CO7020889A2 - Movable structure adapted to support a formwork of a new bridge section in cantilever - Google Patents

Movable structure adapted to support a formwork of a new bridge section in cantilever

Info

Publication number
CO7020889A2
CO7020889A2 CO14161411A CO14161411A CO7020889A2 CO 7020889 A2 CO7020889 A2 CO 7020889A2 CO 14161411 A CO14161411 A CO 14161411A CO 14161411 A CO14161411 A CO 14161411A CO 7020889 A2 CO7020889 A2 CO 7020889A2
Authority
CO
Colombia
Prior art keywords
formwork
cantilever
support
movable structure
bridge section
Prior art date
Application number
CO14161411A
Other languages
Spanish (es)
Inventor
Etxezarreta Angel Maria Aranburu
Original Assignee
Ulma C Y E S Coop
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ulma C Y E S Coop filed Critical Ulma C Y E S Coop
Publication of CO7020889A2 publication Critical patent/CO7020889A2/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
CO14161411A 2012-04-02 2014-07-24 Movable structure adapted to support a formwork of a new bridge section in cantilever CO7020889A2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ES201230505A ES2424774B1 (en) 2012-04-02 2012-04-02 Movable structure adapted to support a formwork of a new bridge section in cantilever

Publications (1)

Publication Number Publication Date
CO7020889A2 true CO7020889A2 (en) 2014-08-11

Family

ID=47827183

Family Applications (1)

Application Number Title Priority Date Filing Date
CO14161411A CO7020889A2 (en) 2012-04-02 2014-07-24 Movable structure adapted to support a formwork of a new bridge section in cantilever

Country Status (6)

Country Link
BR (1) BR112014017051B1 (en)
CO (1) CO7020889A2 (en)
ES (1) ES2424774B1 (en)
MX (1) MX2014011952A (en)
PE (1) PE20142198A1 (en)
WO (1) WO2013149771A1 (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2435505B1 (en) * 2011-11-30 2014-09-23 Rubrica Ingenieria Y Arquitectura, S.L. WORK FOR EXECUTION OF WORKS
ES2566064T3 (en) 2013-01-17 2016-04-08 Rúbrica Ingeniería Y Arquitectura, S.L. Self-launching formwork for port platforms
ES1132730Y (en) 2014-10-27 2015-02-03 Rubrica Ingenieria Y Arquitectura Sl CART FOR THE CONSTRUCTION OF A BOARD OF UNPUENT IN PROGRESSIVE PROGRESS
CN105714683A (en) * 2016-02-23 2016-06-29 中国水利水电第十一工程局有限公司 Installation and dismantling method of high bent cast-in-situ aqueduct suspension type bailey frames
JP6549499B2 (en) * 2016-02-25 2019-07-24 鹿島建設株式会社 Mobile vehicle and construction method of structure
CN105696473A (en) * 2016-04-12 2016-06-22 中建二局第二建筑工程有限公司 Hanging basket single-side assembling and sliding system and hanging basket single-side assembling and sliding method
CN106906750B (en) * 2017-03-24 2019-01-25 中建三局基础设施工程有限公司 Multi-functional across the railway line swing bridge girder closing construction mould bases of one kind and its construction method
CN107988922B (en) * 2018-03-07 2020-01-10 山东博远重工有限公司 Hanging basket trolley with improved structure of bottom support protective cross beam lifting lug
CN108999095A (en) * 2018-09-28 2018-12-14 广东博昊实业集团有限公司 A kind of more truss-like supper wide type hanging basket for bridge construction
CN109778720B (en) * 2019-03-18 2020-11-06 浙江兴土桥梁专用装备制造有限公司 Bridge construction method based on cradle construction
DE102019203959A1 (en) 2019-03-22 2020-09-24 Hünnebeck GmbH Structural system for the manufacture of structures
CN109914244B (en) * 2019-04-26 2023-12-05 四川路桥华东建设有限责任公司 Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof
CN110453612B (en) * 2019-07-25 2021-05-14 广东腾盛模架科技有限公司 Protection device of hanging flower basket is used in road bridge construction
WO2021064259A1 (en) * 2019-10-04 2021-04-08 Rubrica Ingenieria Y Arquitectura, S.L. Successive cantilever carriage
CN113882281B (en) * 2021-11-16 2023-04-07 中国建筑第四工程局有限公司 Hanging basket walking system for bridge cantilever construction and operation method
CN117532624B (en) * 2024-01-10 2024-03-26 南京东奇智能制造研究院有限公司 Automatic positioning and aligning method and system for guardrail plate installation

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1910197B1 (en) * 1969-02-28 1970-04-23 Dyckerhoff & Widmann Ag Process for the production of longer structures, in particular bridge structures, in sections in front of the building and in front of the building in order to carry out the method
DE2607805C3 (en) * 1976-02-26 1979-05-31 Dyckerhoff & Widmann Ag, 8000 Muenchen Device for the section-by-section, free front construction of multi-span bridge structures made of reinforced or prestressed concrete
NO150289C (en) * 1982-06-01 1984-09-19 Oestlandske Spennbetong As DEVICE FOR SECTIONAL CASTING OF TENSIONED CONCRETE BRIDGES AFTER THE FRONT BUILDING METHOD
JP3038163B2 (en) * 1997-04-28 2000-05-08 株式会社ピー・エス Overhang work equipment
DE102007047438B4 (en) 2007-10-04 2022-11-24 Doka Gmbh Formwork arrangement for the cantilever construction of bridges
CN101586330B (en) * 2008-05-22 2011-01-26 中铁十一局集团第一工程有限公司 Receding construction method of cradle of continuous girder bridge made of prestressing concrete
BRPI0925063A2 (en) * 2009-04-15 2015-07-28 Vsl Int Ag Superior advance carriage and method

Also Published As

Publication number Publication date
BR112014017051A8 (en) 2017-07-04
MX2014011952A (en) 2014-12-08
PE20142198A1 (en) 2014-12-29
ES2424774A1 (en) 2013-10-08
BR112014017051B1 (en) 2021-09-21
BR112014017051A2 (en) 2017-06-13
WO2013149771A1 (en) 2013-10-10
ES2424774B1 (en) 2014-07-30

Similar Documents

Publication Publication Date Title
CO7020889A2 (en) Movable structure adapted to support a formwork of a new bridge section in cantilever
CO6910164A2 (en) Antibodies to pcsk9 and uses thereof
BR112015002736A2 (en) processes for oil production and separation of oil and water
BR302012005465S1 (en) CONFIGURATION APPLIED TO CASH TERMINAL FOR USERS
HK1210510A1 (en) Formwork support element
DK2723955T3 (en) FORMWORK SUPPORT IMPROVEMENTS
DE102011115715A8 (en) Holder for pouring into a concrete element
BR112014028100A2 (en) fill to remove wrinkles
DK2903896T3 (en) Course Facilities
DK2912227T3 (en) CONCRETE SHEET
DE112013005666A5 (en) Removal safeguard for knife blocks
CO6900124A2 (en) Improvement in relation to construction
AU344084S (en) Concrete Bridge Unit
BR112013033851A2 (en) method to form sevoflurane
CO6890102A2 (en) New crystal shape
DK2683374T3 (en) Use of vanadium compounds to maintain normoglycemia in a mammal
GB201203477D0 (en) Concrete shuttering
FR2970596B1 (en) CONTACTOR AND SWITCH
UA22930S (en) BLOCK OF FIXED FORMWORK
BRDI7103542S (en) CONSTRUCTION SCAFFOLDING PLATFORM
PL395502A1 (en) Stay-in-place formwork to fabricate strip footings
FI9791U1 (en) Prestressed concrete element
BRDI7106630S (en) CONFIGURATION APPLIED TO POSITION SUPPORT FOR LOWER MEMBERS
TH1201000366B (en) How to produce steel plates
UA22175S (en) SOLD OUT SIGN FOR STREET STRUCTURES