DE10109040C1 - Gründung für eine Windkraftanlage - Google Patents
Gründung für eine WindkraftanlageInfo
- Publication number
- DE10109040C1 DE10109040C1 DE10109040A DE10109040A DE10109040C1 DE 10109040 C1 DE10109040 C1 DE 10109040C1 DE 10109040 A DE10109040 A DE 10109040A DE 10109040 A DE10109040 A DE 10109040A DE 10109040 C1 DE10109040 C1 DE 10109040C1
- Authority
- DE
- Germany
- Prior art keywords
- central tube
- foundation
- tensioning structure
- wind
- quiver
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
- E02D27/425—Foundations for poles, masts or chimneys specially adapted for wind motors masts
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F03D13/22—Foundations specially adapted for wind motors
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Paleontology (AREA)
- Mining & Mineral Resources (AREA)
- Sustainable Energy (AREA)
- Mechanical Engineering (AREA)
- Combustion & Propulsion (AREA)
- Chemical & Material Sciences (AREA)
- Sustainable Development (AREA)
- Foundations (AREA)
Abstract
Gründung für eine Windkraftanlage, mit wenigstens drei Pfahlböcken (10), einem senkrecht stehenden Zentralrohr (12) und einem Strebenwerk (14), wobei jeder der Pfahlböcke (10) ein Kopfstück (16), das aus wenigstens drei in Neigung ausgerichteten Führungsrohren (18) und einem Köcher (20) besteht sowie durch die Führungsrohre (18) unter einem spitzen Winkel zur Vertikalen in den Baugrund eingerammte Rammpfähle (22) aufweist, das Zentralrohr (12) an seinem oberen Ende mit einem Flansch (24) versehen ist und das Strebenwerk (14) aus von dem Köcher (20) der Pfahlböcke (10) in Neigung zu dem Zentralrohr (12) verlaufenden, dieses abstützenden Schrägstreben (26) und von dem Köcher (20) zu dem Fuß des Zentralrohrs (12) verlaufenden Horizontalstreben (28) besteht.
Description
Die Erfindung betrifft eine Gründung für eine Windkraft
anlage.
Bei der Errichtung von großen Windkraftanlagen stellt
sich das Problem der Gründung. Bisher werden große Fun
damente aus Stahlbeton errichtet. Die Kosten insbesonde
re für den Rückbau dieser Fundamente sind erheblich.
2.
Aus der DE 30 07 442 A ist eine Gründung bekannt, bei
der eine tragende Struktur mit ihrem unteren Ende in
einer gelenkigen Lagerung abgestützt ist.
Der Erfindung liegt die Aufgabe zugrunde, eine Gründung
zu schaffen, bei der auf die Verwendung von Massenbeton
verzichtet werden kann.
Erfindungsgemäß wird diese Aufgabe durch die Merkmale
des Hauptanspruchs gelöst, die Unteransprüche geben
bevorzugte Ausgestaltungen an.
Die hier vorgeschlagene Gründung bietet sich besonders
dann an, wenn an einem Altstandort einer Windkraftanlage
eine neue leistungsfähigere zu errichten oder wenn es
darum geht, eine über die Höhe des Turmes hinausgehende
Nabenhöhe zu erreichen.
Die Transportprobleme, die sich bei der Errichtung eines
einstückigen Turmes ergeben, stellen sich bei der Ver
wendung des hier vorgeschlagenen Strebenwerks nicht.
Die Erfindung wird im folgenden anhand einer Zeichnung
erläutert.
Dabei zeigt:
Fig. 1 eine Schnittansicht der Gründung,
Fig. 2 eine Untersicht entlang der Linie B-B
von Fig. 1,
Fig. 3 eine Draufsicht auf einen Pfahlbock,
und
Fig. 4 eine Schnittansicht entlang der Linie
a-a von Fig. 3.
Die Gründung besteht aus drei Pfahlböcken 10, einem sen
krecht stehenden Zentralrohr 12, und einem Strebenwerk
14. Jeder der Pfahlböcke 10 weist ein Kopfstück 16 sowie
unter einem spitzen Winkel zur Vertikalen in den Bau
grund eingerammte Rammpfähle 22 auf. Bei dem dargestell
ten Ausführungsbeispiel sind drei Pfahlböcke 10 vorgese
hen, es können jedoch auch mehr Pfahlstrebeneböcke 10
vorgesehen sein.
Das Kopfstück 16 besteht aus vier in Neigung ausgerich
teten Führungsrohren 18 und einem Köcher 20, das mit den
Führungsrohren 18 verschraubt ist.
Das Zentralrohr 12 ist an seinem oberen Ende mit einem
Flansch 24 versehen, auf den der Fuß des eigentlichen
Turmes der Windkraftanlage verschraubt wird.
Das Strebenwerk 14 besteht aus von dem Köcher 20 der
Pfahlböcke 10 in Neigung zu dem Zentralrohr 12 verlau
fenden, dieses abstützenden Schrägstreben 26 und von dem
Köcher 20 zu dem Fuß des Zentralrohrs 12 verlaufenden
Horizontalstreben 28.
Zur Errichtung der Gründung werden zunächst auf einem
gedachten Kreis Baugruben ausgehoben, in die die Kopf
stücke 16 - noch ohne Köcher 20 - eingesetzt und - etwa
durch den Einsatz von Erdnägeln und/oder durch einen
Verguß mit Beton - fixiert werden. Die Baugrube wird
sodann wieder verfüllt. Sodann werden die - vorzugsweise
als Doppel-T-Träger ausgebildeten - Rammpfähle 22 in die
eine Schablone bildenden Führungsrohre 18 eingesetzt und
entlang dem durch durch diese vorgegebenen Weg unter
einem spitzen Winkel zu der Vertikalen in den Baugrund
eingerammt. Sodann werden die Führungsrohre 18 und die
oberen Enden der Rammpfähle 22 kraftschlüssig vergossen.
Das Kopfstück 16 wird jetzt durch Aufschauben des
Köchers 20 vervollständigt.
Es erfolgt jetzt die Montage des Strebenwerks 14, das
die Kopfstücke 16 über Schrägstreben 26 und Horizontal
streben 28 mit dem in dem Mittelpunkt des gedachten
Kreises angeordneten Zentralrohr 12 verbindet. Die Knag
gen 30, mit denen das Strebenwerk 14 an seinen äußeren
Enden versehen ist, werden in die Köcher 20 eingefügt
und mit diesen vergossen.
Claims (3)
1. Gründung für eine Windkraftanlage, gekennzeichnet
durch
wenigstens drei Pfahlböcke (10),
ein senkrecht stehendes Zentralrohr (12) und
ein Strebenwerk (14),
wobei
jeder der Pfahlböcke (10) ein Kopfstück (16), das aus wenigstens drei in Neigung ausgerichteten Führungsroh ren (18) und einem Köcher (20) besteht, sowie durch die Führungsrohre (18) unter einem spitzen Winkel zur Ver tikalen in den Baugrund eingerammte Rammpfähle (22) aufweist,
das Zentralrohr (12) an seinem oberen Ende mit einem Flansch (24) versehen ist und
das Strebenwerk (14) aus von dem Köcher (20) der Pfahl böcke (10) in Neigung zu dem Zentralrohr (12) verlau fenden, dieses abstützenden Schrägstreben (26) und von dem Köcher (20) zu dem Fuß des Zentralrohrs (12) ver laufenden Horizontalstreben (28) besteht.
wenigstens drei Pfahlböcke (10),
ein senkrecht stehendes Zentralrohr (12) und
ein Strebenwerk (14),
wobei
jeder der Pfahlböcke (10) ein Kopfstück (16), das aus wenigstens drei in Neigung ausgerichteten Führungsroh ren (18) und einem Köcher (20) besteht, sowie durch die Führungsrohre (18) unter einem spitzen Winkel zur Ver tikalen in den Baugrund eingerammte Rammpfähle (22) aufweist,
das Zentralrohr (12) an seinem oberen Ende mit einem Flansch (24) versehen ist und
das Strebenwerk (14) aus von dem Köcher (20) der Pfahl böcke (10) in Neigung zu dem Zentralrohr (12) verlau fenden, dieses abstützenden Schrägstreben (26) und von dem Köcher (20) zu dem Fuß des Zentralrohrs (12) ver laufenden Horizontalstreben (28) besteht.
2. Gründung nach Anspruch 1, dadurch gekennzeichnet,
daß die Rammpfähle (22) mit den Führungsrohren (18)
kraftschlüssig vergossen sind.
3. Gründung nach Anspruch 1 oder 2, dadurch gekenn
zeichnet, daß das Strebenwerk mit Knaggen (30) versehen
ist, die in den Köchern (20) eingefügt und vergossen
sind.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10109040A DE10109040C1 (de) | 2001-02-24 | 2001-02-24 | Gründung für eine Windkraftanlage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10109040A DE10109040C1 (de) | 2001-02-24 | 2001-02-24 | Gründung für eine Windkraftanlage |
Publications (1)
Publication Number | Publication Date |
---|---|
DE10109040C1 true DE10109040C1 (de) | 2002-07-11 |
Family
ID=7675419
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE10109040A Expired - Fee Related DE10109040C1 (de) | 2001-02-24 | 2001-02-24 | Gründung für eine Windkraftanlage |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE10109040C1 (de) |
Cited By (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20211831U1 (de) * | 2002-07-31 | 2003-09-04 | Bauer Karl Heinz | Abstützvorrichtung |
EP1457674A2 (de) * | 2003-03-10 | 2004-09-15 | Bernd Mahlke | Fundament für Offshore Windenergieanlagen |
DE10357392A1 (de) * | 2003-09-08 | 2005-04-21 | Oevermann Gmbh & Co Kg Hoch Un | Turmbauwerk, insbesondere für eine Windenergieanlage |
WO2005040605A1 (de) * | 2003-10-17 | 2005-05-06 | Aerodyn Engineering Gmbh | Gründung für eine offshore-windenergieanlage |
DE202005003425U1 (de) * | 2005-03-03 | 2006-07-20 | Oevermann Gmbh & Co. Kg | Gründung, insbesondere für eine Offshore-Windenergieanlage |
EP2024575A1 (de) * | 2006-06-02 | 2009-02-18 | Rautaruukki OYJ | Fundamentanordnung |
GB2472103A (en) * | 2009-07-24 | 2011-01-26 | Njordgen Sustainable Technologies Ltd | Wind turbine support for vertical adjustment installation method |
CN102535510A (zh) * | 2012-02-27 | 2012-07-04 | 广东明阳风电产业集团有限公司 | 海上风机导管架基础安装方法及一体化导管架装置 |
CN102587405A (zh) * | 2012-02-27 | 2012-07-18 | 广东明阳风电产业集团有限公司 | 海上风机导管架基础安装方法及分离式导管架装置 |
CN103255777A (zh) * | 2013-05-25 | 2013-08-21 | 芜湖中泰新能源有限公司 | 一种柱桩及采用该柱桩的高压电线塔基座 |
CN103998692A (zh) * | 2012-02-03 | 2014-08-20 | 瓦卢瑞克德国有限公司 | 海上设备的基础结构,特别是安装噪音较低的海上风力发电机基础结构,以及该基础结构的安装方法 |
CN105002920A (zh) * | 2015-06-09 | 2015-10-28 | 芜湖中泰新能源有限公司 | 一种建筑用基桩 |
CN105442919A (zh) * | 2015-10-28 | 2016-03-30 | 国网山东省电力公司潍坊供电公司 | 电力抢修用电力水泥杆测偏纠偏集成装置 |
CN105442910A (zh) * | 2015-10-28 | 2016-03-30 | 国网山东省电力公司潍坊供电公司 | 电力抢修用能快速施工的电线杆扶正设备 |
CN105442918A (zh) * | 2015-10-28 | 2016-03-30 | 国网山东省电力公司潍坊供电公司 | 电力线杆校正抢修工具 |
CN105464451A (zh) * | 2015-10-28 | 2016-04-06 | 国网山东省电力公司潍坊供电公司 | 能快速施工的电力线杆校正抢修工具 |
CN106639545A (zh) * | 2015-10-28 | 2017-05-10 | 刘刚 | 一种可在现场快速组装的多用途电线杆测正归正装置 |
CN106639516A (zh) * | 2015-10-28 | 2017-05-10 | 刘刚 | 一种电杆倾斜检测修正机 |
CN106639519A (zh) * | 2015-10-28 | 2017-05-10 | 刘刚 | 野外抢修用便携式线路维护装置 |
CN106639600A (zh) * | 2015-10-28 | 2017-05-10 | 刘刚 | 单人用电力线杆校正抢修工具 |
CN106639520A (zh) * | 2015-10-28 | 2017-05-10 | 刘刚 | 电力水泥杆半自动式*** |
CN106639513A (zh) * | 2015-10-28 | 2017-05-10 | 刘刚 | 一种单人用电力线杆直立状态检测及纠正工具 |
WO2017193792A1 (zh) * | 2016-05-09 | 2017-11-16 | 江苏大学 | 一种防倾倒防霜机固定支座 |
WO2017193794A1 (zh) * | 2016-05-09 | 2017-11-16 | 江苏大学 | 一种底部带侧伸板的防霜机固定支座 |
CN112376603A (zh) * | 2020-11-05 | 2021-02-19 | 上海电气风电集团股份有限公司 | 一种装配式风机基础及其装配方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE300744C (de) * | ||||
DE2014344A1 (de) * | 1970-03-25 | 1971-10-14 | Siemens AG, 1000 Berlin u. 8000 München; Erf( Kießling, Friedrich, Dipl.-Ing., 8520 Erlangen; Stotz, Werner, Dipl.-Ing., 8510Fürth | Gründung für einen Mast, insbesondere Stahlgittermast |
US4561231A (en) * | 1983-04-29 | 1985-12-31 | A. B. Chance Company | Tower-foundation anchor interconnection |
-
2001
- 2001-02-24 DE DE10109040A patent/DE10109040C1/de not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE300744C (de) * | ||||
DE2014344A1 (de) * | 1970-03-25 | 1971-10-14 | Siemens AG, 1000 Berlin u. 8000 München; Erf( Kießling, Friedrich, Dipl.-Ing., 8520 Erlangen; Stotz, Werner, Dipl.-Ing., 8510Fürth | Gründung für einen Mast, insbesondere Stahlgittermast |
US4561231A (en) * | 1983-04-29 | 1985-12-31 | A. B. Chance Company | Tower-foundation anchor interconnection |
Cited By (32)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20211831U1 (de) * | 2002-07-31 | 2003-09-04 | Bauer Karl Heinz | Abstützvorrichtung |
EP1457674A2 (de) * | 2003-03-10 | 2004-09-15 | Bernd Mahlke | Fundament für Offshore Windenergieanlagen |
EP1457674A3 (de) * | 2003-03-10 | 2006-10-11 | Mahlke, Alexander | Fundament für Offshore Windenergieanlagen |
DE10357392A1 (de) * | 2003-09-08 | 2005-04-21 | Oevermann Gmbh & Co Kg Hoch Un | Turmbauwerk, insbesondere für eine Windenergieanlage |
DE10357392B4 (de) * | 2003-09-08 | 2005-11-03 | Oevermann Gmbh & Co. Kg Hoch- Und Tiefbau | Transportsystem für ein Turmbauwerk |
WO2005040605A1 (de) * | 2003-10-17 | 2005-05-06 | Aerodyn Engineering Gmbh | Gründung für eine offshore-windenergieanlage |
DE10349109B4 (de) * | 2003-10-17 | 2008-02-07 | Aerodyn Engineering Gmbh | Gründung für eine Offshore-Windenergieanlage |
DE202005003425U1 (de) * | 2005-03-03 | 2006-07-20 | Oevermann Gmbh & Co. Kg | Gründung, insbesondere für eine Offshore-Windenergieanlage |
EP2024575A1 (de) * | 2006-06-02 | 2009-02-18 | Rautaruukki OYJ | Fundamentanordnung |
EP2024575A4 (de) * | 2006-06-02 | 2010-01-13 | Rautaruukki Oyj | Fundamentanordnung |
GB2472103A (en) * | 2009-07-24 | 2011-01-26 | Njordgen Sustainable Technologies Ltd | Wind turbine support for vertical adjustment installation method |
GB2472103B (en) * | 2009-07-24 | 2011-07-27 | Njordgen Sustainable Technologies Ltd | A wind turbine support assembly and a method for installing a wind turbine using the same |
CN103998692A (zh) * | 2012-02-03 | 2014-08-20 | 瓦卢瑞克德国有限公司 | 海上设备的基础结构,特别是安装噪音较低的海上风力发电机基础结构,以及该基础结构的安装方法 |
CN102535510A (zh) * | 2012-02-27 | 2012-07-04 | 广东明阳风电产业集团有限公司 | 海上风机导管架基础安装方法及一体化导管架装置 |
CN102587405A (zh) * | 2012-02-27 | 2012-07-18 | 广东明阳风电产业集团有限公司 | 海上风机导管架基础安装方法及分离式导管架装置 |
CN103255777A (zh) * | 2013-05-25 | 2013-08-21 | 芜湖中泰新能源有限公司 | 一种柱桩及采用该柱桩的高压电线塔基座 |
CN105002920A (zh) * | 2015-06-09 | 2015-10-28 | 芜湖中泰新能源有限公司 | 一种建筑用基桩 |
CN105442919A (zh) * | 2015-10-28 | 2016-03-30 | 国网山东省电力公司潍坊供电公司 | 电力抢修用电力水泥杆测偏纠偏集成装置 |
CN105442910A (zh) * | 2015-10-28 | 2016-03-30 | 国网山东省电力公司潍坊供电公司 | 电力抢修用能快速施工的电线杆扶正设备 |
CN105442918A (zh) * | 2015-10-28 | 2016-03-30 | 国网山东省电力公司潍坊供电公司 | 电力线杆校正抢修工具 |
CN105464451A (zh) * | 2015-10-28 | 2016-04-06 | 国网山东省电力公司潍坊供电公司 | 能快速施工的电力线杆校正抢修工具 |
CN106639545A (zh) * | 2015-10-28 | 2017-05-10 | 刘刚 | 一种可在现场快速组装的多用途电线杆测正归正装置 |
CN106639516A (zh) * | 2015-10-28 | 2017-05-10 | 刘刚 | 一种电杆倾斜检测修正机 |
CN106639519A (zh) * | 2015-10-28 | 2017-05-10 | 刘刚 | 野外抢修用便携式线路维护装置 |
CN106639600A (zh) * | 2015-10-28 | 2017-05-10 | 刘刚 | 单人用电力线杆校正抢修工具 |
CN106639520A (zh) * | 2015-10-28 | 2017-05-10 | 刘刚 | 电力水泥杆半自动式*** |
CN106639513A (zh) * | 2015-10-28 | 2017-05-10 | 刘刚 | 一种单人用电力线杆直立状态检测及纠正工具 |
WO2017193792A1 (zh) * | 2016-05-09 | 2017-11-16 | 江苏大学 | 一种防倾倒防霜机固定支座 |
WO2017193794A1 (zh) * | 2016-05-09 | 2017-11-16 | 江苏大学 | 一种底部带侧伸板的防霜机固定支座 |
GB2565722A (en) * | 2016-05-09 | 2019-02-20 | Univ Jiangsu | Frost protection machine fixed support with side extending plate at bottom |
GB2565955A (en) * | 2016-05-09 | 2019-02-27 | Univ Jiangsu | Fixed support of anti-toppling frost protection machine |
CN112376603A (zh) * | 2020-11-05 | 2021-02-19 | 上海电气风电集团股份有限公司 | 一种装配式风机基础及其装配方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE10109040C1 (de) | Gründung für eine Windkraftanlage | |
DE202005010398U1 (de) | Verbesserte Struktur eines Modulturms für Windturbinen und andere Anwendungen | |
EP3821084B1 (de) | Fundament für ein windkraftwerk | |
DE102008053454B4 (de) | Hybrides Turmbauwerk | |
DE102011010417A1 (de) | Turm für eine Windkraftanlage | |
DE102005006988A1 (de) | Flächengründung, bevorzugt aufgelöst, für Offshore-Windenergieanlage | |
WO2020012345A1 (de) | Fundament für ein windkraftwerk | |
EP2239398B1 (de) | Turm | |
CN107386327A (zh) | U型槽侧墙与挡墙一体化无拉杆模板及由该模板组成的组合墙 | |
EP3931399A1 (de) | Fundament für eine windkraftanlage | |
EP3208405B1 (de) | Vorrichtung und verfahren zur errichtung von turmartigen bauwerken aus fertigteilelementen | |
EP3303711B1 (de) | Verfahren zur gründung eines turmbauwerks sowie onshore-turmbauwerk | |
DE102018121024A1 (de) | Fundament für eine Windkraftanlage | |
DE102005003972A1 (de) | Gründung einer Offshore-Windenergieanlage mit Seilabspannung | |
WO2021121953A1 (de) | Verfahren zum errichten einer windenergieanlage | |
DE19611518A1 (de) | Windkraftanlage zur Erzeugung elektrischer Energie | |
DE102011116375A1 (de) | Freileitungsmast | |
EP3792430A1 (de) | Turm | |
EP3219879B1 (de) | Verfahren zum aufstellen eines windenergieanlagen-turms sowie entsprechende windenergieanlage | |
CN219219917U (zh) | 一种可拼装伸缩的混凝土浇筑防护棚 | |
DE10117113A1 (de) | Gittermast-Monopfahl als Tragkonstruktion für offshore-Windkraftanlagen | |
DE102011120378A1 (de) | Offshore-Windkraftanlage und Verfahren zum Aufbau und zur Aufstellung der Offshore-Windkraftanlage | |
DE7913787U1 (de) | ||
WO2019179914A1 (de) | Halbfertigteil für ein fundament eines turmbauwerks, halbfertigteil-fundamentsegment, fundament, verfahren zum herstellen eines halbfertigteils sowie verfahren zum herstellen eines fundaments | |
DE102021119100A1 (de) | Anordnung zur Gründung eines Hochbauwerks in einem wasserbedeckten Grund, insbesondere zur Monopile-Gründung einer Offshore-Windenergieanlage, und Montageverfahren hierfür |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8100 | Publication of the examined application without publication of unexamined application | ||
D1 | Grant (no unexamined application published) patent law 81 | ||
8364 | No opposition during term of opposition | ||
8339 | Ceased/non-payment of the annual fee |