer verfestigten Schicht dienen.characterized that over the ridge arches to consolidate the soil in a known manner injections which serve to form a solidified layer. 4. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß aus den Seitenstollen vor dem Einbringen der Stahibetonfüllung schräg nach oben und zum gegenüberliegenden Seitenstollen gerichtete Pfähle im Erdreich hergestellt werden, die gemeinsam ein räumliches Stabwerk bilden.4. The method according to any one of claims 1 to 3, characterized in that from the side tunnels before inserting the steel concrete filling diagonally upwards and towards the opposite side tunnel Directed piles are made in the ground, which together form a spatial framework form. 5. Verfahren nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß ausgehend von den seitlichen Begrenzungsflächen des Tunnels oder Stollens Horizontalzuganker oder Horizontalpfähle eingebracht werden, die zusammen mit den Vertikalpfählen ein horizontalverankertes Stabwerk bilden.5. The method according to any one of claims 1 to 4, characterized in that starting from the lateral boundary surfaces of the tunnel or gallery horizontal tie rods or horizontal piles which, together with the vertical piles, form a horizontally anchored Form framework. 6. Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, daß die seitlichen Begrenzungsflächen des Tunnels oder Stollens mit einer Spritzbetonschicht versehen werden, die gegebenenfalls die Einbringungszonen der Zuganker verstärkt.6. The method according to any one of claims 1 to 5, characterized in that the lateral boundary surfaces of the tunnel or gallery are provided with a shotcrete layer that if necessary, the introduction zones of the tie rods are reinforced. Hierzu 1 Blatt Zeichnungen1 sheet of drawings
DE19681809326 1968-11-16 1968-11-16 Method of making a tunnel or adit Expired DE1809326C3 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE19681809326 DE1809326C3 (en) 1968-11-16 1968-11-16 Method of making a tunnel or adit
AT1210468A AT298551B (en) 1968-11-16 1968-12-12 Process for creating a tunnel or adit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19681809326 DE1809326C3 (en) 1968-11-16 1968-11-16 Method of making a tunnel or adit

Publications (2)

Publication Number Publication Date
DE1809326A1 DE1809326A1 (en) 1970-06-04
DE1809326C3 true DE1809326C3 (en) 1975-04-17

Family

ID=5713521

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19681809326 Expired DE1809326C3 (en) 1968-11-16 1968-11-16 Method of making a tunnel or adit

Country Status (2)

Country Link
AT (1) AT298551B (en)
DE (1) DE1809326C3 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3968655A (en) * 1973-07-13 1976-07-13 Mcglothlin William K Method of reinforcing tunnels before excavation
US3996751A (en) * 1973-07-30 1976-12-14 Tore Jerker Hallenius Method of blasting and reinforcing rock cavities

Also Published As

Publication number Publication date
AT298551B (en) 1972-05-10
DE1809326A1 (en) 1970-06-04

Similar Documents

Publication Publication Date Title
DE3215153C2 (en) Retaining structure and method of manufacturing a retaining structure
DE2545572A1 (en) BUILDING ANCHORING
DE4236766C2 (en) Method for renovating a dam construction for a roadway
DE1809326C3 (en) Method of making a tunnel or adit
DE2700594A1 (en) LAYING FOR A PIT WALL AND METHOD OF MANUFACTURING
DE102007003085B4 (en) Process for producing a sealing wall with optimized precast concrete elements
DE3443040A1 (en) METHOD FOR PRODUCING UNDERGROUND CONSTRUCTIONS BY MEANS OF DOOR STOCK LID CONSTRUCTION
DE3516576C2 (en)
DE2917994C2 (en) Process for the production of a construction pit sheeting or retaining wall made of reinforced concrete for terrain cuts
EP1254999B1 (en) Prefabricated construction element with natural stone components
DE1809326B (en) Method of making a tunnel or adit
CH539740A (en) Method of making a tunnel or adit
DE2829712B1 (en) Process for the production of underground structures
DE2408038C3 (en) Process to reduce subsidence in the expansion of multi-part underground cavities
DE1801984B2 (en) PROCESS FOR MAKING A PILE SUPPORT
DE3209668C1 (en) Method and devices for controlling the roadway level of a roadway with roadway support system in underground operations
DE1801892C (en) Method for producing a pile support
DE3033487C2 (en) Single-layer route extension for mining and tunneling
DE1220879B (en) Underpass structure and procedure for its subsequent installation
DE2254947B2 (en) Process for the mining of several cavities
DE867828C (en) Process for the production and installation of a permanent concrete coating, open at the top and bottom, for foundation pillars or the like.
Filippini et al. Construction of a cavern under an autobahn embankment for the Ceneri Base Tunnel/Unterquerung eines Autobahndamms durch eine Kaverne beim Ceneri‐Basistunnel
CH720069A2 (en) Method for producing a support body anchored in a subsoil using micropiles.
DE3203980A1 (en) Underpass structure and method of producing it
DE2747774A1 (en) ARRANGEMENT FOR SUPPORTING HANGING MATERIAL ON A SLOPING HANS

Legal Events

Date Code Title Description
C3 Grant after two publication steps (3rd publication)
E77 Valid patent as to the heymanns-index 1977
EHJ Ceased/non-payment of the annual fee