DE102005011008A1 - Device with a reinforced concrete reinforcement basket - Google Patents

Device with a reinforced concrete reinforcement basket Download PDF

Info

Publication number
DE102005011008A1
DE102005011008A1 DE102005011008A DE102005011008A DE102005011008A1 DE 102005011008 A1 DE102005011008 A1 DE 102005011008A1 DE 102005011008 A DE102005011008 A DE 102005011008A DE 102005011008 A DE102005011008 A DE 102005011008A DE 102005011008 A1 DE102005011008 A1 DE 102005011008A1
Authority
DE
Germany
Prior art keywords
reinforced concrete
basket
concrete reinforcement
reinforcing
circumferential direction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
DE102005011008A
Other languages
German (de)
Inventor
Guenter Eberhardt
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE102005011008A priority Critical patent/DE102005011008A1/en
Priority to EP06003100A priority patent/EP1701002A1/en
Publication of DE102005011008A1 publication Critical patent/DE102005011008A1/en
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • E21D11/086Methods of making concrete lining segments

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Die Erfindung geht aus von einer Vorrichtung mit einem Stahlbetontübbingarmierungskorb (10) für einen Tübbing (12) in einer Bogensegmentform mit wenigstens einem Armierungselement (14), das über eine Länge des Stahlbetontübbingarmierungskorbs (10) in einer Umfangsrichtung (16) bezüglich der Bogensegmentform verläuft. DOLLAR A Es wird vorgeschlagen, dass das Armierungselement (14) aus der Umfangsrichtung (16) in wenigstens einem Winkel (18-24) in eine radiale Richtung (34) bezüglich der Bogensegementform umgebogen ist.The invention is based on a device with a reinforced concrete reinforcement basket (10) for a tubbing (12) in an arc segment shape with at least one reinforcement element (14) extending over a length of the reinforced concrete reinforcement basket (10) in a circumferential direction (16) with respect to the arc segment shape. DOLLAR A It is proposed that the reinforcing element (14) from the circumferential direction (16) in at least one angle (18-24) is bent in a radial direction (34) with respect to the Bogensegementeform.

Description

Die Erfindung geht aus von einer Vorrichtung mit einem Stahlbetontübbingarmierungskorb nach dem Oberbegriff des Anspruchs 1 und von einem Verfahren zum Herstellen eines Stahlbetontübbingarmierungskorbs nach dem Oberbegriff des Anspruchs 14.The The invention is based on a device with a reinforced concrete reinforcement basket according to the preamble of claim 1 and of a method for Making a reinforced concrete reinforcement basket according to the preamble of claim 14.

Es ist bereits vorgeschlagen worden, einen Stahlbetontübbingarmierungskorb in einer Bogensegmentform, wie er beispielsweise im Tunnel- und Schachtbau zum Einsatz kommt, mit einem Armierungselement auszustatten, das über eine Länge des Stahlbetontübbingarmierungskorbs in einer Umfangsrichtung bezüglich der Bogensegmentform verläuft. Üblicherweise sind solche Armierungselemente Teil von vorgefertigten, flachen Listenmatten, die mit dem Radius der Bogensegmentform vorgebogen werden. Der Stahlbetontübbingarmierungskorb wird in seinen Endbereichen in der Umfangsrichtung bisher durch U-förmige Bügelelemente abgeschlossen, die mit einer statisch erforderlichen Übergreifungslänge mit den längs verlaufenden Armierungselementen verbunden werden, und zwar insbesondere verschweißt werden. Die fertigen Stahlbetontübbingarmierungskörbe werden mit Beton ausgegossen und verstärken so ei nen Tübbing, der insbesondere automatisch von einer Tunnelvortriebsmaschine verlegt werden kann, wobei mehrere Tübbinge zusammen einen Ring bilden.It has already been proposed, a reinforced concrete reinforcement basket in an arc segment shape, as he for example in tunneling and shaft construction is equipped to equip with a reinforcing element, which has a Length of reinforced concrete reinforcement basket in a circumferential direction the arc segment shape runs. Usually Such reinforcing elements are part of prefabricated, flat List mats pre-bent with the radius of the arc segment shape. The reinforced concrete rubbing basket is so far in its end regions in the circumferential direction U-shaped Ironing elements completed with a statically required overlap length with the longitudinal extending reinforcing elements are connected, in particular welded. The finished reinforced concrete reinforcement baskets are filled with concrete and reinforced such a tubbing, in particular automatically laid by a tunnel boring machine can be, with several segments together form a ring.

Der Erfindung liegt die Aufgabe zugrunde, einen besonders kostengünstig und materialsparend herstellbaren Stahlbetontübbingarmierungskorb zu entwickeln und ein Verfahren zum Herstellen eines solchen Stahlbetontübbingarmierungskorbs bereitzustellen, und zwar ohne eine Stabilität des Stahlbetontübbingarmierungskorbs zu beeinträchtigen. Sie wird gemäß der Erfindung durch die Merkmale der Ansprüche 1 und 14 gelöst. Weitere Ausgestaltungen ergeben sich aus den Unteransprüchen.Of the Invention is based on the object, a particularly inexpensive and to develop a material-saving manufacturable reinforced concrete tendon basket and a method for producing such a reinforced concrete reinforcing basket to provide, without a stability of reinforced concrete reinforcement basket to impair. It is according to the invention by the features of the claims 1 and 14 solved. Further embodiments emerge from the subclaims.

Vorteile der ErfindungAdvantages of invention

Die Erfindung geht insbesondere aus von einer Vorrichtung mit einem Stahlbetontübbingarmierungskorb für einen Tübbing in einer Bogensegmentform mit wenigstens einem Armierungselement, das über eine Länge des Stahlbetontübbingarmierungskorbs in einer Umfangsrichtung bezüglich der Bogensegmentform verläuft.The Invention is based in particular on a device with a Stahlbetontübbingarmierungskorb for one tubbing in an arc segment shape with at least one reinforcing element, the above a length of reinforced concrete reinforcement basket in a circumferential direction the arc segment shape runs.

Es wird vorgeschlagen, dass das Armierungselement aus der Umfangsrichtung in wenigstens einem Winkel in eine radiale Richtung bezüglich der Bogensegmentform umgebogen ist. Dadurch können separate, Armierungselemente zum Verstärken des Tübbings bzw. des Stahlbetontübbingarmierungskorbs in der radialen Richtung vorteilhaft eingespart werden. Materialaufwändige Übergreifungsbereiche können reduziert werden, wodurch Materialeinsparungen erreichbar sind, die letztlich zu einer Kostenreduktion des Tübbings bzw. eines Tunnelbaus führen können.It It is proposed that the reinforcing element from the circumferential direction at least at an angle in a radial direction with respect to Curved segment shape is bent. This allows separate, reinforcing elements to amplify of the tubbing or reinforced concrete reinforcement basket Advantageously saved in the radial direction. Material-consuming overlap areas can be reduced, whereby material savings can be achieved, which ultimately leads to a cost reduction of the tubbing or a tunnel construction to lead can.

Als „Umfangsrichtung" soll eine Umfangsrichtung eines gedachten, die Bogensegmentform des Tübbings fortsetzenden Kreises bezeichnet werden. Die Umfangsrichtung entspricht einer Längsrichtung des Tübbings. Entsprechend bezieht sich die Bezeichnung „radiale Richtung" auf den Radius dieses Kreises.As a "circumferential direction" is a circumferential direction an imaginary, the arc segment shape of the tubbing continuing circle be designated. The circumferential direction corresponds to a longitudinal direction of the tubbing. Accordingly, the term "radial direction" refers to the radius of this Circle.

Gattungsgemäße Armierungselemente sind üblicherweise stangenförmig, mit rundem Querschnitt und aus Stahl ausgebildet. Als „Winkel" sollen in diesem Zusammenhang ein gebogener Bereich des Armierungselements mit einem gemäß DIN 4088 bestimmten Krümmungsradius bezeichnet werden, sofern der gebogene Bereich einen Krümmungsradius aufweist, der um ein Vielfaches, insbesondere um mehr als ein Zehnfaches, kleiner ist als ein Krümmungsradius der Bogensegmentform des Stahlbetontübbingarmierungskorbs. Der Durchmesser des Stahls ist durch die statischen Anforderungen bestimmt. Als „über eine Länge" verlaufend soll ein Armierungselement auch dann bezeichnet werden, wenn es sich über einen größeren Anteil der Länge erstreckt, beispielsweise über 90%, mindestens aber über 50% der Länge.Generic reinforcing elements are common rod-shaped, with round cross section and made of steel. As "angle" in this Connection a curved portion of the reinforcing element with a determined according to DIN 4088 radius of curvature are designated, provided that the bent portion has a radius of curvature having a multiple, in particular more than a tenfold, smaller than a radius of curvature the arc segment form of reinforced concrete reinforcement basket. The diameter of the steel is determined by the static requirements. As "about one Length "should be running a reinforcing element are also called, if it is a larger share the length stretches, for example about 90%, but at least over 50% of the length.

In einer Weiterbildung der Erfindung wird vorgeschlagen, dass das Armierungselement in wenigstens zwei Winkeln von etwa 90° umgebogen ist. Dadurch kann das Armierungselement eine besonders gute Stützfunktion in radialer Richtung übernehmen und/oder einen angeformten, statisch vorteilhaften Übergreifungsbereich aufweisen. Als Winkel von „etwa" 90° sollen in diesem Zusammenhang Winkel bezeichnet werden, die um weniger als 20° von 90° abweichen.In A development of the invention is proposed that the reinforcing element is bent in at least two angles of about 90 °. This can the reinforcing element take over a particularly good support function in the radial direction and / or a molded, statically advantageous overlap area exhibit. As an angle of "about" 90 ° in In this context angles are referred to as less than 20 ° from Deviate 90 °.

Besonders vorteilhaft sind Ausgestaltungen der Erfindung, in denen die Vorrichtung zumindest ein den Stahlbetontübbingarmierungskorb in der Umfangsrichtung abschließendes, U-förmiges Bügelelement umfasst, das einstückig mit dem Armierungselement ausgebildet ist. Ein separates, U-förmiges Bügelelement kann vorteilhaft entfallen und Arbeits- und Materialkosten, die mit dem Verschweißen des Bügelelements mit dem Armierungselement einhergehen, können eingespart werden, ohne eine Stabilität des Stahlbetontübbingarmierungskorbs zu beeinträchtigen.Especially advantageous embodiments of the invention, in which the device at least one reinforced concrete reinforcement basket concluding in the circumferential direction, U-shaped bracket element includes, in one piece is formed with the reinforcing element. A separate, U-shaped bracket element can advantageously be omitted and labor and material costs, the with the welding of the bracket element associated with the reinforcing element, can be saved without a stability of Stahlbetontübbingarmierungskorbs to impair.

Die Bügelelemente können beidseitig eingespart werden, wenn das Armierungselement einstückig mit zwei, jeweils an ein Ende des Armierungselements angeformten, U-förmigen Bügelelementen ausgebildet ist.The Ironing elements can be saved on both sides, if the reinforcing element in one piece with two, in each case formed on one end of the reinforcing element, formed U-shaped bracket elements is.

Überspannt ein freies Ende des U-förmigen Bügelelements die Länge des Stahlbetontübbingarmierungskorbs in der Umfangsrichtung zumindest zur Hälfte, können weitere Armierungselemente, die dem Armierungselement radial gegenüberliegen, eingespart werden. Dabei kann das Armierungselement auch eine geschlossene, den Stahlbetontübbingarmierungskorb in der Umfangs- bzw. Längsrichtung vollständig umgreifende Kurve bilden, die eine Fläche eines Segments eines Kreisrings begrenzt.extravagant a free end of the U-shaped bracket element the length of reinforced concrete reinforcement basket in the circumferential direction at least half, can further reinforcing elements, which are radially opposite the reinforcing element, can be saved. The reinforcing element can also be a closed, the reinforced concrete reinforcement basket in the circumferential or longitudinal direction Completely encircling curve forming an area of a segment of a circular ring limited.

Eine weitere Reduktion von Arbeits- und Materialaufwand kann erreicht werden, wenn das Armierungselement die Länge des Stahlbetontübbingarmierungskorbs in der Umfangsrichtung mehrmals überspannt. Dabei kann das Armierungselement auch eine geschlossene, den Stahlbetontübbingarmierungskorb in der Um fangs- bzw. Längsrichtung vollständig umgreifende Kurve bilden, die die Fläche eines Segments eines Kreisrings bildet. In einer weiteren Ausgestaltung der Erfindung umschlingt das Armierungselement den Stahlbetontübbingarmierungskorb in der Umfangsrichtung spiralförmig. Dadurch können Bauteile eingespart werden.A further reduction of labor and material costs can be achieved when the reinforcing element is the length of the reinforced concrete reinforcement basket spans several times in the circumferential direction. The reinforcing element can also be a closed, the reinforced concrete reinforcement basket in the catch or longitudinal direction completely encompassing Curve forming the surface of a Segments of a circular ring forms. In a further embodiment invention, the reinforcing element wraps around the reinforced concrete reinforcement basket spiral in the circumferential direction. Thereby can Components are saved.

Zudem wird vorgeschlagen, dass die Vorrichtung wenigstens ein Verteilereisen mit einem angeformten Winkel umfasst. Dadurch können separate Winkelelemente zum Verbinden von zwei Verteilereisen entfallen.moreover it is proposed that the device at least one distribution iron includes with an integrally formed angle. This allows separate angle elements to connect two distribution bars omitted.

Umfasst die Vorrichtung wenigstens zwei über eine Länge des Stahlbetontübbingarmierungskorbs in einer Umfangsrichtung bezüglich der Bogensegmentform verlaufende Armierungselemente, die montagestabfrei durch wenigstens ein Querbewehrungselement verbunden sind, kann kosten- und materialsparend auf Montagestäbe zum Verbinden der Armierungselemente in einem definierten Abstand verzichtet werden.includes the device at least two over a length of reinforced concrete reinforcement basket in a circumferential direction the Bogensegmentform extending reinforcing elements, the montagestabfrei can be connected by at least one transverse reinforcement element Cost and material saving on mounting rods for connecting the reinforcing elements be waived in a defined distance.

Umfasst die Vorrichtung ein einstückiges Querbewehrungselement des Stahlbetontübbingarmierungskorbs, das eine Breite des Stahlbetontübbingarmierungskorbs wenigstens zweimal überspannt, kann eine besonders einfache und kostengünstige Querbewehrung erreicht werden.includes the device is a one-piece transverse reinforcement element of reinforced concrete reinforcement basket, the one width of the reinforced concrete reinforcement basket spanned at least twice, can achieve a particularly simple and inexpensive transverse reinforcement become.

Dabei kann das Querbewehrungselement den Stahlbetontübbingarmierungskorb besonders vorteilhaft in der Querrichtung spiralförmig umschlingen. Als „Querrichtung" soll in diesem Zusammenhang eine axiale Richtung bezüglich der Bogensegmentform bezeichnet werden.there the transverse reinforcement element can be particularly advantageous in the reinforced concrete reinforcement basket spiral in the transverse direction entwine. As "transverse direction" should in this context an axial direction with respect to the arc segment shape are called.

Ein verspannungsfreier Stahlbetontübbingarmierungskorb kann erreicht werden, wenn das Armierungselement bogenförmig vorgebogen in den Stahlbetontübbingarmierungskorb eingebaut ist.One tension-free reinforced concrete reinforcement basket can be achieved if the reinforcing element arcuately pre-bent into the reinforced concrete reinforcement basket is installed.

Ein Vorbiegevorgang kann andererseits vorteilhaft und kostensparend entfallen, wenn das Armierungselement bogenförmig vorgespannt in den Stahlbetontübbingarmierungskorb eingebaut ist.One Pre-bending process, on the other hand, can be advantageous and cost-saving omitted when the reinforcing element arcuately biased in the reinforced concrete reinforcement basket is installed.

Ferner geht die Erfindung aus von einem Verfahren zum Herstellen eines Stahlbetontübbingarmierungskorbs für einen Tübbing in einer Bogensegmentform mit wenigstens einem Armierungselement, das über eine Länge des Stahlbetontübbingarmierungskorbs in einer Umfangsrichtung bezüglich der Bogensegmentform verläuft.Further The invention is based on a method for producing a Stahlbetontübbingarmierungskorbs for one tubbing in an arc segment shape with at least one reinforcing element, which has a Length of the Stahlbetontübbingarmierungskorbs in a circumferential direction the arc segment shape runs.

Es wird vorgeschlagen, dass das Armierungselement vor dem Verschweißen mit weiteren Armierungselementen aus der Umfangsrichtung in wenigstens einem Winkel in eine radiale Richtung bezüglich der Bogensegmentform umgebogen wird. Dadurch kann auf ein Verschweißen von radialen Stützelementen des Stahlbetontübbingarmierungskorbs verzichtet werden.It It is proposed that the reinforcing element before welding with further reinforcing elements from the circumferential direction in at least an angle in a radial direction with respect to the arc segment shape is bent over. This can be based on a welding of radial support elements of reinforced concrete reinforcement basket be waived.

Zudem geht die Erfindung aus von einem Verfahren zum Herstellen eines Stahlbetontübbingarmierungskorbs für einen Tübbing in einer Bogensegmentform mit wenigstens zwei Armierungselementen.moreover The invention is based on a method for producing a Stahlbetontübbingarmierungskorbs for one tubbing in an arc segment shape with at least two reinforcing elements.

Es wird vorgeschlagen, dass die Armierungselemente auf einer Lehre durch wenigstens ein Querbewehrungselement verbunden werden. Dadurch kann ein Vormontageschritt zum Verbinden der Armierungselemente vor dem Aufbringen auf die Lehre entfallen.It It is suggested that the reinforcing elements on a gauge be connected by at least one transverse reinforcement element. Thereby may be a pre-assembly step for connecting the reinforcing elements omitted before applying to the teaching.

Zeichnungdrawing

Weitere Vorteile ergeben sich aus der folgenden Zeichnungsbeschreibung. In der Zeichnung sind Ausführungsbeispiele der Erfindung dargestellt. Die Zeichnung, die Beschreibung und die Ansprüche enthalten zahlreiche Merkmale in Kombination. Der Fachmann wird die Merkmale zweckmäßigerweise auch einzeln betrachten und zu sinnvollen weiteren Kombinationen zusammenfassen.Further Advantages are shown in the following description of the drawing. In the drawing are exemplary embodiments represented the invention. The drawing, the description and the claims contain numerous features in combination. The specialist will the features also expediently individually consider and summarize to meaningful further combinations.

Es zeigen:It demonstrate:

1 einen Tübbing mit einem Stahlbetontübbingarmierungskorb, 1 a tubing with a reinforced concrete reinforcement basket,

2 ein Armierungselement des Stahlbetontübbingarmierungskorbs aus 1, 2 a reinforcing element of the reinforced concrete reinforcement basket 1 .

3 Armierungselemente des Stahlbetontübbingarmierungskorbs auf einer Lehre, 3 Reinforcing steel reinforcing basket reinforcing elements on a gauge,

3a die Armierungselemente aus 3 mit zusätzlichen Verteilerelementen, 3a the reinforcing elements 3 with additional distribution elements,

3b eines der Verteilerelemente aus 3a mit vier Verteilereisen, 3b one of the distributor elements 3a with four distribution bars,

4 ein Querbewehrungselement des Stahlbetontübbingarmierungskorbs aus den 13, 4 a transverse reinforcement element of the reinforced concrete reinforcement basket from the 1 - 3 .

5 die Armierungselemente aus 1 mit zusätzlichen Querbewehrungselementen, 5 the reinforcing elements 1 with additional transverse reinforcement elements,

6 den Stahlbetontübbingarmierungskorb aus den 15, 6 the reinforced concrete reinforcement basket from the 1 - 5 .

7 ein Armierungselement eines Stahlbetontübbingarmierungskorbs in einer weiteren Ausgestaltung der Erfindung, 7 a reinforcement element of a reinforced concrete reinforcement basket in a further embodiment of the invention,

8 ein Armierungselement eines Stahlbetontübbingarmierungskorbs in einer weiteren Ausgestaltung der Erfindung, 8th a reinforcement element of a reinforced concrete reinforcement basket in a further embodiment of the invention,

9 ein Querbewehrungselement eines Stahlbetontübbingarmierungskorbs in einer weiteren Ausgestaltung der Erfindung, 9 a transverse reinforcement element of a reinforced concrete reinforcement basket in a further embodiment of the invention,

10 ein Querbewehrungselement eines Stahlbetontübbingarmierungskorbs in einer weiteren Ausgestaltung der Erfindung, 10 a transverse reinforcement element of a reinforced concrete reinforcement basket in a further embodiment of the invention,

11 einen Stahlbetontübbingarmierungskorb für einen alternativen Tübbing, 11 a reinforced concrete reinforcement basket for an alternative tubbing,

12 ein Armierungselement eines weiteren alternativen Stahlbetontübbingarmierungskorbs, 12 a reinforcing element of a further alternative reinforced concrete reinforcement basket,

13 ein Verteilerelement eines weiteren alternativen Stahlbetontübbingarmierungskorbs und 13 a distribution element of another alternative reinforced concrete reinforcement basket and

14 ein Verteilerelement eines weiteren alternativen Stahlbetontübbingarmierungskorbs. 14 a distribution element of another alternative reinforced concrete reinforcement basket.

Beschreibung der Ausführungsbeispieledescription the embodiments

1 zeigt einen Tübbing 12a mit einem in Beton eingegossenen Stahlbetontübbingarmierungskorb 10a, der in 6 explizit dargestellt ist. Der Tübbing 12a ist zum automatischen Verlegen durch eine Vortriebsmaschine im Tunnelbau vorgesehen, bildet einen Bruchteil eines Rings, der neben sechs gleichartigen Tübbingen 12a einen Schlussstein umfasst. Der Tübbing 12a weist in einer axialen Ansicht eine Bogensegmentform auf. Radiale Außenflächen und Innenflächen bilden jeweils einen dem Bogensegment entsprechenden Ausschnitt eines Zylindermantels. Seitenflächen 58a, 60a des Tübbings 12a verlaufen radial bzw. senkrecht zur axialen Richtung bezüglich der Bogensegmentform bzw. bezüglich eines die Bogensegmentform erweiternden Zylinders, der zu einem Tunnel, in den der Tübbing 12a eingebaut werden soll, koaxial verläuft. Die Seitenflächen des Tübbings 12a sind zumindest teilweise mit hier nicht explizit dargestellten Dichtungselementen ausgestattet. 1 shows a tubbing 12a with a reinforced concrete concrete reinforcing basket cast in concrete 10a who in 6 is shown explicitly. The tubbing 12a is intended for automatic laying by a tunneling machine in tunneling, forms a fraction of a ring, in addition to six similar segments 12a includes a capstone. The tubbing 12a has an arc segment shape in an axial view. Radial outer surfaces and inner surfaces each form a section corresponding to the arc segment of a cylinder jacket. faces 58a . 60a of the tubbing 12a run radially or perpendicular to the axial direction with respect to the arc segment shape or with respect to a bow segment shape expanding cylinder leading to a tunnel in the tubbing 12a to be installed, runs coaxially. The side surfaces of the tubbing 12a are at least partially equipped with sealing elements not explicitly shown here.

Der Stahlbetontübbingarmierungskorb 10a umfasst Armierungselemente 14a, die über eine Länge des Stahlbetontübbingarmierungskorbs 10a in einer Umfangsrichtung 16a bezüglich der Bogensegmentform verlaufen. 2 zeigt ein solches Armierungselement 14a in einer Einzeldarstellung.The reinforced concrete rubbing basket 10a includes reinforcing elements 14a extending over a length of the reinforced concrete reinforcement basket 10a in a circumferential direction 16a with respect to the arc segment shape. 2 shows such a reinforcing element 14a in a single presentation.

Das Armierungselement 14a für die Längsarmierung des Tübbings 12a ist aus einem endlosen Armierungsstahl mit rundem Querschnitt geschnitten und von einer Biegemaschine in die dargestellte Form gebracht. Es weist einen Hauptteil 38a auf, der mit dem Radius des Tunnels, in den der Tübbing 12a eingebaut werden soll, vorgekrümmt ist und der sich in der Umfangsrichtung 16a erstreckt. Ferner weist das Armierungselement 14a an beiden Enden des Hauptteils 38a U-förmige Bügelelemente 26a, 28a auf, die einstückig mit dem Hauptteil 38a bzw. mit dem Armierungselement 14a ausgeführt sind und die durch jeweils zwei Winkel 18a24a von 90° im Armierungselement 14a gebildet sind. In den Winkeln 18a24a ist das Armierungselement 14a jeweils aus der Umfangsrichtung 16a in eine radiale Rich tung 34a bezüglich der Bogensegmentform bzw. umgekehrt umgebogen.The reinforcing element 14a for the longitudinal reinforcement of the tubbing 12a is cut from an endless reinforcing steel with a round cross section and brought by a bending machine in the illustrated form. It has a major part 38a on, with the radius of the tunnel, in the tubbing 12a is to be installed, is pre-curved and extending in the circumferential direction 16a extends. Furthermore, the reinforcing element has 14a at both ends of the main body 38a U-shaped bracket elements 26a . 28a on, the one-piece with the main body 38a or with the reinforcing element 14a are executed and by each two angles 18a - 24a of 90 ° in the reinforcing element 14a are formed. In the angles 18a - 24a is the reinforcing element 14a each from the circumferential direction 16a in a radial direction 34a with respect to the arc segment shape or vice versa bent.

Zum Zusammenfügen des Stahlbetontübbingarmierungskorbs 10a wird eine Vielzahl von Armierungselementen 14a in durch statische Berechnungen des Tunnels vorgegebenen Abständen parallel auf eine Lehre 36a aufgebracht (3). Die Lehre 36a weist Führungsmittel 40a auf, die ein Ausrichten der Armierungselemente 14a erleichtern. Die Armierungselemente 14a sind bogenförmig vorgebogen in den Stahlbetontübbingarmierungskorb 10a eingebaut. Ferner weist die aus Eisenstangen gefertigte Lehre 36a Seitenbereiche auf, an denen die Armierungselemente 14a mit Hilfe von hier nur schematisch dargestellten Klemmen 84a gegen Verkippen gesichert werden kann.For joining the reinforced concrete reinforcement basket 10a becomes a variety of reinforcing elements 14a in intervals given by static calculations of the tunnel parallel to a gauge 36a applied ( 3 ). The teaching 36a has guiding means 40a on, which is an alignment of the reinforcing elements 14a facilitate. The reinforcing elements 14a are arcuately bent into the reinforced concrete reinforcement basket 10a built-in. Furthermore, the gauge made of iron bars has 36a Side areas on which the reinforcing elements 14a with the help of here only schematically illustrated terminals 84a can be secured against tilting.

Entlang der Seitenflächen 58a, 60a werden Verteilerelemente 62a66a in radial gleichmäßigen Abständen mit den Armierungselementen 14a verbunden (3a). Die Verteilerelemente 62a66a umgrenzen einen der Bogensegmentform entsprechenden Ausschnitt eines Zylindermantels. Die Verteilerelemente 62a66a sind aus Gründen der Übersichtlichkeit in den 5 und 6 nur gestrichelt dargestellt. Neben den dargestellten Armierungselementen 14a und Verteilerelementen 62a66a umfasst der Stahlbetontübbingarmierungskorb 10a noch weitere, statisch erforderliche Armierungselemente, die aus Gründen der Übersichtlichkeit hier nicht explizit dargestellt sind.Along the side surfaces 58a . 60a become distribution elements 62a - 66a in radially uniform intervals with the reinforcing elements 14a connected ( 3a ). The distributor elements 62a - 66a define a segment of the arc shape corresponding section of a cylinder jacket. The distributor elements 62a - 66a are for the sake of clarity in the 5 and 6 shown only by dashed lines. Next to the Armierungsele shown instruments 14a and distribution elements 62a - 66a includes the reinforced concrete reinforcement basket 10a still further, statically required reinforcing elements, which are not explicitly shown here for reasons of clarity.

3b zeigt schematisch eines der Verteilerelemente 62a66a. Das Verteilerelement 62a umfasst vier Verteilereisen 68a74a, die jeweils einen Hauptteil umfassen, der sich über die Länge einer der Seitenflächen 58a, 60a erstreckt, und die zusätzlich einen an den Hauptteil angeformten Winkel 76a82a aufweisen, der einstückig mit dem Hauptteil ausgeführt ist und der zum Verbinden des jeweiligen Verteilereisens 68a74a mit einem benachbarten Verteilereisen 68a74a vorgesehen ist. Die über die gekrümmte, in axiale Richtung weisende Seitenfläche 58a verlaufenden Verteilereisen 68a, 70a sind ihrer radialen Lage entsprechend vorgekrümmt. 3b shows schematically one of the distributor elements 62a - 66a , The distributor element 62a includes four distribution bars 68a - 74a each comprising a main part extending over the length of one of the side surfaces 58a . 60a extends, and in addition an integrally formed on the main part angle 76a - 82a have, which is designed in one piece with the main part and for connecting the respective distribution iron 68a - 74a with a neighboring distribution iron 68a - 74a is provided. The over the curved, facing in the axial direction side surface 58a extending distribution iron 68a . 70a are pre-curved according to their radial position.

In einer weiteren Ausgestaltung der Erfindung werden die Armierungselemente 14a auf der Lehre 36a auf den Radius des Tunnels vorgebogen. Dazu werden die Führungsmittel 40a mit Haltemitteln 46a ausgestattet, die ein Zurückschnellen der Armierungselemente 14a verhindern und die hier als alternative Ausgestaltung der Lehre 36a gestrichelt dargestellt sind.In a further embodiment of the invention, the reinforcing elements 14a on the teaching 36a pre-bent to the radius of the tunnel. These are the guiding means 40a with holding means 46a equipped, which is a snap back of the reinforcing elements 14a prevent and here as an alternative embodiment of the doctrine 36a are shown in dashed lines.

Anschließend werden die korrekt ausgerichteten Armierungselemente 14a montagestabfrei durch eine Vielzahl von Querbewehrungselementen 30a verbunden, die mit den Armierungselementen 14a verschweißt werden und die in einer Querrichtung 32a des Tübbings 12a bzw. in einer Längsrichtung des Tunnels verlaufen (4 und 5).Subsequently, the correctly aligned reinforcing elements 14a Free from assembly by a large number of transverse reinforcement elements 30a connected to the reinforcing elements 14a be welded and in a transverse direction 32a of the tubbing 12a or in a longitudinal direction of the tunnel ( 4 and 5 ).

Jedes der Querbewehrungselemente 30a wird von zwei U-förmigen Teilen 42a, 44a gebildet, die zusammen ein Rechteck von maßgenauer Länge bilden. Die Querbewehrungselemente 30a werden so ausgerichtet, dass sich eine Fläche des Rechtecks in der radialen Richtung 34a und in der Querrichtung 32a erstreckt. Eine Anzahl der Querbewehrungselemente 30a sowie die Abstände zwischen den Querbewehrungselementen 30a sind durch die statischen Berechnungen zur Stabilität des Tunnels vorgegeben, wobei bei der Auslegung der Querbewehrungselemente 30a auch eine Vortriebskraft der Vortriebsmaschine, die beim Einbau auf den Tübbing 12a in der Querrichtung 32a wirkt, berücksichtigt wird. Die in den 38 dargestellten Anordnungen bzw. Abstände von Querbewehrungselementen 30a und Armierungselementen 14a sind nur schematisch zu verstehen und vom Fachmann in bekannter Weise abhängig von den konkreten, im Tunnel erforderlichen Anforderungen zu bestimmen. Die Stärken und Abstände der Armierungselemente 14a und der Querbewehrungselemente 30a entsprechen der DIN 4088-4.Each of the transverse reinforcement elements 30a is made of two U-shaped parts 42a . 44a formed, which together form a rectangle of Maßgenauer length. The transverse reinforcement elements 30a are aligned so that an area of the rectangle in the radial direction 34a and in the transverse direction 32a extends. A number of transverse reinforcement elements 30a as well as the distances between the transverse reinforcement elements 30a are given by the static calculations for the stability of the tunnel, with the design of the transverse reinforcement elements 30a also a driving force of the tunneling machine, the installation on the tubbing 12a in the transverse direction 32a acts, is taken into account. The in the 3 - 8th arrangements shown or distances of transverse reinforcement elements 30a and reinforcing elements 14a are to be understood only schematically and to be determined by the skilled person in a known manner depending on the specific requirements required in the tunnel. The strengths and spacings of the reinforcing elements 14a and the transverse reinforcement elements 30a comply with DIN 4088-4.

Zum Fertigstellen des Stahlbetontübbingarmierungskorbs 10a werden radial außen weitere, stangenförmige und etwa mit dem Außenradius des Tübbings 12a vorgebogene Armierungselemente 48a verschweißt, die jeweils die beiden freien Enden der U-förmigen Bügelelemente 26a, 28a und die Querbewehrungselemente 30a miteinander verbinden und die dazu mit den freien Enden der Bügelelemente 26a, 28a Übergreifungsbereiche 56a bilden, deren Länge, die ebenfalls statisch vorgegeben ist, einige Dezimeter beträgt (6).To finish the reinforced concrete reinforcement basket 10a be radially outward more, rod-shaped and approximately with the outer radius of the tubbing 12a pre-bent reinforcing elements 48a welded, each having the two free ends of the U-shaped bracket elements 26a . 28a and the transverse reinforcement elements 30a connect with each other and with the free ends of the ironing elements 26a . 28a Übergreifungsbereiche 56a whose length, which is also statically predetermined, is a few decimeters ( 6 ).

Die 711 zeigen weitere Ausgestaltungen der Erfindung. In der Beschreibung soll im Wesentlichen auf Unterschiede zu dem in den 16 dargestellten Ausführungsbeispiel eingegangen werden, während im Hinblick auf gleich bleibende Merkmale auf die Beschreibung zu den 16 verwiesen wird. Analoge Merkmale sind mit gleichen Bezugszeichen versehen, wobei zur Unterscheidung der Ausführungsbeispiele die Buchstaben a–i hinzugefügt sind.The 7 - 11 show further embodiments of the invention. In the description is intended essentially to differences to that in the 1 - 6 illustrated embodiment, while with regard to the same features on the description of the 1 - 6 is referenced. Analogous features are provided with the same reference numerals, wherein the letters a-i are added to distinguish the exemplary embodiments.

7 zeigt ein alternatives Armierungselement 14b, das einstückig ausgebildet ist und das eine Länge eines das Armierungselement 14b umfassenden Stahlbetontübbingarmierungskorbs (nicht als Ganzes dargestellt) zweimal in einer Umfangsrichtung 16b überspannt, und zwar einmal an einer Oberseite des Stahlbetontübbingarmierungskorbs und einmal an einer Unterseite des Stahlbetontübbingarmierungskorbs. In einem Übergreifungsbereich 50b ist das Armierungselement 14b zu einer Kurve geschlossen, die einen Außenrand eines Segments eines Kreisrings bildet. Zusätzliche Armierungselemente in der Umfangsrichtung 16b können vorteilhaft entfallen. 7 shows an alternative reinforcing element 14b , which is integrally formed and the one length of the reinforcing element 14b extensive reinforced concrete tendon basket (not shown as a whole) twice in a circumferential direction 16b spans, once at an upper side of the reinforced concrete reinforcement basket and once at an underside of the reinforced concrete reinforcement basket. In a Übergreifungsbereich 50b is the reinforcing element 14b closed to a curve forming an outer edge of a segment of a circular ring. Additional reinforcing elements in the circumferential direction 16b can be advantageously eliminated.

8 zeigt ein weiteres alternatives Armierungselement 14c, das einstückig ausgebildet ist und das eine Länge eines das Armierungselement 14c umfassenden Stahlbetontübbingarmierungskorbs mehrmals in einer Umfangsrichtung 16c überspannt und dabei den Stahlbetontübbingarmierungskorb in der Umfangsrichtung 16c spiralförmig umschlingt. Die gesamte Bewehrung in der Umfangsrichtung 16c kann dadurch einstückig ausgebildet sein. 8th shows another alternative reinforcing element 14c , which is integrally formed and the one length of the reinforcing element 14c comprehensive reinforced concrete tendon basket several times in a circumferential direction 16c spans while the reinforced concrete reinforcement basket in the circumferential direction 16c spirally entwines. The entire reinforcement in the circumferential direction 16c can be formed integrally.

9 zeigt ein alternatives Querbewehrungselement 30d, das einstückig ausgebildet ist und das eine Länge eines das Armierungselement 14d umfassenden Stahlbetontübbingarmierungskorbs zweimal in einer Querrichtung 32d überspannt, und zwar einmal an einer Oberseite des Stahlbetontübbingarmierungskorbs und einmal an einer Unterseite des Stahlbetontübbingarmierungskorbs. In einem Übergreifungsbereich 52d ist das Querbewehrungselement 30d zu einer Kurve geschlossen, die einen Außenrand eines Rechtecks bildet. 9 shows an alternative transverse reinforcement element 30d , which is integrally formed and the one length of the reinforcing element 14d extensive reinforced concrete tendon basket twice in a transverse direction 32d spans, once at an upper side of the reinforced concrete reinforcement basket and once at an underside of the reinforced concrete reinforcement basket. In a Übergreifungsbereich 52d is the transverse reinforcement element 30d closed to a curve that forms an outer edge of a rectangle.

10 zeigt ein weiteres alternatives Querbewehrungselement 30e, das einstückig ausgebildet ist und das eine Länge eines das Querbewehrungselement 30e umfassenden Stahlbetontübbingarmierungskorbs mehrmals in einer Querrichtung 32e überspannt und dabei den Stahlbetontübbingarmierungskorb in der Querrichtung 32e spiralförmig umschlingt. Die gesamte Bewehrung in der Querrichtung 32e kann dadurch einstückig ausgebildet sein. 10 shows another alternative transverse reinforcement element 30e , which is integrally formed and the one length of the transverse reinforcement element 30e comprehensive reinforced concrete tendon basket several times in a transverse direction 32e spans while the reinforced concrete reinforcement basket in the transverse direction 32e spirally entwines. The entire reinforcement in the transverse direction 32e can be formed integrally.

11 zeigt einen weiteren alternativen Stahlbetontübbingarmierungskorb 10f, der zum Einsatz in einem gekrümmten Bereich eines Tunnelbaus vorgesehen ist. Der Stahlbetontübbingarmierungskorb 10f umfasst Armierungselemente 14f, die über eine Länge des Stahlbetontübbingarmierungskorbs 10f in einer Umfangsrichtung 16f des Tunnelbaus verlaufen und die in jeweils zwei Winkeln 18f, 20f umgebogen sind, die ein U-förmiges Bügelelement 26f bilden. An das zweite Ende des Armierungselements 48f ist ein separates U-förmiges Bügelelement 28f mit einem Übergreifungsbereich 54f verschweißt. Die Länge der Armierungselemente 14f variiert über die Breite des Stahlbetontübbingarmierungskorbs 10f in der Querrichtung 32f zum Erreichen einer Krümmung des Tunnelbaus. 11 shows another alternative reinforced concrete reinforcement basket 10f which is intended for use in a curved area of a tunnel construction. The reinforced concrete rubbing basket 10f includes reinforcing elements 14f extending over a length of the reinforced concrete reinforcement basket 10f in a circumferential direction 16f of the tunnel construction and those in two angles 18f . 20f bent over, which is a U-shaped bracket element 26f form. At the second end of the reinforcing element 48f is a separate U-shaped bracket element 28f with an overlap area 54f welded. The length of the reinforcing elements 14f varies across the width of the reinforced concrete reinforcement basket 10f in the transverse direction 32f for achieving a curvature of the tunnel construction.

12 zeigt ein weiteres alternatives Armierungselement 14g eines weiteren alternativen Stahlbetontübbingarmierungskorbs, der hier nicht im Ganzen dargestellt ist. Ein Hauptteil 38g des Armierungselements 14g bildet eine radial äußere Längsarmierung und weist zwei in einer radialen Richtung 34g nach innen greifende, U-förmige und mit dem Hauptteil 38g einstückig ausgebildete Bügelelemente 26g, 28g auf. 12 shows another alternative reinforcing element 14g another alternative reinforced concrete reinforcement basket, which is not shown here in its entirety. A main part 38g of the reinforcing element 14g forms a radially outer longitudinal reinforcement and has two in a radial direction 34g inward, U-shaped and with the main part 38g integrally formed ironing elements 26g . 28g on.

13 zeigt ein alternatives Verteilerelement 62h eines weiteren alternativen Stahlbetontübbingarmierungskorbs, der hier nicht im Ganzen dargestellt ist. Das Verteilerelement 62h besteht aus vier Verteilereisen 68h74h. An die beiden gegenüberliegenden Verteilereisen 68h, 70h sind jeweils zwei Winkel 76h82h angeformt, so dass die Verteilereisen 68h, 70h jeweils U-förmig ausgebildet sind, während die Verteilereisen 72h, 74h stangenförmig sind und im verschweißten Zustand die Verteilereisen 68h, 70h miteinander verbinden. 13 shows an alternative distribution element 62h another alternative reinforced concrete reinforcement basket, which is not shown here in its entirety. The distributor element 62h consists of four distribution bars 68h - 74h , To the two opposite distribution rails 68h . 70h are each two angles 76h - 82h molded, so that the distribution iron 68h . 70h are each U-shaped, while the distribution iron 72h . 74h rod-shaped and in the welded state, the distribution iron 68h . 70h connect with each other.

14 zeigt ein weiteres alternatives Verteilerelement 62i, das einstückig aus einem einzigen Verteilereisen ausgebildet ist, das vier Winkel 76i82i aufweist und das über einen Übergreifungsbereich 86i geschlossen ist. 14 shows another alternative distribution element 62i , which is integrally formed from a single distribution iron, the four angles 76i - 82i and that has a Übergreifungsbereich 86i closed is.

1010
StahlbetontübbingarmieStahlbetontübbingarmie
rungskorbapproximately basket
1212
Tübbingtubbing
1414
Armierungselementarmoring
1616
Umfangsrichtungcircumferentially
1818
Winkelangle
2020
Winkelangle
2222
Winkelangle
2424
Winkelangle
2626
Bügelelementbracket element
2828
Bügelelementbracket element
3030
QuerbewehrungselementTransverse reinforcement element
3232
Querrichtungtransversely
3434
Richtungdirection
3636
Lehreteaching
3838
HauptteilBulk
4040
Führungsmittelguide means
4242
Teilpart
4444
Teilpart
4646
Haltemittelholding means
4848
Armierungselementarmoring
5050
Übergreifungsbereichthe overlap area
5252
Übergreifungsbereichthe overlap area
5454
Übergreifungsbereichthe overlap area
5656
Übergreifungsbereichthe overlap area
5858
Seitenflächeside surface
6060
Seitenflächeside surface
6262
Verteilerelementdistributor element
6464
Verteilerelementdistributor element
6666
Verteilerelementdistributor element
6868
Verteilereisendistribute travel
7070
Verteilereisendistribute travel
7272
Verteilereisendistribute travel
7474
Verteilereisendistribute travel
7676
Winkelangle
7878
Winkelangle
8080
Winkelangle
8282
Winkelangle
8484
Klemmeclamp
8686
Übergreifungsbereichthe overlap area

Claims (15)

Vorrichtung mit einem Stahlbetontübbingarmierungskorb (10) für einen Tübbing (12) in einer Bogensegmentform mit wenigstens einem Armierungselement (14), das über eine Länge des Stahlbetontübbingarmierungskorbs (10) in einer Umfangsrichtung (16) bezüglich der Bogensegmentform verläuft, dadurch gekennzeichnet, dass das Armierungselement (14) aus der Umfangsrichtung (16) in wenigstens einem Winkel (1824) in eine radiale Richtung (34) bezüglich der Bogensegmentform umgebogen ist.Device with a reinforced concrete reinforcement basket ( 10 ) for a tubbing ( 12 ) in an arc segment shape with at least one reinforcing element ( 14 ) extending over a length of the reinforced concrete reinforcement basket ( 10 ) in a circumferential direction ( 16 ) with respect to the arc segment shape, characterized in that the reinforcing element ( 14 ) from the circumferential direction ( 16 ) in at least one angle ( 18 - 24 ) in a radial direction ( 34 ) is bent with respect to the arc segment shape. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass das Armierungselement (14) in wenigstens zwei Winkeln (1824) von etwa 90° umgebogen ist.Device according to claim 1, characterized in that the reinforcing element ( 14 ) in at least two angles ( 18 - 24 ) of about 90 ° is bent. Vorrichtung nach einem der vorhergehenden Ansprüche, gekennzeichnet durch zumindest ein den Stahlbetontübbingarmierungskorb (10) in der Umfangsrichtung (16) abschließendes, U-förmiges Bügelelement (26, 28), das einstückig mit dem Armierungselement (14) ausgebildet ist.Device according to one of the preceding claims, characterized by at least one reinforced concrete reinforcement basket ( 10 ) in the circumferential direction ( 16 ) final, U-shaped bracket element ( 26 . 28 ), which is integral with the reinforcing element ( 14 ) is trained. Vorrichtung nach Anspruch 3, dadurch gekennzeichnet, dass das Armierungselement (14) einstückig mit zwei, jeweils an ein Ende des Armierungselements (14) angeformten, U-förmigen Bügelelementen (26, 28) ausgebildet ist.Apparatus according to claim 3, characterized in that the reinforcing element ( 14 ) in one piece with two, each at one end of the reinforcing element ( 14 ) molded, U-shaped bracket elements ( 26 . 28 ) is trained. Vorrichtung zumindest nach Anspruch 3, dadurch gekennzeichnet, dass das freie Ende des U-förmigen Bügelelements (26, 28) die Länge des Stahlbetontübbingarmierungskorbs (10) in der Umfangsrichtung (16) zumindest zur Hälfte überspannt.Device at least according to claim 3, characterized in that the free end of the U-shaped bracket element ( 26 . 28 ) the length of the reinforced concrete reinforcement basket ( 10 ) in the circumferential direction ( 16 ) at least halfway over. Vorrichtung zumindest nach Anspruch 3, dadurch gekennzeichnet, dass das Armierungselement (14b, 14c) die Länge des Stahlbetontübbingarmierungskorbs in der Umfangsrichtung (16b, 16c) mehrmals überspannt.Device according to at least claim 3, characterized in that the reinforcing element ( 14b . 14c ) the length of the reinforced concrete reinforcement basket in the circumferential direction ( 16b . 16c ) spans several times. Vorrichtung zumindest nach Anspruch 3, dadurch gekennzeichnet, dass das Armierungselement (14c) den Stahlbetontübbingarmierungskorb in der Umfangsrichtung (16c) spiralförmig umschlingt.Device according to at least claim 3, characterized in that the reinforcing element ( 14c ) the reinforced concrete tendon basket in the circumferential direction ( 16c ) spirally entwines. Vorrichtung nach einem der vorhergehenden Ansprüche, gekennzeichnet durch wenigstens ein Verteilereisen (68a74a) mit einem angeformten Winkel (76a82a).Device according to one of the preceding claims, characterized by at least one distributor iron ( 68a - 74a ) with an integrally formed angle ( 76a - 82a ). Vorrichtung nach einem der vorhergehenden Ansprüche, gekennzeichnet durch wenigstens zwei über die Länge des Stahlbetontübbingarmierungskorbs (10) in der Umfangsrichtung (16) bezüglich der Bogensegmentform verlaufende Armierungselemente (14), die montagestabfrei durch wenigstens ein Querbewehrungselement (30) verbunden sind.Device according to one of the preceding claims, characterized by at least two over the length of the reinforced concrete reinforcement basket ( 10 ) in the circumferential direction ( 16 ) with respect to the arc segment shape extending reinforcing elements ( 14 ), the montagestabfrei by at least one transverse reinforcement element ( 30 ) are connected. Vorrichtung nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass das einstückige Querbewehrungselement (30d, 30e) des Stahlbetontübbingarmierungskorbs eine Breite des Stahlbetontübbingarmierungskorbs wenigstens zweimal überspannt.Device according to one of the preceding claims, characterized in that the one-piece transverse reinforcement element ( 30d . 30e ) of the reinforced concrete reinforcement basket spans a width of the reinforced concrete reinforcement basket at least twice. Vorrichtung nach Anspruch 10, dadurch gekennzeichnet, dass das Querbewehrungselement (30) den Stahlbetontübbingarmierungskorb (10) in einer Querrichtung (32) spiralförmig umschlingt.Apparatus according to claim 10, characterized in that the transverse reinforcement element ( 30 ) the reinforced concrete reinforcement basket ( 10 ) in a transverse direction ( 32 ) spirally entwines. Vorrichtung nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass das Armierungselement (14) bogenförmig vorgebogen in den Stahlbetontübbingarmierungskorb (10) eingebaut ist.Device according to one of the preceding claims, characterized in that the reinforcing element ( 14 ) arcuately bent in the reinforced concrete reinforcement basket ( 10 ) is installed. Vorrichtung nach einem der Ansprüche 1 bis 11, dadurch gekennzeichnet, dass das Armierungselement (14) bogenförmig vorgespannt in den Stahlbetontübbingarmierungskorb (10) eingebaut ist.Device according to one of claims 1 to 11, characterized in that the reinforcing element ( 14 ) arcuately biased in the reinforced concrete concrete basket ( 10 ) is installed. Verfahren zum Herstellen eines Stahlbetontübbingarmierungskorbs (10) für einen Tübbing (12) in einer Bogensegmentform mit wenigstens einem Armierungselement (14), das über eine Länge des Stahlbetontübbingarmierungskorbs (10) in einer Umfangsrichtung (16) bezüglich der Bogensegmentform verläuft, dadurch gekennzeichnet, dass das Armierungselement (14) vor dem Verschweißen mit weiteren Armierungselementen (30) aus der Umfangsrichtung (16) in wenigstens einem Winkel (1824) in eine radiale Richtung (34) bezüglich der Bogensegmentform umgebogen wird.Method for producing a reinforced concrete reinforcement basket ( 10 ) for a tubbing ( 12 ) in an arc segment shape with at least one reinforcing element ( 14 ) extending over a length of the reinforced concrete reinforcement basket ( 10 ) in a circumferential direction ( 16 ) with respect to the arc segment shape, characterized in that the reinforcing element ( 14 ) before welding with other reinforcing elements ( 30 ) from the circumferential direction ( 16 ) in at least one angle ( 18 - 24 ) in a radial direction ( 34 ) is bent with respect to the arc segment shape. Verfahren zum Herstellen eines Stahlbetontübbingarmierungskorbs (10) für einen Tübbing (12) in einer Bogensegmentform mit wenigstens zwei Armierungselementen (14), insbesondere Verfahren nach Anspruch 13, dadurch gekennzeichnet, dass die Armierungselemente (14) auf einer Lehre (36) durch wenigstens ein Querbewehrungselement (30) verbunden werden.Method for producing a reinforced concrete reinforcement basket ( 10 ) for a tubbing ( 12 ) in an arc segment shape with at least two reinforcing elements ( 14 ), in particular method according to claim 13, characterized in that the reinforcing elements ( 14 ) on a lesson ( 36 ) by at least one transverse reinforcement element ( 30 ) get connected.
DE102005011008A 2005-03-10 2005-03-10 Device with a reinforced concrete reinforcement basket Ceased DE102005011008A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE102005011008A DE102005011008A1 (en) 2005-03-10 2005-03-10 Device with a reinforced concrete reinforcement basket
EP06003100A EP1701002A1 (en) 2005-03-10 2006-02-16 Device with a cage for a reinforced concrete tubbing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102005011008A DE102005011008A1 (en) 2005-03-10 2005-03-10 Device with a reinforced concrete reinforcement basket

Publications (1)

Publication Number Publication Date
DE102005011008A1 true DE102005011008A1 (en) 2006-09-14

Family

ID=36500859

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102005011008A Ceased DE102005011008A1 (en) 2005-03-10 2005-03-10 Device with a reinforced concrete reinforcement basket

Country Status (2)

Country Link
EP (1) EP1701002A1 (en)
DE (1) DE102005011008A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102018128954A1 (en) 2018-11-19 2020-05-20 Rheinmetall Waffe Munition Gmbh Stabilization device, vehicle and method for operating a stabilization device
DE102018128956A1 (en) 2018-11-19 2020-05-20 Rheinmetall Waffe Munition Gmbh Recording device, vehicle and method for operating a recording device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012122330A (en) * 2012-03-28 2012-06-28 Tokyu Construction Co Ltd Structure of composite segment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1502207A (en) * 1975-07-18 1978-02-22 Tsuzuki J Concrete segment
JPH11141287A (en) * 1997-11-05 1999-05-25 Nishimatsu Constr Co Ltd Segment for lining
DE10114616A1 (en) * 2001-03-23 2002-10-02 Hochtief Ag Hoch Tiefbauten Tubbing, especially high-performance tubbing

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5330135A (en) * 1976-09-01 1978-03-22 Kubota Ltd Assembly system composite supporting holding work portion material and its preparation method
DE3417398A1 (en) * 1984-05-10 1985-11-14 Philipp, Gerhard, Dipl.-Ing. REINFORCED CONCRETE COMPONENT
JPH08326491A (en) * 1995-05-31 1996-12-10 Yoshiji Matsumoto Composite segment
JP3436452B2 (en) * 1996-02-26 2003-08-11 鹿島建設株式会社 Shield segment and manufacturing method thereof
JP3847072B2 (en) * 2000-10-13 2006-11-15 株式会社クボタ Synthetic segment
DE10114615A1 (en) 2001-03-23 2002-10-02 Hochtief Ag Hoch Tiefbauten Tubbing, especially high-performance tubbing

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1502207A (en) * 1975-07-18 1978-02-22 Tsuzuki J Concrete segment
JPH11141287A (en) * 1997-11-05 1999-05-25 Nishimatsu Constr Co Ltd Segment for lining
DE10114616A1 (en) * 2001-03-23 2002-10-02 Hochtief Ag Hoch Tiefbauten Tubbing, especially high-performance tubbing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102018128954A1 (en) 2018-11-19 2020-05-20 Rheinmetall Waffe Munition Gmbh Stabilization device, vehicle and method for operating a stabilization device
DE102018128956A1 (en) 2018-11-19 2020-05-20 Rheinmetall Waffe Munition Gmbh Recording device, vehicle and method for operating a recording device

Also Published As

Publication number Publication date
EP1701002A1 (en) 2006-09-13

Similar Documents

Publication Publication Date Title
EP2233664A1 (en) Device for connecting prefabricated concrete sections
DD263952A5 (en) METHOD FOR STIFFING A STRUCTURE
DE102012105882A1 (en) Roof frame for a motor vehicle
DE60319953T2 (en) FUSE RINGING DEVICE FOR A WHEEL HUB DEVICE
DE2120178B2 (en) LINING SEGMENT AND METHOD OF LINING A TUNNEL
DE102005011008A1 (en) Device with a reinforced concrete reinforcement basket
CH622597A5 (en) Socket connection for pipes or pipe fittings
DE2042640A1 (en) Plastic posts, in particular special road delineators, and processes for its manufacture
DE69515800T2 (en) Pipe clamp and process for its manufacture
DE19708932C1 (en) Track-rod ends for vehicle suspension
DE2637738B2 (en) Steel lining of tunnels for roads, subways and the like
DE4023542A1 (en) Joint for plastic lining of concrete structures - has edge clips over lug and sealing weld, made using clamping strip with 2 retaining beads
DE2715837C3 (en) Protection ring for pipes
EP1690580B1 (en) Filter tube
DE9407435U1 (en) Pipe connection system
DE3205272C2 (en) Clamp connection for channel profile segments
DE2607307C2 (en) Device on overlapping expansion profile segments of the arched route expansion in mining and tunnel construction for the pre-assembly of the structures
DE202006016370U1 (en) Tube for forming ducts for pipes or cables in concrete structures is made from plastic sheet rolled longitudinally and with its edges welded together, sealing ring being fitted over it and support cylinder inside it
AT522887B1 (en) Edge beam fastening, anchor and method of fastening an edge beam
DE4211044B4 (en) Spiral wound reinforcing strip
DE102004017235B4 (en) Tool to make tube-shaped workpieces by inner high pressure formation has two halves which when closed form tube or workpiece shape with sealing/closing element and boring to accept said element
DE2515166B1 (en) Mine roadway arch segment clamp - has clamp-driving bow with holes in strap to support locking screw and nut
DE202014105310U1 (en) BI adapter for a pipe connection
DE102005057597B4 (en) Double-stranded exhaust system for a motor vehicle
DE8532716U1 (en) nail

Legal Events

Date Code Title Description
OM8 Search report available as to paragraph 43 lit. 1 sentence 1 patent law
R012 Request for examination validly filed

Effective date: 20111206

R002 Refusal decision in examination/registration proceedings
R003 Refusal decision now final