DE10242574A1 - Method for cutting a tunnel and erecting an overhead railway has the supports for the railway track attached to reinforcing and embedded in the sprayed concrete lining of the tunnel - Google Patents
Method for cutting a tunnel and erecting an overhead railway has the supports for the railway track attached to reinforcing and embedded in the sprayed concrete lining of the tunnel Download PDFInfo
- Publication number
- DE10242574A1 DE10242574A1 DE2002142574 DE10242574A DE10242574A1 DE 10242574 A1 DE10242574 A1 DE 10242574A1 DE 2002142574 DE2002142574 DE 2002142574 DE 10242574 A DE10242574 A DE 10242574A DE 10242574 A1 DE10242574 A1 DE 10242574A1
- Authority
- DE
- Germany
- Prior art keywords
- tunnel
- monorail
- reinforcement
- suspension device
- overhead conveyor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 239000011378 shotcrete Substances 0.000 title claims abstract description 40
- 238000000034 method Methods 0.000 title claims abstract description 15
- 230000003014 reinforcing effect Effects 0.000 title abstract 2
- 239000000463 material Substances 0.000 claims abstract description 19
- 239000000725 suspension Substances 0.000 claims description 44
- 230000002787 reinforcement Effects 0.000 claims description 32
- 239000011435 rock Substances 0.000 claims description 20
- 239000004567 concrete Substances 0.000 claims description 13
- 230000005641 tunneling Effects 0.000 claims description 9
- 238000009826 distribution Methods 0.000 claims description 8
- 238000010276 construction Methods 0.000 claims description 7
- 238000004519 manufacturing process Methods 0.000 claims description 6
- 238000005259 measurement Methods 0.000 claims description 4
- 238000003801 milling Methods 0.000 claims description 4
- 238000002347 injection Methods 0.000 claims 1
- 239000007924 injection Substances 0.000 claims 1
- 238000010079 rubber tapping Methods 0.000 claims 1
- 238000004873 anchoring Methods 0.000 abstract description 2
- 239000002699 waste material Substances 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 230000005611 electricity Effects 0.000 description 2
- 239000010802 sludge Substances 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 229910000746 Structural steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 230000003749 cleanliness Effects 0.000 description 1
- 230000002996 emotional effect Effects 0.000 description 1
- 239000011798 excavation material Substances 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61B—RAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
- B61B3/00—Elevated railway systems with suspended vehicles
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
- E21F17/02—Suspension devices for tubes or the like, e.g. for ventilating ducts
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Die vorliegende Erfindung betrifft ein Verfahren zum Herstellen eines Tunnels, wobei der Tunnel aus dem umgebenden Gestein herausgearbeitet und der dabei entstehende Abraum und/oder in dem Tunnel benötigtes Material mit Hilfe einer Hängebahn in dem Tunnel transportiert wird, wobei als Außenschale des Tunnels eine Bewehrung mit Beton umspritzt wird sowie eine Hängebahn für den Ausbau eines Tunnels.The present invention relates to a method of making a tunnel, the tunnel being made of worked out the surrounding rock and the resulting Overburden and / or material required in the tunnel with the help of a Monorail System is transported in the tunnel, one being the outer shell of the tunnel Reinforcement is encapsulated with concrete, as well as a monorail for the expansion of a tunnel.
Aus der
Aufgabe der vorliegenden Erfindung ist es somit die genannten Nachteile zu beheben und bei der Herstellung eines Tunnels eine feste und zuverlässige Aufhängung einer Hängebahn zu schaffen um einen schnellen und kostengünstigen Tunnelbau zu ermöglichen.Object of the present invention it is thus to eliminate the disadvantages mentioned and in the manufacture of a tunnel a solid and reliable suspension of a monorail to create a fast and inexpensive tunnel construction.
Die Aufgabe wird gelöst durch ein Verfahren und eine Hängebahn mit den Merkmalen der unabhängigen Patentansprüche.The task is solved by a process and a monorail with the characteristics of independent Claims.
Bei dem erfindungsgemäßen Verfahren zum Herstellen eines Tunnels wird der Tunnel aus dem umgebenden Gestein herausgearbeitet und der dabei entstehende Abraum und/oder in dem Tunnel benötigtes Material mit Hilfe einer Hängebahn in dem Tunnel gefördert. Die Tunnelaußenschale besteht aus bewehrtem Spritzbeton. Mit dem Ausbau des Tunnels wird an der Tunneldecke eine Aufhängevorrichtung für eine Tragschiene der Hängebahn mit eingespritzt. Die Aufhängevorrichtung, welche teilweise aus der Spritzbetonschicht herausragt, dient der schnellen und einfachen Befestigung der Tragschiene der Hängebahn.In the method according to the invention to create a tunnel, the tunnel is made from the surrounding one Rock worked out and the resulting overburden and / or needed in the tunnel Material using a monorail promoted in the tunnel. The tunnel outer shell consists of reinforced shotcrete. With the expansion of the tunnel a hanging device on the tunnel ceiling for one Monorail support rail injected with. The hanging device, which partially protrudes from the shotcrete layer is used for quick and easy attachment of the monorail support rail.
Besonders vorteilhaft ist es, wenn die Aufhängevorrichtung zwischen der Tunnelwand bzw. dem Gestein und der Bewehrung, insbesondere einer hinteren Lage der Bewehrung eingebaut und anschließend mit Beton umspritzt wird. Die Bewehrung dient in diesem Fall der zusätzlichen Befestigung der Aufhängevorrichtung.It is particularly advantageous if the hanger between the tunnel wall or the rock and the reinforcement, in particular a rear layer of the reinforcement and then with Concrete is encapsulated. In this case, the reinforcement serves as additional Attachment of the hanging device.
Die Aufhängevorrichtung besteht beispielsweise aus einer Platte mit aufgeschweißtem Gewindebolzen der Größe M27. Die Platte wird vor dem Spritzen in der Firste fixiert, so daß sie hinter der Bewehrungslage, vorzugsweise hinter der hinteren, bergseitigen Bewehrungslage befestigt wird und der Gewindebolzen ca. 15 cm aus dem fertigen Spritzbeton herausragt.The suspension device is, for example from a plate with welded-on threaded bolts of size M27. Before spraying, the plate is fixed in the roof so that it is behind the reinforcement layer, preferably behind the rear, mountain side Reinforcement layer is attached and the threaded bolt approx. 15 cm protrudes the finished shotcrete.
Wird die Aufhängevorrichtung vor dem Umspritzen der Bewehrung mit der Bewehrung verbunden, so wird in besonders vorteilhafter Weise eine Fixierung der Aufhängevorrichtung vor dem Umspritzen mit Beton erhalten. Die Aufhängevorrichtung kann hierdurch sehr genau ausgerichtet werden und somit eine schnelle und geradlinige Verlegung der Schienen ermöglichen.Will the hanger before overmolding the reinforcement is connected to the reinforcement, so in particular advantageously a fixation of the suspension device before overmolding preserved with concrete. The hanger can hereby be aligned very precisely and thus a quick one and enable straight laying of the rails.
Zum Ausrichten der Aufhängevorrichtung vor dem Umspritzen mit Beton ist es vorteilhaft, wenn die Anordnung der Aufhängevorrichtung mittels Laservermessung festgelegt wird. Der geradlinige Verlauf der Schiene wird somit ermöglicht, ohne daß aufwendige Ausgleichsvorrichtungen erforderlich sind. Die Einmessung erfolgt vorteilhafterweise mittels Richtlaser und Stichmaß bzw. direkt mittels Motorlaser. Der Rasterabstand von z. B. 1,20 m wird mit Schablone erreicht. An dem Gewindebolzen werden später mittels Schäkeln die Gabelstücke zur Aufnahme der Normschienen befestigt. Auf einfache Weise ist ein exaktes Verlegen der Befestigungselemente möglich.For aligning the hanging device before overmolding with concrete, it is advantageous if the arrangement the hanging device is determined by means of laser measurement. The straight course of the Rail is thus enabled without elaborate Compensators are required. The measurement takes place advantageously using a directional laser and gauge or directly using a motor laser. The grid spacing of z. B. 1.20 m with Stencil reached. The threaded bolt will be used later on shackles the fork pieces attached to accommodate the standard rails. It's simple an exact laying of the fasteners possible.
Der Einbau der eingespritzten Befestigungselemente wie auch später der Schäkel, Gabelstücke und Schienen bzw. Stromschienen wird sukzessive von der Plattform der Vortriebsfräse bzw. des Vortriebsgerätes aus vorgenommen, d.h. ohne zusätzlichen baulichen Aufwand.Installation of the injected fasteners as well as later the shackle, Fork pieces and The platform of the tunneling router or the tunneling device made from, i.e. without additional construction effort.
Um die Herstellung des Tunnels möglichst emissionsarm durchführen zu können, ist es vorteilhaft die Hängebahn mit einem Elektroantrieb zu betreiben.To make the tunnel as low-emission as possible carry out to be able it is advantageous the overhead conveyor to operate with an electric drive.
Besonders vorteilhaft ist eine Hängebahn, welche nicht die eigene Stromversorgung, beispielsweise in Form von Batterien, mit sich führt, sondern an der Tragschiene Stromabnehmer für das Fahrzeug der Hängebahn angeordnet werden. Über die Stromabnehmer wird dem Fahrzeug Strom zugeführt. Das Fahrzeug ist somit unabhängig vom Ladezustand von Batterien und kann dauerhaft eingesetzt werden.A monorail is particularly advantageous not your own power supply, for example in the form of batteries, carries with it but pantographs for the overhead conveyor vehicle on the mounting rail to be ordered. about the pantograph is supplied to the vehicle with electricity. The vehicle is thus independently on the state of charge of batteries and can be used permanently.
Besonders vorteilhaft ist es, wenn gleichzeitig mit dem Tunnelvortrieb die Sauberkeitsschicht und Sohle der Innenschale ausgebaut wird. Hierdurch ist ein deutlich schnelleres Herstellen des Tunnels ermöglicht. Während bei der herkömmlichen Bauweise erst der Tunnel fertiggegraben werden mußte und das Abraummaterial mittels auf der Tunnelsohle fahrender Fahrzeuge aus dem Tunnel befördert wurde, ist mit der Verwendung einer Hängebahn die Tunnelsohle frei und kann unabhängig von dem weiteren Tunnelvortrieb bereits ausgebaut werden. Dadurch wird ein Zerfahren der Tunnelsohle vermieden, d.h. wenig Schlammbildung und damit kaum Schlammentsorgung und kein aufwendiges ständiges Herrichten der Fahrsohle durch z.B. Schroppen ist erforderlich.It is particularly advantageous if the cleanliness layer and the sole of the inner shell are removed at the same time as the tunnel is being driven. This enables the tunnel to be built much faster. While in the conventional design the tunnel first had to be dug and the excavation material was transported out of the tunnel by vehicles traveling on the tunnel sole, the use of a monorail is possible the tunnel floor is free and can be expanded independently of the further tunneling. This avoids tearing of the tunnel floor, ie little sludge formation and thus hardly any sludge disposal and no time-consuming constant preparation of the soleplate by, for example, cropping is required.
Neben der Entsorgung des Abraummaterials kann auch eine Materialversorgung für den Tunnelvortrieb mittels der Hängebahn erfolgen. Werkzeuge oder Baumaterialien, wie beispielsweise die als Bewehrung eingebauten Baustahlmatten, können mittels der Hängebahn an die entsprechende Stelle transportiert werden. Dies ist insbesondere dadurch möglich, daß die Hängebahn bis unmittelbar zu der Stelle des Tunnelvortriebs gebaut wird. Sobald die Spritzbetonschicht fest ist, kann die Hängebahnschiene um ein Stück weitergebaut werden und damit die Versorgung des Tunnelendes sicherstellen.In addition to the disposal of the waste material also a material supply for tunneling by means of the monorail respectively. Tools or building materials, such as those Reinforced structural steel mats can be attached using the overhead conveyor be transported to the appropriate place. This is particularly so thereby possible that the Monorail System up to the point of tunneling. As soon as the shotcrete layer is solid, the monorail track can be built a little further and thus ensure the supply of the tunnel end.
Um den Abtransport des Abraummaterials schnell durchführen zu können, wird das Abraummaterial insbesondere über ein Förderband der Fräse oder über Beladung durch einen Bagger in einen Transportbehälter geschüttet, wenn dieser voll ist von der Hängebahn aufgenommen oder aufgezogen und an einer Deponie schnell durch Öffnen des Behälters entladen werden.To remove the waste material quickly carry out to be able the waste material is in particular on a conveyor belt of the milling machine or via loading poured into a transport container by an excavator when it is full from the monorail picked up or raised and quickly at a landfill by opening the Unload the container become.
Der Transportbehälter kann entweder so ausgeführt sein, daß er von einem weiteren Transportgerät aufgenommen und weiterbefördert werden kann, oder er wird in einer vorteilhaften Ausführung der Erfindung an der Entsorgungsstelle entleert und erneut an die Abraumstelle gebracht. Hierdurch ist keine Übergabe von Transportbehältern an das Hängebahnfahrzeug erforderlich. Die Transportaufgabe des Hängebahnfahrzeuges kann hierdurch schnell und zügig erfolgen.The transport container can either be designed that he from another transport device recorded and carried on can be, or it is in an advantageous embodiment of the Invention emptied at the disposal point and again to the overburden brought. This is not a handover of transport containers to the monorail vehicle required. This enables the monorail vehicle to be transported quickly and quickly respectively.
Wird die Hängebahn mit dem Baufortschritt des Tunnels weitergebaut, so ist eine Ver- und Entsorgung des kompletten Tunnels mittels der Hängebahn möglich. Dies ist insbesondere dadurch möglich, daß durch die Aufhängevorrichtung, welche unmittelbar nach Erhärten des Spritzbetons zur Verfügung steht, die Hängebahn bis an die vorderste Stelle des Tunnels kontinuierlich weitergebaut werden kann.Is the monorail with the construction progress of the Tunnels continued to be a supply and disposal of the complete Tunnels using the monorail possible. This is possible in particular by that by the hanging device, which immediately after hardening of shotcrete is available stands, the monorail Continuously built to the front of the tunnel can be.
Die Hängebahn wird insbesondere zur Ver- und Entsorgung während des Tunnelausbaus benötigt. Nach dem Ausbau des Tunnels kann die Hängebahn abgebaut und die Aufhängevorrichtung im wesentlichen bündig mit der Spritzbetonschicht abgetrennt werden. Wird über die Spritzbetonschicht eine weitere Schale angeordnet, so kann die komplette oder abgetrennte Aufhängevorrichtung hinter oder in dieser Schale verdeckt werden.The monorail is especially used for Supply and disposal during of tunnel expansion needed. After the tunnel has been expanded, the monorail and the suspension device can be dismantled essentially flush be separated with the shotcrete layer. Will over the Shotcrete layer arranged another shell, so the complete or separate hanging device hidden behind or in this bowl.
Eine erfindungsgemäße Hängebahn für den Ausbau eines Tunnels weist eine Fahrschiene und eine Aufhängevorrichtung zur Befestigung der Fahrschiene auf. Der Tunnel ist aus dem Gestein herausgearbeitet und der dabei entstehende Abraum und/oder in dem Tunnel benötigtes Material wird mit Hilfe der Hängebahn in dem Tunnel transportiert. An der Tunnelwand ist eine Bewehrung angeordnet, welche mit Beton umspritzt ist. Zur Befestigung der Aufhängevorrichtung wird diese in besonders vorteilhafter Weise in der Firste zumindest teilweise mit Beton umspritzt. Die Aufhängevorrichtung wird hierdurch zusammen mit dem Bau einer Betonschale, insbesondere der Außenschale des Tunnels in dem Tunnel angeordnet und befestigt. Durch die Integration der Aufhängevorrichtung in der Spritzbetonschicht des Tunnels wird eine vorherbestimmbare Tragkraft der Aufhängevorrichtung erzielt. Unabhängig von der Festigkeit des Gesteins, aus welchem der Tunnel herausgearbeitet wurde, hängt die Tragkraft der Aufhängevorrichtung und damit der Hängebahn von der Festigkeit der Spritzbetonschicht ab. Durch das Umspritzen der Aufhängevorrichtung mit dem Spritzbeton wird eine sehr schnelle Befestigung der Aufhängevorrichtung erzielt. Sie ist darüber hinaus unmittelbar nach dem Abbinden des Spritzbetons belastbar.A monorail according to the invention for the expansion of a tunnel has a running rail and a suspension device for fastening the travel rail on. The tunnel is made of rock worked out and the resulting spoil and / or in the Tunnel needed Material is made using the overhead conveyor transported in the tunnel. There is reinforcement on the tunnel wall arranged, which is encapsulated with concrete. To attach the suspension this is at least in a particularly advantageous manner in the roof partially overmoulded with concrete. This will hang up the hanger with the construction of a concrete shell, especially the outer shell of the tunnel arranged and fastened in the tunnel. Through integration the hanging device in the shotcrete layer of the tunnel there is a predeterminable one Load capacity of the suspension device achieved. Independently the strength of the rock from which the tunnel is worked was hanging the load capacity of the suspension device and thus the monorail on the strength of the shotcrete layer. By overmolding the hanging device with the shotcrete, the suspension device is fastened very quickly achieved. It is above resilient immediately after setting the shotcrete.
Vorteilhafterweise ist die Aufhängevorrichtung an der Tunneldecke (Firste) befestigt. Hierdurch wird das Abhängen der Fahrschiene von der Tunneldekke aus ermöglicht. DieBelastbarkeit der Aufhängevorrichtung ist hierbei sehr hoch.The suspension device is advantageous attached to the tunnel ceiling (roof). This will make the hanging out Carriage rail made possible from the tunnel roof. The resilience of suspension is very high here.
Um die Belastbarkeit der Aufhängevorrichtung zusätzlich zu steigern, ist in einer besonders vorteilhaften Ausführung die Aufhängevorrichtung zwischen dem Gestein der Tunnelwand und der Bewehrung, insbesondere einer hinteren Lage der Bewehrung eingebaut. Durch die Anordnung der Aufhängevorrichtung hinter der Bewehrung wird die Festigkeit der Aufhängevorrichtung außer durch den Spritzbeton auch zusätzlich durch die Bewehrung herbeigeführt. Die Bewehrung trägt somit zur Tragfähigkeit der Aufhängevorrichtung bei.The resilience of the suspension device additionally to increase, is in a particularly advantageous embodiment Hanger between the rock of the tunnel wall and the reinforcement, especially one installed in the rear layer of the reinforcement. By arranging the hanging device behind the reinforcement is the strength of the suspension device except through the shotcrete also brought about by the reinforcement. The reinforcement carries thus to the load-bearing capacity the hanging device at.
Um eine noch höhere Festigkeit der Aufhängevorrichtung zu erhalten, ist an der Aufhängevorrichtung eine Platte angeordnet, welche in den Spritzbeton, insbesondere hinter der hinteren Lage der Bewehrung eingegossen ist. Die Platte ist einfach herstellbar und mit der Aufhängevorrichtung verbindbar und sorgt für einen formschlüssigen Halt der Aufhängevorrichtung in der Spritzbetonschicht.For an even higher strength of the suspension device to get is on the hanger a plate arranged in the shotcrete, in particular is cast in behind the rear layer of the reinforcement. The plate is easy to manufacture and can be connected to the hanging device and ensures a positive one Stop the hanger in the shotcrete layer.
Ist die Platte zwischen der Bewehrung und dem Gestein, insbesondere in Nähe des Gesteins angeordnet, so trägt weitgehend die gesamte Spritzbetonschicht und die Bewehrung die Aufhängevorrichtung. Dies ist besonders vorteilhaft für die erfindungsgemäße Hängebahn, da hierdurch zuverlässig große Lasten transportiert werden können.Is the slab between the reinforcement and the rock, especially in the vicinity of the rock, so carries largely the entire shotcrete layer and the reinforcement Suspension. This is particularly beneficial for the monorail according to the invention, because this reliably means large loads can be transported.
Eine besonders einfache Aufhängevorrichtung wird geschaffen, wenn die Aufhängevorrichtung ein Gewindebolzen ist. An dem Gewindebolzen kann die Fahrschiene sehr einfach in der Höhe ausgerichtet werden und somit einen geradlinigen Verlauf der Fahrschiene der Hängebahn gewährleisten.A particularly simple hanging device is created when the hanger is a Is threaded bolt. The track can do a lot on the threaded bolt simply in height be aligned and thus a straight line of the track the monorail guarantee.
Um zu verhindern, daß der Gewindebolzen bei der Befestigung der Hängebahn von der Verankerungsplatte gelöst wird, sind die Platte und der Gewindebolzen verdrehsicher miteinander befestigt. Diese Verdrehsicherung kann beispielsweise durch Verschweißen oder Verschraubung mit Kontermuttern erfolgen.To prevent the threaded bolt from attaching to the overhead conveyor is loosened, the plate and the threaded bolt are secured against rotation. This protection against rotation can be done, for example, by welding or screwing with lock nuts.
Um eine hohe Tragfähigkeit der Hängebahn zu erzielen, hat es sich als vorteilhaft herausgestellt, wenn die Spritzbetonschicht im Bereich der Aufhängevorrichtung mindestens 25 cm dick und 50 – 100 cm breit ist. Hierdurch wird ein Betonband geschaffen, welches eine ausreichende Tragfähigkeit für den Transport von Abraummaterial schafft.To ensure a high load-bearing capacity the monorail too achieve, it has proven to be advantageous if the shotcrete layer in the area of the suspension device at least 25 cm thick and 50 - 100 cm is wide. This creates a concrete belt, which a sufficient load-bearing capacity for the transport of waste material creates.
Sind die Aufhängevorrichtungen entlang der Fahrschiene in regelmäßigen Abständen, vorzugsweise etwa 1 – 1,5 Meter, insbesondere alle 1,20 Meter angeordnet, so wird auch hierdurch eine hohe Tragfähigkeit der Schiene erhalten.Are the suspension devices along the running rail at regular intervals, preferably about 1 - 1.5 Meters, in particular every 1.20 meters, this will also result a high load-bearing capacity get the rail.
Ebenfalls zur Erhöhung der Tragfähigkeit dient eine Lastverteilungsschwinge, welche über jeweils ein Gabelstück mit jeweils einer Aufhängevorrichtung verbunden ist. Die Lasteinleitung erfolgt hierdurch stets in zwei Aufhängevorrichtungen gleichzeitig, wodurch eine im wesentlichen doppelte Tragfähigkeit der Fahrschiene erreicht wird.Also serves to increase the load capacity a load distribution swing arm, each with a fork piece a hanging device connected is. As a result, the load is always introduced in two Hangers at the same time, thereby achieving an essentially double load capacity of the running rail becomes.
Eine besonders einfach Verbindung wird erhalten, wenn das Gabelstück und die Lastverteilerschwinge einfach mittels eines Schäkels verbunden sind.A particularly easy connection is obtained when the fork piece and the load distribution rocker are simply connected by means of a shackle.
Um einen emissionsfreien Transport in dem Tunnel zu erreichen, ist es besonders vorteilhaft, wenn das Fahrzeug eine elektrisch betriebene Hängebahn ist. Im Gegensatz zu Dieselfahrzeugen ist die Entlüftung des Tunnels wesentlich weniger aufwendig durchführbar, die Herstellung des Tunnels kann somit kostengünstiger erfolgen.For emission-free transport to reach in the tunnel, it is particularly advantageous if that Vehicle is an electrically operated overhead conveyor. In contrast to Diesel vehicles is the vent of the tunnel much less expensive to carry out, the manufacture of the Tunnels can thus be less expensive respectively.
Zur Stromversorgung des Fahrzeuges ist es vorteilhaft, wenn an der Fahrschiene Stromschienen angeordnet sind. Das Fahrzeug wird somit nicht batteriebetrieben sondern über die Stromschienen mit Strom versorgt. Hierdurch ist ein kontinuierlicher Betrieb des Fahrzeuges möglich. Ladezeiten oder Batteriewechsel werden hierdurch vermieden.To power the vehicle it is advantageous if busbars are arranged on the running rail are. The vehicle is therefore not battery operated but via the Busbars powered. This is a continuous one Operation of the vehicle possible. This avoids charging times or changing batteries.
Zum Abtransport des Abraums ist an der Hängebahn ein Behälter zur Aufnahme des Abraummaterials angeordnet. Der Ausbau des Tunnels ist mit einer so ausgestatteten Hängebahn sehr schnell abtransportierbar.To remove the overburden is on the monorail a container arranged for receiving the clearing material. The expansion of the tunnel can be removed very quickly with a monorail equipped in this way.
Der Behälter ist vorzugsweise mit einem beweglichen Zugmittel, insbesondere einer Kette oder einem Seil in bezug auf das Fahrzeug vertikal bewegbar. Das Zugmittel wird dabei beispielsweise auf eine Winde aufgerollt oder abgerollt, wodurch der Behälter auf dem Boden oder einer Entladestation absetzbar ist. Nach dem Befüllen oder Entleeren des Behälters wird dieser wieder in die Nähe des Hängebahnfahrzeuges bewegt, um mögliche Arbeiten an der Tunnelsohle nicht zu behindern. Durch den Überkopfbetrieb der Hängebahn wird bei dem Ausbau des Tunnels der besondere Vorteil erzielt, daß sehr schnell gearbeitet werden kann, da sowohl der Tunnelvortrieb als auch der Ausbau des Tunnels gleichzeitig erfolgen kann. Außerdem ist die Unfallgefahr durch den Transport des Abraummaterials aus dem Tunnel deutlich verringert, da der Transport über Kopf erfolgt.The container is preferably with a movable traction means, in particular a chain or a rope vertically movable with respect to the vehicle. The traction device is thereby rolled up or unrolled on a winch, for example the container can be placed on the floor or an unloading station. After this fill or emptying the container it will be close again of the monorail vehicle moved to possible Do not hinder work on the tunnel floor. Through overhead operation the monorail the special advantage is achieved in the expansion of the tunnel that very quickly can be worked because both the tunneling and the Expansion of the tunnel can be done simultaneously. Besides, is the risk of accidents due to the removal of the clearing material from the tunnel significantly reduced because the transport takes place overhead.
In einer besonders vorteilhaften Ausgestaltung der Erfindung ist der Behälter insbesondere mittels vier Zugketten über Traglastrahmen unabhängig vom Elektroantrieb des Fahrzeuges hydraulisch vertikal beweglich und entleert damit auch den Behälter.In a particularly advantageous Embodiment of the invention is the container in particular by means of four Pull chains over Load frame regardless of Electric drive of the vehicle hydraulically movable and vertically also empties the container.
Zum Entleeren des Behälters weist der Behälter Klappen auf. Diese Klappen werden beispielsweise ähnlich einer Baggerschaufel auseinander geschwenkt und entleeren hierdurch den Behälter von dem Abraummaterial.Points to empty the container the container Open up. For example, these flaps become similar to one Excavator bucket pivoted apart and thereby empty the container of the clearing material.
Vorzugsweise werden die Klappen an einer Entladestation der Hängebahn betätigt. Die Entladestation kann beispielsweise in einer Höhe angeordnet sein, welche es erlaubt, daß ein Ladefahrzeug unter der Entladestation positioniert wird, in welches das Abraummaterial gefüllt wird. Das Ladefahrzeug kann schließlich das Material aus dem Tunnel weiter entfernen.The flaps are preferably on an unloading station of the monorail actuated. The unloading station can be arranged at a height, for example be, which allows a Charging vehicle is positioned under the unloading station, in which the Filling material filled becomes. Finally, the loading vehicle can remove the material from the Remove the tunnel further.
Weitere Vorteile der Erfindung sind in den nachfolgenden Ausführungsbeispiel beschrieben. Es zeigt:Further advantages of the invention are in the following embodiment described. It shows:
In
Die Aufhängevorrichtung
Bei dem Ausführungsbeispiel der
An der Lastverteilerschwinge
Der Gewindebolzen
An den Schienen
Das Fahrzeug
Das Fahrzeug
Das Befüllen des Behälters
Entsprechend dem Baufortschritt des
Tunnels
Dadurch, daß der Abtransport des Abraummaterials
durch die Hängebahn
In
Um zu vermeiden, daß die Schicht
aus Spritzbeton
Die Aufhängevorrichtung
Zur besseren Verankerung des Gewindebolzens
Die Platte
Die vorliegende Erfindung ist nicht
auf die dargestellten Ausführungen
beschränkt.
Insbesondere andere Gestaltungen der Aufhängevorrichtung fallen im Rahmen
der Schutzansprüche
ebenfalls unter die vorliegende Erfindung. Die Befestigungsvorrichtung
Claims (30)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE2002142574 DE10242574A1 (en) | 2002-09-11 | 2002-09-11 | Method for cutting a tunnel and erecting an overhead railway has the supports for the railway track attached to reinforcing and embedded in the sprayed concrete lining of the tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE2002142574 DE10242574A1 (en) | 2002-09-11 | 2002-09-11 | Method for cutting a tunnel and erecting an overhead railway has the supports for the railway track attached to reinforcing and embedded in the sprayed concrete lining of the tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
DE10242574A1 true DE10242574A1 (en) | 2004-03-18 |
Family
ID=31724728
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE2002142574 Withdrawn DE10242574A1 (en) | 2002-09-11 | 2002-09-11 | Method for cutting a tunnel and erecting an overhead railway has the supports for the railway track attached to reinforcing and embedded in the sprayed concrete lining of the tunnel |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE10242574A1 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2728112A2 (en) | 2012-10-30 | 2014-05-07 | Herrenknecht Aktiengesellschaft | Device for the transfer of loads during tunnel construction |
CN108194106A (en) * | 2018-02-26 | 2018-06-22 | 龚岗 | Tunnel bolt-spary supports concrete trolley mobile pouring forms and construction technology |
DE102017121603A1 (en) | 2017-09-18 | 2019-03-21 | Smt Scharf Ag | Conveying and transport system for tunnel structures |
DE102018107599A1 (en) * | 2018-03-29 | 2019-10-02 | Gazmend Bukoshi | transport system |
CN111594226A (en) * | 2020-05-11 | 2020-08-28 | 中国一冶集团有限公司 | Movable spraying device for tunnel secondary lining concrete and spraying method thereof |
CN113090328A (en) * | 2021-04-09 | 2021-07-09 | 中铁三局集团有限公司 | Positioning device for pre-buried channel of contact net |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3819644A1 (en) * | 1988-06-09 | 1989-12-14 | Becker Walter Gmbh | WORKING MACHINE HOLDED BY A VEHICLE FOR EARTH WORKING, ESPECIALLY BUCKET LOADER |
DE19941451A1 (en) * | 1999-08-31 | 2001-03-29 | Werner P Berwald | Shackle for connecting to end links of stay chain used in mining and tunnelling has locking section fitted to head of bolt which has tensioning and retaining beads linked to mounting unit by ridge |
-
2002
- 2002-09-11 DE DE2002142574 patent/DE10242574A1/en not_active Withdrawn
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3819644A1 (en) * | 1988-06-09 | 1989-12-14 | Becker Walter Gmbh | WORKING MACHINE HOLDED BY A VEHICLE FOR EARTH WORKING, ESPECIALLY BUCKET LOADER |
DE19941451A1 (en) * | 1999-08-31 | 2001-03-29 | Werner P Berwald | Shackle for connecting to end links of stay chain used in mining and tunnelling has locking section fitted to head of bolt which has tensioning and retaining beads linked to mounting unit by ridge |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2728112A2 (en) | 2012-10-30 | 2014-05-07 | Herrenknecht Aktiengesellschaft | Device for the transfer of loads during tunnel construction |
DE102012219815A1 (en) | 2012-10-30 | 2014-06-12 | Herrenknecht Ag | Device for conveying cargo during tunneling |
DE102017121603A1 (en) | 2017-09-18 | 2019-03-21 | Smt Scharf Ag | Conveying and transport system for tunnel structures |
WO2019052594A1 (en) | 2017-09-18 | 2019-03-21 | Smt Scharf Ag | Conveying and transport system for tunnel constructions |
CN108194106A (en) * | 2018-02-26 | 2018-06-22 | 龚岗 | Tunnel bolt-spary supports concrete trolley mobile pouring forms and construction technology |
CN108194106B (en) * | 2018-02-26 | 2019-09-03 | 龚岗 | The mobile pouring construction technique of tunnel bolt-spary supports concrete trolley |
DE102018107599A1 (en) * | 2018-03-29 | 2019-10-02 | Gazmend Bukoshi | transport system |
DE102018107599B4 (en) | 2018-03-29 | 2023-07-27 | Gazmend Bukoshi | transport system |
CN111594226A (en) * | 2020-05-11 | 2020-08-28 | 中国一冶集团有限公司 | Movable spraying device for tunnel secondary lining concrete and spraying method thereof |
CN113090328A (en) * | 2021-04-09 | 2021-07-09 | 中铁三局集团有限公司 | Positioning device for pre-buried channel of contact net |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1964973B1 (en) | Method for manufacturing a supply line channel and train consisting of vehicles for executing the method | |
EP2709892B1 (en) | Railway work vehicle | |
DE2511416A1 (en) | METHODS AND EQUIPMENT FOR SUBMOTOR DISASSEMBLY | |
DE10242574A1 (en) | Method for cutting a tunnel and erecting an overhead railway has the supports for the railway track attached to reinforcing and embedded in the sprayed concrete lining of the tunnel | |
DE102009007226B4 (en) | Method for creating a drainage device next to the track of a railway line | |
DE102011108093B4 (en) | Precast lane for inclined conveyor system for mining trucks | |
EP3685016B1 (en) | Conveying and transport system for tunnel constructions | |
DE3430642A1 (en) | TRAVELABLE SLOPE LIFT | |
DE3834313A1 (en) | Method and apparatus for producing a track-ballast formation | |
EP2213792B1 (en) | Method for laying U-shaped channel elements beside the track of a rail section | |
EP0257652B1 (en) | Method of and device for driving a coal winning gallery partly in the footwall of a seam | |
DE3819644A1 (en) | WORKING MACHINE HOLDED BY A VEHICLE FOR EARTH WORKING, ESPECIALLY BUCKET LOADER | |
DE102009007222A1 (en) | Method of excavating a trench parallel to a track on railway lines | |
DE2933766C2 (en) | Partial section tunneling machine | |
DE2450455A1 (en) | Articulated granular tipper vehicle - has light alloy body casting with oscillator generator to move load when tipped | |
DE2606060A1 (en) | PIT LOADING MACHINE | |
DE3331032C2 (en) | ||
WO2008098665A1 (en) | Apparatus for removing and loading track ballast | |
DE4208803A1 (en) | Ballast laying machine for railway tracks - has ballast storage bin between crawler tracks at front of machine with additional chutes one either side for loading from wagons on adjacent track | |
DE1188026B (en) | Method and device for moving empty wagons in single-lane drifts | |
DE3421315A1 (en) | Device for transporting away waste from a railway installation | |
DE19526311A1 (en) | Layout for wooden rail=bound self=propelled rail car vehicle to transport dump loads | |
DE102008003951A1 (en) | Device for transferring building materials for a substructure and / or superstructure of a roadway | |
DD209006A5 (en) | RAILWAY TRAIN FOR THE RENEWAL OF RAILWAY RAILS | |
DE1658767A1 (en) | Tunneling facility |