DE102005009592B4 - Quick assembly process for large steam generators - Google Patents
Quick assembly process for large steam generators Download PDFInfo
- Publication number
- DE102005009592B4 DE102005009592B4 DE200510009592 DE102005009592A DE102005009592B4 DE 102005009592 B4 DE102005009592 B4 DE 102005009592B4 DE 200510009592 DE200510009592 DE 200510009592 DE 102005009592 A DE102005009592 A DE 102005009592A DE 102005009592 B4 DE102005009592 B4 DE 102005009592B4
- Authority
- DE
- Germany
- Prior art keywords
- boiler
- ceiling
- main
- section
- steam generator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Revoked
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B37/00—Component parts or details of steam boilers
- F22B37/02—Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
- F22B37/24—Supporting, suspending, or setting arrangements, e.g. heat shielding
- F22B37/244—Supporting, suspending, or setting arrangements, e.g. heat shielding for water-tube steam generators suspended from the top
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Movable Scaffolding (AREA)
Abstract
Verfahren
zur Montage eines Dampferzeugers (1) mit einem von einer Kesselwand
(19) begrenzten Gaszug, wobei der Dampferzeuger ein Kesselgerüst (2) mit
einer geteilten Kesselgerüstdecke
(6) aufweist, wobei die Kesselgerüstdecke (6) einen äußeren Deckenabschnitt
(7), zu dem wenigstens drei an dem Kesselgerüst (2) gelagerte Hauptträger (7a,
7b, 7c) gehören,
zwischen denen Trägerzwischenräume vorhanden
sind, und einen ein- oder mehrteiligen inneren Deckenabschnitt (8)
aufweist, der von den Hauptträgern
(7a, 7b, 7c) getragen ist, wobei das Verfahren die folgenden Schritte
beinhaltet:
bei der Errichtung des Kesselgerüstes werden
zwei über ihre
Länge durchgehende
Hauptträger
(7a, 7c) außerhalb des
von einer zu errichtenden Kesselwand (19) festgelegten Gaszugs und
wenigstens ein in seiner Länge
durchgehend ausgebildeter Hauptträger (7b) sich quer über den Gaszug
erstreckend angeordnet,
auf den Hauptträgern (7a, 7b, 7c) werden Litzenhubsysteme
(17) platziert, von denen sich Zugseile (18) nach unten erstrecken,
Bereiche
der Kesselwand (19) werden registerweise vormontiert und von oben...Method for assembling a steam generator (1) with a throttle cable bounded by a boiler wall (19), wherein the steam generator has a boiler frame (2) with a divided boiler frame ceiling (6), wherein the boiler frame ceiling (6) has an outer ceiling section (7) which comprises at least three main beams (7a, 7b, 7c) mounted on the boiler frame (2), between which there are intermediate beam spaces, and a single or multi-part inner ceiling section (8) spaced from the main beams (7a, 7b, 7c) supported, the method comprising the following steps:
during the erection of the boiler frame, two main beams (7a, 7c) extending over their length are arranged extending transversely across the throttle cable outside the throttle cable defined by a boiler wall (19) and at least one main beam (7b) formed continuously therethrough,
on the main beams (7a, 7b, 7c) strand lifting systems (17) are placed, from which pull cables (18) extend downwards,
Areas of the boiler wall (19) are pre-assembled in register and from the top ...
Description
Die Erfindung betrifft ein Montageverfahren zur schnellen Errichtung von Dampferzeugern sowie einen entsprechenden Dampferzeuger.The The invention relates to an assembly method for rapid erection of steam generators and a corresponding steam generator.
Große Dampferzeuger werden heute fast durchweg als Rohrwand-Dampferzeuger ausgebildet, deren Kesselwand durch schräg oder vertikal angeordnete, untereinander verbundene Rohre gebildet wird. Die Kesselwand umschließt einen Gaszug, beispielsweise in Form eines aufrecht stehenden Schachts. Im oberen Teil desselben sind Einbauten wie Economiser, Zwischen überhitzer, Überhitzer und andere Heizflächen angeordnet. Die Kesselwand ist an ihrer Außenseite mit Bandagen und Vorbauten versehen, zu denen an Traversen angeordnete Sammler gehören. An das untere Ende der Kesselwand schließt sich ein Kesseltrichter an, der über einer so genannten Kesselsohle hängt. Der gesamte Kessel, zu dem die genannten Elemente gehören, ist in einem Kesselgerüst hängend angeordnet. Das Kesselgerüst steht auf einem die Kesselsohle begrenzenden Fundament und weist mehrere durch Querriegel und Gerüstdiagonalen miteinander verstrebte Kesselstützen auf, die eine Kesselgerüstdecke tragen. Die Kesselgerüstdecke trägt den Kessel, der oben unterhalb der Kesselgerüstdecke mit einer Kesseldecke versehen ist.Big steam generator are now almost consistently designed as a tube wall steam generator, their boiler wall by oblique or vertically arranged, interconnected tubes formed becomes. The boiler wall encloses a throttle cable, for example in the form of an upright shaft. In the upper part of the same are internals such as economizer, intermediate superheater, superheater and other heating surfaces arranged. The boiler wall is provided on its outside with bandages and stems, to which arranged on traverses collectors belong. At the bottom of the Boiler wall closes a boiler funnel, which over a so-called boiler sole hangs. The entire boiler, to which the named elements belong, is in a boiler frame hanging arranged. The boiler skeleton stands on a base bounding the boiler base and points several by cross bars and scaffold diagonals mutually braced boiler supports on which a boiler scaffold ceiling wear. The boiler scaffold ceiling wear that Kettle upside down below the boiler scaffold ceiling with a kettle ceiling is provided.
Zur
schnellen Errichtung solcher größerer Dampferzeuger
schlägt
die
Dieses Verfahren hat sich zur Errichtung größerer Dampferzeuger bewährt. Es stößt jedoch an Grenzen bei besonders großen Dampferzeugern, deren Kesselgerüstdecke wenigstens einen, vorzugsweise aber mehrere ungeteilte, den Gaszug überspannende Hauptträger aufweist.This Method has been proven for the construction of larger steam generator. It but it comes up on borders with especially large ones Steam generators, their boiler scaffold ceiling at least one, but preferably several undivided, spanning the throttle cable main carrier having.
Es ist Aufgabe der Erfindung, ein Verfahren und einen Dampferzeuger zu schaffen, das einen rationellen Aufbau auch besonders großer Dampferzeuger gestattet.It Object of the invention, a method and a steam generator to create a rational construction of especially large steam generators allowed.
Diese
Aufgabe wird mit dem Verfahren nach Anspruch 1 und dem Dampferzeuger
nach Anspruch 8 gelöst:
Bei
dem erfindungsgemäßen Verfahren
wird vorausgesetzt, dass der äußere Deckenabschnitt
mehrere Hauptträger
aufweist, von denen sich wenigstens einer quer über den Gaszug erstreckt, wobei
zwischen den verschiedenen Hauptträgern Trägerzwischenräume vorhanden
sind. Die Trägerzwischenräume dienen
als Zugangsöffnung,
durch die mittels eines Krans in dem oberen Teil des Gaszugs zu
montierende Komponenten, wie Ban dagen, Vorbauten oder Kesselwandteile,
zu ihrem Einbauort geführt
werden können.
Der Kran kann die Teile hängend
durch die Trägerzwischenräume führen.This object is achieved by the method according to claim 1 and the steam generator according to claim 8:
In the method according to the invention, it is assumed that the outer ceiling section has a plurality of main beams, at least one of which extends transversely across the throttle cable, wherein carrier gaps are present between the various main beams. The carrier spaces serve as an access opening through which by means of a crane in the upper part of the throttle cable to be mounted components, such as ban dagen, stems or boiler wall parts, can be guided to their installation. The crane can guide the parts suspended through the carrier spaces.
Während auf diese Weise der obere Teil des Kessels weitgehend aufgebaut bzw. fertig gestellt wird kann gleichzeitig in einem vertikal darunter liegenden Baubereich oberhalb der Kesselsohle der innere Deckenabschnitt der Kesselgerüstdecke sowie darunter die Kesseldecke und die Einbauten montiert werden. Die betreffenden Teile können dabei beispielsweise mittels einer geeigneten Hilfsvorrichtung in der jeweils gewünschten Höhe gehalten und miteinander verbunden werden. Es ist auch möglich, die innere Kesselgerüstdecke durch geeignete Mittel aufzuständern und die darunter zu montierende Kesseldecke sowie die Einbauten hängend an ihr zu montieren. Der innere Deckenabschnitt der Kesselgerüstdecke kann auch an Litzen oder Zugseilen aufgehängt werden, die mit entsprechenden Litzenhubsystemen verbunden sind. Die Litzenhubsysteme umfassen z.B. hydraulische Heber, die auf den Hauptträgern der äußeren Kesselgerüstdecke aufgestellt werden können. Insbesondere kann der sich quer über den Gaszug erstreckende Hauptträger zum Aufhängen der inneren Kesselgerüstdecke oder von Deckenmodulen dienen, in die die innere Kesselgerüstdecke aufgeteilt ist.While on this way, the upper part of the boiler largely built or can be finished at the same time in a vertical underneath lying building area above the boiler floor of the inner ceiling section the boiler scaffold ceiling and below which the boiler ceiling and the internals are mounted. The relevant parts can in this case, for example by means of a suitable auxiliary device in the respectively desired Height kept and be connected with each other. It is also possible to use the inner boiler scaffold ceiling to start by appropriate means and the boiler ceiling to be installed underneath and the fittings hanging to mount on it. The inner ceiling section of the boiler scaffold ceiling Can also be hung on strands or pull ropes, with the appropriate Litzenhubsystemen are connected. The Litzenhubsysteme include e.g. hydraulic lifters resting on the main girders of the outer boiler scaffold ceiling can be set up. In particular, the cross over the throttle cable extending main carrier for hanging the inner boiler scaffold ceiling or from ceiling modules into which the inner boiler scaffold ceiling is divided.
Das insoweit vorgeschlagene Konzept gestattet die Anwendung des Prinzips des gleichzeitigen Aufbaus von oberer Kesselwand und Einbauten in vertikal voneinander beabstandeten Montagestellen und des nachträglichen Zusammenführens, indem der innere Deckenabschnitt mit daran hängenden Einbauten nach oben gehoben wird, auch bei sehr großen Dampferzeugern, bei denen ein fast den gesamten Gaszug überdeckender innerer De ckenabschnitt und ein vollständig außerhalb des Gaszugs stehender äußerer Deckenabschnitt zu unwirtschaftlichen Lösungen führen würde. Mit der Teilung der Kesselgerüstdecke in der vorgeschlagenen Weise, bei der nämlich wenigstens ein Hauptträger des äußeren Deckenabschnitts quer über dem Gaszug verläuft, lassen sich ohne Weiteres Gaszüge von beispielsweise 30 m × 30 m Querschnitt überbrücken. Die Hauptträger sind dabei vorzugsweise unterbrechungsfrei ausgebildet, was statische und dynamische Vorteile hat und zu einer Verminderung hoch belasteter Trennstellen führt. Mit dem vorgeschlagenen Konzept können auch sehr große Kesselgerüstdecken in einen inneren und einen äußeren Deckenabschnitt unterteilt und nach der Montage der oberen Kesselwand und der Einbauten an unterschiedlichen Orten nachträglich zusammengeführt werden.The The concept proposed so far allows the application of the principle the simultaneous construction of upper boiler wall and internals in vertically spaced mounting locations and the subsequent Merging, by the inner ceiling section with attached fittings upwards is lifted, even at very large Steam generators in which almost the entire throttle cable überdeckender inner decks section and a completely outside the throttle cable stationary outer ceiling section to uneconomic solutions to lead would. With the division of the boiler scaffold ceiling in the proposed manner, namely at least one main carrier of the outer ceiling section across the throttle cable runs, can be easily throttle cables of for example 30 m × 30 m Cross-section. The main carrier are preferably formed without interruption, which is static and has dynamic advantages and a reduction of high burden Separating points leads. With the proposed concept can also very large boiler scaffolding ceilings in an inner and an outer ceiling section divided and after the installation of the upper boiler wall and the internals be merged at different locations later.
Es ist möglich, den inneren Deckenabschnitt ein- oder mehrteilig, z.B. aufgeteilt in Deckenmodule auszubilden. Der innere Deckenabschnitt kann auf der Kesselsohle aufgebaut oder in Form von vorgefertigten Einheiten dorthin verbracht werden. Die unter ihm zu montierenden Kesseldecke und Einbauten können dann an ihm hängend montiert werden, wobei der innere Deckenabschnitt in gleicher, ausreichender Höhe bleibt oder ausgehend von einer geringeren Höhe schrittweise angehoben wird.It is possible, the inner ceiling section one or more parts, e.g. divided up in ceiling modules. The inner ceiling section can be on the Kesselohle constructed or in the form of prefabricated units be there. The boiler cover to be mounted under it and internals can then hanging on him be mounted, wherein the inner ceiling section in the same, sufficient Height remains or is gradually raised from a lower height.
Ist der innere Deckenabschnitt einteilig ausgebildet, wird er in jedem Fall mit den darunter hängenden Einbauten im Ganzen nach oben verfahren, wenn die obere Kesselwand fertig gestellt ist und die Einbauten an ihm hängend fertig montiert sind. Ist der innere Deckenabschnitt jedoch in Deckenmodule aufgeteilt, können alternativ zwei unterschiedliche Montageverfahren durchgeführt werden, nämlich erstens synchrones An heben aller Deckenmodule mit den darunter hängenden Einbauten an den Einbauort oder zweitens Anheben der Deckenmodule mit den jeweils individuell unter dem jeweiligen Deckenmodul hängenden Einbauten nacheinander, d.h. zu unterschiedlichen Zeitpunkten. In letzterem Fall muss auch die Kesseldecke mehrteilig aufgebaut werden, so dass jedem inneren Deckenmodul ein eigener Kesseldeckenabschnitt zugeordnet ist.is the inner ceiling section integrally formed, he is in each Case with the hanging below Installations as a whole move upwards when the upper boiler wall is completed and the internals are mounted hanging on him ready. However, if the inner ceiling section is divided into ceiling modules, can alternatively two different assembly methods are carried out namely first Synchronous lifting of all ceiling modules with the ones below Built-in to the installation or secondly lifting the ceiling modules with each hanging individually under the respective ceiling module Internals one after the other, i. at different times. In In the latter case, the boiler ceiling must be constructed in several parts, so that each inner ceiling module has its own boiler ceiling section assigned.
Während die erstgenannte Verfahrensweise den Vorzug hat, dass Einbauten zugleich von mehreren Deckenmodulen getragen werden können, d.h. eine Fläche einnehmen können, die größer ist als die eines einzelnen Deckenmoduls, hat die zweitgenannte Verfahrensweise den Vorzug, dass der Aufbau der oberen Kesselwand sowie der Aufbau der Einbauten verfahrenstechnisch und zeitlich noch enger miteinander verzahnt werden können. Wird beispielsweise ein sehr großer Dampferzeuger mit vier Kesselwänden errichtet, die beispielsweise nach Norden, Osten, Süden, Westen ausgerichtet sind und ist bereits die nördliche Kesselwand sowie um die anschließenden Ecken herum ein Teil der östlichen und der westlichen Kesselwand fertig gestellt, kann das an die nördliche Kesselwand anschließende Deckenmodul bereits angehoben werden, während weitere Deckenmodule mit darunter liegenden Einbauten noch über der Kesselsohle errichtet und die östliche, westliche und südliche Kesselwand noch fertig gestellt werden. Diese Vorgehensweise verbessert auch die Zugänglichkeit zu den zu errichtenden Einbauten. Beispielsweise werden Schweiß- und Montagearbeiten erleichtert. Die erhaltene Flexibilität hinsichtlich der Gestaltung des Fertigungsablaufs gestattet eine Verdichtung desselben zur Erzielung kürzest möglicher Bauzeiten von Großdampferzeugern.While the the former method has the advantage that internals at the same time be supported by several ceiling modules, i. occupy an area can, which is bigger than that of a single ceiling module, has the second-mentioned procedure the preference that the construction of the upper boiler wall as well as the construction the internals procedurally and temporally even closer together can be interlocked. If, for example, a very large steam generator with four boiler walls is erected, for example, oriented north, east, south, west and is already the northern one Kesselwand and around the adjoining corners around a part the eastern one and the western boiler wall finished, this can be done to the north Boiler wall adjoining Ceiling module already raised while other ceiling modules built with underlying fittings over the boiler bottom and the eastern, western and southern Boiler wall still to be completed. This approach also improves the accessibility to the built-ins. For example, welding and assembly work facilitated. The resulting flexibility in terms of design the manufacturing process allows it to be compacted shortest potential Construction times of large steam generators.
Die entsprechenden Vorzüge werden mit dem Dampferzeuger nach Anspruch 8 erhalten. Der den Gaszug überspannende, vorzugsweise ungeteilte Hauptträger der äußeren Kesselgerüstdecke verleiht dem Kesselgerüst besondere Stabilität und bietet einen Aufhängepunkt für die innere Kesselgerüstdecke bzw. von Modulen derselben. Es ergibt sich ein statisch günstiger Aufbau in Verbindung mit den oben genannten Vorteilen hinsichtlich der Errichtung des Dampferzeugers.The corresponding benefits are obtained with the steam generator according to claim 8. The spanning the throttle cable, preferably undivided main beams the outer boiler scaffold ceiling gives the boiler skeleton special stability and offers a suspension point for the inner boiler scaffold ceiling or modules thereof. It results in a statically favorable Construction in connection with the above advantages regarding the construction of the steam generator.
Obwohl nicht zwingend, hat es sich als vorteilhaft herausgestellt, die Träger der äußeren Kesselgerüstdecke zueinander parallel auszurichten. Dies ergibt einen übersichtlichen Aufbau. Außerdem sind die Hauptträger vorzugsweise ungeteilt. Sie können bereits in einer frühen Bauphase errichtet werden, in der die Kesselwand noch nicht fertig gestellt ist. Die zwischen den Hauptträgern vorhandenen Zwischenräume sind ausreichend groß bemessen, um Kesselwandabschnitte und sonstige Teile von oben her in das Kesselgerüst einzuheben.Even though not mandatory, it has been found to be advantageous, the carrier the outer boiler scaffold ceiling align parallel to each other. This gives a clear overview Construction. Besides, they are the main carriers preferably undivided. You can already in an early Construction phase to be erected, in which the boiler wall is not finished yet is placed. The gaps between the main beams are big enough to Lift boiler wall sections and other parts from above into the boiler frame.
Vorzugsweise werden die Hauptträger als Kastenprofilträger ausgebildet. Mit diesen wird insbesondere während der Bauphase, in der sie den Gaszug frei überspannen, eine ausreichende Standfestigkeit erreicht, so dass insbesondere der den Gaszug überspannende Hauptträger auch als Abstützung für die Litzenhubsysteme zum Anheben der inneren Kesselgerüstdecke dienen kann.Preferably become the main carriers as a box profile carrier educated. With these, especially during the construction phase, in the they span the throttle cable freely, achieved sufficient stability, so that in particular the throttle cable spanning main carrier also as a support for the Litzhubsysteme for lifting the inner boiler scaffold ceiling can serve.
Weitere Einzelheiten vorteilhafter Ausführungsformen des Dampferzeugers sind Gegenstand der Zeichnung, der Beschreibung oder von Unteransprüchen.Further Details of advantageous embodiments the steam generator are the subject of the drawing, the description or subclaims.
In der Zeichnung sind Ausführungsbeispiele der Erfindung veranschaulicht. Es zeigen:In the drawing are embodiments of Invention illustrated. Show it:
In
Der
innere Deckenabschnitt
In
dem Abschnitt
Der
innere Deckenabschnitt
An
den Abschnitt
Der
insoweit veranschaulichte Dampferzeuger
Gemäß
According to
Zeitgleich
werden die Deckenmodule
Ein
weiterer Arbeitsschritt ist in
Sind
die Bandagen und Vorbauten
An
dem äußeren Deckenabschnitt
Mit
diesem Bauabschnitt ist der Aufbau des Kesselgerüsts
Gleichzeitig
mit dem Einbau der Teile
Etwa
gleichzeitig mit Fertigstellung der oben genannten Einbauten
Im
folgenden werden die Kesselwand
Die
innere Kesselgerüstdecke
Die
Deckenmodule
Abweichend
davon können
einzelne Deckenmodule
Der
z.B. aus drei Deckenmodulen
Zur
rationellen Errichtung großer
Dampferzeuger
Claims (16)
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200510009592 DE102005009592B4 (en) | 2005-02-28 | 2005-02-28 | Quick assembly process for large steam generators |
PL379051A PL210548B1 (en) | 2005-02-28 | 2006-02-24 | Fast assembly method for large steam generators |
AU2006200834A AU2006200834B2 (en) | 2005-02-28 | 2006-02-27 | Fast assembly method for large steam generators |
ZA200601683A ZA200601683B (en) | 2005-02-28 | 2006-02-27 | Fast assembly method for large steam generators |
CNB2006100093641A CN100520170C (en) | 2005-02-28 | 2006-02-28 | Quick assembly method for large scale steam generator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200510009592 DE102005009592B4 (en) | 2005-02-28 | 2005-02-28 | Quick assembly process for large steam generators |
Publications (2)
Publication Number | Publication Date |
---|---|
DE102005009592A1 DE102005009592A1 (en) | 2006-09-07 |
DE102005009592B4 true DE102005009592B4 (en) | 2007-09-27 |
Family
ID=36848066
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE200510009592 Revoked DE102005009592B4 (en) | 2005-02-28 | 2005-02-28 | Quick assembly process for large steam generators |
Country Status (5)
Country | Link |
---|---|
CN (1) | CN100520170C (en) |
AU (1) | AU2006200834B2 (en) |
DE (1) | DE102005009592B4 (en) |
PL (1) | PL210548B1 (en) |
ZA (1) | ZA200601683B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9696029B2 (en) | 2014-04-15 | 2017-07-04 | General Electric Technology Gmbh | Method for erecting a boiler, module and boiler comprising the module |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102009015961B4 (en) * | 2008-04-25 | 2015-05-28 | Alstom Technology Ltd. | Method for assembling a steam generator |
CN102393003B (en) * | 2010-09-28 | 2014-02-19 | 上海锅炉厂有限公司 | Assembling method of steam generator |
CN102788337A (en) * | 2012-07-16 | 2012-11-21 | 大连易世达新能源发展股份有限公司 | Modular bypass vent waste heat boiler at tail of cement kiln |
CN103342321B (en) * | 2013-06-28 | 2016-02-17 | 中广核工程有限公司 | The integral replacing hanging method of in-service nuclear power station steam generator |
CN104930491B (en) * | 2015-05-08 | 2016-11-16 | 山东电力建设第一工程公司 | Double reheat ultra supercritical tower boiler internal heating surface component installation system and method |
CN110005576B (en) * | 2019-03-25 | 2023-12-22 | 明阳智慧能源集团股份公司 | Wind power generation wind tower capable of accurately correcting verticality and installation and maintenance method thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0402248B1 (en) * | 1989-06-07 | 1993-03-03 | STEIN INDUSTRIE Société Anonyme dite: | Erection process for a steam generating plant with steam boiler |
DE10014758C2 (en) * | 2000-03-24 | 2003-10-09 | Alstom Power Boiler Gmbh | Steam generator and assembly method for this |
DE10335499B3 (en) * | 2003-07-31 | 2004-11-25 | Alstom Power Boiler Gmbh | Steam generator erection method has pre-assembled pipe wall modules attached to steam vessel frame before fitting frame cover |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3751783A (en) * | 1971-06-22 | 1973-08-14 | Combustion Eng | Method of erection of horizontal surfaced heat transfer modules for steam generating units |
-
2005
- 2005-02-28 DE DE200510009592 patent/DE102005009592B4/en not_active Revoked
-
2006
- 2006-02-24 PL PL379051A patent/PL210548B1/en unknown
- 2006-02-27 AU AU2006200834A patent/AU2006200834B2/en not_active Ceased
- 2006-02-27 ZA ZA200601683A patent/ZA200601683B/en unknown
- 2006-02-28 CN CNB2006100093641A patent/CN100520170C/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0402248B1 (en) * | 1989-06-07 | 1993-03-03 | STEIN INDUSTRIE Société Anonyme dite: | Erection process for a steam generating plant with steam boiler |
DE10014758C2 (en) * | 2000-03-24 | 2003-10-09 | Alstom Power Boiler Gmbh | Steam generator and assembly method for this |
DE10335499B3 (en) * | 2003-07-31 | 2004-11-25 | Alstom Power Boiler Gmbh | Steam generator erection method has pre-assembled pipe wall modules attached to steam vessel frame before fitting frame cover |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9696029B2 (en) | 2014-04-15 | 2017-07-04 | General Electric Technology Gmbh | Method for erecting a boiler, module and boiler comprising the module |
Also Published As
Publication number | Publication date |
---|---|
CN1837679A (en) | 2006-09-27 |
CN100520170C (en) | 2009-07-29 |
PL210548B1 (en) | 2012-01-31 |
PL379051A1 (en) | 2006-09-04 |
DE102005009592A1 (en) | 2006-09-07 |
AU2006200834A1 (en) | 2006-09-14 |
ZA200601683B (en) | 2007-04-25 |
AU2006200834B2 (en) | 2011-08-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE102005009592B4 (en) | Quick assembly process for large steam generators | |
EP1136754B1 (en) | Steam generator and method of assembling | |
DE102009015961B4 (en) | Method for assembling a steam generator | |
DE69417849T2 (en) | METHOD FOR ASSEMBLING BUILDING SECTIONS OF A STEEL CONSTRUCTION | |
DE69434694T2 (en) | Foundation element for buildings | |
EP2574711A1 (en) | Tower for a wind energy facility | |
DE10335499B3 (en) | Steam generator erection method has pre-assembled pipe wall modules attached to steam vessel frame before fitting frame cover | |
EP3208405B1 (en) | Device and method for assembling tower-like structures from pre-fabricated elements | |
DE102005023488B4 (en) | Lifting method for the cyclic erection of a framework for suspended boilers | |
WO2013139815A1 (en) | Offshore supporting structure for wind energy installations and framework element for same | |
DE102005014025A1 (en) | Steel framework tower e.g. for wind power plants, has tower powerplant having pyramid tapered shape and in corner areas steel supporting tubes of lower anchorage up to upper part are provided | |
EP3042010A2 (en) | Jacket for a wind turbine and method for the production of said jacket | |
DE69000992T2 (en) | ASSEMBLY METHOD OF A STEAM GENERATING SYSTEM WITH A STEAM BOILER. | |
EP3306010B1 (en) | Protection and/or work scaffolding and method for erecting it | |
DE102017114090B4 (en) | Method of constructing a building | |
DE102019217692A1 (en) | Foundation for a tower of a wind turbine | |
DE3933198C2 (en) | Bar grating | |
EP2653715A1 (en) | Tower for a wind energy facility and method for erecting same | |
DE3815911C2 (en) | ||
DE4031663A1 (en) | SPECIALTY ROOF CONSTRUCTION | |
DE10117113A1 (en) | Offshore wind power system bearer structure has position of transition between upper part with static interacting elongated elements and mono-pile lower part dependent on sea-bed height | |
DE2652783C3 (en) | Wooden skeleton for a multi-storey building | |
DE1289057C2 (en) | STEAM GENERATOR WITH HORIZONTAL AND VERTICAL OUTER BANDAGES SERVING THE PIPE WALLS | |
DE10154236A1 (en) | Method for building girder bridge comprises building base section and erecting pylon as temporary support for this, prefabricated sections being added which are supported by cables attached to pylon | |
DE1227632B (en) | Chimney with a framework and the method for its assembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
8363 | Opposition against the patent | ||
R037 | Decision of examining division/fpc revoking patent now final |
Effective date: 20130726 |
|
R107 | Publication of grant of european patent rescinded |
Effective date: 20131219 |