DE1809326B - Method of making a tunnel or adit - Google Patents

Method of making a tunnel or adit

Info

Publication number
DE1809326B
DE1809326B DE1809326B DE 1809326 B DE1809326 B DE 1809326B DE 1809326 B DE1809326 B DE 1809326B
Authority
DE
Germany
Prior art keywords
tunnel
piles
reinforced concrete
ridge
adit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
Other languages
German (de)
Inventor
Anton Dipl Ing 8000 München Frank
Original Assignee
Held & Francke Bauaktiengesellschaft, 8000 München

Links

Description

1 21 2

Die Erfindung betrifft ein Verfahren zum Her- gegenüberliegenden Seitenstollen gerichtete Pfähle im stellen eines Tunnels oder Stollens, insbesondere in Erdreich hergestellt werden, die gemeinsam ein raumdurch Bauwerke belasteten Bodenschichten, bei dem liches Stabwerk bilden. Diese Ausfunrungsform des zunächst zu beiden Seiten des Tunnels Seitenstollen Verfahrens ist dann zweckmäßig, wenn die Bodenaufgefahren werden, in die eine Stahlbetonfüllung 5 schicht über dem Tunnel oder Stollen besonders stark eingebracht wird, worauf im Firstvortrieb die First- belastet ist, z. B. durch Schienenverkehr ud. dgl.
bögen derart eingesetzt werden, daß sie ihren Nach der Erfindung können ferner ausgehend von Kämpferdruck an die Betonbalken in den Seiten- den seitlichen Begrenzungsflachen des Iunnels oder Stollen abgeben, und anschließend der restliche Aus- Stollens Horizontalzuganker oder Honzontalpfahle bruch als Vollausbruch unter den Firstbögen erfolgt. io eingebracht werden, die zusammen mit den Vertikal-
The invention relates to a method for opposite side tunnels directed piles in the construction of a tunnel or adit, in particular in the ground, are produced, which together form a soil layer that is spatially loaded by structures, in which the lichen framework. This Ausfunrungsform of the first on both sides of the tunnel side tunnel method is useful when the ground is driven into which a reinforced concrete filling 5 layer above the tunnel or tunnel is particularly strong, whereupon the ridge is loaded in the ridge drive, z. B. by rail transport ud. like
Arches are used in such a way that they can also, based on combat pressure, give off the concrete beams in the side of the lateral boundary surfaces of the tunnel or tunnel, and then the remaining horizontal tie rods or Honzontal piles break as a full break under the ridge arches. io, which together with the vertical

Ein solches Verfahren ist bereits bekannt und wird pfählen ein horizontalverankertes Stabwerk bilden,Such a method is already known and piles will form a horizontally anchored framework,

als deutsche Kernbauweise bezeichnet. Es leidet unter Diese Ausführungsform des Verfahrens bietet in derreferred to as German core construction. It suffers from this embodiment of the method offers in the

dem Nachteil, daß das Gewölbe über dem Tunnel Horizontalrichtung eint: vergrößerte Sicherung derthe disadvantage that the vault over the tunnel unites horizontal direction: increased security of the

auf in nächster Nähe vorhandenen tragfähigen Bau- Stabwände, die den Tunnelinnenraum begrenzen,on load-bearing structural bar walls that are in the immediate vicinity that delimit the interior of the tunnel,

grund angewiesen ist, weil über das Gewölbe und 15 Schließlich können die seitlichen Begrenzungsflachenreason is required because over the vault and 15 Finally, the lateral boundary surfaces

die ausbetonierten Seitenstollen eine erhebliche Be- des Tunnels oder Stollens mit einer Spritzbetonschichtthe concreted side tunnels a considerable loading of the tunnel or adit with a shotcrete layer

lastung unmittelbar auf den Baugrund übertragen versehen werden, die gegebenenfalls die Einbnngungs-load can be transferred directly to the subsoil, which, if necessary,

wird. Bei schwierigen Baugrundverhältnissen und zonen der Zuganker vers tärkt.will. The tie rods are reinforced in difficult subsoil conditions and zones.

insbesondere dort, wo der tragfähige Baugrund tiefer Nachstehend wird die Erfindung an Hand derespecially where the stable subsoil is deeper

liegt, ist das bekannte Verfahren nicht ohne Bedenken 20 Zeichnung näher erläutert, die einen Querschnittis, the known method is not explained in more detail without hesitation 20 drawing showing a cross section

oder gar nicht anwendbar. Bekannt ist ferner die durch einen Tunnel zeigt.or not applicable at all. Also known is the one that shows through a tunnel.

Stuttgarter Bauweise, die im Prinzip der deutschen Auf der Geländeoberseite befindet sich eine Gleis-Kernbauweise gleicht, bei der jedoch die Seitenstollen anlage 1, bestehend aus vier nebeneinanderliegenden im oberen Bereich des Tunnelquerschnitts angeordnet Gleisen. Die Herstellung des Tunnels beginnt mit sind. Diese Bauweise ist ebenfalls nur dann mit Erfolg 25 dem Auffahren von Seitenstollen 2, deren Abstand anwendbar, wenn seitlich vom Tunnelquerschnitt in sich bestimmt aus der Breite des endgültigen Tunnels, unmittelbarer K'ihe tragfähiger Baugrund zur Ver- Von diesen Seitenstollen 2 aus werden Wurzelpfähle 3 fügung steht, der die Belastung durch die Betonbalken in mehreren Reihen gebohrt, wobei die Anordnung in den Seitenslollen voll aufnenmen kann. so getroffen ist, daß die Wurzelpfähle 3 eine StabvvandStuttgart construction method, which in principle is the German one. On the top of the site there is a core track construction method is the same, but with the side tunnel system 1, consisting of four side-by-side tracks arranged in the upper area of the tunnel cross-section. The construction of the tunnel begins with are. This design is also only successful when driving up side tunnels 2, their spacing Applicable if to the side of the tunnel cross-section is determined from the width of the final tunnel, From these side tunnels 2, root piles 3 Fügung stands that the load through the concrete beams drilled in several rows, with the arrangement can fully absorb in the side slats. is made so that the root piles 3 have a bar wall

Der Erfindung liegt die Auf -abe zugrunde, die 30 bilden. Die Zeichnung zeigt lediglich lotrecht geMöglichkeit zur Anwendung eines Verfahrens der bohrte Wurzelpfähle 3. Es wäre jedoch durchaus eingangs angegebenen Art auch dann zu schaffen, möglich, diese lotrechten Pfähle durch schräg nach wenn der Baugrund im Bereich des Tunnels nicht außen geführte Pfähle zu ergänzen. Zur seitlichen ausreichend tragfähig ist. Verankerung der Wurzelpfähle 3 sind Anker 5 vorge-The invention is based on the tasks which form 30. The drawing only shows the possibility of being perpendicular to use a method of drilled root piles 3. However, it would be At the beginning it is also possible to create these perpendicular piles by obliquely following if the building ground in the area of the tunnel does not have to supplement externally guided piles. To the side is sufficiently stable. Anchors 5 are provided for the anchoring of the root piles 3

Die Lösung dieser Aufgabe besteht erfindungs- 35 sehen, die Horizontalkräfte an die Bodenschichten gemäß darin, daß nach dem Auffahren der Seiten- außerhalb der Wurzelpfähle 3 abgeben. Von den stollen und vor dem Einbringen der Stahlbetonfüllung Seitenstollen 6 können ferner nach außen gerichtete in jedem der Seitenstollen von diesen aus nach unten Wurzelpfähle 4 gebohrt oder hergestellt werden, die gerichtete Wurzelpfähle im Erdreich hergestellt die Aufgabe haben, den durch die Firstbogen 7 erwerden, die eine Stabwand bilden. Der technische 40 zeugten Kämpferdruck mit aufnehmen. Diese Maß-Fortschritt dieses Verfahrens beruht auf der kombi- nähme verhindert mit Sicherheit bei besonders großen nierten Anwendung von Seitenstollen und Wurzel- Belastungen ein seitliches Versetzen der Seitenpfählen. Die Seitenstoilen können nämlich vor ihrer stollen 2. Nach der Herstellung der Pfähle 3 und 4 Auffüllung mit Stahlbeton als Arbeitsraum für das werden die Seitenstollen 2 mit Stahlbeton ausgefüllt, Bohren der Wurzelpfähle dienen, die eine tragende 45 so daß biegefeste Balken 6 besonders großer Ab-Pfahlwand bilden, die bis in den tragfähigen Bau- messungen entstehen. Nach der Ausfüllung der grund herunterreicht. Nach dem Bohren der Wurzel- Seitenstollen 2 erfolgt zunächst ein Firstvortrieb im pfähle und dem Ausfüllen der Seitenrollen mit Stahl- Teilausbruch innerhalb des Raumes 9, wobei mit beton entsteht ein funktionell zusammenwirkendes fortschreitendem Teilausbruch die Montage der Tragsystem aus der als durchlaufender Träger wir- 50 Firstbögen 7 erfolgt, die sich gegen vorbereitete Aufkenden Stahlbetonfüllung und den Wurzelpfählen, so lager 8 in den Betonbalken 6 abstützen. Mit dem daß eine zu starke Belastung einzelner Wurzelpfähle Einbau der Firstbögen 7 wird das Bauwerk im vermieden wird. Es hat sich bereits erwiesen, daß wesentlichen tragsicher, so daß der Vollausbruch in' das neue Verfahren hinsichtlich der Kosten sehr Tunnelraum 10 mit fortschreitendem Einbau der wettbewerbsfähig ist und daß es sehr elastisch ver- SS Firstbogen 7 erfolgen kann. Sobald die aus den schiedenen Baugrundverhälttiissen angepaßt werden Wurzelpfählen 3 entstandene Pfahlwand frei wird, kann. wird sie mit einer Spritzbetonschicht 13 versehen.The solution to this problem consists, according to the invention, of the horizontal forces acting on the soil layers according to the fact that after driving up the side outside of the root piles 3 deliver. Of the tunnel and before the introduction of the reinforced concrete filling side tunnel 6 can also be directed outwards in each of the side tunnels from these down root piles 4 are drilled or made that directed root piles in the ground have the task of getting through the ridge arch 7, which form a bar wall. The technical 40 witnessed fighter pressure with taking up. This measure progress This process is based on the combination of being prevented with safety in the case of particularly large ones ned use of side tunnels and root loads, a lateral shifting of the side piles. This is because the side stalls can be opened in front of their 2. After piles 3 and 4 have been built Filled with reinforced concrete as a work space for the side tunnels 2 are filled with reinforced concrete, Drilling of the root piles are used, which are a load-bearing 45 so that rigid beams 6 particularly large ab-pile wall that arise right up to the stable building measurements. After completing the reason reaches down. After the root side tunnels 2 have been bored, a ridge is first driven in the piles and the filling of the side rolls with partial steel breakout within the space 9, with concrete creates a functionally interacting progressive partial breakout the assembly of the Support system from which we 50 ridge arches 7 are carried out as a continuous support, which are against prepared Aufkenden Reinforced concrete filling and the root piles, so bearing 8 in the concrete beam 6 support. With the that excessive loading of individual root piles installation of the ridge arches 7 is the structure in the is avoided. It has already been shown that essential structural integrity, so that the full breakout in ' the new method in terms of costs very tunnel space 10 with progressive installation of the is competitive and that it can be done very elastically. As soon as the different subsoil conditions are adapted to the root piles 3 resulting pile wall is free, can. it is provided with a layer of shotcrete 13.

Nach einem weiteren Merkmal der Erfindung Danach können die Einbauten 14,15 vorgenommenAccording to a further feature of the invention, the internals 14, 15 can then be made

werden von den Seitenstollen aus vor dem Einbringen werden.will be made from the side tunnels prior to placement.

der Stahlbetonfüllung seitlich nach außen gerichtete 60 In Fällen besonderer Belastung, besonders bei Wurzelpfähle im Erdreich hergestellt, die zusätzlich starken Erschütterungen, kann oberhalb der Firstzur Aufnahme des Kämpferdruckes dienen. Bei einer bögen 7 ein Injektionsschirm 11 durch Injektionen weiteren Ausführungsform der Erfindung werden gebildet werden. In diesen Injektionsschirm können über den Firstbogen zur Verfestigung des Bodens zusätzlich Pfähle 12 eingebohrt werden, die allerdings in bekannter Weise Injektionen durchgeführt, die zur 63 vor dem Einbringen des Stahlbetons in die Seiten-Bildung einer verfestigten Schicht dienen. Ferner stollen 2 hergestellt werden müssen,
können aus den Seitenstollen vor dem Einbringen Der Injektionsschirm 11 kann auch durch eine riw Stahlbetonfüllung schräg flach oben und zum Bodenvereisung ersetzt werden.
the reinforced concrete filling laterally outwardly facing 60 In cases of particular stress, especially in the case of root piles made in the ground, the additional strong vibrations can be used above the ridge to absorb the fighting pressure. In the case of an arch 7, an injection screen 11 by injections further embodiment of the invention will be formed. In this injection screen additional piles 12 can be drilled over the ridge arch to consolidate the ground, but these injections are carried out in a known manner, which are used to form a consolidated layer before the reinforced concrete is introduced into the side. Furthermore, studs 2 must be made,
can be removed from the side tunnels before the installation. The injection screen 11 can also be replaced by a riw reinforced concrete filling at an inclined flat top and to freeze the ground.

Claims (6)

Patentansprüche:Patent claims: 1. Verfahren zum Herstellen eines Tunnels oder Stollens, insbesondere in durch Bauwerke belasteten Bodenschichten, bei dem zunächst zu beiden Seiten des Tunnels Seitenstollen aufgefahren werden, in die eine Stahlbetonfüllung eingebracht wird, worauf im Firstvortrieb die Firstbögen derart eingesetzt werden, daß sie ihren Kämpferdruck an die Betonbalken in den Seitenstollen abgeben, und anschließend der restliche Ausbruch als Vollausbruch unter den Firstbögen erfolgt, dadurch gekennzeichnet, daß nach dem Auffahren der Seitenstollen und vor (lern Einbringen der Stahlbetonfüllung in jedem der Seitenstollen von diesen aus nach unten gerichtete Wurzelpfahle im Erdreich hergestellt werden, die eine Stabwand bilden,1. A method for creating a tunnel or adit, especially in those loaded with structures Soil layers in which side tunnels were initially excavated on both sides of the tunnel into which a reinforced concrete filling is introduced, whereupon the ridge arches in the ridge drive are used in such a way that they apply their fighting pressure to the concrete beams in the side tunnels and then the rest of the excavation as a full excavation under the ridge arches takes place, characterized in that after driving up the side tunnels and before (learn to insert the reinforced concrete filling in each the side tunnel is made from these downwardly directed root piles in the ground that form a bar wall, 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß von den Seitenstollen aus vor dem Einbringen der Stahlbetonfüllung seitlich a° nach außen gerichtete Wurzelpfähle im Erdreich hergestellt werden, die zusätzlich zur Aufnahme des Kämpferdruckes dienen.2. The method according to claim 1, characterized in that from the side cleats in front the introduction of the reinforced concrete filling laterally a ° outwardly directed root piles in the ground are produced, which also serve to absorb the fighter pressure. 3. Verfahren nach Anspruch 1 oder 2, dadurch3. The method according to claim 1 or 2, characterized gekennzeichnet, daß über den Firstbögen zur Verfestigung des Bodens in bekannter Weise Injektionen durchgeführt werden, die zur Bildung einer verfestigten Schicht dienen.characterized that over the ridge arches to consolidate the soil in a known manner injections which serve to form a solidified layer. 4 Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß aus den Seitenstollen vor dem Einbringen der Stahlbetonfüllung schräg nach oben und zum gegenüberliegenden Seitenstollen gerichtete Pfähle im Erdreich hergestellt werden, die gemeinsam ein räumliches Stabwerk bilden.4 method according to any one of claims 1 to 3, characterized in that obliquely from the side tunnels before the introduction of the reinforced concrete filling piles directed upwards and towards the opposite side tunnel were made in the ground that together form a spatial framework. 5 Verfahren nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß ausgehend von den seitlichen Begrenzungsflächen des Tunnels oder Stollens Horizontalzuganker oder Honzontalpfähle eingebracht Widen, die zusammen mit den Vertikalpfählen eiü horizontalverankertes Stabwerk bilden.5 The method according to any one of claims 1 to 4, characterized in that starting from the lateral boundary surfaces of the tunnel or adit, horizontal tie rods or horizontal piles inserted widenings, which, together with the vertical piles, are horizontally anchored Form framework. 6. Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, daß die seitlichen Begrenzungsflächen des Tunnels oder Stollens mit einer Spritzbetonschicht versehen werden, die gegebenenfalls die Einbringungszonen der Zuganker verstärkt6. The method according to any one of claims 1 to 5, characterized in that the lateral boundary surfaces of the tunnel or adit should be provided with a shotcrete layer which, if necessary, forms the introduction zones of the tie rods reinforced Hierzu 1 Blatt Zeichnungen1 sheet of drawings

Family

ID=

Similar Documents

Publication Publication Date Title
DE2434200B2 (en) METHOD OF CREATING UNDERGROUND CAVITIES
DE3215153C2 (en) Retaining structure and method of manufacturing a retaining structure
DE1809326C3 (en) Method of making a tunnel or adit
DE2700594A1 (en) LAYING FOR A PIT WALL AND METHOD OF MANUFACTURING
DE102007003085B4 (en) Process for producing a sealing wall with optimized precast concrete elements
DE3443040A1 (en) METHOD FOR PRODUCING UNDERGROUND CONSTRUCTIONS BY MEANS OF DOOR STOCK LID CONSTRUCTION
DE1809326B (en) Method of making a tunnel or adit
DE3516576C2 (en)
CH539740A (en) Method of making a tunnel or adit
DE19604523A1 (en) Elevated sealing bed manufactured by high pressure injection or submerged concrete
DE2408038C3 (en) Process to reduce subsidence in the expansion of multi-part underground cavities
DE2917994B1 (en) Process for the production of a building pit lining or support wall from reinforced concrete for incisions in the terrain
DE3033715A1 (en) Pile for reinforcing sub-soil - formed of coarse aggregate and binder hardening to open-pore cellular structure
DE3209668C1 (en) Method and devices for controlling the roadway level of a roadway with roadway support system in underground operations
DE1801984B2 (en) PROCESS FOR MAKING A PILE SUPPORT
DE1801892C (en) Method for producing a pile support
EP0235299A1 (en) Building, construction raised on slopes
Filippini et al. Construction of a cavern under an autobahn embankment for the Ceneri Base Tunnel/Unterquerung eines Autobahndamms durch eine Kaverne beim Ceneri‐Basistunnel
DE867828C (en) Process for the production and installation of a permanent concrete coating, open at the top and bottom, for foundation pillars or the like.
DE3033487C2 (en) Single-layer route extension for mining and tunneling
DE1220879B (en) Underpass structure and procedure for its subsequent installation
CH720069A2 (en) Method for producing a support body anchored in a subsoil using micropiles.
AT16710U1 (en) Retaining wall element and retaining wall made of retaining wall elements
CH492835A (en) Process for the production of cesspools, caissons or shafts
DE1801140A1 (en) Process for the production of an underground cavity