CN2839108Y - Separating submersible self-lifting platform - Google Patents

Separating submersible self-lifting platform Download PDF

Info

Publication number
CN2839108Y
CN2839108Y CN 200520083518 CN200520083518U CN2839108Y CN 2839108 Y CN2839108 Y CN 2839108Y CN 200520083518 CN200520083518 CN 200520083518 CN 200520083518 U CN200520083518 U CN 200520083518U CN 2839108 Y CN2839108 Y CN 2839108Y
Authority
CN
China
Prior art keywords
platform
spud leg
lifting
supporting construction
lower box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200520083518
Other languages
Chinese (zh)
Inventor
徐松森
张士华
田海庆
樊敦秋
初新杰
刘忠彦
孙永泰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Drilling Technology Research Institute of Sinopec Shengli Petroleum Administration Bureau
Original Assignee
Drilling Technology Research Institute of Sinopec Shengli Petroleum Administration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Drilling Technology Research Institute of Sinopec Shengli Petroleum Administration Bureau filed Critical Drilling Technology Research Institute of Sinopec Shengli Petroleum Administration Bureau
Priority to CN 200520083518 priority Critical patent/CN2839108Y/en
Application granted granted Critical
Publication of CN2839108Y publication Critical patent/CN2839108Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to a novel platform, particularly to a separating base self-lifting platform. The platform is composed of a self-lifting main platform, a base supporting structure, a butting guiding device and a ballasting system. The platform is divided into two big separate bodies with floating performance. When the platform is operated, the base platform can be automatically formed by butt joint up and down on the sea. The structure of the self-lifting main platform is essentially the same as the conventional self-lifting main platform. Each up-down spud leg is provided with a guide wheel and a guide sleeve. The base supporting structure is provided with a box body and a fixing spud leg corresponding to the up-down spud leg to be welded into a rigid whole. The butting guiding device guides the up-down spud leg and the fixing spud leg to position exactly through a guide cable. The ballasting system controls the sinking and floating of the base supporting structure, and the matching operation can realize the butt joint and disassembly of the platform on the sea. The utility model can be used for a new-building platform and can also be used for the deep water modification of the existing self-lifting platform.

Description

End jack-up platform is sat in split
Technical field:
A kind of jack-up platform that is applicable to than the operation of territory, deep-sea of the utility model exploitation.
Technical background:
Jack-up platform is to be extensive use of in the marine drilling and very expensive device, and common jack-up platform is made of buoyancy aid, spud leg, lifting machinery etc., and whole platform design is as a whole.Limited by platform towage stability, the platform center of gravity can not be too high, and just the lifting spud leg can not be oversize.In order adapting to, to use longer spud leg like this, only to add large platform buoyancy aid principal dimensions, correspondingly need to strengthen lift capability to guarantee the towage stability than the operation of territory, deep-sea.And because each spud leg is independent respectively, can not be rigidly connected, each spud leg rigidity and requirement of strength are all very high, and spud leg weight and the deck working area that takies are very big.The platform cost strengthens with operating water depth and sharply rises, and that this in the world platform operating water depth maximum is 150m at present.
Summary of the invention:
The purpose of this utility model is a kind of jack-up platform that is applicable to than the operation of territory, deep-sea of exploitation, solves existing jack-up platform cost and strengthens and the rapid problem that rises with the depth of water.
End jack-up platform is sat in split, comprises from rising main platform, sit end supporting construction, docking guiding device, ballasting system.Comprise platform upper box, lifting spud leg, solid stake and lifting machinery, bore and repair the operation facility from rising main platform, sit end supporting construction and comprise platform lower box, fixedly spud leg and other rod member, the butt joint guiding device comprises winch and attach troops to a unit guiding rope, track adjusting wheel, orienting sleeve, and ballasting system comprises the pneumatics unit and attaches troops to a unit ballast control gas circuit, maritime mouth.
Feature of the present utility model is that described split seat end jack-up platform is divided into from rising main platform, sitting end supporting construction two big splits; Be no less than three lifting spud legs from rising main platform installation, track adjusting wheel is installed at each lifting spud leg top, and the center, bottom section is provided with orienting sleeve; Sitting supporting construction bottom, the end is the platform lower box, the platform lower box is divided into several ballast compartment, each ballast compartment is equipped with maritime mouthful, platform lower box top is provided with the fixedly spud leg corresponding with lifting spud leg position, that quantity is identical, each fixedly spud leg also establish ballast tank respectively, the platform lower box, fixedly spud leg and a plurality of rod member assembly welding are a rigid unitary, sit end supporting construction and contain at least one at most and platform lower box that fixedly spud leg quantity is identical; Butt joint guiding winch is installed in from rising on the main platform, and the guiding rope of attaching troops to a unit is fixed on the fixedly top cross-section center of spud leg after passing the track adjusting wheel that is installed on the lifting spud leg, orienting sleeve; The pneumatics unit of ballasting system is installed in from rising on the main platform, and set each ballast tank linked to each other respectively on the ballast of attaching troops to a unit was controlled gas circuit and sat end supporting construction.
The utlity model has following advantage:
(1) adopts the branch body structure, lifting platform spud leg length reduces at double, reduced center of gravity, improved the platform afloat stability greatly, thereby can significantly reduce yardstick, the weight of platform upper float, the corresponding platform that reduced is to the requirement of the rigidity of its spud leg, intensity with to the requirement of a whole set of lifting machinery lift capability, and platform suffered environmental load also reduces thereupon.
(2) sit end supporting construction, limited by the lifting platform function, be welded as a whole, better than separate pile leg structure, be difficult for deforming and vibrating, give full play to material usefulness.And sit end supporting construction and can carry out accurate limiting, help reducing the solid stake of common jack-up platform load, improved platform security lifting master flat-bed spud leg.
(3) two big splits all possess self-buoyancy, need not less important works such as crane barge when in place, and platform the pile pulling difficulty can not occur.
(4) can break through the upper limit of present jack-up platform operating water depth 150m with comparalive ease.
(5) not only can be used for newly-built platform, suitable equally to the deep water transformation of existing jack-up platform.
(6) corresponding with above advantage, can significantly reduce the jack-up platform cost.
Description of drawings:
Fig. 1 sits end jack-up platform preceding scheme drawing in place for split
Fig. 2 sits end jack-up platform process scheme drawing in place for split
Fig. 3 sits end jack-up platform back in place scheme drawing for split
1, platform upper box 2, lifting spud leg 3, platform lower box 4, fixing spud leg
5, winch 6, guiding rope 7, track adjusting wheel 8, orienting sleeve
9, pneumatics unit 10, ballast control gas circuit 11, maritime mouth
The specific embodiment:
Now, the utility model is further described in conjunction with Figure of description 1,2,3:
End jack-up platform is sat in split, mainly by rise main platform certainly, sit end supporting construction, butt joint guiding device, ballasting system constitute.Comprise platform upper box 1, lifting spud leg 2, solid stake and lifting machinery, bore and repair the operation facility from rising main platform, sit that end supporting construction comprises platform lower box 3, fixedly spud leg 4 and other are connected and fixed rod member, the butt joint guiding device comprises winch 5 and attach troops to a unit guiding rope 6, track adjusting wheel 7, orienting sleeve 8, and ballasting system comprises pneumatics unit 9 and attaches troops to a unit ballast control gas circuit 10, maritime mouth 11.Take all factors into consideration every performances such as platform towage, butt joint, in place, fractionation, platform be divided into the two big splits that all have flotation property, during operation at sea voluntarily up and down to being connected into a platform.Main platform and conventional jack-up platform are basic identical from rising, and are equipped with to be no less than three lifting spud legs 2, and track adjusting wheel 7 is installed at each lifting spud leg 2 top, and the center, bottom section is provided with orienting sleeve 8; Sitting supporting construction bottom, the end is platform lower box 3, platform lower box 3 is divided into several ballast compartment, each ballast compartment is equipped with maritime mouthful 11, platform lower box 3 tops are provided with the fixedly spud leg 4 corresponding with lifting spud leg 2 positions, that quantity is identical, each fixedly spud leg 4 also establish ballast tank respectively, platform lower box 3, fixedly spud leg 4 and a plurality of rod member assembly welding are a rigid unitary; Butt joint guiding winch 5 is installed in from rising on the main platform, the guiding rope 6 of attaching troops to a unit is along track adjusting wheel 7, orienting sleeve 8, be fixed on the fixedly top cross-section center of spud leg 4 after passing lifting spud leg 2, by tightening up guiding rope 6, lifting spud leg 2 bottoms can be aimed at substantially with fixing spud leg 4 tops, and this moment, the tapered configuration of joint can make both accurate contrapositions; The pneumatics unit 9 of ballasting system is installed in from rising on the main platform, set each ballast tank linked to each other respectively on the ballast of attaching troops to a unit was controlled gas circuit 10 and sat end supporting construction, utilize air pressure control seawater through maritime mouthful 11 turnover ballast tank, each ballast tank can be controlled respectively, adjusts and sits the balance of end supporting construction when not sitting the end as yet.
Sit end supporting construction,, add the fixedly buoyancy of spud leg 4, adopt ripe designing technique can make it not only have afloat stability, also have the sink-float stability, guarantee steady, the safety of marine contraposition, split process because structural focus is low.
Be sitting in by 2 of lifting spud legs on the fixedly spud leg 4 of end supporting construction from rising main platform, rely on from rising main platform weight fully to keep its vertical stability, horizontal then spacing by the tapered configuration of joint.
The typical using method that end jack-up platform is sat in split is:
During the platform towage, rise main platform certainly, sit the end supporting construction (see figure 1) that separately floats on the surface, tug boat.
During the marine butt joint in place of platform, ballasting system is controlled each ballast tank water inlet, seat end supporting construction is sink to below lifting spud leg 2 lower ends, dock guiding device simultaneously and furl guiding rope 6, make lifting spud leg 2 and the fixing spud leg 4 centerings (see figure 2) of joining, fall then and put lifting spud leg 2, be seated the seabed until sitting end supporting construction, after this rise the ship program by common jack-up platform and carry out, be adjusted to operating condition; When there is slight slope in the seabed, regulate to keep from rising main flat-bed state by lifting spud leg 2.
Platform bores repaiies operation and the as broad as long (see figure 3) of other platform.
When the platform floating splits, earlier platform upper box 1 is reduced to the water surface, promote lifting spud leg 2 and loosen guiding rope 6 simultaneously, will rise main platform certainly with tugboat and shift out the upper area of sitting end supporting construction, utilize ballasting system to discharge the interior water of ballast tank, seat end supporting construction is floated.

Claims (2)

1, end jack-up platform is sat in split, comprises from rising main platform, sit end supporting construction, docking guiding device, ballasting system; Comprise platform upper box (1), lifting spud leg (2), solid stake and lifting machinery, bore and repair the operation facility from rising main platform, sit end supporting construction and comprise platform lower box (3), fixedly spud leg (4) and other rod member, the butt joint guiding device comprises winch (5) and the guiding rope of attaching troops to a unit (6), track adjusting wheel (7), orienting sleeve (8), and ballasting system comprises that the pneumatics unit (9) and the ballast of attaching troops to a unit control gas circuit (10), maritime mouth (11); It is characterized in that platform is divided into from rising main platform, sitting end supporting construction two big splits; Be no less than three lifting spud legs (2) from rising main platform installation, track adjusting wheel (7) is installed at each lifting spud leg (2) top, and the center, bottom section is provided with orienting sleeve (8); Sitting supporting construction bottom, the end is platform lower box (3), platform lower box (3) is divided into several ballast compartment, each ballast compartment is equipped with maritime mouthful (11), the fixedly spud leg (4) corresponding with lifting spud leg (2) position, that quantity is identical is equipped with in platform lower box 3 tops, each fixedly spud leg (4) also establish ballast tank respectively, platform lower box (3), fixedly spud leg (4) and a plurality of rod member assembly welding are a rigid unitary; The winch (5) of butt joint guiding device is installed in from rising on the main platform, and the guiding rope of attaching troops to a unit (6) is fixed on the fixedly top cross-section center of spud leg (4) after passing the track adjusting wheel (7) that is installed on the lifting spud leg (2), orienting sleeve (8); The pneumatics unit (9) of ballasting system is installed in from rising on the main platform, and set each ballast tank linked to each other respectively on the ballast of attaching troops to a unit was controlled gas circuit (10) and sat end supporting construction.
2, end jack-up platform is sat in split according to claim 1, it is characterized in that sitting end supporting construction, contain at least one at most with the fixing identical platform lower box (3) of spud leg (4) quantity.
CN 200520083518 2005-05-27 2005-05-27 Separating submersible self-lifting platform Expired - Lifetime CN2839108Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520083518 CN2839108Y (en) 2005-05-27 2005-05-27 Separating submersible self-lifting platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520083518 CN2839108Y (en) 2005-05-27 2005-05-27 Separating submersible self-lifting platform

Publications (1)

Publication Number Publication Date
CN2839108Y true CN2839108Y (en) 2006-11-22

Family

ID=37427093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520083518 Expired - Lifetime CN2839108Y (en) 2005-05-27 2005-05-27 Separating submersible self-lifting platform

Country Status (1)

Country Link
CN (1) CN2839108Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100567079C (en) * 2005-05-27 2009-12-09 中国石化集团胜利石油管理局钻井工艺研究院 End jack-up platform and using method thereof are sat in split
CN102080371A (en) * 2009-11-27 2011-06-01 三一电气有限责任公司 Support leg and mobile offshore work platform
WO2011153677A1 (en) * 2010-06-09 2011-12-15 中国海洋石油总公司 Integrally equipped heavy draught floating type oil production platform with unconditional stability and offshore installation method thereof
CN103244506A (en) * 2012-02-08 2013-08-14 中国石油化工股份有限公司 Ocean structure underwater vertical butt joint buffer and slow descending device
US9032896B2 (en) 2010-06-09 2015-05-19 China National Offshore Oil Corporation Grouting and welding combined connection joint applied to a deepwater floating type platform and an offshore installation method thereof
CN107804437A (en) * 2017-07-20 2018-03-16 上海振华重工(集团)股份有限公司 Sit bottom jack up wind-powered electricity generation pile driving barge

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100567079C (en) * 2005-05-27 2009-12-09 中国石化集团胜利石油管理局钻井工艺研究院 End jack-up platform and using method thereof are sat in split
CN102080371A (en) * 2009-11-27 2011-06-01 三一电气有限责任公司 Support leg and mobile offshore work platform
WO2011153677A1 (en) * 2010-06-09 2011-12-15 中国海洋石油总公司 Integrally equipped heavy draught floating type oil production platform with unconditional stability and offshore installation method thereof
US8733266B2 (en) 2010-06-09 2014-05-27 China National Offshore Oil Corporation Integrative deep draft floating production platform with unconditional stability and offshore installation method thereof
US9032896B2 (en) 2010-06-09 2015-05-19 China National Offshore Oil Corporation Grouting and welding combined connection joint applied to a deepwater floating type platform and an offshore installation method thereof
CN103244506A (en) * 2012-02-08 2013-08-14 中国石油化工股份有限公司 Ocean structure underwater vertical butt joint buffer and slow descending device
CN107804437A (en) * 2017-07-20 2018-03-16 上海振华重工(集团)股份有限公司 Sit bottom jack up wind-powered electricity generation pile driving barge

Similar Documents

Publication Publication Date Title
CN100567079C (en) End jack-up platform and using method thereof are sat in split
AU2012279291B2 (en) Offshore platform with outset columns
AU701557B2 (en) Offshore apparatus and method for oil operations
EP1808369B1 (en) Truss semi-submersible floating structure
CN2839108Y (en) Separating submersible self-lifting platform
NL1010884C2 (en) Work ship.
JP2004526609A (en) Temporary buoyancy stabilizing device and method
US8707882B2 (en) Offshore platform with outset columns
JP2004526609A5 (en)
AU2005226752B2 (en) Single column extendable draft offshore platform
AU2006338668B2 (en) Semi-submersible vessel, method for operating a semi-submersible vessel and method for manufacturing a semi-submersible vessel
US20110214596A1 (en) Vertically installed spar and construction methods
CN106364633A (en) Semi-submersible type ocean platform and implementation method of optimized heaving effect of semi-submersible type ocean platform
CN201258082Y (en) Split jack-up platform butted by external guide rope
CA2762157C (en) Spar hull load out method
TW202026202A (en) Method for constructing marine structure, and work ship
CN115704209A (en) Shallow water area offshore platform installation method
RU85439U1 (en) COMPLEX FOR TRANSPORTATION OF MARINE PLATFORM ON INLAND WATERWAYS
CN213328975U (en) Semi-submersible pile inserting type ocean hoisting construction platform
KR20230010318A (en) Spudcan assembly and vessel having the same
KR101687974B1 (en) Semi-submersible Production System Moored by a Single Tendon
Crowle et al. Port and installation constraints of Tension Leg Platforms (TLP) floating wind turbines
Sharma et al. Semisubmersible design faces challenges

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Effective date of abandoning: 20091209

AV01 Patent right actively abandoned

Effective date of abandoning: 20091209

C25 Abandonment of patent right or utility model to avoid double patenting