DE1559083C3 - Process for the production of single or multi-storey buildings - Google Patents
Process for the production of single or multi-storey buildingsInfo
- Publication number
- DE1559083C3 DE1559083C3 DE19651559083 DE1559083A DE1559083C3 DE 1559083 C3 DE1559083 C3 DE 1559083C3 DE 19651559083 DE19651559083 DE 19651559083 DE 1559083 A DE1559083 A DE 1559083A DE 1559083 C3 DE1559083 C3 DE 1559083C3
- Authority
- DE
- Germany
- Prior art keywords
- ceiling
- supports
- building
- prefabricated
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
- E04G21/26—Strutting means for wall parts; Supports or the like, e.g. for holding in position prefabricated walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
- E04B1/3505—Extraordinary methods of construction, e.g. lift-slab, jack-block characterised by the in situ moulding of large parts of a structure
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Bridges Or Land Bridges (AREA)
Description
randoffenen Aussparungen der Fertigteilträger aufgelagert, können also von einem Fertigteilträger zum anderen quer verspannt sein. Als elastische Auflager für die Deckenplatten werden vorzugsweise Gipskartonstreifen verwendet, die in die randoffenen Aussparungen der Fertigteilträger eingelegt werden. Im Bereich der Pendelstützen können die Deckenplatten durch Fugen voneinander getrennt sein.Open-edged recesses of the prefabricated girders, so can be used from a prefabricated girder to others be braced across the board. Plasterboard strips are preferably used as elastic supports for the ceiling panels used, which are inserted into the open-edged recesses of the precast beams. in the In the area of the pendulum supports, the ceiling panels can be separated from one another by joints.
Die feste Verbindung der einzelnen Konstruktionsteile nach dem Betonieren und Erhärten einer Geschoßdecke kann durch Vergießen der Fugen und Aussparungen an den Stützenfüßen und Stützenköpfen bzw. zwischen den Fertigteilträgern und Ortbetondeckenfeldern erfolgen, wodurch die gelenkige bzw. verschiebliche Lagerung aufgehoben wird und diese biegesteif miteinander verbunden werden.The firm connection of the individual construction parts after concreting and hardening of a floor slab can be done by pouring the joints and recesses on the column feet and column heads or between the precast girders and in-situ concrete slab fields, whereby the articulated or displaceable storage is canceled and these are rigidly connected to one another.
Die Erfindung wird durch die Zeichnung an Hand eines Ausführungsbeispieles näher erläutert, und zwar zeigtThe invention is explained in more detail by the drawing using an exemplary embodiment, and although shows
F i g. 1 den Grundriß eines mehrgeschossigen Gebäudes in schematischer Darstellung,F i g. 1 the floor plan of a multi-storey building in a schematic representation,
Fig.2 einen Teilquerschnitt durch ein Geschoß nach Linie II-II der F i g. 1,2 shows a partial cross-section through a projectile according to line II-II of FIG. 1,
F i g. 3 einen der F i g. 2 entsprechenden Teillängsschnitt nach Linie III-III der F i g. 1,F i g. 3 one of the F i g. 2 corresponding partial longitudinal section along line III-III of FIG. 1,
F i g. 4 einen Horizontalschnitt durch eine der Stützen nach Linie IV-IV in F i g. 3.F i g. 4 shows a horizontal section through one of the supports along line IV-IV in FIG. 3.
In den Zeichnungen ist mit 10 ein mehrgeschossiges Gebäude bezeichnet, dessen rechteckiger Grundriß durch eine rasterartige Stützenanordnung in drei Reihen a, b, c gleich großer, rechteckiger Felder 11, 12,13, 14, 15 und 16 unterteilt ist. Jede der Stützen-Iängsreiheny4,ß, C und D weist eine Anzahl von Mittelstützen 17 und eine Anzahl von Pendelstützen 18 auf, die sowohl als Innenstützen als auch als Fassadenstützen ausgebildet sein können. Alle Stützen 17 und 18 sind Stahlbetonfertigteile und auf der darunterliegenden Geschoßdecke 19 beispielsweise mit Hilfe von Bleilagern 20 gelenkig gelagert. Sie werden durch dreibeinige, als Streben dienende Stative 21 in ihrer aufrechten Lage gehalten.In the drawings, 10 denotes a multi-storey building, the rectangular plan of which is divided into three rows a, b, c rectangular fields 11, 12, 13, 14, 15 and 16 of equal size by a grid-like column arrangement. Each of the longitudinal rows of supports y4, β, C and D has a number of central supports 17 and a number of pendulum supports 18, which can be designed both as inner supports and as facade supports. All supports 17 and 18 are precast reinforced concrete parts and are articulated on the floor slab 19 below, for example with the aid of lead bearings 20. They are held in their upright position by tripods 21 serving as struts.
Jedes Stativ 21 besteht aus einem die Stütze 17 bzw. 18 im Bereich ihres oberen Endes umfassenden Stahlkragen 22, der mit der Stütze 17 bzw. 18 verkeilt oder verschraubt ist. An dem Stahlkragen 22 greifen die Stativbeine 23 an, von denen das eine 23 a jeweils in der Flucht der Stützenreihe A, B, C und D steht, während die beiden anderen 23 b und 23 c geringfügig seitlich gespreizt an der gegenüberliegenden Seite des Stahlkragens 22 befestigt sind (F ig. 4).Each stand 21 consists of a steel collar 22 which surrounds the support 17 or 18 in the region of its upper end and which is wedged or screwed to the support 17 or 18, respectively. The tripod legs 23 engage the steel collar 22, one of which 23 a is aligned with the row of supports A, B, C and D , while the other two 23 b and 23 c are slightly spread laterally on the opposite side of the steel collar 22 are attached (Fig. 4).
Jede der Fertigteilstützen 17 ist an ihrem Kopf 27 mit einem Fertigteilträger 28 biegesteif verbunden, der sich von der Stütze 17 aus in Längsrichtung des Gebäudes nach beiden Seiten über zwei Felder 13, 14 erstreckt und mit seinen Enden 29 auf den benachbarten, als Pendelstützen wirkenden Stützen 18 frei aufliegt. Von den in Längsrichtung des Gebäudes anschließenden, auf den gleichen Pendelstützen aufliegenden, die Felder 11 und 12 bzw. 15 und 16 überspannenden Fertigteilträgern ist er durch eine Fuge 30 getrennt.Each of the precast supports 17 is rigidly connected at its head 27 to a precast support 28, which extends from the support 17 in the longitudinal direction of the building on both sides over two fields 13, 14 extends and with its ends 29 on the adjacent supports 18 acting as pendulum supports rests freely. Of the connecting in the longitudinal direction of the building, resting on the same pendulum supports, the fields 11 and 12 or 15 and 16 spanning prefabricated girders he is by a Joint 30 separated.
An der Oberseite sind die Fertigteilträger 28 mit in Längsrichtung durchlaufenden, randoffenen Aussparangen 31 versehen, die als Auflager für die Deckenplatten 32 dienen. Um den Deckenplatten 32 bei ihrem Erhärten eine ungehinderte Bewegung in ihren Auflagern zu gestatten, sind in die Aussparungen 31 Gipskartonstreifen 33 eingelegt.On the upper side are the prefabricated beams 28 with open-edged cutouts running in the longitudinal direction 31, which serve as supports for the ceiling panels 32. To the ceiling panels 32 at your Hardening to allow unimpeded movement in their supports are in the recesses 31 Plasterboard strips 33 inserted.
ίο Im Bereich der Pendelstütze 18 sind die Deckenplatten
32 durch Fugen 34 voneinander getrennt, die erst nach dem vollendeten Erhärten der Deckenplatten
vergossen werden.
Zum Tragen der Deckenschalung sind für jede der Deckenfeldreihen a, b, c zwei in Längsrichtung des
Gebäudes auf der darunterliegenden Geschoßdecke 19 verfahrbare Schalungswagen 35 vorgesehen, die
im Abstand voneinander angeordnet sind. Zwischen den beiden Schalungswagen 35 verbleibt ein genü-In the area of the pendulum support 18, the ceiling panels 32 are separated from one another by joints 34, which are only cast after the ceiling panels have completely hardened.
To support the ceiling formwork, two formwork carriages 35, which can be moved in the longitudinal direction of the building on the floor ceiling 19 below and are arranged at a distance from one another, are provided for each of the ceiling field rows a, b, c. A sufficient amount of space remains between the two formwork carriages
ao gend breiter Raum, um Notstützen 36 setzen zu können, die nach dem Erhärten des Deckenfeldbetons stehenbleiben und das Vorschieben der Schaltungswagen 35 in das nächste Deckenfeld nicht behindern. ao gend wide space in order to be able to set emergency supports 36, which after the hardening of the ceiling field concrete stop and do not hinder the advancement of the switching carriage 35 into the next ceiling field.
Das Herstellen einer jeden Geschoßdecke des mehrgeschossigen Gebäudes 10 geht auf folgende Weise vor sich:The production of each floor ceiling of the multi-storey building 10 goes on as follows Way in front of you:
Zunächst werden die die Felder 13 und 14 begrenzenden Pendelstützen 18 und die zwischen diesen
Feldern angeordneten T-förmigen Fertigteilstützen 17 samt den Fertigteilträgern 28 gesetzt, wobei die Stützen
mit Hilfe der Stative 21 in ihrer lotrechten Stellung gesichert werden. Dann werden die Schalungswagen
35 in den Feldern 13 und 14 in Stellung gebracht, so daß die Deckenplatten dieser Felder betoniert
werden können. Gleichzeitig können dann schon die den Feldern 11 und 12 sowie 15 und 16
zugeordneten Stützen 17 und 18 gesetzt werden.
Nach dem Betonieren der Deckenfelder 13 und 14 werden diese zur Schnellerhärtung einer Dampfbehandlung
unterworfen. Den hierbei auftretenden Bewegungen können die Deckenplatten ungehindert
folgen, da sie auf den Fertigteilträgern 28 verschieblich aufliegen und die Stützen 18 als Pendelstützen
ausgebildet sind.First the pendulum supports 18 delimiting the fields 13 and 14 and the T-shaped prefabricated supports 17 arranged between these fields together with the prefabricated beams 28 are set, the supports being secured in their vertical position with the aid of the tripods 21. Then the formwork carriage 35 is brought into position in the fields 13 and 14 so that the ceiling panels of these fields can be concreted. At the same time, the supports 17 and 18 assigned to fields 11 and 12 as well as 15 and 16 can then be set.
After the ceiling fields 13 and 14 have been concreted, they are subjected to a steam treatment for rapid hardening. The movements that occur here can be followed unhindered by the ceiling panels, since they rest displaceably on the prefabricated girders 28 and the supports 18 are designed as pendulum supports.
Nach genügender Erhärtung des Deckenfeldbetons wird die Schalung abgesenkt, und die Schalungswagen 35 werden in die anschließenden Felder 12 und 15 vorgefahren. Die Notstützen 36, die vor dem Betonieren der Deckenfelder gesetzt und zum Tragen der Ortbetondecken mit herangezogen wurden, bleiben jedoch stehen.After the slab field concrete has hardened sufficiently, the formwork is lowered and the formwork carriage 35 are driven into the subsequent fields 12 and 15. The emergency supports 36, which are before concreting the ceiling fields were set and used to support the in-situ concrete ceilings, remain however stand.
Nachdem dann alle Deckenfelder einer Geschoßdecke betoniert, genügend erhärtet und abgekühlt sind, werden die Bewehrungsstähle der Fertigteilträger 28 und der Deckenplatten 32 über den Pendelstützen 18 miteinander verbunden und die Fugen 30 und 34 geschlossen. Ferner wird die gelenkige Lagerung der Stützen 17 und 18 am Fuß durch Vergießen der Lagerspalten aufgehoben.After all the ceiling fields of a storey ceiling have been concreted, sufficiently hardened and cooled down are, the reinforcing steel of the precast girders 28 and the ceiling slabs 32 over the pendulum supports 18 connected to one another and the joints 30 and 34 closed. Furthermore, the articulated storage the supports 17 and 18 lifted at the foot by potting the bearing gaps.
Hierzu 1 Blatt Zeichnungen1 sheet of drawings
Claims (7)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEST024586 | 1965-11-03 |
Publications (3)
Publication Number | Publication Date |
---|---|
DE1559083A1 DE1559083A1 (en) | 1969-09-11 |
DE1559083B2 DE1559083B2 (en) | 1973-12-13 |
DE1559083C3 true DE1559083C3 (en) | 1974-07-18 |
Family
ID=7460190
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19651559083 Expired DE1559083C3 (en) | 1965-11-03 | 1965-11-03 | Process for the production of single or multi-storey buildings |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE1559083C3 (en) |
-
1965
- 1965-11-03 DE DE19651559083 patent/DE1559083C3/en not_active Expired
Also Published As
Publication number | Publication date |
---|---|
DE1559083B2 (en) | 1973-12-13 |
DE1559083A1 (en) | 1969-09-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE1759915B2 (en) | METHOD OF MANUFACTURING ROOM BOXES FOR FABRIC HOUSES | |
DE3140287A1 (en) | Device for producing concrete walls of storey height | |
DE2247609B1 (en) | PROCESS FOR CREATING A BRIDGE STRUCTURE FROM PRE-STRENGTHENED CONCRETE IN SECTIONAL FREE FRONT-FRAME | |
DE1559083C3 (en) | Process for the production of single or multi-storey buildings | |
DE836707C (en) | Construction process for the construction of halls and workshops, etc. Like. Made of reinforced concrete | |
DE1559082C (en) | Process for the production of single or multi-storey buildings | |
DE1220990B (en) | Method for creating wall fractures | |
DE820068C (en) | Process for the production of monolithic masonry between removable formwork and formwork supports for this purpose | |
DE1807257A1 (en) | Formwork scaffolding | |
DE1295580C2 (en) | SCAFFOLDING FOR THE SECTION OF THE SUPERSTRUCTURE OF BRIDGES, HOCHSTRASSEN O.DGL. MADE OF REINFORCED CONCRETE OR STRENGTHENED CONCRETE | |
DE571338C (en) | Process for the manufacture of reinforced concrete poles | |
DE1182411B (en) | Method and device for erecting multi-storey buildings with basements | |
DE1257818B (en) | Process for the segmental production of bridge structures or the like elongated structures made of in-situ concrete and precast concrete component for carrying out the process | |
DE2436088A1 (en) | Tunnel or other hollow space movable formwork - comprising height-adjustable ceiling form on movable substructure, hinged to side forms | |
DE911068C (en) | Concrete ceiling made of factory-made reinforced concrete beams and concrete slabs, laid without formwork | |
DE734490C (en) | Casting mold for the production of concrete or reinforced concrete ceilings | |
DE2148882C3 (en) | Building with prefabricated components | |
AT218708B (en) | Procedure for erecting a structure and building gauges for carrying out the procedure | |
DE3505592A1 (en) | Shuttering for structures which are rotationally symmetrical, in particular cylindrical and conical, e.g. tapering slightly upwards | |
AT249105B (en) | Process for the production of high viaducts from reinforced concrete, in particular from prestressed concrete | |
DE1559082B (en) | Process for the production of single or multi-storey buildings | |
DE2037360A1 (en) | Large area formwork and method for its formwork | |
AT327507B (en) | SUPPORTING FRAMEWORK, PREFERABLY FOR SLIDING FORMWORK FOR EXECUTION FROM UP TO REINVENTING BUILDING STRUCTURES | |
DE2331225A1 (en) | Concreting form with storey high uprights - together with vertical plates resting on inside surfaces | |
DE1684537A1 (en) | Process for the production of concrete structures, in particular reinforced bridges, equipment for its application and bridges created according to it |